{{#Wiki_filter:February 15, 2007Administrative JudgeAdministrative JudgeRichard F. ColePaul B. Abramson
{{#Wiki_filter:February 15, 2007 Administrative Judge                                  Administrative Judge Richard F. Cole                                      Paul B. Abramson Atomic Safety and Licensing Board Panel               Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                    Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
 
(Pilgrim Nuclear Power Station)
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board PanelMail Stop: T-3F23Mail Stop: T-3F23 U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission Washington, DC 20555-0001Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR


==Dear Administrative Judges:==
==Dear Administrative Judges:==


The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5),
and is continuing to preserve and maintain all privileged documents during the pendency of this


Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index
R. Cole                                                                    February 15, 2007 P. Abramson A. Young proceeding. Also attached are the Affidavit of Perry Buckley, as required by 10 C.F.R.
 
containing the ADAMS accession number, date, and title or description of each item in the
 
hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5),
and is continuing to preserve and maintain all privileged documents during the pendency of this R. ColeFebruary 15, 2007 P. Abramson
 
A. Young-2-proceeding. Also attached are the Affidavit of Perry Buckley, as required by 10 C.F.R.
§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Director of the Division of License Renewal, formally invoking the deliberative process privilege.
§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Director of the Division of License Renewal, formally invoking the deliberative process privilege.
Sincerely,/RA/Molly L. Barkman Counsel for the NRC Staff
Sincerely,
                                                      /RA/
Molly L. Barkman Counsel for the NRC Staff


==Enclosures:==
==Enclosures:==
Hearing File Index Privilege Log - Deliberative Process
Hearing File Index Privilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Pao-Tsin Kuo cc:            Attached Service List


Affidavit of Perry Buckberg
ATTACHMENT 1    PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 3 - February 15, 2007 Accession Number      Document Date                        Title/Description:
03-01 ML070440359          1/4/2007          E-MAIL: (PD) FW: Pilgrim in the News.
03-02 ML070080409          1/5/2007          2007/01/05-Comment (10) submitted by Lea Wood on Massachusetts Attorney Generals PRM 51-10, regarding to Amend 10 CFR Part 51.
03-03 ML070080406          1/5/2007          2007/01/05-Comment (9) submitted by Nina Keller on Massachusetts Attorney Generals Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51.
03-04 ML063480099          1/5/2007          Pilgrim Nuclear Power Station License Renewal Application Review (SHPO NO. RC 36661).
03-05 ML070050153          1/8/2007          01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station.
03-06 ML070380578          1/10/2007        E-MAIL: (PA) Fluence Values.
03-07 ML070380577          1/10/2007        E-MAIL: (PA) FW: Pilgrim LRA Amendment 11.
03-08 ML070380551          1/10/2007        E-MAIL: (PA) Pilgrim LRA Amendment 11.
03-09 ML070250175          1/10/2007        Pilgrim, License Renewal Application Amendment 11.
03-10 ML070110513          1/11/2007        SRM-M070111 - Affirmation: I. SECY-06-0227 Entergy Nuclear Vermont Yankee LLC & Entergy Nuclear Operations Inc. (Vermont Yankee LBP-06-20 Reconsidn Denied; II. SECY-06-0238 Entergy Nuclear Operations, Inc. Intervenor Pilgrim Watchs Appeal of LBP-06-23.
Page 1 of 5


Declaration of Pao-Tsin Kuocc:Attached Service List Page 1 of 5ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEXSupplement 3 - February 15, 2007Accession NumberDocument DateTitle/Description:03-01ML0704403591/4/2007E-MAIL: (PD) FW: Pilgrim in the News.
Accession Number  Document Date                    Title/Description:
03-02ML0700804091/5/20072007/01/05-Comment (10) submitted by Lea Wood on Massachusetts Attorney General's PRM 51-10, regarding
03-11 ML070120427      1/12/2007      Press Release-I-07-002: NRC to Hold Public Meetings on Draft Environmental Impact Report for Pilgrim Nuclear Plant License Renewal Application.
03-12 ML070180520      1/13/2007      2001/01/13-Comment (10) submitted by Richard DiPrima on Shaws PRM-51-11 re Application of national Academy of Science BEIR-VII Standard to Dose Radiation Calculation.
03-13 ML070180504      1/15/2007      2007/01/15-Comment (16) submitted by Richard DiPrima on Massachusetts Attorney Generals PRM-51-10 re to Amend 10 CFR Part 51.
03-14 ML070370589      1/16/2007      E-MAIL: (PD) Fwd: Documents from Pilgrim.
03-15 ML070230286      1/16/2007      Pilgrim, License Renewal Application Amendment 12.
03-16 ML070170610      1/17/2007      01/30/2007 Notice of Meeting Between NRC Staff &
Entergy Management to Inform Entergy Management of Results of NRC Team Inspection Covering Scoping &
Aging Management Portions of Pilgrim Nuclear Power Station Application For A Renewed License.
03-17 ML070380549      1/17/2007      E-MAIL: (PA) FW: Pilgrim License Renewal Application Amendment 12.
03-18 ML070370587      1/17/2007      E-MAIL: (PD) Fwd: Entergy Info on Drywell Liner UT Measurements.
03-19 ML070380227      1/17/2007      E-MAIL: (PD) Pilgrim LRA Amendment 12.
03-20 ML063540010      1/18/2007      12/18/2006 Summary of Conference Call With Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application.
Page 2 of 5


to Amend 10 CFR Part 51.03-03ML0700804061/5/20072007/01/05-Comment (9) submitted by Nina Keller on Massachusetts Attorney General's Petition for
Accession Number  Document Date                    Title/Description:
03-21 ML070430254      1/18/2007      Comment (1) Of Joan Bartlett Re Pilgrim Power Plan In Plymouth, Requesting Part Of The Negotiations Between Entergy And Town Of Plymouth Include Preservation Of Entergy Land So That For Safety Reasons, No More Development Will Take Place Near The Plant.
03-22 ML070380545      1/18/2007      E-MAIL: (PA) FW: Drawing.
03-23 ML070380092      1/18/2007      E-MAIL: (PD) Fwd: FW: Drawing.
03-24 ML070440395      1/18/2007      E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting.
03-25 ML070380088      1/22/2007      E-mail: (PD) Drywall Air Gap Foam.
03-26 ML070230087      1/22/2007      SRM-M070122A-Affirmation: I. SECY-06-0240 Entergy Nuclear Vermont Yankee, LLC & Entergy Nuclear Operations, Inc. LBP-06-20: Entergy Nuclear Generation Co. (Pilgrim) LBP-06-23; II. SECY-07-0003 Exelon Generation Co., LLC (Early Site Permit Clinton ESP).
03-27 ML070360071      1/23/2007      Letter from NOAA-National Marine Fisheries Service dated January 23, 2007 regarding Essential Fish Habitat Request for Consultation for the Pilgrim Nuclear Power Station.
03-28 ML070230491      1/23/2007      Press Release-I-07-004: NRC to Discuss Preliminary Results of License Renewal Inspection for Pilgrim Nuclear Power Plant.
03-29 ML070330562      1/24/2007      DSEIS Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station.
Page 3 of 5


Rulemaking PRM-51-10 to Amend 10 CFR Part 51.03-04ML0634800991/5/2007Pilgrim Nuclear Power Station License Renewal Application Review (SHPO NO. RC 36661).03-05ML0700501531/8/200701/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for
Accession Number  Document Date                    Title/Description:
03-30 ML070330558      1/24/2007      Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station.
03-31 ML070440355      1/26/2007      E-MAIL: (PA) Backgrounder.pdf.
03-32 ML070440358      1/26/2007      E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regulatory Licensing Programs.
03-33 ML070440356      1/26/2007      E-MAIL: (PA) Scan001 (30).pdf.
03-34 ML070430260      1/28/2007      Comment (2) of Rebecca Hall Opposing the Re-Licensing of Pilgrim Nuclear Plant in 2008.
03-35 ML070300671      1/29/2007      2007/01/29-Comment (33) submitted by Mary Lampert on Shaws PRM-51-11 re Application of National Academy of Science BEIR-VII Standard to Dose Radiation Calculation.
03-36 ML070380543      1/29/2007      E-MAIL: (PA) FW: Pilgrim LRA Amendment 13.
03-37 ML070380579      1/29/2007      E-MAIL: (PA) PNPS Meeting 1.30.07?.
03-38 ML070370295      1/29/2007      E-MAIL: (PD) DLR Briefs.
03-39 ML070370413      1/29/2007      Pilgrim - License Renewal Application Amendment 13.
03-40 ML070370298      1/30/2007      E-MAIL: (PD) Pilgrim LRA Amendment 13.
03-41 ML070440402      1/30/2007      E-MAIL: (PD) Re: Pilgrim SEIS.
03-42 ML070370272      1/30/2007      EMAIL: (PD) FSAR Excerpt.
03-43 ML070440323      1/30/2007      Pilgrim License Renewal Inspection Exit Meeting Slides.
03-44 ML070440406      1/31/2007       E-mail: (PD) Pilgrim Follow Up Information.
Page 4 of 5


the License Renewal of Pilgrim Nuclear Power Station.03-06ML0703805781/10/2007E-MAIL: (PA) Fluence Values.
Accession Number  Document Date                    Title/Description:
03-07ML0703805771/10/2007E-MAIL: (PA) FW: Pilgrim LRA Amendment 11.
03-45 ML070370286      1/31/2007      E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -
03-08ML0703805511/10/2007E-MAIL: (PA) Pilgrim LRA Amendment 11.
01.30.07 (from M. Lampert).
03-09ML0702501751/10/2007Pilgrim, License Renewal Application Amendment 11.
03-46 ML070370290      1/31/2007       E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -
03-10ML0701105131/11/2007SRM-M070111 - Affirmation: I. SECY-06-0227 Entergy Nuclear Vermont Yankee LLC & Entergy Nuclear
01.30.07.
 
