RIS 2005-26, Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
{{#Wiki_filter:ML051430228UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555-0001November 7, 2005NRC REGULATORY ISSUE SUMMARY 2005-26CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUARDSINFORMATION RELATED TO NUCLEAR POWER REACTORS
{{#Wiki_filter:ML051430228 UNITED STATES
NUCLE AR RE GULATOR Y COM MISS ION OFFICE OF NUC LEAR REAC TOR REGU LATION WASHINGTON, D.C. 20555-0001 November 7, 2005 NRC REGUL AT ORY ISSUE SUMMA
RY 2005-26 CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUA
RDS INFORMATION RELATED TO NU
CLEAR POWER REA
CTORS


==ADDRESSEES==
==ADDRESSEES==
All holders of operating licenses for nuclear power reactors and holders of and applicants forcertificates for reactor designs.
All hold ers of operating li censes for nucle ar power re actors and hol ders of and appl icants for certificates for reactor d esigns.


==INTENT==
==INTENT==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)to inform the addressees of the appropriate handling of information that warrants controlsbecause of continuing concerns about terrorist attacks against the critical infrastructure of theUnited States.  The NRC intends to balance its responsibility to preserve public access toinformation and support meaningful participation in NRC's regulatory processes against itsresponsibility to withhold information that might unnecessarily compromise the security ofnuclear facilitiesLicensees for operating nuclear power plants and reactor facility designersmay need to assess their document control procedures to ensure they protect sensitiveinformationAlthough no specific action or written response is required, the NRC encouragesthe addressees for this RIS, vendors and contractors, and others who may possess sensitiveinformation to destroy, mark, or otherwise control the information to avoid inadvertentlyproviding assistance to those who might use the information for malevolent acts.
The U.S. Nuclear Regulator y Commission (NRC) is issuing this regulatory issue summ ary (RIS)to inform the addres sees of the appropriate hand ling of inform ation that warrants controls because of conti nuing concerns about terrorist a ttacks against the cri tical infrastructu re of the Unite d State s.  The N RC in tends to bal ance i ts resp onsib ilit y to p reserv e publ ic acc ess to informat ion a nd sup port me aningful parti cipat ion i n NRC's regu latory proce sses a gainst its responsibil ity to w ithhold i nformation that might unn ecessarily compromise the security of nucle ar facil itiesLic ensee s for ope rating nucle ar pow er pla nts an d reac tor faci lity desi gners may need t o assess their doc ument contro l procedu res to en sure th ey protec t sensit ive informationAl though no speci fic action or w ritten response is required, th e NRC enco urages the addr essees f or this RI
S, vendor s and cont ractor s, and ot hers who ma y possess sensitive information to dest roy, mark, or other wise control the information to avoid inadvertently providin g assistance to those who might use the in formation for malevol ent acts.BA CKGROU ND INF ORMA TION NRC traditi onally has given th e public access to a si gnificant amount of in formation about the facilities a nd materials the agency regul ates.  Openness has been and remains a co rnerstone of NRC's regula tory phil osophy.  The Atomic Energy Act, subsequent l egislation, a nd variou s NRC regulatio ns have giv en the publ ic the right to participate i n the lice nsing and ov ersight process for nucle ar power re actors and othe r NRC lic ensees.  To parti cipate in a meaningful way, the public mus t have acce ss to information about the desi gn and operatio n of regulated facilit ies and use of nucle ar mat erials.  However, NRC an d other G overnme nt agen cies have alway s withhel d some information from public dis closure for reason s of security, p ersonal priv acy, or comme rcial or trad e secre t prote ction.  In l ight of i ncreas ed terr orist activ ity worldw ide, NRC re examined i ts document dis closure pol icies.


