{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 February 26, 2018 MEMORANDUM TO:             Christopher G. Miller, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:                     Troy W. Pruett, Director /RA/
{{#Wiki_filter:February 26, 2018 MEMORANDUM TO:
Division of Reactor Projects Region IV
Christopher G. Miller, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:
Troy W. Pruett, Director /RA/
Division of Reactor Projects Region IV  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 27:
In other cases, all requirements of the procedure were met by work done in another procedure.
In other cases, all requirements of the procedure were met by work done in another procedure.
Lastly, in some cases, procedures are marked as not applicable if they were not required to be performed this inspection cycle.
Lastly, in some cases, procedures are marked as not applicable if they were not required to be performed this inspection cycle.
CONTACT:         Eric A. Ruesch, RIV/DRS 817-200-1126
CONTACT:
Eric A. Ruesch, RIV/DRS 817-200-1126 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511


C. Miller                                   2 Reactor Program System Report 8a does not include security and safeguards inspection program status. However, the baseline program for security and safeguards for all Region IV sites was also verified complete for CY2017.
C. Miller 2
Reactor Program System Report 8a does not include security and safeguards inspection program status. However, the baseline program for security and safeguards for all Region IV sites was also verified complete for CY2017.  


==Enclosure:==
==Enclosure:==
Reactor Program System Report 8a


Reactor Program System Report 8a
Region No: 4 Arkansas Nuclear One (ANO)
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 4
2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 2
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 2
1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 2
1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 17 8
Complete Complete 71111.12 Maintenance Effectiveness Annually 9
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 22 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 7
3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 4
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 10 6
Complete Complete 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete Page 1 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                          Arkansas Nuclear One (ANO)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   4            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  21            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                 Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                   3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                    1            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  4             2      Complete       Complete 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   2            1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    2            1      Complete      Complete 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    2            1      Complete       Complete - in previous year(s) 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  17            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    9            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  22            14      Complete      Complete 71111.15                Oper Determinations/Functionality                      Annually                  22            19      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                    7            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                  22            20      Complete      Complete 71111.20                Refueling and Other Outage Activities                  When required              4            2      Complete      Complete 71111.21M                DBA (Teams)                                            Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                         Triennial                  10            6      Complete      Complete 71111.22                Surveillance Testing                                    Annually                  17            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1      Complete       Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   1             1     Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.06 Drill Evaluation Annually 3
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 1 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 PI&R Annually 9
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete 71153 Followup of Events and NOED Annually 5
1 Complete Complete 994OA7 LINCVs Annually 4
1 Complete Complete Page 2 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   3            3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1     Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                   1             1     Complete       Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                    5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                    4             4      Complete       Complete 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete - in previous year(s) 71124.06                Rad Gas & Liquid Treatment                              Biennial                   6            6      Complete       Complete - in previous year(s) 71124.07                Radiological Environmental Monitoring Program          Biennial                   3            3      Complete       Complete - in previous year(s) 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                   6            6      Complete       Complete - in previous year(s) 71151                    Performance Indicator Verification                      Annually                    3            3      Complete      Complete 71151                    Performance Indicator Verification                      Annually                  24            24      Complete      Complete 71152                    PI&R                                                    Annually                   9            6      Complete      Complete 71152B                  PI&R (Biennial)                                        Biennial                    1             1      Complete       Complete 71153                    Followup of Events and NOED                            Annually                    5            1      Complete      Complete 994OA7                  LINCVs                                                  Annually                    4            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Callaway (CALL)
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 2 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 3
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4
3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1
2 Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)
Triennial 17 9
Complete Complete 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5
1 Complete Complete Page 3 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                      Callaway (CALL)                                  Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                    4            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                         Annually                  12            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                   2            2      Complete       Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  18            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                    3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                   1            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   3            1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1      Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  15            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  19            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                   4            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   21            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              1            2      Complete       Complete - minimum sample not available iaw IMC 0306 71111.21M                DBA (Teams)                                             Triennial                  17            9      Complete      Complete 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  17            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete       Complete 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete      Complete - in previous year(s) 71114.03                Emergency Response Organizational                      Biennial                    1             1      Complete       Complete - in previous year(s)
71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    5            1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 3
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 3 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 16 13 Complete Complete 71152 PI&R Annually 6
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 4
1 Complete Complete 994OA7 LINCVs Annually 1
1 Complete Complete Page 4 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1             1     Complete       Complete - in previous year(s) 71114.06                 Drill Evaluation                                        Annually                   3             3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)                Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                   1             1     Complete       Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5            5      Complete      Complete 71124.03                Airbore Radioactivity                                  Biennial                   4            4      Complete       Complete - in previous year(s) 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   3             3      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   16            13      Complete       Complete 71152                    PI&R                                                    Annually                    6            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                   4            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                    1             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Columbia Generating Station (WNP)
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 4 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 13 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 2
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1
1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 10 8
Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 29 18 Complete Complete 71111.18 Plant Modifications Annually 7
3 Complete Complete 71111.19 Post Maintenance Testing Annually 23 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 24 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete Page 5 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                    Columbia Generating Station (WNP)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   5            4     Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  13            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  17            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                 Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                   3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                    2            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G                Inservice Inspection Activities - BWR                  Biennial                   1            1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    1            1      Complete      Complete 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete - in previous year(s) 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete       Complete 71111.12                Maintenance Effectiveness                              Annually                  10            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  18            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  20            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  29            18      Complete       Complete 71111.18                Plant Modifications                                    Annually                   7            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   23            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              2            2      Complete       Complete 71111.21M                DBA (Teams)                                             Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  24            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1             1      Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1      Complete      Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   1             1      Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.06 Drill Evaluation Annually 4
