| | Start date | Site | Title | System |
|---|
| 05000282/LER-2025-002, Control Room Chiller Inoperable Due to Purge System Failure | 10 October 2025 | Prairie Island | Control Room Chiller Inoperable Due to Purge System Failure | Residual Heat Removal |
| ML25260A487 | 17 September 2025 | Technical Specifications Task Force 99902042 | Correction to TSTF-585, Revision 5, Revise LCO 3.0.3 to Require Managing Risk | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Main Steam Isolation Valve Auxiliary Feedwater High Pressure Core Spray Residual Heat Removal Circulating Water System Emergency Core Cooling System Decay Heat Removal Main Steam Line |
| ML25259A122 | 16 September 2025 | | Olpf September 2025 Update | Steam Generator Reactor Coolant System Feedwater Safety Parameter Display System Reactor Pressure Vessel Control Rod |
| TSTF-25-06, TSTF Response to NRC Request for Additional Information on TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk and Transmittal of Revision 5 | 10 September 2025 | Technical Specifications Task Force 99902042 | TSTF Response to NRC Request for Additional Information on TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk and Transmittal of Revision 5 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Main Steam Isolation Valve Auxiliary Feedwater High Pressure Core Spray Residual Heat Removal Circulating Water System Emergency Core Cooling System Decay Heat Removal Main Steam Line |
| ML25195A044 | 9 September 2025 | Vogtle | Issuance of Amendments Regarding Spent Fuel Assemblies Maximum Enrichment | |
| ML25241A166 | 8 September 2025 | Technical Specifications Task Force | RAIs TSTF-604, Rev. 0, Revise Ventilation System Actions | |
| ML25251A251 | 8 September 2025 | Perry | Acceptance of License Amendment Request to Adopt TSTF-597 | |
| ML25211A337 | 3 September 2025 | 07201042 | 2. Final Technical Specification for CoC No. 1042, Amendment No.4 for the NUHOMS Eos System | Control Rod |
| ML25191A192 | 27 August 2025 | 07200009 | Enclosure 2 - Fort St. Vrain Amendment 12 Technical Specifications | |
| ML25213A183 | 27 August 2025 | Comanche Peak | – Issuance of Amendment Nos. 193 and 193, Respectively, to Change Technical Specifications Consistent with TSTF-51, TSTF-471-A and TSTF-571 | Reactor Coolant System Residual Heat Removal Control Room Emergency Filtration System Control Room Envelope Control Rod |
| L-25-128, Application to Revise Technical Specifications to Adopt TST-597, Eliminate LCO 3.0.3 Mode 2 Requirement | 19 August 2025 | Perry | Application to Revise Technical Specifications to Adopt TST-597, Eliminate LCO 3.0.3 Mode 2 Requirement | |
| ML23240A542 | 18 August 2025 | Saint Lucie | Final SRO Written Exam - St Lucie 2023-301 (1) | Steam Generator Reactor Coolant System Feedwater Reactor Protection System Emergency Diesel Generator Auxiliary Feedwater Circulating Water System Main Steam Safety Valve Main Steam Line |
| ML25224A198 | 7 August 2025 | Technical Specifications Task Force | Meeting Handouts - Active Traveler Summary Report | Reactor Coolant System Shield Building |
| ML25219A024 | 7 August 2025 | Technical Specifications Task Force | TSTF-585 Final RAIs | |
| ENS 57844 | 31 July 2025 21:44:00 | Calvert Cliffs | Both Trains of Control Room Emergency Ventilation/Control Room Emergency Temperature System Inoperable | Control Room Emergency Ventilation |
| ML25169A088 | 25 July 2025 | Waterford | Issuance of Amendment No. 274 Extension of Allowable Outage Times for One or More Control Room Air Conditioning Units Inoperable | Emergency Core Cooling System Control Room Envelope |
| ML25195A039 | 11 July 2025 | Browns Ferry | Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-597-A | |
| ML25178C666 | 27 June 2025 | Prairie Island | Proposed Alternative RR-12 Cooling Water System (EPID 2025-LLR-0062) | Circulating Water System |
| NLS2025003, Application to Revise Technical Specification to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | 24 June 2025 | Cooper | Application to Revise Technical Specification to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | Secondary containment Standby Gas Treatment System |