==BACKGROUND INFORMATION==
RIS 2005-26 Pag e 2 of 5 Since the e vents of Septembe r 11, 2001, NR
NRC traditionally has given the public access to a significant amount of information about thefacilities and materials the agency regulates.  Openness has been and remains a cornerstoneof NRC's regulatory philosophy.  The Atomic Energy Act, subsequent legislation, and variousNRC regulations have given the public the right to participate in the licensing and oversightprocess for nuclear power reactors and other NRC licensees.  To participate in a meaningfulway, the public must have access to information about the design and operation of regulatedfacilities and use of nuclear materials.  However, NRC and other Government agencies havealways withheld some information from public disclosure for reasons of security, personalprivacy, or commercial or trade secret protection.  In light of increased terrorist activityworldwide, NRC reexamined its document disclosure policies. Since the events of September 11, 2001, NRC has issued advisories and taken specific actionsregarding the security of its licensed facilities.  NRC has also assessed and revised its policiesand practices for control of information so that information that could reasonably be expected tobe useful to terrorists in planning or executing an attack against nuclear power plants or otherNRC-licensed facilities will be withheld from public disclosure.  The most recent and detailedguidance on the control of information related to operating nuclear power plants is provided inthe Commission paper SECY-04-0191, "Withholding Sensitive Unclassified InformationConcerning Nuclear Power Reactors From Public Disclosure," dated October 19, 2004, and theassociated staff requirements memorandum dated November 9, 2004.  Also seeSECY-05-0091, "Task Force Report on Public Disclosure of Security-Related Information,"dated May 18, 2005, and the associated staff requirements memorandum dated June 30, 2005. The NRC staff is preparing similar guidance for materials licensees and expects to make itavailable to the public in early 2006.
C has issue d adviso ries and taken s pecific action s regarding the securi ty of its li censed facili ties.  NRC  
has also as sessed and re vised i ts policie s and pr actice s for con trol o f informat ion s o that informat ion th at cou ld rea sonab ly b e exp ected to be useful to terrori sts in plan ning or exec uting an attack again st nuclear po wer plan ts or other NRC-licen sed faciliti es wil l be wi thheld from publi c disclosu re.  The most recent and detail ed guidance on the control of inf ormation related to operat ing nuclear power plants is provided in the Commission paper SECY
-04-0191, "Withholding Sensi tive Uncl assified Information Concerning Nu clear Pow er Reactors From Public Di sclosure," dated October 19, 2004 , and the associated sta ff requirements memorandum dated November 9, 2004.  Also see SECY-05-009 1, "Task F
orce R eport o n Publ ic Di sclos ure of S ecuri ty-Re lated Informati on,"dated May 18, 20 05, an d the a ssoci ated s taff requir ements memoran dum dat ed Jun e 30, 2 005. The NRC staff is preparing similar guidance f or materials licensees and expects to mak e it availab le to the pu blic in early 200 6.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
Considering the various reviews, legislation, and other changes since September 11, 2001, theNRC staff believes that clarifying NRC's current procedures and policies regarding the controlof information will be beneficial to stakeholders.  NRC will continue to make available to thepublic most of the information that the agency receives from or sends to its licenseesInaddition, the public will have access to a large amount of information included in various reportsproduced by the NRC staff.  Much of NRC's information also will be readily available to thepublic via the NRC Web site (www.nrc.gov) and the NRC's electronic document managementsystem (ADAMS) (www.nrc.gov/reading-rm/adams.html).  In addition, other information may bereleased to the public in response to formal or informal requests.  The exceptions for certaininformation to be withheld from public disclosure for reasons other than security (e.g., privacy,proprietary, and pre-decisional information) have not changed as a result of recent eventsTheappropriate handling of Safeguards Information (SGI) is discussed in RIS-2003-08, "Protectionof Safeguards Information From Unauthorized Disclosure," dated April 30, 2003, and morespecific SGI designation guidance documents.  NRC withheld from public disclosure some information related to protecting operating nuclearpower plants although it does not meet the existing criteria for designation as SGI.  This type ofinformation was recognized before September 11, 2001, and, when submitted to NRC by alicensee, was withheld from public disclosure according to the provisions of 10 CFR2.390(d)(1).  This regulation states:(d) The following information is considered commercial or financial information within themeaning of §9.17(a)(4) of this chapter and is subject to disclosure only in accordancewith the provisions of §9.19 of this chapter.(1) Correspondence and reports to or from the NRC which contain information orrecords concerning a licensee's or applicant's physical protection, classified matterprotection, or material control and accounting program for special nuclear material nototherwise designated as Safeguards Information or classified as National SecurityInformation or Restricted Data. NRC expects that licensees will continue to request NRC withhold some information citing10 CFR 2.390(d)(1) and that the volume of material requested to be withheld from publicdisclosure under this provision will increase as the NRC staff and licensees implement theguidance in this RIS.  NRC changed its procedures shortly after September 11, 2001, towithhold from public disclosure various categories of documents likely to include individualrecords that warrant withholding under 10 CFR 2.390.  The NRC staff will assess the need towithhold such document categories if licensees routinely identify specific documents containingsensitive information.  The NRC staff will interact with licensees on a case-by-case basisregarding the use of the provisions of 10 CFR 2.390(d)(1) to assure that information is properlycontrolled, under either Section 2.390(d)(1) or one of the other Freedom of Information Act(FOIA) exemptions that might be applicable.  Licensees that identify information to be withheldfrom public disclosure in accordance with 10 CFR 2.390(d)(1) or other provision in theregulation should use the same general practices as used for proprietary commercial orfinancial information.  As shown on the attached diagram, the cover letter should clearly statethat the document includes sensitive information and the affected pages should include themarking "Security-Related Information - Withhold Under 10 CFR 2.390."  Unlike therequirements for withholding proprietary information, licensees are not required to provide anaffidavit for sensitive information withheld under 10 CFR 2.390(d) and related to (1) physicalprotection or (2) material control and accounting.Most information received and generated by NRC deals with design, operations, or othermatters not directly related to the physical security of nuclear facilities or radioactive materials. This information, if not protected as proprietary or under another exception, is generally madeavailable to the public.  After September 11, 2001, NRC and other Government agenciesresponded to concerns that some information easily available on public Web sites or by othermeans might be useful to terrorists.  SECY-04-0191 provides the primary NRC guidance onwhether information related to operating nuclear power plants should be withheld from publicdisclosure in light of the post-September 11 concerns.  The NRC staff has posted the guidanceand related material within the public reading room (http://www.nrc.gov/reading-rm.html) on theNRC Web site, and stakeholders can ask questions or make suggestions about the guidanceand the examples.  As discussed in SECY-04-0191, other Government agencies have issued regulations orguidance for protecting information that could be reasonably expected to be useful to terroristsin planning or executing an attack on critical infrastructure.*Protected critical infrastructure information (PCII) is information related to the security ofcritical infrastructure that is voluntarily provided to the Department of Homeland Security(DHS). *Critical energy infrastructure information (CEII) is defined in Federal Energy RegulatoryCommission (FERC) regulations as information related to energy-related infrastructure (e.g., hydroelectric dams and electric transmission systems).*Sensitive security information (SSI) is defined in Transportation Safety Administration(TSA) and Department of Transportation (DOT) regulations as information about thesecurity of transportation assets, including pipelines. Licensees may need to assess and revise their procedures for handling sensitive unclassifiednonsafeguards information in their normal activities and interactions with parties other thanNRC.  During discussions of existing practices with various licensees, the NRC staff discoveredthat licensees vary in how they treat and protect information that was previously unprotected butnow is considered sensitive.  Some licensees have instituted more restrictive controls.  Somehave determined that their routine business practices provide an appropriate level of protectionfor the sensitive information.  As described in 10 CFR 2.390, information deemed sensitive because it relates to physicalprotection or material control and accounting is protected in much the same way as commercialor financial information.  As with proprietary information, licensees are expected to havesufficient internal controls to keep the information confidential.  Possible methods to prevent theinadvertent release of sensitive unclassified nonsafeguards information include markingdocuments as described in 10 CFR 2.390, restricting access to electronic recordkeepingsystems, and controlling the reproduction, distribution, and destruction of potentially sensitiverecords.  NRC uses the marking "Security-Related Information - Withhold Under10 CFR 2.390" and encourages the use of this marking by licensees and others possessinginformation deemed sensitive using the guidance in SECY-04-0191.  Licensees should ensurethat similar controls are in place when sensitive information is provided to outside parties suchas contractors or other Government agencies.  The NRC staff posted information on NRC'sWeb site (http://www.nrc.gov/reading-rm.html) and included a feedback form for questions orsuggestions on how to effectively control sensitive information.
Considerin g the various review s, legislati on, and other c hanges since S
eptember 11, 200
1, the NRC staff believ es that clari fying NRC's current procedures and poli cies regarding the control of information wi ll be ben eficial to stakeho lders.  NRC
will continue to make availab le to the publi c most o f the in formatio n that the age ncy r eceiv es from o r send s to i ts li censee sIn addit ion, t he pub lic w ill have acces s to a large a mount o f informat ion i nclud ed in vari ous re ports produced by the NRC sta ff.  Much of NRC's information als o will be readil y avai lable to th e public v ia the NRC
Web site (www.n rc.gov) and the NRC's el ectronic docume nt management system (ADAM
S) (www.nrc.gov/reading-rm/adams.html
).  In additi on, other informatio n may be released to the public in response to form al or informal request s.  The exceptions for cert ain infor mation to be withhe ld from public disc losure f or reas ons othe r than se curity (e.g., privacy, proprietary, a nd pre-decisi onal information) have not changed as a res ult of recent ev entsThe appropriate ha ndling of Safeguards Informatio n (SGI) is dis cussed in R
IS-2003-08, "Prote ction of Safegua rds Infor mation From U nautho rize d Dis closu re," da ted Ap ril 3 0, 200 3, and more speci fic SGI d esigna tion gu idanc e docu ments.  NRC wi thheld from publi c disclosu re some information related to prote cting operating nu clear power pl ants although i t does not meet th e existi ng criteria for desi gnation as SGI.  Thi s type of infor mation was recog nized bef ore Sept ember 11, 2001, and, when su bmitt ed to NRC by a licensee, w as withhe ld from public disclosure according to the provisio ns of 10 CFR
2.390(d)(1).  This re gulation states: (d) The follow ing information i s considered commercial or financial i nformation with in the meaning of §9.17(a)(4) o f this chapter and is subject to disclosure only in accordance with the pr ovis ions of §9.19 of this chapt er.(1) Corresponden ce and reports to or from the NRC  
which co ntain information or records concerni ng a license e's or appl icant's phy sical protec tion, classi fied matter protection, or mate rial control and accounti ng program for special nuclear materia l not otherw ise d esigna ted as Safegua rds Infor mation or cl assifi ed as Natio nal S ecuri ty Information or Restri cted Data.