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 5 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 11 6
Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete 71153 Followup of Events and NOED Annually 7
1 Complete Complete 994OA7 LINCVs Annually 3
1 Complete Complete Page 6 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   4             3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                   0             1     Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete       Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                   4            4      Complete       Complete - in previous year(s) 71124.04                Occupational Dose Assessment                            Biennial                   5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                   6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete      Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete      Complete 71151                    Performance Indicator Verification                      Annually                   3             3     Complete       Complete 71151                    Performance Indicator Verification                      Annually                  13            13      Complete      Complete 71152                    PI&R                                                    Annually                  11            6     Complete      Complete 71152B                  PI&R (Biennial)                                        Biennial                    1            1      Complete      Complete 71153                    Followup of Events and NOED                            Annually                    7            1      Complete      Complete 994OA7                  LINCVs                                                  Annually                    3            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Comanche Peak (CP)
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 6 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 4
4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 3
2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 3
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 2
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 21 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4
3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 9
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 3
3 Complete Complete Page 7 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                  Comanche Peak (CP)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                    4            4      Complete      Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  12            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  17            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  4            4      Complete      Complete 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0            3      Complete      Complete - by reference iaw IMC 0306 71111.06                Flood Protection Measures                              Annually                    3            2      Complete      Complete 71111.07A                Heat Sink Performance                                  Annually                    1            1      Complete      Complete 71111.07T                Heat Sink Performance                                  Triennial                  3            2      Complete      Complete 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   3            1      Complete      Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0             1      Complete      Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                Biennial                    2            1     Complete      Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    9            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  19            14      Complete      Complete 71111.15                Oper Determinations/Functionality                      Annually                  21            19      Complete      Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                    4            3      Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   21            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              3            2      Complete       Complete 71111.21M                DBA (Teams)                                            Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  9            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  18            14      Complete       Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete       Complete 71114.02                Alert and Notification System Testing                  Biennial                   1             1      Complete       Complete - in previous year(s) 71114.03                Emergency Response Organizational                      Biennial                   1             1      Complete       Complete - in previous year(s)
71114.07 Exercise Evaluation -Hostile Action (HA)
Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    1             1      Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                   1            1      Complete       Complete - in previous year(s) 71114.06                Drill Evaluation                                        Annually                   3             3     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Biennial 0
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 7 of 24
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1
3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1
6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 1
3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 27 24 Complete Complete 71152 PI&R Annually 6
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete 71153 Followup of Events and NOED Annually 5
1 Complete Complete 994OA7 LINCVs Annually 4
1 Complete Complete Page 8 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete      Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                    5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete      Complete 71124.04                Occupational Dose Assessment                            Biennial                   5            5      Complete      Complete 71124.05                Radiation Monitoring Instrumentation                    Biennial                    1             3      Complete       Complete - in previous year(s) 71124.06                Rad Gas & Liquid Treatment                              Biennial                    1             6      Complete       Complete - in previous year(s) 71124.07                Radiological Environmental Monitoring Program          Biennial                   1             3      Complete       Complete - in previous year(s) 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete - in previous year(s) 71151                    Performance Indicator Verification                      Annually                    3            3      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   27            24      Complete       Complete 71152                    PI&R                                                    Annually                    6            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete 71153                    Followup of Events and NOED                            Annually                    5            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                   4            1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Cooper (CNS)
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 8 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 16 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 2
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1
1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 21 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 21 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3
3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 0
2 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 10 6
Complete Complete 71111.22 Surveillance Testing Annually 21 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6
1 Complete Complete Page 9 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                        Cooper (CNS)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                    4            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                   12            12      Complete       Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  16            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                 Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                   3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                    2            1      Complete      Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G                Inservice Inspection Activities - BWR                  Biennial                   1            1      Complete       Complete - in previous year(s) 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1      Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  21            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  21            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                   3             3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   22            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              0            2      Complete       Complete - opportunity to apply full procedure not available iaw IMC 0306 71111.21M                DBA (Teams)                                             Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  10            6      Complete      Complete 71111.22                Surveillance Testing                                    Annually                  21            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1             1      Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1     Complete       Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    6             1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
2/26/2018 6:24:12 PM                                                                                                                                                                    Page 9 of 24
1 Complete Complete 71114.06 Drill Evaluation Annually 3
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete - in previous year(s) 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 9
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete 71153 Followup of Events and NOED Annually 10 1
Complete Complete 994OA7 LINCVs Annually 2
