ML113500251
| ML113500251 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/03/2011 |
| From: | Armstrong L Operations Branch I |
| To: | Peter Presby Operations Branch I |
| JACKSON D RGN-I/DRS/OB/610-337-5306 | |
| Shared Package | |
| ML102850247 | List: |
| References | |
| U01834 | |
| Download: ML113500251 (332) | |
Text
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
~IPM Number: JPM-A1.1R Revision: -~-
0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
~~ ec mea eVlewer IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 10
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10
JPM Number: JPM-A1.1R Rev. ___0::....-.__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-A1.1R Rev. ____O~__
Task
Title:
System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes): 25 Task No.(s):
Applicable To: SRO RO X PEO KIA No. 2.2.13 KIA Rating _---...:4.;;;...1:..:..../4..:..;;*.;;;..3_ _
Method of Testing:
Simulated Performance: Actual Performance: X
----=-.;-
Location:
Classroom: X Simulator: - - - In-Plant:
Task Standards: At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB.
Required Materials
- 25203-26005 SH.3 (Condensate Storage and Aux Feed).
(procedures. equipment. etc.):
- 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3, A4>>
- OP 2322-001.
- OP-AA-200 (Equipment Clearance)
- Blank clearance section form.
I
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job erformance measure will be satisfied. You ma use an a roved reference materials Page 3 of 10
JPM Number: JPM-A1.1R Rev. ___0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued) normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Initiating Cues:
- Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-88. "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
Initial Conditions:
- Unit-2 is in Mode 5 for a refueling outage.
- The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
- There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
Simulator
- Not applicable.
Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 10
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
,,~II~Jj'~"AA,I. '
~H~"ttif.11';"I~1 _____
- 1. Obtain the required material for Examinee determines and requests the N determination of clearance boundary. required material for determination of clearance boundary.
- P&ID 25203-26005 SH.3 (Condensate Storage and Aux Feed).
- P&ID25203-30005 (Single Line Meter
& Relay Diagram 4.16KV Emerg.
Buses 24C, 24D)
- Aux Feed Valve line-upr OP 2322-001
- OP-AA-200. Eauioment Clearance Cue:
Page 5 of 10
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 2. (OP-AA-200 3.2.2g). Examinee establishes a clearance ESTABLISH the tagging sequence. WHEN boundary with the following components procedural guidance exists, THEN the and sequencing. (See attached Answer procedure takes precedence over the Key) normal sequence of isolation. The normal sequence of isolation is as follows:
POSITION control switch
- Examinee CAUTION tags "P9B-HS N (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down
- REMOVE power from component(s)
- Examinee removes power from "B" y MDAFP by "RACKING DOWN" 4160VAC breaker (A406).
Cue:
Comments:
Page 6 of 10
PERFORMANCE INFORMATION JPM Number: JPM-A1.1R STEP PERFORMANCE STANDARD
- 3.
- ISOLATE component/system from high ISOLATE component/system from high pressure side to low pressure side pressure side to low pressure side by Danger Tagging "CLOSED":
2-FW-9B (liB" AUX FEED DISCHARGE y STOP VALVE) 2-FW-S2C ("B" AUX FEED y*
RECIRCULATION STOP VALVE) 2-CN-29B ( "B" AUX FEED PUMP y*
SUCTION ISOLATION) 2-FIRE-94B (liB" AUX FEED PUMP y*
EMERGENCY FIRE WATER SUPPLY VALVE)
- The exact sequence of suction side/recirculation alignment is NOTcritical. However, the discharge stop must be closed first.
Page 7 of 10
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 4.
- OPEN drain valve(s) Examinee tags open one or both of the following drain valves and one or both of OPEN vent valve(s) the following vent valves:
2-CN-332 ( "8" AUX FEED PUMP y*
SUCTION HEADER DRAIN) 2-CN 331 ("8" AUX FEED PUMP y*
DISCHARGE HEADER DRAIN VALVE) 2-CN-330 (U8" AUX FEED PUMP CASING I Y*
VENT VALVE) 2-CN-329 ("8" AUX FEED PUMP CASING I y*
VENT VALVE)
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 8 of 10
JPM Number: JPM-A1.1R Rev. ___0=---__
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 25 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
DuringthQTPEt"tnetraineQ * ~. .L'",' . .**., .,. . ' > , *..... ". "*..*
. . *'. . . . . . >;!;i,~,EvaIUatlon;* . .......,.
performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
, never put anyone's safety at risk. Pass I Fail never ~ut equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 9 of 10
JPM Number: JPM-A1.1R Rev.
- - -o - -
STUDENT HANDOUT Initiating Cues:
- Determine the proper safety clearance boundary for an inspection and possible repairireplacement of 2-FW-88, "8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
Initial Conditions:
- Unit-2 is in Mode 5 for a refueling outage.
- The Work Control SRO has asked for your help determining a proper clearance boundary and tag type (color) for an emergent inspection of 2-FW-88 ("8" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve).
- There is evidence that this valve may be leaking by, and the Maintenance Department will be performing a seating surface and general condition inspection.
Page 10 of 10
Section Coversheet Millstone Station Tagout: 2C1.9 Section: 2322X00-002A 03/20/111935 Component to be Worked 2-FW-SB 2_TB _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions! Cautions:
Additional Information:
25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C/24D (A3,A4)
Section Attributes:
Work Order List:
Number! Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:
Status Description Name Verification Date Prepared Prepc3r~d By:
Approved Appr()vedBy:
Authorized Authorized By:
Work Released Work Released By:
To Clear Authorize Tags to clear:
System Restored Restoration Complete lPM-Al.1R
~Page1of3
ANSWER KEY Section Coversheet Millstone Station Tagout: 2C19 Section: 2322X00-002A 03/20/111935 Tag Tag Equipment PIa Placement Place. 1st Ver, PIa Restoration As Left Rest. 1st Rest. 2nd Serial Type Seq :Configuration Verif Req :Seq~~,!~!iJ~!a~i~!I____ _ Configuration Verif Verif
- Equipment Description ~-------------
No.
- Equipment Location
- Notes Time/Date
- Notes Time/DateTIme/Date Yellow P9B-HS III 1 iN/A 5N/A N/A
- HANDSWITCH FOR "B" ~- -BREA~E; RACKED AUXIUARY FEEDWATER PUMP "DOWN
... 2_CB _03606= CNTRl RM COS Red A 406 2 :RACKED DOWN 4 RACKED UP RACKED UP
... 2_TB
~~R_BUS24D Red 2-FW-9B 3 CLOSED 3 OPEN OPEN
- "B" AUX FEED PUMP DISCHARGE STOP VALVE AFWRM IV 4 :CLOSED 2 :OPEN OPEN
- "B" AUX FEED PUMP REORCULATION STOP VALVE
,,* 2_TB _OO106...ABOVE~B~AFP
'*r2*-CN~*****c"",c. "**~********y.*.**k",~".*,*Y**~"i' '!****.l\l 4 fCLOSED 2 OPEN OPEN i * "B" AUX .FEED PUMP SUCTION ISOLATION
~qRJ2~~~~RM
~ed 4 iCLOSED 2 :CLOSED CLOSED
- "B" AUX FEED PUMP EMERGENCY .
FIRE WATER VALVE Red 1 CLOSED CLOSED
- "B"AUX FEED ,PUMP CASING VENT VALVE ANSWER KEY Page 2 of3
ANSWER KEY 2-CN-329 IV 5 OPEN/UNCAPPED 1 CLOSED CLOSED tV 5 OPEN/UNCAPPED 1 .CLOSED CLOSED
- "B" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE *
'* 2_TB _00106_
Red 2-CN-332 IV ! 5 ~OPEN/UNCAPPED 1 CLOSED CLOSED
- "B"AUX FEED PUMP SUCTION HEADER DRAIN *
- Note: only one vent and one drain is required to be open to provide proper venting and draining.
ANSWER KEY Page30f3
JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..'PM
Title:
JPM Number: ,JPM-A2R Revision: _---..:O=--_
II. Initiated:
Marc R. Pucel 02/04/11 Developer Date III. Reviewed:
~ch1:;;2 IV. Approved:
Cognizant Plant Supervisor (optional) Date Page 1 of 11
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 11
JPM Number: JPM-A2R Rev. 0 JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
~-------------------
JPM Number: JPM-A2R Rev. ___O~__
Task
Title:
System: Equipment Control Time Critical Task: Yes No x Validated Time (minutes): 15 Task No.(s): _ _ _ _ _ _ _ _ _ _ __
Applicable To: SRO RO X PEO KIA No. 2.2.37 KIA Rating _--:;;.3,;;..;;.6:..:.../4,.;.:.*.:;;..6_ _
Method of Testing:
Simulated Performance: Actual Performance:
- -X- -
Location:
Classroom: X Simulator: In-Plant:
Task Standards: At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F.
Required Materials OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment. etc.): OU-M2-201 Attachment 3, " Millstone Unit 2 SFP Time to 150°F Calculation" General
References:
OU-M2-201 "Shutdown Safety Assessment Checklist"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 11
JPM Number: JPM-A2R Rev. ___0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit Initial Conditions:
- Unit-2 is in day 12 of a refueling outage.
- Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
- Unit-2 has just experienced a Station Blackout
- Present Spent Fuel Pool temperature as read on TR-7030 is 93F.
Simulator
- N/A Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, A!:L. critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 11
PERFORMANCE INFORMATION JPM Number:
CRIT.ICAL I GRADE I STEP I PERFORMANCE STANDARD I (YIN) (§/U)
- S**"AQ,~;i:I* .M*e",
';;'l~i_;:~!;':'.": ~t£&i!;;/i;N;.,.,Y"}* _ _ __
Page 5 of 11
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 1. NOTE: The SSA Checklist or Heatup I Examinee reads and acknowledges notes N Calculations may be completed by any licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status.
NOTE: Systems planned to be removed from service in the next 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> may be assumed to be out of service, and, therefore, not credited.
NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist. NOTE: SSA Checklists are completed as follows:- Daily* Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service
- Equipment available to support the KSFs unexpectedly becomes unavailable
- Prior to performing plant MODE changes when shutdown
- A system/component is restored to available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be Cue:
Comments:
Page 6 of 11
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD-
_(V/N) _(§Ll!l__
- 2. I 3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination Examinee determines that this step is not N is desired, THEN PERFORM the applicable.
following:
- a. REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions.
- b. RECORD results on Attachment 2.
3.2.2 IF a time to reach 150°F SFP design Examinee refers to Attachment 3, N temperature determination is desired Millstone Unit 2 SFP Time to 150°F THEN PERFORM the following: Calculation.
- a. REFER to Attachment 3, Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW instructions.
- b. RECORD results on Attachment 3.
- 3. NOTE: SFP temperature should be I Examinee reads and acknowledges note. N obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable). If SFP temperature is expected to increase, a SFP temperature of up to 5°F greater than the current SFP temperature can be used to bound
. expected conditions.
1-------
Cue:
Comments:
Page 7 of 11
PERFORMANCE INFORMATION JPM Number: JPM-A2R STEP PERFORMANCE STANDARD
- 4. Instructions: Examinee records 12 days after shutdown y
- 1. Record time after reactor shutdown (in on Attachment 3 days), and current SFP temperature (OF). y Examinee records current Spent Fuel pool temperature of 93F to 98F on Attachment 3
Cue:
Comments:
- 5. Examinee refers to Table 1 to obtain SFP N Heatup Rate Cue:
Comments:
- 6. Table 1 SFP Heatup Rates Examinee reads and acknowledges note N NOTE: When using this table, the more conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup rate).
Cue:
Comments:
Page 8 of 11
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD (nn) c-- _)
- 7. Record SFP Heatup Rate Examinee records a SFP Heatup Rate of y 17.7 F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days on Attachment 3.
Cue:
Comments:
- 8. 3. Calculate and record SFP Time to 150°F Examinee performs the following Calculation: calculation to determine SFP temperature
=
SFP Time to 150°F {(150°F - SFP to 150F:
Temperature (OF>> / SFP Heatup Rate (OF/hour) J =
SFP Time to 150°F {(150°F - SFP Temperature rF)) / SFP Heatup Rate (OF/hour) ]
y Cue:
Comments:
9.
Cue:
TERMINATION CUE: The evaluation for this JPM is concluded.
JsreitlME:
Page 9 of 11
JPM Number: Rev. ___0,--__
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
! During the TPE. the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for ImprovemenUComments:
Page 10 of 11
JPM Number: JPM-A2R Rev. _ _-,0,-__
STUDENT HANDOUT Initial Conditions:
- The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.
Initiating Cues:
- Unit-2 is in day 12 of a refueling outage.
- Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
- Unit-2 has just experienced a Station Blackout.
- Present Spent Fuel Pool temperature as read on TR-7030 is 93F.
Page 11 of 11
Calculation:
SFP Time to 150°F= {(150"F-SFP Temperature(OF)/ SFP Heatup Rate (OF/Hour)}
Time From SFP SFP Heatup Shutdown Temperature Rate SFP Time to . . .
Date/Time (Days) (OF) (OF/hour) 150 OF Today/now 12 93 17.7 Today/now 12 98 17.7 JPIVl"A~Answer Key
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-A3R Revision: 0 II. Initiated:
Marc R. Pucei 02/01/11 Developer Date III. Reviewed:
IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor bate Page 1 of 8
SUMMARY
OF CHANGES:
I All & DATE DESCRIPTION REV/CHANGE I 2006-317 Update JPM to include HUP evaluations and new format I
I I
Page 2 of 8
JPM Number: JPM-A3R Rev.
--- o --
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-A3R Rev. ___.....;0"---__
Task
Title:
System: Radiation Protection Time Critical Task: Yes No x Validated Time (minutes):
Task No.(s):
Applicable To: SRO - - - - RO X PEO - - - -
KIA No. 2.3.7 KIA Rating ___ 3_.5_/3_.6___
Method of Testing:
Simulated Performance:
Actual Performance:
- -X- -
Location:
Classroom: X Simulator: ----- In-Plant:
Task Standards: At the completion of this JPM, the examinee has determined all of the radiological requirements for entering the CLRW filter skid area to assist The Radwaste Coordinator Required Materials Health Physics Survey Map (procedures. equipment. etc.): Operations blanket RWP General
References:
- '* *
- READ TO THE EXAMINEE '* '* '*
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
.JPM Number: JPM-A3R Rev. ___0,--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues: State the radiological requirements for entering this area. Include in your discussion:
- Which RWP task Gob step) is appropriate for this assignment
- Highest loose contamination level in the work area
- Protective clothing required in the work area
- Highest general area radiation level in the work area
- Dose rate alarm setting
- Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.
Initial Conditions:
- You are the BOP operator.
- Unit-2 is at 80%
- You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
- The operator has 450 mrem of annual dose exposure remaining Simulator N/A Requirements:
'* '* '* NOTES TO EVALUATOR '* '* '* '*
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. Ifnecessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD siTAR~nuE~
",nh ,~"-:;,, ,J;;7""'-'~___C_'_> _ _ __
- 1. Which RWP task Gob step) is appropriate Examinee states that the appropriate RWP for this assignment task ( job step) for this assignment is y Job Steo1 Cue:
Comments:
- 2. I Highest loose contamination level in the Examinee states that the highest loose work area contamination level in the work area is y 22000 DPM/100cm2 Cue:
Comments:
- 3. I Protective clothing required in the work Examinee states that the protective area clothing required in the work area is "Full y PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Cue:
Comments:
4.
Cue:
Comments:
5.
Cue:
Comments:
Page 5 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 6. Maximum time that the operator can remain Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without limit exceedina anv dose limit is 4.5 hrs Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
)iST~,P~11N1E:
Page 6 of 8
JPM Number: JPM-A3R Rev.
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work gractices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 7 of 8
JPM Number: ..IPM-A3R Rev. ___0,,--__
STUDENT HANDOUT Initial Conditions: State the radiological requirements for entering this area. Include in your discussion:
- Which RWP task Gob step) is appropriate for this assignment
- Highest loose contamination level in the work area
- Protective clothing required in the work area
- Highest general area radiation level in the work area
- Dose rate alarm setting
- Maximum time that the operator can remain at the filter skid without exceeding any dose limit The examiner will act as Health Physics (HP) for any related questions.
Initiating Cues:
- You are the BOP operator.
- Unit-2 is at 80%
- You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid
- The operator is has 450 mrem of annual dose exposure remaining Page 8 of 8
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-A4R Revision: -~-
0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor
~Ilate Page 1 of 11
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 12
JPM Number: JPM-A4R Rev. ___0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-A4R Rev. _ _--'0'--__
System: Reactivity Control Time Critical Task: Yes No X Validated Time (minutes): 25 Task No.(s):
Applicable To: SRO RO - - X PEO KIA No. 055-EK 3.02 KIA Rating 4.3/4.6 Method of Testing:
Simulated Performance:
Actual Performance:
- -X- -
Location:
Classroom: X Simulator: In-Plant:
Task Standards: At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO event.
Required Materials EOP 2530" Station Blackout" (procedures. equipment. etc.): EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 20)
General
References:
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 12
JPM Number: JPM-A4R Rev. ___0,---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied.
- Additionally, if it is determined that SDM is not being satisfied, calculate the amount of boric acid that must be added to the RCS.
- Document data used and values calculated.
Inilial Conditions:
- Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
- Unit-2 had been operating at 100% power for one month prior to the trip.
- The crew is performing EOP 2530.
- Power is just being restored to Unit-2 from the SBO Diesel.
- Tavg is being maintained at 530F.
- Present Core Burnup is 5000 MWD/MTU.
Simulator
- N/A Reg uirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 12
PERFORMANCE INFORMATION JPM Number: JPM-A4R
'~tm\i~~§tlttQiWl'ijfl~~
STEP PERFORMANCE I STANDARD l CRITICALl (YIN)
GRADEl (S/U) I i:$l'liR,Tl'fttlF\ic_ _ __
- 1. EOP 2530 Step 30. CHECK Shutdown Examinee reads EOP 2530 Step 30 and N Margin is satisfied. Refer To Appendix 17, determines that he/she needs to refer to "Shutdown Margin." Appendix 17 to determine Shutdown Comm
- 1. IF desired to calculate required shutdown 17 to calculate required shutdown boron boron concentration, PERFORM concentration.
Attachment 17-A, Shutdown Boron Concentration."
Comments:
- 3. Attachment 17A Required Shutdown Boron Examinee reads and acknowledges note Concentration about initial and subsequent calculations N NOTE ofSOM.
The initial calculation is used to determine that SOM is met at the current conditions.
The subsequent calculation determines if SOM will be met for anticipated
, temperatures when coolina down the RCS.
Comments:
4.
Comments:
Page 5 of 12
PERFORMANCE INFORMATION JPM Number: JPM-A4R lIeletlmii":'+.(tutd_iIilttlll*.**!fO\\I1~J~-i)53.iiIIJ'~B';*';"Blcickaut~;5~
.... ".. '.' .**.*. .*It_.. L.lI,......___ *.d""*. ii .** .... lm-k.*... _____ . . .;. &~_."'i'___."J!t!LJi'1x..........__ . . .<_. .
STEP PERFORMANCE STANDARD (Y
- 5. I 2. RECORD the current RCS TAVE. I Examinee records current RCS TAVE as Y 530F from Initial Conditions.
Cue:
Comments:
- 6. 13. RECORD core burnup from ONE of the following: Examinee records core burnup as Y
_ "CVBURNUP" (PPC) 5000 MWD/MTU as given in Initial
_ Control Room Daily Surveillance Conditions.
_ Reactor Engineering MWD/MTU I 'u" ." " ..... _. u._....-." . ..,"".MhW....*. _ .**,,~. __ .~. ,
Cue:
Comments:
- 7. 14. Refer To the applicable curve in Reactor Engineering Curve and Data Book and Examinee uses "1.0% Shutdown Boron N DETERMINE the required shutdown boron Concentration vs. Moderator Temperature" concentration for the core burnup and the (RE-B-02) and determines the required current T AVE as follows: shutdown boron concentration for the core burnup and the current TAVE as -790.71
Shutdown Boron Concentration vs.
Moderator Temperature" (RE-B-02)
Examinee states that there is no indication
_IF more than one CEA is not fully that more than one CEA is not fully inserted, INCREASE the required inserted and that this step is not shutdown boron concentration 350 ppm per applicable.
l ~."",,;u
- greater than one,
- , ."e" """,""v;-;-.">:.," """""""k4",:."",,,,,,,,.+: .- '",,-,,"
not fully inserted .
"'~'Y""?/k;;;;;;L'b_AA ;; .d""*,,,. -.' """'" 2!L"""",&,/..:.'"
Cue:
Comments:
Page 6 of 12
PERFORMANCE INFORMATION JPM Number: JPM-A4R STEP PERFORMANCE STANDARD
- 8. I b.IF directed to this Appendix by any other Examinee states that this step is not N EOP use "3.6% Shutdown Boron applicable.
Concentration vs. Moderator Temperature" (RE-B-01 )
_IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
td.....,." ... ~ **. ,.* '"
Cue:
Comments:
- 9. 5. RECORD the required shutdown boron Examinee records the required shutdown y concentration and the TAVE for which it boron concentration and the TAVE for was calculated. which it was calculated.
ppm -790.71 ppm of L., >J ' _,
Cue:
Comments:
- 10. I 6. DETERMINE Inverse Boron Worth at Examinee determines Inverse Boron Y present core burnup. Refer To Reactor Worth at present core burnup (5000 Engineering Curve and Data Book. (RE-F- MWD/MTU ) as -116.8 IBW 02)
MWD/MTU (step 3.)
IBW
,(, ,'P"~ ,,;;
Cue:
Comments:
Page 7 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 11. 7. DETERMINE smallest xenon reactivity Examinee determines smallest xenon N worth expected within the time frame being reactivity worth expected within the time evaluated. Refer To ANY of the following: frame being evaluated by use of "Reactor
_ "Xenon-Samarium Post Trip Engineering Curve and Data Book (RE-C Report" 01)" as 2.669 XRW (range 2.65 to 2.67).
_ Reactor Engineering Curve and Data Book (RE-C-01 )
_ "XENON-SAMARIUM DEMAND" program on PPC Reactor ~n ...inoo..in...
Cue:
Comments:
12.
Cue:
Comments: -
- 13. 9.CALCULATE Boron Equivalent of Xenon Examinee calculates Boron Equivalent of y Reactivity Worth (BE of XRW) as follows: Xenon Reactivity Worth (BE of XRW) as follows:
(2.65-2.67) (309-311.9) 2.669 116.8 311.7 Xenon X Inverse ::; Boron Equivalent Xenon X Inverse ::; Boron Equivalent Reactivity Worth Boron Worth of Xenon Reactivity Worth Boron Worth of Xenon Reactivity Worth Reactivity Worth (Range of 3.09-311.9)
Cue:
Comments:
Page 8 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 14. 10. CALCULATE Xenon Corrected Examinee calculates Xenon Corrected Required Shutdown Boron Required Shutdown Boron (309-311.9)
Required Shutdown Boron Equivalent = -790.71 311.7 y Boron Concentration of Xenon Reactivity Required Shutdown Boron Equivalent Worth Boron Concentration ofXenon Reactivity Worth Xenon Corrected Required Shutdown Boron Concentration 479.0 (478-481)
Xenon Corrected Required Shutdown Boron Concentration C
Comments:
I 15. 111. Record ANY of th-e following: Examinee records RCS boron sample y RCS boron concentration at the time of the results obtained from Chemistry 770 ppm reactor trip ppm at time of Rx trip from Chemistry sample ( Initial Conditions)
RCS boron sample results obtained from from Chern Cue:
Comments:
- 16. 12. CHECK RCS boron concentration Examinee determines that RCS boron y greater than Xenon Corrected Required concentration is greater than Xenon Shutdown Boron concentration. Corrected Required Shutdown Boron concentration. ,
,',",,,,j"';; ,."Zi, Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 9 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD Page 10 of 12
JPM Number: JPM-A4R Rev. _ _-'0'--__
VERIFICATION OF JPM COMPLETION Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 25 Actual Time to Complete (minutes):
..'PM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 11 of 12
JPM Number: JPM-A4R Rev. - - - 0 --
STUDENT HANDOUT Initial Conditions:
- The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SOM is being satisfied.
- Additionally, if it is determined that SOM is not being satisfied, calculate the amount of boric acid that must be added to the RCS Initiating Cues:
- Unit-2 has experienced a plant trip with a concurrent Station Blackout one half hour ago.
- Unit-2 had been operating at 100% power for one month prior to the trip.
- The crew is performing EOP 2530.
- Power is just being restored to Unit-2 from the SBO Diesel.
- Tavg is being maintained at 530F.
- Present Core Burnup is 5000 MWO/MTU.
Page 12 of 12
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-A1.1S Revision: 0 II. Initiated:
R. J. Ashey 11/30/2011 Developer Date III. Reviewed: ~
~*IR* ec mca eVI er IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 8
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 11/30/2011 Created JPM for LOIT 2011 NRC Exam 010 Page 2 of 8
Facility: MP-2 Examinee:
. .IPM Number: JPM-A1.1S Rev. o Task
Title:
System: Conduct of Operations Time Critical Task: Yes No N Validated Time (minutes): 15 Task No.(s): N/A Applicable To: SRO X RO - - PEO KJA No. 2.1.7 KJA Rating _ _4_.4_/4_._7__
Method of Testing:
Simulated Performance: X Actual Performance:
Location:
Classroom: X Simulator: In-Plant: - - -
Task Standards: At the completion of this JPM, the SRO will determine the appropriate Action Level for an RCS leak and determine the appropriate actions that must be taken.
Reguired Materials C OP 200.15, RCS Leakage Trending and Investigation (procedures, equipment. etc.>: OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2 General
References:
C OP 200.15, RCS Leakage Trending and Investigation OPS Form 2619A-001, Control Room Daily Surveillance, MODES 1 & 2
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Initiating Cues:
- Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs.
Initial Conditions:
- You are the Night Crew Shift Manager.
- The plant is in MODE 1 and stable at 100% power.
- The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
- The latest ReS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
- There is NO indication of PRESSURE BOUNDARY LEAKAGE.
- The present RCS leak rate calculation has been confirmed.
- All input parameters have been evaluated and are valid.
Simulator N/A Reguirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in~plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
!,i l'_;?'l_______
c
- 1. Examinee reviews the attached graphs and y obtains C OP 200.15, RCS Leakage Trending and Investiaatior Cue:
Comments:
- 2. Section 4.1 Examinee determines from Initial Conditions N Step 4.1.1 If leakage is PRESSURE that NO PRESSURE BOUNDARY LEAKAGE BOUNDARY LEAKAGE, exists and this step is NOT applicable.
perform the following:
- a. Refer to Technical specification 3.4.6.2 for ACTIONS.
Comme Page 5 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 3. Step 4.1.2
- Examinee determines that NO seven (7) N If any of the following Action Level 1 day rolling average of daily RCS limits are exceeded, Go To Section 4.2 UNIDENTIFIED LEAKAGE rates is
- One seven (7) day rolling average of greater than 1.0; therefore, this does NOT daily RCS UNIDENTIFIED require entry into Action Level 1.
LEAKAGE rates greater than 1.0
- Examinee determines that, the last nine y gpm, consecutive RCS UNIDENTIFIED
- Nine (9) consecutive daily RCS LEAKAGE rates are greater than the IDENTIFIED LEAKAGE rates greater baseline mean.
than the baseline mean. o Examinee determines that Action y Level 1 is applicable.
- Examinee oroceeds to Section 4.2.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 6 of 8
JPM Number: JPM-A1.1S Rev.
--- a --
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
Overall Result of JPM: SAT UNSAT (circle one)
Page 7 of 8
JPM I\lumber: JPM-A1.1S Rev. ___0,,--__
STUDENT HANDOUT Initiating Cues:
- Review the Unit 2 RCS Unidentified Leakage and Unit 2 RCS Identified Leakage graphs.
Initial Conditions:
- You are the Night Crew Shift Manager.
- The plant is in MODE 1 and stable at 100% power.
- The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
- The latest RCS Leak Rate has been determined has been entered into the Operation Trending database. (See attached graphs)
- There is NO indication of PRESSURE BOUNDARY LEAKAGE.
- The present RCS leak rate calculation has been confirmed.
- All input parameters have been evaluated and are valid.
Page 8 of 8
Training Use Only Unit 2 ReS Unidentified Leakage 0.12 0.10 0.08 0.06 0.04 Il. 0.02
(!)
0.00 !
-o~t\t\. " \1-\.
~\.\.
,,\1-'0
~\.\. 1-\t>.\\.\. ~\\.');
~\.\. 'b\\.\.
<,\\.\.
I'}; '?\
t>.\\.\. \.\.\\.\.
-0.04
-0.06
-0.08
-0.10
-+- Unidentified Leakage Rate -II-- Unidentified Leakage 90 Day Average
- . - Unidentified Leakage Alert Level 2 (90 Day Average + 2 StDev) ~ Unidentified Leakage Alert Level 3 (90 Day Average + 3StDev)
~Unidentified Leakage 7 Day Average
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-A1.2S Revision: 0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional) Date
\..../Nuclear Training Supervisor Page 1 of 8
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006*317 Update JPM to include HUP evaluations and new format Page 2 of 8
JPM Number: JPM-A1.2S Rev. ___0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-A1.2S Rev.
--- o --
Task
Title:
System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s):
Applicable To: SRO X RO PEO - - -
KIA No. 2.2.14 KIA Rating _ _ 3._9/_4_.3_ _
Method of Testing:
Simulated Performance: Actual Performance: - -X- -
Location:
Classroom: - - X - Simulator: - - - In-Plant: - - - - -
Task Standards: At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why.
Reguired Materials
- The following P&ID's available: (25203-26005 SH.3/
(procedures. equipment. etc.): Condensate Storage and Aux Feed). 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4),
and 25203-29008 SH 26 ( Seal & Manifold Piping)
- OP 2322-001 General
References:
- OP-M-200 (Equipment Clearance)
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
JPM Number: ~IPM-A1.2S Rev. _ _--"-0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- Your task is to review, approve. and authorize the attached Tag Clearance Sheet.
Initial Conditions:
- Unit-2 is in Mode 5
- There is evidence of leak-by of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
- Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
Simulator
- N/A Requirements:
- *
- NO"rES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y" . For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number: Rev..
',J.iH,. ".'.';:!'" '.:B.*. 'i,:. ,,' i i. ' d*.*.
~.eaf:~J1lceoun. a I
I STEP 1 PERFORMANCE STANDARD CRITICAL (YIN)
GRADE (S/U)
S'fART~filE:
- 1. OP-AA-200 "Equipment Clearance" Examinee reviews the completed Tagging Record for accuracy and completeness, 3.2.3c. REVIEW the completed Tagging using controlled drawings:
Record for accuracy and completeness, (25203-26005 SH.31 Condensate Storage referencing controlled documents as N and Aux Feed) For fluid systems.
necessary. The reviewing SRO or designee (25203-30005 Single Line Meter & Relay shall:
Diagram 4.16KV Emerg. 8uses 24C,24D
- ENSURE that the tag-out is adequate for (A3,A4)) for electrical isolation.
the tasks and hazards involved. y Examinee identifies that the incorrect 4160 VAC breaker ( A307) is Danger
- ENSURE that the proper sequence of Tagged and that the correct breaker component alignment and tag placement is (A406) is required to be Danger Tagged specified.
"Racked Down"
- ENSURE that the appropriate entries Examinee identifies that 2-FIRE-948. "8" y have been made in the comment section of AUX FEED PUMP EMERGENCY FIRE the Tagging Record. WATER SUPPLY VALVE" has been incorrectly omitted from the tagging sheet.
- DETERMINE if support is required from This alternate suction for the "8" Auxiliary Maintenance Personnel to execute the tag Feed Pump is required to be Danger out. Tagged "Closed" Examinee determines that this tag y clearance cannot be approved or authorized as written.
Examinee may desire to tag open only one casing vent valve (2-CN-329 or 2-CN-330). Additionally, examinee may desire to tag open only one header drain valve (2-CN-331 or 2-CN-332). At least one casing vent valve and one header drain valve must be tagged open. Examinee may desire to tag open the motor heater breaker for "8" MDAFW pump. This is not required.
Page 5 of 8
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (§ll,JJ_
TERMINATION CUE: The evaluation for this JPM is concluded.
- iSTOP'tfME".'"
,'" " '" 0'/ _ _ __
Page 6 of 8
JPM Number: JPM-A1.2S Rev. ___0.0...-__
VERIFICATION OF JPM COMPLETION
Title:
ApprQveancFAUthorize a Clearance Boundary Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes -
No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass / Fail Areas for Improvement/Comments:
Page 7 of 8
JPM Number: JPM-A1 Rev. ___0,--__
STUDENT HANDOUT Initiating Cues:
- Your task is to review, approve, and authorize the attached Tag Clearance Sheet.
Initial Conditions:
- Unit-2 is in Mode 5
- There is evidence of leakby of 2-FW-8S, the "S" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
- Mechanical Maintenance wilt be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
Page 8 of 8
Section *Coversheet Millstone Station Tagout: 2C19 Section: 2322X00-002A 03/20/111935 Component to be Worked 2-FW-8B 2_TB _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-8B CHECK VALVE INSPECTION Instructions/Cautions:
Additional Information:
25203-26005 SH.3/ Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Re!ay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
Section Attributes:
Work Order List:
Number / Equipment ID Description 2-FW-8B Perform Check Valve Inspection Section Verification:
Status Description Name Verification Date Prepared Prepared By: "Qualified Operator" "This Morning" Approved Approved By:
Authorized Authorizedf?y:
Work Released Work Released By:
To Clear Authori:ze Tags to clear:
System Restored Restoration Complete AN!
