ML020460012
| ML020460012 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/04/2002 |
| From: | Mccollum W Duke Energy Corp |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| Download: ML020460012 (19) | |
Text
P Dke Duke Energy 0 Energy Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 W. R. McCollum, Jr.
(864) 885-3107 OFFICE Vice President (864) 885-3564 FAX February 4, 2002 U.
S.
Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Oconee Nuclear Station Docket 50-269,
-270,
-287 Selected Licensee Commitments Manual (SLC)
Gentlemen:
Pursuant to 10CFR 50.4 and 50.71, please find attached 7 copies of the latest revisions to the Oconee Selected Licensee Commitments Manual (SLC).
The SLC Manual is Chapter 16.0 of the Oconee Updated Final Safety Analysis Report (UFSAR).
This manual is intended to contain commitments and other station issues that warrant higher control, but are not appropriate for inclusion into the Technical Specifications (TS).
Instead of being updated with the annual UFSAR Update, the SLC Manual will be updated as necessary throughout the year.
Very truly yours,
.R.
McCollum, Jr.
V ice President Oconee Nuclear tation CMB/cmb Attachment xc:
Luis A.
Reyes Regional Administrator, Region II L.
N. Olshan, ONRR M. C. Shannon Oconee Senior Resident Inspector
February 4, 2002 To: Manual Holders
Subject:
Oconee Selected Licensee Commitments Manual (SLC)
Revision On January 16, 2002, Station Management approved revisions to SLC Table of Contents, which were implemented on January 17, 2002.
These changes revise the SLC Table of Contents to correct typographical errors that have occurred since conversion of SLC to the new ITS format.
It also deletes the title of SLC 16.6.10, Containment Hydrogen Recombiner System.
SLC 16.6.10 was deleted from SLC's on December 20, 2001.
Remove these pages SLC LOEP Pages 1-11 SLC Page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Insert these pages SLC LOEP Pages 1-11 SLC page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Any questions concerning these revisions may be directed to Reene Gambrell at ext. 3364.
Regulatory Compliance By: Conice Breazeale Regulatory Compliance
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date LOEP 1 1/17/02 LOEP 2 9/20/01 LOEP 3 12/20/01 LOEP 4 8/09/01 LOEP 5 12/18/01 LOEP 6 11/14/01 LOEP 7 7/12/01 LOEP 8 7/12/01 LOEP 9 12/11/01 LOEP 10 1/14/02 LOEP 11 11/30/99 16.0-1 1/17/02 16.0-2 1/17/02 16.0-3 1/17/02 16.0-4 1/17/02 16.0-5 1/17/02 16.0-6 1/17/02 16.1-1 3/27/99 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 7/18/00 16.5.1-2 7/18/00 16.5.1-3 7/18/00 16.5.2-1 5/11/99 16.5.2-2 5/11/99 16.5.2-3 5/11/99 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 10/18/01 16.5.3-2 10/18/01 16.5.3-3 10/18/01 16.5.4-1 3/27/99 16.5.5-1 3/27/99 16.5.6-1 3/27/99 16.5.7-1 3/27/99 16.5.7-2 3/27/99 LOEP 1
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.5.7-3 9/02/99 16.5.7-4 5/1/00 16.5.7-5 5/1/00 16.5.7-6 9/02/99 16.5.8-1 3/27/99 16.5.8-2 3/27/99 16.5.9-1 3/27/99 16.5.9-2 3/27/99 16.5.10-1 5/11/99 16.5.10-2 1/31/00 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 9/20/01 16.6.1-2 9/20/01 16.6.1-3 9/20/01 16.6.1-4 9/20/01 16.6.1-5 9/20/01 16.6.2-1 3/27/99 16.6.2-2 3/27/99 16.6.2-3 2/17/00 16.6.2-4 10/4/00 16.6.2-5 10/4/00 16.6.2-6 10/4/00 16.6.2-7 2/17/00 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 3/27/99 16.6.4-1 3/27/99 16.6.4-2 3/27/99 LOEP 2