Page 5 of 5
Operations Inc. (Vermont Yankee LBP-06-20 Reconsid'n
 
Denied; II. SECY-06-0238 Entergy Nuclear Operations, Inc. Intervenor Pilgrim Watch's Appeal of LBP-06-23.
Accession NumberDocument DateTitle/Description:
Page 2 of  503-11ML0701204271/12/2007Press Release-I-07-002: NRC to Hold Public Meetings on Draft Environmental Impact Report for Pilgrim Nuclear
 
Plant License Renewal Application.03-12ML0701805201/13/20072001/01/13-Comment (10) submitted by Richard DiPrima on Shaw's PRM-51-11 re Application of national
 
Academy of Science BEIR-VII Standard to Dose
 
Radiation Calculation.03-13ML0701805041/15/20072007/01/15-Comment (16) submitted by Richard DiPrima on Massachusetts Attorney General's PRM-51-10 re to
 
Amend 10 CFR Part 51.03-14ML0703705891/16/2007E-MAIL: (PD) Fwd: Documents from Pilgrim.
03-15ML0702302861/16/2007Pilgrim, License Renewal Application Amendment 12.
03-16ML0701706101/17/200701/30/2007 Notice of Meeting Between NRC Staff &
Entergy Management to Inform Entergy Management of
 
Results of NRC Team Inspection Covering Scoping &
 
Aging Management Portions of Pilgrim Nuclear Power
 
Station Application For A Renewed License.03-17ML0703805491/17/2007E-MAIL: (PA) FW: Pilgrim License Renewal Application Amendment 12.03-18ML0703705871/17/2007E-MAIL: (PD) Fwd: Entergy Info on Drywell Liner UT Measurements.03-19ML0703802271/17/2007E-MAIL: (PD) Pilgrim LRA Amendment 12.
03-20ML0635400101/18/200712/18/2006 Summary of Conference Call With Entergy Nucelar Operations, Inc., Regarding the Pilgrim License
 
Renewal Application.
Accession NumberDocument DateTitle/Description:
Page 3 of 503-21ML0704302541/18/2007Comment (1) Of Joan Bartlett Re Pilgrim Power Plan In Plymouth, Requesting Part Of The Negotiations Between
 
Entergy And Town Of Plymouth Include Preservation Of
 
Entergy Land So That For Safety Reasons, No More
 
Development Will Take Place Near The Plant.03-22ML0703805451/18/2007E-MAIL: (PA) FW: Drawing.
03-23ML0703800921/18/2007E-MAIL: (PD) Fwd: FW: Drawing.
03-24ML0704403951/18/2007E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting.03-25ML0703800881/22/2007E-mail: (PD) Drywall Air Gap Foam.
03-26ML0702300871/22/2007SRM-M070122A-Affirmation: I. SECY-06-0240 Entergy Nuclear Vermont Yankee, LLC & Entergy Nuclear


Operations, Inc. LBP-06-20: Entergy Nuclear Generation
ATTACHMENT 2:          PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 3: February 15, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
PDP    Accession            Author          Title/Description:      Document      Document        Addressee /          Comment        Page No.      Number            Name/                                      Date        Type          Addressee                          Count Affiliation:                                                              Affiliation DP-    ML0701901        Cheruvenki G      E-MAIL: (PD) Fwd:        11/16/2006      E-Mail      Chang K, NRC        Comments on        3 03-01          53                S,            Pilgrim PT Curve                                                      future conference NRC/NRR/AD        Amendment MD1218                                                                  call.
ES/DCI            Conference Call.
DP-    ML0701901          Wen P C,          E-MAIL: (PD) Re:        11/21/2006      E-Mail      Cheruvenki G        Comments and        3 03-02          59        NRC/NRR/AD            RPV Intervals -                                    S, Davis J A,     recommendations RO/DLR                  Pilgrim.                                         Hsu K R,            for SER Medoff J, NRC DP-     ML0701901        Cheruvenki G      E-MAIL: (PD) RPV        11/21/2006      E-Mail        Davis J A,        Comments and        3 03-03          60                S,          Internals - Pilgrim.                                  Medoff J, Wen      recommendations NRC/NRR/AD                                                                  P C, NRC            for SER ES/DCI DP-    ML0701901        Cheruvenki G      E-MAIL: (PD) Pilgrim      11/27/2006      E-Mail      Buckberg P H,      Comments and        3 03-04          56                S,                  - LRA.                                            NRC          recommendations NRC/NRR/AD                                                                                        for SER ES/DCI Page 1 of 9


Co. (Pilgrim) LBP-06-23; II. SECY-07-0003 Exelon
PDP  Accession    Author      Title/Description:  Document    Document  Addressee /        Comment        Page No. Number      Name/                              Date      Type    Addressee                        Count Affiliation:                                              Affiliation DP-  ML0701901 Cheruvenki G  E-mail: (PD) Fwd:  11/29/2006    E-Mail Davis J A, NRC    Comments and        4 03-05    55          S,        Pilgrim - LRA.                                          recommendations NRC/NRR/AD                                                                    for SER ES/DCI DP-  ML0704403 Sheehan N A,  E-MAIL: (PD) Draft  1/3/2007    E-Mail, Williamson A R,  Draft Press Relief  3 03-06   60      NRC/OPA/R    Press Release for                Press  NRC/NRR/ADR GN-I/FO    1/24 Pilgrim License              Release  O/DLR/REBB Renewal Meetings.
DP-  ML0703800  Buckberg P    E-MAIL: (PD) RAI    1/3/2007    E-Mail    Davis J A,    Comments and        3 03-07   31          H,      B.1.16.1 (torus room                        Hoang D V,    recommendations NRC/NRR/AD          water).                            Meyer G W,            for RAI RO/DLR                                                NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1 DP-  ML0703800  Buckberg P    E-MAIL: (PD) Re:    1/3/2007    E-Mail  Hoang D V,      Comments and        2 03-08    27          H,      RAI B.1.16.1 (torus                      NRC/NRR/ADR      recommendations NRC/NRR/AD        room water).                              O/DLR            for RAI RO/DLR DP-  ML0703800  Buckberg P  E-MAIL: (PD) Pilgrim  1/4/2007    E-Mail Ellis D, Entergy  Comments and        3 03-09    23          H,          Open Issues.                              Nuclear    recommendations NRC/NRR/AD                                              Generation Co          for RAI RO/DLR Page 2 of 9


Generation Co., LLC (Early Site Permit Clinton ESP).03-27ML0703600711/23/2007Letter from NOAA-National Marine Fisheries Service dated January 23, 2007 regarding Essential Fish Habitat
PDP  Accession    Author      Title/Description:  Document    Document  Addressee /      Comment      Page No. Number      Name/                              Date      Type    Addressee                    Count Affiliation:                                              Affiliation DP-  ML0701105 Williamson A  E-MAIL: (PD) PNPS      1/4/2007    E-Mail Franovich R L, Draft summary of  3 03-10    81    R, NRC/NRR        Draft Report                                NRC        environmental Summary Findings                                              findings Poster.
DP-  ML0701105 Williamson A  E-MAIL: (PD) PNPS      1/4/2007    E-Mail Raymond W J,    Comments on      2 03-11    79    R, NRC/NRR            news.                                   NRC        news article DP-  ML0703800  Buckberg P    E-MAIL: (PD) Fwd:    1/8/2007    E-Mail    Davis J A,  Comments and      5 03-12    21          H,          Questions &                            Hoang D V,  recommendations NRC/NRR/AD        Comments On                            NRC/NRR/ADR          for RAI RO/DLR      Pilgrim RAI B.1.16.1.                          O/DLR DP- ML0703801  Buckberg P      E-MAIL: (PD)      1/8/2007    E-Mail    Davis J A,  Comments and      5 03-13    06          H,      Response to Pilgrim                          Hoang D V,  recommendations NRC/NRR/AD    LRA Amendment 10.                          Meyer G W,          for RAI RO/DLR                                                  OHara T L, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 DP-  ML0702901  Wen P C,    E-MAIL: (PD) Fwd:    1/12/2007     E-Mail    Davis J A,  Comments and    12 03-14    27    NRC/NRR/AD    FYI: Receipt of the                      NRC/NRR/ADR    recommendations RO/DLR          SER Input on                                O/DLR          for SER Evaluation of Flaw Evaluations - Pilgrim LRA.
Page 3 of 9