Page1of3
ANSWER KEY Section Coversheet Millstone Station ragout: 2C19 Section: 2322X00-OO2A 03/20/111935 Tag Tag ;Equipment Ver Pia Placement Place. 1st Ver: Pia Restoration As left Rest. 1st Rest. 2nd Serial Type * --- --- - -- ---------------- Req Seq Configuration Verif Req ;Seq~l!~iI~~tion Configuration Verif Verif No. '", Equipment Description
- Notes Time/Date
- Notes Time/DateTime/Date
- Equipment Location Yellow P9B-HS IV 1 N/A 4 N/A
- HANDSWITCH fOR "BII
- BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN
'" 2_CB _03606_ CNTRL RM COS Red A 406 2 RACKED DOWN 3 RACKED UP RACKED UP
TI------------...,
'" 238 _OS606_UPR_ for "B" AFW Pump SWG~BUS24D
~," l<',." '""-".' .,'
Red 2-FW-98 'IV 3 CLOSED 'OPEN OPEN
- "8" AUX FEED PUMP DISCHARGE STOP VALVE
- ,.//:c~<<.<.,.,.,..""A.,.... "'."A"""'.',,'., ,,,",,".w., ,,, '"'"'.
Red . IV 3 CLOSED , 2 OPEN OPEN
- "BII AUX FEED PUMP RECIRCULATION STOP VALVE 00106_ABOVE "8"AFP ,
-,~"",:,¥,,,:,,,, ""';"R~-'~"":"' ~~~,~"""~""'~,.'w+,~~, "~~ ~." ,~"V "
Red 2-CN-29B IV 3 CLOSED 2 OPEN OPEN
- "B" AUX FEED PUMP SUCTION ISOLATION
- 2_TB _00106_AFW RM Red 2-FIRE-94B ;N 3 CLOSED This is an alternate 2 CLOSED nOSED
'" "B" AUX FEED PUMP EMERGENCY 'OIl suction that must be FIRE WATER SUPPLY VALVE : tagged
- '" 2_TB Red 2-CN-330 [OPEN/UNCAPPED 1 CLOSED CLOSED
- "B" AUX FEED PUMP CASING VENT VALVE
'" 2_TB 00106_
ANSWER KEY Page2of3
ANSWER KEY Red 2-CN-329 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED
- "BTl AUX FEED PUMP CASING VENT VALVE
- 2_TB _00106_
Red 2-CN-331 IV 4 OPENjUNCAPPED CLOSED
- "BTl AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
- 23B Red 2-CN-332 IV 4 OPEN/UNCAPPED 1 CLOSED CLOSED
- "B" AUX FEED PUMP SUCTION HEADER DRAIN
- 2_TB _00106_
ANSWER KEY Page30f3
JOB PERFORMANCE MEASURE APPROVAL SHEET L JPM
Title:
JPM Number: "IPM-A2S Revision: --"-
0 II. Initiated:
Robert L. Cimmino, Jr. 02/03/11 Developer Date III. Reviewed:
Date IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 7
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 02/03/11 Created .JPM for LOIT 2011 NRC Exam 010 Page 2 of 7
JPM Number: JPM-A2S Rev. 010 JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
- CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
- I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
- I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
- Testing and replacement will take approximately six hours.
- Perform the Administrative duties of the US for this malfunction.
Initial Conditions:
- You are the on-shift US.
- The plant is at 100% power, having just completed Control Valve Testing.
- Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.
Simulator N/A Reg uirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" ot "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 7
JPM Number: JPM-A2S Rev. _ _.::.;.01-.:;.0_ _
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP-2 Examinee:
. .IPM Number: JPM-A2S Rev. ° Task
Title:
System: Administrative Time Critical Task: Yes
-- No x Validated Time (minutes): _-,-1.;;;..5_ __
Task No.(s): _ _ _ _ _ _ _ _ __
Applicable To: SRO X RO _ __ PEO _ __
KIA No. 2.2.40 KIA Rating _--=..:3.:....:.;4/.....:.4.:...;...7_ _
Method of Testing:
Simulated Performance: - -X- - Actual Performance:
- -X- -
Location:
Classroom: X Simulator: - - - In-Plant:
Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillance.
Reguired Materials
- Plant Technical Specifications Manual (procedures, equipment etc.):
- SP-2619A-001; Control Room Daily Surveillance, Mode 1 & 2 General
References:
- Plant Technical Specifications Manual
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 7
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
~~~iS'i"[
~~~~~tm,,_ _ _
- 1. Given a copy of the plant Technical Examinee reviews the following:
Specifications Manual and, if requested,
- Review the Initial Conditions and If requested:
Initiating Cue.
- Review Tech. Specs. and, as needed, Malfunctions and/or SP-2619A-001, AOP-2556 for any required entries and Control Room Daily Surveillance.
additional surveillance reauirements.
Cue:
Comments:
- 2. Explain the necessary Tech. Spec. entry
- During the review of the plant requirements and the Tech. Spec. Technical Specifications Manual, the y surveillance that must be performed. examinee should state the need to enter into Tech. Spec. 3.1.3.1B (B. 1 or B.2), 3.1.3.1C and perform required actions.
- The examinee should also state the y need to record CEA Position Indication at least once every four (4) hours.
Cue:
Comments: I The examinee may note that Tech. Spec. 3.1.3.6.D applies. This input is not a Critical item because the requirements of this TS is less restrictive than the Critical required TS. However, the examinee should NOT log into Tech. Spec. 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.
TERMINATION CUE: The evaluation for this JPM is concluded.
il':ift~'~l~'"
'j19JE~_A~' - - - - -
Page 5 of 7
JPM Number: JPM-A2S Rev. - - - 0 --
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
Overall Result of JPM: SAT UNSAT (circle one)
Page 6 of 7
..IPM Number: JPM-A2S Rev . - - - o --
STUDENT HANDOUT Initiating Cues:
- As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
- CEA Pulse Counting, the Backup Scanner and the Core Mimic all tracked motion as designed.
- I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input from CEA #1 is not capable of tracking any CEA motion at this time.
- I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C05, needs to replaced with a spare from the warehouse.
- Testing and replacement will take approximately six hours.
- Perform the Administrative duties of the US for this malfunction.
Initial Conditions:
- You are the on-shift US.
- The plant is at 100% power, having just completed Control Valve Testing.
- Group 7 CEAs were inserted 10 steps for power control, but have all just been fully withdrawn, as indicated by the Core Mimic.
Page 7 of 7
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-A3S Revision: 0 II. Initiated:
~~Robert L. Cimmino, Jr.
Developer 02/03/11 Date III. Reviewed:
Technical eviewer IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 8
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam 010 Page 2 of 8
JPM Number: JPM-A3S Rev.
- - -010- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP-2 Examinee:
JPM Number: JPM-A3S Rev. o Task
Title:
System: Administrative Time Critical Task: Yes No x Validated Time (minutes): _--.:..'-=5____
Task No.(s):
Applicable To: SRO X RO _ __ PEO _ __
KIA No. 2.3.12 KIA Rating __~3...;.;;.2;;:.../3';;";'.;....7 _ _
Method of Testing:
Simulated Performance: X Actual Performance:
.:..~-
- -X- -
Location:
Classroom: X Simulator: In-Plant:
Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each.
Required Materials If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities.
(procedures, equipment. etc.):
General
References:
- RPM 5.2.2; Basic Radiation Worker Responsibilities
- Radiation Worker CBT
- * *
- READ TO THE EXAMINEE'" '" '" '"
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
JPM Number: JPM-A3S Rev. _ _..:...01..:...0_ _
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.
Initial Conditions:
- You are the Work Control SRO.
- The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger.
- The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
- The following additional conditions exist:
- The area around the Heat Exchanger has been posted as a "Locked High Radiation Area".
- The area is at the minimum radiation level to meet the required posting.
- All valves on the valve lineup are in the posted area.
- There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
- PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
- PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
- It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
- It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification. It will take PEO #2 approximately 25 minutes of stay time to perform the same task.
Simulator_ N/A Reg uirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number: JPM-A3S Rev. 0 STEP PERFORMANCE STANDARD I~Y~iiil~~~
~ .... .
- ,I~ ~j§l....-'_ __
- 1.
- Review the Initial Conditions and
- PEa #1 only has 400 mR of exposure N Initiating Cue. left and PEa #2 has 850 mR of
- Using known exposure rate in the area, exposure left.
calculate the maximum available stay
- The minimum radiation level for a N time for each PEa. Locked High Radiation area is 1000
- Based on available stay time, decide mRlhr.
which PEa must perform each task.
- Therefore, based on the available exposure for each PEa and the N expected radiation levels at the job site, the maximum stay time for PEa
- 1 is approximately 24 minutes.
(400 mR /1000 mRlhr.
- 60 min/hr. =
24 minutes)
And 51 minutes for PEa #2 (850 mR 11000 mRlhr
- 60 min/hr. =
51 Cue:
Comments:
Page 5 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 2.
- PEO #1 does not have enough Based on the calculated stay times for y exposure left to clear the tags and each PEO and the individual task time perform the initial valve lineup. requirements, PEO #2 is assigned to clear the tags and perform the initial valve
- PEO #2 has enough exposure to clear lineup, while PEO #1 is assigned to the tags and perform the initial valve perform the valve lineup Independent lineup. Then, PEO #1 will have enough Verification.
exposure left to perform the valve lineup Independent Verification.
The examinee may also state the following, but it is not required:
- PEO #2 does not have enough exposure left to perform both tasks, clearing the tagout and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Reauirements ..
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
_(tIlllJ!~)I,--! ___
Page 6 of 8
JPM Number: JPM-A3S Rev. 0 VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
Overall Result of ..IPM: SAT UNSAT (circle one)
Areas for Improvement/Comments:
Page 7 of 8
JPM Number: JPM-A3S Rev. ___0_ __
STUDENT HANDOUT Initiating Cues:
- Determine which PEO (#1 or #2) you are going to direct to perform the task of clearing the tag-out and perform the initial valve lineup and which PEO you are going to assign to perform the required valve lineup Independent Verification.
Initial Conditions:
- You are the Work Control SRO.
- The plant has been shut down to repair a leak in the eves Regenerative Heat Exchanger.
- The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
- The following additional conditions exist:
- The area around the Heat Exchanger has been posted as a "locked High Radiation Area".
- The area is at the minimum radiation level to meet the required posting.
- All valves on the valve lineup are in the posted area.
- There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
- PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
- PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
- It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
- It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.
It will take PEO #2 approximately 25 minutes of stay time to perform the same task.
Page 8 of 8
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
. .IPM Number: JPM-A4S Revision: - - 0 -
II. Initiated:
R. J. Ashey 01/20/2011 Developer Date Ill. Reviewed:
/J/pr) J)
T echmcal Revi r J Date IV. Approved:
Cognizant Plant Supervisor (optional) Date II(
- NUClear Training Supervisor Date Page 1 of 11
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 01/20/2011 Create for use on LOIT-2011 NRC Exam 0 Page 2 of 11
JPM Number: JPM- Rev. _ _ _ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP-2 Examinee:
JPM Number: JPM-A4S Rev. o Task
Title:
System: Emergency Plan Time Critical Task: Yes X No Validated Time (minutes): 30 minutes Task No.(s): NUTIMS #000-05-205 Applicable To: SRO X RO PEO KIA No. 2.4.41 KIA Rating 2.9/4.6 Method of Testing:
Simulated Performance: Actual Performance: X Location:
Classroom: X Simulator: X In-Plant: X Task Standards: At the completion of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.
Required Materials
- MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment etc.): Levels
- MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
- MP-26-EPI-FAP06, Classification and PARs General
References:
- MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels
- MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
- MP-26-EPI-FAP06, Classification and PARs
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 11
JPM Number: JPM- Rev.
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiatinq Cues:
- You are the on-duty SM.
- Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs).
Initial Conditions: See attached form.
Simulator N/A Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 11
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 1. MP-26-EPI-FAP06, Step 2.1, Event The examinee obtains Millstone 2 MP N Classification based on EAL Tables EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Obtain MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue:
Comments: I Time starts when the examinee obtains the required procedures
- 2. I Perform the initia.1 c.lassifica~i?n for this event, per the eXisting conditions.
Itechnique, Based on a "top to bottom, left to right' the examinee will determine Y
that this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA.
Cue:
Comments:
- 3. MP-26-EPI-FAP06, Step 2.4.1 Examinee obtains: N For Control Room PARs, Refer To EPI
- MP-26-EPI-FAP06, Classification and FAP06-005, "Control Room Protective PARs Action recommendations" and determine the proper PAR.
- MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
Cue:
Comments:
Page 5 of 11
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 4. MP*26*FAP06*005 (Flowchart) NO Are All Three Fission Product Barriers Examinee determines that all 3 Fission Y Lost? Product Barriers are NOT lost
- FCB3 (Loss)
- RCS Barrier RCB2 (Loss)
- CNB2 (Potential Loss)
Cue:
Comments:
- 5. Does Containment Radiation Exceed Table INO 1 Values? Examinee determines that Table 1 values Y are NOT exceeded.
Cue:
Comments:
- 6. Do 5 Mile doses Exceed Table 2 Values? YES Examinee determines from the provided Y IDA Form that Table 2 values are exceeded.
Cue:
Comments:
- 7. Is there a Release in Progress? NO Examinee determines that there is NOT a Y release in progress Cue:
Comments:
Page 6 of 11
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 8. Check the appropriate wind direction from
- Examinee observes wind direction N the 142 ft. level for zone(s) to evacuate: table and checks 139 0 -154 0
- A and Band C and Lyme in D.
- Examinee determines from the wind Y direction table that Zones to be Evacuated include A and Band C and Lyme in D.
Cue:
Comments:
- 9.
- Shelter all other zones.
- Examinee determines that all other Y zones must be sheltered.
- Recommend state officials implement
- Examinee determines that actual dose Y Potassium Iodide (KI) strategy for is equal to or greater than 5 REM general public. thyroid (CDE)at site boundary and recommends state officials implement Potassium Iodide (KI) strategy for the general public.
Cue:
Comments: I The classification is a GENERAL EMERGENCY, ALPHA, based on either OG1 or loss of all three barriers (BG1) on the Barrier Failure Reference Table (FCB3, RCB2, and CNB2)
The PAR should state, "Evacuate zones A and Band C and Lyme in D. Shelter all other zones. " Additionally, recommend state officials implement Potassium Iodine (KI) strategy for the general public.
TERMINATION CUE: The evaluation for this JPM is concluded.
_.mA~ii!!y;fI~
~~_~_~l!~,-, ______
Page 7 of 11
JPM Number: JPM-A4S Rev.
--- o --
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes X No Validated Time (minutes): 30 Actual Time to Complete (minutes):
Overall Result of JPM: SAT UNSAT (circle one)
Areas for Improvement/Comments:
Page 8 of 11
JPM Number: JPM-A4S Rev. - - - 0 --
STUDENT HANDOUT Initiating Cues:
- You are the on-duty SM.
- Your task is to determine the final NRC classification and state posture code for the event described on the attached form. In addition, determine any Protective Action Recommendations (PARs), if applicable.
Initial Conditions: See attached form.
NRC Classification: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
State Posture Code: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
PAR: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Page 9 of 11
JPIVI Number: JPM-A4S Rev. _ _..;;...O_ _
Initiating Cue: Plant is at 100% power. "B" Containment Spray pump has seized during a surveillance run. The pump is presently tagged out for repair. Wind speed is 16 mph from 142°.
- CRI[la'<<l*p~AN;r,SARAMc"
- l"ERSjj*i., ~
- " .c: .,:
- _: -_::-:r .:.:' ~;,'~'~\:i:':)"~:" 'j")!'::'{: ;.: :-:" ..-;--: __:_:,_.' - '. ---:- ".,,", ,<-::::. ~:.+/-" ,',:~,~,:,,,,) \: ,:\ -.--.:,-:-: :::.:-::: :-,:- : ;-:-':--..'.. -:.:-: -.-: '.':- -: . :-: : -: - :-:' :-~
.*:~~t~\ ..
TIME INFORMATION SOURCE 0
- Reactor trip occurs. RO/BOP
- EOP 2525 is commenced.
14min. EOP 2525 is complete, the following conditions exist: RO/BOP
- Reactor is tripped.
- Turbine is tripped.
- Buses 24A, 24B, and 24C are deenergized. (The RSST is deenergized and "An DIG will !\lOT start.)
- Bus 240 is energized by its associated DIG.
- Buses 25A, 25B are deenergized.
- Both D.C. Buses are energized.
- Pressurizer level is 0%.
- Head level is 61 % and stable.
- RCS subcooling is 2°F and slowly lowering.
- Pressurizer pressure is 527 psia and lowering.
- SIAS, CIAS, EBFAS, MSI, and CSAS have actuated and available components are in their accident condition.
- S/G pressures are 840 psia and stable.
- Tave is 470 0 F and slowly lowering.
- AFW flow to both S/Gs at approximately 300 gpm each.
- SG levels are 46% and rising.
- Containment pressure is 42 psig and rising.
- Refuel Bridge and Personnel Access Rad Monitors are slowly rising, but NOT in alarm.
- CTMT gas and particulate Rad Monitors are in alarm, but are lowering.
- All other Rad Monitors are below their respective alarm setpoints.
21 min.
- Pressurizer pressure is 321 psia and lowering. RO
- "B" LPSI Pump discharge pressure indicates between 0 and 10 psig.
- "B" LPSI Pump is secured due to lack of 'flow and abnormally low discharge pressure.
Page 10 of 11
JPM Number: JPM-A4S Rev. ___0_ __
38 min. The following conditions exist:: RO/BOP
- Power has NOT been restored to Facility 1.
- Pressurizer level is 0%.
- Head level is 0% on both channels.
- RWST level is 37% and lowering.
- CET subcooling is -116 of and becoming more negative.
- Pressurizer pressure is 19 psia and stable.
- CSAS has actuated.
- S/G pressures are 832 psia and stable.
- 0 CETs are 342 F and slowly rising.
- AFW is being supplies to both S/Gs at approximately 200 gpm each.
- SG levels are 65% and stable.
- Containment pressure is 2 psig and lowering.
- Refuel Bridge and Personnel Access Rad Monitors are in alarm.
- CTMT gas and particulate Rad Monitors are in alarm.
- RM-8240 and 8241, CTMT High Range Rad Monitors, are reading 450 Rlhr and slowly rising
- Steam Plant Rad Monitors are elevated, but NOT in alarm.
- The MP2 Kaman Vent Monitor, RM 8168, is reading 100 J.lCi/cc and rising.
- Several other Rad Monitors outside Containment are in alarm or elevated.
Page 11 of 11
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-S1.1 Revision: -~-
0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
Odjsj;;
~.~ echmca ReViewer ~ 'Date IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 19
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format P~ge 2 of 19
"IPM Number: JPM-S1.1 Rev. ___0'--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S1.1 Rev. ____0'--__
Task
Title:
Align Charging Discharge Path System: CVCS Time Critical Task: Yes No X Validated Time (minutes): 20 Task No.(s):
Applicable To: SRO X RO X PEO KJA No. 004 A4.18 KJA Rating 4.3/4.1 Method of Testing:
Simulated Performance: -----=-.:.....---
X Actual Performance:
Location:
Classroom: Simulator: X In-Plant:
Task Standards: At the completion of this JPM the examinee will determine that the normal Charging flow path is not available and will align Charging to Emergency Borate through the '~" HPSI Header (Alternate Charging Flow Path).
Required Materials ARP 2590B-057 " CHARGING FLOW LO" (procedures. equipment. etc.): AOP 2512 " Loss of All Charging" General
References:
AOP 2512" Loss of All Charging"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 19
JPM Number: JPM-S1.1 Rev. - - - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You are the Reactor Operator. Respond to all alarms Initial Conditions:
- Unit-2 is at 100% power, all rods out. No equipment out of service.
Simulator
- IC- 30 Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 19
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
~t:~R1ii;~JrfE: _ _ __
- 1. Observe and respond to "CHARGING Examinee observes annuciator on C-02/03 y FLOW LO" (C-02/03,A-15) Examinee refers to ARP 25908-057 for N "CHARGING FLOW LO" (C-02/03,A-15 Cue:
Comments: I Examinee may recommend securing charging and letdown due to observed closure of 2-CH-429, low charging header flow and/or hioh charoino header oressure to orotect the olant equipment.
- 2. I If requested, secure charging and letdown I Examinee secures charging and letdown N by placing all charging pump hand switches in "PULL-TO-LOCK" and closing the following: (C-02)
"LTDN ISOL, CH-515" "LTDN ISOL. CH-516" Cu Comments:
Page 5 of 19
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 3. I CAUTION Examinee reads and acknowledges N
- 1. Prior to starting a standby pump, caution.
consider if charging flow low was caused by gas intrusion.[SOER 97-1, Potential Loss of High Pressure Injection and Charging Capability From Gas Intrusion"].
- 2. Charging flow transmitter, FT-212, is unreliable at low RCS pressure << 1000 I psi). "/'",,,2, Cue:
Comments:
- 4. 11. IF gas intrusion intrusion was indicated, I Examinee observes no change in VCT I N PERFORM the following: I level , determines that gas intrusion is not 1.1 PLACE all charging pump hand indicated, and that this step is not switches in "PULL-TO-LOCK." applicable.
1.2 CLOSE the following: (C-02) 1.2.1 "LTON ISOL, CH-515" 1.2.2 "LTON ISOL, CH-516" 1.3 Go To AOP 2512, "Loss of
~k~,~~r,.qi~hg*lI.
Cue:
Comments:
- 5. I 2. As necessary, START another charging Examinee determines that it is not N pump and PLACE affected charging pump necessary to start another charging pump switch in "PULL TO LOCK" (C-02). and that this steo is not aoolicable.
Cue:
Comments:
Page 6 of 19
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 6. I 3. IF charging flow is restored to normal by Examinee determines that this step is not N shifting operating charging pumps, SEND applicable.
operators to ensure piping integrity for pump which developed low flow and SUBMIT Trouble Report to Maintenance Department to investigate possible degradation of charging pump or discharge relief valve malfunction.
L" ,,"!?k """""" """",,
Cue:
Comments:
- 7. I 4. IF "A" or "C" charging pump is the affected pump, as necessary, PERFORM IExaminee states that this step is not N necessary.
the following:
4.1 IF available, Refer To OP 2304E, "Charging Pumps," and PERFORM applicable actions to align "B" charging pump, to serve as applicable facility OPERABLE charging pump.
4.2 IF "B" charging pump is not available AND "A" or "cn charging pump is made inoperable, LOG entry into appropriate TIS LCO ACTION Statements --><-- .,.,- ,- .' -.~;v_,," A in SM Cue:
Comments:
- 8. 5. IF "CHG HDR FLOW" is less than 40 Examinee goes to AOP 2512, N gpm (C-02/3, F-212), Go To AOP 2512, "Loss of All Charging."
"Loss of All Ch---'-- "
L Cue:
Comments:
Page 7 of 19
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) l~!~)
- 9. 3.0 Assessment of Loss of All Charging NOTE
- 1. If charging flow cannot be established I Examinee reads and acknowledges note. I N prior to Pressurizer level lowering to 10%
below programmed value (less than 55%
PZR level at Tavg of 561.5 F), the RX must be tripped and actions to establish HPSI flow initiated.
- 2. If the SM/US believe attempts to restore charging will be unsuccessful then the decision to trip the RX should not be delayed.
- 3. Following a reactor trip, this procedure will be performed in parallel with EOP 2526, "Reactor Trip Recovery" and OP 2207, "Plant Cooldown"
- 4. Power reduction should not be attempted with a loss of Charging as inventory continues to be lost and the potential for I-_ _ _--II.,...,,::.~IAS on Cue:
Comments:
Page 8 of 19
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE I STANDARD CRITICAL (YIN)
I GRADE (S/U) 1
- 10. 3.1 IF PZR level lowers to 10% below Examinee notes that this step is not N programmed value or Charging restoration required now but will keep this step open.
is determined unlikely, PERFORM the following:
- a. ENSURE the reactor is tripped.
- b. ENSURE EOP 2525, "Standard Post Trip Actions" are completed.
- c. IF desired, CONTINUE this procedure in parallel with EOPs.
Comments:
11 . 3.2 Refer To RAC 14, "Non-Emergency Examinee requests that the US/8M N Station Events" and CLASSIFY the event determine reportability/classification under "Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to shutdown the reactor and maintain it in a safe shutdown condition."
10CFR50 Cue:
Comments:
Page 9 of 19
PERFORMANCE INFORMATION JPM Number:
I STEP I PERFORMANCE I STANDARD CRITICAL (Y"~)
GRADE (S/U)
- 12. 3.3 INITIATE forcing sprays, and Examinee initiates forcing sprays by N MONITOR PZR pressure. placing backup heaters to on and the lowering automatic setpoint on the controlling channel pressure controller to I maintain RCS pressure at - 2500 psi.
~;<",,';"VA<;,,"'*',,;, ,/'" 'U',l' "~J::1i:!H:<;,.';77i~:j,n<x;,t'~;~BiL;it;~?h\-;,i.2:t;lHH ;'0 Cue:
Comments:
Page 10 of 19
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 13. 3.4 CHECK charging flowpath as Examinee checks charging flowpath by follows: observing:
Suction aligned from one of Suction aligned from one of the following the following: by red OPEN indication "VCT OUT ISOL CH-501" open N
_"VCT OUT ISOL CH-501" "BA ISOL CH-514" OR N
_ "GRAV FD (SOL BAST A, CH-509",
_ "GRAV FD ISOL BAST A, CH-509", OR N OR "GRAV FD ISOL BAST B, CH-508"
_"GRAV FD ISOL BAST B, CH-508" N
_ "RWST ISOL, CH-192" and "RWST TO CHGSUCT, CH-504", open - "RWST ISOL, CH-192" and "RWST TO N CHGSUCT, CH-504", open Charging header isolation valves open: Charging header isolation valves open:
"CHG HDR ISOL, CH-429" N "CHG ISOL, CH-518" OR "CHG ISOL, CH-518" OR N "CHG ISOL, CH-519" "CHG ISOL, CH-519" y
Examinee notes that "CHG HDR ISOL, CH-429" is closed by green CLOSE indication
_ NO indication of blockage in either the _ NO indication of blockage in either the N
suction or discha suction or discharge flowpath A "1~
~
- .=0,t~,~~,-C--~.~0~~7dAA~A~.~-C=
Cue:
Comments:
Page 11 of 19
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE ------
STANDARD (Y'l~L (~l~
14 . I 3.4.1 PERFORM the following:
Examinee places all charging pump
- a. PLACE all charging pump handswitches handswitches in "PULL-TO-LOCK." Y in "PULL-TO-LOCK."
- b. CLOSE Examinee closes the following valves by
- "LTDN ISOL, CH-S1S" rotating their handswitches to the CLOSE
- "LTDN ISOL, CH-S16" (C-02) direction
- "LTDN ISOL, CH-S1S" Y/N*
- "LTDN ISOL, CH-S16" Y/N*
- c. WHEN VCT level rises to 86% or as WHEN VCT level rises to 86% or as N desired, PLACE letdown divert switch, desired, examinee places letdown divert "L TON DIVERT CH-SOO to "RWS" position. switch, "LTON DIVERT CH-SOO to "RWS" position.
Cue:
Comments: I
- Only one of these valves are required to be closed to isolate letdown
'--_ _ _---',g!!arging pump handswitches may have already placed in "PULL-TO-LOCK" Page 12 of 19
PERFORMANCE INFORMATION JPM Number:
I STEP PERFORMANCE STANDARD CRITICAL (yIN)
GRADE (SIU)
- 15. I d. Refer To the following TS/TRM LCOs and DETERMINE Examinee requests that the US/SM refer N applicability: to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:
_ TS 3.5.2.a (if PZR press> 1750 psia)
_ TS 3.5.3.a (if PZR press < 1750 psia)
TS 3.0.3 h, ",,,,,",,,,><, ", ,
Cue:
Comments:
1 6. I e. Refer To the applicable section and PERFORM applicable actions. IExaminee refers to Section 5.0, Discharge Section 4.0, "Suction Flowpath I Flowpath Restoration" due to observed I N Restoration" closure of "CHG HDR ISOL, CH-429" Section 5.0, Discharge Flowpath Restoration" L~~>
Section 7 Cue:
Comments:
- 17. I NOTE N
If the normal charging flowpath is lost and cannot be reestablished, a plant shutdown IExaminee reads and acknowledges note is necessary. While shutting down, pressurizer level can be maintained by charging into the RCS through the alternate fl Cue:
Comments:
Page 13 of 19
PERFORMANCE INFORMATION JPM Number:
I CRITICAL I GRADE STEP PERFORMANCE I STANDARD (YIN) (S/U)
- 18. I S.1 IF the normal charging path is not available, ESTABLISH alternate charging f10wpath as follows: I Examinee ensures that the flowing valves are closed:
- a. ENSURE the following are closed:{C-02).
"LTDN ISOL, CH-S1S" "LTDN ISOL, CH-51S" N "LTDN ISOL, CH-S16" "LTDN ISOL, CH-516" N Cue:
I..".
Comments:
- 19. IUt>: ENSURE letdown flow has stopped as IExaminee ensures letdown flow has N indicated on "LTDN FLOW, FI-202" (C-02). stopped by observing no flow on "LTDN FI-202" Comments:
2 O.
Cue:
Comments:
- 21. I d. Refer To the following TSITRM LCOs and DETERMINE applicability: Examinee requests that the US/SM refer N TS 3.0.3 to the listed TSITRM LCOs and TRM 3.1.2.2 DETERMINE applicability:
TRM 7.1.1 TS 3.5.2.a, if PZR press> 17S0 psia L~<.T~,,~;~:~:a, .i!. ~?l3e.~e:.~s~.17S.o C
Page 14 of 19
PERFORMANCE INFORMATION JPM Number:
CRITICAL I GRADE I STEP PERFORMANCE I STANDARD (YIN) (§[!J~
- 22. e. OBTAIN key #39 from Operations key Examinee obtains key #39 from y locker and CLOSE "HPSI HDR A STOP, Operations key locker and closes "HPSI SI-656" (C-01). HDR A STOP, SI-656" 1------11="' u' Cue:
Comments:
- 23. f. OPEN both of the following Examinee requests plant operator to open valves (14'6" AB Boronometer Room): the following valves:
_ CH-340, "CHARGING PUMP CH-340, "CHARGING PUMP y DISCHARGE TO HPSI HEADER" DISCHARGE TO HPSI HEADER" y
_ CH-440, "CHARGING PUMP _ CH-440, "CHARGING PUMP DISCHARGE TO HPSI HEADER" DISCHARGE TO HPSI HEADER"
'v vL "",0\%
Cue:
Comments:
- 24. g. CLOSE the following HPSI Examinee closes the following valves by injection valves (C-01): taking their handswitches to the "CLOSE" direction and observing a green CLOSE light:
y
- "LOOP 1A, SI-617" - "LOOP 1A , SI-617"
- "LOOP 1B, SI-627" y "LOOP 1B, SI-627"
- "LOOP 2B , SI-647" "LOOP 2B, SI-647" y Cue:
Co~me~n~ts~:~I____________________________________________________________________________________~
Page 15 of 19
PERFORMANCE INFORMATION JPM Number: Rev..
STEP PERFORMANCE STANDARD
Cue:
Comments:
- 26. I i. OBTAI N Key #50 from Operation Key Examinee obtains Key #50 from Operation I N Locker and UNLOCK and CLOSE Key Locker and unlocks and closes "CHG HDR ISOL, CH-429" (C-02). "CHG HDR ISOL, CH-429" by rotating the key counter-clockwise and observing a reen CLOSE lioht.
L""", """d"""",",,",3* J.J. ' L.:':"L."3" Cue:
Comments: Examinee may state that this valve was
- 27. NOTE
~,,~~~~~..I .~_~ ____ *** :11 .... _ ~ .... _~ n-,.n I~ **_1 I Examinee reads and acknowledges note.
N Page 16 of 19
PERFORMANCE INFORMATION JPM Number:
I STEP I PERFORMANCE 1 STANDARD 1 CRITICAL (YIN)
GRADE (S/U)
- 28. j. IF desired, ALIGN charging Examinee aligns the charging pump suction to RWST as follows (C-02): pump suction to RWST as follows:
- 1) CLOSE "VCT MAKEUP BYPASS, CH Verifies "VCT MAKEUP BYPASS, CH 196." N 196." closed by green CLOSE indication.
- 5) Refer To AOP 2575, "Rapid Opens "RWST ISOL, CH-192" by rotating Down power, .. and SELECT borate from the Y its handswitch clockwise and observing a RWST red OPEN light.
Closes "VCT OUT ISOL, CH-501" by Y rotating its handswitch counter-clockwise and observing a green CLOSE light.
Examinee states that he/she will refer to AOP 2575, "Rapid Downpower," and N SELECT borate from the RWST Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
,STQRJ;gME~~***
",,,,,, "'<kdn,~' ' _ _ __
Page 17 of 19
JPM Number: JPM-S1.1 Rev. _ _-,,-0_ _
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No --,
Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
Areas for Improvement/Comments:
Page 18 of 19
JPM Number: JPM-S1.1 Rev. _ _....:...O_ _
STUDENT HANDOUT Initial Conditions:
- You are the Reactor Operator. Respond to all alarms Initiating Cues:
- Unit-2 is at 100% power, all rods out. No equipment out of service.
Page 19 of 19
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-S4s.1 Revision: ----=--
0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
~~3/; J echnical Reviewer ~
IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 12
SUMMARY
OF CHANGES:
DESCRIPTION REV/CHANGE de HUP evaluations and new format Page 2 of 12
JPM Number: JPM-S4s.1 Rev. _ _.....;0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S4s.1 Rev. ___0=--__
Task
Title:
System: Foxboro IA Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s):
Applicable To: SRO RO X PEO KIA No. 041 A4.06 KIA Rating _--""-2..;......9'-'-'3"-._1__
Method of Testing:
Simulated Performance: Actual Performance: X Location:
Classroom: - - - Simulator: X In-Plant:
-"-=-- ----
Task Standards: At the completion of this JPM, the examinee will attempt to operate the #2 ADV from C-05 and determine that the controller is failed.