==BACKFIT DISCUSSION==
RIS 2005-26 Pag e 3 of 5 NRC expe cts that lice nsees wi ll contin ue to request NRC
This RIS requires no action or written responseAny action on the part of addressees toassess and revise their document control procedures in accordance with the guidancecontained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109. Consequently, the NRC staff did not perform a backfit analysis.
withhol d some information citing 10 CFR 2.390(d)(1) and that the volume of material requested to be withheld fr om public disclosure under this pro vision will increase as the NRC staff and l icensees i mplement the guidan ce in this RIS.  N RC ch anged i ts proc edures shortl y after Septe mber 11 , 2001 , to withhol d from public di sclosure v arious categorie s of documents li kely to inc lude indi vidual record s that warra nt wi thhol ding u nder 1 0 CFR 2.390.  The N RC sta ff will asses s the n eed to withhol d such documen t categories if li censees routin ely ide ntify specific documents contai ning sensitive information.  The NRC staf f will interact with licensees on a case-by-case basis regarding the use of the provisions of 10 CFR 2.390(d)(1) to assu re that informat ion is properly controlled, u nder either S
ection 2.390(d
)(1) or one of the o ther Freedom of Information Act (FOIA) exemptions that m ight be applicable.  Licensees that identify inf ormation to be withheld from public dis closure in accordance w ith 10 CFR
2.390(d)(1) or oth er provisi on in the regulation sho uld use the same general prac tices as used for proprietary commercial or financi al in formatio n.  As show n on th e attac hed di agram, th e cov er let ter sho uld c learl y sta te that the document includes s ensitive information and the affected pages shoul d include the marking "Security-R
elated Information
- Withhold Under 10 CFR
2.390."  Unl ike the requirements for wi thholding prop rietary in formation, license es are not requi red to provi de an affidavit for sensiti ve information withhel d under 10 C
FR 2.390(d) an d related to
(1) physica l prot ecti on o r (2) mate rial con trol and acc ount ing.Most informatio n receive d and generated by NRC deals w ith design, op erations, or oth er matters not di rectly relat ed to t he phy sical securi ty of n uclea r facil ities or rad ioact ive materi als. This information, i f not protected as p roprietary o r under another exception, is generally made availab le to the pu blic.  After Sep tember 11, 2001, NRC and oth er Government agenc ies responded to c oncerns that some information easi ly ava ilable o n public Web sites or by other means might be use ful to terrorists.  S
ECY-04-0191 provides the primary N
RC guidance on whether information relate d to operating nuclear power plants should be withheld from public disclosure in light of the post-September 11 concerns.  The N
RC staff has posted th e guidance and related material w ithin the p ublic readi ng room (http://ww w.nrc.gov/readi ng-rm.html) on the NRC Web site, and stakehol ders can ask questi ons or make suggestions about the guida nce and th e exa mples.  As discussed in SECY-04-0191, other Gov ernment agencies have issu ed regulations or guidan ce for pr otecti ng inform ation that c ould be rea sonab ly e xpec ted to be use ful to t errori sts in planni ng or executi ng an attack on criti cal infrastructure.