Request for Consultation for the Pilgrim Nuclear Power
PDP  Accession    Author      Title/Description:    Document    Document      Addressee /      Comment    Page No. Number      Name/                                Date        Type        Addressee                  Count Affiliation:                                                    Affiliation DP-  ML0703705  Buckberg P      E-MAIL: (PD)      1/12/2007      E-Mail        Medoff J,  Comments and    7 03-15    91          H,        Simons Addition.                              NRC/NRR/ADR  recommendations NRC/NRR/AD                                                        O/DLR          for RAI RO/DLR DP-  ML0703705  Buckberg P    E-MAIL: (PD) Re:    1/16/2007      E-Mail      Davis J A,  Comments and    2 03-16    88          H,        Fwd: Documents                                  Hoang D V,  recommendations NRC/NRR/AD        from Pilgrim.                                NRC/NRR/ADR        for RAI RO/DLR                                                          O/DLR DP-  ML0704403 Williamson A  E-MAIL: (PD) Fwd:    1/18/2007      E-Mail      Raymond W,    Comments on    4 03-17    97    R, NRC/NRR        Pilgrim Alert.                                                news article DP-  ML0703601        ,        E-Mail Re: SER      1/19/2007  E-Mail, Final        ,      Comments and    5 03-18    17    NRC/NRR/AD    [Attachment 1]: (PD)                  Safety                  recommendations RO/DLR/RLR    Package 18 - Final                Evaluation                      for SER A        Safety Evaluation                  Report Report for the Pilgrim               (FSER)
Nuclear Generating Station License Renewal Application Evaluation.
DP-  ML0703601      NRC        E-Mail Re: SER      1/19/2007      Safety            ,      Comments and    215 03-19    36                  [Attachment 2]: (PD)                Evaluation                recommendations Section 3 Aging                  Report                        for SER Management Review Results.
Page 4 of 9


Station.03-28ML0702304911/23/2007Press Release-I-07-004: NRC to Discuss Preliminary Results of License Renewal Inspection for Pilgrim
PDP  Accession    Author      Title/Description:  Document    Document    Addressee /      Comment    Page No. Number      Name/                              Date      Type      Addressee                    Count Affiliation:                                                Affiliation DP-  ML0703800  Rodriguez V      E-MAIL: (PD)    1/19/2007    E-Mail    Jones J, - No  Comments and    2 03-20    32          M,          Clarification.                             Known      recommendations NRC/NRR/AD                                                  Affiliation      for SER RO/DLR DP-  ML0704403 Williamson A  E-mail: (PD) Re: FYI 1/19/2007    E-Mail  Davis J, Emch    Comments on    4 03-21    98    R, NRC/NRR      - Four Northeast                          R L, Masnik M    news article Plants Informed of                            T, NRC Monticello Shutdown.
DP-  ML0703801  Jones J,    E-MAIL: (PD) RE:    1/19/2007    E-Mail  Rodriguez V M,  Comments and    3 03-22    19    Legin Group,          SER.                              NRC/NRR/ADR    recommendations Inc                                                    O/DLR          for SER DP-  ML0702901  Rodriguez V      E-MAIL: (PD)    1/19/2007    E-Mail    Buckberg P,  Comments and    3 03-23   45          M,      Resending - Pilgrim                          Sanabria Y D, recommendations NRC/NRR/AD            SER.                                    NRC          for SER RO/DLR DP- ML0703601        ,      E-Mail SER Section  1/23/2007    E-Mail,          ,      Comments and    137 03-24    55    NRC/NRR/AD    2 [Attachment 1]:                 Safety                  recommendations RO/DLR/RLR      (PD) Section 2 -              Evaluation                    for SER A        Structures and                Report Components Subject to Aging Management Review (Draft).
Page 5 of 9


Nuclear Power Plant.03-29ML0703305621/24/2007DSEIS Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station.
PDP  Accession    Author      Title/Description:  Document    Document    Addressee /      Comment    Page No. Number      Name/                              Date        Type        Addressee                  Count Affiliation:                                                  Affiliation DP-  ML0703601  No Known      E-Mail SER Section  1/23/2007      - No            ,      Comments and    1 03-25    93      Affiliation    2 [Attachment 2]:              Document                  recommendations (PD) PNPS Section 2              Type Applies                    for SER Comments.
Accession NumberDocument DateTitle/Description:
DP-  ML0703602      NRC      E-Mail SER Section  1/23/2007      Safety          ,       Comments and    150 03-26    13                      2 [Attachment 3]:              Evaluation                recommendations (PD) Section 2                  Report                      for SER Structures and Components Subject to Aging Management Review (Tech Edits Incorporated).
Page 4 of 503-30ML0703305581/24/2007Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the
DP-  ML0703801  Dresser R,    E-MAIL: (PD) SER    1/23/2007      E-Mail    Buckberg P H,  Comments and    3 03-27    17    Legin Group,        Section 2.                              NRC/NRR/ADR  recommendations Inc                                                        O/DLR          for SER DP-  ML0702902  Buckberg P      Email Drywell Air  1/23/2007      E-Mail      Hoang D V,  Comments and    2 03-28    47            H,            Gap Form.                              NRC/NRR/ADR  recommendations NRC/NRR/AD                                                      O/DLR          for SER RO/DLR/RLR A
DP- ML0702901  Medoff J,    E-MAIL: (PD) FYI - 1/24/2007      E-Mail      Davis J A,  Comments and    4 03-29    33    NRC/NRR/AD    Pilgrim LRA: Here is                          NRC/NRR/ADR  recommendations RO/DLR/RLR    the BWRVIP-49 Draft                             O/DLR/RLRC        for SER C        Audit Report Input that I Wrote for TLAA 4.7.2.3.
Page 6 of 9


License Renewal of Pilgrim Nuclear Power Station.03-31ML0704403551/26/2007E-MAIL: (PA) Backgrounder.pdf.
PDP  Accession  Author      Title/Description:  Document    Document    Addressee /      Comment    Page No. Number      Name/                              Date        Type      Addressee                    Count Affiliation:                                                Affiliation DP-  ML0703602 Legin Group,    E-Mail Requested  1/25/2007    E-Mail,          ,      Comments and    40 03-30    24          Inc.          Documents                    Safety                  recommendations
03-32ML0704403581/26/2007E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regulatory Licensing Programs.03-33ML0704403561/26/2007E-MAIL: (PA) Scan001 (30).pdf.
[Attachment 1]: (PD)              Evaluation                    for SER Section 4 Time-                Report Limited Aging Analyses (Version A Draft).
03-34ML0704302601/28/2007Comment (2) of Rebecca Hall Opposing the Re-Licensing of Pilgrim Nuclear Plant in 2008.03-35ML0703006711/29/20072007/01/29-Comment (33) submitted by Mary Lampert on Shaw's PRM-51-11 re Application of National
DP-  ML0703602 Legin Group,    E-Mail Requested  1/25/2007      Safety          ,      Comments and    38 03-31    31          Inc.          Documents                  Evaluation                recommendations
[Attachment 2]: (PD)               Report                        for SER Section 4 Time-Limited Aging Analyses (Version B Draft).
DP-  ML0703605 Legin Group,    E-Mail Requested  1/25/2007      Safety          ,      Comments and    44 03-32    05          Inc.          Documents                  Evaluation                recommendations
[Attachment 3]: (PD)             Report, Draft                  for SER Section 4 Time-Limited Aging Analysis (Version A Tech Edits Incorporated).
Page 7 of 9


Academy of Science BEIR-VII Standard to Dose
PDP  Accession    Author      Title/Description:  Document    Document      Addressee /        Comment      Page No. Number      Name/                              Date        Type        Addressee                        Count Affiliation:                                                  Affiliation DP-  ML0703605 Legin Group,  E-Mail Requested    1/25/2007      Safety            ,        Comments and      43 03-33    38          Inc.          Documents                  Evaluation                    recommendations
[Attachment 4]: (PD)            Report, Draft                      for SER Section 4 Time-Limited Aging Analyses (Version B Tech Edits incorporated).
DP-  ML0703605 Legin Group,  E-Mail Requested    1/25/2007      Safety            ,        Comments and      1 03-34    73          Inc.          Documents                  Evaluation                    recommendations
[Attachment 5]: (PD)                Report                          for SER PNPS Section 4
[Johns] Comments.
DP-  ML0703605 Legin Group,  E-Mail Requested    1/25/2007      - No              ,        Comments and      1 03-35    89          Inc.          Documents                  Document                      recommendations
[Attachment 6]: (PD)            Type Applies                        for SER PNPS Section 4
[Jennifers]
Comments.
DP-  ML0703801  Jones J,        E-MAIL: (PD)    1/25/2007      E-Mail    Buckberg P H,    Comments and      3 03-36    14    Legin Group,        Requested                                NRC/NRR/ADR      recommendations Inc          Documents.                                    O/DLR            for SER DP-  ML0703800  Buckberg P  E-MAIL: (PD) Phone  1/26/2007    E-Mail,    Ellis D, Entergy  Draft record of   5 03-37    85            H,      Conference 1                Meeting          Corp      phone conference NRC/NRR/AD            2007.                    Summary RO/DLR/RLR A
Page 8 of 9