1 Complete Complete Page 10 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1             1     Complete       Complete 71114.06                Drill Evaluation                                        Annually                    3            3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete      Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                    5            5      Complete       Complete - in previous year(s) 71124.03                Airbore Radioactivity                                  Biennial                   4            4      Complete       Complete 71124.04                Occupational Dose Assessment                            Biennial                   5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   3             3      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   13            13      Complete       Complete 71152                    PI&R                                                    Annually                    9             6     Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete 71153                    Followup of Events and NOED                            Annually                  10            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                   2             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Diablo Canyon (DIAB)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 10 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 2
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 2
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 19 18 Complete Complete 71111.18 Plant Modifications Annually 4
3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete Page 11 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                  Diablo Canyon (DIAB)                                  Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   5            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  19            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                 Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                   3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                    2            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   2            1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1      Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  16            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  22            19      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  19            18      Complete       Complete 71111.18                Plant Modifications                                    Annually                   4            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   22            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              1            2      Complete       Complete 71111.21M                DBA (Teams)                                             Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  18            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1            1     Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1             1     Complete       Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    2            1      Complete      Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.06 Drill Evaluation Annually 3
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 11 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 29 24 Complete Complete 71152 PI&R Annually 7
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 4
1 Complete Complete 994OA7 LINCVs Annually 1
1 Complete Complete Page 12 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   3            3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1     Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                   1             1     Complete       Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete       Complete 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete - in previous year(s) 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete - in previous year(s) 71124.07                Radiological Environmental Monitoring Program          Biennial                    3             3      Complete       Complete - in previous year(s) 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6             6      Complete       Complete - in previous year(s) 71151                    Performance Indicator Verification                      Annually                    3            3      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   29            24      Complete       Complete 71152                    PI&R                                                    Annually                    7            6      Complete       Complete 71152B                  PI&R (Biennial)                                        Biennial                   1             1     Complete       Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                   4            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                    1             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Grand Gulf (GG)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 12 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 7
4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1
1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 13 8
Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 16 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4
3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 6
2 Complete Complete 71111.21M DBA (Teams)
Triennial 19 9
Complete Complete 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 16 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete Page 13 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                      Grand Gulf (GG)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   4             4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  12            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  18            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  7            4      Complete      Complete 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0             3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                    3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                   1            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G                Inservice Inspection Activities - BWR                  Biennial                   1            1      Complete       Complete - in previous year(s) 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1      Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  13            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  18            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  16            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                   4            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   22            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              6             2      Complete       Complete 71111.21M                DBA (Teams)                                             Triennial                  19            9      Complete      Complete 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  16            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete      Complete 71114.02                Alert and Notification System Testing                  Biennial                    1             1      Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1      Complete      Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   1             1      Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.06 Drill Evaluation Annually 4
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 13 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete - in previous year(s) 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 16 13 Complete Complete 71152 PI&R Annually 8
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Incomplete 71153 Followup of Events and NOED Annually 3
1 Complete Complete 994OA7 LINCVs Annually 10 1
Complete Complete Page 14 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   4             3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete       Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5             5      Complete       Complete - in previous year(s) 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete       Complete 71124.04                Occupational Dose Assessment                            Biennial                   5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   3             3     Complete       Complete 71151                    Performance Indicator Verification                      Annually                   16            13      Complete       Complete 71152                    PI&R                                                    Annually                   8            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Incomplete 71153                    Followup of Events and NOED                            Annually                   3             1     Complete       Complete 994OA7                  LINCVs                                                  Annually                  10            1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Palo Verde (PALO)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 14 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete - by reference iaw IMC 0306 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 5
2 Complete Complete 71111.07A Heat Sink Performance Annually 2
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 5
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1
1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 25 22 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 34 18 Complete Complete 71111.18 Plant Modifications Annually 3
3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 20 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 3
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete - in previous year(s)
Page 15 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                    Palo Verde (PALO)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   4            4      Complete       Complete - by reference iaw IMC 0306 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  21            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                    5            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                   2            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   5             1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    1            1      Complete       Complete 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete - in previous year(s) 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete       Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  18            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  25            22      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  34            18      Complete       Complete 71111.18                Plant Modifications                                    Annually                   3             3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   21            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              3            2      Complete       Complete 71111.21M                DBA (Teams)                                            Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  20            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete      Complete 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete      Complete - in previous year(s) 71114.03                Emergency Response Organizational                      Biennial                   1             1     Complete       Complete - in previous year(s)
71114.06 Drill Evaluation Annually 3
Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    3            1     Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1             1     Complete       Complete - in previous year(s)
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Biennial 0
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 15 of 24
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 7
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 35 35 Complete Complete 71152 PI&R Annually 7
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 5
1 Complete Complete 994OA7 LINCVs Annually 1