The examinee will take manual control of #2 ADV from the Foxboro Controller.
Required Materials EOP 2528 (Step 29)
(procedures. equipment. etc.):
OP 2386 " Reactor Regulating System" General
References:
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 12
JPM Number: JPM-S4s.1 Rev. _ _ _ 0_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.
using both Steam Generators.
Initial Conditions:
- Unit-2 was manually tripped due to a loss of condenser vacuum
- Due to a small steam leak in the 38'-6" West Enclosure Building. the Shift Manager has restricted access to this area.
- Plant management has decided that the plant will go to MODE 5 to repair this steam leak.
Simulator
- IC-152 Requirements:
- Instructor to act as RO to address alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1<
- 1<
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue" .
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 12
PERFORMANCE INFORMATION JPM Number: JPM- S4s.1 Rev..
tt!1~:tlm0tJ("~;M~1(~ t1t'\r::~ge:- ::f"'" 1'le"'\~di:Z;\ ,~\ ' :8,':1':14; \", tS(i': ,:;
- g~~r~%~I%%~, 0~li{~v~~Qn+t;
- Q ,\,' 1!;'.Y:(1( , J!;\i!;i>;it; / ,
STEP PERFORMANCE STANDARD
~TARTTIME:
- 1. EOP 2528 Examinee refers to EOP 2528 N Loss Of Offsite Power/Loss of Loss Of Offsite Power/Loss of Cue:
Comments: ! Instructor will act as RO to acknowled
- 2. I NOTE Examinee reads and acknowledges note N Technical Specification cooldown rates on cooldown rate limits.
should be observed during the cooldown.
The cooldown rates are as follows:
Cue:
Comments:
- 3. I Perform Controlled Cooldown Examinee initiates a cooldown of the RCS y using both ADV's per step 29.1 due to the
- 29. INITIATE a controlled cooldown using condenser and steam dumps not the steam dumps to establish shutdown available.
cooling entry conditions.
29.1 INITIATE a controlled cooldown using the ADVs to establish shutdown cooling entry conditions.
t" _,, ,Y',_"" ,"~. 0',,) ",aM>.,~ ,~, ",<<.w§.<<~, ~ '" "" ",,,,4~'~,,.*c, "
Cue:
Comments: I Once examinee has commenced an RCS cooldown using both ADV's, trigger malfunction RX20D to 0% to fail PIC 4224 to the Foxboro IA.
Page 5 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDAR'-=-=D=---__ __J
- 4. #2 ADV fails closed Examinee observes the following: y*
- #2 ADV red OPEN light is not lit
- The cooldown rate lowers Cue Comments:
5.
Cue:
Comments: I The examinee may determine that the #2 ADV can be successfully operated from C-21. If he/she chooses to rm this success oath. then oroceed to JPM Steo 19 Page 6 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 6. I 4.1.2 Manual Operation
- a. PUSH the "AIM" button until "M" is Examinee pushes the "M" on "ATMOS N DUMP CTRL PIC 4224" in order to take manual control of 2-MS-190B N
- b. PRESS "SEL" button until cursor Examinee presses "SELl! button on appears above output (right hand bar "ATMOS DUMP CTRL PIC 4224" until graph). cursor appears above output.
- c. USING "up" and "down" buttons, ADJUST output as desired. Examinee raises output on "ATMOS N DUMP CTRL PIC 4224" in order to open 2-MS-190B 3th""
Cue:
Comments:
7.
Cue:
Comments:
8.
Controlling from the Foxboro screen results Examinee reads and acknowledges note N in the setpoint of the controller failing high on controller setpoint failure.
such that the valve will close or remain I---------+"L closed.
Cue:
Comments:
Page 7 of 12
PERFORMANCE INFORMATION JPM Number: JPM- S4s.1 Rev.. 0 l STEP PERFORMANCE I STANDARD CRITICAL (YIN)
GRADE (S/U) 4.5.1 SELECT "Change Env" (Foxboro Examinee selects "Change Env" on the controls PPC PPC Foxboro screen.
I ' c" ",,,,,,Xc.,.'" '
Cue:
Comments:
10.
Cue:
Comments:
11 .
Cue:
Comments:
12.
Cue:
Comments:
13.
Cue:
Comments:
- 14. 4.5.6 OBSERVE the "NORMAL" button Examinee observes the "NORMAL" button N changed to "BYPASSED." changed to "BYPASSED" for controller PIC-4224 on the PPC Foxboro screen. ,'
Cue:
Comments:
Page 8 of 12
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 15. I 4.5.7 To take manual control SELECT I Examinee selects "MANit for controller Y PIC-4224 on the PPC Foxboro screen.
I. '
Cue:
Comments:
- 16. 4.5.8 CHECK "MAN" button changes from Examinee checks "MAN" button changes N grey to red. from grey to red for controller PIC-4224 on the PPC Foxboro screen.
Cue:
Comments:
17.
Cue:
Comments:
- 18. I 4.5.9 USING up and down buttons, I Examinee adjusts controller PIC-4224 Y ADJUST controller output as desired. output as desired on the PPC Foxboro I screen to continue plant cooldown .
h 'y,'",,:L~" ,,~ ", ,,,{$'84@\ J.' ,/t. ,Q".Zkl""N" \i" ,< .",,,~" ,L*A.*,<'!'h",)$",;Z;;:;S;,f ZYLy",k.9>>A''' " AN'A'/~
- Cue:
Comments:
19.
Cue:
Comments:
- 20. I Place #2 ADV controller HIC 4224 in IExaminee locates and places "HIC 4224" Y manual control in the "MAN" position and establishes L,J, communication with the Control Room Cue:
Page 9 of 12
PERFORMANCE INFORMATION JPM Number:
GRADE STEP PERFORMANCE STANDARD (S/U)
- 21. Operate #2 ADV controller in manual to Examinee rotates control knob to open y open #2 ADV #2 ADV to continue cooldown and maintain #2 S/G pressure approximately ual to #1 S/G
,.....-..,..-,.....--:-~
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
§,TOPTIME:
Page 10 of 12
JPM Number: JPM- S4s.1 Rev. _ _-'0"--__
VERIFICATION OF JPM COMPLETION
'~; ,(
+" (;;;
Title:
) J < ;
H///";:""
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No Validated Time (minutes): 20 Actual Time to Complete (minutes):
..IPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass / Fail never violated radiological work practices. Pass / Fail demonstrated effective use of event-free human performance tools. Pass / Fail Areas for Improvement/Comments:
Page 11 of 12
JPM Number: JPM- S4s.1 Rev. - - - 0 --
STUDENT HANDOUT Initial Conditions:
- You have been directed to commence an RCS cooldown per Step 29 of EOP 2528 at a controlled cooldown rate of between 40 to 50 F/hr.
using both Steam Generators.
Initiating Cues:
- Unit-2 was manually tripped due to a loss of condenser vacuum.
- Due to a small steam leak in the 38'-6" West Enclosure Building, the Shift Manager has restricted access to this area.
- Plant management has decided that the plant will go to MODE 5 to repair this steam leak.
Page 12 of 12
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
Containment Isolatiori due to Fuel Handfing Acciaeht' . .
"IPM Number: "IPM-S5.1 Revision: - - 0 -
II. Initiated:
Marc R. Puce! 02/01/11 Developer Date III. Reviewed:
Tec IcalReviewer AJ)~/;/
Dat IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 10
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 10
~IPM Number: JPM-S5.1 Rev. ___0,,---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S5.1 Rev. ___0,,---__
System: Containment Time Critical Task: Yes No X Validated Time (minutes): 15 Task No.(s):
Applicable To: SRO -X- RO - -X- - PEa KIA No. 103 A2.04 KIA Rating 3.5/3.6 Method of Testing:
Simulated Performance: Actual Performance: X Location:
Classroom: Simulator: - - X - In-Plant:
Task Standards: At the completion of this JPM, the examinee will take the required actions in the Control Room to isolate Containment due to a Fuel Handling Accident.
Required Materials OP 2315A "Control Room Air Conditioning System" (procedures. equipment. etc.): AOP 2557 " Fuel Handling Accident" General
References:
OP 2315A "Control Room Air Conditioning System" AOP 2557 " Fuel Handling Accident"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 10
JPM Number: ..... I\II_.~'C> 1 Rev. - - - 0 --
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You are the RO. Respond to all alarms or direction as normal.
Initial Conditions:
- Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
Simulator
- IC-153 Reguirements:
- Train "An CRACS is operating in "NORMAL" mode.
- Containment purge valves are open to maintain containment habitability.
- Mon 1 (SDC). Mon 2 (STR). Mon 3 ( PAY)
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 10
PERFORMANCE INFORMATION JPM Number: JPM-S5.1 e~i"r'l
'9t1ildj STEP PERFORMANCE I STANDARD CRITICAL C(t~)
I G(RA~E I StU StART TIME: - - - -
- 1. Millstone Unit 2 Examinee states that the Fuel Handling N Fuel Handling Accident AOP 2577 Accident ( AOP 2577) procedure has idance for this event Cue:
Comments:
2.
Cue:
Comments:
- 3. 3.1 REQUEST Health Physics Examinee requests Health Physics N Department perform the following: Department perform the following:
_ Evacuate personnel from SG primary _ Evacuate personnel from SG primary sides and loop areas sides and loop areas
_ Coordinate an evacuation of personnel in _ Coordinate an evacuation of personnel containment . I .in containment Cue:
Comments:
4.
Cue:
Comments:
Page 5 of 10
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 5. 3.3 ANNOUNCE the following over plant Examinee announces the following over page system: plant page system:
y "Attention all personnel, a fuel handling "Attention all personnel, a fuel accident has occurred inside Unit 2 handling accident has occurred inside containment. All personnel evacuate Unit 2 Unit 2 containment. All personnel containment." evacuate Unit 2 containment."
Cue:
Comments:
- 6. I 3.4 IF purging of containment is in Examinee closes the following by rotating progress, their switches to the "CLOSE" position and VERIFY the following are closed: verifying by green" CLOSE" light
_ AC-4, Containment Outboard indication only that the dampers are Isolation Damper closed:
_ AC-5, Containment Inboard _ AC-4, Containment Outboard Y Isolation Damper Isolation Damper
_ AC-6, Containment Inboard _ AC-5, Containment Inboard y Isolation Damper Isolation Damper
_ AC-7. Containment Outboard _ AC-6, Containment Inboard y Isolation Damper Isolation Damper
_ AC-7, Containment Outboard Isolation Dam Cue:
Comments:
7.
Cue:
Comments:
Page 6 of 10
PERFORMANCE INFORMATION JPM Number: JPM-S5.1 Rev.. _0_
i cot1tatnmen(,'sGlatiot{dU6"fO~Fi.Jel
, ' "~'ecce " '" ",,' " ' ' ' ' ' ' ' ' " " " " " " " " " " " """ '" ,',' " , '" "
Hahdlrn~:jl!cci8ehf
" , ' ,"',,,' g" ,',', ""'"
STEP PERFORMANCE STANDARD
- 8. _3.6 VERIFY at least one train of Examinee verifies "A" train of CRACS in CRACS operating in recirculation mode. the recirculation mode by:
(C25) Starting "CRACS FL TR FANF-32A" by Facility 1 rotating its handswitch to the "ON" y
_ HV-203A, Fan F-21A exhaust damper is position.
open. Examinee verifies:
_ Fan F-21A, supply fan is running. y
_HV-203A, Fan F-21A exhaust damper is
_ HV-206A, Fan F-31A exhaust damper is open by red "OPEN" light lit only.
open. y
_ Fan F-21A, supply fan is running by red
_ Fan F-31A, exhaustfan is running.
"ON" light lit only.
_ HV-212A, Fan F-32A exhaust damper is open. _ HV-206A, Fan F-31A exhaust damper is y
_ Fan F-32A, filter fan is running. open by red "OPEN" light lit only.
_ HV-202, minimum fresh air damper is _ Fan F-31A, exhaustfan is running by red y closed. "ON" light lit only.
y
_ HV-207, cable vault exhaust damper is _HV-212A, Fan F-32A exhaust damper is closed. open by red "OPEN" light lit only.
_ Fan F-32A, filter fan is running by red y
_ HV-208, exhaust air damper is closed.
"ON" light lit only.
_ HV-202, minimum fresh air damper is y closed by green "CLOSE" light lit only.
_ HV-207, cable vault exhaust damper is y closed by green "CLOSE" light lit only.
_ HV-208, exhaust air damper is closed by y green "CLOSE" light lit only.
Cue: h.f~,$~iitlJ,d'~Yd~li~,tRlml!rOP ~31S~ fc)(.pla~!rfg ~~cs'Iij";f~~ir*ulation'mod~tharid;hJli!lherOP ~~'5A.
Comments: I Examinee will observe that both HV -207 and HV-208 remain open if handswitches "NORM/RECIRC MODE, HS 8346" and "NORM/RECIRC MODE, HS-8359" are not placed in "RECIRC". Examinee may refer to OP 2315A for placing CRACS in recirculation mode which provides direction for placing "NORM/RECIRC MODE, HS-8346" and "NORM/RECIRC MODE, HS-8359" in "RECIRC" thus allowing HV-207 and HV-208 to go closed Page 7 of 10
PERFORMANCE INFORMATION JPM Number: 1 STEP PERFORMANCE STAND=A~R~D~________~~~__~.......... L~~~
TERMINATION CUE: The evaluation for this JPM is concluded.
~t6PTIME!
Page 8 of 10
"IPM Number: JPM-S5.1 Rev. _ _--::..._ _
VERIFICATION OF JPM COMPLETION Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes -
No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 9 of 10
JPM Number: JPM-S5.1 Rev. ___0,,---__
STUDENT HANDOUT Initial Conditions:
- You are the RO. Respond to all alarms or direction as normal Initiating Cues:
- Unit-2 is in a Refueling outage with fuel movement occurring in Containment.
Page 10 of 10
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
Actuation Test of Various ESF Co~ponent§! F~,ci!inl,t;l'.....
';:<;AM-515} ~ Monthly i;.. ** ." ' , , { ..' \\!.;;'~~Ii/'
JPM Number: JPM-S7.1 Revision: - - 0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
IV. Approved:
Cognizant Plant Supervisor (optional) Date 6~N~c,~~~~or ~IIDate Page 1 of 13
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
..IPM Number: JPM-S7.1 Rev. ___0'--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM-S7.1 Rev. - - - - -
JPM Number:
Task
Title:
° System:
Time Critical Task: Yes No x Validated Time (minutes):
Task No.(s): _ _ _ _ _ _ _ _ _ __
Applicable To: SRO X RO X PEO KIA No. 013 A4.03 KIA Rating _----'4..:...;.5;..:-14..:......___
7 _
Method of Testing:
Simulated Performance: Actual Performance:
- -X- - ----
Location:
Classroom:
Simulator:
X In-Plant: - - - -
Task Standards: At the completion of this JPM, the examinee will have performed the required actions to test actuation of ESAS component AM-515, per surveillance procedure SP 2604T.
Required Materials SP 2604T " Actuation Tests of Various ESF Components" (procedures, eqUipment, etc.): SP 2604T-001 "Actuation Tests of Various ESF Components Facility 1)
General
References:
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
JPM Number: JPM-S7.1 o Rev. - - - - - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.
Initial Conditions:
- Unit-2 is at 100% power, ARO
- You are the BOP operator
- A second licensed operator is available to assist you.
Simulator
- IC-30 or IC-20 Reguirements:
- An instructor to act as the second licensed operator as required.
- *
- NOTES TO EVALUATOR '* '* '* *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What ar~: you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
~iSFAtiil~rfiMEt'_ _ __
,"""',"""',',""",,i',"',,,"
- 1. I SP 2604T (4.1) INSTRUCTIONS 4.1 Testing Actuation Module, AM515 Examinee reads and acknowledges note N NOTE about expected alarms for test of AM515.
The following alarms may be received during the performance of this section:
"ESAS COMPONENT UNDER TEST FAILURE" (C-01 B41)
_ "SIAS OR UV ACTUATION SIG CH 1 TRIP" (C-01 A34)
_ "CONT PRESS HI A" (C-01 A21)
"CTMT AIR RECIRC FAN A VIBRATION HI" (C-01 A4)
"CTMT AIR RECIRC FAN C VIBRATION HIli (C-01 C4)
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number: JPM-S7.1 Rev.. 0
, .~ .... ,,*!fii!p{;lIl_i;:lIf+.;.;.t:,<r\ j. . * "!'!;.ii:.:m.,i,S*C1d~~'i**'~.*~.I"*:ii: i tJ : iF '" "I'~i 1 ( A'M'" ~:.\5I,@~~~'1.IIUIII~~§iII!i!!i!I :,~ , jh:~'i!!<
. ' .jj:'i:~ , , ! .. ! ~h ,~,p~'iVanQUS~;;t=i1iP!>~ro ~,~Iil~n S!, ,aCI t , '. ,c;y: It ,: ,YJmY~I1\"; 10J11,. "$'j;!,ji~li;ii:;';i':::: iii!i:!;i!ii!i!i!,tl!1il;>,~; "f" '_ttl' '\i,,<
CRITICAL GRADE I STEP I PERFORMANCE I STANDARD <YIN) (SM
- 2. 4.1.1 VERIFY the following: Examinee verifies initial equipment N
_ "A" Service Water Pump is operating OR alignments are met by verifying:
hand switch P5A, "A" Service Water Pump is operating by "SERVICE WATER PPA," is in "PULL TO amp indication and red operating light LOCK" (C-06) OR hand switch P5A, "SERVICE WATER
_ "F-14A, CAR FAN A," and "F-14C, CAR PP A," is in "PULL TO LOCK" (C-06)
FAN C," are operating in fast speed (C-01)
No boration or dilution to VCT or charging "F-14A, CAR FAN A," and "F-14C, CAR pumps in progress FAN C," are operating in fast speed by red light indication (C-01).
No boration or dilution to VCT or charging Cue:
Comments:
3* I C AUT ION I Examinee reads and acknowledges N PMW or boric acid flow may commence if caution statement.
the respective controllers are not in manual closed or set to "0" when CH-196, "VCT I--------j MAKEUP BYP Cue:
Comments:
- 4. 4.1.2 VERIFY "FC-21OX PRI MAKEUP Examinee verifies that FC-21 OX and FC Y WTR FLOW CONTROLLER" and "FC 210Y meet one of the following conditions:
210Y SA MAKEUP FLOW CONTROLLER," In manual mode and set fully closed are each in one of the following conditions: _Integrator set for "0" manual mode and set fully closed ntegrator set for "0" I., ' ,L.!~,=.","",.'M"dlh ***h","~.A" Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number: JPM-S7.1 L..ScT..E
... P PERFORMANCE STAND=-::.A-=.R-=.=D'--_ _ _------'
~
Cue:
Comments:
- 6. 4.1.4 Depending on current condition, Examinee determines that SIAS is not y PERFORM applicable action: "Blocked" (*pzr pressure greater than or equal to 1,850 psia), and checks a""1/5"
_IF SIAS is not "Blocked" (*pzr pressure lights or bistable "TRIP" lights not lit for greater than or equal to 1,850 psia), SIAS, CIAS, EBFAS, CSAS, or SG on CHECK all "1/5" lights or bistable "TRIP" Facility 1 and Facility 2 ESAS actuation lights not lit for SIAS, CIAS, EBFAS, CSAS, and sensor cabinets.
or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
_IF SIAS is "Blocked" (pressurizer pressure less than 1,850 psia) CHECK all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor cabinets.
_ MSI is "Blocked" (SG pressure less than 700 psia) all lower "1/5" lights (from containment pressure input) not lit for SIAS, CIAS, EBFAS, CSAS, or SG on Facility 1 and Facility 2 ESAS actuation and sensor 1------\
. cabinets.
Cue:
Comments:
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 7. 4.1.5 PLACE "S-501, TEST PERMISSIVE IExaminee places "S-501, TEST SWITCH," in 'TEST SIAS" (ESAS actuation PERMISSIVE SWITCH," in "TEST SIAS" 1----
. cabinet Cue:
Comments:
8.
Cue:
Comments:
9.
Cue:
Comments:
1 O. NOTE N
- 1. When the next step is performed, many Examinee reads and acknowledges note "1/5" lights illuminate on the actuation about 1/5 lights and requirement for modules. additional person requirement for test
- 2. Due to the distance between bistable, initiation.
BA101, and actuation module, AM 515, two uired to initiate the test.
Cue:
Comments:
Page 8 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE I STANDARD
- l CRITICAL (YIN)
I GRADE (S/U)
- 11. 4.1.8 PRESS and HOLD "TRIP TEST" Examinee either performs or directs y button on bistable, BA 101. (ESAS Sensor pressing and holding of "TRIP TEST" Cabinet 'A') button on bistable, BA101 at ESAS Sensor Cabinet 'A'.
Cue:
Comments:
12.
Cue:
Comments:
- 13. 4.1.10 To initiate start signal, PRESS lower Examinee either performs or directs the Y "1/5" "TEST" button on actuation module, pressing of lower "1/5" "TEST" button on AM515 (ESAS actuation cabinet 5). actuation module, AM515 on ESAS actuation cabinet 5.
Cue:
Comments:
- 14. I 4.1.11 RELEASE "TRIP TEST" button on Examinee either performs or directs the Y bistable BA 101. releasing of "TRIP TEST" button on bistable BA101.
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 15. I 4.1.12 OBSERVE the following and INITIAL Examinee observes and initials for proper Y for the "Results" on SP 2604T-001: actuation of equipment on SP 2604T-001
_ Actuation module, AM515, red "TRIP" by observing:
light is lit (ESAS actuation cabinet 5)
_ "F-14A, CAR FAN A," shifted to slow F-14A slow speed red light lit.
speed (C-01)
F-14C slow speed red light lit.
"F-14C, CAR FAN C," shifted to slow speed (C-01) CH-196 green light lit.
_ "CH-196, VCT MAKEUP BYPASS,"
L, closed n ,d ,
Cue:
Comments:
- 16. I 4.1.13 PLACE the following switches to IExaminee places "F-14A, CAR FAN A" Y "START LOW/PULL TO LOCK" (C-01): and "F-14C, CAR FAN Cit switches to "F-14A CAR FAN An I
I "START LOW/PULL TO LOCK.
CARFANC" Cue:
Comments:
- 17. 14.1.14 PRESS "ACTUATION RESET SIAS" IExaminee presses "ACTUATION RESET Y button (ESAS Actuation Cabinet 5). SIAS" button at ESAS Actuation Cabinet Comments:
- 18. I 4.1.15 PRESS red "TRIP" light on bistable, Examinee presses red "TRIP" light on Y BA 101. (ESAS Sensor Cabinet'A') bistable, BA 101. (ESAS Sensor Cabinet
'Af).
Cue:
Comments: r"'E;~~inee may note that red "TRIP" Ii Page 10 of 13
PERFORMANCE INFORMATION JPM Number:
I STEP I PERFORMANCE I STANDARD CRITICAL (YIN)
GRADE (StU)
- 19. 4.1 .16 PLACE "5-102, TRIP TEST" switch Examinee places "5-102, TRIP TEST" y in "OPERATE." (ESAS Sensor Cabinet 'A') switch in "OPERATE." On ESAS Sensor Cabinet 'A'.
Cue:
Comments:
- 20. 4.1.17 PLACE "5-501, TEST PERMISSIVE Examinee places "S-501, TEST y SWITCH" in "OPERATE." (ESAS actuation PERMISSIVE SWITCH" in "OPERATE."
cabinet 5) on ESAS actuation cabinet 5.
1-------1 Cue:
Comments:
21 . 4.1.18 PRESS red "AT I FAULT PRESS TO Examinee presses red "ATI FAULT y RESET" light. (ESAS actuation cabinet 5) PRESS TO RESET" light on ESAS actuation cabinet 5.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
'~§'1Qft,~tMe~~i~;l. ' - - - -
Page 11 of 13
..IPM Number: 1 Rev. ___0_ __
VERIFICATION OF JPM COMPLETION Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee .. Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
JPM Number: JPM-S7.1 Rev. ___0:.....-__
STUDENT HANDOUT Initial Conditions:
- You have been assigned to perform SP 2604T, (Section 4.1) Testing Actuation Module, AM515 for monthly surveillance testing.
Initiating Cues:
- Unit-2 is at 100% power, ARO
- You are the BOP operator
- A second licensed operator is available to assist you.
Page 13 of 13
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
ManLJalBlendedMakeLJp to. volum~ CO(llrol*Tabf(<afllted)
JPM Number: JPM-S2.1 Revision: 0
=--
II. Initiated:
R. Pucel 02/01/11 Developer Date III. Reviewed:
~)Js/J/
I Da(e IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 15
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15
JPM Number: Rev. ___0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S2. Rev. _ _--'0'--__
Task
Title:
System: _C-'--'-V-'-C-=.S_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time Critical Task: Yes No X Validated Time (minutes): 20 Task No.(s):
Applicable To: SRO X RO X PEO KIA No. 004 A4.07 KIA Rating 3.9/3.7 Method of Testing:
Simulated Performance: X Actual Performance:
Location:
Classroom: Simulator: X In-Plant:
Task Standards: At the completion of this JPM, the examinee will initiate a blended makeup to the VCT, determine that the PMW Flow Control Valve failed open, and terminate the blended makeup to prevent a Boron Dilution event.
Required Materials
- Section 4.9, OP 2304C, Manual Blended Make Up to VCT (procedures, equipment. etc.):
- Section 4.21, OP 2304C, Maintaining VCT Level and Pressure During Normal Operation
- ARP 2590C-060" PMW FLOW HI/LO" General
References:
OP 2304C" Make Up (Boration and Dilution) Portion of eves"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simUlate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normall available in the Control Room, includin 10 s. Make all written re orts, oral Page 3 of 15
JPM Number: JPM-S2.1 Rev. _ _--'-_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been directed to perform a blended makeup to the VCT to raise level 2%
Initial Conditions:
- The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "An BAST
- The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).
Simulator
- IC-30 Requirements:
- VCT level 78%
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 15
PERFORMANCE INFORMATION JPM Number:
I I STEP PERFORMANCE J STANDARD CRITICAL (YIN)
GRADE (S/U) i~TART"Tjli~t; _ _ __
- 1. 4.9 Manual Blended Make Up to VCT Examinee refers to 4.21, "Maintaining VCT N 4.9.1 Refer To Section 4.21, "Maintaining Level and Pressure During Normal VCT Level and Pressure During Normal Operation," and determines that during Operation," and PERFORM applicable this manual blend that no VCT high level actions. rameters will be exceeded.
Cue:
Comments:
- 2. CAUTION Examinee reads and acknowledges N
- 1. Manual make up must be monitored caution statement.
closely as there is no automatic shutoff on Examinee notes that the initial conditions a high level in the VCT. explain that the amount and effects of
- 2. When calculating the amount of boric PMW in the pipe have been considered, acid required for neutral blend, the amount as well as the effects of Boron-10 and effects of PMW in the pipe must be depletion.
considered.
- 3. When calculating the ratio of boric acid to PMW, the effects of Boron-10 depletion
_ _ _-Il=,.!l1ust be considered.
Cue:
Comments:
Page 5 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 3. 4.9.2 VERIFY the following (C-02): Examinee notes that red "ON" indicating N
_ PMW is available (indicating lights for is lit for runnina PMW pump.
PMW transfer pumps).
Examinee notes red "ON" lit for running
_ WHEN blend will be injected into the Charging pump and -44 gpm indicated for RCS, at least one charging pump running. charging header flow "F-212".
Cue:
Comments:
- 4. 4.9.3 Refer To OP 2208, "Reactivity Examinee notes that initial conditions have N Calculations" or PPC and DETERMINE provided a blend ratio, corrected for required ratio of boric acid flow to PMW Boron-10 depletion.
Boron-10 donloti r-------~~~~~~~
Cue:
Comments:
- 5. I 4.9.4 VERIFY the following are closed: Examinee verifies the following valves N closed by their green "CLOSE" lights lit CH-512, "MAKEUP VLV STOP," (C-04) only:
_ CH-196, "VCT MAKEUP BYPASS," (C02) CH-512, "MAKEUP VLV STOP," (C-04)
_ CH-192, "RWST ISOL," (C-02) CH-196, "VCT MAKEUP BYPASS,"(C02)
Cue:
Comments:
6.
Cue:
Comments:
Page 6 of 15
PERFORMANCE INFORMATION JPM Number: o STEP PERFORMANCE STANDARD
- 7. 4.9.6 DETERMINE total gallons required to Examinee determines that an addition of N make desired level change as follows: 68 gallons are required to raise VCT level Desired level change in % x 34 gallons = 2%
l Tot~! ...~~II,~ns. f~!"Q'J~(~\:~~e .~o/~.lev~l. ... ........v ... I Cue:
Comments:
Page 7 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 8. 4.9.7 RESET "PRI MAKEUP WTR FLOW Examinee resets "PRI MAKEUP WTR CONTROLLER FC-21 OX" and "BORIC FLOW CONTROLLER FC-21 OX" to 0 total ACID FLOW CONTROLLER FC-210Y" to 0 gallons by performing the following:
total gallons by performing the following (C 04): a. CHECK "RlL" light indicates "L" N
- a. CHECK "RlL" light indicates "L." (FC-21OX )
- b. IF a manual leak rate determination is in b. determines that a manual leak rate N progress AND flow controller totalizers are determination is not in progress AND flow being used to track RCS makeup, controller totalizers are not being used to PERFORM the following: track RCS makeup, and that this step is
- 1) PRESS "SEL" button until "PMW not applicable.
TOTAL" or "BA TOTAL" is displayed. c. PRESS "SEL" button and HOLD until Y
- 2) OBSERVE total gallons added. display indicates "TOTAL RST." (FC
Leak Rate Determination," and RECORD d. PRESS "RlL" button to transfer to "Rn Y total gallons added. mode to reset totalizer (FC-21 OX).
- c. PRESS "SEL" button and HOLD until e. PRESS "RlL" button to transfer to "L" y
display indicates "TOTAL RST." mode (FC-21 OX).
- d. PRESS "RIL" button to transfer to "R" f. PRESS "SEL" button and HOLD until y
mode to reset totalizer. controller number (FC-21 OX) total gallons
- e. PRESS "RlL" button to transfer to "L" is displayed.
mode.
- f. PRESS "SEL" button and HOLD until controller number (FC-21OX or FC-210Y) total gallons is displayed.
Cue:
Comments:
Page 8 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 8. 4.9.7 Examinee resets "BORIC ACID FLOW (cont) CONTROLLER FC-210Y" to 0 total gallons by performing the following:
N
- a. CHECK "RlL" light indicates "L" (FC 210Y)
- b. determines that a manual leak rate N determination is not in progress AND flow controller totalizers are not being used to track RCS makeup, and that this step is not applicable.
- c. PRESS "SEL" button and HOLD until y
display indicates 'TOTAL RST." (FC 210Y)
- d. PRESS "RILl! button to transfer to URn y mode to reset totalizer (FC-21 OY).
- e. PRESS "RILl! button to transfer to "L" y mode (FC-210Y).
- f. PRESS "SEL" button and HOLD until controller number (FC-210Y) total gallons y is displayed.
Cue:
I I ~1;;>, -c Comments:
9.
Cue:
Comments:
Page 9 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 10. NOTE Examinee reads and acknowledges note N Boric acid flow rates of greater than 30 gpm for Boric Acid flow limitations.
.h "',,:z "":",',,:,,",,.?~, " '. ,ACiD ' "
but are not to be exceeded .
,,,".LA}, : ":",,~.£:,.;.,.,, , ZC" "d"*'m," ,_ ,C<<, t Cue:
Comments:
- 11. I 4.9.9 ADJUST automatic setpoint of "PRI Examinee adjusts automatic setpoint of MAKEUP WTR FLOW CONTROLLER FC "PRI MAKEUP WTR FLOW 210X" and "BORIC ACID FLOW CONTROLLER FC-21 OX" as follows CONTROLLER FC-210Y" as follows (C04): (C04):
- b. PRESS "SEL" button until cursor b. PRESS "SEL" button until cursor Y appears above setpoint (left hand bar appears above setpoint (left hand bar graph). graph).
- c. Using "up" and "down" buttons, ADJUST c. Using "up" and "down" buttons, y setpoint to desired flow rate. ADJUST setpoint to desired flow rate to
, maintain proper blend ratio.
kYL ,-'-'", k', "<C/'U",",","",/;",, ;*,,*:,,:,,>>§dL ,,_ _",*,*_*,,,,h,,,,,,,t -"<"'" """",:;;.."-~,, -,'-".h"0"',,","'" ,L,'- ;
Cue:
Comments:
11 . 4.9.9 Examinee adjusts automatic setpoint of (cont) "BORIC ACID FLOW CONTROLLER FC 210Y"as follows (C04):
N
- a. VERIFY "AM" is lit.
y
- b. PRESS "SEL" button until cursor appears above setpoint (left hand bar graph).
- c. Using "up" and "down" buttons, y ADJUST setpoint to desired flow rate to maintain proper blend ratio.
,.,,,,,' ... ,_ -;,'.-0-,-."<.-, . _,,"',",.,":.
I
/-",.i ""
Cue:
Page 10 of 15
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) {SM
- 12. I 4.9.10 PLACE "MAKEUP MODE SEL" in IExaminee places "MAKEUP MODE SEL" I Y "MANUAL" (C-04). in "MANUAL" I,d,,,,",,, ,."" ' c', ""'~M""L.j;;;",;
Cue:
Comments:
1 3. 14.9.11 START one boric acid pump (C-02). I Examinee starts "An boric acid pump by Y
_ P-19A, "BA PP A" placing its handswitch to "START' P-19B, "BA PP B" 1",,,:[;,
Cue:
Comments:
- 14. 14.9.12 VERIFY the following: Examinee verifies "An boric acid pump N
_ Boric acid pump starts (C-02) starts by observing its red running light lit.