Radiation Calculation.03-36ML0703805431/29/2007E-MAIL: (PA) FW: Pilgrim LRA Amendment 13.
PDP  Accession   Author      Title/Description:  Document    Document    Addressee /       Comment      Page No. Number     Name/                             Date       Type      Addressee                       Count Affiliation:                                              Affiliation DP- ML0704404 Williamson A  E-MAIL: (PD) Pilgrim 1/29/2007    E-Mail  Franovich R L,   Comments on        2 03-38    01          R,           Follow Up.                             NRC/NRR/ADR    scoping summary NRC/NRR/AD                                                   O/DLR             report RO/DLR DP- ML0703800  Buckberg P       E-MAIL: (PD)     1/29/2007    E-Mail    Meyer G W,     Comments and       3 03-39    69          H,       Possible Region I                          NRC/RGN-     recommendations NRC/NRR/AD         SER Input.                               I/DRS/EB1        for SER RO/DLR DP- ML0703901  Stubbs A,   E-MAIL: (PD) Draft 1/30/2007    E-Mail      Pope S,     Comments and    148 03-40    39    NRC/NRR/AD       Pilgrim SER.                             Information  recommendations ES/DSS/SBP                                                Systems Labs,       for SER B                                                        Inc DP- ML0704404 Williamson A  E-mail: (PD) Re: FYI 1/30/2007    E-Mail,   Wrona D J,       Comment on        3 03-41    04          R,       - Four Northeast              Highlights NRC/NRR/ADR   meeting summary NRC/NRR/AD     Plants Informed of                             O/DLR RO/DLR     Monticello Shutdown.
03-37ML0703805791/29/2007E-MAIL: (PA) PNPS Meeting 1.30.07?.
DP- ML0704403 Williamson A  E-MAIL: (PD) Re:   1/30/2007    E-Mail  Franovich R L,   Comments and       2 03-42    96    R, NRC/NRR     Pilgrim Follow Up.                           NRC/NRR     recommendations for replying to question after scoping meeting DP-  ML0703801  Rodriguez V   E-MAIL: (PD) SER    1/31/2007    E-Mail      Medoff J,     Comments and     43 03-43    11          M,           Section 4.                           NRC/NRR/ADR   recommendations NRC/NRR/AD                                                   O/DLR           for SER RO/DLR Page 9 of 9
03-38ML0703702951/29/2007E-MAIL: (PD) DLR Briefs.
03-39ML0703704131/29/2007Pilgrim - License Renewal Application Amendment 13.
03-40ML0703702981/30/2007E-MAIL: (PD) Pilgrim LRA Amendment 13.
03-41ML0704404021/30/2007E-MAIL: (PD) Re: Pilgrim SEIS.
03-42ML0703702721/30/2007EMAIL: (PD) FSAR Excerpt.
03-43ML0704403231/30/2007Pilgrim License Renewal Inspection Exit Meeting Slides.
03-44ML0704404061/31/2007E-mail: (PD) Pilgrim Follow Up Information.
Accession NumberDocument DateTitle/Description:
Page 5 of 503-45ML0703702861/31/2007E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -
01.30.07 (from M. Lampert).03-46ML0703702901/31/2007E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -
01.30.07.
Page 1 of  9 ATTACHMENT 2:    PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGESupplement 3: February 15, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been de termined by the NRC Staff to contain information subject to withholding from pub lic disclosure as predecisional, deliberative information. Pur suant to 10 C.F.R.
§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" p rivilege.PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count DP-03-01 ML070190153 Cheruvenki G S, NRC/NRR/AD ES/DCI E-MAIL: (PD) Fwd:
Pilgrim PT Curve Amendment MD1218 Conference Call.11/16/2006E-MailChang K, NRCComments on future conference call.3 DP-03-02 ML070190159 Wen P C, NRC/NRR/AD RO/DLR E-MAIL: (PD) Re:
RPV Intervals -
Pilgrim.11/21/2006E-MailCheruvenki GS, Davis J A, Hsu K R, Medoff J, NRC Comments and recommendations for SER 3 DP-03-03 ML070190160 Cheruvenki G S, NRC/NRR/AD ES/DCI E-MAIL: (PD) RPV Internals - Pilgrim.11/21/2006E-MailDavis J A, Medoff J, Wen P C, NRC Comments and recommendations for SER 3 DP-03-04 ML070190156 Cheruvenki G S, NRC/NRR/AD ES/DCI E-MAIL: (PD) Pilgrim- LRA.11/27/2006E-MailBuckberg P H, NRC Comments and recommendations for SER 3 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 2 of  9 DP-03-05 ML070190155 Cheruvenki G S, NRC/NRR/AD ES/DCI E-mail: (PD) Fwd:
Pilgrim - LRA.11/29/2006E-MailDavis J A, NRCComments and recommendations for SER 4 DP-03-06 ML070440360 Sheehan N A, NRC/OPA/R GN-I/FO E-MAIL: (PD) Draft Press Release for 1/24 Pilgrim License Renewal Meetings.1/3/2007E-Mail, Press Release Williamson A R, NRC/NRR/ADR O/DLR/REBBDraft Press Relief3 DP-03-07 ML070380031 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD) RAI B.1.16.1 (torus room water).1/3/2007E-MailDavis J A, Hoang D V, Meyer G W, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1 Comments and recommendations for RAI 3 DP-03-08 ML070380027 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD) Re:
RAI B.1.16.1 (torus room water).1/3/2007E-MailHoang D V, NRC/NRR/ADR O/DLR Comments and recommendations for RAI 2 DP-03-09 ML070380023 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD) Pilgrim Open Issues.1/4/2007E-MailEllis D, Entergy Nuclear Generation Co Comments and recommendations for RAI 3 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 3 of  9 DP-03-10 ML070110581 Williamson A R, NRC/NRR E-MAIL: (PD) PNPS Draft Report Summary Findings Poster.1/4/2007E-MailFranovich R L, NRC Draft summary of environmental findings 3 DP-03-11 ML070110579 Williamson A R, NRC/NRR E-MAIL: (PD) PNPS news.1/4/2007E-MailRaymond W J, NRC Comments on news article 2 DP-03-12 ML070380021 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD) Fwd:
Questions &
Comments On Pilgrim RAI B.1.16.1.1/8/2007E-MailDavis J A, Hoang D V, NRC/NRR/ADR O/DLR Comments and recommendations for RAI 5 DP-03-13 ML070380106 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD)
Response to Pilgrim LRA Amendment 10.1/8/2007E-MailDavis J A, Hoang D V, Meyer G W, O'Hara T L, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 Comments and recommendations for RAI 5 DP-03-14 ML070290127 Wen P C, NRC/NRR/AD RO/DLR E-MAIL: (PD) Fwd:
FYI: Receipt of the SER Input on Evaluation of Flaw Evaluations - Pilgrim LRA.1/12/2007E-MailDavis J A, NRC/NRR/ADR O/DLR Comments and recommendations for SER 12 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 4 of  9 DP-03-15 ML070370591 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD)
Simon's Addition.1/12/2007E-MailMedoff J, NRC/NRR/ADR O/DLR Comments and recommendations for RAI 7 DP-03-16 ML070370588 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD) Re:
Fwd: Documents from Pilgrim.1/16/2007E-MailDavis J A, Hoang D V, NRC/NRR/ADR O/DLR Comments and recommendations for RAI 2 DP-03-17 ML070440397 Williamson A R, NRC/NRR E-MAIL: (PD) Fwd:
Pilgrim Alert.1/18/2007E-MailRaymond W, Comments on news article 4 DP-03-18 ML070360117 , NRC/NRR/AD RO/DLR/RLR A E-Mail Re: SER
[Attachment 1]: (PD)
Package 18 - Final Safety Evaluation Report for the Pilgrim Nuclear Generating Station License Renewal Application Evaluation.1/19/2007E-Mail, Final Safety Evaluation Report (FSER), Comments and recommendations for SER 5 DP-03-19 ML070360136NRCE-Mail Re: SER
[Attachment 2]: (PD)
Section 3 Aging Management Review Results.1/19/2007Safety Evaluation Report, Comments and recommendations for SER 215 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 5 of 9 DP-03-20 ML070380032 Rodriguez V M, NRC/NRR/AD RO/DLR E-MAIL: (PD)
Clarification.1/19/2007E-MailJones J, - No Known Affiliation Comments and recommendations for SER 2 DP-03-21 ML070440398 Williamson A R, NRC/NRR E-mail: (PD) Re: FYI- Four Northeast Plants Informed of Monticello Shutdown.1/19/2007E-MailDavis J, Emch R L, Masnik M T, NRC Comments on news article 4 DP-03-22 ML070380119 Jones J, Legin Group, Inc E-MAIL: (PD) RE:
SER.1/19/2007E-MailRodriguez V M, NRC/NRR/ADR O/DLR Comments and recommendations for SER 3 DP-03-23 ML070290145 Rodriguez V M, NRC/NRR/AD RO/DLR E-MAIL: (PD)
Resending - Pilgrim SER.1/19/2007E-MailBuckberg P, Sanabria Y D, NRC Comments and recommendations for SER 3 DP-03-24 ML070360155 , NRC/NRR/AD RO/DLR/RLR A E-Mail SER Section 2 [Attachment 1]: (PD) Section 2 -
Structures and Components Subject to Aging Management Review (Draft).1/23/2007E-Mail, Safety Evaluation Report, Comments and recommendations for SER 137 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 6 of 9 DP-03-25 ML070360193 No Known Affiliation E-Mail SER Section 2 [Attachment 2]: (PD) PNPS Section 2 Comments.1/23/2007- No Document Type Applies, Comments and recommendations for SER 1 DP-03-26 ML070360213 NRCE-Mail SER Section 2 [Attachment 3]: (PD) Section 2


