ML20138C182: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
yj s | yj s | ||
* y 1 | |||
Department of Energy | |||
[ | -k | ||
[ | |||
Idaho Operations Office 550 Second Street Idaho Falls, Idaho 83401 August 23, 1984 Mark Williams, TAPMG Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, DC 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 30: | ||
==REFERENCES:== | ==REFERENCES:== | ||
(a) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Divi::fon of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A-6819, May 12, 1984 (b) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Division of Licensing, NRR, NRC: " Evaluations of | (a) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Divi::fon of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A-6819, May 12, 1984 (b) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Division of Licensing, NRR, NRC: " Evaluations of Selected Open NRC Activities at Waterford Unit 3 Site Needing Action Before Plant Fuel Load" FIN A-6821, May 12,1984 | ||
Selected Open NRC Activities at Waterford Unit 3 Site Needing Action Before Plant Fuel Load" FIN A-6821, May 12,1984 | |||
==Dear Mr. Williams:== | ==Dear Mr. Williams:== | ||
In accordance with the referenced letters, enclosed are five copies of the subject NRC Form 189 documents. | In accordance with the referenced letters, enclosed are five copies of the subject NRC Form 189 documents. | ||
Pursuant to verbal discussions with the DOE-ID and NRC Technical Monitors, the funding levels for A6819 and A6821 have been established at 5632K and $255K, respectively, rather than the $332X and $155K authorized in the referenced letters. Both increases were made in order to cover work scope for the Comanche Peak plant, since the referenced letters cover the Waterford plar.t only. The work scope in A6819 has been written to include assistance to the NRC in evaluating allegation of mismanagement at the Comanche Peak plant. | Pursuant to verbal discussions with the DOE-ID and NRC Technical Monitors, the funding levels for A6819 and A6821 have been established at 5632K and $255K, respectively, rather than the $332X and $155K authorized in the referenced letters. Both increases were made in order to cover work scope for the Comanche Peak plant, since the referenced letters cover the Waterford plar.t only. The work scope in A6819 has been written to include assistance to the NRC in evaluating allegation of mismanagement at the Comanche Peak plant. | ||
Should you have any questions, please contact Mr. Paul Litteneker, DOE-ID Project Manager for this work. | Should you have any questions, please contact Mr. Paul Litteneker, DOE-ID Project Manager for this work. | ||
Very truly yours, 8510220239 851016 PDR FOIA | Very truly yours, 8510220239 851016 PDR FOIA x | ||
GARDE 85-751 | r/ | ||
GARDE 85-751 PDR S. | |||
am, ssistant Manager for Administration Enclosure cc: | |||
J. N. Donohew, Jr., NRC, w/ enc. | |||
F. E. Witmer, DOE-HQ, w/ enc. | F. E. Witmer, DOE-HQ, w/ enc. | ||
P. E. Litteneker, ID, w/ enc. | P. E. Litteneker, ID, w/ enc. | ||
i l | i l | ||
l I | l I | ||
.}} | |||
Latest revision as of 20:01, 11 December 2024
| ML20138C182 | |
| Person / Time | |
|---|---|
| Site: | Waterford, Comanche Peak, 05000000 |
| Issue date: | 08/23/1984 |
| From: | Milam S ENERGY, DEPT. OF, IDAHO OPERATIONS OFFICE |
| To: | Mike Williams Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20136F578 | List:
|
| References | |
| CON-FIN-A-6819, CON-FIN-A-6821, FOIA-84-751, FOIA-85-751 NUDOCS 8510220239 | |
| Download: ML20138C182 (1) | |
Text
.
yj s
- y 1
Department of Energy
-k
[
Idaho Operations Office 550 Second Street Idaho Falls, Idaho 83401 August 23, 1984 Mark Williams, TAPMG Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, DC 20555
SUBJECT:
A6819 - Evaluation of Selected NRC Open Items Before Plant Fuel Load - Revision 1 A6821 - Evaluation of Selected Open NRC Activities at NT0L Sites Needing Action Before Plant Fuel Load
REFERENCES:
(a) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Divi::fon of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A-6819, May 12, 1984 (b) D. G. Eisenhut ltr to T. E. Wade II, INEL Technical Assis-tance to the Division of Licensing, NRR, NRC: " Evaluations of Selected Open NRC Activities at Waterford Unit 3 Site Needing Action Before Plant Fuel Load" FIN A-6821, May 12,1984
Dear Mr. Williams:
In accordance with the referenced letters, enclosed are five copies of the subject NRC Form 189 documents.
Pursuant to verbal discussions with the DOE-ID and NRC Technical Monitors, the funding levels for A6819 and A6821 have been established at 5632K and $255K, respectively, rather than the $332X and $155K authorized in the referenced letters. Both increases were made in order to cover work scope for the Comanche Peak plant, since the referenced letters cover the Waterford plar.t only. The work scope in A6819 has been written to include assistance to the NRC in evaluating allegation of mismanagement at the Comanche Peak plant.
Should you have any questions, please contact Mr. Paul Litteneker, DOE-ID Project Manager for this work.
Very truly yours, 8510220239 851016 PDR FOIA x
r/
GARDE 85-751 PDR S.
am, ssistant Manager for Administration Enclosure cc:
J. N. Donohew, Jr., NRC, w/ enc.
F. E. Witmer, DOE-HQ, w/ enc.
P. E. Litteneker, ID, w/ enc.
i l
l I
.