_ Boric acid pump develops discharge Examinee verifies "An boric acid pump pressure of at least 98 psig, indicated "PP develops pressure of at least 98 psig.
A DIS PRES, PI-206" or "PP B DIS PRES, indicated "PP A DIS PRES, PI-206".
I""
PI-208" <<,i,,,S Cue:
Comments:
- 15. 1 NOTE I Examinee reads and acknowledges note. I N When CH-512, "MAKEUP VLV STOP," is opened, the "M" part of the "AM" light will extinguish, indicating the controller is activated.
I,Ll", n ,. .wh', ~~,
Cue Comments:
Page 11 of 15
PERFORMANCE INFORMATION JPM Number: JPM-S2.1 STEP PERFORMANCE STANDARD
- 16. 4.9.13 OPEN CH-512 (C-04). Y Cue:
Comments: I Examinee may announce expected "PMW FLOW HIILO" (C-04, BB-8) and "BA MAKEUP FLOW HI/LO" 9C-04,BA
- 8) flow alarms prior to, (or after receiving alarm) upon initiating blend flow. It is expected that the ARP's for these alarms will be referenced.
- 17. I 4.9.14 VERIFY flows have stabilized at I Examinee verifies flows have stabilized at N setpoint of flow controllers (C-04). setpoint of flow controllers FC-210X and FC-210Y by observing output of controller andlor FR-210 for flow values .'.
Cue:
Comments:
1 8. 4.9.15 MONITOR VCT level and pressure Examinee monitors VCT level and Y as indicated on the following: (C-02 or pressure, by observing a PPC trend, PPC). computer trend recorder UR-243(C-04),
_ "VCT PRES, PI-225" and/or "VCT PRES, PI-225" and "VCT "VCT LVL. LI-226" LVL, LI-226"(C-02/03)
Cue:
Comments:
- 19. I ARP 2590C-060 Examinee refers to ARP for PMW FLOW Y AUTOMATIC FUNCTIONS HIILO" (C-04, 88-8) and takes corrective 1-------1-1 1. None actions.
Cue:
Comments:
Page 12 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 20. 2. CHECK flow rate on "PRI MAKEUP WTR Examinee determines that indicated flow is I Y FLOW, FC-21 OX," within 10 gpm of greater than 10 gpm from setpoint.
nt (C-O Cue:
Comments:
- 21. I 3. IF desired to terminate PMW flow, PERFORM the following:
IExaminee determines that it is desired to terminate flow and:
3.1 PLACE "PRI MAKEUP WTR FLOW, 3.1 Places "PRI MAKEUP WTR FLOW, FC-21 OX," to "MANUAL." Y*
FC-21 OX," to "MANUAL."
3.2 ADJUST "PRI MAKEUP WTR FLOW, 3.2 Adjusts "PRI MAKEUP WTR FLOW, FC-21 OX," to zero output. FC-21 OX," to zero output. y*
3.3 VERIFY 2-CH-196, "VCT MAKEUP 3.3 Verifies 2-CH-196, "VCT MAKEUP BYPASS," closed. BYPASS," closed by ensuring green N 3.4 VERIFY 2-CH-512, "MAKEUP VLV "close" light only lit.
STOP," closed. 3.4 Verifies 2-CH-512, "MAKEUP VLV Y*
STOP," closed by placing valve handswitch in close and ensuring green "close" light only lit.
- A combination of steps 3.1 and 3.2 or step 3.4 alone will have the desired effect of securing the blended makeup to th~ VCT. The JPM is complete when the blended makeup is secured.
TERMINATION CUE: The evaluation for this JPM is concluded.
- 'iS1l0R~TIM;E~'"
'~L,'. ."4",,,,', :~'_Oi',_"" ,'.,,',,;:~/> _ _ __
Page 13 of 15
JPM Number: JPM-S2.1 Rev. - - - - -
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes -
No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
Areas for Improvement/Comments:
Page 14 of 15
JPM Number: JPM-S2.1 Rev. ___0_ __
STUDENT HANDOUT Initial Conditions:
- You have been directed to perform a blended makeup to the VCT to raise level 2%
Initiating Cues:
- The current blend ratio is 9:1 (corrected for Boron-10 depletion) calculated using "A" BAST
- The piping to the VCT is currently at blend concentration (no requirement for adjusting for water in the piping).
Page 15 of 15
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-S6.1 Revision: _~O=---_
II. Initiated:
Marc R. 02/01/11 Developer Date III. Reviewed:
echnical RevIewer IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 13
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
JPM Number: JPM-S6.1 Rev. ° JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S6.1 Rev. ___0'--__
Task
Title:
System: AC Electrical Distribution Time Critical Task: Yes No x Validated Time (minutes): _-=2:..=;.0_ __
Task No.(s): _ _ _ _ _ _ _ _ _ __
Applicable To: SRO X RO X PEO KIA No. 062 A2.05 KIA Rating _ _2_.9_/3_._3__
Method of Testing:
Simulated Performance: -----=--=-- X Actual Performance:
Location:
Classroom: Simulator: X In-Plant:
Task Standards: At the completion of this JPM, the examinee will attempt to restore power to Bus 24C from the RSST. The RSST supply breaker will fail to close and the examinee will restore power to Bus 24C from Unit 3.
Required Materials EOP 2541, Appendix 23 (procedures. equipment. etc.): Attachment 23-B," Energizing 4.16 kV Bus 24C From the RSST" Attachment 23-N," Energizing 4.16 kV Bus 24E From Unit 3" General
References:
EOP 2541, Appendix 23
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral re orts, alarm acknowled ments, and 10 entries as if the evolution was actuall bein Page 3 of 13
JPM Number: 1 Rev. - - -o- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued) reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Initiating Cues:
- The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.
Initial Conditions:
- Unit-2 is in Mode 3 after experiencing a plant trip.
- All SPTA's of EOP 2525 have been carried out.
- Bus 24C failed to transfer to the RSST on the plant trip.
- There are no faults indicated on Bus 24C
- "A" EDG is out of service for maintenance Simulator
- IC-154 Reguirements:
- ED17A, EGR12,EGRI7
- 1/0 06A1A556 [RSST TO 24C(A302) TRIP]
- Tag breaker A312 and START/STOP switch
- Additional operator to address board alarms 1< 1< 1< NOTES TO EVALUATOR 1< 1< * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:
l STEP I PERFORMANCE STANDARD CRITICALi (YIN)
GRADE (S/U)
\;~~I'ttl.l.i;;"Y____
- 1. EOP 2541, Appendix 23 Examinee states that he/she will choose N Attachment 23-B," Energizing 4.16 kV Bus EOP 2541, Appendix 23 (Attachment 23 24C From the RSST" B) "Energizing 4.16 kV Bus 24C From the RSST" ~......,....,...........,
Cue:
Comments:
--~------------~~=------------,,----------------------------.--------,-------~
- 2. NOTE Examinee reads and acknowledges note N The following may indicate a fault on 4.16 for fault indications on Bus 24C.
kV Bus 24C:
_ Annunciator "DIESEL GEN 12U BKR TRIP" lit (A-3~, C08)
_ Annunciator "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" lit (C-36, C08)
Annunciator "4KV BUS 24A1C TIE BKR A304 TRIP" lit (A-10, C08)
Annunciator "4KV BUS 24C/E TIE BKR 1j\~g~c:!:~fl'litJ-ti&l;'::'-~~ (
Cue:
Comments:
3.
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number: JPM-S6.1 Rev.. 0 liM>j.**l'.*'(' '*
i~g;.: . *::~. . ..l...tt\;;J~%'lill'l*
'J**\g.~ C!<.'*l'h~"~,,,.lljZ.ll.'i!b.*.*jj'n.
- ~&.!o!~\..!:i I.****' 'It~~'.I/:"\.JgOln uau.
...*. "em. *m.'o. *N.'W~t~*.*.c.">.*.I'
'liit.'A. I.' . . .
- 11~~~[!~lO . "",C!Si.*2'0jj~\lf~";'(.il*.'~.).:./.
f't~'*'rjJQU,~~q.;jf S~.,'.i.'.).'" ",', . *j~.t~j?;;
- 1..7
- ::; / .., . c . '
.J'~Jts:JL*;
STEP PERFORMANCE STANDARD
- 4. 2. CHECK that no fault indications are Examinee notes that: N present for 4.16 kV Bus 24C. _"DIESEL GEN 12U BKR TRIP"(A-30, C08)
_ "DIESEL GEN 12U BKR CLOSING CKT BLOCKED" (C-36, C08),
_"4KV BUS 24NC TIE BKR A304 TRIP" (A-10, C08)
"4KV BUS 24C/E TIE BKR A305 TRIP"(B-10, C08) are not lit and determines that no fault exists on Bus;;;.,.;;;;...;.,..;;;...;.~=~=-
24C.
Cue:
Comments:
- 5. 3. ENSURE ALL of the following Examinee ensures all of the following N breakers are open (C-08): breakers are open (C-08):
_A304, "24N24C TIE BKR, 24C-1T-2" A304, "24N24C TIE BKR, 24C-1T-2"
_ A305, "24C/24E TIE BKR, 24C-2T-2" _ A305, "24C/24E TIE BKR, 24C-2T-2" A312, "DG A FDR BKR, 15G-12U-2" _A312, "DG A FOR BKR, 15G-12U-2" by observing either green "OPEN" light, or no ht lit ( racked down )for each breaker. I .
Cue:
Comments:
- 6. 4. ENSURE A702, "RSS FOR BKR, Examinee notes by red "CLOSE" light that 22S3-2-2", is closed. (C-08) A702, "RSS FOR BKR, 22S3-2-2", is closed. (C-08 Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICAL f STEP 1 PERFORMANCE I STANDARD (YIN)
GRADE (S/U)
- 7. NOTE Due to the "Dead Bus" state of 4.16 kV Bus I Examinee reads and acknowledges note. N 24C, the 1--------1 Cue:
Comments:
- 8. 5. PLACE "SYN SW, 22S3-24C-2 Examinee states that the synchroscope is N (A302)" to "ON" and CHECK not moving.
"INCOMING" voltage indicated. (C-08)
Y Examinee places "SYN SW, 22S3-24C-2 (A302)" to "ON" and checks "INCOMING" indicated on
- 9. 6. PLACE ALL four "UV BUS A3" Examinee obtains (4) "UV BUS A3" y channel bypass keyswitches to the channel bypass keys ( key 26) and installs "INHIBIT" position. (Key 26) them in "UV BUS A3" locations on all (4)
(ESF Sensor Cabinets) ESF sensor cabinets. Examinee rotates the kevs to the "INHIBIT' Cue:
Comments:
10.
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD 11 . 8. PLACE 80TH of the following control Examinee rotates the following control y switches in "PULL TO LOCK": switches to the left places in "PULL TO
_ Service Water Pump A LOCK" RBCCW Pump A _ Service Water Pump A RBCCWPumcA Cue:
Comments:
- 12. I 9. PLACE BOTH SG Auto Aux Feed Examinee places both S/G Override Switches in "PULL TO LOCK." "OVERI DE/MAN/START RESET" Cue:
Comments:
- 13. 10. OVERRIDE ALL of the following Examinee overrides the following control N control switches to prevent an switches by to prevent an inadvertent inadvertent automatic start: automatic start:
_HPSI Pump A _HPSI Pump A
_LPSI Pump A LPSI Pump A Containment S Containment Cue:
Comments:
14.
Cue:
Comments: I Student should recommend success path of energizing bus Bus 24E from Unit-3.This will allow energizing "8" Service Water Pu_m~p_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _---,
Page 8 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 15. Attachment 23-N Energizing 4.16 kV Bus dent refers to Attachment 23-N for 24E From Unit 3 4.16 kV Bus 24E From Unit 1------1 ~~~~~==~~--==~
Cue:
Comments:
1 6. NOTE Examinee reads and acknowledges note N The following may indicate a fault on 4.16 for fault indications on Bus 24E.
kV Bus 24E:
_ Annunciator "4KV BUS 24E/34B TIE BKR A505 TRIP" lit (A-9, C08)
_ Annunciator "4KV BUS 24C/E TIE BKR A305 TRIP" lit (B-10, C08)
Annunciator "4KV BUS 24D/E TIE BKR TRIP" lit Cue:
Comments:
- 17. 1.CHECK that no fault indications are Examinee notes that: N present for 4.16 kV Bus 24E. "4KV BUS 24E/34B TIE BKR A505 TRIP" (A-9, C08)
_ "4KV BUS 24C/E TIE BKR A305 TRIP" (B-10, C08)
_ "4KV BUS 24D/E TIE BKR A408 TRIP" (D-10, C08) lights are not lit, indicating no faults on bus 24E.
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number: JPM-S6.1 Rev.. o lfig,,_
STEP PERFORMANCE STANDARD
- 18. I 2. ENSURE 4.16 kV Bus 24E "SPLY VOLTS" voltage is indicated.
IExaminee verifies Bus 24E "SPLY N VOLTS" indicate -4200 VAC Ie .-', A, XL~_ ,,' ~_~- .--,.@,b.,
Cue:
Comments:
- 19. 3. ENSURE ALL of the following load Examinee verifies by green "OPEN" or no N breakers on 4.16 kV Bus 24E are open: light indication that the following load
_ A502, "SERVICE WTR PUMP B" breakers on 4.16 kV Bus 24E are open:
- A503 , "HPSI PUMP Bit _ A502, "SERVICE WTR PUMP B"
- A504 , "RBCCW PUMP B" - A503 , "HPSI PUMP B" "RBCCW PUMP B" Comments:
2 O. 4. ENSURE ALL of the following breakers Examinee ensures that the following N are open: breakers are open by observing green
_ A305, "24C/24E TIE BKR, 24C-2T-2" "OPEN" light indication only, or no light
_ A408, "24D/24E TIE BKR, 24D-2T-2" indication for the breaker:
A305, "24C/24E TIE BKR, 24C-2T-2" l... . .,M,.;,:,," ,-,
A408 "24D/24E
"""X_N:;YS4b;;",,~, _,L-*
TIE BKR. 24D-2T-2"
.:& ,v",'""
Cue:
Comments:
- 21. I 5. REQUEST permission from Unit 3 Shift Examinee either states that he/she will call I N Manager or Unit Supervisor to energize Unit-3, or calls the booth operator and Unit 2 4.16 kV Bus 24E from Unit 3 4.16 kV requests from Unit-3 SM/US permission to Bus 34A134B. energize 24E from Unit-3.
Cue:
Comments:
Page 10 of 13
PERFORMANCE INFORMATION JPM Number:
S_cT.EP
<---__ PERFORMANCE STANDARD
- 22. NOTE Examinee reads and acknowledges note. N Due to the "Dead Bus" state of 4.16 kV Bus 24E, the svnchroscooe will not move.
Cue:
Comments:
~-
- 23. 6. PLACE "SYN SEl SW, 34B-24E-2 Examinee places "SYN SEl SW, 34B (A505)" to "ON" and CHECK "INCOMING" 24E-2 (A505)" to "ON" and checks
~_ ' voltage indicated. "INCOMING" voltaae indicated.
Cue:
Comments:
- 24. Y Cue:
Comments:
25.
Cue:
Comments:
26.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 11 of 13
JPM Number: JPM-S6.1 Rev. ___0,--__
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
- During the TPE, the trainee Evaluation
- performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
JPM Number: JPM-S6.1 Rev. ___0=--__
STUDENT HANDOUT Initial Conditions:
- The Unit Supervisor has directed you to repower Bus 24C from the RSST so that a Service Water Pump can be restored to Facility 1.
Initiating Cues:
- Unit-2 is in Mode 3 after experiencing a plant trip.
- All SPTA's of EOP 2525 have been carried out.
- Bus 24C failed to transfer to the RSST on the plant trip.
- There are no faults indicated on Bus 24C
- "An EDG is out of service for maintenance Page 13 of 13
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-S3.1 Revision: 0
--=-
II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Page 1 of 18
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 18
JPM Number: JPM-S3.1 Rev. ___0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S3.1 Rev. _ _-'0=--__
Task
Title:
System:
Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s): _ _ _ __
Applicable To: SRO RO _X__ PEO _ _
KIA No. A4.07 KIA Rating ___4_.4_/4_._4__
Method of Testing:
Simulated Performance:
X Actual Performance: -----=--='----
Location:
Classroom: Simulator: X In-Plant:
--- -=--
Task Standards: At the completion of this JPM, the examinee will raise #1 SIT level by 2% using the '~" HPSI Pump.
Required Materials OP 23060 Section 4.1, " Raising SIT Level" (procedures. equipment. etc.): OP 23060 Section 4.2, " Reducing SIS Loop High Pressure After Filling SIT" General
References:
OP 23060 Safety Injection Tanks, RCS >1750 psi ARP 2590A-040 "SAFETY INJECTION TANK 1 PRES LO"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 18
JPM Number: JPM-S3.1 Rev. ___0,---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been directed to fill #1 SIT to a final level of -58% using P41-A ("A" HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.
Initial Conditions: * #1 SIT level is 56.7%
- Sampling of the #1 SIT is not required.
Simulator
- IC-151 Requirements: * #1 SIT level is 56.7%
- "SAFETY INJECTION TANK 1 PRES LO" (C-01lD-10)
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at'!" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Page 4 of 18
PERFORMANCE INFORMATION JPM Number: o CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (S/U}_I
.ii$TARII~E'::!J;;
, ...."".,~[~.1l!J .... ,,~_ __
- 1. I OP 23060 4.1 Raising SIT Level Examinee notes that cause of level N 4.1.1 IF the cause of the SIT level reduction change is known and that this step is not is unknown, Refer To SP 2604Z and required.
PERFORM applicable steps to confirm the associated SIS header to Loop piping penetration(s) full. (UT Points 15, 16, 17, or Page 5 of 18
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 2. 4.1.2 DETERMINE desired SIT(s) level using one of the following criteria: Examinee determines that sampling is not N
_ IF sampling is not required, do not fill required as given in initial conditions, and greater than 58.8% (alarm C-01 59%) that desired stop level is < 58.8% (alarm C-0159%)
_IF sampling is required, do not fill greater than 59.6% (PPC high alarm 59.7%) the following alarms are expected (C-01):
SAFETY INJECTION TANK 1 LEVEL HI" (A-10)
_ SAFETY INJECTION TANK 2 LEVEL HI" (A-11 )
SAFETY INJECTION TANK 3 LEVEL HI" (A-12)
_ SAFETY INJECTION TANK 4 LEVEL HI" (A-13)
Cue:
Comments:
Page 6 of 18
PERFORMANCE INFORMATION JPM Number:
GRADE I STEP I PERFORMANCE I STANDARD CRITICAL (YIN) (S/U)
- 3. NOTE
- 1. The facility one Header Stop (2-SI-656) I Examinee reads and acknowledges note. N is the only HPSI HDR Stop that can be opened with the DIP caused by having a running HPSI Pump. The HPSI HDR Stop must be closed, prior to starting a HPSI Pump, to prevent the pressure wave, which will cause perturbations in the downstream piping and valves.
- 2. The following alarms are expected after reopening 2-SI-656:
_ SIS TO LOOP 1A PRESS HI, (C-01, window A-14)
_ SIS TO LOOP 1B PRESS HI, (C-01, window B-14)
_ SIS TO LOOP 2A PRESS HI, (C-01, window C-14)
SIS TO LOOP 2B PRESS HI. (C-01, Cue:
Comments:
4.
Cue:
Comments:
Page 7 of 18
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 5. 4.1.4 CLOSE 2-SI-656 "HPSI HDR A Examinee closes 2-SI-656 "HPSI HDR A STOP." STOP" by rotating its keyswitch to the y CLOSE direction and verifies closed by I Jeen CLOSE light lit on J.",)/),Lh Cue:
Comments:
- 6. 4.1.5 WHEN HPSI pump is started, CHECK Examinee notes and acknowledges the following (C-01): expected pump starting parameters. N
_ Motor amperage 20 to 30 amps
_ Nominal discharge pressure 1250 to 1300 1-------1
, psi Comments:
- 7. 4.1.6 START one of the following HPSI Examinee starts "P-41A, HPSI PP A" as pumps (C-01). directed by initiating cue by taking its y
- "P-41A, HPSI PP A" handswitch in the clockwise direction and IF aligned to Facility 1, "P-418, HPSI PP verifies by light, amp, and/or discharge 8" pressure that the pump is running.
Cue:
Comments:
- 8. 4.1.7 WAIT 10 seconds. After 10 second wait, examinee opens 4.1.8 OPEN 2-SI-656 "HPSI HDR A 2-SI-656 "HPSI HDR A STOP" by rotating y STOP." its keyswitch to the open direction and I observinq its red OPEN Iiaht lit.
~~~~
Cue:
Comments: I Page 8 of 18
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 9. I 4.1.9 LOG out of TSAS 3.5.2.a. I Examinee informs US to log out of TSAS N Comments:
- 10. I CAUTION I Examinee reads and acknowledges Recirculation header must not be subjected caution. N to pressure above 300 psig as indicated on "RECIRC HDR PRESS, PI-30S."
NOTE When raising pressure during reactor I Examinee reads and acknowledges note. N startup before containment reaches operating temperature, SIT pressure should be limited to 220 psig to allow for thermal l:)(el:l.nsio~:.
Cue:
Comments:
11 . I 4.1.10 IF filling SIT 1, PERFORM the Examinee opens "SI-611, FILL & DRN" by following (C-01): rotating its handswitch to the open y
- a. OPEN "SI-611. FILL & DRN." direction and observing its red OPEN light lit.
Cue:
Comments:
12 . I b. THROTTLE open "SI-618, HDR-1A CK Examinee throttles open "SI-618, HDR-1A VLV LKG DRN STOP" not to exceed 300 CK VLV LKG DRN STOP" not to exceed y psig, indicated on "PI-305, RECIRC HDR 300 psig, indicated on "PI-30S, RECIRC PRESS." HDR PRESS" usina its control knob.
Page 9 of 18
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 13. c. WHEN any of the following occur, CLOSE SI-618: Examinee closes SI-618 after filling to y
_ "L311 SI TK 1 LVL" at desired level (PPC) -58% and < 58.8% (alarm C-01 59%) by
_ "P311 SI TK 1 PRESS" pressure 225 psig rotating its control knob and observing its (PPC) green CLOSE light
_ "PI-311, SIT 1 PRESS" pressure 225 psig PPC SIT high level alarm (59.7%
'¥ '" r ,,,Ali """ .. ",' ~"k,,,,,,,, h/
Cue:
Comments:
1 4. I d. CLOSE "SI-611, FILL & DRN." Examinee closes "SI-611, FILL & DRN" by y rotating its handswitch to the close direction and observing its green CLOSE t
Cue:
Comments:
- 15. 4.1.11 IF filling SIT 2, PERFORM the Examinee notes that these steps are not following (C-01): required, and N/A's these steps. N 4.1.12 IF filling SIT 3, PERFORM the following (C-01):
4.1.13 IF filling SIT 4, PERFORM the followina (C-01 Cue:
Comments:
Page 10 of 18
PERFORMANCE INFORMATION JPM Number: JPM-S3.1 CRITICAL I GRADE f STEP PERFORMANCE I STANDARD ('(IN) (S/lJ)
- 16. 4.1.14IF no longer required, STOP HPSI Examinee stops "P-41A, HPSI PP A" by y pump (C-01). rotating its handswitch to the counter clockwise direction.
Cue:
Comments:
- 17. 4.1.15 IF any SIT fill was terminated due to 1 Examinee states that this step is not N pressure limit AND it is desired to continued applicable filling, Refer To Section 4.5 to vent Cue:
Comments:
Page 11 of 18
PERFORMANCE INFORMATION JPM Number: 1 CRITICAL GRADE STEP I PERFORMANCE STANDARD (YIN) (S/U)
- 18. 4.1.16 Refer To one ofthe following and Examinee states or attempts to perform RECORD new SIT level and if applicable, the following administrative actions prior to boron concentration. proceeding.
_ SP 2619A-001, "Control Room Daily N Refers to SP 2619A-001, "Control Room Surveillance, Modes 1 and 2" Daily Surveillance, Modes 1 and 2" and
_ SP 2619A-002, "Control Room Daily records new SIT level and if applicable, Surveillance, Modes 3 and 4" boron concentration.
4.1.17 UPDATE applicable control board marker reference level(s). Update applicable control board marker reference level(s).
4.1.18 CHANGE applicable PPC temporary high alarm limit(s) for new reference Change SIT#1 PPC temporary high alarm level(s). limit(s) for new reference IQ\Ij:"lf~
Cue:
Comments:
19.
Examinee reads and acknowledges N caution.
Cue:
Comments:
Page 12 of 18
PERFORMANCE INFORMATION JPM Number:
I STEP PERFORMANCE STANDARD CRITICAL (yIN)
GRADE (S/U)
- 20. 4.1.19 Go To Section 4.2 to lower SIS loop I Examinee goes to Section 4.2 to lower SIS N pressure to clear annunciator.
L . , ....... *'e'**** , . . .*. J * ..*.* A .
- u .d **.*
Cue:
Comments: ----
21 . 4.2.1 IF "SIS TO LOOP 1A PRESS HI," (A Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 1A PRESS HI" alarm:
01 ):
- b. CRACK open "SI-618, HDR-1A CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
- c. WHEN "P319 SIS TO LOOP 1A PRES," b. CRACK open "SI-618, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
- 1) "SI-618, HDR-1A CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P319 SIS TO LOOP 1B PRES,"
- 1) "SI-618, HDR-1 B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication
- 2) "SI-611, FILL & DRN" by rotating its N
switch to the "CLOSE" direction and "hc>",r\linrt the green CLOSE licht lit
~
Cue:
Comments:
Page 13 of 18
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP I PERFORMANCE STANDARD (YIN) (S/U)
- 22. 4.2.2 IF "SIS TO LOOP 1B PRESS HI," (B Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 1B PRESS HI" alarm:
01 ):
- b. CRACK open "SI-628, HDR-1 B CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
- c. WHEN "P329 SIS TO LOOP 1B PRES," b. CRACK open "SI-628, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
- 1) "SI-628, HDR-1B CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P329 SIS TO LOOP 1B PRES,"
- 1) "SI-628, HDR-1 B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
- 2) "SI-621, FILL & DRN" by rotating its switch to the "CLOSE" direction and observino the oreen CLOSE lioht lit Cue:
Commen_ts_:~I ______________________________________________________________________________~
Page 14 of 18
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 23. 4.2.3 IF "S[S TO LOOP 2A PRESS HI," (C Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 2A PRESS HI" alarm:
01):
- b. CRACK open "SI-638, HDR-2A CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
- c. WHEN "P339 SIS TO LOOP 2A PRES," b. CRACK open "SI-638, HDR-1B CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
- 1) "SI-638, HDR-2A CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P339 SIS TO LOOP 1B PRES,"
- 1) "SI-638, HDR-1B CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
- 2) "SI-631, FILL & DRN" by rotating its switch to the "CLOSE" direction and observina the areen CLOSE light lit
~
Cue:
Comment-s-:+1-'-'--"--"--"--'-'--'------'-=""-'
Page 15 of 18
PERFORMANCE INFORMATION JPM Number:
PERFORMANCE STANDARD
- 24. 4.2.4 IF "SIS TO LOOP 28 PRESS HI," (D Examinee performs the following to clear 14, C-01) is lit, PERFORM the following (C "SIS TO LOOP 28 PRESS HI" alarm:
01):
- b. CRACK open "SI-648, HDR-28 CK VLV N its switch to the "OPEN" direction and LKG DRN STOP." observing the red OPEN light lit
- c. WHEN "P349 SIS TO LOOP 28 PRES," b. CRACK open "SI-648, HDR-18 CK VLV N (PPC) indicates 225 to 275 psig, CLOSE LKG DRN STOP" by rotating its knob and the following: observing the valve open by needle
- 1) "SI-648, HDR-2B CK VLV LKG DRN indication and red OPEN light indication STOP" c. WHEN "P349 SIS TO LOOP 18 PRES,"
1} "SI-648, HDR-18 CK VLV LKG DRN N STOP" by rotating its knob and observing the valve closed by needle indication and green CLOSE light indication N
- 2) "SI-641, FILL & DRN" by rotating its switch to the "CLOSE" direction and the areen CLOSE liaht lit
~---r-r:-,.,-l ""
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
- '~$'F~ej[IM]t!:
Page 16 of 18
JPM Number: JPM-S3.1 Rev. - - - - -
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall RE~sult of JPM: SAT UNSAT (circle one)
Areas for Improvement/Comments:
Page 17 of 18
JPM Number: JPM-S3.1 Rev. _ _-"O_ _
STUDENT HANDOUT Initial Conditions:
- You have been directed to fill #1 SIT to a final level of -58% using
- P41-A ("An HPSI Pump) to makeup for some known leakage back to the Primary Drain Tank.
Initiating Cues: * #1 SIT level is 56.7%
- Sampling of the #1 SIT is not required.
Page 18 of 18
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-S9.1 Revision: 0
--=-
II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor ~il' Date Page 1 of 15
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 15
JPM Number: JPM-S9.1 Rev. _ _......;0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-S9.1 Rev. - - - - o- - -
System: Radiation Monitoring Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s):
Applicable To: SRO X RO X PEO - -
KIA No. 071 A4.25 KIA Rating _-=3.=2/:...=3=.2:....-_
Method of Testing:
Simulated Performance: Actual Performance: - -X- -
Location:
Classroom: Simulator: X In-Plant:
Task Standards: At the completion of this JPM, the examinee will determine that the Vent Stack Radiation Monitor, RM8268, has failed and will take the appropriate actions for the failed Radiation Monitor.
Required Materials ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL" (procedures. equipment. etc.):
General
References:
ARP 2590E-061 "VENT STACK RADMONITOR HI/FAIL"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 15
JPM Number: JPM-S9.1 Rev. - - - o --
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL (C-06/07, A-12) alarm.
Initial Conditions:
- Unit-2 is in Mode 1 at 100% power
- You are the BOP operator.
- "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm has come in a few moments ago while you were out of the Control Room.
Simulator
- 1/0 RIC-8168 "EQUIP FAIL" light on.
Reguirements: * "VENT STACK RADMONITOR HI/FAIL" (C-06/07. A-12) alarm window lit.
- *
- NOTES TO EVALUATOR'" * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the pe:rformance of this JPM (in-plant only).
Page 4 of 15
PERFORMANCE INFORMATION JPM Number:
I I STEP I PERFORMANCE STANDARD CRITICAL (YIN)
GRADE (S/U)
- sfliftf.J1I!11E~lII
- . . - - - -
- 1. VENT STACK RADMONITOR HI/FAIL Examinee refers to ARP 2590E-061 for
, (C-06/07, A-12) 'C-OB/07. A-12) 1-------+
Cue:
Comments:
- 2. AUTOMATIC FUNCTIONS ALARA Examinee reads and acknowledges N To prevent contaminating low range stack ALARA note.
activity monitor during high radiation condition. ouraina is desirable.
Cue:
Comments:
- 3. 1. If red "HIGH" light is lit AND "STACK Examinee states that red "HIGH" light is N GAS EFFLUENT PURGE VALVE, not RV-8132," is in "ENABLE," purging of Unit 2 stack gaseous monitor, RM-8132B, is
--~--f-,.I,initiated (C-101)'
Cue:
Comments:
- 4. 1. IF high radiation condition exists, Examinee states that a high radiation N PERFORM the following: condition does not exist and that this step 1.1 Refer To MP-26-EPI-FAP06, is not applicable.
"Classification and PARs" and DETERMINE reportability.
1.2 MONITOR Unit 2 stack discharge 1--------1;,6 activity (C-101 Cue:
Comments:
Page 5 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 5. I NOTE Tech Spec 3.3.3.1, Radiation Monitoring I Examinee reads and acknowledges note N Table 3.3-6 Instrument 2.C requires about required operable channels.
channel 1 or channel 2 Noble Gas to be OPERABLE.
ILeA.***""."", .*,.,.,.~U Cue:
Comments:
- 6. 12. DETERMINE if equipment failure exists as follows: Examinee presses "TEST LT CK" Y 2.1 PERFORM the following to verify pushbutton.
display indication (C-101): Examinee verifies LED display indicates all I 2.1.1 PRESS 'TEST LT CK" pushbutton. N 8's and all lamps are lit.
2.1.2 VERIFY LED display indicates a/l 8's Examinee states that this step is not and all lamps are lit. applicable. N Cue:
Comments:
- 7. I ARP 2590E-061 NOTE Examinee reads and acknowledges note N Failure codes are displayed in scientific E about failure code display notation.
notation, e.g. 1.00EOO=1, 4.00EOO=4, 1.20E01 =12. etc.
Cue:
Comments:
Page 6 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 8. 12.2 At RIC-8168, CHECK for the following Examinee observes and states that the Y failure conditions: "EQUIP FAIL" lamp is 2.2.1 "EQUIP FAIL" lamp lit y 2.2.2 CHECK for channel 1 failure codes Examinee presses "DSP" "1" "30" "ENT."
as follows:
- a. PRESS "DSP" "1" "30" "ENT." y Examinee obtains CODE FAILURE value
- b. OBTAIN CODE FAILURE value. of "1.00EOO" for Channel 1.
Cue:
Comments:
- 9. I2.2.3 CHECK for channel 2 failure codes as I Examinee presses "DSP" "2" "30" "ENT." Y follows:
- a. PRESS "DSP" "2" "30" "ENT." Examinee obtains CODE FAILURE value y
- b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2.
Cue:
Comments:
- 10. 12.2.4 CHECK for channel 3 failure codes as I Examinee presses "DSP" "3" "30" "ENT." Y follows:
- a. PRESS "DSP" "3" "30" "ENT." Examinee obtains CODE FAILURE value y
- b. OBTAIN CODE FAILURE value. of "O.OOEOO" for Channel 2.