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.6.4-3 3/27/99 16.6.4-4 3/27/99 16.6.4-5 1/31/00 16.6.4-6 3/27/99 16.6.5-1 12/14/00 16.6.6-1 3/27/99 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 6/12/01 16.6.9-2 3/27/99 16.6.10-1 12/20/01 16.6.10-2 Delete 16.6.10-3 Delete 16.6.12-1 02/15/01 16.6.12-2 02/15/01 16.6.12-3 02/15/01 16.6.12-4 Delete 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 7/31/01 16.6.13-2 7/31/01 16.7.1-1 3/27/99 16.7.1-2 3/27/99 16.7.2-1 1/31/00 16.7.2-2 5/23/01 16.7.2-3 1/31/00 16.7.3-1 3/27/99 16.7.3-2 3/27/99 16.7.4-1 3/27/99 16.7.5-1 10/04/99 16.7.5-2 3/27/99 16.7.5-3 10/04/99 16.7.5-4 10/04/99 16.7.6-1 3/27/99 16.7.7-1 3/27/99 16.7.7-2 3/27/99 16.7.8-1 3/27/99 LOEP 3
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.7.8-2 3/27/99 16.7.9-1 3/27/99 16.7.10-1 3/27/99 16.7.10-2 3/27/99 16.7.11-1 3/27/99 16.7.11-2 3/27/99 16.7.11-3 3/27/99 16.7.12-1 3/27/99 16.7.12-2 3/27/99 16.7.13-1 3/27/99 16.7.13-2 3/27/99 16.7.13-3 6/29/99 16.7.14-1 2/17/00 16.7.14-2 2/17/00 16.7.14-3 2/17/00 16.7.14-4 2/17/00 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 3/27/99 16.8.3-1 3/27/99 16.8.3-2 1/31/00 16.8.3-3 1/31/00 16.8.3-4 3/27/99 16.8.3-5 1/31/00 16.8.3-6 1/31/00 16.8.3-7 1/31/00 16.8.4-1 9/18/99 16.8.4-2 02/15/01 16.8.4-3 02/15/01 16.8.4-4 02/15/01 16.8.4-5 02/15/01 16.8.4-6 02/15/01 16.8.4-7 02/15/01 16.8.4-8 02/15/01 16.8.4-9 02/15/01 16.8.5-1 9/30/99 16.8.5-2 1/31/00 16.8.5-3 1/31/00 16.8.5-4 9/30/99 16.8.5-5 1/31/00 16.8.6-1 3/27/99 LOEP 4
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.8.6-2 1/31/00 16.8.6-3 1/31/00 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.9.1-1 1/31/00 16.9.1-2 3/27/99 16.9.1-3 3/27/99 16.9.1-4 3/27/99 16.9.1-5 6/12/01 16.9.2-1 12/18/01 16.9.2-2 12/18/01 16.9.2-3 12/18/01 16.9.2-4 12/18/01 16.9.2-5 12/18/01 16.9.3-1 1/31/00 16.9.3-2 1/31/00 16.9.4-1 1/31/00 16.9.4-2 1/31/00 16.9.4-3 1/31/00 16.9.4-4 3/27/99 16.9.4-5 6/12/01 16.9.5-1 1/31/00 16.9.5-2 4/29/99 16.9.5-3 4/29/99 16.9.5-4 6/12/01 16.9.6-1 3/27/99 16.9.6-2 3/27/99 16.9.6-3 3/27/99 16.9.6-4 3/27/99 16.9.6-5 3/27/99 16.9.6-6 3/27/99 16.9.6-7 3/27/99 16.9.6-8 3/27/99 16.9.6-9 11/30/99 16.9.7-1 3/27/01 16.9.7-2 3/27/01 16.9.7-3 3/27/01 16.9.7-4 3/27/01 16.9.7-5 3/27/01 LOEP 5
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.7-6 3/27/01 16.9.7-7 3/27/01 16.9.7-8 Delete 16.9.7-9 Delete 16.9.8-1 6/24/99 16.9.8-2 Delete 16.9.8-3 Delete 16.9.8-4 Delete 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 3/27/99 16.9.8a-2 3/27/99 16.9.8a-3 3/27/99 16.9.9-1 3/27/99 16.9.9-2 3/27/99 16.9.10-1 3/27/99 16.9.10-2 3/27/99 16.9.11-1 4/13/00 16.9.11-2 4/13/00 16.9.11-3 4/13/00 16.9.11-4 4/13/00 16.9.11-5 4/13/00 16.9.11-6 4/13/00 16.9.11-7 4/13/00 16.9.11-8 4/13/00 16.9.12-1 11/14/01 16.9.12-2 11/14/01 16.9.12-3 11/14/01 16.9.12-4 11/14/01 16.9.12-5 11/14/01 16.9.12-6 11/14/01 16.9.12-7 11/14/01 16.9.12-8 11/14/01 16.9.12-9 11/14/01 16.9.12-10 11/14/01 16.9.12-11 11/14/01 16.9.12-12 11/14/01 16.9.12-13 11/14/01 16.9.12-14 11/14/01 16.9.13-1 3/27/99 LOEP 6