1 Complete Complete Page 16 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   3            3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1             1     Complete       Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                    7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   7            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                   4            4      Complete       Complete - in previous year(s) 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete      Complete 71151                    Performance Indicator Verification                      Annually                   3             3     Complete       Complete 71151                    Performance Indicator Verification                      Annually                   35            35      Complete       Complete 71152                    PI&R                                                    Annually                    7            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                   5            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                    1             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 River Bend (RBS)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 16 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 4
2 Complete Complete 71111.08G Inservice Inspection Activities - BWR Biennial 1
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1
1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3
3 Complete Complete 71111.19 Post Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1
2 Complete Complete 71111.21M DBA (Teams)
Triennial 22 9
Complete Complete 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 14 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0
1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete Page 17 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                      River Bend (RBS)                                  Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   4             4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  12            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  17            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                 Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                   3            2      Complete       Complete 71111.07A                Heat Sink Performance                                  Annually                    1            1      Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  4             2      Complete       Complete 71111.08G                Inservice Inspection Activities - BWR                  Biennial                    1            1      Complete      Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    1            1      Complete      Complete 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete - in previous year(s) 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete       Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete      Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  14            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  15            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                   3             3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   20            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              1            2      Complete       Complete 71111.21M                DBA (Teams)                                             Triennial                  22            9      Complete      Complete 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  14            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1             1     Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1            1     Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1      Complete      Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   0            1     Complete       Complete - minimum sample not available iaw IMC 0306 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.06 Drill Evaluation Annually 4
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 17 of 24
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 6
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete 71153 Followup of Events and NOED Annually 9
1 Complete Complete 994OA7 LINCVs Annually 3
1 Complete Complete Page 18 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   4             3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1     Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                   1             1      Complete       Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete      Complete - in previous year(s) 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete 71151                    Performance Indicator Verification                      Annually                   3             3     Complete       Complete 71151                    Performance Indicator Verification                      Annually                   13            13      Complete       Complete 71152                    PI&R                                                    Annually                    6             6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete 71153                    Followup of Events and NOED                            Annually                    9            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                   3             1      Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 South Texas Project (STP)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 18 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 6
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 6
4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 2
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 27 18 Complete Complete 71111.18 Plant Modifications Annually 3
3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2
2 Complete Complete 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 0
6 Complete Complete - in previous year(s) 71111.22 Surveillance Testing Annually 19 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0
1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 4
3 Complete Complete Page 19 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                              South Texas Project (STP)                                  Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                    6            4      Complete      Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  20            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  6            4      Complete      Complete 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0             3      Complete      Complete - by reference iaw IMC 0306 71111.06                Flood Protection Measures                              Annually                    3            2      Complete      Complete 71111.07A                Heat Sink Performance                                  Annually                    1            1     Complete      Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   2            1     Complete      Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1     Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                Biennial                    1            1      Complete      Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                   8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  17            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  20            19      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  27            18      Complete       Complete 71111.18                Plant Modifications                                    Annually                    3             3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                  21            20      Complete      Complete 71111.20                Refueling and Other Outage Activities                  When required              2            2      Complete      Complete 71111.21M                DBA (Teams)                                             Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  0            6     Complete       Complete - in previous year(s) 71111.22                Surveillance Testing                                    Annually                  19            14      Complete       Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete       Complete - in previous year(s) 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete       Complete 71114.03                Emergency Response Organizational                      Biennial                    1            1      Complete       Complete Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   0            1      Complete       Complete - minimum sample not available iaw IMC 0306 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                   1             1     Complete       Complete - in previous year(s) 71114.06                Drill Evaluation                                        Annually                   4            3     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
71114.07 Exercise Evaluation -Hostile Action (HA)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 19 of 24
Biennial 0
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 PI&R Annually 6
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3
1 Complete Complete 994OA7 LINCVs Annually 0
1 Complete Complete - by reference iaw IMC 0306 Page 20 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete      Complete - in previous year(s) 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                    5            5      Complete       Complete 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete       Complete 71124.04                Occupational Dose Assessment                            Biennial                   5            5      Complete       Complete 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete - in previous year(s) 71124.06                Rad Gas & Liquid Treatment                              Biennial                   6            6      Complete       Complete - in previous year(s) 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete       Complete - in previous year(s) 71151                    Performance Indicator Verification                      Annually                   3            3      Complete       Complete 71151                    Performance Indicator Verification                      Annually                  24            24      Complete       Complete 71152                    PI&R                                                    Annually                    6            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                   3            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                    0            1     Complete       Complete - by reference iaw IMC 0306 Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Waterford (WAT)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 20 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 0
4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 2
2 Complete Complete - by reference iaw IMC 0306 71111.07A Heat Sink Performance Annually 1
1 Complete Complete 71111.07T Heat Sink Performance Triennial 3
2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 1
1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0
1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 17 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4
3 Complete Complete 71111.19 Post Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2
2 Complete Complete 71111.21M DBA (Teams)
Triennial 15 9
Complete Complete 71111.21N DBA (Programs)
Triennial 0
6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete - in previous year(s)