Cue:
Comments:
11 . 12.2.5 CHECK for channel 4 failure codes as I Examinee presses "DSP" "4" "30" "ENT." Y follows:
- a. PRESS "DSP" "4" "30" "ENT." Examinee obtains CODE FAILURE value y
- b. OBTAIN CODE FAILURE value. of "O.OOEDO" for Channel 4.
Cue:
Comments:
Page 7 of 15
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD n (YIN) (S/U)_
- 12. 2.2.6 CHECK for channel 5 failure codes as I Examinee presses "DSP" "5" "30" "ENT," Y follows:
- a. PRESS "DSP" "5" "30" "ENT," IExaminee obtains CODE FAILURE value Y
. b. OBTAIN CODE FAILURE value. of "O.OOEOa" for Channel 5.
I---~---i Cue:
Comments:
- 13. 2.2.7 IF any CODE FAILURE Table display Examinee refers to CODE FAILURE Table "numbers" are indicated, to identify failure.
I---~~--i' REFER to Table 1 to id Cue:
Comments:
Page 8 of 15
PERFORMANCE INFORMATION JPM Number:
~ l CRITICAL GRADE STEP PERFORMANCE STANDARD (YIN) (S/U) 1 4. I Table 1, Channel Failure Codes:
o No Failure Examinee identifies "Detector Failure" for Y 1 Detector Failure Channel 1.
2 Detector Saturation 3 Motor Failure 4 High Voltage Failure 5 Check Source Failure 6 Low Flow 7 Particulate Filter Failure 8 End of Particulate Filter Roll 9 High Pressure Trip Value Exceeded 10 Low Pressure Trip Value Exceeded 11 High Temperature Trip Value Exceeded 12 Low Temperature Trip Value Exceeded 13 High Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 14 Low Delta Pressure (Moving Filter Channel Only) Trip Value Exceeded 15 Reserved (High Flow on Some Monitors) 16 Tern Cue:
Comments:
Page 9 of 15
PERFORMANCE INFORMATION JPM Number:
~ STEP J PERFORMANCE STANDARD CRITICAL rf/N)
I GRAD.EJ (S/~)
- 15. NOTE
- 1. IF failure code "1" exists on" Channel 1" Examinee reads and acknowledges note N and channel is updating plant conditions, on resetting failure codes, and potential the monitor can be restored to service if differences in output readings of channels.
failure codes are reset.
- 2. Channels 1 and 2 are gaseous channels.
Channels 3, 4, and 5 are particulate channels. Therefore the output readings for channels 1, 2 compared to channels 3, 4, 5 could be sianificantlv different.
Cue:
Comments:
- 16. 2.3 CHECK if monitor detector "Channel 1" Examinee states that monitor detector is updating plant conditions, i.e. dynamic "Channel 1" is updating plant conditions, y indication update once per second. i.e. dynamic indication update once per second.
Cue Comments:
- 17. 2.4 PRESS "DSP" "3" "23" "ENT' to check Examinee states that "DSP" "3" "23" "ENT" if monitor detector "Channel 3" is indicating monitor detector "Channel 3" is indicating y plant conditions, i.e. is a static indication plant conditions, i.e. is a static indication and will not update once per second and and will not update once per second and should not read O. does not read O.
Cue:
Comments:
Page 10 of 15
PERFORMANCE INFORMATION JPM Number:
GRADE STEP PERFORMANCE STANDARD ~---- ----
(S/U)
- 18. 2.5 IDENTIFY any Main Board Rad Monitor IExaminee identifies that VENT STACK alarms. RADMONITOR HI/FAIL (C-06/07, A-12) N alarm is lit.
Cue:
Comments:
19.
Cue:
Comments:
- 20. 5. IF any of the following exist:
_ Failure codes exist other than No.1, Examinee states that this step is not y "Detector Failure" applicable due to only No.1, "Detector
_ "Channel 1" is not updating plant Failure" indicated, and both "Channel 1" conditions and "Channel 3" indicating plant
_ "Channel 3" is not indicating plant conditions.
conditions PERFORM the following:
_ CONSULT I&C or System Engineer for corrective action.
Generate CR.
Cue:
Comments:
Page 11 of 15
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD 21 . 5. OBTAIN key #82 and CLEAR failure Examinee obtains key #82 y codes at RIC-8168 as follows:
5.1 TURN key switch to "ENABLE." Examinee verifies key switch in "ENABLE" y 5.2 PRESS "FTN" "1" "07" "ENT."
Examinee presses "FTN" "1" "07" "ENT." y 5.3 CHECK "EQUIP FAIL" lamp not lit. IF lamp is lit, Go To step 5.6.
5.4 PRESS "ACS" "1/1 "ENT" to activate Examinee states that "EQUIP FAIL" lamp Channel 1 check source and CHECK is still lit and goes to step 5.6.
indication increases.
5.5 CHECK Main Board Rad Monitor y
alarms have cleared. Examinee turns key switch to "DISABLE."
5.6 TURN kev switch to "DISABLE."
Comments:
22.
- 23. NOTE If RM-8168 fails, Unit 2 stack gaseous Examinee reads and acknowledges note N monitor, RM-8132B, is the alternate about RM-8132B being that alternate radiation monitor to be used (preplanned radiation monitor.
1-----
. alternate method),
Cue:
Com~e~n~ts~:~IL- __________________________________________________________________________________~
Page 12 of 15
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD mO'/N) (S/ljL_
- 24. I 7. IF equipment failure did not clear, PERFORM the following:
Examinee places "STACK GAS y 7.1 To ensure Unit 2 stack gaseous EFFLUENT PURGE VALVE, RV-8132," in monitor, RM-8132B is not being purged, "DISABLE" (C-101).
PLACE "STACK GAS EFFLUENT PURGE VALVE, RV-8132," in "DISABLE" (C-101).
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
$TQ~~1JJlI~iY*____
Page 13 of 15
JPM Number: JPM-S9.1 Rev. _ _-'0'--__
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly_ If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation* .
performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 14 of 15
JPM Number: JPM-S9.1 Rev. ___0=--__
STUDENT HANDOUT Initial Conditions:
- The Unit Supervisor has directed you to carry out actions in response to "VENT STACK RADMONITOR HI/FAIL"( C-06/07, A-12) alarm.
Initiating Cues:
- Unit-2 is in Mode 1 at 100% power
- You are the BOP operator.
- "VENT STACK RADMONITOR HI/FAIL" ( C-06/07, A-12) alarm has come in a few moments ago while you were out of the Control Room.
Page 15 of 15
JOB PERFORMANCE MEASURE APPROVAL SHEET I. ..IPM
Title:
JPM Number: JPM-013 Revision:
6/1 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date 2006. Reviewed:
2006. Approved:
N/A Cognizant Plant Supervisor (optional) Date z-{s;r ,
Nuclear Training Supervisor date Page 1 of 13
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 6/0 11/19/2010 Minor admin changes to JPM to reflect minor procedure 6/1 i change (OP 2302A) and standards I
Page 2 of 13
JPM Number: ~IPM-013 Rev. - - 6/1 ---
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-013 Rev. _ _. :. :6/.. ,;.1_ _
Task
Title:
- .<'.i
- )
- .~...*.*.*
- .*..*. CI,lJ.,
t* *.*.**.****** **.I*
- .*.J..".* ..*n*
..*..*.*.O**.*.*.
a...."W ". . . . . . .'*. . ~.~
o ..*. . . . . . . . . . . .1!'".I;~JJi\;; .*....... f.. *ili."*.*J*.**.i*.***.**.n**.*.*.*.*.***g*****.*.** . '.' .\Ih,*J;;W'ml!l~*i:)
....i.;*. . .
_ .. S.*.e****c*****.*o.*'.n':.**.".:...** #**.*!
' f !.... i::
I ..i*..** .
- . M*..*...".
- .i*.;.;.~*.**.*..*.*..*.*.***e... ..";":\\~8h,;**'*Y' **.~4f~~~;i;r
. . . *.t*.. . . . . . . . . . . . . . " . ' . " . " . . "vi/Wi" System: Control Element Drive System (CEDS)
Time Critical Task: Yes No x Validated Time (minutes): 20 Task No.(s): NUTIMS #001-01-019 Applicable To: SRO X RO X PEO X KIA No. -A. 408 KIA Rating _ _3_.7_/3......_4__
Method of Testing:
Simulated Performance: - -X- - Actual Performance:
Location:
Classroom: Simulator: In-Plant: X Task Standards: At the completion of this JPM, the examinee has successfully started the '~" CEDM MG set and paralleled it with the "8" MG set.
Reguired Materials OP-2302A, Section 4.7 (pen and ink changes required)
(procedures, equipment, etc.):
General
References:
OP 2302A, "Control Element Drive System"
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
JPM Number: "IPM-013 Rev.
- - -6/1- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
- The plant is preparing for startup.
- All TCBs are open except TCB-9, which is closed.
- Both Voltage droop circuits are on.
- In-plant loads are powered from the RSST.
Initiating Cues:
- The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.
Simulator
- NIA Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the examinee states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. Ifnecessary, question the examinee for details of simulated actions/observations (i.e. "What are you looking at?" or "\\Inat are you observing?").
- 4. Under NO circumstances must the examinee be allowed to manipulate any devices during the performance ofthis JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 ST PERFORMANCE STANDARD
$~A~r.TIMS:,. _ _ __
- 1. CAUTION If bus 24C and 24D are not receiving power I Examinee reads and acknowledges the N from the same source, (not at the same Caution.
frequency), the CEDM MG set outputs cannot be paralleled due to the potential I difference in motor speeds.
- /h "~"A<A/ffd"",!j-V'A,A"~"",%L.,>,>"d\"",,,"_;< i"A_ ", " . *, ' <.'.'A~C , . ",l*,
Cue:
Comments:
2.
Cue:
Comments:
- 3. 4.7.2 PERFORM applicable action: Examinee progresses to step 4.7.3. y
Cue:
Comments:
4.
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 1 St~~ii1g!~Htr}t!?~f:~lIeURg:tS~Ga~q;;GF'J1)r{nM§~$et~:p4;;,>;:""
STEP PERFORMANCE STANDARD
- 5. 4.7.3 IF starting "A" CEDM MG second, Examinee states that they would place y PERFORM the following: "MG-A" handswitch to "START" or request that it be done by someone in the Control
- a. PLACE "MG-A" to "START" (C-04). I Room.
. -- _ . . I I Cue: I ' ,"..' k , ' .. '" ~ ** '1i> ""='~""'>''' ~~"trnl~"hri:t-":In:ci&'3th~ breakerJinform the examinee that it h'asbeen closed.
indication that would be seen based on the Comments:
- 6. b. PLACE "A" CEDM MG "MOTOR INPUT" Examinee states that they close MG motor y breaker to "ON" (top left of C-30). supply breaker by taking handle on top left of C-30 to "ON".
Cue:
Comments:
- 7. c. PLACE "A" CEDM MG "INCOMING Examinee states that they place y GENERATOR" synchronizing selector synchronizing selector switch on C-29 in switch to "LOCAL." "LOCAL".
Cue:
Comments:
- 8. Examinee states that they press "MOTOR y ON" pushbutton for 4-5 sec.
Cue:
Comments:
- 9. Examinee states that they have released the "MOTOR ON" Dushbutton.
Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD 1 O. I f. ALLOW MG set to come up to rated Examinee states that the "red" indicating N speed (red "LOCAL" "MOTOR ON" light, lit). light above the "Motor On" pushbutton should light when the MG set is at rated speed.
""",:",,:,"*,.,.,3:k u ,> '
Cue:
Comments:
11 .
Cue:
Comments:
- 12. h. WHEN 142 to 158 seconds have lapsed Examinee states that they are waiting and N after starting MG set AND within 2 second listening for 142 to 158 seconds after of the red 'MOTOR ON' light lighting, starting MG set AND within 2 seconds of LISTEN for audible clunk (indicates starting the red 'MOTOR ON' light lighting, for winding de-energized). audible clunk (indicates starting winding Comments:
13.
Cue:
Comments:
Page 7 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD
- 14. j. Using "LOCAL" "GEN VOLTAGE Examinee states that voltage is already at N ADJUSTMENT" switch, ADJUST 240 VAC and no adjustment is necessary.
"GENERATOR VOLTS" as close as ble to 240 volts.
Cue:
Comments: I The voltage indication was given in the previous step. However, If the examinee feels it must be adjusted, have them demonstrate how by pointing to the applicableI volt meter and where the needle should be for proper I ~
indication.
I ~---I
- 15. NOTE Closing "GENERATOR OUTPUT" breaker Examinee reads and acknowledges the N does not energize the bus. Note.
Cue:
Comments:
- 16. I k. PLACE "A" CEDM MG "GENERATOR Examinee states that they close MG Set y OUTPUT" breaker to "ON." Output breaker by taking handle on bottom ht of C-29 to "ON".
Cue:
Comments:
Page 8 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD
- 17. NOTE
- 1. If other MG set is not loaded, the speed I Examinee reads and acknowledges the N of each machine is very close to each Note.
other and the synchroscope may not be rotating.
- 2. The object of the following steps is to have the synchroscope at or very near the 12 o'clock position and nearly stationary and the voltages of both machines set at or near 240 VAC.
Cue:
Comments:
- 18. I. IF synchroscope is not at 12 o'clock and 1) Examinee states that they are turning y not rotating, PERFORM the following to get the "REMOTE" "GEN VOLTAGE the synchroscope to move: ADJUSTMENT" switch to raise the
ADJUSTMENT" switch, RAISE "GENERATOR VOLTS" to 250 VAC.
"REMOTE" ("B" CEDM MG) 2) Examinee states that they are turning "GENERATOR VOLTS" to 250 VAC. the "LOCAL" "GEN VOLTAGE
- 2) Using "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to lower the ADJUSTMENT" switch, LOWER "LOCAL" ("A" CEDM MG)
"LOCAL" ("An CEDM MG) "GENERATOR VOLTS" to 235 VAC.
"GENERATOR VOLTS" to 235 VAC.
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP PERFORMANCE STANDARD
- 19. I m. WHEN synchroscope is at the 12 o'clock 1) Examinee states that they are turning Y position, ADJUST both MG set output the "REMOTE" "GEN VOLTAGE voltages to 240 VAC. (The synchroscope ADJUSTMENT" switch to lower the should be nearly stationary.) "REMOTE" ("8" CEDM MG)
"GENERATOR VOLTS" to 240 VAC.
- 2) Examinee states that they are turning the "LOCAL" "GEN VOLTAGE ADJUSTMENT" switch to raise the "LOCAL" ("A" CEDM MG)
"GENERATOR ,VOLTS" to 240 VAC.
t ,... ..~~. '~M'~"" " _"_'_H,~,'_' J'.{~V'.'1(%,:;;;W:P;%SL$L,,,,,",-,_9 ' ,. . ,., "H ,>. t!:v.Mt~hZC.,,&b h_""~22t2t!M&,, * ,.'L;;:#",~, _ j Cue:
Comments:
- 20. I n. PRESS and HOLD "LOCAL" "LOAD ON". I Examinee states that they press the "A" Y CEDM MG set "LOAD ON" button until the L,,,,~,,,,,!,,,,,.,,,,."h ****. '. """'~h!:,!.",",va>>",*","".""""_T,_,,,,,_.
A.*:~OAD ON"li~.~t is Cue:
Comments:
21.
Cue:
Comments:
Page 10 of 13
PERFORMANCE INFORMATION JPM Number: JPM-013 Rev.. 6/1 STEP L PERFORMANCE STANDARD n _ - - - , - , , - - ,
- 22. p. PLACE "A" CEDM MG "INCOMING Examinee states that they turn the GENERATOR" synchronizing selector synchronizing selector switch to "OFF."
t-------hL~A,_
switch to "OFF."
Cue:
Comments: I If performing this JPM with either MG set operating. TERMINA TE the JPM after the completion of this step.
If performing this JPM with both MG sets secured and permission has been granted to open the cabinet, continue the JPM to normal comDletion.
- 23. I q. PRESS and RELEASE "RESET," (back I Examinee opens the back door of C-29 N of C-29). and states that they would press the reset button.
Cue:
Comments:
24.
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
S.TPP 11IfJJ~:
Page 11 of 13
JPM Number: JPM-013 Rev. _ _...:.c6/,-1_ _
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the examinee to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one) the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
never put anyone's safety at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
..IPM Number: JPM-013 Rev. _ _.:::..:6/~1 _ _
STUDENT HANDOUT Initial Conditions:
- The plant is preparing for startup.
- All TCBs are open except TCB-9. which is closed.
- Both voltage droop circuits are on.
- In-plant loads are powered from the RSST.
Initiating Cues:
- The Unit Supervisor has directed you to startup the "A" CEDM MG set and parallel it with the "B" CEDM MG set.
Page 13 of 13
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: JPM-124 Revision: 4/0 II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
Technical Revie r P;&p/ Da e IV. Approved:
Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor 2J¥11 Date Page 1 of 8
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE
..... "'...."'-317 Update JPM to include HUP evaluations and new format Page 2 of 8
JPM Number: JPM-124 Rev. _ _....:.;4/~0_ _
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
JPM Number: JPM-124 Rev. - - 4/0 ---
Task
Title:
System: Service Water Time Critical Task: Yes ---- No x Validated Time (minutes): 15 Task No.(s.): _ _ _ _ _ _ _ _ _ __
Applicable To: SRO X RO X PEO - - -
KIA No. 076 A4.02 KIA Rating _ _2_.6_/2_._6__
Method of Testing:
Simulated Performance: - -X- - Actual Performance:
Location:
Classroom: - - - - Simulator: In-Plant: --=-=-
X Task Standards: At the completion of this JPM, the examinee will have placed 2-SW-3.2A in manual operation and closed the valve.
Required Materials OP 2326A Attachment 3" Manual Operation of 2-SW-3.2A and 2 (procedures, equipment. etc.): SW-3.2B" General
References:
OP 2326A Service Water
- * *
- READ TO THE EXAMINEE * * *
- I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make al/ written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
JPM Number: 24 Rev. _ _....:.:4/'-=0_ _
.JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
- The examiner will act as the US as needed.
Initial Conditions:
- The plant has tripped due to a LOCA.
- A SIAS was automatically actuated.
- "8" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.
Simulator
- N/A Requirements:
-It -It -It NOTES TO EVALUATOR -It -It -It-lt
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. Ifnecessary, question the student for details of simulated actions/observations (Le. "What an~ you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 1. OP 2326A Attachment 3
- 1. To place valve in manual, PERFORM the Examinee identifies 2-SW-3.2A and N following: documents valve number and function on 1.1 DOCUMENT valve number and function top of Attachment 3 (OP 2326A).
I ~, ~.. of this Attachment Cue:
Comments:
2.
Cue:
Comments:
- 3. I 1.3 OPEN operating cylinder equalizing Examinee opens operating cylinder y valve. equalizing valve for 2-SW-3.2A by taking the valve to the counter-clockwise direction.
Cue:
Comments:
- 4. 1.4 To align slot in shaft with T-handle I Examinee aligns slot in shaft with T-handle y mechanism, OPERATE manual handwheel. mechanism with the use of the manual handwheel.
Cue:
Comments:
Page 5 of 8
PERFORMANCE INFORMATION JPM Number:
GRADE STEP PERFORMANCE STANDARD JS/U}
- 5. 1.5 ENGAGE T-handle mechanism in valve Examinee ENGAGE's T-handle y shaft. mechanism in valve shaft for 2-SW-3.2A.
Cue:
Comments:
- 6. NOTE The following are reverse acting valves: Examinee reads and acknowledges note. N
_ 2-SW-3.2B, 'A' SERVICE WATER HEADER TO TBCCW HEAT EXCHANGERS"
_ 2-SW-3.2A, 'B' SERVICE WATER HEADER TO TBCCW HEAT I--_ _ _-+I.,,:;;~~;;;..X:.,:C..;,..H~J\NGERS" Cue:
Comments:
- 7. 1.6 POSITION valve as directed by SM or Examinee closes 2-SW-3.2A by operating y US: handwheel in counterclockwise direction to
_ To close valve, OPERATE handwheel in its limit of travel.
counterclockwise direction.
_ To open valve, OPERATE handwheel in 1------1 clockwise direction.
Cue:
TERMINATION CUE: The evaluation for this JPM is concluded.
" .. "';/ <'" S:;<U'/~;///// / ,
,~Pl1ME::
Page 6 of 8
JPM Number: JPM-124 Rev. _ _....:.:4/....::.0_ _
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation ..
performed the task correctly and in accordance with procedure Pass 1 Fail usage and adherence requirements.
never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass I Fail never violated radioloQical work practices. Pass / Fail demonstrated effective use of event-free human performance too Pass / Fail Areas for Improvement/Comments:
Page 7 of 8
JPM Number: JPM-124 Rev. _ _:....:4/:....:0_ _
STUDENT HANDOUT Initial Conditions:
- You have been directed to take manual control and close 2-SW-3.2A per OP 2326A, Attachment 3
- The examiner will act as the US as needed.
Initiating Cues:
- The plant has tripped due to a LOCA.
- A SIAS was automatically actuated.
- "B" Service Water Supply to TBCCW Heat Exchangers, 2-SW-3.2A, failed to close on the SIAS signal, and will NOT close from the Control Room.
Page 8 of 8
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM
Title:
JPM Number: ..IPM-P2.2 Revision: --::-
II. Initiated:
Marc R. Pucel 02/01/11 Developer Date III. Reviewed:
T~chnical ReVier IV. Approved:
Cognizant Plant Supervisor (optional) Date
"'"" Nuclear Training Supervisor Date Page 1 of 13
SUMMARY
OF CHANGES:
All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format Page 2 of 13
JPM Number: JPM-P2.2 Rev. ___0=--__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility: MP2 Examinee:
. .IPM Number: JPM-P2.2 Rev. ___0"-__
Task
Title:
System: Instrument Air Time Critical Task: Yes No x Validated Time (minutes): __ 2_0_ __
Task No.(s): _ _ _ _ _ _ _ _ _ __
Applicable To: SRO X RO X PEO KIA No. 065 M1.04 KIA Rating _---C::.3..:....:.5:..:..../3=-::.-"-4_ _
Method of Testing:
Simulated Performance: X Actual Performance:
Location:
Classroom: Simulator: In-Plant: - -X- -
Task Standards: At the completion of this JPM, the examinee will have aligned a backup air supply to 2-CH-517, 2-CH-518, and 2-CH-619 per EOP 2541 Appendix 40.
Required Materials EOP 2541 Appendix 40, "Aligning Backup Instrument Air" (procedures. I~quipment. etc.):
General
References:
EOP 2541 "Standard Appendixes"
- * 'It
- READ TO THE EXAMINEE * * * 'It I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13
JPM Number: Rev. ___0=---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initiating Cues:
- You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-51B, and 2-CH-519 per EOP 2541 Appendix 40 Initial Conditions:
- Unit-2 was manually tripped due to low Instrument Air header pressure Simulator
- N/A Requirements:
- *
- NOTES TO EVALUATOR * * * *
- 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
- 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
- 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
- 4. Under NO circumstances must the student be allowed to manipulate any devices during the perfonnance of this JPM (in-plant only).
Page 4 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICAL GRADE STEP PERFORMANCE STANDARD (YiNL (§lU)
~:$i~ij1":*ili":~iii'i,i~f;.,--;_ __
- 1. Examinee refers to EOP 2541 Attachment I 40-A to C !lIil"I~IJ\';~<~'i~ iIlli nltiiJJi"'~""
Comments:
- 2. NOTE Examinee reads and acknowledges note N The next step places Backup Air Supply System in service for the following: (-5' Aux Bldg near letdown HX room)
_ CH-517, Auxiliary spray valve
_ CH-518, Charging header to loop 2A CH-519, Charging header to loop 1A
_ EB-88, RM-8123 inboard supply EB-89. RM-8262 inboard s Cue:
Comments:
- 3. 5. IF placing backup air in service for Charging and Sampling System isolation Examinee adjusts IA-591 backup air y valves, PERFORM the following: (-5' Aux PCV to minimum by turning the valve Bldg near letdown HX room) counterclockwise.
- a. ADJUST IA-591, backup air PCV to minimum. (full counterclockwise)
,:;;;:;z:;;;;:< ,m >1-" <8tW '"" tf:JtkJ ",;, "
Cue:
Comments:
Page 5 of 13
PERFORMANCE INFORMATION JPM Number:
CRITICALi GRADEl STEP PERFORMANCE I STANDARD {yIN} (S/U) I
- 4. b. Slowly OPEN IA-603, "MASTER STOP". I Examinee slowly opens IA-603, "MASTER y STOP" by taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
- 5. I c. OPEN IA-590, master stop. Examinee opens IA-590, master stop by y taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
- 6. d. ADJUST IA-591, backup air PCV Examinee adjusts IA-591, backup air PCV y clockwise and ESTABLISH 100 psig outlet clockwise to establish 100 psig outlet pressure. pressure as read on the downstream regulator Cue:
Comments:
- 7. e. UNLOCK and OPEN IA-566, master Examinee unlocks and opens IA-566, y stop. master stop by taking the valve handle in the counterclockwise direction to a hard sto Cue:
Comments:
8.
Cue:
Comments:
Page 6 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 9. g. Slowly OPEN IA-595, master stop. Examinee slowly opens IA-595, master y stop by taking the valve handle in the counterclockwise direction to a hard Cue:
Comments:
- 10. h. MONITOR backup air bottle pressure Examinee states that backup air bottle N every 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />. pressure will be monitored every 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> and is Dresentlv - 990 Cue:
Comments:
- 11. NOTE Approximately 50 psi of air is required to Examinee reads and acknowledges note. N cycle a valve. If the supply of air bottles is limited, the Shift Manager or TSC may elect
...~o chanae air bottles at a lower 1--------11,..,,:
Cue:
Page 7 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 12. i. WHEN pressure lowers to less than 1000 psig OR is expected to fall below Examinee determines that swing backup N 1000 psig before the next pressure air supply is available and is not supplying check, PERFORM ONE of the following: AC-15, 20, 12, and 47.
_ IF swing backup air supply is available Examinee refers to step 6 for aligning N AND not supplying AC-15, 20,12,47, swing backup air supply to Charging and Refer To step 6, and ALIGN swing Sampling System valves inside backup air supply to Charging and Containment.
Sampling System valves inside Containment.
REPLACE QA air bottle Com air to AC-15, 20,12, and 47. Use cue above.
Page 8 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 13. I The next step places swing backup air I Examinee reads and acknowledges note. I N supply in service for the following sets of valves:
_ Charging and Sampling System Valves Inside Containment:
_ CH-517, Auxiliary spray valve
_ CH-518, Charging header to loop 2A
_ CH-519, Charging header to loop 1A,
_ EB-88, RM-8123 inboard supply, EB-89, RM-8262 inboard s t;",,~," """0"""",,,.,*. ".0*-1,"
Cue:
Comments:
- 14. 16. IF placing swing backup air station in service for Charging and Sampling System, Examinee adjusts IA-886, "BtU AIR PCV" Y PERFORM the following: to minimum by taking regulator handle full
- a. ADJUST IA-886, "BtU AIR PCV" to counterclockwise.
minimum. (full counterclockwise) (14'6" Aux Bldg near MCC B61 1'"B_"..a'ffibffi~~pA''''''''''''0"",h0
Cue:
Comments:
- 15. b. Slowly OPEN IA-885, air bottle Examinee slowly opens IA-885, air bottle y "MASTER STOP". "MASTER STOP" by taking the valve (14'6" Aux Bldg near MCC B61 ) handle counterclockwise to a hard stop.
[,,"" ~ ,"-'" ~"'.'/"/Y<Y. ****,., '!!r,,~,...;,d\'!U'!.i:':,~ ',,"
Cue:
Comments:
Page 9 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 16. I c. OPEN IA-88?, "REGULATOR ISOL FOR Examinee opens IA-88?, "REGULATOR Y BtU IA", (14'6" Aux Bldg near MCC B61) ISOL FOR BtU IAn by taking the valve I ..*",. .. ~ ",;; " "'Yh" ,'.,',"',~." ,1 handle counterclockwise to a hard
~",A" Cue:
Comments:
1 7. I d. ADJUST IA-886,"BtU AIR PCV" Examinee adjusts IA-886,"BtU AIR PCV' Y clockwise and ESTABLISH 100 psig outlet clockwise and establishes 100 psig outlet pressure. (14'6" Aux Bldg near MCC B61) Pressure as indicated on the downstream Cue:
I..~ce.' **. ' *** ,="'.... >1" .. %'" UV ..**"", .**
Comments:
1 8. e. Slowly OPEN IA-889, "MANIFOLD Examinee slowly opens IA-889, ISOLATION FOR BtU AIR CYLINDER "MANIFOLD ISOLATION FOR BtU AIR Y C-3C". (14'6" Aux Bldg near MCC B61) CYLINDER C-3C" by taking the valve handle counterclockwise to a hard I** S.... M .d . ' , ,., ".'ffi " , ,. """ cc " . k. * '_0'_, _,.::,"/N/""",_",,""",,,,', "'//Mo, ,~ _, ft.,*,. .' " __,__,,,,w,y,,, ,"" ""
Cue:
Comments:
1 9. f. Slowly OPEN IA-910, "BtU Examinee slowly opens IA-910, "BtU Y AIR SWING BOTTLE MANIFOLD STOP AIR SWING BOTTLE MANIFOLD STOP VALVE". (14'6" Aux Bldg near MCC B61) VALVEil by taking the valve handle counterclockwise to a hard I, ' " S$.C!IJ>, . 'nM"ad:',~, t",.,,_ .". b , ** ,,;;;: f,,*S/>
Cue:
Comments:
- 20. I g. CLOSE IA-595, master stop.
(-5' Aux Bldg near letdown HX room)
IExaminee closes IA-595, master stop by Y taking the valve handle clockwise to a Comments:
Page 10 of 13
PERFORMANCE INFORMATION JPM Number:
STEP PERFORMANCE STANDARD
- 21. h. CLOSE IA-603, "MASTER STOP". (-5' Examinee closes IA-603, "MASTER y Aux Bldg near letdown HX room) STOP" by taking the valve handle clockwise to a hard stop. I
~~",;:<'W;;,,.",";:-":'1~1~i Ar ' , J,:",:t~:b" ->iMP "'AX,,,,
Cue:
Comments:
- 22. i. IF at any time during this evolution, Examinee reads and acknowledges this Containment isolation is required, step and states that this step will be left CLOSE IA-566, master open and used if required.
Comments:
23.
Com TERMINATION CUE: The evaluation for this JPM is concluded.
S]QRtl1N1E:
Page 11 of 13
JPM Number: JPM-P2.2 Rev. ___0_ __
VERIFICATION OF JPM COMPLETION
Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task? Yes No X Validated Time (minutes): 20 Actual Time to Complete (minutes):
JPM Work Practice Evaluation: SAT UNSAT NA (circle one)
Overall Result of JPM: SAT UNSAT (circle one)
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure Pass I Fail usage and adherence requirements.
never put anyone's safety at risk. Pass I Fail i never put equipment reliability at risk. Pass I Fail never violated radiological workpractices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
JPM Number: JPM-P2.2 Rev. _ _-'--_ _
STUDENT HANDOUT Initial Conditions:
- You have been directed to align Backup Instrument Air to 2-CH-517, 2-CH-518, and 2-CH-519 per EOP 2541 Appendix 40.
Initiating Cues:
- Unit-2 was manually tripped due to low Instrument Air header pressure.
Page 13 of 13
Appendix D Scenario Outline Form ES-D-1 Facility: MP2 Scenario No.: ES11 Ll1 Op-Test No.:_1"---_
Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __
Initial Conditions: 100% power, MOL, Eg. Xe., 9.2 ppm Boron SG8D @ 40 gpm per SG, 24E aligned to 24C, "8" TBCCW Pimp is OOS for motor repairs.
Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1, SGBD @ 25 gpm per SG, 24E aligned to 24C, "8" RBCCW Pump OOS for motor repairs. no other equipment OOS and no surveillance in progress or due.
Event No.
I Malf.
No.
Event Type*
Event Description 1 N/A N ISwap from "A" to "B" RBCCW Pump (TS)
(BOP/S) 2 RX11D I i #2 SG Alternate steam flow transmitter failure (BOP/S) 3 RD0368 C CEA #28 to slip 35 steps into the core. (TS)
(RO/S) 4 N/A R Downpower to < 70% power for CEA recovery i (All) (Reactivity) i 5 RP24D I I "D" CTMT pressure transmitter failure (TS)
(RO/S) 6 FW33 M
- Loss of vacuum with failure of Turbine Low Vacuum Trip TC10A (All) Manual reactor trip with loss of both Main Feed Pumps 7 FW30A C Degradation/loss of the "A" AFW Pump FW20A (BOP/S) Overspeed trip of the Turbine Driven Aux Feed Pump FW20C i 8 ED05D 1 M Bus 24D Fault i
(All)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39
Simulator Exercise Guide Job Aid Page 1 of 27 SEG#ES11L11 Rev;_O_
SITE: I Millstone Power Station I PROGRAM: Unit 2 LOIT NRC Exam I Title Simulator #1 I COURSE: I ESllLIl I Course #: NA i i Total Time 11.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> (C,©~'\1
~.-" "".
Prepared by: R.1. Ashey Printed Name
!~(j~ Instructo S SIgnature 12/7/10 Date Reviewed by: Jgh't".( t., er;'h/+l)lIi~ iv. ~~~vh aJA¥J (Optional) Printed Name Simulator Development Checklist Date Instructor Signature I
Reviewed by:
(Optional) Printed Name Simulat ~r ~lidation Checklist Signature Date
( '(,~~,
i Approved by: 1'"'~ i~~i {-fL-"
_ i > i,~',('
1 ,-.., ~
"-/
~
2/4/11 bate Printed Name Training Supervisor I I
Simulator Exercise Guide Job Aid Page 2 of 27 SEG# ES11L11 Rev;--,,-O_ _
Goal of Training: a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
- 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
- 2) Ability of the crew to:
- Understandlinterpret annunciators/alarms, plant/systems response
- Diagnose events/conditions based on signals/readings
- Comply with/use procedures, Technical Specifications, and TRIVI
- Perform control board operations
- Properly communicate information/proper crew interactions
- Practice Reactivity Management
- Make conservative decisions.