| LR-N25-0058, License Amendment Request (LAR) - Hope Creek Technical Specification Coversion to NUREG-1433, Revision 5, Supplement 4 | 24 June 2025 | Hope Creek | License Amendment Request (LAR) - Hope Creek Technical Specification Coversion to NUREG-1433, Revision 5, Supplement 4 | Reactor Coolant System High Pressure Coolant Injection Reactor Core Isolation Cooling Primary containment Shutdown Cooling Core Spray Residual Heat Removal Automatic Depressurization System Standby Liquid Control Emergency Core Cooling System Decay Heat Removal Low Pressure Coolant Injection |
| ML24310A121 | 20 June 2025 | Diablo Canyon | ISFSI Renewal Technical Specifications (ML24310A121) | |
| CNL-25-038, Application to Revise Technical Specifications to Adopt TSTF-597-A, Eliminate LCO 3.0.3 Mode 2 Requirement | 20 June 2025 | Browns Ferry | Application to Revise Technical Specifications to Adopt TSTF-597-A, Eliminate LCO 3.0.3 Mode 2 Requirement | |
| WBL-25-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 5 June 2025 | Watts Bar | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | Steam Generator Reactor Coolant System Feedwater Main Steam Isolation Valve Auxiliary Feedwater Auxiliary Building Gas Treatment System Residual Heat Removal Control Room Emergency Ventilation Shield Building Main Steam Safety Valve Remote shutdown Emergency Gas Treatment System Emergency Core Cooling System Decay Heat Removal Control Rod Containment Spray Control Room Emergency Air Temperature Control System |
| ML25098A308 | 28 May 2025 | Diablo Canyon | Issuance of Amendment Nos. 250 and 252 Revise Technical Specifications to Adopt TSTF-541 | Auxiliary Feedwater Emergency Core Cooling System Control Room Envelope |
| ML25085A422 | 22 May 2025 | 05200050 | SDAA - FSER Chapter 16 - Technical Specifications | Steam Generator Reactor Coolant System Feedwater Secondary containment Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Primary containment Shutdown Cooling HVAC Reactor Pressure Vessel Residual Heat Removal Automatic Depressurization System Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Control Rod Main Steam Containment Spray |
| NL-25-0143, License Amendment Request: Spent Fuel Assemblies Maximum Enrichment | 22 May 2025 | Vogtle | License Amendment Request: Spent Fuel Assemblies Maximum Enrichment | |
| ML25139A124 | 22 May 2025 | | Enforcement Program Annual Report, Calendar Year 2024 (Public) | Reactor Protection System Emergency Diesel Generator Auxiliary Feedwater Rod Worth Minimizer Control Rod |
| 05000528/LER-2025-001, Unit 1 Loss of High Pressure Safety Injection Safety Function | 22 May 2025 | Palo Verde | Unit 1 Loss of High Pressure Safety Injection Safety Function | |
| ML25134A159 | 14 May 2025 | Hope Creek | Enclosure 2, Volume 5: Hope Creek Generating Station Improved Tehnical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 1 | Reactor Coolant System Feedwater High Pressure Coolant Injection Reactor Core Isolation Cooling Primary containment High Pressure Core Spray Automatic Depressurization System Control Rod |
| ML25134A164 | 14 May 2025 | Hope Creek | Enclosure 2, Volume 10: Hope Creek Generating Station - Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), RPV Water Inventory Control, and Reactor Core Isolation Cooling (RCIC) System | Reactor Coolant System Feedwater Secondary containment Service water High Pressure Coolant Injection Main Steam Isolation Valve Reactor Core Isolation Cooling Primary containment Main Turbine Shutdown Cooling Reactor Pressure Vessel Core Spray Residual Heat Removal Automatic Depressurization System Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control rod blade Control Rod Containment Spray Low Pressure Coolant Injection |
| LR-N24-0029, Enclosure 1: Contents of the Hope Creek Improved Technical Specifications (ITS) Submittal | 14 May 2025 | Hope Creek | Enclosure 1: Contents of the Hope Creek Improved Technical Specifications (ITS) Submittal | Reactor Coolant System Secondary containment Reactor Core Isolation Cooling Shutdown Cooling Reactor Pressure Vessel Reactor Water Cleanup Automatic Depressurization System Standby Liquid Control Emergency Core Cooling System Control Rod |
| ML25134A155 | 14 May 2025 | Hope Creek | License Amendment Request (LAR) - Revision 1 to Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 | Secondary containment Reactor Protection System |
| ML25133A012 | 8 May 2025 | Technical Specifications Task Force | Meeting Handouts - Active Traveler Summary Report | Reactor Coolant System Shield Building |
