{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2015 LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2015 LICENSEE:       Pacific Gas and Electric Company FACILITY:       Diablo Canyon Power Plant, Unit Nos. 1 and 2
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Power Plant, Unit Nos. 1 and 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM AT DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME7522 AND ME7523) On August 5, 2015, a Category 1 teleconference public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM AT DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME7522 AND ME7523)
The purpose of the teleconference meeting was to discuss the license amendment request (LAR) submitted by PG&E on October 26, 2011, for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113070457).
On August 5, 2015, a Category 1 teleconference public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference meeting was to discuss the license amendment request (LAR) submitted by PG&E on October 26, 2011, for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113070457). The meeting notice and agenda dated July 21, 2015, are available at ADAMS Accession No. ML15202A083. A list of attendees is provided in Enclosure 1.
The meeting notice and agenda dated July 21, 2015, are available at ADAMS Accession No. ML15202A083.
The teleconference meeting is one in a series of publicly noticed teleconference meetings to be held periodically to discuss issues associated with the NRC staff's LAR review. Preliminary issues that the NRC staff identified during the initial review, and the licensee's responses to these preliminary issues, were discussed during the teleconference meeting. The list of preliminary issues is provided in Enclosure 2.
A list of attendees is provided in Enclosure
Highlights from this meeting include the following:
: 1. The teleconference meeting is one in a series of publicly noticed teleconference meetings to be held periodically to discuss issues associated with the NRC staff's LAR review. Preliminary issues that the NRC staff identified during the initial review, and the licensee's responses to these preliminary issues, were discussed during the teleconference meeting. The list of preliminary issues is provided in Enclosure
: 2. Highlights from this meeting include the following:
* NRC audit regarding this LAR was conducted from June 22-26, 2015, at the Westinghouse facility.
* NRC audit regarding this LAR was conducted from June 22-26, 2015, at the Westinghouse facility.
* The open item summary listing was discussed and the current version is provided with this meeting summary as Enclosure
* The open item summary listing was discussed and the current version is provided with this meeting summary as Enclosure 2. The NRC staff noted that it is still awaiting responses to some items that have been open for an extended period of time. The NRC staff noted that no new issues had been added to the open items list, and that no new items are able to be closed as of the date of the meeting.
: 2. The NRC staff noted that it is still awaiting responses to some items that have been open for an extended period of time. The NRC staff noted that no new issues had been added to the open items list, and that no new items are able to be closed as of the date of the meeting.
* The project plan for the review of the LAR was discussed and the major upcoming milestones were confirmed. The current version is provided with this meeting summary as Enclosure 3.
* The project plan for the review of the LAR was discussed and the major upcoming milestones were confirmed.
The current version is provided with this meeting summary as Enclosure
: 3.
* The NRC staff is planning to go to Advisory Committee on Reactor Safeguards (ACRS) subcommittee with a draft safety evaluation during November 2015.
* The NRC staff is planning to go to Advisory Committee on Reactor Safeguards (ACRS) subcommittee with a draft safety evaluation during November 2015.
* The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015. Two members of the public were in attendance for the teleconference meeting and had no comments.
* The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015.
Further, no public meeting feedback forms were submitted.
Two members of the public were in attendance for the teleconference meeting and had no comments. Further, no public meeting feedback forms were submitted.
Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.
Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.
Docket Nos. 50-275 and 50-323  
                                                    '
                                                ~~~,~~
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Staff Identified Issues That are Open 3. Project Plan cc w/encls: Distribution via Listserv '
: 2. Staff Identified Issues That are Open
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DIGITAL UPGRADE FOR DIABLO CANYON POWER PLANT. UNIT NOS. 1AND2 DOCKET NOS. 50-275 AND 50-323 NAME K. Schrader A. Wilson L. Williams K. Singh K. Durinsky A. Breneman T. Tuite R. Stattel S. Darbali S. Lingam G.Adams D. Pomerening E. Domes G. Clefton M. Lewis D. Gilmore ORGANIZATION Pacific Gas and Electric Pacific Gas and Electric Pacific Gas and Electric Pacific Gas and Electric Westinghouse Westinghouse Westinghouse Nuclear Regulatory Commission (NRC) NRC NRC Southwest Research Institute (SwRI) SwRI SwRI Nuclear Energy Institute Public Member Public Member Enclosure 1
: 3. Project Plan cc w/encls: Distribution via Listserv
ENCLOSURE 2 STAFF IDENTIFIED OPEN ISSUES LISTING PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 August 20, Fi Fi -DCPP PPS Open Item Summary Table Page 1 of 22 No Src/RI Issue Description P&GE response:
 
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 101 RJS Phase 2 Environmental Qualification Documentation:
LIST OF ATTENDEES AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DIGITAL UPGRADE FOR DIABLO CANYON POWER PLANT. UNIT NOS. 1AND2 DOCKET NOS. 50-275 AND 50-323 NAME                             ORGANIZATION K. Schrader                     Pacific Gas and Electric A. Wilson                       Pacific Gas and Electric L. Williams                     Pacific Gas and Electric K. Singh                         Pacific Gas and Electric K. Durinsky                     Westinghouse A. Breneman                     Westinghouse T. Tuite                         Westinghouse R. Stattel                       Nuclear Regulatory Commission (NRC)
Open RAI 61 4/30/14 7/2/2015 During the second ALS audit, Per ISG 6 Section D.5.1, the NRC staff needs to review the information PG&E asked that we consider provided to determine if the PPS equipment has been demonstrated to be def err al of the able to operate within the specified environment.
S. Darbali                       NRC S. Lingam                       NRC G.Adams                         Southwest Research Institute (SwRI)
In order to do this the seismic evaluation staff needs to environmental data for the plant and specifically for the cable until after the SE is spreading room. The ISG 6 matrix (item 2.12) states that this information completed has been provided in the two vendor topical reports; however, these reports do not contain any plant specific data. 12/12/14 Hold OPEN until final The NRC requires plant specific environmental condition data for normal qualification documents are operating conditions and the worst conditions expected during abnormal received.
D. Pomerening                   SwRI E. Domes                         SwRI G. Clefton                       Nuclear Energy Institute M. Lewis                         Public Member D. Gilmore                       Public Member Enclosure 1
and accident conditions where the PPS equipment is expected to perform its safety function.
 
12/11/13-RJS Seismic Reports
ENCLOSURE 2 STAFF IDENTIFIED OPEN ISSUES LISTING PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323
* Range of temperature and humidity conditions that are posted on expected in the cable spreading room. sharepoint.
 
Further plant specific
August 20, 2015A11m1~t Fi ~01 Fi                         DCPP PPS Open Item Summary Table                                             Page 1 of 22
* Seismic data for the Diablo Canyon QBE and SSE information earthquakes including frequencies and acceleration values. including ping tests
                  -
* EMI I RFI data for areas where PPS equipment is to be of PPS cabinets is installed.
No     Src/RI   Issue Description                           P&GE response:                     Status RA/No.     RA/           Comments (Date Sent) Response (Due Date) 101     RJS       Phase 2 Environmental Qualification Documentation:                             Open   RAI 61     4/30/14 7/2/2015 During the second ALS audit, Per ISG 6 Section D.5.1, the NRC staff needs to review the information                                     PG&E asked that we consider provided to determine if the PPS equipment has been demonstrated to be deferral of the able to operate within the specified environment. In order to do this the                                   seismic evaluation staff needs to environmental data for the plant and specifically for the cable                             until after the SE is spreading room. The ISG 6 matrix (item 2.12) states that this information                                   completed has been provided in the two vendor topical reports; however, these reports do not contain any plant specific data.                                                             12/12/14 Hold OPEN until final qualification The NRC requires plant specific environmental condition data for normal documents are operating conditions and the worst conditions expected during abnormal                                     received.
still needed for evaluation.
and accident conditions where the PPS equipment is expected to perform its safety function.                                                                                       12/11/13- RJS Seismic Reports posted on
The FRS section does specify the ranges of temp and humidity but for 11/1/13 -RJS seismic environment, it refers to documents DCM C-17, DCM C-25, DCM Waiting for C-30, DCM C-28, and DCM T-10. additional testing to be completed.
* Range of temperature and humidity conditions that are sharepoint. Further expected in the cable spreading room.
Note: The required information may also be contained in the UFSAR. The staff is reviewing design basis information in the UFSAR, however specific environmental 6/26/2013:
plant specific
during conditions applicable to the PPS equipment remain unclear to the staff. this call the following 3/28/14 Update: clarifications were In-Equipment Response Spectra (IERS): In the seismic test report, it is provided:
* Seismic data for the Diablo Canyon QBE and SSE                                             information earthquakes including frequencies and acceleration values.                                 including ping tests
stated the IERS spectra will change as a result of the equipment August 20, 2015Auoust fi ?01 fi --. ----*v-* --. DCPP PPS Open Item Summary Table Page 2 of 22 No Src/RI Issue Description P&GE response:
* EMI I RFI data for areas where PPS equipment is to be                                       of PPS cabinets is installed.                                                                                 still needed for evaluation.
Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) modifications.
The FRS section does specify the ranges of temp and humidity but for 11/1/13 - RJS seismic environment, it refers to documents DCM C-17, DCM C-25, DCM                                         Waiting for C-30, DCM C-28, and DCM T-10.                                                                               additional testing to be completed.
So far, the evaluation is based on comparing the ALS and -Describe specific Tricon test data (TRS) with the RRS derived from the 140' elevation conditions for the spectra provided in DCM No. C-25. I think that these RRS spectra will be room where the conservative in comparison to the IERS but I will need to confirm this once system will be installed.
Note: The required information may also be contained in the UFSAR. The staff is reviewing design basis information in the UFSAR, however specific environmental                             6/26/2013: during conditions applicable to the PPS equipment remain unclear to the staff.                                     this call the following 3/28/14 Update:                                                                                             clarifications were In-Equipment Response Spectra (IERS): In the seismic test report, it is                                     provided:
I see the revised I ERS. -Is there any restrictive requirement for this room? Electromagnetic  
stated the IERS spectra will change as a result of the equipment
-What is the Was the plant-specific electromagnetic environment confirmed to be similar relationship to that identified in EPRI TR-102323?
 
between the system See follow-up questions and answers in the PG&E response below. specification requirement and environmental conditions?
August 20, -2015Auoust
PG&E Response:
            - . -- --*v-* - fi ?01
PG&E provided seismic information in the document titled 'Westinghouse Seismic Test Report EQLR-2248, Rev. 1" on the Sharepoint on 12/3/13. Additional testing is required for the PPS cabinets to be used. 3/28/14 Update: 1) IEEE 344-1975, Section 3.5.3, states that If equipment damping is not known, a value of 5 percent is recommended.
                                - . fi                    DCPP PPS Open Item Summary Table                                           Page 2 of 22 No     Src/RI       Issue Description                         P&GE response:                   Status RA/ No. RA/           Comments (Date Sent) Response (Due Date) modifications. So far, the evaluation is based on comparing the ALS and                                 - Describe specific Tricon test data (TRS) with the RRS derived from the 140' elevation                                     conditions for the spectra provided in DCM No. C-25. I think that these RRS spectra will be                               room where the system will be conservative in comparison to the IERS but I will need to confirm this once installed.
Therefore use 5% damping. Based on the following criteria:
I see the revised IERS.                                                                                 - Is there any restrictive requirement for this room?
: 2) IEEE 344-1975, Section 6.6.3.1, states that the TRS envelops the RRS over a frequency range which includes all natural frequencies of the equipment up to 33 Hz. The guidance has been more specifically addressed in IEEE 344-1987 (Endorsed by NRC RG 1.100 Rev. 2), Section 7.6.3.1.1 O that it can be shown by a resonance search that no Aug_ust20, 2015/\imw:;t Fi ::>01fi v DCPP PPS Open Item Summary Table Page 3 of 22 No Src/RI Issue Description P&GE response:
Electromagnetic Comgatibilit~                                                                          - What is the Was the plant-specific electromagnetic environment confirmed to be similar                             relationship between the to that identified in EPRI TR-102323?
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) resonance response phenomena exist below 5Hz, it is required to envelop the RRS only down to 3.5 Hz. Excitation must continue to be maintained in the 1 Hz to 3.5 Hz range to the capability of the test facility.
system specification See follow-up questions and answers in the PG&E response below.                                         requirement and environmental conditions?
: 3) According to Draft NTS Report No TR62987-07N-SEI, Revision O (Reference 8.9 of Draft TR ICON v1 O Nuclear Qualification Project , Seismic Test Report 9600164-526, Date 04/13/07)
PG&E Response: PG&E provided seismic information in the document titled 'Westinghouse Seismic Test Report EQLR-2248, Rev. 1" on the Sharepoint on 12/3/13. Additional testing is required for the PPS cabinets to be used.
Section 6.8, Resonance Survey Results shows that the ETP or Chassis has no resonance occurred below 40 Hz. The TRS did not envelop RRS below 3 . Hz meet the above IEEE 344-1975 as well as IEEE 344-1987 criteria.
3/28/14 Update:
: 1) IEEE 344-1975, Section 3.5.3, states that If equipment damping is not known, a value of 5 percent is recommended. Therefore use 5% damping.
Based on the following criteria:
: 2) IEEE 344-1975, Section 6.6.3.1, states that the TRS envelops the RRS over a frequency range which includes all natural frequencies of the equipment up to 33 Hz. The guidance has been more specifically addressed in IEEE 344-1987 (Endorsed by NRC RG 1.100 Rev. 2),
Section 7.6.3.1.1 O that it can be shown by a resonance search that no
 