===FEDERAL REGISTER NOTIFICATION===
*Protected criti cal infrastructure information (PCII) i s information rel ated to the sec urity of criti cal i nfrastru cture t hat is vol untari ly p rovi ded to the De partmen t of Home land Securi ty (DHS). *Criti cal e nergy infrastr ucture informa tion (CEII) i s defin ed in Feder al En ergy R egulat ory Commission (FE
A notice of opportunity for public comment on this RIS was not published in the FederalRegister because it is informational and pertains to a staff position that does not represent adeparture from current regulatory requirements and practice. NRC intends to work with theNuclear Energy Institute, industry representatives, members of the public, and otherstakeholders in modifying related guidance documents.SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT OF 1996The NRC has determined that this action is not a rule and thus is not subject to the SmallBusiness Regulatory Enforcement Fairness Act of 1996.
RC) regulation s as information related to ene rgy-related in frastructure (e.g., hy droel ectric dams a nd el ectric transmi ssion syste ms).*Sensitiv e security information (SSI) i s defined in Transportation Sa fety Administrati on (TSA) and Departmen t of Transportation (DOT) regul ations as i nformation about the security of trans portation asse ts, includi ng pipeline s.


===PAPERWORK REDUCTION ACT STATEMENT===
RIS 2005-26 Pag e 4 of 5 Licensees may need to asse ss and revi se their proce dures for handli ng sensitiv e unclassi fied nonsafeguards information in their n ormal activ ities and interactions with parti es other than NRC.  Duri ng discussion s of existin g practices w ith vario us license es, the NRC
This RIS does not contain information collections and, therefore, is not subject to therequirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
staff discovered that license es vary in how they treat and protect information that was pre viously unprotected bu t now is con sider ed sen sitiv e.  Som e lic ensee s hav e ins titute d more restri ctiv e cont rols.  Some have determi ned that their routine busi ness practices provide an appropria te level of protection for the s ensit ive informat ion.  As described in 10 CF R 2.390, informatio n deemed sensi tive beca use it relate s to physi cal protection or mate rial control and accounti ng is protected i n much the same way as commercial or fina ncial inf ormat ion.  As with pr oprieta ry infor mation , license es are expe cted to have sufficient internal controls to keep the information c onfidential.
 