Page 21 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                    Waterford (WAT)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   5            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  19            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  0             4      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0            3      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06                Flood Protection Measures                              Annually                    2            2      Complete      Complete - by reference iaw IMC 0306 71111.07A                Heat Sink Performance                                  Annually                    1             1     Complete       Complete 71111.07T                Heat Sink Performance                                  Triennial                  3            2      Complete       Complete 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   1            1      Complete       Complete 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                    0            1      Complete       Complete - by reference iaw IMC 0306 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete      Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  19            14      Complete       Complete 71111.15                Oper Determinations/Functionality                      Annually                  17            15      Complete       Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                   4            3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                   20            20      Complete       Complete 71111.20                Refueling and Other Outage Activities                  When required              2            2      Complete       Complete 71111.21M                DBA (Teams)                                            Triennial                  15            9      Complete      Complete 71111.21N                DBA (Programs)                                          Triennial                  0            6      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22                Surveillance Testing                                    Annually                  18            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete      Complete 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete      Complete - in previous year(s) 71114.03                Emergency Response Organizational                      Biennial                   1             1     Complete       Complete - in previous year(s)
71114.06 Drill Evaluation Annually 3
Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                    4            1     Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                    1             1     Complete       Complete - in previous year(s)
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Biennial 0
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 21 of 24
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 6
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3
1 Complete Complete 994OA7 LINCVs Annually 1
1 Complete Complete Page 22 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                   3            3      Complete       Complete 71114.07                Exercise Evaluation -Hostile Action (HA)               Biennial                    0             1     Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                   1             1     Complete       Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                   7            7      Complete       Complete 71124.02                Occupational ALARA                                      Biennial                   5            5      Complete      Complete 71124.03                Airbore Radioactivity                                  Biennial                   4            4      Complete       Complete - in previous year(s) 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete       Complete - in previous year(s) 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete       Complete 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete       Complete 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete       Complete 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete      Complete 71151                    Performance Indicator Verification                      Annually                   3             3     Complete       Complete 71151                    Performance Indicator Verification                      Annually                   13            13      Complete       Complete 71152                    PI&R                                                    Annually                   6            6      Complete       Complete 71152B                  PI&R (Biennial)                                         Biennial                   1             1     Complete       Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                   3            1     Complete       Complete 994OA7                  LINCVs                                                  Annually                    1             1     Complete       Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Region No: 4 Wolf Creek (WC)
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 22 of 24
Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5
4 Complete Complete 71111.04 Equipment Alignment (Quarterly)
Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2
2 Complete Complete 71111.05A Fire Protection - Annual Annually 1
1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)
Triennial 7
4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)
Triennial 0
3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3
2 Complete Complete 71111.07A Heat Sink Performance Annually 2
1 Complete Complete 71111.07T Heat Sink Performance Triennial 0
2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 1
1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 1
1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1
1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8
8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8
8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0
18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3
3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 0
2 Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)
Triennial 0
9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)
Triennial 10 6
Complete Complete 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1
1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1
1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1
1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1
1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1
1 Complete Complete - in previous year(s)
Page 23 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site Region No: 4                                      Wolf Creek (WC)                                    Inspection Cycle: 2017 Procedure          Title                                                  Frequency              Sample      Minimum      Status        Note Completed      Sample 71111.01                Adverse Weather Protection                              Annually                   5            4      Complete       Complete 71111.04                Equipment Alignment (Quarterly)                        Annually                  14            12      Complete      Complete 71111.04S                Equipment Alignment                                    Annually                    2            2      Complete      Complete 71111.05A                Fire Protection - Annual                                Annually                    1            1      Complete      Complete 71111.05Q                Fire Protection - Quarterly                            Quarterly                  20            16      Complete      Complete 71111.05T                Fire Protection (Triennial)                             Triennial                  7            4      Complete      Complete 71111.05XT              Fire Protection - NFPA 805 (Triennial)                  Triennial                  0             3      Complete      Complete - by reference iaw IMC 0306 71111.06                Flood Protection Measures                              Annually                    3            2      Complete      Complete 71111.07A                Heat Sink Performance                                  Annually                    2            1     Complete      Complete 71111.07T                Heat Sink Performance                                  Triennial                  0            2      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P                Inservice Inspection Activities - PWR                  Biennial                   1             1     Complete       Complete - in previous year(s) 71111.11A                Licensed Op Requal & Perform - Annual                  Annually                   1            1      Complete       Complete 71111.11B                Licensed Op Requal & Perform - Biennial                 Biennial                    1            1      Complete       Complete - in previous year(s) 71111.11Q                Licensed Op Requal & Perform - Quarterly                Quarterly                  8            8      Complete       Complete 71111.12                Maintenance Effectiveness                              Annually                    8            8      Complete       Complete 71111.13                Maint Risk Assessments & Emer Wk Control                Annually                  16            14      Complete      Complete 71111.15                Oper Determinations/Functionality                      Annually                  15            15      Complete      Complete 71111.17T                Changes, Tests, and Experiments                        Triennial                  0            18      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18                Plant Modifications                                    Annually                    3             3     Complete       Complete 71111.19                Post Maintenance Testing                                Annually                  21            20      Complete      Complete 71111.20                Refueling and Other Outage Activities                  When required              0            2      Complete      Complete - minimum sample not available iaw IMC 0306 71111.21M                DBA (Teams)                                             Triennial                  0            9      Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N                DBA (Programs)                                          Triennial                  10            6     Complete       Complete 71111.22                Surveillance Testing                                    Annually                  18            14      Complete      Complete 71114.01                Exercise Evaluation                                    Biennial                   1            1      Complete      Complete 71114.02                Alert and Notification System Testing                  Biennial                    1            1      Complete       Complete - in previous year(s) 71114.03                Emergency Response Organizational                      Biennial                   1            1      Complete       Complete - in previous year(s)
71114.06 Drill Evaluation Annually 3
Staffing/Augmentation 71114.04                Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                   1            1      Complete       Complete 71114.05                Correction of EP Weaknesses & Deficiencies              Biennial                   1             1     Complete       Complete - in previous year(s)
3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)
Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Biennial 0
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 23 of 24
1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1
1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7
7 Complete Complete 71124.02 Occupational ALARA Biennial 5
5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4
4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5
5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3
3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6
6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3
3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6
6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3
3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 7
6 Complete Complete 71152B PI&R (Biennial)
Biennial 1
1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3
1 Complete Complete 994OA7 LINCVs Annually 1
1 Complete Complete Page 24 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
Baseline Inspection Completion By Site IR Report 8a