Aug_ust20, 2015/\imw:;t v
Fi ::>01fi                     DCPP PPS Open Item Summary Table                                     Page 3 of 22 No     Src/RI     Issue Description                         P&GE response:                     Status RA/No.     RA/     Comments (Date Sent) Response (Due Date) resonance response phenomena exist below 5Hz, it is required to envelop the RRS only down to 3.5 Hz. Excitation must continue to be maintained in the 1 Hz to 3.5 Hz range to the capability of the test facility.
: 3) According to Draft NTS Report No TR62987-07N-SEI, Revision O (Reference 8.9 of Draft TR ICON v1 O Nuclear Qualification Project ,
Seismic Test Report 9600164-526, Date 04/13/07) Section 6.8, Resonance Survey Results shows that the ETP or Chassis has no resonance occurred below 40 Hz. The TRS did not envelop RRS below 3                                       .
Hz meet the above IEEE 344-1975 as well as IEEE 344-1987 criteria.
Therefore, Tricon seismic test response are acceptable.
Therefore, Tricon seismic test response are acceptable.
Based on 2) and 3) above, it can be justified that the Tricon test report is acceptable for the qualification of PCS racks. The PCS racks are identical to the PPS racks and are in the same location/elevation.
Based on 2) and 3) above, it can be justified that the Tricon test report is acceptable for the qualification of PCS racks.
Since there are no natural frequencies below 5Hz, you . only need to envelop down to 3.5Hz. The resonance survey showed that the natural frequencies were all greater than 40Hz. So the TRS below 3.5Hz does not matter. Response to follow-up questions:
The PCS racks are identical to the PPS racks and are in the same location/elevation. Since there are no natural frequencies below 5Hz, you
      .
only need to envelop down to 3.5Hz. The resonance survey showed that the natural frequencies were all greater than 40Hz. So the TRS below 3.5Hz does not matter.
Response to follow-up questions:
* Will you be submitting a revised EQLR-2248 with the new IERS or do you plan to submit the IERS information via some other document?
* Will you be submitting a revised EQLR-2248 with the new IERS or do you plan to submit the IERS information via some other document?
No, EQLR-2248 is Westinghouse proprietary.
No, EQLR-2248 is Westinghouse proprietary. We cannot revise their report. We will generate IERS at ALS mounting location to compare with TRS from the EQLR-2248. The new IERS will be documented in the DCPP seismic calculation.
We cannot revise their report. We will generate IERS at ALS mounting location to compare with TRS from the EQLR-2248.
 
The new IERS will be documented in the DCPP seismic calculation.
August 20, 2015A11rn w.t Fi ::>n1 F.
August 20, 2015A11rn w.t Fi ::>n1 F. DCPP PPS Open Item Summary Table Page 4 of 22 No Src/RI Issue Description P&GE response:
                  ~
Status RA/No. RA/ Comments (Date Sent) Response (Due Date)
DCPP PPS Open Item Summary Table                                         Page 4 of 22 No     Src/RI   Issue Description                             P&GE response:                 Status RA/No.     RA/           Comments (Date Sent) Response (Due Date)
* Also, the EQLR-2248 document is specific to the ALS, so will there be a similar seismic test report for the Tricon? Yes, Tricon has seismic test report for ETP and chassis per IEEE 344.
* Also, the EQLR-2248 document is specific to the ALS, so will there be a similar seismic test report for the Tricon?
Yes, Tricon has seismic test report for ETP and chassis per IEEE 344.
* Will there be a different set of IERS for ALS and Tricon or can the same set of spectra be applied to both subsystems?
* Will there be a different set of IERS for ALS and Tricon or can the same set of spectra be applied to both subsystems?
Yes, the ALS and Tricon are mounted in the different PPS racks, the IERS are not the same. Since the ALS and Tricon have different seismic test reports, we will compare the TRS with the IERS separately.
Yes, the ALS and Tricon are mounted in the different PPS racks, the IERS are not the same. Since the ALS and Tricon have different seismic test reports, we will compare the TRS with the IERS separately.
10/14/14 -The ALS Platform EQ report revision, 6002-00200, Revision 4 is on the sharepoint.
10/14/14 - The ALS Platform EQ report revision, 6002-00200, Revision 4 is on the sharepoint. This document is referenced by the PPS specific EQ report (EQ-QR-120-PGE, Revision 0, Diablo Canyon PPS Advanced Logic System and Line Sense Module Equipment Qualification Summary Report) that is also on the sharepoint.
This document is referenced by the PPS specific EQ report (EQ-QR-120-PGE, Revision 0, Diablo Canyon PPS Advanced Logic System and Line Sense Module Equipment Qualification Summary Report) that is also on the sharepoint.
8/5/15 PG&E will 12erform shake tests of the cabinets with egui12ment installed to address this 012en Item. The schedule for tests and re12ort are being develo12ed.
8/5/15 PG&E will 12erform shake tests of the cabinets with egui12ment installed to address this 012en Item. The schedule for tests and re12ort are being develo12ed.
115 RJS Electro Magnetic Compatibility (Tricon):
115     RJS       Electro Magnetic Compatibility (Tricon):                                     Open   RAI 71               3/12/15 Request schedule for Section 4.14 - ASAl-6 of the LAR states that the equipment vendors are                                   submittal of supplemental required to confirm equipment compliance with physical requirements in information.
Open RAI 71 3/12/15 Request schedule for Section 4.14 -ASAl-6 of the LAR states that the equipment vendors are submittal of required to confirm equipment compliance with physical requirements in supplemental the DCPP FRS. These requirements include the EMC requirements from information.
the DCPP FRS. These requirements include the EMC requirements from Section 3.1.6 of the FRS which states: "the PPS shall be qualified by test,                               4/16/14 - RAI will analysis, or a combination thereof, to function without fault or error in an                             be required.
Section 3.1.6 of the FRS which states: "the PPS shall be qualified by test, 4/16/14 -RAI will analysis, or a combination thereof, to function without fault or error in an be required.
electromagnetic environment in accordance with the guidance of Regulatory Guide 1.180."
electromagnetic environment in accordance with the guidance of Regulatory Guide 1.180."
August 20, 2015Auom;t fi '.201 fi DCPP PPS Open Item Summary Table Page 5 of 22 No Src/RI Issue Description P&GE response:
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) In contrast to this, the Tricon V1 O safety evaluation determined that the Tricon V1 O PLC system did not fully meet the guidance of RG 1.180, Revision 1, for conducted or radiated emissions or susceptibility.
As a result, the SE states: "before using the Tricon V1 O system equipment in SR systems in a nuclear power plant, licensees must determine that the plant-specific EMI requirements are enveloped by the capabilities of the Tricon V1 O system as approved in this SE." To complete its safety evaluation, the NRC requires the licensee to provide documentation to show the DCPP specific EMI requirements to be enveloped by the Tricon V10 test levels achieved and documented in the Tricon V1 O safety evaluation.
PG&E Response:
AEIElitieRal eleetFema§Retie eR>rirnRmeRt testiR§ Ras 13eeR 13eFfeFmeEI feF tl:le +FiGeR tl:lat im13Fe 1 Je meetiR§ tl:le BQ §l::liElaRGe.
IRfeFmatieR eR tl:le aEIElitieRal testiR§ aREI e 1 Jal1::1atieR te tl:le req1::1iFomeRts
*.viii 13e s1::18mittoEI.
DetmmiRatieR et tl:lo s1::18mittal Elate is iR J3F9§Fess.
The PG&E Functional Reguirements Sgecification (FRS} (Section 3.1.6.2} reguires the PPS Eguigment to be EMl/RFI gualified in accordance with the guidance in Reg Guide 1.180. The Triconex EMl/RFI test regort 9600164-527 concluded that the TRICON unit under test comglied with the allowable emissions and suscegtibility levels reguired by RG 1.180 with the excegtion of allowable conducted emissions level (MIL-STD-461 E., CE101 and CE102} for low and high freguency conducted emissions on the 120 VAC chassis gower suggly line. In section 7.2.2 of the Triconex test regort, documentation is included for a final CE102 (high freguency}
test gerformed with a Corcom Model 30VSK6 line filter installed.
With the line filter installed the MIL-STD-461-E, CE102 conducted emissions were accegtable.
Therefore, PG&E is including a
AUQ_l.JSt 20, 2015A1 inw;t Fi Fi DCPP PPS Open Item Summary Table Page 6 of 22 No Src/RI Issue Description P&GE response:
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly.
With use of the Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly 1 the high freguency conducted emissions meets the guidance of RG 1.180. RG 1.180 12rovides an exem12tion from CE101 testing if: 1) the 12ower guality reguirements of the egui12ment are consistent with the existing 12ower su1212ly and design 12ractices include 12ower guality controls and, 2) the new egui12ment will not im12ose additional harmonic distortion on the 12ower distribution system exceeding 5% total harmonic distortion or other 12ower guality criteria established with a valid technical basis. The 120 VAC 12ower to the Tricon is to be su1212lied by Class 1 E vital instrument 12ower with a1212ro12riate guality reguirements and design 12ractices in 12lace. Based on testing 12erformed for another similar a1212lication (safety-related auxilia!Y building and fuel handling ventilation control system) at Diablo Canyon, no a1212reciable difference in the harmonic distortion of the instrument AC system was observed before and after the 12ower SUQQlies were installed.
Therefore, the RG 1.180 criteria for exem12tion from CE101 testing are met for the PPS Re12lacement Tricon egui12ment.
119 sd (Audit Item) IOM is using laptops, one per Protection Set plus one backup, Close RAI 72 3/19/15 Hold in 01 each with TriStation 1131 installed, to develop the V1 O Tricon protection list until RAI is sent. set application code for the DCPP PPS Replacement project. PG&E bought these 5 development laptops and IOM will be delivering them to PG&E as part of the Tricon product delivery.
However, during the Invensys audit on June 3-5, 2014, PG&E informed the staff that it does not plan to use these laptops, and only plans use the TriStation installed on the MWS's. Please clarify what PG&E will do with the 5 development laptops once they are delivered to them. Also, please clarify what controls will be placed on the TriStation software installed on these laptop computers.
AUQUSt 20, 2015/\11rn1.::t F. ?01.S '-' -. DCPP PPS Open Item Summary Table Page 7 of 22 No Src/RI Issue Description P&GE response:
Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) PG&E Response:
The PG&E laptops provided for development for the V10 Tricon were not designated as safety related and will not be used by PG&E in the future because they are obsolete.
129 RA ALS Topical Report Addendum:
Open RAI 73 Hold Open for RAI The ALS topical report addendum identifies changes in Category 4 as letter. those modifications that are applicable to the approved ALS topical report. 12/10/14 -The ALS Please describe how these changes affect the DC PPS replacement, in addendum is being particular description and functionality of the Halt mode. withdrawn.
However, PG&E PG&E Response:
Additional information provided by licensee in separate provided document dated 12/11 /14. clarifications about the HALT mode for the ALS system. Therefore, a RAI is necessary.
135 RA ALS Project Organization 3/1 /15: A new The Management Plan (6116-00000, Rev. 6) defines the project revision of the Close Management Plan organization for the DC PPS replacement project. However this plan does will address this not define the role and responsibilities for the PPS Product Manager. This team member is identified in Section 4.1.1 of the Management Plan, as well as in Section 2.1 of the Software Safety Plan (6116-10020).
Please describe the roles and responsibilities for the PPS Product Manager, and his interface/relationship with the Project Manager PG&E Response:
This will be addressed by an update to 6116-00000 (new Revision 7). 


2015 DCPP PPS Open Item Summary Table Page 8 of 22 No Src/RI Issue Description P&GE response:
August 20, 2015Auom;t fi '.201 fi
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 136 RA ALS Management Plan 3/1 /15: A new The Management Plan (6116-00000, Rev. 6), Section 4.1.2, states ALS Gf3eR revision of the close Management Plan personnel required support from Global Instrumentation and Control will address this Production (GICP) to complete the project. Can you please provide information about the support provided by G ICP? PG&E Response:
                ~
This will be addressed by an update to 6116-00000 (new Revision 7). 137 RA ALS Management Plan 3/1 /15: A new The Management Plan (6116-00000, Rev. 6), Section 6.16, describes NA Gf3eR revision of the close Management Plan 4.51 "Fiel Programmable Gate Array Development Procedure" as the will address this procedure used for software development.
DCPP PPS Open Item Summary Table                                           Page 5 of 22 No     Src/RI   Issue Description                               P&GE response:                         Status RA/No.     RA/     Comments (Date Sent) Response (Due Date)
Can you please provide a copy of this procedure in the Sharepoint?
In contrast to this, the Tricon V1 O safety evaluation determined that the Tricon V1 O PLC system did not fully meet the guidance of RG 1.180, Revision 1, for conducted or radiated emissions or susceptibility. As a result, the SE states: "before using the Tricon V1 O system equipment in SR systems in a nuclear power plant, licensees must determine that the plant-specific EMI requirements are enveloped by the capabilities of the Tricon V1 O system as approved in this SE."
PG&E Response:
To complete its safety evaluation, the NRC requires the licensee to provide documentation to show the DCPP specific EMI requirements to be enveloped by the Tricon V10 test levels achieved and documented in the Tricon V1 O safety evaluation.
This will be addressed by an update to 6116-00000 (new Revision 7). 138 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new The Management Plan (6002-00002, Rev. 10), Sections 1.2.5 and 2.1, revision of the close Management Plan states the ALS Project Management Plan will identify the configuration andthe management organizational structure.
PG&E Response: AEIElitieRal eleetFema§Retie eR>rirnRmeRt testiR§ Ras 13eeR 13eFfeFmeEI feF tl:le +FiGeR tl:lat im13Fe1Je meetiR§ tl:le ~G ~. ~ BQ §l::liElaRGe.
However, the ALS Project Configuration Management Plan does not provide this information.
IRfeFmatieR eR tl:le aEIElitieRal testiR§ aREI e1Jal1::1atieR te tl:le PG&~
Furthermore, Section Management Plan 2.2 of the Configuration Management Plan describes allocation for will address this. configuration management activities, but the Project Management Plan This is SE does not define how this is applied to the DC PPS project. reference 72 PG&E Response:
req1::1iFomeRts *.viii 13e s1::18mittoEI. DetmmiRatieR et tl:lo s1::18mittal Elate is iR J3F9§Fess. The PG&E Functional Reguirements Sgecification (FRS}
This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
(Section 3.1.6.2} reguires the PPS Eguigment to be EMl/RFI gualified in accordance with the guidance in Reg Guide 1.180.
August 20, 2015A11m1F>t fi. ::>01 fi ,., DCPP PPS Open Item Summary Table Page 9 of 22 No Src/RI Issue Description P&GE response:
The Triconex EMl/RFI test regort 9600164-527 concluded that the TRICON unit under test comglied with the allowable emissions and suscegtibility levels reguired by RG 1.180 with the excegtion of allowable conducted emissions level (MIL-STD-461 E., CE101 and CE102} for low and high freguency conducted emissions on the 120 VAC chassis gower suggly line.
Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) 140 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new Section 3.1.1 refers to a Document Index (DI). This document is not revision of the close Configuration identified or described in the ALS Management Plan. Please describe how Management Plan the DI is used in conjunction with the configuration items and the will address this Configuration Status Accounting.
In section 7.2.2 of the Triconex test regort, documentation is included for a final CE102 (high freguency} test gerformed with a Corcom Model 30VSK6 line filter installed. With the line filter installed the MIL-STD-461-E, CE102 conducted emissions were accegtable. Therefore, PG&E is including a
This is SE reference 72 PG&E Response:
 
