MONTHYEARML19282C3602019-10-0202 October 2019 International - HI-STORM FW Amendment 6 Request Project stage: Request ML20140A1912020-05-19019 May 2020 Application for the Model No. Hi-Storm FW: Storage System, Amendment No. 6 - Supplemental Information Needed Project stage: Other ML20182A8622020-06-30030 June 2020 Responses to HI-STORM FW Amd. 6 Requests for Supplemental Information Project stage: Supplement ML20182A8632020-06-30030 June 2020 Attachment 1: HI-STORM FW Amendment 6 Rsi Responses Project stage: Other ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes Project stage: Other ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes Project stage: Other ML20182A8702020-06-30030 June 2020 Attachment 8 - Affidavit Project stage: Other ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes Project stage: Other ML20205L5972020-08-10010 August 2020 Transmittal Letter: Application for the Model Hi-Storm FW Storage System, Amendment No. 6 - Accepted for Review Project stage: Other ML20267A1662020-09-24024 September 2020 Transmittal Letter and Rais: Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, Thermal Evaluation Project stage: RAI ML20315A0172020-10-31031 October 2020 Fuelsolutions Spent Fuel Management System Certificate of Compliance Renewal Application Project stage: Other ML20280A7432020-11-0606 November 2020 Enclosure (Rais) to Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluations, Final Staggered Request for Additional Information Project stage: RAI ML20280A7412020-11-0606 November 2020 Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluation, Final Staggered Request for Additional Information Project stage: RAI ML20356A3292020-12-21021 December 2020 Attachment 1 - Responses to Request for Additional Information Certificate of Compliance No. 1032 Docket No. 72-1032 HI-STORM FW Storage System Amendment No. 6 Project stage: Response to RAI ML20356A3302020-12-21021 December 2020 Attachment 2 - SFSC Heat Removal System Project stage: Other ML20356A3362020-12-21021 December 2020 Affidavit for Kimberly Manzione Project stage: Other ML20356A3322020-12-21021 December 2020 Attachment 4 - Acceptance Tests and Maintenance Project stage: Other ML20356A3282020-12-21021 December 2020 International Responses to HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Other ML21146A0962021-07-0202 July 2021 Application for the Westinghouse Sentry Dry Storage Cask System, Certificate of Compliance No. 1026, Amendment No. 5 - Request for Additional Information Project stage: RAI ML21214A1322021-08-0202 August 2021 International, Supplemental Responses to HI-STORM FW Amendment 6 Requests for Additional Information Project stage: Supplement ML21333A1422021-11-29029 November 2021 Attachment 4 - HI-STORM FW Amendment 6 CoC, Appendix a - Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1382021-11-29029 November 2021 International Revised Supplemental Responses for HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Supplement ML21333A1392021-11-29029 November 2021 Attachment 1 - HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (Non-Proprietary) Project stage: Supplement ML21333A1412021-11-29029 November 2021 Attachment 3 - HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1432021-11-29029 November 2021 Attachment 5 - Affidavit of Kimberly Manzione Project stage: Other ML22145A4072022-10-13013 October 2022 User Need Memorandum for Rulemaking for the Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 Project stage: Other ML22145A3132022-10-13013 October 2022, 9 December 2022 Rulemaking Package: Certificate of Compliance No. 1032, Amendment 6, Model No. HI-STORM FW Project stage: Request ML22290A1472022-11-0808 November 2022 Approval of Holtec International Request Withholding Information from Public Disclosure of the Application for Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 (Docket No. 72-1032) Project stage: Other ML22145A4092022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 2: Draft Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4112022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 4: Preliminary Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML22145A4082022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 1: Draft Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4102022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 3: Draft Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML23041A4692023-02-15015 February 2023 Enclosure 3 - Final Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4702023-02-15015 February 2023 Enclosure 4 - Final Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML23041A4682023-02-15015 February 2023 Enclosure 2 - Final Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4662023-02-15015 February 2023 Amendment No. 6 to Certificate of Compliance No. 1032 for the Holtec International Storage Module (Hi-Storm) Flood and Wind (FW) Multipurpose Canister (MPC) Storage System (Docket No. 72-1032, CAC No. 001028, EPID: L-2019-LLA-0231) Project stage: Other 2020-09-24
[Table View] |
Text
Design Features 3.0 Certificate of Compliance No. 1032 Amendment No. 65 Appendix B 3-13 7.
a.
For storage in a free-standing OVERPACK, Tthe user shall demonstrate that the ISFSI pad parameters used in the non-mechanistic tipover and drop analyseis are bounding for the site or a site specific non-mechanistic tipover and drop analyseis to demonstrate that the acceptance criteria set forth in the HI-STORM FW FSAR are met shall be performed using the dynamic model described in FSAR Section 3.4. The maximum total deflection, d, in the active fuel region of the basket panels shall be limited by the following inequality: d 0.005 l, where l is basket cell inside dimension. The site-specific analyses shall be performed using methodologies consistent with those described in the HI-STORM FW FSAR.
b.
For storage in an anchored OVERPACK, a tipover event is not credible. However, the ISFSI pad shall be designed to meet the embedment requirements of the anchored design. In addition, the user shall demonstrate that the ISFSI pad parameters used in the drop analysis are bounding for the site or a site specific drop analysis to demonstrate that the acceptance criteria set forth in the HI-STORM FW FSAR are met shall be performed using the dynamic model described in FSAR Section 3.4. The maximum total deflection, d, in the active fuel region of the basket panels shall be limited by the following inequality: d 0.005 l, where l is basket cell inside dimension. The site-specific drop analysis shall be performed using methodologies consistent with those described in the HI-STORM FW FSAR.
8.
In cases where engineered features (i.e., berms and shield walls) are used to ensure that the requirements of 10CFR72.104(a) are met, such features are to be considered important-to-safety and must be evaluated to determine the applicable quality assurance category.
9.
LOADING OPERATIONS, TRANSPORT OPERATIONS, and UNLOADING OPERATIONS shall only be conducted with working area ambient temperatures 0o F.
10.
For those users whose site-specific design basis includes an event or events (e.g., flood) that result in the blockage of any OVERPACK inlet or outlet air ducts for an extended period of time (i.e, longer than the total Completion Time of LCO 3.1.2), an analysis or evaluation may be performed to demonstrate adequate heat removal is available for the duration of the event. Adequate heat removal is defined as fuel cladding temperatures remaining below the short term temperature limit. If the analysis or evaluation is not performed, or if fuel cladding temperature limits are unable to be demonstrated by analysis or evaluation to remain below the short term temperature limit for the duration of the event, ATTACHMENT 4 TO HOLTEC LETTER 5018078 1 of 1