{{#Wiki_filter:}} | {{#Wiki_filter:Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 November 29, 2021 Norma Garcia Santos - Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 EPID L-2019-LLA-0231 | ||
==Subject:== | |||
Revised Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information Reference(s): | |||
[1] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated September 24, 2020. | |||
[2] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Final Staggered Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated November 6, 2020. | |||
[3] Holtec Letter 5018081, Holtec Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated December 21, 2020. | |||
[4] NRC Conversation Record, Conference Call with Holtec International--Clarify Thermal, Materials, and Structural RAI Responses Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 8, 2021. | |||
Document ID 5018092 Page 1 of 3 | |||
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 | |||
[5] NRC Conversation Record, Conference Call with Holtec International-- | |||
Discuss response to Structural RAI 3-3 Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 24, 2021. | |||
[6] Holtec Letter 5018089, Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated August 2, 2021. | |||
==Dear Ms. Garcia Santos:== | |||
By letters dated September 24, 2020 [1] and November 6, 2020 [2], the NRC staff sent staggered Requests for Additional Information (RAIs) needed to complete their detailed technical review of Amendment 6 of the HI-STORM FW Certificate of Compliance (CoC) 72-1032. Holtec provided responses to the RAIs by {{letter dated|date=December 21, 2020|text=letter dated December 21, 2020}} [3]. Subsequent to submittal of these responses, Holtec and the NRC staff participated in two telephone conference calls on March 8, 2021 [4] and March 24, 2021 [5], during which it was determined that clarification was warranted for Holtecs responses to Thermal RAIs 4-1 & 4-2, Materials RAI 4-1, and Structural RAIs 3-1, 3-2, & 3-3. Holtec provided supplemental responses to these RAIs by {{letter dated|date=August 2, 2021|text=letter dated August 2, 2021}} | |||
[6]. Following submittal of the supplemental responses, further discussion between Holtec and the NRC staff regarding Thermal RAIs 4-1 & 4-2 and Structural RAIs 3-1, 3-2, & 3-3 determined additional clarification was necessary. Holtec is pleased to submit its revised supplemental responses in Attachment 1 of this letter. | |||
Attachments 2 & 3 contain the proprietary and non-proprietary versions of the HI-STORM FW FSAR with changes specifically resulting from the latest revisions of the supplemental responses. | |||
Note that any previous changes associated with Amendment 6 remain tracked in Attachments 2 & | |||
3, while only the latest changes are highlighted for clarity. contains Appendix A of CoC 72-1032 with changes specifically resulting from the latest revisions of the supplemental responses. Note that any previous changes associated with Amendment 6 remain tracked in Attachment 4, while only the latest changes are highlighted for clarity. | |||
As Attachment 2 is considered proprietary, an affidavit requesting that this information be withheld from public disclosure in accordance with 10CFR2.390 is contained in Attachment 5. | |||
Document ID 5018092 Page 2 of 3 | |||
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 If you have any questions, please contact me at c.omullane@holtec.com or 856-912-1162. | |||
Sincerely, Christopher OMullane Licensing Engineer, Holtec International cc:(via email) | |||
Yoira Diaz-Sanabria (USNRC) | |||
Kimberly Manzione (Holtec) | |||
Attachments : HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW Amendment 6 CoC, Appendix A - Revised November 29, 2021 (NON-PROPRIETARY) : Affidavit in Accordance with 10CFR2.390 Document ID 5018092 Page 3 of 3}} | |||
Revision as of 10:39, 18 January 2022
| ML21333A138 | |
| Person / Time | |
|---|---|
| Site: | 07201032 |
| Issue date: | 11/29/2021 |
| From: | O'Mullane C Holtec |
| To: | Santos N Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML21333A137 | List: |
| References | |
| 5018092, CoC No. 1032, EPID L-2019-LLA-0231 | |
| Download: ML21333A138 (3) | |
Text
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 November 29, 2021 Norma Garcia Santos - Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 EPID L-2019-LLA-0231
Subject:
Revised Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information Reference(s):
[1] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated September 24, 2020.
[2] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Final Staggered Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated November 6, 2020.
[3] Holtec Letter 5018081, Holtec Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated December 21, 2020.
[4] NRC Conversation Record, Conference Call with Holtec International--Clarify Thermal, Materials, and Structural RAI Responses Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 8, 2021.
Document ID 5018092 Page 1 of 3
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909
[5] NRC Conversation Record, Conference Call with Holtec International--
Discuss response to Structural RAI 3-3 Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 24, 2021.
[6] Holtec Letter 5018089, Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated August 2, 2021.
Dear Ms. Garcia Santos:
By letters dated September 24, 2020 [1] and November 6, 2020 [2], the NRC staff sent staggered Requests for Additional Information (RAIs) needed to complete their detailed technical review of Amendment 6 of the HI-STORM FW Certificate of Compliance (CoC) 72-1032. Holtec provided responses to the RAIs by letter dated December 21, 2020 [3]. Subsequent to submittal of these responses, Holtec and the NRC staff participated in two telephone conference calls on March 8, 2021 [4] and March 24, 2021 [5], during which it was determined that clarification was warranted for Holtecs responses to Thermal RAIs 4-1 & 4-2, Materials RAI 4-1, and Structural RAIs 3-1, 3-2, & 3-3. Holtec provided supplemental responses to these RAIs by letter dated August 2, 2021
[6]. Following submittal of the supplemental responses, further discussion between Holtec and the NRC staff regarding Thermal RAIs 4-1 & 4-2 and Structural RAIs 3-1, 3-2, & 3-3 determined additional clarification was necessary. Holtec is pleased to submit its revised supplemental responses in Attachment 1 of this letter.
Attachments 2 & 3 contain the proprietary and non-proprietary versions of the HI-STORM FW FSAR with changes specifically resulting from the latest revisions of the supplemental responses.
Note that any previous changes associated with Amendment 6 remain tracked in Attachments 2 &
3, while only the latest changes are highlighted for clarity. contains Appendix A of CoC 72-1032 with changes specifically resulting from the latest revisions of the supplemental responses. Note that any previous changes associated with Amendment 6 remain tracked in Attachment 4, while only the latest changes are highlighted for clarity.
As Attachment 2 is considered proprietary, an affidavit requesting that this information be withheld from public disclosure in accordance with 10CFR2.390 is contained in Attachment 5.
Document ID 5018092 Page 2 of 3
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 If you have any questions, please contact me at c.omullane@holtec.com or 856-912-1162.
Sincerely, Christopher OMullane Licensing Engineer, Holtec International cc:(via email)
Kimberly Manzione (Holtec)
Attachments : HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW Amendment 6 CoC, Appendix A - Revised November 29, 2021 (NON-PROPRIETARY) : Affidavit in Accordance with 10CFR2.390 Document ID 5018092 Page 3 of 3