Possible methods to prev ent the inadverten t release of sens itive un classified no nsafeguards information i nclude marking documents as de scribed in
10 CFR 2.39
0, restricting acce ss to electroni c recordkeeping system s, and co ntrollin g the re produc tion, dis tribut ion, and de struc tion of potent ially sensit ive records.  NRC
uses the marking "Sec urity-Rela ted Information - Withhold Unde r 10 CFR 2.39
0" and encoura ges the use of this marking by lic ensees and o thers possessi ng informat ion d eemed s ensit ive using t he gui dance in SE CY-04-0191.  Lice nsees shoul d ensu re that similar controls are i n place w hen sensiti ve information is provi ded to outsid e parties suc h as contractors or other Government agencies.  T
he NRC staff posted inf ormation on NRC's Web site (http://www.n rc.gov/reading-rm.html) an d include d a feedback form for questions o r suggesti ons on how to effecti vely contro l sen sitiv e infor mation.  BA CKFIT DISCU SSION This R IS requi res no actio n or w ritten respo nse.  A ny ac tion o n the p art of ad dresse es to assess and rev ise their do cument control p rocedures in accordance w ith the guidan ce contai ned i n this RIS i s stric tly v olunt ary a nd, the refore, i s not a backfit under 10 CFR 50.10 9. Consequently , the NRC sta ff did not perform a backfit anal ysis.FEDERAL REGISTER
NOTIF ICA TION A notice of opp ortunity for pub lic comment on this RIS w as not publi shed in the Federal Register becau se it is in formatio nal a nd per tains to a s taff posi tion t hat do es not repres ent a departure from current regul atory requirements and practice.  NRC inte nds to work w ith the Nuclear Ene rgy Institute, in dustry represe ntatives, membe rs of the publi c, and other stakeholders in modifying rela ted guidance d ocuments.SMAL L BUSINESS
REGULA TORY ENFOR
CEMENT FA IRNESS A CT OF 1996 The NRC has determined that this act ion is not a rule and thus is not subject to the Small Busin ess Re gulato ry En forcemen t Fair ness A ct of 199 6.
 
RIS 2005-26 Pag e 5 of 5 PAPERWORK REDUCTION A
CT STA TEMENT This RIS does not contain i nformation colle ctions and, th erefore, is not sub ject to the require ments o f the Pa perw ork Red uctio n Act o f 1995 (44 U.S.C. 350 1 et se q.).


==CONTACT==
==CONTACT==
Please direct any questions about this matter to the technical contacts listed below or to theappropriate Office of Nuclear Reactor Regulation (NRR) project manager./RA/ By Patrick L. Hiland For/Michael J. Case, DirectorDivision of Inspection and Regional SupportOffice of Nuclear Reactor RegulationTechnical Contacts:William Reckley, NRRMargie Kotzalas, NRR301-415-1323301-415-2737E-mail: wdr@nrc.govE-mail: mxk5@nrc.govAttachmentMarking diagram for documents withheld under 10 CFR 2.390Note:  NRC generic communications may be found on the NRC public Web site,http://www.nrc.gov, under Electronic Reading Room/Document Collections.
Please di rect any questi ons about thi s matter to the tech nical conta cts listed b elow or to the approp riate Office of N
uclea r Reac tor Regu latio n (NRR) proje ct mana ger./RA/ By Patrick L. Hiland For
/Michael J. Case, Di rector Divi sion of Inspe ction and R egiona l Sup port Office of Nuclear Reacto r Regulation Technical Co ntacts: W illiam Reckley, NRR
Margie Kotzalas, NRR
301-415-1323
301-415-2737 E-mail: wdr@nrc.gov E-mail: mxk5@nrc.gov AttachmentM
arking diagram for documents withhel d under 10 C
FR 2.390 Note:  NRC  
generic communica tions may b e found on the N
RC publi c Web site, http://www.nrc.gov, under E
lectronic Re ading Room/Docu ment Collecti ons.
 
Security-Re lated Information Withhold Under 10 CFR
2.390 Subject XXXXXXXXXX
XXXXXXXXXX
XXXXXXXXXX
 
XXXXXXXXXX
Attachment
 
RIS-2005-26
 
Pag e 1 of 1 SUGGESTED MA
RKINGS Withhold From Pub lic Disclosure In Ac cordance With 1
0 CFR 2.390
 
Over all page marking on the top of all pa ges Ensure Subjec t Line is non-se nsitive Appropriate Controls Access: Need-to-know i n order to perform official licensee functions.


Security-Related InformationWithhold Under 10 CFR 2.390SubjectXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Storage: Openly w ithin li censee facili ties wi th electronic or other acces s controls, for exa mple, key cards , guards, alarms.
XXXXXXXXXXAttachment RIS-2005-26 SUGGESTED MARKINGSWithhold From Public Disclosure In Accordance With 10 CFR 2.390                                                                                                                  Overall page marking on the top of all pagesEnsure Subject Line is non-sensitiveAppropriate ControlsAccess:Need-to-know in order to perform official licensee functions.Storage:Openly within licensee facilities with electronic or other accesscontrols, for example, key cards, guards, alarms.Mail:U.S. Postal Service first class mail, single opaque envelope withno markings to indicate 10 CFR 2.390 contents.Electronic Transmission:Over encrypted phone, facsimile, computer, if available;otherwise over non-encrypted circuits where recipient willbe present to receive the transmission.