Structures and Components Subject to Aging Management Review (Tech Edits Incorporated).1/23/2007Safety Evaluation Report, Comments and recommendations for SER 150 DP-03-27 ML070380117 Dresser R, Legin Group, Inc E-MAIL: (PD) SER Section 2.1/23/2007E-MailBuckberg P H, NRC/NRR/ADR O/DLR Comments and recommendations for SER 3 DP-03-28 ML070290247 Buckberg P H, NRC/NRR/AD RO/DLR/RLR A Email Drywell Air Gap Form.1/23/2007E-MailHoang D V, NRC/NRR/ADR O/DLR Comments and recommendations for SER 2 DP-03-29 ML070290133 Medoff J, NRC/NRR/AD RO/DLR/RLR C E-MAIL: (PD) FYI -
February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                   )
Pilgrim LRA: Here is the BWRVIP-49 Draft Audit Report Input that I Wrote for TLAA 4.7.2.3.1/24/2007E-MailDavis J A, NRC/NRR/ADR O/DLR/RLRC Comments and recommendations for SER 4 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
                                                    )
Addressee AffiliationCommentPage Count Page 7 of  9 DP-03-30 ML070360224 Legin Group, Inc.E-Mail Requested Documents[Attachment 1]: (PD)
ENTERGY NUCLEAR GENERATION                         )           Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR                         )
Section 4 Time-Limited Aging Analyses (Version A Draft).1/25/2007E-Mail, Safety Evaluation Report, Comments and recommendations for SER 40 DP-03-31 ML070360231 Legin Group, Inc.E-Mail Requested Documents[Attachment 2]: (PD)
OPERATIONS, INC.                                   )           ASLBP No. 06-848-02-LR
Section 4 Time-Limited Aging Analyses (Version B Draft).1/25/2007Safety Evaluation Report, Comments and recommendations for SER 38 DP-03-32 ML070360505 Legin Group, Inc.E-Mail Requested Documents[Attachment 3]: (PD)
                                                    )
Section 4 Time-Limited Aging Analysis (Version A Tech Edits Incorporated).1/25/2007Safety Evaluation Report, Draft, Comments and recommendations for SER 44 PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
(Pilgrim Nuclear Power Station)                     )
Addressee AffiliationCommentPage Count Page 8 of  9 DP-03-33 ML070360538 Legin Group, Inc.E-Mail Requested Documents[Attachment 4]: (PD)
Section 4 Time-Limited Aging Analyses (Version B Tech Edits incorporated).1/25/2007Safety Evaluation Report, Draft, Comments and recommendations for SER 43 DP-03-34 ML070360573 Legin Group, Inc.E-Mail Requested Documents[Attachment 5]: (PD)
PNPS Section 4
[John's] Comments.1/25/2007Safety Evaluation Report, Comments and recommendations for SER 1 DP-03-35 ML070360589 Legin Group, Inc.E-Mail Requested Documents[Attachment 6]: (PD)
PNPS Section 4
[Jennifer's]
Comments.1/25/2007- No Document Type Applies, Comments and recommendations for SER 1 DP-03-36 ML070380114 Jones J, Legin Group, Inc E-MAIL: (PD)
RequestedDocuments.1/25/2007E-MailBuckberg P H, NRC/NRR/ADR O/DLR Comments and recommendations for SER 3 DP-03-37 ML070380085 Buckberg P H, NRC/NRR/AD RO/DLR/RLR A E-MAIL: (PD) Phone Conference 1 2007.1/26/2007E-Mail, Meeting Summary Ellis D, Entergy Corp Draft record of phone conference 5
PDP No.Accession Number Author Name/Affiliation:Title/Description:Document Date DocumentType Addressee /
Addressee AffiliationCommentPage Count Page 9 of  9 DP-03-38 ML070440401 Williamson A R, NRC/NRR/AD RO/DLR E-MAIL: (PD) Pilgrim Follow Up.1/29/2007E-MailFranovich R L, NRC/NRR/ADR O/DLR Comments on scoping summary report 2 DP-03-39 ML070380069 Buckberg P H, NRC/NRR/AD RO/DLR E-MAIL: (PD)
Possible Region I SER Input.1/29/2007E-MailMeyer G W, NRC/RGN-I/DRS/EB1 Comments and recommendations for SER 3 DP-03-40 ML070390139 Stubbs A, NRC/NRR/AD ES/DSS/SBP B E-MAIL: (PD) Draft Pilgrim SER.1/30/2007E-MailPope S, Information Systems Labs, Inc Comments and recommendations for SER 148 DP-03-41 ML070440404 Williamson A R, NRC/NRR/AD RO/DLR E-mail: (PD) Re: FYI- Four Northeast Plants Informed of Monticello Shutdown.1/30/2007E-Mail, Highlights Wrona D J, NRC/NRR/ADR O/DLR Comment on meeting summary 3 DP-03-42 ML070440396 Williamson A R, NRC/NRR E-MAIL: (PD) Re:
Pilgrim Follow Up.1/30/2007E-MailFranovich R L, NRC/NRR Comments and recommendations for replying to question after scoping meeting 2 DP-03-43 ML070380111 Rodriguez V M, NRC/NRR/AD RO/DLR E-MAIL: (PD) SER Section 4.1/31/2007E-MailMedoff J, NRC/NRR/ADR O/DLR Comments and recommendations for SER 43 February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR)
OPERATIONS, INC.)ASLBP No. 06-848-02-LR
)(Pilgrim Nuclear Power Station))
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Perry Buckberg, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a
I, Perry Buckberg, do hereby state as follows:
 
: 1.     I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
project manager for the Pilgrim Nuclear Power Station's license renewal application ("LRA"). 2.I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the
: 2.     I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
: 3.      I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
                                                                /Original Signed By/
______________________
Perry Buckberg Executed in Rockville, MD this 15th day of February, 2007


disclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                     )
/Original Signed By/
                                                    )
______________________
ENTERGY NUCLEAR GENERATION                           )           Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR                         )
Perry Buckberg Executed in Rockville, MD this 15 th day of February, 2007 February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
OPERATIONS, INC.                                     )           ASLBP No. 06-848-02-LR
)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR)
                                                    )
OPERATIONS, INC.)ASLBP No. 06-848-02-LR
(Pilgrim Nuclear Power Station)                     )
)(Pilgrim Nuclear Power Station))
DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:
DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:
: 1. I am employed as the Director of the Division of Licensing Renewal ("DLR") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation ("NRR").  
: 1.     I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR).
My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.
: 2.      As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the February 15, 2007, submission of the Staffs Hearing File.
: 3.      I have personally reviewed the documents identified as privileged in , and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part


My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the
of the deliberative process necessary to the Staffs review of the pending license renewal application.
 
: 4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
Pilgrim Nuclear Power Station license renewal application.2. As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several
: 5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the February 15, 2007 submission of the Hearing File Supplement 1.
 
