D Unit I'
Document Nurpber DB1 DBRM-EMER-lSOOA I.
DB1 DBRM-EMER-1SOOA f
\\:
I:
~
f, I:
i
~
FE NOC Davis-Besse Power Station Delinquent Transmittal Report Data Date Time: 07/15/2016 11:18:24 AM Page 1of1 Record Type Doc Type Sheet/Section Revision Version Change Type Change Number Document Status HC AC CD REFERENCE MATERIAL REFERENCE MATERIAL 0006 0007 REVISED APPROVED Sign and return this document transmittal to acknowledge your receipt of the identified documents and removal of the superseded documents from use. This transmittal is delinquent as of 06/01/2016. It is now 44 days overdue.
Received By:
Date: __________ _
Return To: Davis-Besse Power Station Document Control DB1033 5501 N. State Rt. 2 Oak Harbor, OH 43449 1
0 0
1 0
0 TOC1 TOC2 Changes
To Whom It May Concern:
Please verify the attached transmittal has been completed. If all is correct, please sign/date and return completed* transmittal either by email to; DB_Document_Control@firstenergycorp.. com or via U.S. mail to:
Davis Besse 5501 North State Route 2 Oak Harbor, Ohio 43449 Attention: Document Control, MS 1035 Your prompt response would be greatly appreciated so the overdue transmittal may be
. logged as C()mplet~.
- Regards, Susan Martin Nuclear Document and Procedure Control 5501 North.State Route 2 Mailstop 1035 Oak Harbor, Ohio 43449 Phone 419-321-8576