IR Report 8a Baseline Inspection Completion By Site 71114.06                Drill Evaluation                                        Annually                    3            3      Complete      Complete 71114.07                Exercise Evaluation -Hostile Action (HA)                Biennial                    0            1      Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08                Exercise Evaluation  Scenario Review                  Biennial                    1            1      Complete      Complete 71124.01                Rad Haz Assess Exposure Controls                        Annually                    7            7      Complete      Complete 71124.02                Occupational ALARA                                      Biennial                    5            5      Complete      Complete 71124.03                Airbore Radioactivity                                  Biennial                    4            4      Complete      Complete 71124.04                Occupational Dose Assessment                            Biennial                    5            5      Complete      Complete 71124.05                Radiation Monitoring Instrumentation                    Biennial                    3            3      Complete      Complete - in previous year(s) 71124.06                Rad Gas & Liquid Treatment                              Biennial                    6            6      Complete      Complete - in previous year(s) 71124.07                Radiological Environmental Monitoring Program          Biennial                    3            3      Complete      Complete - in previous year(s) 71124.08                Solid Waste Proc, Handling, Stor, Transp                Biennial                    6            6      Complete      Complete - in previous year(s) 71151                    Performance Indicator Verification                      Annually                    3            3      Complete      Complete 71151                    Performance Indicator Verification                      Annually                  13            13      Complete      Complete 71152                    PI&R                                                    Annually                    7            6      Complete      Complete 71152B                  PI&R (Biennial)                                        Biennial                    1            1      Complete      Complete - in previous year(s) 71153                    Followup of Events and NOED                            Annually                    3            1      Complete      Complete 994OA7                  LINCVs                                                  Annually                    1            1      Complete      Complete Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.
ML18057B084 SUNSI Review ADAMS:
2/26/2018 6:24:12 PM                                                                                                                                                                  Page 24 of 24
Non-Publicly Available Non-Sensitive Keyword:
 