This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002). . 141 RA ALS Configuration Management Plan Gf3eR 3/1/15: A new" Section 3.2.5 described the use of REC to manage requirement changes to close revision of thet'' Configuration.\
AUQ_l.JSt 20, 2015A1 inw;t Fi ~01 Fi
Cls. Please explain the relationship of the REC and the OnTime ticket Management Plan process. will address this, This is SE PG&E Response:
                      ~
This will be addressed by an update to 6116-00000 (new . reference 72 .
DCPP PPS Open Item Summary Table                                            Page 6 of 22 No        Src/RI    Issue Description                          P&GE response:                    Status RA/No.     RA/            Comments (Date Sent) Response (Due Date)
* Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly. With use of the Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly 1 the high freguency conducted emissions meets the guidance of RG 1.180.
142 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new Section 3.2.5 states that the control points for release of Level A, B and C revision of the close Cont ig u ration are described in Section 3.2.2, but the section referenced does not provide Management Plan that information.
RG 1.180 12rovides an exem12tion from CE101 testing if: 1) the 12ower guality reguirements of the egui12ment are consistent with the existing 12ower su1212ly and design 12ractices include 12ower guality controls and, 2) the new egui12ment will not im12ose additional harmonic distortion on the 12ower distribution system exceeding 5% total harmonic distortion or other 12ower guality criteria established with a valid technical basis. The 120 VAC 12ower to the Tricon is to be su1212lied by Class 1 E vital instrument 12ower with a1212ro12riate guality reguirements and design 12ractices in 12lace. Based on testing 12erformed for another similar a1212lication (safety-related auxilia!Y building and fuel handling ventilation control system) at Diablo Canyon, no a1212reciable difference in the harmonic distortion of the instrument AC system was observed before and after the 12ower SUQQlies were installed. Therefore, the RG 1.180 criteria for exem12tion from CE101 testing are met for the PPS Re12lacement Tricon egui12ment.
Please clarify when these points are released will address this. PG&E Response:
119        sd        (Audit Item) IOM is using laptops, one per Protection Set plus one backup,    Close  RAI 72              3/19/15 Hold in 01 each with TriStation 1131 installed, to develop the V1 O Tricon protection                                list until RAI is sent.
This will be addressed by an update to 6116-00000 (new This is SE reference 72 Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
set application code for the DCPP PPS Replacement project. PG&E bought these 5 development laptops and IOM will be delivering them to PG&E as part of the Tricon product delivery. However, during the Invensys audit on June 3-5, 2014, PG&E informed the staff that it does not plan to use these laptops, and only plans use the TriStation installed on the MWS's. Please clarify what PG&E will do with the 5 development laptops once they are delivered to them. Also, please clarify what controls will be placed on the TriStation software installed on these laptop computers.
AuQust 20, 2015/\1irn1Rt Fi :201 Fi _, DCPP PPS Open Item Summary Table Page 10 of 22 No Src/RI Issue Description P&GE response:
 
Status RA/No. RAJ Comments (Date Sent) Response (Due Date) 143 RA ALS Configuration Management Plan GJ3eR 3/1 /15: A new Section 3.6 describes control of subcontractors and vendors. This section close revision of the Configuration refers to the ALS management plan for further description of integration Management Plan and sightseeing of activities conducted by subcontractors and vendors. will address this. However, the Management Plan does not provide any information about This is SE control of subcontractors and vendors. reference 72 ' Furthermore, Section 4.1.2 identifies Global Instrumentation and Control Production as a provider for this project. This section does not describe how WEC will manage and integrate the work performed by GICP. Please provide this information.
AUQUSt 20, 2015/\11rn1.::t
PG&E Response:
                    '-'
This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
F. . ?01.S
144 Rjs/ga Environmental qualification:
                          -                            DCPP PPS Open Item Summary Table                                          Page 7 of 22 No      Src/RI      Issue Description                          P&GE response:                  Status RA/ No. RA/            Comments (Date Sent) Response (Due Date)
EMl/RFI Open Added 01 on Clarify if CD-ER 993754-30 demonstrates Triconex components comply 3/18/15 with RG 1.180 conducted emissions levels for CE101 and CE102 testing. Basis: Project Traceability Matrix (Document No. 993754-1-804)
PG&E Response: The PG&E laptops provided for development for the V10 Tricon were not designated as safety related and will not be used by PG&E in the future because they are obsolete.
Item 445 identifies CD-ER 993754-30 with regard to 120VAC power module exceeding allowable levels specified in RG 1.180. This line item refers to qualified AC power line filters provided.
129    RA          ALS Topical Report Addendum:                                                Open  RAI 73              Hold Open for RAI letter.
PG&E Response:
The ALS topical report addendum identifies changes in Category 4 as those modifications that are applicable to the approved ALS topical report.                            12/10/14 - The ALS Please describe how these changes affect the DC PPS replacement, in                                    addendum is being particular description and functionality of the Halt mode.                                             withdrawn.
In progress.
However, PG&E PG&E Response: Additional information provided by licensee in separate                                provided document dated 12/11 /14.                                                                              clarifications about the HALT mode for the ALS system.
Aug_ust 20, F. ?01.S DCPP PPS Open Item Summary Table No 145 Src/RI I Issue Description P&GE response:
Therefore, a RAI is necessary.
Status I RA/ No. I RA/ RA Remaining Document Submittals Next Supplement: (to include) * *
135    RA          ALS Project Organization                                                                                3/1 /15: A new
* Removal of Printers from system Response to ALS ASAl's T.S. Implementation Commitment PG&E Documents:
                                                                                                ~                          revision of the The Management Plan (6116-00000, Rev. 6) defines the project                Close                      Management Plan organization for the DC PPS replacement project. However this plan does                                will address this not define the role and responsibilities for the PPS Product Manager. This team member is identified in Section 4.1.1 of the Management Plan, as well as in Section 2.1 of the Software Safety Plan (6116-10020). Please describe the roles and responsibilities for the PPS Product Manager, and his interface/relationship with the Project Manager PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).
DCPP Seismic Calculation I IERS (See 01101) (Ref. 166 no docket) Interface Requirements Specification (Current docketed revision is 7) (Reference
 
: 67) Functional Requirements Specification (Current docketed revision is 7) (Reference
Auqu~20, 2015Auau~5.
: 68) (Date Sent) Response (Due Date) Controller Transfer Functions Design Input Specification (Current docketed revision is 1) (Reference 208) PG&E Failure Modes and Effects Analysis (FMEA) (No reference yet) Licensee Scope Requirements Traceability Matrix (ATM) (No reference yet) ALS Documents:
              ~
The following documents were identified in ISG-06 matrix as part of Phases 1 and 2 submittals for the Diablo Canyon LAA. Several of these documents have been submitted but have been superseded.
2015                      DCPP PPS Open Item Summary Table                                        Page 8 of 22 No    Src/RI  Issue Description                        P&GE response:                Status RA/No.     RA/            Comments (Date Sent) Response (Due Date) 136  RA      ALS Management Plan                                                                                  3/1 /15: A new Gf3eR                      revision of the The Management Plan (6116-00000, Rev. 6), Section 4.1.2, states ALS      close                      Management Plan personnel required support from Global Instrumentation and Control                                  will address this Production (GICP) to complete the project. Can you please provide information about the support provided by G ICP?
Please docket the latest revision of the following documents:
PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).
6116-10020, "Diablo Canyon PPS Software Safety Plan" (Ref. 182) 6116-00003, "Diablo Canyon PPS VV Plan" (Ref. 91) 6116-00000, "Diablo Canyon Management Plan" (Ref. 72) 6116-00005, "Diablo Canyon PPS System Test Plan" (Ref. 93) 6116 70140, "PPS /\LS Test Design SpeGifisation" (NR) 6116-70030. "Diablo Canyon PPS System Design Specification" Page 11 of 22 Comments 7/10/1 -Added new documents identified during second ALS audit to be docketed.
137  RA      ALS Management Plan                                                                                  3/1 /15: A new Gf3eR                      revision of the The Management Plan (6116-00000, Rev. 6), Section 6.16, describes NA    close                      Management Plan 4.51 "Fiel Programmable Gate Array Development Procedure" as the                                    will address this procedure used for software development. Can you please provide a copy of this procedure in the Sharepoint?
DCL-15-072 Is being processed in byNRC 6/16/15 Added 6116-00204 EQ Evaluation to list. Added 01 on 3/18/15 
PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).
138  RA      ALS Configuration Management Plan                                        Gf3eR                      3/1 /15: A new revision of the The Management Plan (6002-00002, Rev. 10), Sections 1.2.5 and 2.1,      close                      Management Plan states the ALS Project Management Plan will identify the configuration                              andthe management organizational structure. However, the ALS Project                                        Configuration Management Plan does not provide this information. Furthermore, Section                              Management Plan 2.2 of the Configuration Management Plan describes allocation for                                    will address this.
configuration management activities, but the Project Management Plan                                This is SE reference 72 does not define how this is applied to the DC PPS project.
PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
 
August 20, 2015A11m1F>t
                  ,.,   fi. ::>01 fi                  DCPP PPS Open Item Summary Table                                            Page 9 of 22 No      Src/RI      Issue Description                          P&GE response:                    Status RA/ No. RA/            Comments (Date Sent) Response (Due Date) 140    RA        ALS Configuration Management Plan                                            Gf3eR                      3/1 /15: A new revision of the Section 3.1.1 refers to a Document Index (DI). This document is not          close                      Configuration identified or described in the ALS Management Plan. Please describe how                                  Management Plan the DI is used in conjunction with the configuration items and the                                        will address this Configuration Status Accounting.                                                                          This is SE reference 72 PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).                                                  .~.'
141    RA          ALS Configuration Management Plan                                            Gf3eR                      3/1/15: A new" close                      revision of thet''
Section 3.2.5 described the use of REC to manage requirement changes to                                  Configuration.\
Cls. Please explain the relationship of the REC and the OnTime ticket                                    Management Plan process.                                                                                                will address this, PG&E Response: This will be addressed by an update to 6116-00000 (new This is SE reference 72 . *
                                                                                                                                                    .
Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
142    RA          ALS Configuration Management Plan                                            Gf3eR                      3/1 /15: A new revision of the Section 3.2.5 states that the control points for release of Level A, B and C close                      Cont ig u ration are described in Section 3.2.2, but the section referenced does not provide                              Management Plan that information. Please clarify when these points are released                                          will address this.
This is SE PG&E Response: This will be addressed by an update to 6116-00000 (new                                    reference 72 Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).


