ML16208A069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Data Date Time: 07/15/2016 11:18:24 AM FE NOC D                                                               Davis-Besse Power Station Delinquent Transmittal Report Page 1of1 I'
{{#Wiki_filter:D Unit I'
Unit Document Nurpber       Record Type        Doc Type      Sheet/Section Revision Version Change Type  Change Number Document Status  HC  AC  CD  TOC1  TOC2  Changes DB1 DBRM-EMER-lSOOA                     REFERENCE MATERIAL                0006                                          REVISED        1    0    0 I.
Document Nurpber DB1 DBRM-EMER-lSOOA I.
DB1 DBRM-EMER-1SOOA                     REFERENCE MATERIAL                0007                                        APPROVED        1    0    0 Sign and return this document transmittal to acknowledge your receipt of the identified documents and removal of the superseded documents from use. This transmittal is delinquent as of 06/01/2016. It is now 44 days overdue.
DB1 DBRM-EMER-1SOOA f  
Received By:                                                  Date: _ _ _ _ _ _ _ _ _ __
\\:
Return To: Davis-Besse Power Station Document Control DB1033 5501 N. State Rt. 2 Oak Harbor, OH 43449 f
I:  
                      \:
~
I:
                      ~
f, I:
f, I:
i
i  
                        ~
~
FE NOC Davis-Besse Power Station Delinquent Transmittal Report Data Date Time: 07/15/2016 11:18:24 AM Page 1of1 Record Type Doc Type Sheet/Section Revision Version Change Type Change Number Document Status HC AC CD REFERENCE MATERIAL REFERENCE MATERIAL 0006 0007 REVISED APPROVED Sign and return this document transmittal to acknowledge your receipt of the identified documents and removal of the superseded documents from use. This transmittal is delinquent as of 06/01/2016. It is now 44 days overdue.
Received By:
Date: __________ _
Return To: Davis-Besse Power Station Document Control DB1033 5501 N. State Rt. 2 Oak Harbor, OH 43449 1
0 0
1 0
0 TOC1 TOC2 Changes


To Whom It May Concern:
To Whom It May Concern:
Please verify the attached transmittal has been completed. If all is correct, please sign/date and return completed* transmittal either by email to; DB_Document_Control@firstenergycorp. com or via U.S. mail to:
Please verify the attached transmittal has been completed. If all is correct, please sign/date and return completed* transmittal either by email to; DB_Document_Control@firstenergycorp.. com or via U.S. mail to:
Davis Besse 5501 North State Route 2 Oak Harbor, Ohio 43449 Attention: Document Control, MS 1035 Your prompt response would be greatly appreciated so the overdue transmittal may be
Davis Besse 5501 North State Route 2 Oak Harbor, Ohio 43449 Attention: Document Control, MS 1035 Your prompt response would be greatly appreciated so the overdue transmittal may be  
  . logged as C()mplet~.
. logged as C()mplet~.
Regards, Susan Martin Nuclear Document and Procedure Control 5501 North.State Route 2 Mailstop 1035 Oak Harbor, Ohio 43449 Phone 419-321-8576
: Regards, Susan Martin Nuclear Document and Procedure Control 5501 North.State Route 2 Mailstop 1035 Oak Harbor, Ohio 43449 Phone 419-321-8576
_..:,_.. -=----=-- -- - - - - -- - --- ----=- --- -=----=----~- - - - --- ----=- --= -
_..:,_.. -=----=--
- - --=- - --- - ---=- -=-= -=- --=-=- -_-==-<-~--=-~-=- __ ...____,_____ =--=-- ---. - -- - - - ~ ------}}
-- --=- - ---
---=-
-=-= -=-
--=-=- -_-==-<-~--=-~-=-
__...____,_____ =--=-- ---. - --
~ ------
-- ---- -- - --- ----=- ---
-=----=----~- ---
--- ----=- --=
-}}

Latest revision as of 21:39, 9 January 2025

Delinquent Transmittal Report
ML16208A069
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/15/2016
From: Martin S
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16208A069 (2)


Text

D Unit I'

Document Nurpber DB1 DBRM-EMER-lSOOA I.

DB1 DBRM-EMER-1SOOA f

\\:

I:

~

f, I:

i

~

FE NOC Davis-Besse Power Station Delinquent Transmittal Report Data Date Time: 07/15/2016 11:18:24 AM Page 1of1 Record Type Doc Type Sheet/Section Revision Version Change Type Change Number Document Status HC AC CD REFERENCE MATERIAL REFERENCE MATERIAL 0006 0007 REVISED APPROVED Sign and return this document transmittal to acknowledge your receipt of the identified documents and removal of the superseded documents from use. This transmittal is delinquent as of 06/01/2016. It is now 44 days overdue.

Received By:

Date: __________ _

Return To: Davis-Besse Power Station Document Control DB1033 5501 N. State Rt. 2 Oak Harbor, OH 43449 1

0 0

1 0

0 TOC1 TOC2 Changes

To Whom It May Concern:

Please verify the attached transmittal has been completed. If all is correct, please sign/date and return completed* transmittal either by email to; DB_Document_Control@firstenergycorp.. com or via U.S. mail to:

Davis Besse 5501 North State Route 2 Oak Harbor, Ohio 43449 Attention: Document Control, MS 1035 Your prompt response would be greatly appreciated so the overdue transmittal may be

. logged as C()mplet~.

Regards, Susan Martin Nuclear Document and Procedure Control 5501 North.State Route 2 Mailstop 1035 Oak Harbor, Ohio 43449 Phone 419-321-8576

_..:,_.. -=----=--

-- --=- - ---

---=-

-=-= -=-

--=-=- -_-==-<-~--=-~-=-

__...____,_____ =--=-- ---. - --

~ ------

-- ---- -- - --- ----=- ---

-=----=----~- ---

--- ----=- --=

-