: 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
documents as privileged because they contained info rmation concerning the Staff's deliberative process. Those documents are listed in Attachment 2 to the February 15, 2007, submission of
                                                              /Original Signed By/
 
the Staff's Hearing File.3. I have personally reviewed the documents identified as privileged in , and have determined, in accordance with the guidance set forth in Management
 
Directive 3.4, that they contain predecisional information concerning the Staff's review of the
 
license renewal application. All documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency
 
position with respect to the matters discussed therein. Each of the documents comprises part  of the deliberative process necessary to the Staff's review of the pending license renewal application.4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual
 
Staff members and/or the Staff prior to reaching a final agency decision, and could thus create
 
confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all
 
future deliberations and would interfere with the Staff's ability to engage in a free exchange of
 
opinions and analyses prior to publishing its final review documents; and (c) imply or suggest
 
incorrectly that the opinions of the Staff members involved in these communications are actually
 
the final decisions of the agency, while no such final decision has yet been made.5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the February 15, 2007 submission of the
 
Hearing File Supplement 1.6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.  
/Original Signed By/
_______________________
_______________________
Pao-Tsin Kuo Executed in Rockville, MD this 15 th day of February, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
Pao-Tsin Kuo Executed in Rockville, MD this 15th day of February, 2007
)ENTERGY NUCLEAR OPERATIONS, INC.    )Docket No. 50-293-LR
          )
(Pilgrim Nuclear Power Station) )ASLBP No. 06-848-02-LR
)    CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that
 
the hearing file and mandatory disclosures, privilege log, accompanying declaration, and
 
affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commission's
 
internal mail system as indicated by a single as terisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 15 th day of February 2007.
Administrative Judge*
Richard F. Cole
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: amy@nrc.gov Sheila Slocum Hollis**
Duane Morris LLP
 
1667 K Street, NW, Suite 700
 
Washington, DC 20006
 
E-mail: sshollis@duanemorris.com Administrative Judge*
Paul B. Abramson
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: pba@nrc.gov Office of Commission Appellate
* Adjudication
 
Mail Stop: O-16C1
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff
 
Mail Stop: O-16C1
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: hearingdocket@nrc.gov  Atomic Safety and Licensing Board*
Mail Stop: T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 Molly H. Bartlett, Esq.**
52 Crooked Lane
 
Duxbury, MA 02332
 
E-mail: mollyhbartlett@hotmail.com Chief Kevin M. Nord**
Fire Chief & Director Duxbury Emergency   
 
Management Agency
 
668 Tremont Street
 
Duxbury, MA 02332
 
E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.**
Entergy Nuclear
 
1340 Echelon Parkway
 
Mail Stop: M-ECH-62
 
Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
 
Pillsbury, Winthrop, Shaw, Pittman, LLP
 
2300 N Street, NW
 
Washington, DC 20037-1137
 
E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth
 
11 Lincoln St.


Plymouth, MA 02360
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
ENTERGY NUCLEAR OPERATIONS, INC.                    )            Docket No. 50-293-LR
                                                    )
(Pilgrim Nuclear Power Station)                    )            ASLBP No. 06-848-02-LR
                                                    )
CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 15th day of February 2007.
Administrative Judge*                                  Administrative Judge*
Richard F. Cole                                        Paul B. Abramson Atomic Safety and Licensing Board Panel                Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                      Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission                      U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                              Washington, DC 20555-0001 E-mail: rfc1@nrc.gov                                    E-mail: pba@nrc.gov Administrative Judge*                                  Office of Commission Appellate
* Ann Marshall Young, Chair                              Adjudication Atomic Safety and Licensing Board Panel                Mail Stop: O-16C1 Mail Stop: T-3F23                                      U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission                      Washington, DC 20555-0001 Washington, DC 20555-0001                              E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*
Sheila Slocum Hollis**                                  Attn: Rulemaking and Adjudications Staff Duane Morris LLP                                        Mail Stop: O-16C1 1667 K Street, NW, Suite 700                            U.S. Nuclear Regulatory Commission Washington, DC 20006                                    Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com                        E-mail: hearingdocket@nrc.gov


E-mail: msylvia@townhall.plymouth.ma.us
Atomic Safety and Licensing Board*          Terence A. Burke, Esq.**
/RA/                               Molly L. Barkman Counsel for the NRC Staff}}
Mail Stop: T-3 F23                          Entergy Nuclear U.S. Nuclear Regulatory Commission          1340 Echelon Parkway Washington, DC 20555-0001                  Mail Stop: M-ECH-62 Jackson, MS 39213 Molly H. Bartlett, Esq.**
52 Crooked Lane                            David R. Lewis, Esq.**
Duxbury, MA 02332                          Paul A. Gaukler, Esq.
E-mail: mollyhbartlett@hotmail.com          Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Chief Kevin M. Nord**                      Washington, DC 20037-1137 Fire Chief & Director Duxbury Emergency    E-mail: david.lewis@pillsburylaw.com Management Agency                                  paul.gaukler@pillsburylaw.com 668 Tremont Street Duxbury, MA 02332                          Town Manager**
E-mail: nord@town.duxbury.ma.us            Town of Plymouth Fax: 781-934-6530                          11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us
                                            /RA/
Molly L. Barkman Counsel for the NRC Staff}}

Revision as of 09:13, 23 November 2019

2007/02/15- Pilgrim - Updated Hearing File
ML070540189
Person / Time
Site: Pilgrim
Issue date: 02/15/2007
From: Barkman M
NRC/OGC
To:
M L Barkman, NRC/OGC, 301-45-1117
References
50-293-LR, ASLBP 06-848-02-LR, RAS 13065
Download: ML070540189 (20)


Text

February 15, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5),

and is continuing to preserve and maintain all privileged documents during the pendency of this

R. Cole February 15, 2007 P. Abramson A. Young proceeding. Also attached are the Affidavit of Perry Buckley, as required by 10 C.F.R.

§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Director of the Division of License Renewal, formally invoking the deliberative process privilege.

Sincerely,

/RA/

Molly L. Barkman Counsel for the NRC Staff

Enclosures:

Hearing File Index Privilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Pao-Tsin Kuo cc: Attached Service List

ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 3 - February 15, 2007 Accession Number Document Date Title/Description:

03-01 ML070440359 1/4/2007 E-MAIL: (PD) FW: Pilgrim in the News.

03-02 ML070080409 1/5/2007 2007/01/05-Comment (10) submitted by Lea Wood on Massachusetts Attorney Generals PRM 51-10, regarding to Amend 10 CFR Part 51.

03-03 ML070080406 1/5/2007 2007/01/05-Comment (9) submitted by Nina Keller on Massachusetts Attorney Generals Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51.

03-04 ML063480099 1/5/2007 Pilgrim Nuclear Power Station License Renewal Application Review (SHPO NO. RC 36661).

03-05 ML070050153 1/8/2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station.

03-06 ML070380578 1/10/2007 E-MAIL: (PA) Fluence Values.

03-07 ML070380577 1/10/2007 E-MAIL: (PA) FW: Pilgrim LRA Amendment 11.

03-08 ML070380551 1/10/2007 E-MAIL: (PA) Pilgrim LRA Amendment 11.

03-09 ML070250175 1/10/2007 Pilgrim, License Renewal Application Amendment 11.

03-10 ML070110513 1/11/2007 SRM-M070111 - Affirmation: I. SECY-06-0227 Entergy Nuclear Vermont Yankee LLC & Entergy Nuclear Operations Inc. (Vermont Yankee LBP-06-20 Reconsidn Denied; II. SECY-06-0238 Entergy Nuclear Operations, Inc. Intervenor Pilgrim Watchs Appeal of LBP-06-23.

Page 1 of 5

Accession Number Document Date Title/Description:

03-11 ML070120427 1/12/2007 Press Release-I-07-002: NRC to Hold Public Meetings on Draft Environmental Impact Report for Pilgrim Nuclear Plant License Renewal Application.

03-12 ML070180520 1/13/2007 2001/01/13-Comment (10) submitted by Richard DiPrima on Shaws PRM-51-11 re Application of national Academy of Science BEIR-VII Standard to Dose Radiation Calculation.

03-13 ML070180504 1/15/2007 2007/01/15-Comment (16) submitted by Richard DiPrima on Massachusetts Attorney Generals PRM-51-10 re to Amend 10 CFR Part 51.

03-14 ML070370589 1/16/2007 E-MAIL: (PD) Fwd: Documents from Pilgrim.

03-15 ML070230286 1/16/2007 Pilgrim, License Renewal Application Amendment 12.

03-16 ML070170610 1/17/2007 01/30/2007 Notice of Meeting Between NRC Staff &

Entergy Management to Inform Entergy Management of Results of NRC Team Inspection Covering Scoping &

Aging Management Portions of Pilgrim Nuclear Power Station Application For A Renewed License.

03-17 ML070380549 1/17/2007 E-MAIL: (PA) FW: Pilgrim License Renewal Application Amendment 12.

03-18 ML070370587 1/17/2007 E-MAIL: (PD) Fwd: Entergy Info on Drywell Liner UT Measurements.

03-19 ML070380227 1/17/2007 E-MAIL: (PD) Pilgrim LRA Amendment 12.

03-20 ML063540010 1/18/2007 12/18/2006 Summary of Conference Call With Entergy Nucelar Operations, Inc., Regarding the Pilgrim License Renewal Application.