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.14-1 3/27/99 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 3/27/99 16.9.16-2 5/23/01 16.9.16-3 5/23/01 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 11/21/00 16.9.18-2 3/27/99 16.9.18-3 11/21/00 16.9.18-4 11/21/00 16.9.18-5 11/21/00 16.9.18-6 11/21/00 16.9.18-7 11/21/00 16.9.18-8 11/21/00 16.9.18-9 11/21/00 16.10.1-1 3/27/99 16.10.1-2 3/27/99 16.10.1-3 12/20/00 16.10.2-1 3/27/99 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 1/31/00 16.10.5-1 3/27/99 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.11.1-1 7/12/01 16.11.1-2 7/12/01 16.11.1-3 7/12/01 16.11.1-4 7/12/01 16.11.1-5 7/12/01 LOEP 7
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.1-6 7/12/01 16.11.1-7 7/12/01 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 1/31/00 16.11.3-2 1/31/00 16.11.3-3 3/27/99 16.11.3-4 3/27/99 16.11.3-5 1/31/00 16.11.3-6 1/31/00 16.11.3-7 1/31/00 16.11.3-8 11/14/00 16.11.3-9 1/31/00 16.11.3-10 1/31/00 16.11.3-11 3/27/99 16.11.3-12 1/31/00 16.11.3-13 1/31/00 16.11.3-14 3/27/99 16.11.3-15 3/27/99 16.11.3-16 3/27/99 16.11.3-17 3/27/99 16.11.3-18 1/31/00 16.11.4-1 3/27/99 16.11.4-2 9/01/99 16.11.4-3 3/27/99 16.11.4-4 1/31/00 16.11.4-5 1/31/00 16.11.4-6 3/27/99 16.11.5-1 1/31/00 16.11.5-2 1/31/00 16.11.5-3 1/31/00 16.11.6-1 1/31/00 LOEP 8
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.6-2 1/31/00 16.11.6-3 3/27/99 16.11.6-4 3/27/99 16.11.6-5 3/27/99 16.11.6-6 3/27/99 16.11.6-7 3/27/99 16.11.6-8 3/27/99 16.11.6-9 1/31/00 16.11.6-10 1/31/00 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 1/31/00 16.11.8-2 1/31/00 16.11.9-1 11/14/00 16.11.9-2 1/31/00 16.11.9-3 1/31/00 16.11.10-1 6/30/99 16.11.10-2 3/27/99 16.11.11-1 3/27/99 16.11.12-1 3/27/99 16.11.12-2 3/27/99 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 16.12.1-1 3/27/99 16.12.2-1 6/6/00 16.12.2-2 6/6/00 16.12.3-1 3/27/99 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.13.1-1 12/11/01 16.13.1-2 12/11/01 16.13.1-3 12/11/01 16.13.1-4 12/11/01 LOEP 9
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages PaQe Revision Date 16.13.1-5 12/11/01 16.13.1-6 12/11/01 16.13.1-7 12/11/01 16.13.1-8 12/11/01 16.13.1-9 12/11/01 16.13.2-1 1/14/02 16.13.2-2 1/14/02 16.13.2-3 1/14/02 16.13.2-4 1/14/02 16.13.3-1 1/14/02 16.13.3-2 1/14/02 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 10/11/99 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 3/27/99 16.14.2-1 3/27/99 16.14.2-2 3/27/99 16.14.3-1 3/27/99 16.14.4-1 3/27/99 16.15.1-1 3/27/99 16.15.1-2 3/27/99 16.15.1-3 3/27/99 16.15.1-4 3/27/99 16.15.1-5 1/31/00 16.15.2-1 3/27/99 16.15.2-2 3/27/99 16,15.2-3 3/27/99 16.15.2-4 12/20/00 16.15.2-5 12/20/00 16.15.3-1 3/27/99 16.15.3-2 3/27/99 LOEP 10
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.15.3-3 3/27/99 16.15.3-4 3/27/99 16.15.3-5 3/27/99 LOEP 11
SECTION NO 16.0 16.1 16.2 16.3 16.4 16.5 16.5.1 16.5.2 16.5.3 16.5.4 16.5.5 16.5.6 16.5.7 16.5.8 16.5.9 16.5.10 16.5.11 16.5.12 16.5.13 16.6 16.6.1 16.6.2 16.6.3 01/17/02 I TABLE OF CONTENTS TITLE SELECTED LICENSEE COMMITMENTS INTRODUCTION APPLICABILITY DEFINITIONS COMMITMENTS RELATED TO REACTOR COMPONENTS REACTOR COOLANT SYSTEM (RCS)