2015A11rn Fi ?01 Fi DCPP PPS Open Item Summary Table No I Src/RI I Issue Description P&GE response:
AuQust 20, 2015/\1irn1Rt
I Status I RAI No. I RAI (Date Sent) Response (Due Date) 6116-10216, "Diablo Canyon PPS VV Simulation Environment Specification" (Ref. 205) DCL-15-009 6116-00100, ''TxB1 and TxB2 Communications Protocol Specification" (NR) 6116-00054, "Diablo Canyon PPS ISG04 Matrix" (NR) 6116-00204, "Diablo Canyon PPS ALS Subsystem Equipment Qualification Evaluation" (Ref. 225) 6116-00011, "ALS System Design Specification" (Docketed version is 1) (Ref. 112) 6116-00400. "ALS Configuration Management Report" 6116-00401, "ALS Configuration Management Baseline Report" ALS Platform Documents 6002-00002, "ALS Configuration Management Plan" (Ref. 70) 6002-00006, "ALS Security Plan" Rev. 3 llifil_(Rev.
_,    Fi :201 Fi                     DCPP PPS Open Item Summary Table ~
1 is docketed ML13036A380) 6002-00030, "ALS Design Tools" Rev. 12 (Ref. 150 Rev. 9) Tricon Documents:
Page 10 of 22 No     Src/RI     Issue Description                         P&GE response:                 Status RA/No.     RAJ            Comments (Date Sent) Response (Due Date) 143    RA          ALS Configuration Management Plan                                          GJ3eR                      3/1 /15: A new close                      revision of the Section 3.6 describes control of subcontractors and vendors. This section                              Configuration refers to the ALS management plan for further description of integration                              Management Plan and sightseeing of activities conducted by subcontractors and vendors.                                will address this.
993754-11-854-1 Revision 1 Protection Set I Factory Acceptance Report (filled out test paperwork does not need to be included) (Reference 192) 993754-11-854-0 Revision 1 Protection Set I HVT Report (Reference 188) 993754-11-861 Revision 2 VnV Design Phase Summary Report PPS I (Reference 179) 993754-11-862 Revision 1 VnV Implementation Phase Summary Report PPS I (Reference 180) 993754-11-818 Revision O Protection Set I System Time Response Confirmation Report (Reference 196) 993754-12-818 Revision O Protection Set II System Time Response Confirmation Report (Reference 197) 993754-12-854-0 Revision O Protection Set II HVT Report (Refeence 189) 993754-12-854-1 Revision O Protection Set II Factory Acceptance Report (Reference 193) Page 12 of 22 Comments Auqust 20, Fi ?01Fi DCPP PPS Open Item Summary Table No Src/RI I Issue Description P&GE response:
However, the Management Plan does not provide any information about                                    This is SE control of subcontractors and vendors.                                                                reference 72
Status I RAJ No. I RAJ (Date Sent) Response 993754-12-862 Revision O VnV Implementation Phase Summary Report PPS II-IV (Reference 202) (Due Date) 993754-13-818 Revision O Protection Set Ill System Time Response Confirmation Report (Reference 198) 993754-13-854-0 Revision O Protection Set Ill HVT Report (Reference 190) 993754-13-854-1 Revision O Protection Set Ill Factory Acceptance Report (Reference 194) 993754-14-818 Revision O Protection Set IV System Time Response Confirmation Report (Reference 199) 993754-14-854-0 Revision O Protection Set IV HVT Report (Reference 191) 993754-14-854-1 Revision O Protection Set IV Factory Acceptance Report (Reference 195) 993754-1-915 Revision 9 Safety Analysis (Reference 200 PG&E Response:
                                                                                                                                            '
The ALS documents have been uploaded to the Share Point Site and will all be docketed, except for the NA 4.50 and NA 4.51 procedures which are quality assurance procedures that are part of the Westinghouse Quality Management System (QMS) and can be made available for audit purposes. (Staff agrees that these two documents can be removed from docketing list) Page 13 of 22 Comments 146 I Rjs/ga I Environmental Qualification:
Furthermore, Section 4.1.2 identifies Global Instrumentation and Control Production as a provider for this project. This section does not describe how WEC will manage and integrate the work performed by GICP.
I Open I RAI 7 4 I I 6/16/15 -The EQ 147 In the response to 01 94 (ASAl-04), PG&E referred to document 6116-00204, Revision 1, "ALS Subsystem Equipment Qualification Evaluation." The NRC staff needs to review this document.
Please provide this information.
Please place on sharepoint or provide on docket. PG&E Response:
PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).
6116-00204-R1 was placed on the Sharepoint site in the ALS directory on 4/14/15. Rjs/ga \ Environmental Qualification:
144    Rjs/ga      Environmental qualification: EMl/RFI                                      Open                        Added 01 on 3/18/15 Clarify if CD-ER 993754-30 demonstrates Triconex components comply with RG 1.180 conducted emissions levels for CE101 and CE102 testing.
Temperature and Humidity Clarify if FAS Section 3.1.4.1 specifies the temperature and relative humidity worst case conditions expected in the cable spreading room (i.e., mild environment) for normal, abnormal, and accident conditions.
Basis:
Open evaluation document will need to be submitted on docket as a basis for our EQ SE safety conclusions. (Added to 01 145) Added on 4/8/15 Added on 4/8/15 Aug_u_$L20, 2015A11niwt Fo ?01Fo " DCPP PPS Open Item Summary Table Page 14 of 22 No Src/RI Issue Description P&GE response:
Project Traceability Matrix (Document No. 993754-1-804) Item 445 identifies CD-ER 993754-30 with regard to 120VAC power module exceeding allowable levels specified in RG 1.180. This line item refers to qualified AC power line filters provided.
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) Has an evaluation been performed for the plant-specific configuration of Tricon and ALS components to determine:
PG&E Response: In progress.
: a. Maximum temperature rise in each cabinet, b. Maximum ambient temperature in the cable spreading room, and c. Design basis temperature margin has not been affected?
 
The licensee has specified a broader range of relative humidity than the qualified and tested range for the ALS and Tricon platforms.
Aug_ust 20, 2015"11r111~t F. ?01.S                        DCPP PPS Open Item Summary Table                                            Page 11 of 22 No      Src/RI I Issue Description                            P&GE response:                    Status    I RA/ No. I RA/            Comments (Date Sent) Response (Due Date) 145      RA        Remaining Document Submittals                                                                                7/10/1 - Added new documents identified during Next Supplement: (to include)                                                                                 second ALS audit to be docketed.
Clarify how the use of the ALS and Tricon subsystems is acceptable for the broader range of 0% to 95% RH specified in the FRS Section 3.1.4.1.2 when subsystems were to a narrower range. Provide DCM T-20, Environmental Qualification including Appendix A titled "Environmental Conditions for EQ of Electric Equipment." This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments.
* Removal of Printers from system
This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments PG&E Response.
* Response to ALS ASAl's                                                                        DCL-15-072 Is being processed in
DCM T-20 has been put on the sharepoint site in the DCM directory.
* T.S. Implementation Commitment byNRC 6/16/15 Added PG&E Documents:                                                                                              6116-00204 EQ DCPP Seismic Calculation I IERS (See 01101) (Ref. 166 no docket)                                              Evaluation to list.
It lists CSR Normal Operation humidity level range as 20% to 90% on page 31 in Table A4.2-1. It also seems to list the same area humidity range as 0% to 95% on page 32 and this includes a note identifying a basis for this range and states it is an abnormal, non-condensing relative humidity specification.
Interface Requirements Specification (Current docketed revision is 7) (Reference 67)                         Added 01 on 3/18/15 Functional Requirements Specification (Current docketed revision is 7) (Reference 68)
8/5/15 ALS Humidity Tests. Additional information on humidity testing has been added to SOS, 6116-00011, Revision 8. The methodology to gerform the humiditv environmental testina is contained in WCAP-8587-<NP)
Controller Transfer Functions Design Input Specification (Current docketed revision is 1) (Reference 208)
Rev.
PG&E Failure Modes and Effects Analysis (FMEA) (No reference yet)
AuqusJ20, 2015A11rn1gt n ?01n DCPP PPS Open Item Summary Table Page 15 of 22 -No Src/RI Issue Description P&GE response:
Licensee Scope Requirements Traceability Matrix (ATM) (No reference yet)
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 6-A, "Methodology for Qualifying Westinghouse WRD (Water Reactor Division}
ALS Documents:
Su1212lied NSSS Safety Related Electrical Egui12ment 1" Westinghouse Electric Com[2any LLC, and justifies the 0% to 95% relative humidity levels based on test levels of 35% to 95% relative humidity.
The following documents were identified in ISG-06 matrix as part of Phases 1 and 2 submittals for the Diablo Canyon LAA. Several of these documents have been submitted but have been superseded. Please docket the latest revision of the following documents:
The low humidity is not an environmental failure mechanism for electronic egui12ment, and, therefore, all humidity conditions below 35% (0-35% relative humidity}
6116-10020, "Diablo Canyon PPS Software Safety Plan" (Ref. 182) 6116-00003, "Diablo Canyon PPS VV Plan" (Ref. 91) 6116-00000, "Diablo Canyon Management Plan" (Ref. 72) 6116-00005, "Diablo Canyon PPS System Test Plan" (Ref. 93) 6116 70140, "PPS /\LS Test Design SpeGifisation" (NR) 6116-70030. "Diablo Canyon PPS System Design Specification"
are envelo12ed by the more conservative humidity levels included in the test. The only failure mechanism associated with low humidity is electrostatic discharge
 
[ESD], which is addressed by item R161 O of the SOS, 6116-00011.
Auqu~L20, 2015A11rn 1~t Fi ?01 Fi                DCPP PPS Open Item Summary Table                                            Page 12 of 22 No    I Src/RI I Issue Description                      P&GE response:                    I Status I RAI No. I RAI          Comments (Date Sent) Response (Due Date) 6116-10216, "Diablo Canyon PPS VV Simulation Environment Specification" (Ref. 205) DCL-15-009 6116-00100, ''TxB1 and TxB2 Communications Protocol Specification" (NR) 6116-00054, "Diablo Canyon PPS ISG04 Matrix" (NR) 6116-00204, "Diablo Canyon PPS ALS Subsystem Equipment Qualification Evaluation" (Ref. 225) 6116-00011, "ALS System Design Specification" (Docketed version is 1) (Ref. 112) 6116-00400. "ALS Configuration Management Report" 6116-00401, "ALS Configuration Management Baseline Report" ALS Platform Documents 6002-00002, "ALS Configuration Management Plan" (Ref. 70) 6002-00006, "ALS Security Plan" Rev. 3 llifil_(Rev. 1 is docketed ML13036A380) 6002-00030, "ALS Design Tools" Rev. 12 (Ref. 150 Rev. 9)
Tricon Documents:
993754-11-854-1 Revision 1 Protection Set I Factory Acceptance Report (filled out test paperwork does not need to be included) (Reference 192) 993754-11-854-0 Revision 1 Protection Set I HVT Report (Reference 188) 993754-11-861 Revision 2 VnV Design Phase Summary Report PPS I (Reference 179) 993754-11-862 Revision 1 VnV Implementation Phase Summary Report PPS I (Reference 180) 993754-11-818 Revision O Protection Set I System Time Response Confirmation Report (Reference 196) 993754-12-818 Revision O Protection Set II System Time Response Confirmation Report (Reference 197) 993754-12-854-0 Revision O Protection Set II HVT Report (Refeence 189) 993754-12-854-1 Revision O Protection Set II Factory Acceptance Report (Reference 193)
 
Auqust 20, 2015A11rn1~t Fi ?01Fi                        DCPP PPS Open Item Summary Table                                                Page 13 of 22 No      Src/RI I Issue Description                          P&GE response:                    Status I RAJ No. I RAJ            Comments (Date Sent)  Response (Due Date) 993754-12-862 Revision O VnV Implementation Phase Summary Report PPS II-IV (Reference 202) 993754-13-818 Revision O Protection Set Ill System Time Response Confirmation Report (Reference 198) 993754-13-854-0 Revision O Protection Set Ill HVT Report (Reference 190) 993754-13-854-1 Revision O Protection Set Ill Factory Acceptance Report (Reference 194) 993754-14-818 Revision O Protection Set IV System Time Response Confirmation Report (Reference 199) 993754-14-854-0 Revision O Protection Set IV HVT Report (Reference 191) 993754-14-854-1 Revision O Protection Set IV Factory Acceptance Report (Reference 195) 993754-1-915 Revision 9 Safety Analysis (Reference 200 PG&E Response: The ALS documents have been uploaded to the Share Point Site and will all be docketed, except for the NA 4.50 and NA 4.51 procedures which are quality assurance procedures that are part of the Westinghouse Quality Management System (QMS) and can be made available for audit purposes. (Staff agrees that these two documents can be removed from docketing list) 146    I Rjs/ga I Environmental Qualification:                                                I Open   I RAI 7 4    I          I 6/16/15 - The EQ evaluation In the response to 01 94 (ASAl-04), PG&E referred to document 6116-                                        document will need 00204, Revision 1, "ALS Subsystem Equipment Qualification                                                  to be submitted on Evaluation." The NRC staff needs to review this document. Please                                            docket as a basis place on sharepoint or provide on docket.                                                                  for our EQ SE safety conclusions.
PG&E Response: 6116-00204-R1 was placed on the Sharepoint site in the                                          (Added to 01 145)
ALS directory on 4/14/15.
Added on 4/8/15 147      Rjs/ga  \ Environmental Qualification: Temperature and Humidity                        Open                              Added on 4/8/15 Clarify if FAS Section 3.1.4.1 specifies the temperature and relative humidity worst case conditions expected in the cable spreading room (i.e., mild environment) for normal, abnormal, and accident conditions.
 
Aug_u_$L20, 2015A11niwt Fo ?01Fo                        DCPP PPS Open Item Summary Table                                    Page 14 of 22
                  "
No      Src/RI    Issue Description                          P&GE response:                    Status RA/No.      RA/      Comments (Date Sent) Response (Due Date)
Has an evaluation been performed for the plant-specific configuration of Tricon and ALS components to determine:
: a. Maximum temperature rise in each cabinet,
: b. Maximum ambient temperature in the cable spreading room, and
: c. Design basis temperature margin has not been affected?
The licensee has specified a broader range of relative humidity than the qualified and tested range for the ALS and Tricon platforms. Clarify how the use of the ALS and Tricon subsystems is acceptable for the broader range of 0% to 95% RH specified in the FRS Section 3.1.4.1.2 when subsystems were ~ested to a narrower range.
Provide DCM T-20, Environmental Qualification including Appendix A titled "Environmental Conditions for EQ of Electric Equipment." This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments. This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments PG&E Response. DCM T-20 has been put on the sharepoint site in the DCM directory. It lists CSR Normal Operation humidity level range as 20%
to 90% on page 31 in Table A4.2-1. It also seems to list the same area humidity range as 0% to 95% on page 32 and this includes a note identifying a basis for this range and states it is an abnormal, non-condensing relative humidity specification.
8/5/15 ALS Humidity Tests. Additional information on humidity testing has been added to SOS, 6116-00011, Revision 8. The methodology to gerform the humiditv environmental testina is contained in WCAP-8587-<NP) Rev.
 