Page 2 of 5

Accession Number Document Date Title/Description:

03-21 ML070430254 1/18/2007 Comment (1) Of Joan Bartlett Re Pilgrim Power Plan In Plymouth, Requesting Part Of The Negotiations Between Entergy And Town Of Plymouth Include Preservation Of Entergy Land So That For Safety Reasons, No More Development Will Take Place Near The Plant.

03-22 ML070380545 1/18/2007 E-MAIL: (PA) FW: Drawing.

03-23 ML070380092 1/18/2007 E-MAIL: (PD) Fwd: FW: Drawing.

03-24 ML070440395 1/18/2007 E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting.

03-25 ML070380088 1/22/2007 E-mail: (PD) Drywall Air Gap Foam.

03-26 ML070230087 1/22/2007 SRM-M070122A-Affirmation: I. SECY-06-0240 Entergy Nuclear Vermont Yankee, LLC & Entergy Nuclear Operations, Inc. LBP-06-20: Entergy Nuclear Generation Co. (Pilgrim) LBP-06-23; II. SECY-07-0003 Exelon Generation Co., LLC (Early Site Permit Clinton ESP).

03-27 ML070360071 1/23/2007 Letter from NOAA-National Marine Fisheries Service dated January 23, 2007 regarding Essential Fish Habitat Request for Consultation for the Pilgrim Nuclear Power Station.

03-28 ML070230491 1/23/2007 Press Release-I-07-004: NRC to Discuss Preliminary Results of License Renewal Inspection for Pilgrim Nuclear Power Plant.

03-29 ML070330562 1/24/2007 DSEIS Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station.

Page 3 of 5

Accession Number Document Date Title/Description:

03-30 ML070330558 1/24/2007 Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station.

03-31 ML070440355 1/26/2007 E-MAIL: (PA) Backgrounder.pdf.

03-32 ML070440358 1/26/2007 E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regulatory Licensing Programs.

03-33 ML070440356 1/26/2007 E-MAIL: (PA) Scan001 (30).pdf.

03-34 ML070430260 1/28/2007 Comment (2) of Rebecca Hall Opposing the Re-Licensing of Pilgrim Nuclear Plant in 2008.

03-35 ML070300671 1/29/2007 2007/01/29-Comment (33) submitted by Mary Lampert on Shaws PRM-51-11 re Application of National Academy of Science BEIR-VII Standard to Dose Radiation Calculation.

03-36 ML070380543 1/29/2007 E-MAIL: (PA) FW: Pilgrim LRA Amendment 13.

03-37 ML070380579 1/29/2007 E-MAIL: (PA) PNPS Meeting 1.30.07?.

03-38 ML070370295 1/29/2007 E-MAIL: (PD) DLR Briefs.

03-39 ML070370413 1/29/2007 Pilgrim - License Renewal Application Amendment 13.

03-40 ML070370298 1/30/2007 E-MAIL: (PD) Pilgrim LRA Amendment 13.

03-41 ML070440402 1/30/2007 E-MAIL: (PD) Re: Pilgrim SEIS.

03-42 ML070370272 1/30/2007 EMAIL: (PD) FSAR Excerpt.

03-43 ML070440323 1/30/2007 Pilgrim License Renewal Inspection Exit Meeting Slides.

03-44 ML070440406 1/31/2007 E-mail: (PD) Pilgrim Follow Up Information.

Page 4 of 5

Accession Number Document Date Title/Description:

03-45 ML070370286 1/31/2007 E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -

01.30.07 (from M. Lampert).

03-46 ML070370290 1/31/2007 E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth -

01.30.07.

Page 5 of 5

ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 3: February 15, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0701901 Cheruvenki G E-MAIL: (PD) Fwd: 11/16/2006 E-Mail Chang K, NRC Comments on 3 03-01 53 S, Pilgrim PT Curve future conference NRC/NRR/AD Amendment MD1218 call.

ES/DCI Conference Call.

DP- ML0701901 Wen P C, E-MAIL: (PD) Re: 11/21/2006 E-Mail Cheruvenki G Comments and 3 03-02 59 NRC/NRR/AD RPV Intervals - S, Davis J A, recommendations RO/DLR Pilgrim. Hsu K R, for SER Medoff J, NRC DP- ML0701901 Cheruvenki G E-MAIL: (PD) RPV 11/21/2006 E-Mail Davis J A, Comments and 3 03-03 60 S, Internals - Pilgrim. Medoff J, Wen recommendations NRC/NRR/AD P C, NRC for SER ES/DCI DP- ML0701901 Cheruvenki G E-MAIL: (PD) Pilgrim 11/27/2006 E-Mail Buckberg P H, Comments and 3 03-04 56 S, - LRA. NRC recommendations NRC/NRR/AD for SER ES/DCI Page 1 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0701901 Cheruvenki G E-mail: (PD) Fwd: 11/29/2006 E-Mail Davis J A, NRC Comments and 4 03-05 55 S, Pilgrim - LRA. recommendations NRC/NRR/AD for SER ES/DCI DP- ML0704403 Sheehan N A, E-MAIL: (PD) Draft 1/3/2007 E-Mail, Williamson A R, Draft Press Relief 3 03-06 60 NRC/OPA/R Press Release for Press NRC/NRR/ADR GN-I/FO 1/24 Pilgrim License Release O/DLR/REBB Renewal Meetings.

DP- ML0703800 Buckberg P E-MAIL: (PD) RAI 1/3/2007 E-Mail Davis J A, Comments and 3 03-07 31 H, B.1.16.1 (torus room Hoang D V, recommendations NRC/NRR/AD water). Meyer G W, for RAI RO/DLR NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1 DP- ML0703800 Buckberg P E-MAIL: (PD) Re: 1/3/2007 E-Mail Hoang D V, Comments and 2 03-08 27 H, RAI B.1.16.1 (torus NRC/NRR/ADR recommendations NRC/NRR/AD room water). O/DLR for RAI RO/DLR DP- ML0703800 Buckberg P E-MAIL: (PD) Pilgrim 1/4/2007 E-Mail Ellis D, Entergy Comments and 3 03-09 23 H, Open Issues. Nuclear recommendations NRC/NRR/AD Generation Co for RAI RO/DLR Page 2 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0701105 Williamson A E-MAIL: (PD) PNPS 1/4/2007 E-Mail Franovich R L, Draft summary of 3 03-10 81 R, NRC/NRR Draft Report NRC environmental Summary Findings findings Poster.

DP- ML0701105 Williamson A E-MAIL: (PD) PNPS 1/4/2007 E-Mail Raymond W J, Comments on 2 03-11 79 R, NRC/NRR news. NRC news article DP- ML0703800 Buckberg P E-MAIL: (PD) Fwd: 1/8/2007 E-Mail Davis J A, Comments and 5 03-12 21 H, Questions & Hoang D V, recommendations NRC/NRR/AD Comments On NRC/NRR/ADR for RAI RO/DLR Pilgrim RAI B.1.16.1. O/DLR DP- ML0703801 Buckberg P E-MAIL: (PD) 1/8/2007 E-Mail Davis J A, Comments and 5 03-13 06 H, Response to Pilgrim Hoang D V, recommendations NRC/NRR/AD LRA Amendment 10. Meyer G W, for RAI RO/DLR OHara T L, NRC/NRR/ADR O/DLR, NRC/RGN-I/DRS/EB1, NRC/RGN-I/DRS/PSB2 DP- ML0702901 Wen P C, E-MAIL: (PD) Fwd: 1/12/2007 E-Mail Davis J A, Comments and 12 03-14 27 NRC/NRR/AD FYI: Receipt of the NRC/NRR/ADR recommendations RO/DLR SER Input on O/DLR for SER Evaluation of Flaw Evaluations - Pilgrim LRA.

Page 3 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0703705 Buckberg P E-MAIL: (PD) 1/12/2007 E-Mail Medoff J, Comments and 7 03-15 91 H, Simons Addition. NRC/NRR/ADR recommendations NRC/NRR/AD O/DLR for RAI RO/DLR DP- ML0703705 Buckberg P E-MAIL: (PD) Re: 1/16/2007 E-Mail Davis J A, Comments and 2 03-16 88 H, Fwd: Documents Hoang D V, recommendations NRC/NRR/AD from Pilgrim. NRC/NRR/ADR for RAI RO/DLR O/DLR DP- ML0704403 Williamson A E-MAIL: (PD) Fwd: 1/18/2007 E-Mail Raymond W, Comments on 4 03-17 97 R, NRC/NRR Pilgrim Alert. news article DP- ML0703601 , E-Mail Re: SER 1/19/2007 E-Mail, Final , Comments and 5 03-18 17 NRC/NRR/AD [Attachment 1]: (PD) Safety recommendations RO/DLR/RLR Package 18 - Final Evaluation for SER A Safety Evaluation Report Report for the Pilgrim (FSER)

Nuclear Generating Station License Renewal Application Evaluation.

DP- ML0703601 NRC E-Mail Re: SER 1/19/2007 Safety , Comments and 215 03-19 36 [Attachment 2]: (PD) Evaluation recommendations Section 3 Aging Report for SER Management Review Results.