By:EAR4/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE TL:IPAT D:DRS D:DRP NAME ERuesch TVegel TPruett SIGNATURE  
ML18057B084 SUNSI Review       ADAMS:           Non-Publicly Available Non-Sensitive Keyword:
/RA/  
By:EAR4/rdr       Yes No       Publicly Available     Sensitive     NRC-002 OFFICE       TL:IPAT       D:DRS         D:DRP NAME         ERuesch       TVegel         TPruett SIGNATURE       /RA/         /RA/           /RA/
/RA/  
DATE           2/26/18     2/26/18       2/26/18}}
/RA/
DATE 2/26/18 2/26/18 2/26/18}}

Latest revision as of 08:49, 6 January 2025

Calendar Year 2017 Baseline Inspection Completion
ML18057B084
Person / Time
Issue date: 02/26/2018
From: Troy Pruett
NRC/RGN-IV/DRP
To: Chris Miller
Division of Inspection and Regional Support
Ruesch E
References
Download: ML18057B084 (27)


Text

February 26, 2018 MEMORANDUM TO:

Christopher G. Miller, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:

Troy W. Pruett, Director /RA/

Division of Reactor Projects Region IV

SUBJECT:

CALENDAR YEAR 2017 BASELINE INSPECTION COMPLETION This memorandum documents Region IVs completion of the Reactor Oversight Process (ROP)

Baseline Inspection Program for calendar year (CY) 2017 in accordance with Inspection Manual Chapter (IMC) 2515. Region IV completed the baseline inspection program at all regional reactor licensees subject to the ROP.

Reactor Program System (RPS) Report 8a is enclosed. With one exception, the report documents completion of all required samples for the 2017 inspection cycle. The biennial problem identification and resolution sample at Grand Gulf was begun during 2016-2017 biennial inspection cycle, but was not completed until January 18, 2018. It is therefore documented as incomplete on the enclosed report. However, because it was completed in the first quarter of 2018, and was the only sample not completed in 2017, it meets the IMC 2515 criteria for regional completion of the ROP.

Note that along with the status, some procedures have attached notes as described in IMC 0306. In some cases, procedures are performed on a biennial or triennial frequency and were not required to be performed in CY2017. Also, in some cases, procedures were considered complete with less than the minimum samples because sufficient samples were not available.

In other cases, all requirements of the procedure were met by work done in another procedure.

Lastly, in some cases, procedures are marked as not applicable if they were not required to be performed this inspection cycle.

CONTACT:

Eric A. Ruesch, RIV/DRS 817-200-1126 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

C. Miller 2

Reactor Program System Report 8a does not include security and safeguards inspection program status. However, the baseline program for security and safeguards for all Region IV sites was also verified complete for CY2017.