AuqusJ20, 2015A11rn1gt n ?01n
                ~
DCPP PPS Open Item Summary        -
Table                            Page 15 of 22 No    Src/RI    Issue Description                            P&GE response:                    Status RA/No.      RA/      Comments (Date Sent) Response (Due Date) 6-A, "Methodology for Qualifying Westinghouse WRD (Water Reactor Division} Su1212lied NSSS Safety Related Electrical Egui12ment 1" Westinghouse Electric Com[2any LLC, and justifies the 0% to 95% relative humidity levels based on test levels of 35% to 95% relative humidity. The low humidity is not an environmental failure mechanism for electronic egui12ment, and, therefore, all humidity conditions below 35% (0-35%
relative humidity} are envelo12ed by the more conservative humidity levels included in the test. The only failure mechanism associated with low humidity is electrostatic discharge [ESD], which is addressed by item R161 O of the SOS, 6116-00011.
ALS Tem12erature Test: Testing was 12erformed to envelo12e a tem12erature range of 40-140&deg;F 1 consistent with the ALS 12latform reguirements.
ALS Tem12erature Test: Testing was 12erformed to envelo12e a tem12erature range of 40-140&deg;F 1 consistent with the ALS 12latform reguirements.
The tem12erature in the cable s12reading room is monitored and controlled to 103 degrees F (101 degree set12oint with 2 degrees allowed for instrument uncertainty}
The tem12erature in the cable s12reading room is monitored and controlled to 103 degrees F (101 degree set12oint with 2 degrees allowed for instrument uncertainty} by Egui12ment Control Guideline 23.1, "Area Tem12erature Monitoring." If the tem12erature exceeds 103, actions are reguired to restore the tem12erature to less than 103 degrees F in 4 hours, or 012en the cabinet doors and verify tem12erature less than 119 degrees, or 12erform an evaluation of 012erability, or to declare the egui12ment in the cabinet ino12erable.
by Egui12ment Control Guideline 23.1, "Area Tem12erature Monitoring." If the tem12erature exceeds 103, actions are reguired to restore the tem12erature to less than 103 degrees F in 4 hours, or 012en the cabinet doors and verify tem12erature less than 119 degrees, or 12erform an evaluation of 012erability, or to declare the egui12ment in the cabinet ino12erable.
The humidity in the cable s12reading room is monitored and controlled to less than 90% relative humidity. If 90% relative humidity is exceeded, 12rocedural actions reguire restoration of the humidity to within limits.
The humidity in the cable s12reading room is monitored and controlled to less than 90% relative humidity.
Procedure OP H-10:1V, "Combating High Humidity Inside the CSR" 12rovides guidance to restore humidity to within limits.
If 90% relative humidity is exceeded, 12rocedural actions reguire restoration of the humidity to within limits. Procedure OP H-10:1V, "Combating High Humidity Inside the CSR" 12rovides guidance to restore humidity to within limits. PG&E will 12erform a calculation of the maximum tem12erature rise in the cabinets with egui12ment installed to address this 012en Item. The schedule for calculation is being develo12ed.  
PG&E will 12erform a calculation of the maximum tem12erature rise in the cabinets with egui12ment installed to address this 012en Item. The schedule for calculation is being develo12ed.
-
                  -
AuQust 20, fi ?01 fi DCPP PPS Open Item Summary Table Page 16 of 22 No Src/RI Issue Description P&GE response:
 
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 148 Rjs/ga Environmental Qualification:
AuQust 20, 2015/\.11rn1~t fi ?01 fi
EMl/RFI Open Added on 4/8/15 1. Clarify if EMl/RFI levels in the cable spreading room are within the tested operating envelopes for Tricon and ALS components.
                    ~
Was the plant-specific electromagnetic environment confirmed to be similar to that identified in EPRI TR-102323?
DCPP PPS Open Item Summary Table                                       Page 16 of 22 No     Src/RI     Issue Description                           P&GE response:                     Status RA/No.     RA/         Comments (Date Sent) Response (Due Date) 148     Rjs/ga     Environmental Qualification: EMl/RFI                                           Open                       Added on 4/8/15
Note: This is a follow-up to 01 101 which also asks for plant specific environmental conditions.
: 1. Clarify if EMl/RFI levels in the cable spreading room are within the tested operating envelopes for Tricon and ALS components. Was the plant-specific electromagnetic environment confirmed to be similar to that identified in EPRI TR-102323? Note: This is a follow-up to 01 101 which also asks for plant specific environmental conditions.
: 2. Clarify how EMC requirements are met with regard to power sources including those cases where the plant-specific system differs from the Tricon and ALS tested subsystems.
: 2. Clarify how EMC requirements are met with regard to power sources including those cases where the plant-specific system differs from the Tricon and ALS tested subsystems.
: a. Clarify how the PPS AC and DC power sources are deployed to accomplish the isolation features that can affect EMl/RFI test results. b. Clarify how the PPS AC and DC power sources have been qualified for EMC. c. Clarify how the installation limitation for the safety power supply is met as described in Section 7.2 of the ALS Platform EQ Summary Report. 3. Identify the qualification test documentation for the rack power supplies specified in Section 4.6.3 of the LAR (Ancillary Safety-Related Equipment Utilized in the PPS Replacement Project) to show testing was done in accordance with EPRI TR-107330 and RG 1.180.
: a. Clarify how the PPS AC and DC power sources are deployed to accomplish the isolation features that can affect EMl/RFI test results.
AuQust 20, Fi ?01 Fi DCPP PPS Open Item Summary Table Page 17 of 22 No Src/RI Issue Description P&GE response:
: b. Clarify how the PPS AC and DC power sources have been qualified for EMC.
Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) 4. For the ALS subsystem components, identify the LAR section and supporting documentation that explains how the plant design basis criteria for PPS power quality are maintained to meet the requirements for exemption to CE101 testing. PG&E Response.
: c. Clarify how the installation limitation for the safety power supply is met as described in Section 7.2 of the ALS Platform EQ Summary Report.
PG&E to discuss with staff if EMl/RFI testing done in 1990s for Eagle-21 installation (re12ort submitted to NRG) can be credited.
: 3. Identify the qualification test documentation for the rack power supplies specified in Section 4.6.3 of the LAR (Ancillary Safety-Related Equipment Utilized in the PPS Replacement Project) to show testing was done in accordance with EPRI TR-107330 and RG 1.180.
 
AuQust 20, 2015/\iJmJ~t Fi ?01 Fi
                  ~
DCPP PPS Open Item Summary Table                                       Page 17 of 22 No     Src/RI     Issue Description                           P&GE response:                   Status RA/ No. RA/         Comments (Date Sent) Response (Due Date)
: 4. For the ALS subsystem components, identify the LAR section and supporting documentation that explains how the plant design basis criteria for PPS power quality are maintained to meet the requirements for exemption to CE101 testing.
PG&E Response. PG&E to discuss with staff if EMl/RFI testing done in 1990s for Eagle-21 installation (re12ort submitted to NRG) can be credited.
IA PF9&sect;Fess.
IA PF9&sect;Fess.
149 Rjs/ga Environmental Qualification:
149     Rjs/ga     Environmental Qualification: Seismic                                         Open                       Added on 4/8/15
Seismic Open Added on 4/8/15 1. Provide the response spectra for Attachments C and H to DCM C-17 a. The contents for Attachment H to DCM C-17 reference several response spectra that are not included in the document.
: 1. Provide the response spectra for Attachments C and H to DCM C-17
In particular, horizontal and torsional spectra are identified in the contents of the document but were not actually shown as figures in the document.
: a. The contents for Attachment H to DCM C-17 reference several response spectra that are not included in the document. In particular, horizontal and torsional spectra are identified in the contents of the document but were not actually shown as figures in the document.
: b. DCM C-17 also includes ground response spectra for the Auxiliary Building in Attachment C. 2. Provide supporting documentation to show how the DCM C-17 and DCM C-25 node-specific floor response spectra were used to develop the IERS for both Tricon and ALS subsystems.
: b. DCM C-17 also includes ground response spectra for the Auxiliary Building in Attachment C.
For the ALS subsystem, provide SAP No 9000040848-000-00 (Legacy Cale No. IS-0228) which is referenced in the Review of EQLR-2248.
: 2. Provide supporting documentation to show how the DCM C-17 and DCM C-25 node-specific floor response spectra were used to develop the IERS for both Tricon and ALS subsystems. For the ALS subsystem, provide SAP No 9000040848-000-00 (Legacy Cale No. IS-0228) which is referenced in the Review of EQLR-2248.
Auqust 20, 2015/\11rnwt Fi ?n1s DCPP PPS Open Item Summary Table Page 18 of 22 No Src/RI Issue Description P&GE response:
 
Status RAI No. RAI Comments (Date Sent) Response (Due Date) a. DCM C-25 provides node-specific response spectra for Node #2 at the 140' elevation
Auqust 20, 2015/\11rnwt Fi ?n1s
                  ~
DCPP PPS Open Item Summary Table                                   Page 18 of 22 No     Src/RI     Issue Description                         P&GE response:                   Status RAI No. RAI     Comments (Date Sent) Response (Due Date)
: a. DCM C-25 provides node-specific response spectra for Node #2 at the 140' elevation
: b. DCM C-17 provides node-specific response spectra in attachment H at the 128' and 140' elevations
: b. DCM C-17 provides node-specific response spectra in attachment H at the 128' and 140' elevations
: c. The review of EQLR-2248, Revision 1 shows IERS for the OBEA/SSEA and OBEB/SSEB versus the RRS for the ALS subsystem.
: c. The review of EQLR-2248, Revision 1 shows IERS for the OBEA/SSEA and OBEB/SSEB versus the RRS for the ALS subsystem.
: d. No documentation was found showing the development of the IERS from the node -specific floor response spectra. 3. Provide DCM T-24 for the seismic qualification of plant instrumentation and controls.
: d. No documentation was found showing the development of the IERS from the node -specific floor response spectra.
DCM T-24 is referenced by DCM T-1 O is identified in FRS Section 3.1.5.2. Clarify what category the ALS and Tricon subsystems fall under in DCM T-24 and how they meet the specific seismic qualification requirements in DCM T-24. 4. Provide documentation to clarify what Phase A and Phase B RRS are representing for the ALS subsystem.
: 3. Provide DCM T-24 for the seismic qualification of plant instrumentation and controls. DCM T-24 is referenced by DCM T-1O is identified in FRS Section 3.1.5.2. Clarify what category the ALS and Tricon subsystems fall under in DCM T-24 and how they meet the specific seismic qualification requirements in DCM T-24.
From the information we have reviewed, it is not clear how Figures 5-1 and 5-2 in the ALS EQ Plan were developed.
: 4. Provide documentation to clarify what Phase A and Phase B RRS are representing for the ALS subsystem. From the information we have reviewed, it is not clear how Figures 5-1 and 5-2 in the ALS EQ Plan were developed. For example, were they developed from the information in DCM C-17 and DCM C-25 or were they developed from some other basis?
For example, were they developed from the information in DCM C-17 and DCM C-25 or were they developed from some other basis? 5. Clarify the following information from the Seismic Test Report (Document No. 9600164-526) because this report only provides a discussion of results. a. Provide comparison plots of the TRS and RRS to show the RRS levels were enveloped.
: 5. Clarify the following information from the Seismic Test Report (Document No. 9600164-526) because this report only provides a discussion of results.
: b. Clarify the resonance search results. The executive summary states that there were no resonances below 100 AuQU$1_20, 2015" 11rn wt Fi ?01 Fi DCPP PPS Open Item Summary Table Page 19 of 22 No Src/RI Issue Description P&GE response:
: a. Provide comparison plots of the TRS and RRS to show the RRS levels were enveloped.
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) Hz. Section 7.3 states that there was amplification between 20 and 70 Hz up to about 20 times. c. Provide data to show statistical independence and stationarity of seismic time histories.
: b. Clarify the resonance search results. The executive summary states that there were no resonances below 100
: d. Reference 9.14 of the Tricon Seismic Test Report may contain this information (National Technical Systems Test Report No. TR62987-07N-SEI, "Test Report for Seismic Qualification of TR ICON v 1 O Nuclear Qualification Project TRICON-Under-Test,"Rev.
 