Mail: U.S. P ostal Serv ice fir st cla ss mai l, si ngle o paque e nvel ope w ith no markings to indi cate 10 CFR
2.390 contents.


Electronic Tran smission: Over encryp ted phone, facsimi le, computer, if av ailable;otherwise over non-encrypted circuits where recipient will be present to re ceive the transmission.
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Revision as of 10:16, 30 August 2018

Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors
ML080940150
Person / Time
Issue date: 11/07/2005
From: Case M J
NRC/NRR/ADRO/DPR
To:
W.Reckley,NRR,301-415-1323
References
RIS-05-026
Preceding documents:
Download: ML080940150 (6)


ML051430228 UNITED STATES

NUCLE AR RE GULATOR Y COM MISS ION OFFICE OF NUC LEAR REAC TOR REGU LATION WASHINGTON, D.C. 20555-0001 November 7, 2005 NRC REGUL AT ORY ISSUE SUMMA

RY 2005-26 CONTROL OF SENSITIVE UNCLASSIFIED NONSAFEGUA

RDS INFORMATION RELATED TO NU

CLEAR POWER REA

CTORS

ADDRESSEES

All hold ers of operating li censes for nucle ar power re actors and hol ders of and appl icants for certificates for reactor d esigns.

INTENT

The U.S. Nuclear Regulator y Commission (NRC) is issuing this regulatory issue summ ary (RIS)to inform the addres sees of the appropriate hand ling of inform ation that warrants controls because of conti nuing concerns about terrorist a ttacks against the cri tical infrastructu re of the Unite d State s. The N RC in tends to bal ance i ts resp onsib ilit y to p reserv e publ ic acc ess to informat ion a nd sup port me aningful parti cipat ion i n NRC's regu latory proce sses a gainst its responsibil ity to w ithhold i nformation that might unn ecessarily compromise the security of nucle ar facil ities. Lic ensee s for ope rating nucle ar pow er pla nts an d reac tor faci lity desi gners may need t o assess their doc ument contro l procedu res to en sure th ey protec t sensit ive information. Al though no speci fic action or w ritten response is required, th e NRC enco urages the addr essees f or this RI

S, vendor s and cont ractor s, and ot hers who ma y possess sensitive information to dest roy, mark, or other wise control the information to avoid inadvertently providin g assistance to those who might use the in formation for malevol ent acts.BA CKGROU ND INF ORMA TION NRC traditi onally has given th e public access to a si gnificant amount of in formation about the facilities a nd materials the agency regul ates. Openness has been and remains a co rnerstone of NRC's regula tory phil osophy. The Atomic Energy Act, subsequent l egislation, a nd variou s NRC regulatio ns have giv en the publ ic the right to participate i n the lice nsing and ov ersight process for nucle ar power re actors and othe r NRC lic ensees. To parti cipate in a meaningful way, the public mus t have acce ss to information about the desi gn and operatio n of regulated facilit ies and use of nucle ar mat erials. However, NRC an d other G overnme nt agen cies have alway s withhel d some information from public dis closure for reason s of security, p ersonal priv acy, or comme rcial or trad e secre t prote ction. In l ight of i ncreas ed terr orist activ ity worldw ide, NRC re examined i ts document dis closure pol icies.

RIS 2005-26 Pag e 2 of 5 Since the e vents of Septembe r 11, 2001, NR

C has issue d adviso ries and taken s pecific action s regarding the securi ty of its li censed facili ties. NRC

has also as sessed and re vised i ts policie s and pr actice s for con trol o f informat ion s o that informat ion th at cou ld rea sonab ly b e exp ected to be useful to terrori sts in plan ning or exec uting an attack again st nuclear po wer plan ts or other NRC-licen sed faciliti es wil l be wi thheld from publi c disclosu re. The most recent and detail ed guidance on the control of inf ormation related to operat ing nuclear power plants is provided in the Commission paper SECY

-04-0191, "Withholding Sensi tive Uncl assified Information Concerning Nu clear Pow er Reactors From Public Di sclosure," dated October 19, 2004 , and the associated sta ff requirements memorandum dated November 9, 2004. Also see SECY-05-009 1, "Task F

orce R eport o n Publ ic Di sclos ure of S ecuri ty-Re lated Informati on,"dated May 18, 20 05, an d the a ssoci ated s taff requir ements memoran dum dat ed Jun e 30, 2 005. The NRC staff is preparing similar guidance f or materials licensees and expects to mak e it availab le to the pu blic in early 200 6.