Page 4 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0703800 Rodriguez V E-MAIL: (PD) 1/19/2007 E-Mail Jones J, - No Comments and 2 03-20 32 M, Clarification. Known recommendations NRC/NRR/AD Affiliation for SER RO/DLR DP- ML0704403 Williamson A E-mail: (PD) Re: FYI 1/19/2007 E-Mail Davis J, Emch Comments on 4 03-21 98 R, NRC/NRR - Four Northeast R L, Masnik M news article Plants Informed of T, NRC Monticello Shutdown.

DP- ML0703801 Jones J, E-MAIL: (PD) RE: 1/19/2007 E-Mail Rodriguez V M, Comments and 3 03-22 19 Legin Group, SER. NRC/NRR/ADR recommendations Inc O/DLR for SER DP- ML0702901 Rodriguez V E-MAIL: (PD) 1/19/2007 E-Mail Buckberg P, Comments and 3 03-23 45 M, Resending - Pilgrim Sanabria Y D, recommendations NRC/NRR/AD SER. NRC for SER RO/DLR DP- ML0703601 , E-Mail SER Section 1/23/2007 E-Mail, , Comments and 137 03-24 55 NRC/NRR/AD 2 [Attachment 1]: Safety recommendations RO/DLR/RLR (PD) Section 2 - Evaluation for SER A Structures and Report Components Subject to Aging Management Review (Draft).

Page 5 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0703601 No Known E-Mail SER Section 1/23/2007 - No , Comments and 1 03-25 93 Affiliation 2 [Attachment 2]: Document recommendations (PD) PNPS Section 2 Type Applies for SER Comments.

DP- ML0703602 NRC E-Mail SER Section 1/23/2007 Safety , Comments and 150 03-26 13 2 [Attachment 3]: Evaluation recommendations (PD) Section 2 Report for SER Structures and Components Subject to Aging Management Review (Tech Edits Incorporated).

DP- ML0703801 Dresser R, E-MAIL: (PD) SER 1/23/2007 E-Mail Buckberg P H, Comments and 3 03-27 17 Legin Group, Section 2. NRC/NRR/ADR recommendations Inc O/DLR for SER DP- ML0702902 Buckberg P Email Drywell Air 1/23/2007 E-Mail Hoang D V, Comments and 2 03-28 47 H, Gap Form. NRC/NRR/ADR recommendations NRC/NRR/AD O/DLR for SER RO/DLR/RLR A

DP- ML0702901 Medoff J, E-MAIL: (PD) FYI - 1/24/2007 E-Mail Davis J A, Comments and 4 03-29 33 NRC/NRR/AD Pilgrim LRA: Here is NRC/NRR/ADR recommendations RO/DLR/RLR the BWRVIP-49 Draft O/DLR/RLRC for SER C Audit Report Input that I Wrote for TLAA 4.7.2.3.

Page 6 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0703602 Legin Group, E-Mail Requested 1/25/2007 E-Mail, , Comments and 40 03-30 24 Inc. Documents Safety recommendations

[Attachment 1]: (PD) Evaluation for SER Section 4 Time- Report Limited Aging Analyses (Version A Draft).

DP- ML0703602 Legin Group, E-Mail Requested 1/25/2007 Safety , Comments and 38 03-31 31 Inc. Documents Evaluation recommendations

[Attachment 2]: (PD) Report for SER Section 4 Time-Limited Aging Analyses (Version B Draft).

DP- ML0703605 Legin Group, E-Mail Requested 1/25/2007 Safety , Comments and 44 03-32 05 Inc. Documents Evaluation recommendations

[Attachment 3]: (PD) Report, Draft for SER Section 4 Time-Limited Aging Analysis (Version A Tech Edits Incorporated).

Page 7 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0703605 Legin Group, E-Mail Requested 1/25/2007 Safety , Comments and 43 03-33 38 Inc. Documents Evaluation recommendations

[Attachment 4]: (PD) Report, Draft for SER Section 4 Time-Limited Aging Analyses (Version B Tech Edits incorporated).

DP- ML0703605 Legin Group, E-Mail Requested 1/25/2007 Safety , Comments and 1 03-34 73 Inc. Documents Evaluation recommendations

[Attachment 5]: (PD) Report for SER PNPS Section 4

[Johns] Comments.

DP- ML0703605 Legin Group, E-Mail Requested 1/25/2007 - No , Comments and 1 03-35 89 Inc. Documents Document recommendations

[Attachment 6]: (PD) Type Applies for SER PNPS Section 4

[Jennifers]

Comments.

DP- ML0703801 Jones J, E-MAIL: (PD) 1/25/2007 E-Mail Buckberg P H, Comments and 3 03-36 14 Legin Group, Requested NRC/NRR/ADR recommendations Inc Documents. O/DLR for SER DP- ML0703800 Buckberg P E-MAIL: (PD) Phone 1/26/2007 E-Mail, Ellis D, Entergy Draft record of 5 03-37 85 H, Conference 1 Meeting Corp phone conference NRC/NRR/AD 2007. Summary RO/DLR/RLR A

Page 8 of 9

PDP Accession Author Title/Description: Document Document Addressee / Comment Page No. Number Name/ Date Type Addressee Count Affiliation: Affiliation DP- ML0704404 Williamson A E-MAIL: (PD) Pilgrim 1/29/2007 E-Mail Franovich R L, Comments on 2 03-38 01 R, Follow Up. NRC/NRR/ADR scoping summary NRC/NRR/AD O/DLR report RO/DLR DP- ML0703800 Buckberg P E-MAIL: (PD) 1/29/2007 E-Mail Meyer G W, Comments and 3 03-39 69 H, Possible Region I NRC/RGN- recommendations NRC/NRR/AD SER Input. I/DRS/EB1 for SER RO/DLR DP- ML0703901 Stubbs A, E-MAIL: (PD) Draft 1/30/2007 E-Mail Pope S, Comments and 148 03-40 39 NRC/NRR/AD Pilgrim SER. Information recommendations ES/DSS/SBP Systems Labs, for SER B Inc DP- ML0704404 Williamson A E-mail: (PD) Re: FYI 1/30/2007 E-Mail, Wrona D J, Comment on 3 03-41 04 R, - Four Northeast Highlights NRC/NRR/ADR meeting summary NRC/NRR/AD Plants Informed of O/DLR RO/DLR Monticello Shutdown.

DP- ML0704403 Williamson A E-MAIL: (PD) Re: 1/30/2007 E-Mail Franovich R L, Comments and 2 03-42 96 R, NRC/NRR Pilgrim Follow Up. NRC/NRR recommendations for replying to question after scoping meeting DP- ML0703801 Rodriguez V E-MAIL: (PD) SER 1/31/2007 E-Mail Medoff J, Comments and 43 03-43 11 M, Section 4. NRC/NRR/ADR recommendations NRC/NRR/AD O/DLR for SER RO/DLR Page 9 of 9

February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Perry Buckberg, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

______________________

Perry Buckberg Executed in Rockville, MD this 15th day of February, 2007

February 15, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:

1. I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR).

My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.

2. As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the February 15, 2007, submission of the Staffs Hearing File.
3. I have personally reviewed the documents identified as privileged in , and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part

of the deliberative process necessary to the Staffs review of the pending license renewal application.

4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the February 15, 2007 submission of the Hearing File Supplement 1.
6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

_______________________

Pao-Tsin Kuo Executed in Rockville, MD this 15th day of February, 2007

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) ) ASLBP No. 06-848-02-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 15th day of February 2007.

Administrative Judge* Administrative Judge*

Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: rfc1@nrc.gov E-mail: pba@nrc.gov Administrative Judge* Office of Commission Appellate

  • Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*

Sheila Slocum Hollis** Attn: Rulemaking and Adjudications Staff Duane Morris LLP Mail Stop: O-16C1 1667 K Street, NW, Suite 700 U.S. Nuclear Regulatory Commission Washington, DC 20006 Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com E-mail: hearingdocket@nrc.gov

Atomic Safety and Licensing Board* Terence A. Burke, Esq.**

Mail Stop: T-3 F23 Entergy Nuclear U.S. Nuclear Regulatory Commission 1340 Echelon Parkway Washington, DC 20555-0001 Mail Stop: M-ECH-62 Jackson, MS 39213 Molly H. Bartlett, Esq.**

52 Crooked Lane David R. Lewis, Esq.**

Duxbury, MA 02332 Paul A. Gaukler, Esq.

E-mail: mollyhbartlett@hotmail.com Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Chief Kevin M. Nord** Washington, DC 20037-1137 Fire Chief & Director Duxbury Emergency E-mail: david.lewis@pillsburylaw.com Management Agency paul.gaukler@pillsburylaw.com 668 Tremont Street Duxbury, MA 02332 Town Manager**

E-mail: nord@town.duxbury.ma.us Town of Plymouth Fax: 781-934-6530 11 Lincoln St.

Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us

/RA/

Molly L. Barkman Counsel for the NRC Staff