| IR 05000395/2025001 | 5 May 2025 | Summer 07201038 | Integrated Inspection Report 05000395/2025001 and 07201038/2025001 | Feedwater Service water Emergency Diesel Generator Residual Heat Removal Control Room Emergency Filtration System |
| ML25086A180 | 2 May 2025 | Fermi | – Amendment 231 to Adopt TSTF-505, TSTF-439, TSTF-591 | Reactor Coolant System Feedwater Service water High Pressure Coolant Injection Reactor Protection System Reactor Core Isolation Cooling Primary containment Main Turbine Shutdown Cooling Reactor Pressure Vessel Core Spray Residual Heat Removal Automatic Depressurization System Standby Liquid Control Emergency Equipment Cooling Water Residual Heat Removal Service Water Steam Jet Air Ejector Emergency Core Cooling System Main Steam Line Safety Relief Valve Moisture Separator Reheater Control Rod Main Turbine Bypass System |
| ML25112A099 | 25 April 2025 | 07201031 | Enclosure 2 - Final CoC 1031 Amendment 15 TS Appendix a | Circulating Water System Control Rod |
| ML25078A251 | 24 April 2025 | 07201042 | 3 Proposed Technical Specifications for CoC No. 1042, Amendment No. 4 | Control Rod |
| ML25086A138 | 22 April 2025 | Monticello | Issuance of Amendment No. Regarding the Revision of Technical Specifications to Adopt TSTF-566 and TSTF-580 | Reactor Coolant System Service water Shutdown Cooling Residual Heat Removal Reactor Water Cleanup Decay Heat Removal Main Steam |
| ML25115A201 | 22 April 2025 | Palo Verde | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report 2024 | Steam Generator Circulating Water System |
| LR-N25-0038, License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 3 | 21 April 2025 | Hope Creek | License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 3 | Feedwater High Pressure Coolant Injection Reactor Core Isolation Cooling Reactor Pressure Vessel Core Spray Main Steam Line |
| NLS2025008, Technical Specification Bases Changes | 17 April 2025 | Cooper | Technical Specification Bases Changes | Secondary containment Primary containment Shutdown Cooling Reactor Water Cleanup Decay Heat Removal Main Steam Line Rod Worth Minimizer Control Rod Main Steam |
| ML25002A194 | 15 April 2025 | Holtec | 4. CoC 1014 Renewed Amendment No. 19 Appendix A-100U | |
| ML25002A192 | 15 April 2025 | Holtec | 6. CoC 1014 Renewed Amendment No. 19 Appendix C | Control Rod |
| W3F1-2025-0019, License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioned Units Inoperable | 15 April 2025 | Waterford | License Amendment Request to Extend Allowable Outage Times for One or More Control Room Air Conditioned Units Inoperable | Control Room Envelope Control Room Emergency Air Temperature Control System |
| ML25002A190 | 15 April 2025 | Holtec | 2. CoC 1014 Renewed Amendment No. 19 Appendix a | Control Rod |
| CNL-25-041, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423-A, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line. | 10 April 2025 | Browns Ferry | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423-A, Revision 1, Technical Specifications End States, NEDC-32988-A, Using the Consolidated Line. | Secondary containment Service water High Pressure Coolant Injection Reactor Protection System Main Steam Isolation Valve Reactor Core Isolation Cooling Primary containment Shutdown Cooling Residual Heat Removal Automatic Depressurization System Emergency Equipment Cooling Water Residual Heat Removal Service Water Emergency Core Cooling System Decay Heat Removal Main Condenser Control Rod Low Pressure Coolant Injection |
| ML25099A279 | 9 April 2025 | 05200050 | LLC - Part 4, US460 Generic Technical Specifications, Revision 2, Volume 1 - Specifications | Steam Generator Reactor Coolant System Feedwater Main Steam Isolation Valve Reactor Pressure Vessel Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Rod Main Steam |
| ML25098A156 | 8 April 2025 | Technical Specifications Task Force | Acceptance for Review Regarding Traveler TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk | |
| ML25083A291 | 7 April 2025 | 07201025 | Renewed CoC No. 1025, Amendment No. 9, Appendices a and B | |
| ML25083A287 | 7 April 2025 | 07201025 | Renewed CoC No. 1025, Amendment No. 7, Revision 1, Appendices a and B | |
| ML25083A285 | 7 April 2025 | 07201025 | Renewed CoC No. 1025, Amendment No. 6, Revision 1, Appendices a and B | |
| ML25083A289 | 7 April 2025 | 07201025 | Renewed CoC No. 1025, Amendment No. 8, Revision 1, Appendices a and B | |