SUMMARY OF ISSUE

Considerin g the various review s, legislati on, and other c hanges since S

eptember 11, 200

1, the NRC staff believ es that clari fying NRC's current procedures and poli cies regarding the control of information wi ll be ben eficial to stakeho lders. NRC

will continue to make availab le to the publi c most o f the in formatio n that the age ncy r eceiv es from o r send s to i ts li censee s. In addit ion, t he pub lic w ill have acces s to a large a mount o f informat ion i nclud ed in vari ous re ports produced by the NRC sta ff. Much of NRC's information als o will be readil y avai lable to th e public v ia the NRC

Web site (www.n rc.gov) and the NRC's el ectronic docume nt management system (ADAM

S) (www.nrc.gov/reading-rm/adams.html

). In additi on, other informatio n may be released to the public in response to form al or informal request s. The exceptions for cert ain infor mation to be withhe ld from public disc losure f or reas ons othe r than se curity (e.g., privacy, proprietary, a nd pre-decisi onal information) have not changed as a res ult of recent ev ents. The appropriate ha ndling of Safeguards Informatio n (SGI) is dis cussed in R

IS-2003-08, "Prote ction of Safegua rds Infor mation From U nautho rize d Dis closu re," da ted Ap ril 3 0, 200 3, and more speci fic SGI d esigna tion gu idanc e docu ments. NRC wi thheld from publi c disclosu re some information related to prote cting operating nu clear power pl ants although i t does not meet th e existi ng criteria for desi gnation as SGI. Thi s type of infor mation was recog nized bef ore Sept ember 11, 2001, and, when su bmitt ed to NRC by a licensee, w as withhe ld from public disclosure according to the provisio ns of 10 CFR 2.390(d)(1). This re gulation states: (d) The follow ing information i s considered commercial or financial i nformation with in the meaning of §9.17(a)(4) o f this chapter and is subject to disclosure only in accordance with the pr ovis ions of §9.19 of this chapt er.(1) Corresponden ce and reports to or from the NRC

which co ntain information or records concerni ng a license e's or appl icant's phy sical protec tion, classi fied matter protection, or mate rial control and accounti ng program for special nuclear materia l not otherw ise d esigna ted as Safegua rds Infor mation or cl assifi ed as Natio nal S ecuri ty Information or Restri cted Data.

RIS 2005-26 Pag e 3 of 5 NRC expe cts that lice nsees wi ll contin ue to request NRC

withhol d some information citing 10 CFR 2.390(d)(1) and that the volume of material requested to be withheld fr om public disclosure under this pro vision will increase as the NRC staff and l icensees i mplement the guidan ce in this RIS. N RC ch anged i ts proc edures shortl y after Septe mber 11 , 2001 , to withhol d from public di sclosure v arious categorie s of documents li kely to inc lude indi vidual record s that warra nt wi thhol ding u nder 1 0 CFR 2.390. The N RC sta ff will asses s the n eed to withhol d such documen t categories if li censees routin ely ide ntify specific documents contai ning sensitive information. The NRC staf f will interact with licensees on a case-by-case basis regarding the use of the provisions of 10 CFR 2.390(d)(1) to assu re that informat ion is properly controlled, u nder either S

ection 2.390(d

)(1) or one of the o ther Freedom of Information Act (FOIA) exemptions that m ight be applicable. Licensees that identify inf ormation to be withheld from public dis closure in accordance w ith 10 CFR 2.390(d)(1) or oth er provisi on in the regulation sho uld use the same general prac tices as used for proprietary commercial or financi al in formatio n. As show n on th e attac hed di agram, th e cov er let ter sho uld c learl y sta te that the document includes s ensitive information and the affected pages shoul d include the marking "Security-R

elated Information

- Withhold Under 10 CFR 2.390." Unl ike the requirements for wi thholding prop rietary in formation, license es are not requi red to provi de an affidavit for sensiti ve information withhel d under 10 C

FR 2.390(d) an d related to

(1) physica l prot ecti on o r (2) mate rial con trol and acc ount ing.Most informatio n receive d and generated by NRC deals w ith design, op erations, or oth er matters not di rectly relat ed to t he phy sical securi ty of n uclea r facil ities or rad ioact ive materi als. This information, i f not protected as p roprietary o r under another exception, is generally made availab le to the pu blic. After Sep tember 11, 2001, NRC and oth er Government agenc ies responded to c oncerns that some information easi ly ava ilable o n public Web sites or by other means might be use ful to terrorists. S

ECY-04-0191 provides the primary N

RC guidance on whether information relate d to operating nuclear power plants should be withheld from public disclosure in light of the post-September 11 concerns. The N

RC staff has posted th e guidance and related material w ithin the p ublic readi ng room (http://ww w.nrc.gov/readi ng-rm.html) on the NRC Web site, and stakehol ders can ask questi ons or make suggestions about the guida nce and th e exa mples. As discussed in SECY-04-0191, other Gov ernment agencies have issu ed regulations or guidan ce for pr otecti ng inform ation that c ould be rea sonab ly e xpec ted to be use ful to t errori sts in planni ng or executi ng an attack on criti cal infrastructure.

  • Protected criti cal infrastructure information (PCII) i s information rel ated to the sec urity of criti cal i nfrastru cture t hat is vol untari ly p rovi ded to the De partmen t of Home land Securi ty (DHS). *Criti cal e nergy infrastr ucture informa tion (CEII) i s defin ed in Feder al En ergy R egulat ory Commission (FE

RC) regulation s as information related to ene rgy-related in frastructure (e.g., hy droel ectric dams a nd el ectric transmi ssion syste ms).*Sensitiv e security information (SSI) i s defined in Transportation Sa fety Administrati on (TSA) and Departmen t of Transportation (DOT) regul ations as i nformation about the security of trans portation asse ts, includi ng pipeline s.