Reactor Coolant System Vents Low Temperature Overpressure Protection System Loss of Decay Heat Removal
[DELETED]
[DELETED]
[DELETED]
Chemistry Requirements Pressurizer Testing Following Opening of System (Core Barrel Bolt Inspections)
Loss of Reactor Coolant Subcriticality RCS Leak Testing Following Opening of System High Pressure Injection (HPI) and the Chemical Addition Systems ENGINEERED SAFETY FEATURES Containment Leakage Tests Containment Tendon Surveillance Program Containment Heat Removal Verification Frequency PAGE 16.1-1 16.1-1 16.2-1 16.3-1 Pending 16.5.1-1 16.5.1-1 16.5.2.1 16.5.3-1 16.5.4-1 16.5.5-1 16.5.6-1 16.5.7-1 16.5.8-1 16.5.9.1 16.5.10-1 16.5.11-1 16.5.12-1 16.5.13-1 16.6.1-1 16.6.1-1 16.6.2-1 16.6.3-1 I
16.0-1
SECTION NO 16.6.4 16.6.5 16.6.6 16.6.7 16.6.8 16.6.9 16.6.10 16.6.11 16.6.12 16.6.13 16.7 16.7.1 16.7.2 16.7.3 16.7.4 16.7.5 16.7.6 16.7.7 16.7.8 16.7.9 16.7.10 16.7.11 16.7.12 01/17/02 I TABLE OF CONTENTS (continued)
TITLE Low Pressure Injection (LPI) System Leakage Core Flood Tank (CFT) Discharge Valve Breakers Core Flooding System Test Borated Water Storage Tank (BWST) Outlet Valve Control Low Pressure Injection (LPI) System Valve Test Restrictions Containment Purge Valve Testing
[DELETED]
Reserved Additional High Pressure Injection (HPI) Requirements Additional Requirements to Support Low Pressure Injection (LPI)
Operability INSTRUMENTATION Accident Monitoring Instrumentation - Noble Gas Effluent Monitor (RIA-56)
Anticipated Transients Without Scram Emergency Feedwater - Low Level Initiation
[DELETED]
Steam Generator Overfill Protection
[DELETED]
Position Indicator Channel Testing I ncore Instrumentation RCP Monitor Core Flood Tank (CFT) Instrumentation Display Instrumentation SSF Diesel Generator (DG) Air Start System Pressure Instrumentation PAGE 16.6.4-1 16.6.5-1 16.6.6-1 16.6.7-1 16.6.8-1 16.6.9-1 16.6.10-1 16.6.12-1 16.6.13-1 16.7.1-1 16.7.1-1 16.7.2-1 16.7.3-1 16.7.4-1 16.7.5-1 16.7.6-1 16.7.7-1 16.7.8-1 16.7.9-1 16.7.10-1 16.7.11-1 16.7.12-1 16.0-2
SECTION NO 16.7.13 16.7.14 16.8 16.8.1 16.8.2 16.8.3 16.8.4 16.8.5 16.8.6 16.8.7 16.8.8 16.9 16.9.1 16.9.2 16.9.3 16.9.4 16.9.5 16.9.6 TABLE OF CONTENTS (continued)
TITLE SSF Instrumentation Rod Withdrawal Limit Alarm ELECTRIC POWER SYSTEM Control of Room Temperature for Station Blackout
[DELETED]
Power Battery Parameters Keowee Operational Restrictions 125Vdc Vital I&C System Ground Locating Policy Lee/Central Alternate Power System Auctioneering Diodes External Grid Trouble Protection System AUXILIARY SYSTEMS Fire Suppression Water Supply Systems Sprinkler and Spray Systems Keowee CO2 Systems Fire Hose Stations Fire Barriers Fire Detection Instrumentation 16.9.7 Keowee Lake Level 16.9.8
[DELETED]
16.9.8a HPSW Requirements to Support Loss of LPSW 16.9.9 Auxiliary Service Water (ASW) System and Main Steam Atmospheric Dump Valves 16.9.10 Component Cooling (CC) and HPI Seal Injection to Reactor Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.0-3 PAGE 16.7.13-1 16.7.14-1 16.8.1-1 16.8.1-1 16.8.2-1 16.8.3-1 16.8.4-1 16.8.5-1 16.8.6-1 16.8.7-1 16.8.8-1 16.9.1-1 16.9.1-1 16.9.2-1 16.9.3-1 16.9.4-1 16.9.5-1 16.9.6-1 16.9.7-1 16.9.8-1 16.9.8a-1 16.9.9-1 16.9.10-1 16.9.11-1 01/17/02