- 3) Ability of each individual to:
- Respond and correctly interpret annunciators
- Correctly diagnose events
- Properly interpret integrated system response
- Comply with and use Technical SpecificationslTRM
- Comply with and use procedures
- Properly perform control board operations
- Demonstrate responsible attitude
- Properly communicate information and interact with rest of crew
- Leadership skills required to effectively manage the evolutions
- Provide adequate overview where required Learning Objectives: NA Tasks: NA Prerequisites: N/A Training Resources: 2 booth instructors, 3 NRC Examiners
Simulator Exercise Guide Job Aid Page 3 of 27 SEG# ES11l11 Rev; --,,-0_ _
References:
OP 2330A, RBCCW System ARP 2590D-064, SG level Setpoint Deviation Hilla ARP 2590A-084, CTMT Pres Hi D RE Curve and Data Book AOP 2556, CEA Malfunctions AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP 2537, Loss of All Feedwater Commitments: N/A Evaluation Method:
Operating Experience:
Plant/Simulator differences that may affect the scenario: None Related PRA Core Damage Frequency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement "A" and "B" RBCCW Pumps must be swapped for maintenance.
Simulator Exercise Guide Job Aid Page 4 of 27 SEG#_-=ES"'-'1-'-'1L:.w11'--_ _ Rev; _0_
INITIAL CONDITIONS:
- 100% power EOL. (IC-171)
- 24E aligned to 24C
- "A" and "B" RBCCW Pumps must be swapped to allow maintenance to complete vibration testing.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
Scenario Summary.,;,
The crew will take the shift with the unit at 100% power, 24E aligned to 24C, The Crew will initially be directed to swap from "A" RBCCW Pump to "B" RBCCW Pump supplying Facility 1 for preventative maintenance on the "A" RBCCW Pump. The US will brief the crew and the BOP will perform the evolution. The US will log into TSAS 3.7.4.1 during the pump swap.
After the "B" RBCCW Pump is started and the US logs out of TSAS 3.7.4.1, the alternate steam flow transmitter for #2 SG will start to fail low. Feed flow to #2 SG will trend down. The SPO must diagnose the problem and deselect the failed transmitter. (Prior to deselecting the failed transmitter, the examinee may place the #2 FRV and both main feed pump speed controllers in 'manual' to control S/G level.)
Shortly after restoring #2 S/G level control to automatic, a CEA will slip to -145 steps. The BOP should lower Turbine load to match Reactor power. The crew will enter AOP 2556, CEA Malfunctions.
As a result of the slipped CEA, the crew will enter AOP 2575, Rapid Downpower, and reduce power to
,::70%.
During the down power, the "0" Containment pressure transmitter will gradually fail high. The US will enter TSAS 3.3,1,1, Table 3.3-1, Action 2, and TSAS 3.3.2.1, Table 3.3-3, Action 2, and direct the RO to bypass the appropriate channels of RPS (CTMT High Pressure) and ESAS (CTMT High Pressure and HighlHigh Pressure).
After the crew has taken the appropriate actions for the failed Containment pressure transmitter, Condenser Vacuum will rapidly degrade. Because the low vacuum Turbine trip will NOT actuate, the crew should immediately trip the Reactor prior to reaching 7.5" HG Backpressure and perform EOP 2525.
Shortly after the trip, "A" Aux Feed Pump will degrade. The pump will trip within a few minutes (if not manually secured) requiring the BOP to start the Turbine Driven Aux Feed Pump. Shortly after the TOAFP is started, it will trip on overspeed and cannot be restored.
After EOP 2525 is complete, Bus 240 will fault resulting in a loss of the only remaining Aux Feed Pump.
The crew will rediagnose and enter EOP 2537, Loss of All Feedwater. This will require lowering S/G pressure enough to initiate Condensate flow for heat removal.
The scenario will end when adequate Condensate flow is established to both S/Gs.
CT-1 (SPTA-5): Manually shut down the Reactor.
When Condenser Vacuum exceeds 7.5" Hg backpressure, the Turbine will fail to automatically trip. The Plant must be manually tripped to prevent an automatic trip on low Steam Generator Level.
CT-2 (LOAF-4): Establish a Primary to Secondary Heat Sink.
Main Feed flow (from Condensate) is restored prior to reaching 70 inches wide range level in either S/G OR Once-Thru-Cooling initiated with less than or equal to 70 inches in either S/G and level NOT being restored.
Simulator Exercise Guide Job Aid Page 5 of 27 SEG#'_-,=,E",,-S1w.1.!=lLl..! - , Rev;_O_
o ENSURE TRex Workstation is operating.
o VERIFY the most current approved training load is loaded.
o RESET to IC-30 o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
o As needed, RESET Computer Terminals (At Power displays if 100% power IC).
o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
o ENSURE RCS Leak Rate is reset in PPC.
o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
o If necessary (Le., exams), ADVANCE chart recorders o ENSURE the appropriate Protected Train placard is hung ("B" TRAIN PROTECTED).
o ENSURE appropriate signs are in place on simulator doors.
o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o If necessary, ENSURE Simulator fidelity items cleared.
o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o ENTER Initial Malfunctions I liDs I Remote Functions.
o PLACE Simulator to RUN.
o If placing Equipment ODS, then PERFORM necessary switch manipulations and HANG appropriatl9 tags, as required for the following:
o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
Simulator Exercise Guide
'Dominiont<
Job Aid Page 6 of 27 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 1. INiTIAL CONDiTIONS: ENTER or VERIFY the Initial Malfunctions 1II0s I N/A
- IC-171 I Remote Functions are loaded on the appropriate Schedule.
- Mode: 1
- Burnup:EOl
- Power: 99.8%
- Boron: (CB): 9.2 ppm
- Temperature: Tave 569°F
- Pressure: 2250 psia
- Xenon: Stable, at equilibrium
- Rods: ARO
- Generator: 888 Mwe N/A
- 2. SIMULATOR SETUP: COMPLETE Simulator Setup Checklist o As necessary, PERFORM I.V. of Initial Malfunctions Ili0s I Remote Functions entered.
- 3. TURNOVER: PERFORM the crew turnover SM brief crew on plant conditions and any major (Turnover Sheet) with the SM. equipment OOS. (All) Walk down control boards and let US know when they are ready.
- Crew must swap "A" and "B" RBCCW Pumps for maintenance.
Simulator Exercise Guide Job Aid Page 7 of 27 SEG# ES11L11 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 1. Swap From "A to "B" RBCCW Pump If Normal EvolutionlTechSpec US Directs/BOP Performs: Swap "A" and "B" RBCCW Pumps per OP 2330A, RBCCW System, Section 4.2.
Perform actions as directed. BOP:
If dispatched, report that SIAS/LNP
- Verify "B" RBCCW Pump is properly aligned ACTUATION SIGNAL HS 9119D is in BLOCK, with the SIAS/LNP ACTUATION SIGNAL HS 9119D in BLOCK.
- Verify RB-251A, AlB RBCCW Pump X-Tie Valve, is open on C-06.
- Ensure US logs into TSAS 3.7.3.1.
- Start "B" RBCCW Pump.
o Check "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator is lit on C-0617, a Check "B" RBCCW Pump for normal running amps and discharge pressure.
Event 7: CCR06 - 0, Close 2-RB-3A
- Direct a PEa to close 2-RB-3A, "A" RBCCW Pump Discharge Stop.
o Verify "A" RBCCW Header High Flow annunciator is clear.
Event 8: CCR40 - NORM, Place "B" RBCCW
- Direct a PEa to place "B" RBCCW Pump Pump SIAS/LNP Actuation Hand Switch in SIAS/LNP Actuation Hand Switch in
'Normal', 'Normal'.
a Verify "B" RBCCW Pump SIAS/LNP Start Manually Blocked annunciator clears.
- Verify US exits TSAS 3.7.3.1.
Event 9: CCR06 - 100, Open 2-RB-3A
- Direct a PEa to open 2-RB-3A, "A" RBCCW Pump Discharge Stop.
Acknowledge the direction and report that
- Direct a PEa to verify the appropriate Rad RBCCW Rad Monitors flows are normal. Monitor flow locally.
Simulator Exercise Guide Job Aid Page 8 of 27 SEG# ES11L11 Rev;_O__
Event 1: RX11 D - 100% with a Ramp Time of I BOP:
300 seconds, #2 Steam Generator Alternate Steam Flow Transmitter Failure.
- Recognizes a difference the #2 Main and Alternate Steam Flow Transmitters TM1, AE1
- Observe #2 S/G level rising.
- May observe S/G Level Deviation HilLa annunciator on C-OS.
- Reports to the US that the #2 Alternate Steam flow Transmitter appears to be failing high.
US:
- Directs BOP to deselect the #2 Alternate Steam Flow Transmitter (Select Main Steam Flow Transmitter) or, o If necessary, directs the BOP to place
- 2 Main Feed Reg valve in Manual and both Main Feed Pump speeds in manual to restore and maintain #2 SlG level to the normal band.
Simulator Exercise Guide Job Aid Page 9 of 27 SEG# ES11L11 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
- Deselects the #2 S/G Alternate Steam Flow Transmitter on C-OS.
- If necessary, takes manual control of #2 Main Feed Reg Valve and place both Main Feed Pump Speed Controls in manual.
a Restores and maintains #2 SlG level in normal band.
a When normal level has been restored, returns #2 Main Feed Reg valve and Main Feed pump Speed control to automatic.
Simulator Exercise Guide Job Aid Page 10 of 27 SEG# ES11L11 Rev; Event 2: RD0368 - 35 Steps, CEA #68 (Group RO:
- 7) slips to 145 steps
- Observes the following on C-04:
TM2,AE2 a CEA DROPPED NIS Annunciator a White light for CEA #68 is lit (red light out) o CEAPDS Monitor indicates that CEA
- 68 is misaligned.
a CEA GR DEV BKiUP annunciator.
- Reports that CEA #68 has slipped to 145 steps.
BOP:
Lowers Turbine load to match Reactor power and stabilize RCS temperature.
RO:
Monitors RCS temperature, Pressurizer pressure, and Pressurizer level.
US:
- Enters TSAS 3.1.3.1, action a.1.
When I&C assistance is requested, state that
- Requests I&C assistance.
you will begin troubleshooting immediately.
Simulator Exercise Guide Job Aid Page 11 of 27 SEG# ES11L11 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
- Notifies Reactor Engineering.
- Monitors d T Power on RPS.
- As required, toggles Dropped Rod Reset switches on RPS to clear Dropped Rod LEDs.
Simulator Exercise Guide Job Aid Page 12 of 27 SEG# ES11L11 Rev;_O__
AE3 US:
<1 hour.
- Performs Focus Brief for Trip Criteria and RCS Temperature Control.
- Directs or makes required notifications.
RO:
- Commences Forcing Pressurizer Sprays:
o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
US:
Refers to Reactor Engineering Curve and Data Book and determine that Reactivity Plan, RE-G 11 is appropriate for the down power.
Simulator Exercise Guide Job Aid Page 13 of 27 SEG# ES11L11 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS Commences Boration form the RWST (the crew may opt to Borate from the BAST):
- Ensures at least one Charging Pump is running.
- Checks Charging flow is appropriate.
- Starts an additional Charging Pump and j----~~_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + -.... b~l~nces Charging and Letdown.
BOP:
Reduces Turbine load using the LOAD LIMIT POT.
- Maintains Tc within 1°F of program.
- Maintains 50-150 MVARs Crew:
Maintains parameters within the prescribed limits of Attachment 1, Rapid Downpower Parameters.
BOP:
When power is between 80 and 85%, stops one of the three Condensate Pumps.
Simulator Exercise Guide Job Aid Page 14 of 27 SEG# ES11L11 Rev;_O__
Event 3: RP24D -100%, with a Ramp Time of I RO:
160 seconds. "D" Containment pressure Observes and reports CTMT PRES HI D transmitter fails high.
annunciator on C-01 TM3,AE4
- Reports value and trend of all Containment pressure indications and determines that Channel "D" appears to have failed high.
The crew may temporarily stop the downpower RO:
to address the failed instrument.
Closes RWST to Charging Suction, CH-19, if the US directs the downpower to be temporarily stopped to address the failed instrument.
BOP:
Maintains RCS temperature on program, if the US directs the downpower to be temporarily stopped to address the failed instrument.
US:
- Directs RO (or BOP) to obtain appropriate keys and bypass Channel "D" Containment Pressure on RPS and ESAS.
- Logs into TSAS 3.3.1.1. Table 3.3-1, and 3.3.2.1. Table 3.3-3.
- Contacts I&C for troubleshooting and repairs.
Simulator Exercise Guide Job Aid Page 15 of 27 SEG# ES11 Ll1 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO (or BOP):
us:
If the downpower were temporarily halted, directs the RO and BOP to commence the downpower as previously performed.
Simulator Exercise Guide Job Aid Page 16 of 27 SEG# ES11L11 Rev;_O__
CT-1 (SPT A-5): Manually shut down the Event 4: FW33 - 100%. Condenser Vacuum RO/BOP:
Reactor. rapidly degrades.
The plant must be manually tripped prior to
- Observes and reports annunciators and TC10A - Fail. The Main Turbine fails to trip on indications associated with a rapidly an automatic Reactor trip on low S/G level low Condenser Vacuum. (Inserted during initial degrading Condenser Vacuum due to loss of Main Feed Pumps setup)
- When directed, manually trips the Reactor TM4, MA1, CT1 and commences actions of EOP 2525, Standard Post Trip Actions.
US:
Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:
- Reactivity Control (RO) o Status of the Reactor
- Maintenance of Vital Auxiliaries (BOP) o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)
value & trend
Simulator Exercise Guide Job Aid Page 17 of 27 SEG# ES11L11 Re\l;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS a S/G levels, value and trend oRCS Subcooling Margin
- Containment (CTMT) Isolation (RO) a Radmonitors inside CTMT, outside CTMT, steam plant a CTMT pressure <1 psig
- CTMT temperature and pressure value and trend RO:
Performs associated actions of EOP 2525 and reports results when queried:
- RX tripped
- All CEAs inserted
- SUR negative and power lowering BOP:
Performs associated actions of EOP 2525 and reports results when queried:
- Value and trend of S/G pressures
- Closes MSIVs.
- Value and trend of T c
- Adjusts ADVs to maintain on the lower end of 880-920 psig.
- Value and trend of S/G levels
- Commence feeding S/Gs with 'A' and 'B' AFW pump, S/G level band 40-70%. (Main Feed Pumps tripped)
- Subcooling value / CET temperature
Simulator Exercise Guide Job Aid Page 18 of 27 SEG# ES11L11 Rev;_D__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
Continues with associated actions of EOP 2525 and reports results when queried:
- Rad monitors inside CTMT not going up or in alarm
- Rad monitors outside CTMT not going up or in alarm
- Steam Plant Rad monitors not in alarm or going up
- Value and trend of CTMT temperature and pressure BOP:
Continue with Subsequent Actions:
- Closes MSIVs due to condenser NOT being available
- Opens HD-1 06, Subcooling Valve
- Stops both Heater Drains Pumps
- Closes MFW pump mini flow Recirc(s},
FW-36NB
- If AFAS has actuated (alarms on C-04),
then places both Override hand switches in Pull-To-Lock and controls Aux Feed flow rate
- Secures all but one Condensate Pump
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
Simulator Exercise Guide Job Aid Page 19 of 27 SEG# ES11L11 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
US:
- At the completion of EOP 2525, Diagnostic Flow Chart, determines that the trip is uncomplicated and goes to EOP 2526, Reactor Trip Recovery.
- Places Master Silence Switch in NORM.
Simulator Exercise Guide Job Aid Page 20 of 27 SEG# ES11L11 Rev;_O__
Event 5: FW30A - 100%, with a Ramp Time of BOP:
270 seconds. "A" Aux Feed Pump degrades Observes lowing Aux Feed flow or S/G levels over the next 4.5 minutes.
continuing to lower with 2 Motor Driven Aux FW20A - Trip, with a 6 minute delay. "Au Aux Feed Pumps running.
Feed Pump trips 1.5 minutes after it is degraded.
- Trips "Au Aux Feed Pump or observes "N Aux Feed Pump is tripped.
Event 29: FW20C - TRIP, When the TDAFP
- Reports loss of liN Aux Feed Pump to the speed reaches 500 rpm, the pump will trip. US.
(Inserted during Initial setup.)
- If directed, dispatches a PEO to TM5, EM1 determine the cause of the pump trip.
- Starts the Turbine Driven Auxiliary Feed Pump.
If a PEO is dispatched to determine the problem
- Observes annunciator and indications of with the "Au Aux Feed Pump and/or the TDAFP: a trip of the TDAFP.
- Reports the loss of the TDAFP to the US.
- If the "Au Aux Feed Pump still running, report that there is a very loud screeching
- Closes the steam inlet valve to the noise that appears to be coming from the TDAFP.
outboard motor bearing.
- If the "Au Aux Feed Pump NOT running, report that the breaker is in the trip-free position and the outboard motor bearing is extremely hot.
- The trip mechanism latch on the Steam Admission Valve for the TDAFP is broken and cannot be fixed for several hours.
Simulator Exercise Guide Job Aid Page 21 of 27 Rev;_O__
Event 6: ED05D - Trip. Bus 24D trips on fault BOP:
resulting in a complete loss of all feedwater.
- Observes annunciators associated with the TM6, EM2, MA2, EU1 loss of Bus 24D on C-OB and reports the loss of Bus 24D to the US.
- When directed or when recommended, trips "B" DIG.
Event 10: CVR11 - 22E, When directed, Place US:
"B" Charging Pump on Facility 1.
- USing the Diagnostic Flow Chart, determine that Loss of All Feedwater has occurred.
- When (If) deemed necessary, dispatches a PEO to swap the "B" Charging Pump to Facility 1.
Safety Function Status Checks are normally US:
performed by the Shift Technical Advisor.
- Directs that Safety Function Status Checks Classifications are generally performed by the be performed.
Shift Manager.
- Classifies event as a General Interest, Echo due to the plant trip_
RO:
When directed by the US:
- Stops all Reps
- Places TIC-4165, Steam Dump Tavg Controller, in manual and closed.
- Places Pressurizer Spray Controllers in manual and closed.
Simulator Exercise Guide Job Aid Page 22 of 27 SEG# ES11L11 Rev;~O_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS If dispatched to determine if any Aux Feed BOP:
Pump can be started, as necessary, report that:
- Determines that both S/G levels are greater
- The "A" Aux Feedwater Pump outboard than 70" (Wide Range) and reports value motor bearing is still very hot and and trend to US.
discolored, The pump will NOT rotate by
- Using various indications, determines that hand. the loss of all feedwater was NOT caused
- The TDAFP overs peed trip mechanism is by a Main or Aux Feed Line break.
broken and cannot be repaired until new
- When directed by the US, performs actions parts are ordered or manufactured (at least to conserve S/G inventory:
4-6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br />) o Closes MS-220A and B, Blowdown
- Bus 24D has significant damage caused by Isolation Valves.
an internal phase to phase short. o Closes MS-191A and B, S/G Sample Isolation valves.
o Attempts to restore feedwater to at least one S/G.
- Determines that at least on Condensate Pump is running.
- Determines both Main Feed Pump Discharge Valves, FW-38A and B, are open.
- Closes both Main Feed Pump Min-Flow Valves, FW-36A and B.
- When (If) dispatched to locally open CNM-2, I
- Observes CPF Bypass Valve, CNM-2, is inform the Control Room that you'll do your deenergized (closed) and dispatches a PEO best, but it will likely take at least an hour to to manually open CNM-2.
complete. I
- Opens both Main Feed Reg Bypass Valves, FW-41 A and B.
o If MSI actuates, pushes the MSI OVRD push buttons, then opens the Feed Reg Valve Bypass Valves.
- Determines both Main Feed Air Assist Check Valves, FW-SA and B, are in the open position.
Simulator Exercise Guide Job Aid Page 23 of 27 SEG# ES11L11 Rev;_O__
BOOTH INSTRUCTOR STUDENTS RO:
During the subsequent cooldown and when permitted:
- blocks SIAS
- blocks MSI
- commences Emergency Boration CT-2 (LOAF-4): Establish a Primary to CT2 BOP:
Secondary Heat Sink.
Using the Steam Dumps to the Condenser, Main Feed flow (from Condensate) is initiates a cooldown at the maximum restored prior to reaching 70 inches wide range level in either SIG OR Once-Thru contro"able rate to establish feed flow from Condensate to the Steam Generators Cooling initiated with less than or equal to (approximately 550 psig in the S/Gs) 70 inches in either SIG and level NOT being restored.
- Controls feed flow to establish and maintain 40-70% in both S/Gs.
The US will likely direct the RO to prepare for US:
Once-Thru-Cooling prior to reaching 70 inches in either S/G.
- If either SIG level lowers to 70 inches and level is NOT being restored, directs the crew to initiate Once-Thru-Cooling.
- When Once-Thru-Cooling has been initiated, enters EOP 2540, Functional Recovery.
RO:
- Trips aI/ Proporlional Heaters.
- Places all Backup Heaters in Pull-To-Lock.
- Initiates both facilities of SIAS.
- Verifies "A" HPSI Pump is running.
- Verifies all HPSllnjection valves are open.
- Ensures at least "A" Charging Pump is running.
- Obtains keys and opens both PORVs.
Simulator Exercise Guide Job Aid Page 24 of 27 SEG# ES11L11 Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Opens both ADVs.
SCENARIO END: At the discretion of the lead
- When directed, FREEZE simulator.
evaluator, the simulator will be placed in
- Inform the crew that the evaluation is FREEZE. complete.
, Dominion Simulator Exercise Guide Job Aid Page 25 of 27 SEG# ES10Ll1 Rev; _0_
Delay Ramp I Event I Severity I Final IRelative Description Time Time Trigger Or Value Value Order MALFUNCTIONS
-~ ~--~~ ~~-- ~ -----
TC10A, Failure of the Main Turbine to trip on low vacuum. NA NA NA NA NA 1 FW20C, The TOAFP trips shortly after being started. NA NA 29 NA NA 1 RX11 0, #2 S/G Alternate Steam Flow Transmitter failure. NA 300 sec. 1 100 100 5 R00368, CEA #68 slips to 145 steps. NA NA 2 35 145 6 RP240, "0" Containment Pressure Transmitter fails high. NA 160 sec. 3 100 100 7 FW33, Condenser Vacuum rapidly degrades. NA NA 4 7.5 7.5 8 FW30A, "A" Aux Feed Pump degrades. NA 270 sec. 5 100 100 9 FW20A, "A" Aux Feed Pump trips 360 sec. NA 5 NA NA 10
~----~~~~- -------
E0050, Bus 240 trips on fault resulting in a loss of all feedwater. NA NA 6 NA NA 11 REMOTE FUNCTIONS CCR06, Close 2-RB-3A NA NA 7 0 0 2 CCR40, Place "B" RBCCW Pump SIAS/LNP Actuation Hand Switch in 'Normal'. NA NA 8 NORM NORM 3 CCR06, Open 2-RB-3A NA NA 9 100 100 4 CVR11. Place "B" Charging Pump on Facility 1. I NA NA 10 22E 22E 12 OVERRIDES I
(JjjJ"Dominion'*
SEG# ES10Ll1 Rev; _0_
Simulator Exercise Guide Job Aid Page 26 of 27 Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
Yes No
- 1. The desired initial condition(s) could be achieved. o
- 2. All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario.
- 3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
o
- 4. All applicable acceptance criteria were met for procedures that were used to support the simulator scenario.
o
- 5. During the simulator scenario, observed changes corresponded to expected plant response.
o
- 6. Did the scenario satisfy the learning or examination objectives without any significant simulator performance issues, or deviations from the approved scenario sequence?
o
- 7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o
sequence.
- 8. Any identified Critical Tasks possesses the following elements (NUREG-1021 ):
o
- Essential to safety with adverse consequences or significant degradation,
- Cue(s) prompt the Operator to respond.
- Defined and measurable performance indicators.
- Performance feedback.
The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.
Discrepancies noted (Check "none" or list items in comments field) None 125::1 Comments:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Simulator Exercise Guide Job Aid Page 27 of 27 SEG# ES10Ll1 Rev; _0_
SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED BY Today 0515 Unit Supervisor ('NIGHT" Shift PLANT STATUS:
Mode: 1 Rx Power:
Megawatts: Thermal: 2698 MWTH PZR Pressure:
Electric: 888 MWe RCS T-AVE:
RCS Leakage: Identified: 0.015 gpm Protected Train/Facility: TRAIN B Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements I E_quipmentlReason I LCO Action Date Time in LCO Action Requirement Time Left I
! None 2-U-AIL, See AIL for details None 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position 2-CH-507. RCP bleedoff relief isolation. is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-1 0 for Bleedoff flow high 7/05/08 ODM RO directs closing CH-507. ARP 8-10 directs opening CH-507. (>280#).
OP-2301C-001 has been modified for this valve to be CLOSED.
I PLANT SYSTEMS APe System I Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E I 34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES I SPREAD SHEET FOR ADDITIONAL INFO)
Current Rod Height ARO@ 180 Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)
Appendix D Scenario Outline Form ES-D-1 Facility: MP2 Scenario No.: ES11 Ll3 Op-Test No.:_3=--_---i1 Examiners: _ _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ __
Initial Conditions: 100% power. MOL. Eg. Xe .. 9.2 ppm Boron SGBD @ 40 gpm. Bus 24E is aligned to Bus 24C. TDAFP is OOS for bearing replacement.
Turnover: 100% power, MOL, Eg. Xe., 9.2 ppm Boron, blend ratio: 70:1 SGBD @ 40 gpm per S/G, Bus 24E aligned to Bus 24C, TDAFP is OOS for bearing replacement. In TSAS 3.7.1.2a and TRM Table 7.1.15-1, ACTIONS b.1
- and b.2 for fire areas R-3, R-11. R-16 and R-17.
Event Malf. Event Event Description No. No. I Type*
1 SW9A C "Au Service Water Pump degrading performance. (TS).
(BOPfS) (Swap Service Water Pumps.)
2 RX03B I Failure of in-service Pressurizer Pressure transmitter (ROfS) 3 CH07 C Non-Vital Bus 22B is lost develops due to a seismic event ED06B (BOP/S) 4 RC04 C Small RCS Leak develops. (TS)
(ROfS) 5 NfA R Plant shutdown due to RCS leak (All) 6 RC04 M Small Break LOCA requiring a Reactor trip. Failure of ED06B (All) automatic Reactor trip and manual trip push buttons Loss RP04A, of Actuation Cabinet 6 on the trip.
B,C,D RP27B 7 MS01B I M Excess Steam Demand in Containment on #2 SfG after
- (BOPfS) the trip 8 RH06A C Failure of "AU Containment Spray Pump to start on CSAS (ROfS)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D. 38 of 39
~
ifijJ~ Dominion" Simulator Exercise Guide Job Aid Page 1 of 32 SEG# ES11 Ll3 Rev;~
I SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Title Simulator Exam #3 COURSE: ESllLI3 I Course #: NA Total Time 1.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> Prepared by: R.J. 1110/2011 Printed N amc Il1Structor's lignature Date Reviewed by: Idkl"-t L Cfl11m1n5 ~\
(Optional) Printed Name Instructor Signature Reviewed by:
(Optional) Printed Name ~im latr\Validation Checklist Signature Date Approved by: ---!-tL~A \4 ~~ e",.~ ". ~ \ ~}--
Printed Name Training Supervisor
'<\//
I '
Simulator Exercise Guide Job Aid Page 2 of 32 SEG# ES11L13 Rev; --,,-0_ _
Goal of Training: a) Evaluate the licensees' ability. as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
- 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
- 2) Ability of the ~ to:
- Understand/interpret annunciators/alarms, plant/systems response
- Diagnose events/conditions based on signals/readings
- Comply with/use procedures. Technical Specifications, and TRIVI
- Perform control board operations
- Properly communicate information/proper crew interactions
- Practice Reactivity Management
- Make conservative decisions.
- 3) Ability of each individual to:
- Respond and correctly interpret annunciators
- Correctly diagnose events
- Properly interpret integrated system response
- Comply with and use Technical SpecificationslTRM
- Comply with and use procedures
- Properly perform control board operations
- Demonstrate responsible attitude
- Properly communicate information and interact with rest of crew
- Leadership skills required to effectively manage the evolutions
- Provide adequate overview where required Learning Objectives: NA Tasks: NA Prerequisites: N/A Training Resources: 1 lead simulator (floor) instructor, 1 booth instructor
Simulator Exercise Guide Job Aid Page 3 of 32 SEG# ES11 Ll3 Rev; _0,,--_ _
References:
ARP 2590E-029, SW PUMP A STNR TROUBLE AOP 2565, Loss of Service Water OP 2326A, Service Water System ARP 25908-212, PZR PRESSURE SELECTED CHANNEL DEVIATION HIILO Millstone 2 Technical Specifications AOP 2562, Earthquake AOP 2568 Reactor Coolant System Leak AOP 2575, Rapid Downpower EOP 2525, Standard Post Trip Actions EOP Loss of Coolant Accident EOP 2540, Functional Recovery EOP 2540, Functional Recovery of Containment Temperature and Pressure Control EOP 2540C1, Functional Recovery of RCS Inventory Control EOP 2540D, Functional Recovery of RCS Heat Removal Commitments: N/A Evaluation Method:
Operating Experience:
Plant/Simulator None differences that may affect the scenario:
Related PRA Core Damage Freguency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C TDAFP out for bearing replacement
Simulator Exercise Guide Job Aid Page 4 of 32 SEG#_---==:ES"-1.1..\.l:1L:l-"13"---_ Rev;_O_
INITIAL CONDITIONS:
- 100% power EOL.
- 24E aligned to 24C
- In TSAS 3.7.1.2.a and TRM Table 7.1.15-1, Actions b.1 and b.2 for Fire Areas R-3, R-11, R-16, and R-17.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
Scenario Summary:
The crew will take the shift with the unit at 100% power and 24E aligned to 24C. The Turbine Driven Aux. Feed Pump is out of service for bearing replacement.
Shortly after the crew takes the shift, the "A" Service Water Pump will begin to degrade requirill9 the crew to swap to the "B" Service Water Pump. While swapping Service Water Pumps the US will enter TSAS 3.7.4.1.
After the Service Water Pumps are swapped, the Channel "Y" Pressurizer Pressure transmitter will fail low causing RCS presslJre to rise. The crew will swap to Channel "X". (Prior to swapping to Channel "X", the crew may take manual control of pressurizer pressure components.)
When RCS pressure is back to 2250 psia and stable, a seismic event will result in a loss of Non-Vital 480 Volt Bus 22B. The crew should enter AOP 2503B and take action to cross-tie Bus 22B with Bus 22A.
When the Non-Vital Buses are cross-tied, a small RCS leak will develop. The Crew will attempt to determine the location of the leak while the US enters TSAS 3.4.6.2, and AOP 2575, Rapid Downpower. The downpower rate will be determined and the appropriate Reactivity Plan will be selected.
During the down power, the RCS leak will degrade to where it exceeds charging pump capacity (Small Break LOCA) and eventually trigger an automatic reactor trip (if not manual performed).
The automatic (or manual) reactor trip will not occur, even when the trip push buttons are pressed, requiring the crew to trip the CEDM MG sets to initiate a reactor trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, ESAS Actuation Cabinet 6 deenergizes resulting in a failure of all Facility 2 ESAS components from automatically actuating to their accident conditions.
During the performance of EOP 2525, a small steam line break in Containment will occur. The crew will diagnose the 2 events and transition to EOP 2540, Functional Recovery.
When Containment Spray is actuated, the "B" Containment Spray Pump will NOT automatically start. The crew will start the "A" and/or the "B" Containment Spray Pump(s) to maintain Containment Integrity.
The scenario will end when at least one Containment Spray Pump is running and the crew has prioritized the Safety Functions for performance.
CT1 (LOCA-11): Perform a plant cooldown. A plant cooldown must be initiated within one hour following an unisolable LOCA at a rate of greater than 40°F/hr.
CT2 (CTPC-1): Maintain Containment Temperature and Pressure Control. Establish greater than or equal to 1300 gpm Containment Spray flow from at least one Containment Spray Pump prior to reaching 51 psig Containment Pressure.
CT3 (ESDE-6): Isolate the Affected S/G. AFW to the faulted (#2) SG is isolated within :s30 minutes of MSI actuation on an ESDE.
Simulator Exercise Guide Job Aid Page 5 of 32 SEG#_--=ES"-!.1...!.-"1L",,13,--_ Rev;_O_
o ENSLIRE TRex Workstation is operating.
o VERIFY the most current approved training load is loaded.
o RESET to IC-173 o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
o As needed, RESET Computer Terminals (At Power displays if 100% power IC).
o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
o ENSURE I~CS Leak Rate is reset in PPC.
o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
o If necessary (Le., exams), ADVANCE chart recorders o ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).
o ENSURE appropriate signs are in place on simulator doors.
o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o If necessary, ENSURE Simulator fidelity items cleared.
o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o ENTER Initial Malfunctions I II0s I Remote Functions.
o PLACE Simulator to RUN.
o If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:
o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
'Dominion'"
Simulator Exercise Guide .