: 0) PG&E Response:
AuQU$1_20, 2015" 11rn wt Fi ?01 Fi
Part 1. PG&E previously provided the applicable Auxiliary Building horizontal and torsional spectra at the 115 foot and 140 foot locations that bound the location of the PPS Replacement equipment on the Sharepoint site in the "Spectra" subdirectory in the NRC directory on 02/12/14 as part of the response to Open Item 101. Requested following spectra be added to shared drive for SWRI access. Aux Bldg. E-W Horizontal 11 Sft. Aux Bldg N-S Horizontal 115ft. Aux Bldg. T ortional 11 Sft. Aux Bldg. E-W Horizontal 140ft. Aux Bldg N-S Horizontal 140ft. Aux Bldg. Tortional 140ft.
                  ~
DCPP PPS Open Item Summary Table                                   Page 19 of 22 No     Src/RI     Issue Description                           P&GE response:                   Status RA/No.     RA/     Comments (Date Sent) Response (Due Date)
Hz. Section 7.3 states that there was amplification between 20 and 70 Hz up to about 20 times.
: c. Provide data to show statistical independence and stationarity of seismic time histories.
: d. Reference 9.14 of the Tricon Seismic Test Report may contain this information (National Technical Systems Test Report No. TR62987-07N-SEI, "Test Report for Seismic Qualification of TR ICON v 1O Nuclear Qualification Project TRICON-Under-Test,"Rev. 0)
PG&E Response: Part 1. PG&E previously provided the applicable Auxiliary Building horizontal and torsional spectra at the 115 foot and 140 foot locations that bound the location of the PPS Replacement equipment on the Sharepoint site in the "Spectra" subdirectory in the NRC directory on 02/12/14 as part of the response to Open Item 101.
Requested following spectra be added to shared drive for SWRI access.
Aux Bldg. E-W Horizontal 11 Sft.
Aux Bldg N-S Horizontal 115ft.
Aux Bldg. T ortional 11 Sft.
Aux Bldg. E-W Horizontal 140ft.
Aux Bldg N-S Horizontal 140ft.
Aux Bldg. Tortional 140ft.


2015Auauci5.
2015Auauci5.
2015 ---. -* --*v---' ----DCPP PPS Open Item Summary Table Page 20 of 22 No Src/RI Issue Description P&GE response:
Auqu~20, --- . -* --*v-- -   ' 2015
Status RA/No. RAJ Comments (Date Sent) Response (Due Date) Part 2. In progress.
                              -- - -                     DCPP PPS Open Item Summary Table                                   Page 20 of 22 No   Src/RI       Issue Description                             P&GE response:                 Status RA/No.     RAJ     Comments (Date Sent) Response (Due Date)
Part 2. In progress.
Part 3. DCM T-24 has been put on the sharepoint site in the DCM directory.
Part 3. DCM T-24 has been put on the sharepoint site in the DCM directory.
Part 4. SSE-A was developed in L TA-EQ-12-23 (and was derived from previous Eagle 21 seismic levels. Several limitations to the seismic spectra are noted in the letter, with the understanding that Diablo Canyon had the responsibility to confirm the final levels that are applicable to the ALS installation in their PGE cabinets.
Part 4. SSE-A was developed in LTA-EQ-12-23 (and was derived from previous Eagle 21 seismic levels. Several limitations to the seismic spectra are noted in the letter, with the understanding that Diablo Canyon had the responsibility to confirm the final levels that are applicable to the ALS installation in their PGE cabinets.
SSE-B was developed in EQ EV 48 and was designed to envelop all locations within athe standard safety Corry cabinet under representative loading. These levels were originally developed for Common Q generic applications, specifically for the HSL modems, and were therefore decided to be applied to generic ALS applications.
SSE-B was developed in EQ EV 48 and was designed to envelop all locations within athe standard safety Corry cabinet under representative loading. These levels were originally developed for Common Q generic applications, specifically for the HSL modems, and were therefore decided to be applied to generic ALS applications. This seismic spectrum is not applicable to the Diablo Canyon project.
This seismic spectrum is not applicable to the Diablo Canyon project. Part 5. In 13FegFess.
Part 5. In 13FegFess. 8/5/15 PG&E will perform shake tests of the cabinets with eguipment installed to address this Open Item. The schedule for tests and report are being develo12ed. The report for the tests will supersede previous Seismic Test Report Document No. 9600164-526.
8/5/15 PG&E will perform shake tests of the cabinets with eguipment installed to address this Open Item. The schedule for tests and report are being develo12ed.
150   RA           Westinghouse and PG&E                                                         New PG&E letter DCL-15-072 identifies several modifications to section 4.8, compliance to ISG-04, in the LAA. These changes are inconsistent with the information provided in WEC 6116-00054, Diablo Canyon PPS ISG04 Matrix. So we will make a clarification in the safety evaluation stating the LAA supersedes the WEC document since design changes were not made (only clarifications).
The report for the tests will supersede previous Seismic Test Report Document No. 9600164-526.
 
150 RA Westinghouse and PG&E New PG&E letter DCL-15-072 identifies several modifications to section 4.8, compliance to ISG-04, in the LAA. These changes are inconsistent with the information provided in WEC 6116-00054, Diablo Canyon PPS ISG04 Matrix. So we will make a clarification in the safety evaluation stating the LAA supersedes the WEC document since design changes were not made (only clarifications).
Auw_st 20, 2015AurniF>t
Auw_st 20, 2015AurniF>t fi '.201 fi ..., DCPP PPS Open Item Summary Table Page 21 of 22 No Src/RI Issue Description P&GE response:
                  ...,    fi '.201 fi                   DCPP PPS Open Item Summary Table                                 Page 21 of 22 No     Src/RI     Issue Description                           P&GE response:               Status RA/No.     RA/     Comments (Date Sent) Response (Due Date)
Status RA/No. RA/ Comments (Date Sent) Response (Due Date) PG&E Resgonse:
PG&E Resgonse: PG&E agrees with this NRG action because the LAA information 12rovided additional clarifications on how ISG-04 guidance is met for ALS.
PG&E agrees with this NRG action because the LAA information 12rovided additional clarifications on how ISG-04 guidance is met for ALS. 151 RA PG&E New The PG&E "Quality Assurance Plan for the Diablo Canyon Process Protection System Replacement" state PG&E will perform management and oversight activities during the work performed by Invensys and Westinghouse/AL, as well as evaluate deviations or anomalies during software development, approved corrective actions, and coordinated the disposition of discrepancies in the course of V&V. Please indicate how these activities will be documented and when this information will be available.
151     RA         PG&E                                                                       New The PG&E "Quality Assurance Plan for the Diablo Canyon Process Protection System Replacement" state PG&E will perform management and oversight activities during the work performed by Invensys and Westinghouse/AL, as well as evaluate deviations or anomalies during software development, approved corrective actions, and coordinated the disposition of discrepancies in the course of V&V. Please indicate how these activities will be documented and when this information will be available.
PG&E Res12onse:
PG&E Res12onse: In 12rogress.
In 12rogress.
152     RA         PG&E                                                                       New The PG&E "DCPP Project Procedure, System Verification and Validation Plan (SyVVP) for the PPS Replacement Project" defines activities for PG&E to perform, such as preparing the final system V&V report for Diablo Canyon PPS. Please indicate how these activities will be documented and when this information will be available.
152 RA PG&E New The PG&E "DCPP Project Procedure, System Verification and Validation Plan (SyVVP) for the PPS Replacement Project" defines activities for PG&E to perform, such as preparing the final system V&V report for Diablo Canyon PPS. Please indicate how these activities will be documented and when this information will be available.
PG&E Res12onse: In 12rogress.
PG&E Res12onse:
153     RA         PG&E                                                                       New The FAS, TFS and IRS include requirements that are the responsibility of PG&E. Will PG&E prepare a traceability matrix to show how these requirements were fulfilled?
In 12rogress.
PG&E Res12onse: PG&E is gerforming a groject s12ecific traceability matrix to document how reguirements are met for PG&E sco12e egui12ment.
153 RA PG&E New The FAS, TFS and IRS include requirements that are the responsibility of PG&E. Will PG&E prepare a traceability matrix to show how these requirements were fulfilled?
 
PG&E Res12onse:
August 20, 2015AllrnJF>t
PG&E is gerforming a groject s12ecific traceability matrix to document how reguirements are met for PG&E sco12e egui12ment.
                    ..., fi 2015      DCPP PPS Open Item Summary Table                             Page 22 of 22 No     Src/RI       Issue Description     P&GE response:             Status RA/No.     RA/     Comments (Date Sent) Response (Due Date)
August 20, 2015AllrnJF>t fi 2015 ..., DCPP PPS Open Item Summary Table Page 22 of 22 No Src/RI Issue Description P&GE response:
 
Status RA/No. RA/ Comments (Date Sent) Response (Due Date)
ENCLOSURE 3 PROJECT PLAN PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323
ENCLOSURE 3 PROJECT PLAN PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) -LAR Review Step Planned Date Task Actual Date 1 Oct. 26, PG&E LAR Submittal for NRC approval.
 
Submittal Oct. 26, 2011 includes all Phase 1 documents needed to be 2011 docketed prior to acceptance for review per ISG-06, "Digital Licensing." 2 Jan. 12,2012 Acceptance Review complete.
Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review Step   Planned Date                             Task                           Actual Date 1       Oct. 26,     PG&E LAR Submittal for NRC approval. Submittal           Oct. 26, 2011       includes all Phase 1 documents needed to be               2011 docketed prior to acceptance for review per ISG-06, "Digital Licensing."
LAR accepted for Jan. 12, detailed technical review. Several issues identified 2012 that could present challenges for the staff to complete its review. Scheduled public meeting with PG&E to discuss the results of the acceptance review. 3 Jan. 13,2012 Acceptance letter sent to licensee.
2     Jan. 12,2012   Acceptance Review complete. LAR accepted for             Jan. 12, detailed technical review. Several issues identified       2012 that could present challenges for the staff to complete its review. Scheduled public meeting with PG&E to discuss the results of the acceptance review.
Jan. 13, 2012 4 Jan. 18,2012 Conduct Public Meeting to discuss staff's findings Jan. 18, during the LAR acceptance review. Staff proceeds 2012 with LAR technical review. 5 March 18, 2012 PG&E provides information requested in April 2, acceptance letter. Initiate bi-weekly telecoms with 2012 PG&E and its contractors to discuss potential RAI issues. Open Items spreadsheet will be maintained by NRC to document staff issues and planned licensee responses.
3     Jan. 13,2012   Acceptance letter sent to licensee.                     Jan. 13, 2012 4     Jan. 18,2012   Conduct Public Meeting to discuss staff's findings     Jan. 18, during the LAR acceptance review. Staff proceeds           2012 with LAR technical review.
6 May 30, 2012 PG&E provides partial set of Phase 2 June 6, documentation per commitments made in LAR. 2012* *PG&E provided a subset of the Phase 2 documents on June ffh See step 14 which is a milestone for submittal of all remaining Phase 2 documents.
5     March 18, 2012 PG&E provides information requested in                   April 2, acceptance letter. Initiate bi-weekly telecoms with       2012 PG&E and its contractors to discuss potential RAI issues. Open Items spreadsheet will be maintained by NRC to document staff issues and planned licensee responses.
7 July First RAI sent to PG&E on Phase 1 documentation August 7, 2012 (e.g., specifications, plans, and equipment 2012 qualification).
6     May 30, 2012   PG&E provides partial set of Phase 2                     June 6, documentation per commitments made in LAR.               2012*
Continue review of the application.
                        *PG&E provided a subset of the Phase 2 documents on June ffh See step 14 which is a milestone for submittal of all remaining Phase 2 documents.
Request 45 day response. (ML12208A364) 8 June SER for Tricon V10 Platform issued final. This May 15, 2012 platform becomes a Tier 1 review of the LAR. 2012 (ML12146A010) 8.1 June SER for Westinghouse ALS Platform issued final. 2013 This platform becomes a Tier 1 review of the LAR. 9 September 2012 Receive answers to first RAI. (ML12256A308)
7           July     First RAI sent to PG&E on Phase 1 documentation         August 7, 2012     (e.g., specifications, plans, and equipment               2012 qualification). Continue review of the application.
Sept. 11, 2012 10 November 2012 Audit trip to Invensys facility for thread audit; audit Nov. 13-the life cycle planning documents and outputs, with 16,2012 particular emphases on verification and validation, configuration management, quality Assurance, software safety, the Invensys application software development procedures, and aoolication software program design. Page 1 of 4 Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) -LAR Review 10.1 December 2012 Audit report provided to PG&E. February 21,2013 11 February 2013 Audit trip to Westinghouse/CS!
Request 45 day response. (ML12208A364) 8         June       SER for Tricon V10 Platform issued final. This           May 15, 2012     platform becomes a Tier 1 review of the LAR.               2012 (ML12146A010) 8.1         June       SER for Westinghouse ALS Platform issued final.
facility for thread February audit; audit the life cycle planning documents and 21,2013 outputs, with particular emphases on verification and validation, configuration management, quality Assurance, software safety, the W/ALS application software development procedures, and PPS ALS aoolication software proQram desiQn. 11.1 April Audit report provided to PG&E and its contractor.
2013       This platform becomes a Tier 1 review of the LAR.
April 11, 2013 2013 12 March Second RAI Letter to PG&E on Phase 1 March 2013 documentation 20,2013 12.1 April Receive responses to Second set of RAl's May9, 2013 2013 13 April LAR revision and all supporting documentation April 30, 2013 associated with the change in ALS and Tricon V1 O 2013 workstation desiQns for the PPS are submitted.
9   September 2012   Receive answers to first RAI. (ML12256A308)           Sept. 11, 2012 10     November 2012   Audit trip to Invensys facility for thread audit; audit Nov. 13-the life cycle planning documents and outputs, with     16,2012 particular emphases on verification and validation, configuration management, quality Assurance, software safety, the Invensys application software development procedures, and aoolication software program design.
14 August NSIR Cyber Security audit at Diablo Canyon site. August 8, 2013 2013 14.1 February 2014 Cyber Security Audit Report provided to licensee April 28, EICB Letter sent to PM 9/2/13 -ML13242A078 2014 NSIR Report -ML13339A428, ML13339A438 and ML13339A442 15 See Revised PG&E provides remaining set of Phase 2 Document Submittal documentation per commitments made in LAR. To Schedules include ALS PSAI related documents.
Page 1 of 4
See step 6 for initial submittal of Phase 2 documents.
 