RIS 2005-26 Pag e 4 of 5 Licensees may need to asse ss and revi se their proce dures for handli ng sensitiv e unclassi fied nonsafeguards information in their n ormal activ ities and interactions with parti es other than NRC. Duri ng discussion s of existin g practices w ith vario us license es, the NRC

staff discovered that license es vary in how they treat and protect information that was pre viously unprotected bu t now is con sider ed sen sitiv e. Som e lic ensee s hav e ins titute d more restri ctiv e cont rols. Some have determi ned that their routine busi ness practices provide an appropria te level of protection for the s ensit ive informat ion. As described in 10 CF R 2.390, informatio n deemed sensi tive beca use it relate s to physi cal protection or mate rial control and accounti ng is protected i n much the same way as commercial or fina ncial inf ormat ion. As with pr oprieta ry infor mation , license es are expe cted to have sufficient internal controls to keep the information c onfidential.

Possible methods to prev ent the inadverten t release of sens itive un classified no nsafeguards information i nclude marking documents as de scribed in

10 CFR 2.39

0, restricting acce ss to electroni c recordkeeping system s, and co ntrollin g the re produc tion, dis tribut ion, and de struc tion of potent ially sensit ive records. NRC

uses the marking "Sec urity-Rela ted Information - Withhold Unde r 10 CFR 2.39

0" and encoura ges the use of this marking by lic ensees and o thers possessi ng informat ion d eemed s ensit ive using t he gui dance in SE CY-04-0191. Lice nsees shoul d ensu re that similar controls are i n place w hen sensiti ve information is provi ded to outsid e parties suc h as contractors or other Government agencies. T

he NRC staff posted inf ormation on NRC's Web site (http://www.n rc.gov/reading-rm.html) an d include d a feedback form for questions o r suggesti ons on how to effecti vely contro l sen sitiv e infor mation. BA CKFIT DISCU SSION This R IS requi res no actio n or w ritten respo nse. A ny ac tion o n the p art of ad dresse es to assess and rev ise their do cument control p rocedures in accordance w ith the guidan ce contai ned i n this RIS i s stric tly v olunt ary a nd, the refore, i s not a backfit under 10 CFR 50.10 9. Consequently , the NRC sta ff did not perform a backfit anal ysis.FEDERAL REGISTER

NOTIF ICA TION A notice of opp ortunity for pub lic comment on this RIS w as not publi shed in the Federal Register becau se it is in formatio nal a nd per tains to a s taff posi tion t hat do es not repres ent a departure from current regul atory requirements and practice. NRC inte nds to work w ith the Nuclear Ene rgy Institute, in dustry represe ntatives, membe rs of the publi c, and other stakeholders in modifying rela ted guidance d ocuments.SMAL L BUSINESS

REGULA TORY ENFOR

CEMENT FA IRNESS A CT OF 1996 The NRC has determined that this act ion is not a rule and thus is not subject to the Small Busin ess Re gulato ry En forcemen t Fair ness A ct of 199 6.

RIS 2005-26 Pag e 5 of 5 PAPERWORK REDUCTION A

CT STA TEMENT This RIS does not contain i nformation colle ctions and, th erefore, is not sub ject to the require ments o f the Pa perw ork Red uctio n Act o f 1995 (44 U.S.C. 350 1 et se q.).

CONTACT

Please di rect any questi ons about thi s matter to the tech nical conta cts listed b elow or to the approp riate Office of N

uclea r Reac tor Regu latio n (NRR) proje ct mana ger./RA/ By Patrick L. Hiland For

/Michael J. Case, Di rector Divi sion of Inspe ction and R egiona l Sup port Office of Nuclear Reacto r Regulation Technical Co ntacts: W illiam Reckley, NRR

Margie Kotzalas, NRR

301-415-1323

301-415-2737 E-mail: wdr@nrc.gov E-mail: mxk5@nrc.gov Attachment: M

arking diagram for documents withhel d under 10 C

FR 2.390 Note: NRC

generic communica tions may b e found on the N

RC publi c Web site, http://www.nrc.gov, under E

lectronic Re ading Room/Docu ment Collecti ons.

Security-Re lated Information Withhold Under 10 CFR 2.390 Subject XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

XXXXXXXXXX

Attachment

RIS-2005-26

Pag e 1 of 1 SUGGESTED MA

RKINGS Withhold From Pub lic Disclosure In Ac cordance With 1

0 CFR 2.390

Over all page marking on the top of all pa ges Ensure Subjec t Line is non-se nsitive Appropriate Controls Access: Need-to-know i n order to perform official licensee functions.

Storage: Openly w ithin li censee facili ties wi th electronic or other acces s controls, for exa mple, key cards , guards, alarms.

Mail: U.S. P ostal Serv ice fir st cla ss mai l, si ngle o paque e nvel ope w ith no markings to indi cate 10 CFR

2.390 contents.

Electronic Tran smission: Over encryp ted phone, facsimi le, computer, if av ailable;otherwise over non-encrypted circuits where recipient will be present to re ceive the transmission.