Job Aid Page 6 of 32 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 1. INITIAL CONDITIONS: ENTER or VERIFY the following Initial N/A
- IC-173 Malfunctions I I/0s I Remote Functions
- Mode: 1
- Burnup:EOL
- Power: 99.8%
- Boron: (CB): ppm
- Temperature: Tave 569 F
- Pressure: 2250 psia
- Xenon: Stable, at equilibrium
- Rods: ARO
- Generator: 888 Mwe
- 2. SIMULATOR SETUP: COMPLETE Simulator Setup Checklist NIA As necessary, PERFORM I.V. of Initial Malfunctions I II0s I Remote Anl'Ar~lr!
~~~~~---------------------------------+--------------------------------~
- 3. PRE*SCENARIO:
BRIEF the crew on of this session
- 4. TURNOVER: PERFORM the crew turnover SM brief crew on plant conditions and any major (Turnover Sheet) with the US. equipment OOS. (All) Walk down control boards and let US know when they are ready.
No shift briefing is required or recommended.
Simulator Exercise Guide ..
Job Aid Page 7 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 1. Observe degraded performance of itA" Technical Specification Service Water Pump and swap to "B" Service Water Pump.
Event 1: SW09A - Ramp to 100% over 240 BOP:
seconds, "A" Service Water Strainer clogs.
Observes and reports indications associated TM1, AE1 with degrading flow on "A" Service Water header.
- Observes and reports SW PUMP A STNR TROUBLE annunciator on C-06/7 US:
- Refers to ARP 2590E-029 (CA-4 on C-06/7) o If High RBCCW or TBCCW header temperature annunciator are received, refers to ARP 2590E-048 (D-8 on C 06/7) or 2590E-015 (DA-2 on C-06/7)
- Determines that "A" Service Water Header flow is lowering.
When dispatched to determine the cause of the
- Dispatches a PEO to the Intake Structure to low "A" Service Water Header flow, report that determine the cause.
the "A" Service Water Strainer DIP is 28 psid o Directs the PEO to stop Soduim and getting worse. The strainer motor is Hypochlorite to the "A" Service Water rotating, but the strainer is NOT rotating. Pump.
- Refers to OP 2326A and directs the BOP to Report that Sodium Hypochlorite is secured to Start "B" Service Water Pump on Facility 1 the "A" Service Water Pump. and secure "A" Service Water Pump.
- Enters and exits TSAS 3.7.4.1 as directed by procedure.
- Makes notifications for assistance.
Simulator Exercise Guide Job Aid Page 8 of 32 SEG# ES11 Ll3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
- Verifies that the "Bn Service Water Pump is properly aligned to Facility 1:
o Bus 24E is being supplied by Bus 24C o "B" SW Pump is in Pull-To-Lock o A502, "B" SW Pump breaker is racked up.
o SW-97B. Dis X-Tie, is closed.
o SW-97A, Dis X-Tie, is open.
o HS-6484A (on A502), SIAS/LNP Actuation Signal Hand Switch, is in BLOCK.
- Dispatches a PEO to secure Sodium Hypochlorite to the "An Service Water Pump and to observe proper start of "B" SW Pump
- Informs the US to log into TSAS 3.7.4.1.
(already in Action Statement)
- Starts "B" Service Water Pump.
- Checks SW Pump B SIAS/LNP Start Manually Blocked annunciator alarms.
- Stops "An SW Pump.
Report that "B" SW is operating properly. !. Observes proper operation of "B" SW Pump.
Event 7: When directed to vent the "B" SW
STNR TROUBLE, CA-4 on C-06/7. Allow the
- Places "A" SW Pump in Pull-To-Lock.
1/0 to remain in for 2 minutes, then delete the
- Directs a PEO to place HS-6484A (on 1/0. A502), SIAS/LNP Actuation Signal Hand Event 8: When directed, insert Remote Switch, in the NORMAL position.
Function SWR31 in NORM, to place HS-6484A I
- Checks SW Pump B SIAS/LNP Start (on A502), SIAS/LNP Actuation Signal Hand Manually Blocked annunciator is clear.
Switch, in the NORMAL position. I
- Informs US to exit TSAS 3.7.4.1.
Report when each directed action is complete.
Simulator Exercise Guide ,
Job Aid Page 9 of 32 SEG# ES11 Ll3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 2. Failure of Channel Y Pressurizer pressure transmitter.
Event 2: RX03B - Ramp to 1500 over 400 RO:
seconds, Channel Y Pressurizer Pressure transmitter gradually fails low.
- Observes RCS pressure rising.
- Observes Pressurizer Pressure Deviation TM2, AE2 Hilla annunciator.
- Reports rising Pressurizer pressure to the US.
US:
- Obtains ARP 2590B-212, Pzr Pressure Selected Channel Deviation Hilla (D-37 on C-2/3) and lor Pressurizer Ch Y Pres Hilla (D-39 on C-02/3)
- Makes notifications for assistance and troubleshooting.
- Refers to (does NOT enter) TSAS 3.2.6, 3.3.3.5, and 3.3.3.8. (Only one channel is required to be OPERABLE.)
RO:
- Observes all Pressurizer pressure channels and determines that Channel Y is failing.
- When directed, shifts Pressure control to Channel x.
- Verifies proper operation of Pressurizer pressure control system.
Simulator Exercise Guide ~
Job Aid Page 10 of 32 SEG# ES11 Ll3 Rev;_O__
- 3. Seismic Event Resulting in a Loss of Non-Vita14BO Volt Bus 22B.
Event 3: CH07 -Insert, Seismic event. Crew:
Event 3: ED068 - TRIP, Loss of Non-Vital Bus Observes numerous component high vibration 22B. annunciators and receives a report of a seismic event.
Seismic Event annunciator and white flag on Immediately after entering the seismic event event recorder.
malfunction, call the Control Room and report Significant vibration in the Turbine Building BOP:
lasting several seconds.
Observes and reports numerous annunciators TM3. AE3 and indications associated with the loss of Non Vital Bus 22B.
US:
If requested, report accelerometer reading is
- Enters AOP 2562, Earthquake.
0.03g ZPA.
Report NO damage indicated anywhere.
- Dispatches PEOs to determine any plant damage.
- References ARP 2590F-065, 480B BUS 22AJB/C/D VOLTS LO, and enters AOP 2503B, Loss of Non-Vital 480 VAC Bus 22B.
When dispatched, report that tie breaker A204 is I
- Directs BOP to place equipment in service open with NO target drops. All other conditions requires to support plant operation.
are normal. I
- Directs BOP to ensure a fault is NOT indicated on Bus 22B.
- Directs a PEO to determine the cause of the breaker trip.
- Directs BOP to perform applicable steps to cross-tie Bus 22B with 22A.
- Requests assistance form Maintenance Department.
Simulator Exercise Guide Job Aid Page 11 of 32 SEG# ES11 Ll3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
- From available indications, determines that Bus 22B does NOT have a fault.
- Checks Bus 22A voltage between 435 and 525 Volts.
- Ensures the following breakers are open:
o A204, 24B/22B Feeder Breaker (24B4 2) o B0209, 22B Supply breaker (24B4-1X3 2) o B0111, 22A122B Tie Breaker (22A-1T-2)
- Places (or requests RO to place) Group 1 and Group 2 Pressurizer Backup Heaters in Pull-To-Lock.
- Places Sync Selector Switch, 22A122B in CL TIEITRIP B.
- Closes B0111 , 22A122B Tie Breaker (22A 1T-2)
- Places Sync Selector Switch, 22A122B in OFF.
- Checks Bus 22B voltage between 435 and 525 volts.
- Checks current on Bus 22A is less than 1,800 amps.
If dispatched, report that 22A-1T-2 Ammeter
- If current on Bus 22A is greater than 1,600 Phase B (Ammeter above B0111 cubicle) is amps, dispatches a PEa to verify local reading 850 amps. current reading is less than 1,600 amps.
- When (If) directed, Caution Tag Group 1 and Group 2 Pressurizer Backup Heaters.
Simulator Exercise Guide Job Aid Page 12 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 4. .*Unisolable ReS Leak Develops. Technical Specification Event 4: RC04 - 2% with a Ramp Time of 90 RO/BOP:
seconds and a 120 second delay; 14 gpm Observes and reports:
RCS leak.
- Charging and Letdown flow mismatch TM4,AE4
- RCS Leak Rate Rising annunciator on C 06/7
- Containment Sump level rising US:
- Enter AOP 2568, Reactor Coolant System Leak.
- Determines that RCS leakage exceeds 10 gpm and enters TSAS 3.4.6.2.
- Determines that leak does NOT exceed the capacity of the Charging system. ( Reactor trip is NOT required)
- When Containment Sump level reaches 100%, logs into TSAS 3.3.3.8 and 3.4.6.1.
RO:
When requested. reports the status of:
- Pressurizer level
- Pressurizer pressure
- RCS leak rate
Simulator Exercise Guide ..
Job Aid Page 13 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 5. Rapid Downpower due to ReS leak. Reactivity Manipulation US:
- Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria and RCS Temperature Control.
o Requests SMISTA to make required notifications. (Unusual Event, Delta One) o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight).
o Determines that Reactivity Plan RE-G 13, 14, or 15 should be used.
o Directs RO and BOP to coordinate a rapid down power.
RO:
- Initiates Forcing Sprays:
o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
- Inserts Group 7 CEAs to 170 steps and observes applicable parameters.
- Initiates Boration from the RWST:
o Ensures at least one Charging Pump is operating.
o Ensures CH-196, VCT Makeup Bypass, is closed.
o Ensures CH-504, RWST to Charging Suction, is
Simulator Exercise Guide Job Aid Page 14 of 32 SEG# ES11 Ll3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS a Opens CH-192, RWST Isolation.
a Starts a second Charging Pump.
The US may direct Boration to be accomplished I. If Boration is from the BAST:
from the BAST to allow for easier makeup to the a Ensures the Makeup Flow Selector VCT. Boration from the BAST (alternate switch is in the DILUTE position.
method) is in italics. a Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".
a Ensures CH-S12, Makeup Valves Stop, is closed.
a Ensures CH-196, VCT Makeup Bypass, is closed.
a EnsuresCH-192, RWST Isolation, is closed.
a Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.
a Opens CH-S04, RWST to Charging Suction.
a Place Makeup Mode Sel switch in MAN.
a Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.
a Opens CH 196, VCT Makeup Bypass.
a As required, refers to attachment and performs actions to maintain VCT level in the desired band.
BOP:
Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
Simulator Exercise Guide Job Aid Page 15 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 6. RCS leak rapidly degrades to a small Break LOCA and a failure of the Reactor to automatically or manually trip.
Event 5: RC04 - 25% with a ramp time of 270 RO:
seconds. Small break LOCA (175 gpm) requiring a Reactor trip.
- Observes lowering Pressurizer level and pressure which exceeds Charging capacity RP04A, B, C and 0 - FAIL; Failure of all and informs the US.
rd Reactor Trip push buttons.
- Starts 3 Charging Pump.
RP27B - FAIL. Failure of all RPS Channels to process a Reactor trip ES04F - Deenergize. Actuation Cabinet 6 deenergizes.
TM5, MA1 US:
Directs the crew to manually trip the Reactor and perform EOP 2525. Standard Post Trip Actions.
Queries RO and BOP on the status of Safety Functions as delineated in EOP 2525:
- Reactivity Control (RO) o Status of the Reactor
- Maintenance of Vital Auxiliaries {BOP}
o Status of the Turbine o Status of Electrical Buses o Status of SW & RBCCW o Check one facility of CRAC operating (RO)
value & trend
Simulator Exercise Guide ~
Job Aid Page 16 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS T c value and trend o S/G levels, value and trend oRCS Subcooling Margin
- Containment (CTMT) Isolation (RO) oRad monitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
- CTMT temperature and pressure value and trend.
RO:
- Presses all four Reactor Trip push buttons on C-04 and immediately realizes the Reactor did NOT trip.
- Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
Simulator Exercise Guide ,.
Job Aid Page 17 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Perform associated actions of EOP 2525 and report results when queried:
- Turbine tripped, stop valves are closed, 8T
& 9T are open, Megawatts are zero
- All electrical buses energized
- Two Facilities of SW and RBCCWoperating RO:
Performs associated actions of EOP 2525 and report results when queried:
- Control Room Air Conditioning Status
- Pressurizer level value and trend
- Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1750 psia, then SIAS, CIAS, and EBFAS have actuated on Facility 1 only.
o After SIAS actuates, one RCP in each loop is secured.
o If Pressurizer pressure lowers to minimum NPSH, then all RCPs are secured.
- Observes and reports numerous annunciators associated with ESAS on C 01.
- Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
Simulator Exercise Guide Job Aid Page 18 of 32 SEG# ES11L13 Rev:_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Performs associated actions of EOP 2525 and reports results when queried:
- Value and trend of S/G pressures
- Value and trend of T c
- Value and trend of S/G levels
- Subcooling value! CET temperature RO:
Continues with associated actions of EOP 2525 and reports results when queried:
- Reports Rad Monitors inside CTMT not going up or in alarm
- Reports Rad Monitors outside CTMT not going up or in alarm
- Reports Steam Plant Rad Monitors not in alarm or going up
- Reports Value and trend of CTMT temperature and pressure.
- Starts Containment Aux Recirc Fans and PIR Fans.
Simulator Exercise Guide Job Aid Page 19 of 32 SEG# ES11113 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Continue with Subsequent Actions:
- Opens HD-106, Subcooling Valve
- Stops both Heater Drains Pumps
- Secures all but one Condensate Pump
- Secures one Main Feed Pump o Closes FW-42A and B, Main Feed Block Valves o Ensure both Main Feed Reg Bypass Valves are throttled to 40%
o Closes FW-38A or B, associated Main Feed Pump Discharge Valve
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
Simulator Exercise Guide Job Aid Page 20 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:
- At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
- Places Master Silence Switch in NORM.
- Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
- Directs the RO and BOP:
o Ensure SIAS Actuation o Optimize Safety Injection o Monitor for RCP trip criteria.
o Perform actions to isolate the LOCA, if possible.
o Determine LOCA location.
o Place H2 Analyzers in operation.
o Ensure CIAS.
o When appropriate, ensure CSAS.
o Check fA pressure> 90 psig and stable.
o Align Condenser Air Removal.
o Initiate a controlled cooldown.
Simulator Exercise Guide Job Aid Page 21 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
- When Pressurizer pressure lowers to 1714 psia, ensures SIAS has actuated.
o Ensures one complete train of CRAC is in Recirc.
- Ensures Safety Injection flow is within the SI Flow Curve.
- Ensures two RCPs are tripped within 5 minutes after SIAS or all RCPs are secured if below minimum NPSH.
- Attempts to isolate the LOCA (UnisolabJe)
- When time permits, places H2 Analyzers in service.
CSAS will actuate shortly after the steam line
- Determines that Containment pressure has break is inserted.
NOT exceeded 4.42 psig; therefore. MSI and CSAS have NOT actuated.
- When Containment pressure is greater than 9.48 psig, determines that Facility 2 CSAS did not actuate (Loss of Actuation Cabinet
- 6) and that "A" Containment Spray Pump did not automatically start.
BOP:
- Verifies IA pressure is greater than 90 psig.
- Aligns Condenser Air Removal to Unit 2 Stack.
CT1 (LOCA-11) Perform a plant cooldown. Crew:
A plant cooldown must be initiated within Initiates a controlled cooldown.
one hour following an unisolable LOCA at a rate of greater than 40°F/hr.
Simulator Exercise Guide Job Aid Page 22 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 7. Excess Steam Demand in Containment on #2 Steam Generator Event 6: MS01 B - 2.5% ramped in over 240 BOP:
seconds, Excess Steam Demand on #2 S/G Observes and reports Lowering S/G pressures, (0.475 #m/hr).
S/G levels, RCS temperature, and other TM6, MA2, EM1 parameters associated with an Excess Steam Demand event.
EU1,EC1 US:
- Acknowledges reports(s) and enters Diagnostic Flow Chart, then enters EOP 2540 Functional Recovery due to more than one major event.
- Notes the need for the SM to complete EPI FAP06-002, determine that the event remains an Alert, Charlie-1, and make appropriate notifications.
- Open the Safety Function Tracking Page and enter EOP entry time.
- Return alarm silence to normal RO:
- If PZR press. < 1714 psia, ensures:
o Only 1 RCP/loop running o Secured RCP Spray vlv. closed
o All RCPs are secured o TIC-4165 in manual and closed o Both spray valves are in manual and closed.
Simulator Exercise Guide Job Aid Page 23 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Directs Chemistry to obtain samples of both SGs, frisk the samples, report frisk results, and analyze the samples for activity and Boron.
Simulator Exercise Guide Job Aid Page 24 of 32 SEG# ES11L13 Rev;_O__
- 8. Failure of "A" Containment to start on CSAS.
This malfunction will occur when Containment RH06A, TRIP, Failure of "A" CS Pump to start RO:
pressure exceeds 9.48 psig. The crew will on CSAS. (Initial Conditions)
Observes and reports actuation of Facility 1 continue to take the actions of EOP 2540 prior TM7, EM2, CSAS and the failure of the "A" Containment to and after the malfunction.
Spray Pump to start.
US:
- Directs RO to start either uN or "S" Containment Spray Pump.
- Determines that the Safety Function Status Checks for CTPC-3 are NOT met and enters EOP 2540F, Functional Recovery of Containment Temperature.
CT2 (CTPC-1): Maintain Containment RO:
Temperature and Pressure Control.
- Starts "S" Containment Spray Pump and the Establish greater than or equal to 1300 gpm associated Containment Spray header flow Containment Spray flow from at least one is greater than or equal to 1300 gpm.
Containment Spray Pump prior to reaching
- Verifies Containment Temperature and 51 psig Containment Pressure. Pressure Control acceptance criteria is met:
o At least 2 CAR Fans operating in Slow Speed.
o At least one Containment Spray Header delivering at least 1300 gpm.
o Containment pressure less than 51 psig.
Simulator Exercise Guide ..
Job Aid Page 25 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:
- Directs placing H2 analyzers in service .
- Identifies Success paths to be used .
US:
Identifies Success Paths to be used.
Note: Safety Path I Met? IPriority Function These success paths and order of priority are based on the conditions seen during RC-1 CEA Insertion Yes 5 the scenario validation. A different path DC-1 DC Power Yes 6 and priorities may be applicable due to the timing of operator mitigating actions. AC-1 RSST Yes 7 IC-2 SI Yes 2 PC-1 Subcooled Yes 4 HR-2 S I Operati ng Yes 3 (2)
CI-1 Isolated Yes 8
,~~~.
CTPC-3 CARs [Emerg.] Yes 4 (3)
Ee2 US:
Identifies CTPC-3, CARs (Emerg.), as the first priority and enters EOP 2540F, Containment Temperature and Pressure Control.
Simulator Exercise Guide "
Job Aid Page 26 of 32 SEG# ES11U3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
Performed earlier as a Critical Task.
- Ensure CSAS has actuated with at least one Containment Spray Header flow greater than 1300 gpm.
- Ensures both Containment Aux Recirc Fans are operating.
- Ensures both PIR Fans are operating.
- Reviews Containment Spray termination criteria.
- Verifies CTPC-3 Acceptance Criteria are satisfied:
a At least two CAR Fans running in slow speed.
a At least one Containment Spray header is delivering at least 1300 gpm.
a Containment pressure is less than 51 psig.
US:
Identifies IC-2, SI, as the next Safety Function priority and enters EOP 2540C1, Functional Recovery of RCS Inventory Control.
Simulator Exercise Guide ..
Job Aid Page 27 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
- Ensures SIAS, CIAS, and EBFAS have properly actuated.
- Checks Safety Injection flow meets the SI Flow Curve.
o Determines that RCS pressure is NOT preventing adequate SI flow.
- Ensures both facilities of RBCCW and Service Water are in service.
- Performs actions to conserve RCS Inventory. (Isolates various non-essential components.)
- Requests assistance for filling the RWST.
- Observes Containment Sump level is rising.
- Determines that SItCS Pump Minflow valves, SI-651 and 652, must be placed in OPER when RWST level lowers to 20%.
- Determines that SRAS must be initiated when RWST level lowers to less than 9%.
- Reviews SRAS supplemental actions.
- Reviews HPSI Pump post SRAS performance criteria.
When dispatched, report that the SI Room
- Dispatches a PEa to open SI Room Sump Sump Pump breakers are open and there is no Pump Breakers and monitor for leakage.
leakage.
- Verifies that IC-2 Acceptance Criteria are met:
o HPSI flow is within the SI Flow Curve.
o Vessel level is >7%.
Simulator Exercise Guide
- Job Aid Page 28 of 32 SEG# ES11 Ll3 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS US:
- Continues to assess Safety Functions up to and including EOP 25400, Functional Recovery of RCS Heat Removal.
o Ensure at least one complete facility of SIAS, CIAS, EBFAS, MSI, and CSAS have actuated.
o Ensure one complete facility of CRAC is operating in RECIRC.
o Verify single phase Safety Injection flow is adequate.
o Verify subcooling.
o Align Condenser Air Removal.
- Determines SGTR did NOT occur.
- Determines ESD did occur and that #2 S/G is the most affected.
- Directs BOP to perform actions of Appendix EU2 11, ESDE Response.
RO:
Ensures MSI has actuated and at least one train of MSI has properly actuated (all MSI components are in their accident condition on C-01X).
Simulator Exercise Guide Job Aid Page 29 of 32 SEG# ES11L13 Rev;_O__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS BOP:
Isolates #2 S/G:
- Ensues MS-64B, #2 MSIV, is closed.
- Ensures MS-65B, #2 MSIV Bypass, is closed.
- Ensures #2 ADV controller is in Manual and closed.
- Places ADV Quick Open Permissive switch in OFF.
- Closes FW-41B, #2 Main Feed Reg Valve Bypass Valve.
- Ensures FW-42B, #2 Main Feed Block Valve, is closed.
- Places FW-5B, Main Feed Air Assist Check Valve switch in CLOSE.
- Dispatches a PEO to unlock and close Event 9: When dispatched, insert Remote Disconnect for MS-202, #2 Main Steam Function MSR13, RI. Close the disconnect for Supply to the TDAFP. (May be performed MS-202, #2 Main Steam Supply to the TDAFP.
earlier)
- Ensures MS-220B, #2 S/G Blowdown Isolation, is closed.
- Ensures both Aux Feed OVERRIDE/MAN/START/RESET hand switches are in Pull-To-Lock.
CT3 (ESDE-6): AFW to the faulted (#2) SG is
- Closes FW-43B, #2 Aux Feed Reg Valve.
isolated within ~30 minutes of MSI actuation
- Places hand switch for FW-12B, #2 Aux on an ESDE. Feed Air Assist Check Valve, in CLOSE.
- Ensures MS-65B, #2 Main Steam Leg Low Point Drain, is closed.
- Ensures Main Steam Safety Valves are closed.
SCENARIO END: When #2 S/G is isolated or at the discretion of the lead evaluator, direct the I When directed, inform the crew that the scenario is complete and place the simulator in FREEZE.
simulator to be placed in FREEZE.
'DOlllinion'"
Simulator Exercise Guide ,
Job Aid Page 30 of 32 SEG# ES11L13 Rev; _0_
Description Deiay Time Ramp Time I Event I Severity Trigger Or Value I Value Final IRelative Order MALFUNCTIONS RP04A. Failure of #1 Reactor Trip Push Button NA NA NA NA NA 6 RP04B. Failure of #2 Reactor Trip Push Button NA NA NA NA NA 6
~ ----
RP04C, Failure of #3 Reactor Trip Push Button NA NA NA NA NA 6 RP04D, Failure of #4 Reactor Trip Push Button NA NA NA NA NA 6 f-RP27B, Automatic RPS Trip Failure (ATWS) NA NA NA NA NA 6 RH06A, Failure of "A" CS Pump to start. NA NA NA NA NA 10 SW10, uN SW Pump Degrades. NA 240 sec. 1 100% 100% 1 RX03B, Channel Y Pressurizer Pressure transmitter fails low NA 400 sec. 2 0% 0% 4 CH07, Seismic Event NA NA 3 NA NA 5
-- - - - - - c-----
RC04, 14 gpm RCS Leak. NA 90 sec. 3 2% 2% 6 f------
ED16B, Loss of VA-20 NA NA 4 NA NA 7 RC04, Small Break LOCA (175 gpm) NA 270 sec. 6 25% 25% 8 ES04F, Actuation Cabinet 6 Deenergizes. NA NA 6 NA NA 8 MS01 B, ESD on #2 S/G inside Containment NA 240 sec. 7 2.5 2.5 9 REMOTE FUNCTIONS SWR31 , Place HS-6484A in Normal. NA NA NORM NORM 2 MSR13, Close the disconnect for MS-202 NA NA RI RI 11 OVERRIDES Annunciator CA-4 on C-06/7, SW PUMP STNR TROUBLE NA NA 5 ON OFF 3
Simulator Exercise Guide
'Dominion'"
Job Aid Page 31 of 32 SEG# ES11U3 Rev; _0__
Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
Yes No
- 1. The desired initial condition(s) could be achieved. D
- 2. All malfunctions and other instructor interface items were functional and responded to D support the simulator Scenario.
- 3. All malfunctions and other instructor interface items were initiated in the same sequence D described within the simulator scenario.
- 4. All applicable acceptance criteria were met for procedures that were used to support the D simulator scenario.
- 5. During the simulator scenario, observed changes corresponded to expected plant D response.
- 6. Did the scenario satisfy the learning or examination objectives without any significant D simulator performance issues, or deviations from the approved scenario sequence?
- 7. The simulator is capable of being used to satisfy learning or examination objectives without D exceptions, significant performance discrepancies, or deviation from the approved scenario sequenCE!.
- 8. Any identified Critical Tasks possesses the following elements D (NUREG-1 021):
- Essential to safety with adverse consequences or significant degradation,
- Cue(s) prompt the Operator to respond.
- Defined and measurable performance indicators.
- Performance feedback.
The use of "N/A" is allowed for item 8 only if this is NOT an evaluated scenario.
Discrepancies noted (Check "none" or list items in comments field) None ~
Comments:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
.,~
ifiJjjJJ¥Dominion'"
SEG# ES11 Ll3 Rev; _0_
Simulator Exercise Guide Job Aid Page 32 of 32 SIMULATOR TRAINING SHIFT TURNOVER REPORT DATE-TIME PREPARED BY Today 0515 Unit Supervisor I"NIGHT" Shift PLANT STATUS:
Mode: 1 RxPower:
Megawatts: Thermal: 2698 lVIWTH PZR Pressure:
Electric: 888 MWe RCS T-AVE:
RCS Leakage: Identified: 0.015 gpm Protected Train/Facility:
Unidentified: 0.036 gpm DatelTime: Toda 0015 Active Tracking Records and Action Statements Equipment/Reason LCO Action Date Time in LCO Action Requirement Time Left 3.7.1.2 a Today 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> Restore to OPERABLE within 7 days. 6d, 20 hrs Establish a roving watch. Ensure FUNCTIONALITY TRM Table 7.1 b.1 and Today 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> of Fire Detection and Suppression systems for Fire 59 d, 20 hrs 15.1 b.2 Areas R-3, R-11, R-17 and R-17.
2-U-AIL, See AIL for details None OD Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position 2-CH-507, RCP bleedoff relief isolation, is closed on C02. This is due to relief CH-199 leaking by into the PDT. ARP C-10 for Bleedoffflow high 7/05108 ODM RO directs closing CH-507. ARP B-10 directs opening CH-507, (>280#).
OP-2301 C-001 has been modified for this valve to be CLOSED.
I PLANT SYSTEMS APe System I Notes CROSS UNIT SYSTEM STATUS U3 Power to 24E J34A aligned to 24E SURVEILLANCES I EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES J SPREAD SHEET FOR ADDITIONAL INFO)
Current Rod H A Xenon Trend Stable Current Boron 9.2 ppm Boron Pot Setting I Blend Ratio 70 to 1 (corrected)
Appendix 0 Scenario Outline Form ES-O-1 Facility: MP2 Scenario No.: ES11 Ll4 Op-Test No. :_1..:.....-_
Examiners: _ _ _ _ _ _ _ _ _ _ Operators: _ _ _ _ _ _ _ _ __
Initial Conditions: 45% power, BOl, Eg. Xe., $ ppm Boron SGSD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service.
Turnover: 45% power. BOl, Eg. Xe .* $ ppm Boron, blend ratio: $:1, SGBD @ $ gpm per SG, 24E aligned to 24D, "A" Main Feed Water Pump in service. waiting for 'B' Main Feed Water Pump to come back from Maintenance, no other equipment OOS and no surveillance in progress or due.
Event Malt. Event Event Description No. No. Type*
1 N/A ~
I~--r----- ~+-----------------------------~I CH08C C CRAC Filter Fan "A", F-32A, trips. (TS)
(BOP/S) 3 CW04C C Main Condenser tube leak in the "C" water box.
(BOP/S) 4
- 5 II 6 7
8
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M}ajor Appendix D, 38 of 39
ES11L14 Scenario Summary:
The crew will take the shift with the unit at approximately 50% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will spike, causing the ventilation system to shift into recirculation mode. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and discuss returning the system to normal operation. Before this action is taken, a PEO will report that the belt for CRACS Filter Fan, F32A, is broken. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per OP 2315A, Control Room Air Conditioning System. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC and call MaintenanceIWork Planning to repair the fan belt.
While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
The crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
While "C" Waterbox is being isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer pressure and level to lower. The crew will either take manual control of Pressurizer level (Letdown flow) or will swap to Channel "X".
When Pressuriz~~r level is restored to setpoint and control is back in automatic. the "A" Condenser Steam Dump Valve will open slightly due to a failure of its C-05 controller output. The Crew must transfer control of the steam dump to the Foxboro IA Control System in order to re-close the valve.
Once the "A" Steam Dump is re-closed, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise coming from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.
Once plant power has been lowered about 10%, Bus 24C will deenergize (bus fault), requiring a manual plant trip. The crew will enter EOP 2525, Standard Post Trip Actions. On the trip, a LOCA will develop due to a rupture of the "A" RCP Seal Cooler.
During the performance of EOP 2525, a manual or automatic SIAS will be initiated and the "A" DG will be emergency tripped due to the fault on 24C (Loss of Service Water to the EDG).
After entry into EOP 2532, Loss of Coolant Accident, the "C" HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and start the "B" HPSI Pump.
The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.
Restore a running HPSI pump within 30 minutes of entry into EOP 2532.
CT-2 (LOCA-3) Establish CTMT Isolation.
Isolate CTMT by closing at least one isolation valve at each penetration.
CT-2 (LOCA-6) Isolate RCS Leakage.
Isolate or attempt to isolate locations that may be the source of the loss of coolant.
CT-3 (LOCA-3): Initiate a plant cooldown.
A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.
Simulator Exercise Guide
'Dominion*'
Job Aid Page 1 of 29 SEG# ES10Ll4 (SpareL- Rev;_O_
SITE: I Millstone Power Station PROGRAM: Unit 2 LOIT NRC Exam Title Simulator #4 (Original Spare)
COURSE: ESIOLI4 I Course #: NA Total Time 1.5 hours0.208 days <br />0.0298 weeks <br />0.00685 months <br /> Prepared by: Robert L. Cimmino, Jr. 09/13/11 Printed Name Instructor's Signature Date Reviewed by:
(Optional) Printed Name Simulator Development Checklist Date Instructor Signature Reviewed by:
(Optional) Printed Name Simulator Validation Checklist Signature Date Approved by:
Printed Name Training Supervisor Date
Simulator Exercise Guide Job Aid Page 2 of 29 SEG# ES10Ll4 (Spare) Rev: _ _--lO..0_ _
Goal of Training: a) Evaluate the licensees' ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations, abnormal operating conditions and emergency operating conditions.
b) Evaluate the crew's ability, as a team and individually, to safely and responsibly operate the plant during normal plant operations and abnormal operating conditions. To include:
- 1) Ability of the crew to perform crew-dependent (and time-critical) tasks.
- 2) Ability of the crew to:
- Understand/interpret annunciators/alarms, plant/systems response
- Diagnose events/conditions based on signals/readings
- Comply with/use procedures, Technical Specifications, and TRM
- Perform control board operations
- Properly communicate information/proper crew interactions
- Practice Reactivity Management
- Make conservative decisions.
- 3) Ability of each individual to:
- Respond and correctly interpret annunciators
- Correctly diagnose events
- Properly interpret integrated system response
- Comply with and use Technical SpecificationslTRM
- Comply with and* use procedures
- Properly perform control board operations
- Demonstrate responsible attitude
- Properly communicate information and interact with rest of crew
- Leadership skills required to effectively manage the evolutions
- Provide adequate overview where required Learning Objectives: NA Tasks: NA Prerequisites: N/A Training Resources: 1 lead simulator (floor) instructor, 1 booth instructor
Simulator Exercise Guide Job Aid Page 3 of 29 SEG# ES10Ll4 (Spare) Rev: _ _----"-0_ _
References:
ARP 2590A-159, CRACS in Auto Recirc Mode ARP 25900-067, C Hotwell Cond Hi AOP 2516, Condenser Tube Leak ARP 25908-217, Pressurizer CH Y Level HI/LO ARP 25900-041, Condensate Pump Trouble EOP 2525, Standard Post Trip Actions EOP 2532, Loss of Coolant Accident Plant Technical Specifications Commitments: N/A Evaluation Method: NRC License Examiner Observation Operating Experience: N/A Plant/Simulator None differences that may affect the scenario:
Related PRA Core Damage Frequency: 0.98 Information: LERF: 1.00 Important Components: 24E aligned to 24C
Simulator Exercise Guide Job Aid Page 4 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
INITIAL CONDITIONS:
- 46% power BOL.
- 24E aligned to 24C with "An & "B" Condensate Pumps operating.
- Plant startup with "A" Main Feed Pump in service.
- "A" Emergency Diesel Generator out of service for PMs.
The simulator will be prepared for the evaluation and the licensees will be briefed on the conduct of the evaluation and the areas in which they will be evaluated.
Scenario Summary:
The crew will take the shift with the unit at approximately 45% power with the direction to hold power here until the "B" Main Feedwater Pump is returned from Maintenance.