16 See Revised All Documentation for DCPP W/CSI ALS and Document Submittal IOM/Triconex V10 processors applicable to the Schedules DCPP PPS LAR are submitted.
Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review 10.1   December 2012     Audit report provided to PG&E.                       February 21,2013 11     February 2013   Audit trip to Westinghouse/CS! facility for thread   February audit; audit the life cycle planning documents and   21,2013 outputs, with particular emphases on verification and validation, configuration management, quality Assurance, software safety, the W/ALS application software development procedures, and PPS ALS aoolication software proQram desiQn.
17 June 2014 Follow-up audit trip to Invensys facility for thread June 13, audit; audit the life cycle planning documents and 2014 outputs, with particular emphases on verification and validation, configuration management, quality assurance, software safety, the Invensys application software development procedures, and application software promam desiQn. 17.1 July 2014 Second Invensys audit report provided to PG&E. April 30, Report sent to DORL 8/14. ML14216A398 2015 Final report 4/30/15. ML15103A011/ML15103A010 Page 2 of 4 Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) -LAR Review 18 February Third RAI Letter to PG&E on Phase 2 February 2014 documentation 27, (e.g., FMEA, safety analysis, RTM, EQ test results, 2014 setpoint calculations.)
11.1       April       Audit report provided to PG&E and its contractor. April 11, 2013                                                               2013 12         March       Second RAI Letter to PG&E on Phase 1                 March 2013         documentation                                       20,2013 12.1       April       Receive responses to Second set of RAl's             May9, 2013                                                               2013 13         April       LAR revision and all supporting documentation       April 30, 2013         associated with the change in ALS and Tricon V1 O     2013 workstation desiQns for the PPS are submitted.
ML14055A058 18.1 April Receive responses to third set of RAl's. April 30, 2014 DCL-14-036  
14       August       NSIR Cyber Security audit at Diablo Canyon site. August 8, 2013                                                               2013 14.1   February 2014   Cyber Security Audit Report provided to licensee     April 28, EICB Letter sent to PM 9/2/13 - ML13242A078           2014 NSIR Report - ML13339A428, ML13339A438 and ML13339A442 15     See Revised     PG&E provides remaining set of Phase 2 Document Submittal documentation per commitments made in LAR. To Schedules     include ALS PSAI related documents. See step 6 for initial submittal of Phase 2 documents.
-ML14121A002 2014 19 June 2015 Audit trip to W/ALS facilities for additional thread June 22-audit items; audit hardware and software 26,2015 installation plans, configuration management reports, detailed system and hardware design, completed test procedures, V&V activities, summary test results (including FAT) and incident reports, and application code listings.
16     See Revised     All Documentation for DCPP W/CSI ALS and Document Submittal IOM/Triconex V10 processors applicable to the Schedules     DCPP PPS LAR are submitted.
Audit Plan -ML15090A716 19.1 August/September Audit report provided to PG&E. 2015 22 February 18 I Presentation to ACRS Subcommittee/Full ACRS February March Committee on DCPP PPS LAR Safety Evaluation.
17       June 2014     Follow-up audit trip to Invensys facility for thread June 13, audit; audit the life cycle planning documents and     2014 outputs, with particular emphases on verification and validation, configuration management, quality assurance, software safety, the Invensys application software development procedures, and application software promam desiQn.
18; 2014 March 6, 2014 November 2015, Presentation to ACRS Subcommittee/Full ACRS 22.1 and February 10, Committee on DCPP PPS LAR Safety Evaluation.
17.1     July 2014     Second Invensys audit report provided to PG&E.       April 30, Report sent to DORL 8/14. ML14216A398                 2015 Final report 4/30/15. ML15103A011/ML15103A010 Page 2 of 4
2016 23 September 2015 Complete draft technical SER for management review and approval.
 
24 September 2015 Issue completed draft technical SER to DORL 25 Novmber 2015 Draft SER sent it to PG&E, Invensys, and W/CSI to perform technical review and ensure no proprietary information was included.
Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review 18       February     Third RAI Letter to PG&E on Phase 2                   February 2014       documentation                                           27, (e.g., FMEA, safety analysis, RTM, EQ test results,     2014 setpoint calculations.) ML14055A058 18.1         April     Receive responses to third set of RAl's.             April 30, 2014       DCL-14-036 - ML14121A002                             2014 19       June 2015     Audit trip to W/ALS facilities for additional thread June 22-audit items; audit hardware and software             26,2015 installation plans, configuration management reports, detailed system and hardware design, completed test procedures, V&V activities, summary test results (including FAT) and incident reports, and application code listings.
26 December 2015 Receive comments from PG&E and its contractors on draft SER proprietary review. 27 March Approved License Amendment issued to PG&E 2016 28 TBD Inspection trip to DCPP for PPS Site Acceptance Testing (SAT), training and other preparation for installing the new system. To be coordinated with regional visit. 29 TBD Inspection trip to DCPP for PPS installation tests, training and other system installation activities for the new system. To be coordinated with region visit. Page 3 of 4 Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS {PPS) -LAR Review Page 4 of 4
Audit Plan - ML15090A716 19.1 August/September Audit report provided to PG&E.
2015 22     February 18 I Presentation to ACRS Subcommittee/Full ACRS           February March       Committee on DCPP PPS LAR Safety Evaluation.             18; 2014                                                             March 6, 2014 November 2015,   Presentation to ACRS Subcommittee/Full ACRS 22.1   and February 10, Committee on DCPP PPS LAR Safety Evaluation.
2016 23   September 2015   Complete draft technical SER for management review and approval.
24   September 2015   Issue completed draft technical SER to DORL 25     Novmber 2015   Draft SER sent it to PG&E, Invensys, and W/CSI to perform technical review and ensure no proprietary information was included.
26     December 2015   Receive comments from PG&E and its contractors on draft SER proprietary review.
27         March       Approved License Amendment issued to PG&E 2016 28         TBD       Inspection trip to DCPP for PPS Site Acceptance Testing (SAT), training and other preparation for installing the new system. To be coordinated with regional visit.
29         TBD       Inspection trip to DCPP for PPS installation tests, training and other system installation activities for the new system. To be coordinated with region visit.
Page 3 of 4
 
Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS
{PPS) - LAR Review Page 4 of 4
* The NRC staff is planning to go to Advisory Committee on Reactor Safeguards (ACRS) subcommittee with a draft safety evaluation during November 2015.
* The NRC staff is planning to go to Advisory Committee on Reactor Safeguards (ACRS) subcommittee with a draft safety evaluation during November 2015.
* The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015. Two members of the public were in attendance for the teleconference meeting and had no comments. Further, no public meeting feedback forms were submitted.
* The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015.
Two members of the public were in attendance for the teleconference meeting and had no comments. Further, no public meeting feedback forms were submitted.
Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.
Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.
Docket Nos. 50-275 and 50-323  
IRA/
Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323


==Enclosures:==
==Enclosures:==
: 1. List of Attendees IRA/ Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
: 1. List of Attendees
: 2. Staff Identified Issues That are Open 3. Project Plan cc w/encls: Distribution via Listserv DISTRIBUTION:
: 2. Staff Identified Issues That are Open
PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorl Resource RidsNrrDorllpl4-1 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsNsirDsp Resource RidsRgn4MailCenter Resource TWertz, NRR CRosales-Cooper, EDO RIV ADAMS A ccess1on N M f N f ML15202A083 M f S OS. ee mg 01ce ' ee mg OFFICE NRR/DORULPL4-1  
: 3. Project Plan cc w/encls: Distribution via Listserv DISTRIBUTION:
/PM NRR/DORULPL4-1  
PUBLIC                             RidsNrrLAJBurkhardt Resource        RStattel, NRR/DE/EICB LPL4-1 Reading                     RidsNrrPMDiabloCanyon Resource      SDarbali, NRR/DE/EICB RidsAcrsAcnw_MailCTR Resource     RidsNsirDsp Resource                RAlvarado, NRR/DE/EICB RidsNrrDeEicb Resource             RidsRgn4MailCenter Resource          SMakor, RIV/DRS/EB2 RidsNrrDorl Resource               TWertz, NRR                          BMaier, RIV RidsNrrDorllpl4-1 Resource         CRosales-Cooper, EDO RIV ADAMS A ccess1on N OS. M ee f mg N01cef    ML15202A083 Mee f mg S ummary ML15233A006 OFFICE   NRR/DORULPL4-1 /PM           NRR/DORULPL4-1 /LA
/LA NAME Slingam JBurkhardt DATE 8/24/15 8/21/15 OFFICE N RR/DORULPL4-1  
                                                            '          NRR/DE/EICB (A)
/BC NRR/DORULPL4-1  
NAME     Slingam                       JBurkhardt                       DRahn DATE     8/24/15                       8/21/15                          8/24/15 OFFICE   NRR/DORULPL4-1 /BC           NRR/DORULPL4-1 /PM NAME     MMarkley                     Slingam (MMarkley for)
/PM NAME MMarkley Slingam (MMarkley for) DATE 9/9/15 9/10/15 OFFICIAL RECORD COPY RStattel, NRR/DE/EICB SDarbali, NRR/DE/EICB RAlvarado, NRR/DE/EICB SMakor, RIV/DRS/EB2 BMaier, RIV ummary ML15233A006 NRR/DE/EICB (A) DRahn 8/24/15}}
DATE     9/9/15                       9/10/15 OFFICIAL RECORD COPY}}

Revision as of 07:36, 31 October 2019

08/05/2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 (TAC Nos. ME7522 and ME7523)
ML15233A006
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/10/2015
From: Siva Lingam
Plant Licensing Branch IV
To:
Lingam S
References
TAC ME7522, TAC ME7523
Download: ML15233A006 (32)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 10, 2015 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Power Plant, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM AT DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME7522 AND ME7523)

On August 5, 2015, a Category 1 teleconference public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference meeting was to discuss the license amendment request (LAR) submitted by PG&E on October 26, 2011, for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113070457). The meeting notice and agenda dated July 21, 2015, are available at ADAMS Accession No. ML15202A083. A list of attendees is provided in Enclosure 1.

The teleconference meeting is one in a series of publicly noticed teleconference meetings to be held periodically to discuss issues associated with the NRC staff's LAR review. Preliminary issues that the NRC staff identified during the initial review, and the licensee's responses to these preliminary issues, were discussed during the teleconference meeting. The list of preliminary issues is provided in Enclosure 2.

Highlights from this meeting include the following:

  • NRC audit regarding this LAR was conducted from June 22-26, 2015, at the Westinghouse facility.
  • The open item summary listing was discussed and the current version is provided with this meeting summary as Enclosure 2. The NRC staff noted that it is still awaiting responses to some items that have been open for an extended period of time. The NRC staff noted that no new issues had been added to the open items list, and that no new items are able to be closed as of the date of the meeting.
  • The project plan for the review of the LAR was discussed and the major upcoming milestones were confirmed. The current version is provided with this meeting summary as Enclosure 3.
  • The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015.

Two members of the public were in attendance for the teleconference meeting and had no comments. Further, no public meeting feedback forms were submitted.

Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.

