Category:Manual
Jump to navigation
Jump to search
(previous page) (next page)
Category Used between: 6 May 1976 to 7 October 2025
Plant
University
Fuel Processing
- BWX Technologies (0)
- Barnwell (0)
- Claiborne (0)
- Consolidated Interim Storage Facility (0)
- Eagle Rock (0)
- Erwin (0)
- Framatome ANP Richland (0)
- Global Nuclear Fuel (0)
- HI-STORE (0)
- Holtec (1)
- Orano USA (0)
- Paducah Gaseous Diffusion Plant (0)
- Portsmouth Gaseous Diffusion Plant (0)
- Triso-X (0)
- West Valley Demonstration Project (0)
- Wood River Junction (0)
Laboratory
- 05000470 (0)
- Battelle Memorial Institute (0)
- Dow Chemical Company (0)
- General Atomics (0)
- Hermes (0)
- Idaho National Laboratory (0)
- Knolls Atomic Power Laboratory (0)
- Los Alamos National Laboratory (0)
- Lynchburg Research Center (0)
- National Bureau of Standards Reactor (0)
- National Institute of Standards and Technology (0)
- National Renewable Energy Lab (0)
- Northwest Medical Isotopes (0)
- Oak Ridge National Laboratory (0)
- PM-1 (0)
- PM-2A (0)
- Pacific Northwest National Laboratory (0)
- Plum Brook (0)
- SHINE Medical Technologies (1)
- SM-1 (0)
- SM-1A (0)
- Sandia National Laboratories (0)
- Tuxedo (0)
- U.S. Geological Survey (0)
- Vanowen (0)
- Waltz Mill (0)
Hospital
- Advocate Illinois (0)
- Avera McKennan Hospital (0)
- Banner Boswell Medical Center (0)
- Bard Brachytherapy (0)
- Dermatology of Seattle and Bellevue (0)
- Fred Hutchinson Cancer Center (0)
- George Washington Hospital (0)
- Karmanos Cancer Institute (0)
- Kennedy Memorial Hospital (0)
- Lincoln Memorial Hospital (0)
- Northwestern Memorial Hospital (0)
- Piedmont Hospital (0)
- UMass Memorial Health Medical Center (0)
- University Hospitals of Cleveland (0)
- West Virginia University Hospital (0)
Manufacturer
- 05200045 (0)
- Braun Intertec Corporation (0)
- Electric Boat (0)
- Martinez Refining Company (0)
- Mistras Group (0)
- Reliable Testing Services (0)
- Sacyr Construction (0)
- Screaming Eagle Coal (0)
- Tilden-Mine (0)
Agency
Pages in category "Manual"
The following 200 pages are in this category, out of 1,943 total.
(previous page) (next page)0
- 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operations Quality Assurance Program Manual Description
- 0CAN042301, Radioactive Effluent Release Report for 2022
- 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341
3
- 3F0406-05, Off-Site Dose Calculation Manual, Revision 27
- 3F0407-05, Off-Site Dose Calculation Manual, Revision 29
- 3F0410-05, Off-Site Dose Calculation Manual, Revision 32
- 3F0412-14, Submittal of Annual Radioactive Effluent Release Report 2011
- 3F0413-03, Attachment C, Off-Site Dose Calculation Manual, Revision 34
- 3F0821-01, Response to Requests for Additional Information & Supplement 1 to License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSl)-Only Emergency Plan, & ISFSI-Only Emergency Action Level Bases Manual
A
B
- BSEP 05-0020, Off-Site Dose Calculation Manual (ODCM) Revision 28
- BSEP 11-0028, Response to Request for Additional Information Regarding Proposed Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue
- BSEP 11-0045, Offsite Dose Calculation Manual, Revision 34, Enclosure 2 to BSEP 11-0045
- BSEP 12-0047, Offsite Dose Calculation Manual Revision 35
- BSEP 13-0042, Off-Site Dose Calculation Manual, Revision 36
- BVY 09-037, Off-Site Dose Calculation Manual, Revision 32
- BVY 09-037, Vermont Yankee - Off-Site Dose Calculation Manual, Revision 31
- BVY 14-072, Submittal of the Entergy Vermont Yankee Quality Assurance Program Manual, Revision 0
- BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)
- BVY 24-020, Biennial Update of Quality Assurance Program Manual
- BW110044, CY-BR-170-301, Revision 5, Offsite Dose Calculation Manual (Odcm)
- BW120042, Offsite Dose Calculation Manual (Odcm), CY-BR-170-301, Rev. 6
- BW140031, CY-BR-170-301, Revision 8, Offsite Dose Calculation Manual (ODCM)
- BW190043, CY-BR-170-301, Revision 10, Offsite Dose Calculation Manual
- BW210028, CY-BR-170-301, Revision 11, Offsite Dose Calculation Manual (ODCM)
- BYRON 2003-0042, Annual Radiological Environmental Operating Report, Table of Contents Through Section 3.0
- BYRON 2012-0038, ODCM Revision 7 Change Summary Matrix, Page II.4-39 - Page II.6-19
- BYRON 2020-0026, CY-BY-170-301, Revision 15, Offsite Dose Calculation Manual. (Part 3 of 3)
C
- CNL-14-197, Two-Unit Offsite Dose Calculation Manual, Revision 0
- CNL-15-177, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual
- CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 12
- CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
- CNS-15-041, Radioactive Waste Process Control Program Manual, Revision 15
- CNS-16-037, Ufsar/Selected Licensee Commitment Changes
- CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual
- CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes
- CP-200801015, Technical Requirements Manual for Comanche Peak Steam Electric Station Units 1 & 2
- CP-201000212, FSAR A103 - Figures - Technical Requirements Manual (TRM)
- CP-201101065, Final Safety Analysis Report (Fsar), Amendment 104, Technical Requirements Manual
- CP-201300130, Technical Requirements Manual (TRM) and TRM Basis, Revision 84
- CP-201700604, FSAR Amendment 108 - Technical Requirements Manual (Trm), Revision 88
- CP-202000403, Technical Requirements Manual, Revision 93
- CPSES-200101357, Administrative Manual Quality-Related, Control of High Radiation Areas, Procedure No. STA-660, Revision No. 7
- CPSES-200201626, Part 2 of 2, Comanche Peak Steam Electric Station (CPSES) - Transmittal of Year 2001 Radioactive Effluent Release Report Radioactive Effluents Bases
- CY-04-095, Update from Connecticut Yankee Atomic Power Company to Controlled Manual, Using the Attached Insertion Instructions (November 2004 Update, Attachment to RACY-04-095, Dated 11-22-04)
E
- E910-04-015, Experimental Corporation (Snec), 2003 Annual Radioactive Effluent Releases Report
- E910-05-021, Experimental Corporation, Revision 5 of the SNEC Facility Quality Assurance Plan
- ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16
- ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
- ET 05-0014, Request Number I3R-03 for the Third Ten-Year Interval Inservice Inspection Program - Request for Relief to Allow Use of Alternate Requirements for Snubber Inspection and Testing
- ET 22-0006, Operating Corp. - Application to Revise Technical Specifications to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections
G
- GNRO-2002/00033, 2001 Annual Radioactive Effluent Release Report (ARERR)
- GNRO-2006/00009, Technical Requirements Manual Update to the NRC for Period Dated February 16, 2006
- GNRO-2006/00052, Technical Requirements Manual Update to NRC for Period Dated September 21, 2006
- GNRO-2007/00017, Technical Requirements Manual Update to NRC for Period Dated March 1, 2007
- GNRO-2009/00005, Technical Requirements Manual Update to the NRC Dated January 19, 2009
- GNRO-2009/00024, Technical Requirements Manual Update to the NRC Dated March 31, 2009
- GNRO-2011/00072, Technical Requirements Manual and Technical Specification Bases Update
- GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update
- GNRO-2013/00033, Offsite Dose Calculation Manual, Revs. 38 & 39, Page 2.0-31 Through End
- GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)
- GO2-09-043, Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 2008
- GO2-11-039, Offsite Dose Calculation Manual
- GO2-12-031, Offsite Dose Calculation Manual
- GO2-13-067, Offsite Dose Calculation Manual
- GO2-14-069, Offsite Dose Calculation Manual
- GO2-19-023, 2018 Annual Radioactive Effluent Release Report
- GO2-24-123, Summary of Changes and Analysis for Revision 21 of Plant Procedures Manual 13.2.2, Determining Protective Action Recommendations
H
- HBL-13-004, ODCM, Revision 22, Volume 4, Safstor/Decommissioning Offsite Dose Calculation Manual
- HBL-17-005, Safstor/Decommissioning Offsite Dose Calculation Manual, Vol.4, Rev. 4. Part 2 of 2
- HNP-03-046, Off-Site Dose Calculation Manual, Revision 16
- HNP-07-178, Shearon Harris, Submittal of Information in Support of NFPA 805 Pilot Observation Reviews
J
L
- L-02-079, Mid-Cycle Core Operating Limits Report Revision
- L-03-151, Original Issuance of the Pressure and Temperature Limits Report
- L-04-147, Cycle 17 Reload and Core Operating Limits Report
- L-05-117, Cycle 17 Core Operating Limits Report Mid-Cycle Revision
- L-07-060, RTL A9.621B, Annual Radioactive Effluent Release Report for 2006, Rev. 5 to Offsite Dose Calculation Manual Changes
- L-09-111, Offsite Dose Calculation Manual, Revision 22
- L-10-050, RTL A9.621B, 1/2-ODC-1.01, Revision 8, ODCM: Index, Matrix and History of ODCM Changes.
- L-10-050, RTL A9.621B, 1/2-ODC-1.01, Revision 8, ODCM: Index, Matrix and History of ODCM Changes
- L-11-143, Operations Manual, Offsite Dose Calculation Manual, Revision 18
- L-11-150, Offsite Dose Calculation Manual, Rev. 24
- L-12-152, Offsite Dose Calculation Manual, Revision 26
- L-12-167, Enclosure B, Offsite Dose Calculation Manual, Revision 18 and Enclosure C, Process Control Program, Revision 12
- L-13-138, Enclosure B to L-13-138, Offsite Dose Calculation Manual, Revision 20 and Enclosure C, Process Control Program, Revision 12
- L-14-135, Offsite Dose Calculation Model, Revision 27
- L-16-134, Offsite Dose Calculation Manual, Revision 31
- L-17-170, Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual
- L-18-092, Offsite Dose Calculation Manual, Revision 33
- L-19-113, Rev. 9 to ODCM: Radiological Environmental Monitoring Program
- L-19-177, Summary of Changes to the Firstenergy Nuclear Operating Company Quality Assurance Program Manual for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant
- L-20-093, Offsite Dose Calculation Manual, Revision 37
- L-2002-045, Part 2 of 2, St. Lucie, Units 1 & 2, 2001 Annual Radioactive Effluent Release Report, St. Lucie Plant, Chemistry Operating Procedure C-200, Revision 23A
- L-2008-029, Annual Radioactive Effluent Release Report January 1, 2007 Through December 31, 2007, Attachment C, C-200, Offsite Dose Calculation Manual Revision 30
- L-2009-039, Attachment C, C-200, Offsite Dose Calculation Manual Revision 31B, Annual Radioactive Effluent Release Report, January 1, 2008 Through December 31, 2008
- L-2010-033, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up Pages
- L-2010-033, St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual (Odcm), Chemistry Operating Procedure C-200, Rev 31B, Marked Up Pages
- L-2010-033, St. Lucie, Units 1 and 2, Offsite Dose Calculation Manual, Chemistry Operating Procedure C-200, Rev 32.