Enclosure:

Reactor Program System Report 8a

Region No: 4 Arkansas Nuclear One (ANO)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 2

1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 17 8

Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 22 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 7

3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 4

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete Page 1 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 PI&R Annually 9

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 5

1 Complete Complete 994OA7 LINCVs Annually 4

1 Complete Complete Page 2 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Callaway (CALL)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 3

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

2 Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 17 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5

1 Complete Complete Page 3 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 16 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 4

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 4 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Columbia Generating Station (WNP)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 13 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 29 18 Complete Complete 71111.18 Plant Modifications Annually 7

3 Complete Complete 71111.19 Post Maintenance Testing Annually 23 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 24 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete Page 5 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 11 6

Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 7

1 Complete Complete 994OA7 LINCVs Annually 3

1 Complete Complete Page 6 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Comanche Peak (CP)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 4

4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 3

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 2

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 21 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 9

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 3

3 Complete Complete Page 7 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1

3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1

6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 1

3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 27 24 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 5

1 Complete Complete 994OA7 LINCVs Annually 4

1 Complete Complete Page 8 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Cooper (CNS)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 16 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1

1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 21 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 21 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 0

2 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing Annually 21 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6

1 Complete Complete Page 9 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete - in previous year(s) 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 9

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 10 1

Complete Complete 994OA7 LINCVs Annually 2

1 Complete Complete Page 10 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Diablo Canyon (DIAB)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 19 18 Complete Complete 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete Page 11 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 29 24 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 4

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 12 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Grand Gulf (GG)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities - BWR Biennial 1

1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 13 8

Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 16 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 6

2 Complete Complete 71111.21M DBA (Teams)

Triennial 19 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 16 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete Page 13 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete - in previous year(s) 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 16 13 Complete Complete 71152 PI&R Annually 8

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Incomplete 71153 Followup of Events and NOED Annually 3

1 Complete Complete 994OA7 LINCVs Annually 10 1

Complete Complete Page 14 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Palo Verde (PALO)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete - by reference iaw IMC 0306 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 5

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 5

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 25 22 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 34 18 Complete Complete 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 20 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 3

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s)

Page 15 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 7

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 35 35 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 5

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 16 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 River Bend (RBS)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 4

2 Complete Complete 71111.08G Inservice Inspection Activities - BWR Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

2 Complete Complete 71111.21M DBA (Teams)

Triennial 22 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 14 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete Page 17 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 9

1 Complete Complete 994OA7 LINCVs Annually 3

1 Complete Complete Page 18 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 South Texas Project (STP)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 6

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 6

4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 27 18 Complete Complete 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2

2 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 0

6 Complete Complete - in previous year(s) 71111.22 Surveillance Testing Annually 19 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete - in previous year(s) 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s) 71114.06 Drill Evaluation Annually 4

3 Complete Complete Page 19 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete - in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306 Page 20 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Waterford (WAT)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.06 Flood Protection Measures Annually 2

2 Complete Complete - by reference iaw IMC 0306 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual Annually 0

1 Complete Complete - by reference iaw IMC 0306 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 17 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2

2 Complete Complete 71111.21M DBA (Teams)

Triennial 15 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s)

Page 21 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete - in previous year(s) 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete - in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 22 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

Region No: 4 Wolf Creek (WC)

Inspection Cycle: 2017 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities - PWR Biennial 1

1 Complete Complete - in previous year(s) 71111.11A Licensed Op Requal & Perform - Annual Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial Biennial 1

1 Complete Complete - in previous year(s) 71111.11Q Licensed Op Requal & Perform - Quarterly Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 0

2 Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete - in previous year(s) 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete - in previous year(s) 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies Biennial 1

1 Complete Complete - in previous year(s)

Page 23 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 7

7 Complete Complete 71124.02 Occupational ALARA Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 3

3 Complete Complete - in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 6

6 Complete Complete - in previous year(s) 71124.07 Radiological Environmental Monitoring Program Biennial 3

3 Complete Complete - in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 6

6 Complete Complete - in previous year(s) 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s) 71153 Followup of Events and NOED Annually 3

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 24 of 24 2/26/2018 6:24:12 PM Note: Biennial samples completed are the total of 2016 and 2017. Triennial samples completed are the total between 2017 and 2019.

Baseline Inspection Completion By Site IR Report 8a

ML18057B084 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By:EAR4/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE TL:IPAT D:DRS D:DRP NAME ERuesch TVegel TPruett SIGNATURE

/RA/

/RA/

/RA/

DATE 2/26/18 2/26/18 2/26/18