TABLE OF CONTENTS (continued)
SECTION NO TITLE 01/17/02 I PAGE 16.9.12 Additional Low Pressure Service Water (LPSW) And Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.14 SSF Diesel Generator Inspection Requirements 16.9.15 Radioactive Material Sources 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated temperature and pressure) 16.9.18 Snubbers 16.10 STEAM & POWER CONVERSION SYSTEMS 16.10.1 Condensate Inventory Requirements for Emergency Feedwater 16.10.2 Steam Generator Secondary Side Pressure and Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.4 Low Presssure Service Water (LPSW) System Testing 16.10.5 Main Steam Line Break (MSLB) Feedwater Isolation Features 16.10.6 Emergency Feedwater Controls 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1 Radioactive Liquid Effluents 16.11.2 Radioactive Gaseous Effluents 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.4 Operational Safety Review 16.11.5 Solid Radioactive Waste 16.9.12-1 16.9.13-1 16.9.14-1 16.9.15-1 16.9.16-1 16.9.17-1 16.9.18-1 16.10.1-1 16.10.1-1 16.10.2-1 16.10.3-1 16.10.4-1 16.10.5-1 16.10.6-1 16.10.7-1 16.11.1-1 16.11.1-1 16.11.2-1 16.11.3-1 16.11.4-1 16.11.5-1 I
16.0-4
TABLE OF CONTENTS (continued)
SECTION NO TITLE 01/17/02 I 16.11.6 Radiological Environmental Monitoring 16.11.7 Dose calculations 16.11.8 Reports 16.11.9 Radioactive Effluent Release Report 16.11.10 Radiological Environmental Operating Report 16.11.11 Iodine Radiation Monitoring Filters 16.11.12 Radioactive Material in Outside Temporary Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.12 REFUELING OPERATIONS 16.12.1 Decay Time for Movement of Irradiated Fuel 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.4 Handling of Irradiated Fuel Assemblies 16.12.5 Loads Suspended Over Spent Fuel in Spent Fuel Pool 16.13 CONDUCT OF OPERATIONS 16.13.1 Minimum Station Staffing Requirements 16.13.2 Technical Review and Control 16.13.3 Plant Operations Review Committee 16.13.4 Reactivity Anomaly 16.13.5
[DELETED]
16.13.6 Retraining and Replacement of Station Personnel 16.0-5 PAGE 16.11.6-1 16.11.7-1 16.11.8-1 16.11.9-1 16.11.10-1 16.11.11-1 16.11.12-1 16.11.13-1 16.11.14-1 16.12.1-1 16.12.1-1 16.12.2-1 16.12.3-1 16.12.4-1 16.12.5-1 16.13.1-1 16.13.1-1 16.13.2-1 16.13.3-1 16.13.4-1 16.13.5-1 16.13.6-1
TABLE OF CONTENTS (continued)
TITLE SECTION NO 16.13.7 16.13.8 16.13.9 16.13..10 16.13.11 16.14 16.14.1 16.14.2 16.14.3 16.14.4 16.15 16.15.1 16.15.2 16.15.3 PAGE Procedures for Control of pH in Recirculated Coolant after Loss-of-Coolant Accident (LOCA) & Long-term Emergency Core Cooling Systems Respiratory Protective Program Startup Report Core Operating Limits Report Procedure for Station Survey Following an Earthquake CONTROL RODS AND POWER DISTRIBUTION APSR Movement Control Rod Program Verification Power Mapping Control Rod Drive Patch Panels VENTILATION FILTER TESTING PROGRAM Penetration Room Ventilation Room System Testing Control Room Pressurization and Filtering System Spent Fuel Pool Ventilation System 01/17/021 16.13.7-1 16.13.8-1 16.13.9-1 16.13.10-1 16.13.11-1 16.14.1-1 16.14.1-1 16.14.2-1 16.14.3-1 16.14.4-1 16.15.1-1 16.15.1-1 16.15.2-1 16.15.3-1 16.0-6