- L-2011-064, Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010, Enclosures 2 and 3, Offsite Dose Calculation Manual Revisions
- L-2012-080, Annual Radioactive Effluent Release Report January 1, 2011 Through December 31, 2011, C-200, Offsite Dose Calculation Manual Revision 35
- L-2013-078, C-200, Rev. 38, Offsite Dose Calculation Manual
- L-2014-044, Offsite Dose Calculation Manual for Gaseous and Liquid Effluents, Revision 20
- L-2014-053, Enclosure 2 - Procedure C-200, Rev. 41, Offsite Dose Calculation Manual (Odcm)
- L-2015-052, Enclosures 2, 3, 4 & 5: St. Lucie, Units 1 and 2 - Revision 43 to C-200, Offsite Dose Calculation Manual and Revision 14 to Process Control Program, Including Marked Up Pages from ODCM and PCP
- L-2016-037, C-200, Revision 45, Offsite Dose Calculation Manual
- L-2018-048, Offsite Dose Calculation Manual
- L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55
- L-23-172, Quality Assurance Program Manual
- L-MT-04-031, Offsite Dose Calculation Manual - Appendix C, Revision 0
- L-MT-06-032, Offsite Dose Calculation Manual for Monticello
- L-MT-07-032, Off-Site Dose Calculation Manual
- L-MT-09-009, Technical Requirements Manual
- L-MT-09-037, Enclosure 3 - Monticello Revisions to ODCM-01.01, Offsite Dose Calculation Manual
- L-MT-10-008, Technical Requirements Manual
- L-MT-10-035, Revisions to Offsite Dose Calculation Manual, Enclosure 3
- L-MT-11-021, Offsite Dose Calculation Manual
- L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 7
- L-MT-12-043, Enclosure 3, Offsite Dose Calculation Manual
- L-MT-24-014, Offsite Dose Calculation Manual, Revision 9
- L-MT-25-018, Offsite Dose Calculation Manual
- L-PI-07-033, Offsite Dose Calculation Manual H4, Rev 20
- L-PI-09-055, Enclosure 4 - H4, Offsite Dose Calculation Manual (Odcm), Revision 22
- L-PI-10-028, Enclosure 5, H4, Offsite Dose Calculation Manual (Odcm), Revision 24
- LG-19-038, Offsite Dose Calculation Manual, Revision 31
- LIC-18-0015, CH-ODCM-0001, Revision 26, Off-Site Dose Calculation Manual.
- LIC-18-0015, CH-ODCM-0001, Revision 27, Off-Site Dose Calculation Manual
- LR-N09-0099, Annual Radioactive Effluent Release Report, Page 181 Through End
- LR-N09-0099, Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180
- LR-N10-0238, Inservice Testing Manual for Pumps and Valves
- LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 25
- LR-N10-0355, Offsite Dose Calculation Manual, Rev. 25 for Pseg Nuclear LLC Salem Generating Station
- LR-N14-0084, Offsite Dose Calculation Manual, Revision 27
- LR-N14-0084, Salem, Units 1 and 2, Offsite Dose Calculation Manual, Revision 27
M
- ML003733225
- ML011560249
- ML011560256
- ML011560259
- ML011560265
- ML011560267
- ML011560270
- ML011560273
- ML011560275
- ML011560290
- ML011560316
- ML011560322
- ML011560331
- ML012050514
- ML020280413
- ML020390199
- ML020460012
- ML020460280
- ML020580252
- ML020640651
- ML020660606
- ML020720326
- ML020720361
- ML020730188
- ML020730487
- ML020730499
- ML020790008
- ML020800817
- ML020810254
- ML020860470
- ML020920496
- ML020930107
- ML020950312
- ML021050303
- ML021090499
- ML021090511
- ML021120442
- ML021130547
- ML021150025
- ML021150047
- ML021150822
- ML021190531
- ML021210534
- ML021220472
- ML021230304
- ML021230342
- ML021260601
- ML021280124
- ML021280166
- ML021280248
- ML021280275
- ML021280527
- ML021290310
- ML021350447
- ML021420008
- ML021430275
- ML021440636
- ML021510491
- ML021550477
- ML021580281
- ML021620407
- ML021650306
- ML021680081