Once the crew has the watch, the Control Room Air Conditioning (CRAC) Radiation Monitor will fail high, causing the ventilation system to shift into recirculation mode. Five seconds after starting, the "A" Filter Fan, F32A, will trip due to a broken belt. Per ARP 2590A-159, the crew should verify proper operation of the CRAC system and note the loss of the filter fan. This will require the crew to secure Facility 1 CRAC and ensure Facility 2 CRAC is operating as required per ARP 2590A-159. The US will enter TSAS 3.7.6.1 a for an inoperable train of CRAC, TSAS 3.3.3.1 for the failed rad monitor, and call MaintenanceIWork Planning for the needed equipment repairs.
While the work order for fan F32A is being generated, a seawater leak will develop in the "C" Waterbox.
Chemistry will report the leak and the crew will enter AOP 2516, Condenser Tube Leak, and isolate "C" Waterbox.
After "C" Waterbox is isolated, Channel "Y" Pressurizer level transmitter will fail high causing Pressurizer level and pressure to lower. The crew will either take manual control of Pressurizer level (Letdown flow) and swap to swap to Channel "X" level control, or immediately swap level control channels.
Once Pressurizer level is restored to automatic control, the "A" Condensate Pump motor winding temperatures will rise abnormally high, causing a control board trouble alarm and applicable PPC alarms.
The Crew must start the "B" Condensate Pump and secure the "A" Condensate Pump before the "An trips on high current/overload.
When the "A" Condensate Pump problem has been mitigated, the Turbine System Engineer will call to inform the crew that the "A" Main Feedwater Pump should be shut down as soon as possible due to abnormal noise corning from the pump turbine. This will force the crew into AOP 2575, Emergency Downpower, and commence a plant shut down.
Once plant power has been lowered by approximately 10%, a major fault will occur on bus 24A causing bus 24C to de-energize and force a manual plant trip. During the performance of EOP 2525, Standard Post Trip Actions, the "A" RCP seal cooler will rupture, resulting in an Intersystem, Small-Break LOCA.
n After entry into EOP 2532, Loss of Coolant Accident, the "c HPSI Pump will trip and not restart. The crew will recognize that safety injection flow is inadequate and the need to start a Facility 1 HPSI Pump. This will require either bus 24C be re-energized from the RSST, or 24E be re-energized from Unit 3.
The scenario will end after the crew isolates the intersystem LOCA and initiates a controlled cooldown.
Simulator Exercise Guide Job Aid Page 5 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
Critical Tasks CT-1 (LOCA-9): Manually establish the required minimum safety injection flow.
Restore a running HPSI pump within 30 minutes of entry into EOP 2532.
CT-2 (LOCA-3) Establish CTMT Isolation.
Isolate CTMT by closing at least one isolation valve at each penetration.
and/or CT-2 (LOCA-6) Isolate RCS Leakage.
Isolate or attempt to isolate locations that may be the source of the loss of coolant.
CT-3 (LOCA-3): Initiate a plant cooldown.
A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, following an unisolable LOCA, until the condenser steam dump valves or ADVs are full open.
Simulator Exercise Guide Job Aid Page 6 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
o ENSURE TRex Workstation is operating.
o VERIFY the most current approved training load is loaded.
o RESET to IC-83 (-45% power, BOL) o If necessary, ADJUST the various potentiometer settings to the values specified by the chart in the simulator Notebook for the selected IC.
o As needed, RESET Computer Terminals (At Power displays if 100% power IC).
o ENSURE SG blowdown values in PPC Plant Calorimetric are reset.
o ENSURE RCS Leak Rate is reset in PPC.
o ENSURE keys on Control Panels are only those required for the session (including RPS, ESAS, and RC-14).
o ADVANCE chart recorders.
o ENSURE the appropriate Protected Train placard is hung (A TRAIN PROTECTED).
o ENSURE appropriate signs are in place on simulator doors.
o ENSURE procedures designated for use during the scenario are clear of previous place keeping marks.
o If necessary, ENSURE Simulator fidelity items cleared.
o ENSURE each desk has adequate supplies (e.g., pencils, grease pencils, markers, paper).
o If required, OVERRIDE annunciators that will be lit long-term in the Control Room.
o ENTER Initial Malfunctions / II0s I Remote Functions.
o PLACE Simulator to RUN.
o If placing Equipment OOS, then PERFORM necessary switch manipulations and HANG appropriate tags, as required for the following:
a "A" and "c" Condensate Pumps running and "B" Condensate Pump in standby.
o 24E aligned to 24C.
o "Bn Main Feedwater Pump OOS.
o PERFORM final walk down of Control Panels to verify proper indications (e.g., lights, switches, magnetic labels).
iiilv DominIOn Simulator Exercise Guide Job Aid Page 7 of 29 FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 1. INITIAL CONDITIONS: ENTER or VERIFY the following Initial N/A
- IC-18 Malfunctions 1II0s I Remote Functions:
- Mode: 1 CI Ensure 24E aligned to 24C.
- Burnup:MOL CI Ensure "A" & "C" Condensate Pumps
- Power: 45% are running and "B" is in standby.
- Boron: (CB): XXX ppm CI "An Main Feedwater Pump tagged out.
- Temperature: Tave 563°F CI "A" EDG tagged out.
EGR12 (CLOSED) "An EDG Air Start isol.
- Xenon: Increasing
- Rods: Gp 7 at 165
- Generator: 405 MWe
- 2. SIMULATOR SETUP: N/A COMPLETE Simulator Setup Checklist CI As necessary. PERFORM I.V. of Initial Malfunctions 1II0s I Remote Functions entered.
- 3. PRE*SCENARIO: Review Log keeping responsibilities per the Gold Standard Book. page 23 & 24.
CI BRIEF the crew on purpose of this session and REVIEW objectives (if necessary).
D lE this is the first simulator scenario of the week, THEN REVIEW the Plant/Simulator Differences List with the crew.
- 4. TURNOVER: PERFORM the crew turnover US brief crew on plant conditions and any major (Turnover Sheet) with the SM. equipment OOS. (All) Walk down control boards and let US know when they are ready.
D Provide crew with partially completed No shift briefing is required or recommended.
OP 2204 and brief on existing conditions.
Simulator Exercise Guide Job Aid Page 8 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
flflCi{ity1 C;R.AC Shifts to Recirculation'> creY/has the watch.~ndatthe/./
Mode/With Loss of Fan F-32A 'JiscrAtionofthe Lea(l.Examlner*. ~rdtl~te ~1. .'
CRAC Facility 1 Radiation Monitor fails low, Event 1: RM010 - 100% RO:
causing the system to shift to Recirculation RM-9799A fails high, causing "An Train of CRAC I
- Observe "C.RA.C.S. IN AUTO RECIRC Mode. Shortly after this occurs, the Filter to shift to "Recirc." mode. MODE" annunciator (C-40) on C01 and Fan, F-32A, will trip due to broken fan belts overloading the motor. Facility 1 CRAC has shifted to recirc. mode.
- Reports observation to US.
US:
- Enters ARP-2590A-159, Automatic Function:
CRACS transfers to recirculation mode.
- Directs the RO to verify Facility 1 operating as designed in recirculation mode.
Event 1: CH08C - ON (5 second delay) RO: Per ARP 2590A-159 CHHS8006_1 (NG) (5 second delay) 1. Verifies Facility 1 CRAC has shifted to F-32A green light out recirculation mode.
- 1. PLACE "NORM/RECIRC MODE, HS-8346" CHHS8006_1 (NR) (5 second delay)
AND "NORM/RECIRC MODE, HS-8359" F-32A red light out switches in "RECIR" (C-2SA and C-25B).
If requested, call as a PEO to report fan F-32A 2. Check damper positions.
belts have failed and appear to have caused the 3. Verify both Filter Fans running. Notes F-32A fan to trip. not running or tripped.
- Reports observation to US.
TM1, AE1 US: Per ARP 2590A-159
- Receive report of F-32A failure.
- Direct RO to secure Fac. 1 CRAC and start Fac. 2 CRAC per OP-2315A, Control Room Air Conditioning System.
- Enters TSAS 3.7.6.1a.; One train ofCRAC inoperable.
Simulator Exercise Guide Job Aid Page 9 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO: Per ARP 2S90A-1S9
5.1. VERIFY "CRACS SPL Y FAN F21 B. HS 8010" and "CRACS EXH FAN F31B, HS 8000" running (C-2SB).
5.2. CHECK "F-21 B, EXH DMPR. HV-203B" and "F-31 B, EXH DMPR, HV-206B" open (C-2SB).
5.3. VERIFY "CRACS SPLY FAN F21A. HS 8009" and "CRACS EXH FAN F31A. HS 8001" not running (C-2SA).
5.4. CHECK "F-21A. EXH DMPR. HV-203A" and "F-31A, EXH DMPR, HV-206A" closed (C-2SA).
5.5. CHECK "F-32B EXH DMPR, HV-212B,"
indicates open (red light lit) (C-25B).
- 9. Verifies one complete train (Fac. 2) of CRAC operating.
The crew may attempt to return CRAC to US/RO: Per ARP 2590A-1S9 "NORMAL" but will be unable to with the failed rad monitor.
- Receives report; Fac. 2 CRAC in service.
- 12. Notes probable failure of RM-9799A and enters TSAS 3.3.3.1. Action 16; Control Room Isolation Rad Monitor inoperable.
- Makes required notifications for troubleshooting and repairs.
Simulator Exercise Guide Job Aid Page 10 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
- 2. Condenser Tube Leak (s~awa(~r) in the "c" Water Box.
Event 2: CW04C -10 gpm (100%) BOP:
Main Condenser tube leak in the "cn water box.
- Observe "CONDENSATE DEMIN SYSTEM TROUBLE" annunciator (A-16) on C05.
When the Demin System Trouble alarm comes in, call as Chemistry and report
- Reports observation to US.
indication of a tube leak in "C n Water Box.
- Utilize the ARP for "C" HOTWELL COND LEVEL HI annunciator (BA-17) on C05.
TM2, AE2 (Hotwell conductivity recorders will already be pegged high with all alarms active due to the low power level).
If necessary, call as the SM and remind the US: AOP 2516, Condenser Tube Leak US that the PPC conductivity screen will not update with rising conductivity.
- Notes actions under ARP 2590D-061 under Chemistry jurisdiction.
- Enters ARP-2590D-067, HOTWELL COND LEVEL HI (C05, BA-17), go to AOP 2516.
- Enters AOP-2516, Condenser Tube Leak.
3.1 N/A 3.2 Notes CPF demins. are operating in Amine form, references OP-2316A, Main Steam System, and directs BOP to secure SG blowdown.
BOP:
- Per OP-2316A, closes MS-220A & -220B and MS-145A & -145B
- Verifies PPC indicates zero blowdown flow.
- Reports completion to US.
If Chemistry samples are requested, inform US:
US samples have already confirmed "c" 3.5 Determines "C" water box should be water box has a tube leak.
isolated and references AOP-2516, section 6.0. Isolate "C" Water Box
Simulator Exercise Guide Job Aid Page 11 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS AOP 2516 Condenser Tube leak 6.1-6.3 N/A 6.4 Directs the BOP to stop the "C* Circ. Pump BOP:
6.4 Per AOP-2516, secures "C" Circ. Pump by tripping or lowering VFD.
US: Directs the BOP to perform the following:
6.5 Close CW-11 F, "C" water box inlet.
6.6 Monitor RBCCW & TBCCW temperatures.
6.8 Ensure CW-11C, *C" water box outlet open.
Event 8: US (or BOP): Directs a PEO to:
FWR53 (CLOSE) "C" condenser air isolation. 6.9 Close AR-1C, condenser "C" isolation stop.
CWR04A (CLOSE) "C* water box outlet and inlet stops. 6.10 Close VP-1C & -1G, "C" water box outlet &
VP-9C us not modeled. inlet stops.
6.11 Open VP-9C, *C" water box inlet vent.
When valves linked to Event 8 have reached 6.12 (Crew/BOP) Monitor condenser vacuum.
their demand position, inform the crew that 6.13 Deenergize cathodic protection.
all PEO actions are completed.
6.14 (BOP) When directed, close CW-11C.
nd It is not necessary to actually start a 2 SJAE or the Mechanical Vacuum Pumps.
Simulator Exercise Guide Job Aid Page 12 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
- 3. Wn~rl.*actiqn~* for #2 are cOR,Jpltieted. or<~tthe discretion. Qf~!:le~ead. Exarniner,initiate #3.
Event 3: RX04B - 85% (300 second ramp) I RO:
- Observes and reports any of the following:
Channel "Y" Pressurizer Level transmitter fails high over a period of five minutes.
- Letdown flow rising.
- Pressurizer backup heaters energized.
TM3.AE3
- Level controller output rising.
- Actual level dropping (may not be diagnosed at this time).
- PRESSURIZER CH Y LEVEL HIILO annunciator (A-39) on C02-3 (delayed).
US: Enters ARP-2590B-217, annunciator A-39.
- 3. Notes indicated level is high.
- a. Backup charging pump has stopped.
- b. Letdown flow is at maximum (128 gpm)
The ARP assumes only one charging pump is US: Directs and the RO performs the following:
running. Therefore, when level control is nd transferred to Channel 'X', the 2 charging 8.1 SHIFT "LTDN FLOW CNTL, HIC-110" to pump will restart automatically, unless the "MAN" (C-02).
charging pump control switches have been 8.2 Adjust "LTDN CNTL. HIC-11 0" to stabilize changed from the initial setup of two running Pressurizer level and Letdown flow.
pumps. 8.3 Commence forcing PZR sprays (in setup) 8.4 SHIFT PZR level control to channel "X".
8.5 RESTORE Letdown to automatic.
RO: (Restoring Letdown flow to automatic) 8.5.1 Adjust bias to "0".
8.5.2 Shift HIC-110" back to "AUTO."
8.5.3 Adjust bias to restore PZR level to setpoint.
8.5.4 Shift Pressurizer heater control "SEL SW" to channel "X".
Simulator Exercise Guide Job Aid Page 13 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 4. itA" Condensate Pump High Motor WhenHIC-110 is back in automatic, or at the.
Winding Temperature. discretion of the Lead Examiner; initiate #4.
Event 4: FW23 - 100% BOP/Crew:
The "An Condensate Pump motor winding
- Observe "A" Condensate Pump high motor temperature will begin to rise abnormally high, winding alarms on PPC MON 2.
causing control board and PPC alarms.
- Observe "CONDENSATE PUMP TM4, AE4 TROUBLE" alarm A-11 on C05 US/BOP:
- Enters ARP-2590D-041, annunciator A-11, CONDENSATE PUMP TROUBLE.
- 1. Notes "An Condensate Pump not tripped.
- 2. Notes "An Condensate Pump amps not high
- 3. Notes "An Condensate Pump motor winding temperature high and rising on the PPC.
- US - Directs "B" Condensate Pump be started.
- US - Directs "A" Condensate Pump be secured.
BOP Event 9: FW23 - 0% (ramp 5 minutes)
- Starts the "Bn Condensate Pump.
When "A" Condensate pump is secured,
- Secures the "An Condensate Pump and trigger Event 9 to ramp down high temp. places it in Pull-To-Lock.
- Observes Condensate Header pressure.
Simulator Exercise Guide Job Aid Page 14 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
'Rapid Downpowerdue to failing SGFP. When <S'Co.,d.pump is runnh\9; or atthe di~~retion oft~e L;ead:Exarniner; initiate #5.
Call as Turbine Engineer and inform the crew US:
that the "An SG Feed Pump (SGFP) is making unusual noises and should be shut
- Enters AOP 2575, Rapid Downpower o Performs Focus Brief on Trip Criteria down as soon as possible. It is not necessary to trip the pump at this time. and RCS Temperature Control.
o Requests SMISTA to make required TM5, AE5 notifications.
o Directs RO to initiate forcing sprays and to insert Group 7 CEAs 10 steps (while maintaining Reactivity oversight)
The US may not use a predetermined reactivity o Determines which Reactivity Plan, plan due to the existing power level not directly RE-G-13, -14, or -15 may be used.
matching any existing plant generated by RE. In o Directs RO and BOP to coordinate a this case, reactivity thumbrules should be used.
rapid down power per the chosen plan.
RO:
- Initiates Forcing Sprays: (if not already) o Closes all Backup Heater Breakers o Adjusts Pressurizer pressure controller to achieve an output of approximately 50% (to maintain RCS pressure at approximately 2250 psia).
- Inserts Group 7 CEAs 10 steps and observes applicable parameters.
The US may direct Boration to be accomplished
- Initiates Boration from the RWST:
o Ensures at least one Charging Pump from the BAST to aI/ow for easier makeup to the is operating.
VeT. Borafion from the BAST (alternate o Ensures CH-196, VCT Makeup method) is in italics.
Bypass, is closed.
o Ensures CH-504, RWST to Charging Suction, is open.
o Opens CH-192, RWST Isolation.
o Starts a second Charaina Pum~.
Simulator Exercise Guide Job Aid Page 15 of 29 SEG# ES10Ll4 (Spare) Rev; _0__
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO (alternate boration method):
- If Boration is from the BAST:
o Ensures the Makeup Flow Selector switch is in the DILUTE position.
o Ensues FC-210X, Primary Makeup Water Flow controller, is set to "0".
o Ensures CH-S12, Makeup Valves Stop, is closed.
o Ensures CH-196, VCT Makeup Bypass, is closed.
o EnsuresCH-192, RWST Isolation. is closed.
o Ensures FC-210Y,Boric Acid Flow controller, is set to the predetermined flow rate.
o Opens CH-S04, RWST to Charging Suction.
o Place Makeup Mode Sel switch in MAN.
o Starts the selected Boric Acid and verifies discharge pressure is greater than 98 psig.
o Opens CH 196, VCT Makeup Bypass.
o As required, refers to attachment and performs actions to maintain VCT level in the desired band.
BOP:
Reduces Turbine load to follow Reactor power to maintain Tc on program using the Load Limit Pot.
Simulator Exercise Guide Job Aid Page 16 of 29 SEG# Rev;_O_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- 6. Loss of Vital Bus 24C; Manual Plant Trip. When po~i~l()wered.by "'10%, orat the LOCA.lnitiates on the Plant Trip. disereti()ll:oftheJ..ea.dExaminer, initiate #6.
Event 6: ED05A - ON Causes a fault on vital bus 24A which results in Directs the crew to manually trip the Reactor the following: and perform EOP 2525. Standard Post Actions.
- NSST to 24A trips on the bus fault, deenergizing 24A and all non-Vital 4160/480 Queries RO and BOP on the status of Safety VAC power (unrecoverable). Functions as delineated in Eap 2525:
- Reactivity Control (RO)
- Maintenance of Vital Auxiliaries (BOP) 4160/480 VAC power remain deenergized.
o Status of the Turbine
- 24C can be recovered, but not in time to prevent a required plant trip. o Status of Electrical Buses o Status of SW & RBCCW TM6, MA1 o Check one facility of CRAC operating Event 6: (+2 minutes) RC20B 308 gpm (56%) (RO)
On the trip. a rupture will occur in the "An RCP
- RCS Inventory Control (RO) seal cooler. resulting in a Small Break LOCA. o Pzr level & Subcooled margin (SCM),
value & trend TM7, MA2
- RCS Heat Removal (BOP) o S/G pressures, value and trend oRCS Tc value and trend o S/G levels, value and trend oReS Subcooling Margin
Simulator Exercise Guide Job Aid Page 17 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS
- Containment (CTMT) Isolation (RO) o Radmonitors inside CTMT, outside CTMT, steam plant o CTMT pressure <1 psig
- Presses all four Reactor Trip push buttons on C-04 and verifies the Reactor trips.
- Reactor has tripped, power is lowering, SUR is negative, all CEAs are inserted.
BOP:
Perform associated actions of EOP 2525 and report results when queried:
- Turbine tripped, stop valves are closed, 8T
& 9T are open, Megawatts are zero
RO:
Performs associated actions of EOP 2525 and report results when queried:
- Control Room Air Conditioning Status
- Pressurizer level value and trend o PZR level lowering, all available charging pumps running, letdown flow at minimum.
Simulator Exercise Guide Job Aid Page 18 of 29 SEG# ES10Ll4 (Spare) Rev; FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
- Pressurizer pressure value and trend o PORVs and Spray Valves are closed o When RCS pressure is less than 1714 psia, then SIAS, CIAS, and EBFAS have actuated (only Facility 2 powered).
o "A" & "C" RCPs secured due to no The remaining RCPs may be secured when RBCCW flow on loss of 24C.
the crew recognizes the leak in the "8" RCP Seal Cooler. o If Pressurizer pressure lowers to minimum NPSH, then all Reps are secured.
- Number of RCPs operating o Value and trend of loop Delta-T o Value and trend of subcooling
- If no RCPs operating, T AVG controller,TIC-4165 in manual/closed BOP:
Performs associated actions of EOP 2525 and reports results when queried:
- Value and trend of S/G pressures
- Operates steam dumps, as necessary, to control RCS T AVG *
- Value and trend of T c
- Value and trend of S/G levels
- Subcooling value / CET temperatures
Simulator Exercise Guide Job Aid Page 19 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO:
Continues with associated actions of EOP 2525 and reports results when queried:
- Rad monitors:
o Inside CTMT; not going up or in alarm o Outside CTMT; RM-6038, RBCCW going up and/or in alarm.
US/BOP/RO: RBCCW Surge Tank level rising o Steam Plant; not going up or in alarm.
- CTMT temperature/pressure rising slowly.
o 2 CAR Fans and "B" Aux Circ. Fan running in slow.
o Starts "B" PIR Fan.
BOP:
Continue with Subsequent Actions:
- Opens HD-106, Subcooling Valve
- Stops both Heater Drains Pumps
- Secures all but one Condensate Pump
- Verifies Main Feed Pump operating.
o Closes FW-42B, Main Feed Block Valve.
o Ensure both Main Feed Reg Bypass Valves are throttled to 40%
US:
Query RO & BOP regarding the status of EOP 2525 subsequent actions.
Simulator Exercise Guide Job Aid Page 20 of 29 SEG# ES10Ll4(Sparel Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS RO/BOP:
When asked, report that Subsequent Actions are complete and verified.
US:
- At the completion of EOP 2525, Diagnostic Flow Chart, determines that a LOCA inside Containment has occurred and goes to EOP 2532, Loss of Coolant Accident.
- Places Master Silence Switch in NORM.
- Notes the need for the SM to complete EPI FAP06-002, classify the event as an Alert, Charlie-1, and make appropriate notifications.
Simulator Exercise Guide Job Aid Page 21 of 29 SEG# ES10Ll4 (Spare) Rev;
- 1. LosS of High Pressure6afety/((1ject;on~ Once EOP 2532 discretion of the Event 7: RC208 550 gpm (100%) US:
Raise the severity of the "8" RCP Seal o Enters EOP 2532, Loss Of Coolant Accident Cooler tube rupture to maximum.
o Directs performance of SFSC o Directs Chemistry sample S/Gs Event 27 (RCS Pres < 1600 psia): SI04C - ON I 0 Directs SM to classify the event Initiate a trip of the "C" HPSI Pump when RCS pressure drops below 1600 psia, causing the o Opens Place keeper and ENTER the EOP entry time loss of the only running High Pressure Safety Injection Pump. o Ensures the master silence switch is in "NORMAL" TM8, EM1 US/BOP:
o Opens both SG sample valves.
o Directs Chemistry to do the following:
o Sample both SGs.
o Frisk the samples.
o Report frisk results.
o Analyze samples for boron and activity.
RO:
o Check SIAS, CIAS and EBFAS actuation.
o Check adequate Safety Injection flow.
o Notes "e" HPSI pump has tripped.
o May attempt restart of "C" HPSI Pump.
o Reports "A" & "8" HPSI pumps have no power. 24C or 24E must be restored.
Simulator Exercise Guide Job Aid Page 22 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
RO:
Event 10: CVR 11 22F When "B" charging pump is swapped to 22F it will automatically start due to the already IWhen directed, swap "B: charging pump to 22F.
o Directs PEO to swap "B" Charging pump power to Facility 2 (22F).
existing SIAS start signal. o Takes "B" Charging Pump out of "Pull-To-Lock".
o Verifies "B" Charging Pump running.
There will not be any safety injection flow US:
from the HPSI pump until RCS pressure drops below 1250 psia. o Acknowledges "CO HPSI pump lost (no SI) and "A" & "B" HPSI pump without power.
o Directs 24C be reenergized by the RSST or Unit 3.
If energizing 24C from the RSST, this If the crew desires to energizing 24E from RO/BOP:
section will be used. Unit 3 and requests power, give permission Appendix 23-B Energizing 24C from the RSST to take power up to the applicable limit. Unit '
3 is not experiencing any power challenges 1. Verifies RSST energized on C-08.
and is operating normally. 2. Checks for faults on 24C.
Note: the fault on 24A may be seen as a fault on 24C and cause the crew to abandon efforts to restore 24C. If so, they should proceed to restore power to 24E from Unit 3 (following).
- 3. Ensures breakers A304, A305 and A312 are open. (A305 would be closed on setup).
- 4. Ensures A702 is closed.
- 5. Put synch switch for A302 to "ON".
- 7. Presses "UV RESET" button on Cabinet 5.
Simulator Exercise Guide Job Aid Page 23 of 29 SEG# ES10ll4 (Spare) Rev; _0_
RO/BOP:
Appendix 23-B, Energizing 24C from the RSST
- 9. Both AFW Override switches in P-T-L.
- 11. Close A302 to energize 24C.
CT-1 (LOCA-9): Manually establish the RO:
required minimum safety injection flow.
Restore a running HPSI pump within 30 Start the "A" HPSI pump and verify adequate SI.
minutes of entry into EOP 2532. US: Verifies SI flow adequate.
If energizing 24E from Unit 3, this section RO/BOP:
will be used. Appendix 23-N, Energizing 24E from Unit 3
- 1. Checks no faults on 24E.
- 2. Verifies 24E supply from Unit 3 has voltage.
- 4. Ensure A305 and A408 are open.
- 5. Verifies permission granted from Unit 3.
- 6. Put synch switch for A305 to "ON" and check "INCOMING" voltage.
- 7. Close A305 to energize 24E.
- 8. Check voltage indicated on "RUNNING".
- 9. Put synch switch for A305 to "OFF".
CT-1 (LOCA-9): Manually establish the RO:
required minimum safety injection flow.
Restore a running HPSI pump within 30 Start the "B" HPSI pump and verify adequate 51.
minutes of entry into EOP 2532. US: Verifies SI flow adequate.
BOP:
o Verifies switchgear room cooling.
RO:
o Stop RCPs as necessary (may have been secured earlier if NPSH was lost).
Simulator Exercise Guide Job Aid Page 24 of 29 SEG# ES10Ll4 (Spare) Rev: _0_
D Place PZR spray controller(s) in manual and close.
D Place HIC-4165 in manual and close.
RO/BOP:
D Verifies PORVs closed, letdown isolated, RCS sample valves closed.
D Notes indication of leakage into RBCCW o RM-6038, RBCCW Rad. Monitor, rising.
o RBCCW Surge Tank level rising (C06)
US:
D Directs any operating RCPs be secured.
D Directs RBCCW CTMT Header Isolation Valves be closed.
BOP:
D Stops the operating RCPs.
D Places associated pressurizer spray valve controller RC-100E or RC-100F in manual and closed.
D Places TIC-4165, steam dump TAVG controller, in manual and closed.
Simulator Exercise Guide Job Aid Page 25 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
FLOOR INSTRUCTOR BOOTH INSTRUCTOR STUDENTS CT-2 (LOCA-3) Establish CTMT Isolation. Event 11: 05A1A2S9 CLOSE BOP:
Isolate CTMT by closing at least one 05A1AS12 CLOSE Q Closes Fac. 1 RBCCW CTMT header isolation valve at each penetration.
isolation valves: RB-30.1A, RB-37.2A.
and/or if directed to close RB-30.1 A and RB-37.1 A CT-2 (LOCA-6) Isolate RCS Leakage. locally, trigger Event 11. o If 24C has not been restored, directs a Isolate or attempt to isolate locations that Then do the following to close the valves: PEO to close the valves locally.
may be the source of the loss of coolant. 1. Open the "Insight" window.
Q Closes Fac. 2 RBCCW CTMT header
- 2. In "Insight", open the file Note: As a minimum, RB-30.1 Band RB-37.2B isolation valves: RB-30.1B and RB-37.2B.
must be closed. "johnccrbvalves.tis" .
- 3. Set the values for both valves to "0.0".
Note: The Crew may need to continue to US/CREW:
monitor indications to ensure the LOeA has Q Verifies LOCA is no longer outside CTMT.
been redirected into CTMT.
US/CREW:
Q Directs/places hydrogen analyzer in service.
Crew:
Q Verifies SIAS, CIAS, EBFAS, MSI, CRACS, CAR fan operation, as necessary.
US/BOP:
Q Verifies adequate instrument air pressure.
US:
Q Directs Crew initiate a controlled cool down and depressurization of RCS.
CT-3 (LOCA-3): Initiate a plant cooldown. BOP:
A plant cooldown at a rate of greater than 40°F/hr should be initiated within one hour, Q Initiates a plant cool down.
following an unisolable LOCA, until the o Opens steam dump valves.
condenser steam dump valves or ADVs are full open. o Establishes 40 -100 °F/hr cool down.
Simulator Exercise Guide Job Aid Page 26 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
RO:
IJ Depressurizes RCS (as necessary) using Auxiliary Spray Flow.
The scenario may be terminated once a plant I Restore simulator references/procedures. Crew:
cooldown has been initiated, or at the discretion Standby for questions from Examiners.
of the Lead Examiner.
Simulator Exercise Guide
'Dominion"'
Job Aid Page 27 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
I I Event Severity I Final IRelative Description Trigger Or Value Value Order MALFUNCTIONS RM010 - Rad. Monitor RM-9799A on CRAC, fails low. NA 0 1 0.1 mr/Hr I 1 (0%)
CHOSC - CRAC Filter Fan "A", F-32A, trips NA 0 2 NA 2 CW04C - Main Condenser tube leak in the "C" water box. 0 3 10gpm 3 (100%)
RX04B - Ch. 'V' Pressurizer Level transmitter, LT-110Y, fails to 2350 psia. NA 300 4 2350 psia I I 4 (85%)
FW23 - "A" Condensate Pump Motor Winding Temperature High. NA 0 5 ON 5 ED05C - Major fault on bus 24A (loss of Facility One 4160/480 VAC). NA 0 6 ON 6 RC20A; Seal Cooler Rupture in RCP "An (2 minute delay) 2 min. 0 6 308 gpm 7 (56%)
RC20A; Seal Cooler Rupture in RCP "A" (Increase in severity) NA 0 7 550 gpm 8 (100%)
SI04C - 'c' HPSI Pump trip. NA 0 27 ON 9 REMOTE FUNCTIONS
~~~EDI EGR12 - "A" EDG Air Start Valves () 0 EGR17 - "A" EDG Breaker () 0 OVERRIDES
Simulator Exercise Guide
'Dominion'"
Job Aid Page 28 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
Mark with an "X" Yes or No for any of the following. If the answer is No, include an explanation after the item.
Yes No
- 1. The desired initial condition(s) could be achieved. o
- 2. All malfunctions and other instructor interface items were functional and responded to o support the simulator Scenario.
- 3. All malfunctions and other instructor interface items were initiated in the same sequence described within the simulator scenario.
o
- 4. All applic;able acceptance criteria were met for procedures that were used to support the simulator scenario.
o
- 5. During the simulator scenariO, observed changes corresponded to expected plant response.
o
- 6. Did the scenario satisfy the learning or examination objectives without any significant o simulator performance issues, or deviations from the approved scenario sequence?
- 7. The simulator is capable of being used to satisfy learning or examination objectives without exceptions, significant performance discrepancies, or deviation from the approved scenario o
sequence.
- 8. Any identified Critical Tasks possesses the following elements (NUREG-1 021):
o
- Essential to safety with adverse consequences or significant degradation,
- Cue(s) prompt the Operator to respond.
- Defined and measurable performance indicators.
- Performance feedback.
The use of uN/A" is allowed for item 8 only if this is NOT an evaluated scenario.
Discrepancies noted (Check "none" or list items in comments field) None [8J Comments:
Validator: Sign the cover page only after noted discrepancies are corrected or compensatory actions are taken to ensure quality training.
Simulator Exercise Guide Job Aid Page 29 of 29 SEG# ES10Ll4 (Spare) Rev; _0_
SIMULATOR TRAINING SHIFT TURNOVER REPORT DATEnTIME PREPARED BY Toda:i 0515 PLANT STATUS:
I Unit SUl2ervisor I"NIGHT" Shift I SHIFT 18:00 - 06:00 Mode: 1 Rx Power: 45%
Megawatts: Thermal: 1215 MWTH PZR Pressure: 2?50 psia Electric: 405 MWe RCS T-AVE: sa3degF RCS Leakage: Identified: 0.015 gpm Protected Train/Facility: TRAIN Unidentified: 0.036 gpm DatelTime: Today 0015 Active Tracking Records and Action Statements Equipment/Reason LCO ~ Action I Date I Time in LCO I Action Requirement I Time Left 2-U-AIL, See AIL for details I I I I 00 Compensatory Actions I Temp Logs Watch Open Date Class Reason Reason Position PLANT SYSTEMS APC System Notes I CROSS UNIT SYSTEM STATUS U3 Power to 24E I 34A aligned to 24E SURVEILLANCES f EVOLUTIONS IN PROGRESS OP 2204 I Steady State Operation at 45% power.
REACTIVITY BRIEFING (SEE REACTIVITY THUMBRULES f SPREAD SHEET FOR ADDITIONAL INFO)
Current Rod Height ARO@165 Xenon Trend Rising Current Boron 700 ppm Boron Pot Setting f Blend Ratio to 1 (corrected)