'

~~~,~~

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. List of Attendees
2. Staff Identified Issues That are Open
3. Project Plan cc w/encls: Distribution via Listserv

LIST OF ATTENDEES AUGUST 5, 2015, TELECONFERENCE MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DIGITAL UPGRADE FOR DIABLO CANYON POWER PLANT. UNIT NOS. 1AND2 DOCKET NOS. 50-275 AND 50-323 NAME ORGANIZATION K. Schrader Pacific Gas and Electric A. Wilson Pacific Gas and Electric L. Williams Pacific Gas and Electric K. Singh Pacific Gas and Electric K. Durinsky Westinghouse A. Breneman Westinghouse T. Tuite Westinghouse R. Stattel Nuclear Regulatory Commission (NRC)

S. Darbali NRC S. Lingam NRC G.Adams Southwest Research Institute (SwRI)

D. Pomerening SwRI E. Domes SwRI G. Clefton Nuclear Energy Institute M. Lewis Public Member D. Gilmore Public Member Enclosure 1

ENCLOSURE 2 STAFF IDENTIFIED OPEN ISSUES LISTING PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323

August 20, 2015A11m1~t Fi ~01 Fi DCPP PPS Open Item Summary Table Page 1 of 22

-

No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 101 RJS Phase 2 Environmental Qualification Documentation: Open RAI 61 4/30/14 7/2/2015 During the second ALS audit, Per ISG 6 Section D.5.1, the NRC staff needs to review the information PG&E asked that we consider provided to determine if the PPS equipment has been demonstrated to be deferral of the able to operate within the specified environment. In order to do this the seismic evaluation staff needs to environmental data for the plant and specifically for the cable until after the SE is spreading room. The ISG 6 matrix (item 2.12) states that this information completed has been provided in the two vendor topical reports; however, these reports do not contain any plant specific data. 12/12/14 Hold OPEN until final qualification The NRC requires plant specific environmental condition data for normal documents are operating conditions and the worst conditions expected during abnormal received.

and accident conditions where the PPS equipment is expected to perform its safety function. 12/11/13- RJS Seismic Reports posted on

  • Range of temperature and humidity conditions that are sharepoint. Further expected in the cable spreading room.

plant specific

  • Seismic data for the Diablo Canyon QBE and SSE information earthquakes including frequencies and acceleration values. including ping tests
  • EMI I RFI data for areas where PPS equipment is to be of PPS cabinets is installed. still needed for evaluation.

The FRS section does specify the ranges of temp and humidity but for 11/1/13 - RJS seismic environment, it refers to documents DCM C-17, DCM C-25, DCM Waiting for C-30, DCM C-28, and DCM T-10. additional testing to be completed.

Note: The required information may also be contained in the UFSAR. The staff is reviewing design basis information in the UFSAR, however specific environmental 6/26/2013: during conditions applicable to the PPS equipment remain unclear to the staff. this call the following 3/28/14 Update: clarifications were In-Equipment Response Spectra (IERS): In the seismic test report, it is provided:

stated the IERS spectra will change as a result of the equipment

August 20, -2015Auoust

- . -- --*v-* - fi ?01

- . fi DCPP PPS Open Item Summary Table Page 2 of 22 No Src/RI Issue Description P&GE response: Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) modifications. So far, the evaluation is based on comparing the ALS and - Describe specific Tricon test data (TRS) with the RRS derived from the 140' elevation conditions for the spectra provided in DCM No. C-25. I think that these RRS spectra will be room where the system will be conservative in comparison to the IERS but I will need to confirm this once installed.

I see the revised IERS. - Is there any restrictive requirement for this room?

Electromagnetic Comgatibilit~ - What is the Was the plant-specific electromagnetic environment confirmed to be similar relationship between the to that identified in EPRI TR-102323?

system specification See follow-up questions and answers in the PG&E response below. requirement and environmental conditions?

PG&E Response: PG&E provided seismic information in the document titled 'Westinghouse Seismic Test Report EQLR-2248, Rev. 1" on the Sharepoint on 12/3/13. Additional testing is required for the PPS cabinets to be used.

3/28/14 Update:

1) IEEE 344-1975, Section 3.5.3, states that If equipment damping is not known, a value of 5 percent is recommended. Therefore use 5% damping.

Based on the following criteria:

2) IEEE 344-1975, Section 6.6.3.1, states that the TRS envelops the RRS over a frequency range which includes all natural frequencies of the equipment up to 33 Hz. The guidance has been more specifically addressed in IEEE 344-1987 (Endorsed by NRC RG 1.100 Rev. 2),

Section 7.6.3.1.1 O that it can be shown by a resonance search that no

Aug_ust20, 2015/\imw:;t v

Fi ::>01fi DCPP PPS Open Item Summary Table Page 3 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date) resonance response phenomena exist below 5Hz, it is required to envelop the RRS only down to 3.5 Hz. Excitation must continue to be maintained in the 1 Hz to 3.5 Hz range to the capability of the test facility.

3) According to Draft NTS Report No TR62987-07N-SEI, Revision O (Reference 8.9 of Draft TR ICON v1 O Nuclear Qualification Project ,

Seismic Test Report 9600164-526, Date 04/13/07) Section 6.8, Resonance Survey Results shows that the ETP or Chassis has no resonance occurred below 40 Hz. The TRS did not envelop RRS below 3 .

Hz meet the above IEEE 344-1975 as well as IEEE 344-1987 criteria.

Therefore, Tricon seismic test response are acceptable.

Based on 2) and 3) above, it can be justified that the Tricon test report is acceptable for the qualification of PCS racks.

The PCS racks are identical to the PPS racks and are in the same location/elevation. Since there are no natural frequencies below 5Hz, you

.

only need to envelop down to 3.5Hz. The resonance survey showed that the natural frequencies were all greater than 40Hz. So the TRS below 3.5Hz does not matter.

Response to follow-up questions:

  • Will you be submitting a revised EQLR-2248 with the new IERS or do you plan to submit the IERS information via some other document?

No, EQLR-2248 is Westinghouse proprietary. We cannot revise their report. We will generate IERS at ALS mounting location to compare with TRS from the EQLR-2248. The new IERS will be documented in the DCPP seismic calculation.

August 20, 2015A11rn w.t Fi ::>n1 F.

~

DCPP PPS Open Item Summary Table Page 4 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

  • Also, the EQLR-2248 document is specific to the ALS, so will there be a similar seismic test report for the Tricon?

Yes, Tricon has seismic test report for ETP and chassis per IEEE 344.

  • Will there be a different set of IERS for ALS and Tricon or can the same set of spectra be applied to both subsystems?

Yes, the ALS and Tricon are mounted in the different PPS racks, the IERS are not the same. Since the ALS and Tricon have different seismic test reports, we will compare the TRS with the IERS separately.

10/14/14 - The ALS Platform EQ report revision, 6002-00200, Revision 4 is on the sharepoint. This document is referenced by the PPS specific EQ report (EQ-QR-120-PGE, Revision 0, Diablo Canyon PPS Advanced Logic System and Line Sense Module Equipment Qualification Summary Report) that is also on the sharepoint.

8/5/15 PG&E will 12erform shake tests of the cabinets with egui12ment installed to address this 012en Item. The schedule for tests and re12ort are being develo12ed.

115 RJS Electro Magnetic Compatibility (Tricon): Open RAI 71 3/12/15 Request schedule for Section 4.14 - ASAl-6 of the LAR states that the equipment vendors are submittal of supplemental required to confirm equipment compliance with physical requirements in information.

the DCPP FRS. These requirements include the EMC requirements from Section 3.1.6 of the FRS which states: "the PPS shall be qualified by test, 4/16/14 - RAI will analysis, or a combination thereof, to function without fault or error in an be required.

electromagnetic environment in accordance with the guidance of Regulatory Guide 1.180."

August 20, 2015Auom;t fi '.201 fi

~

DCPP PPS Open Item Summary Table Page 5 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

In contrast to this, the Tricon V1 O safety evaluation determined that the Tricon V1 O PLC system did not fully meet the guidance of RG 1.180, Revision 1, for conducted or radiated emissions or susceptibility. As a result, the SE states: "before using the Tricon V1 O system equipment in SR systems in a nuclear power plant, licensees must determine that the plant-specific EMI requirements are enveloped by the capabilities of the Tricon V1 O system as approved in this SE."

To complete its safety evaluation, the NRC requires the licensee to provide documentation to show the DCPP specific EMI requirements to be enveloped by the Tricon V10 test levels achieved and documented in the Tricon V1 O safety evaluation.

PG&E Response: AEIElitieRal eleetFema§Retie eR>rirnRmeRt testiR§ Ras 13eeR 13eFfeFmeEI feF tl:le +FiGeR tl:lat im13Fe1Je meetiR§ tl:le ~G ~. ~ BQ §l::liElaRGe.

IRfeFmatieR eR tl:le aEIElitieRal testiR§ aREI e1Jal1::1atieR te tl:le PG&~

req1::1iFomeRts *.viii 13e s1::18mittoEI. DetmmiRatieR et tl:lo s1::18mittal Elate is iR J3F9§Fess. The PG&E Functional Reguirements Sgecification (FRS}

(Section 3.1.6.2} reguires the PPS Eguigment to be EMl/RFI gualified in accordance with the guidance in Reg Guide 1.180.

The Triconex EMl/RFI test regort 9600164-527 concluded that the TRICON unit under test comglied with the allowable emissions and suscegtibility levels reguired by RG 1.180 with the excegtion of allowable conducted emissions level (MIL-STD-461 E., CE101 and CE102} for low and high freguency conducted emissions on the 120 VAC chassis gower suggly line.

In section 7.2.2 of the Triconex test regort, documentation is included for a final CE102 (high freguency} test gerformed with a Corcom Model 30VSK6 line filter installed. With the line filter installed the MIL-STD-461-E, CE102 conducted emissions were accegtable. Therefore, PG&E is including a

AUQ_l.JSt 20, 2015A1 inw;t Fi ~01 Fi

~

DCPP PPS Open Item Summary Table Page 6 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly. With use of the Corcom Model 30VSK6 line filter on the in12ut of the 120 VAC 12ower su1212ly 1 the high freguency conducted emissions meets the guidance of RG 1.180.

RG 1.180 12rovides an exem12tion from CE101 testing if: 1) the 12ower guality reguirements of the egui12ment are consistent with the existing 12ower su1212ly and design 12ractices include 12ower guality controls and, 2) the new egui12ment will not im12ose additional harmonic distortion on the 12ower distribution system exceeding 5% total harmonic distortion or other 12ower guality criteria established with a valid technical basis. The 120 VAC 12ower to the Tricon is to be su1212lied by Class 1 E vital instrument 12ower with a1212ro12riate guality reguirements and design 12ractices in 12lace. Based on testing 12erformed for another similar a1212lication (safety-related auxilia!Y building and fuel handling ventilation control system) at Diablo Canyon, no a1212reciable difference in the harmonic distortion of the instrument AC system was observed before and after the 12ower SUQQlies were installed. Therefore, the RG 1.180 criteria for exem12tion from CE101 testing are met for the PPS Re12lacement Tricon egui12ment.

119 sd (Audit Item) IOM is using laptops, one per Protection Set plus one backup, Close RAI 72 3/19/15 Hold in 01 each with TriStation 1131 installed, to develop the V1 O Tricon protection list until RAI is sent.

set application code for the DCPP PPS Replacement project. PG&E bought these 5 development laptops and IOM will be delivering them to PG&E as part of the Tricon product delivery. However, during the Invensys audit on June 3-5, 2014, PG&E informed the staff that it does not plan to use these laptops, and only plans use the TriStation installed on the MWS's. Please clarify what PG&E will do with the 5 development laptops once they are delivered to them. Also, please clarify what controls will be placed on the TriStation software installed on these laptop computers.

AUQUSt 20, 2015/\11rn1.::t

'-'

F. . ?01.S

- DCPP PPS Open Item Summary Table Page 7 of 22 No Src/RI Issue Description P&GE response: Status RA/ No. RA/ Comments (Date Sent) Response (Due Date)

PG&E Response: The PG&E laptops provided for development for the V10 Tricon were not designated as safety related and will not be used by PG&E in the future because they are obsolete.

129 RA ALS Topical Report Addendum: Open RAI 73 Hold Open for RAI letter.

The ALS topical report addendum identifies changes in Category 4 as those modifications that are applicable to the approved ALS topical report. 12/10/14 - The ALS Please describe how these changes affect the DC PPS replacement, in addendum is being particular description and functionality of the Halt mode. withdrawn.

However, PG&E PG&E Response: Additional information provided by licensee in separate provided document dated 12/11 /14. clarifications about the HALT mode for the ALS system.

Therefore, a RAI is necessary.

135 RA ALS Project Organization 3/1 /15: A new

~ revision of the The Management Plan (6116-00000, Rev. 6) defines the project Close Management Plan organization for the DC PPS replacement project. However this plan does will address this not define the role and responsibilities for the PPS Product Manager. This team member is identified in Section 4.1.1 of the Management Plan, as well as in Section 2.1 of the Software Safety Plan (6116-10020). Please describe the roles and responsibilities for the PPS Product Manager, and his interface/relationship with the Project Manager PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).

Auqu~20, 2015Auau~5.

~

2015 DCPP PPS Open Item Summary Table Page 8 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 136 RA ALS Management Plan 3/1 /15: A new Gf3eR revision of the The Management Plan (6116-00000, Rev. 6), Section 4.1.2, states ALS close Management Plan personnel required support from Global Instrumentation and Control will address this Production (GICP) to complete the project. Can you please provide information about the support provided by G ICP?

PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).

137 RA ALS Management Plan 3/1 /15: A new Gf3eR revision of the The Management Plan (6116-00000, Rev. 6), Section 6.16, describes NA close Management Plan 4.51 "Fiel Programmable Gate Array Development Procedure" as the will address this procedure used for software development. Can you please provide a copy of this procedure in the Sharepoint?

PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7).

138 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new revision of the The Management Plan (6002-00002, Rev. 10), Sections 1.2.5 and 2.1, close Management Plan states the ALS Project Management Plan will identify the configuration andthe management organizational structure. However, the ALS Project Configuration Management Plan does not provide this information. Furthermore, Section Management Plan 2.2 of the Configuration Management Plan describes allocation for will address this.

configuration management activities, but the Project Management Plan This is SE reference 72 does not define how this is applied to the DC PPS project.

PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).

August 20, 2015A11m1F>t

,., fi. ::>01 fi DCPP PPS Open Item Summary Table Page 9 of 22 No Src/RI Issue Description P&GE response: Status RA/ No. RA/ Comments (Date Sent) Response (Due Date) 140 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new revision of the Section 3.1.1 refers to a Document Index (DI). This document is not close Configuration identified or described in the ALS Management Plan. Please describe how Management Plan the DI is used in conjunction with the configuration items and the will address this Configuration Status Accounting. This is SE reference 72 PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002). .~.'

141 RA ALS Configuration Management Plan Gf3eR 3/1/15: A new" close revision of thet

Section 3.2.5 described the use of REC to manage requirement changes to Configuration.\

Cls. Please explain the relationship of the REC and the OnTime ticket Management Plan process. will address this, PG&E Response: This will be addressed by an update to 6116-00000 (new This is SE reference 72 . *

.

Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).

142 RA ALS Configuration Management Plan Gf3eR 3/1 /15: A new revision of the Section 3.2.5 states that the control points for release of Level A, B and C close Cont ig u ration are described in Section 3.2.2, but the section referenced does not provide Management Plan that information. Please clarify when these points are released will address this.

This is SE PG&E Response: This will be addressed by an update to 6116-00000 (new reference 72 Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).

AuQust 20, 2015/\1irn1Rt

_, Fi :201 Fi DCPP PPS Open Item Summary Table ~

Page 10 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RAJ Comments (Date Sent) Response (Due Date) 143 RA ALS Configuration Management Plan GJ3eR 3/1 /15: A new close revision of the Section 3.6 describes control of subcontractors and vendors. This section Configuration refers to the ALS management plan for further description of integration Management Plan and sightseeing of activities conducted by subcontractors and vendors. will address this.

However, the Management Plan does not provide any information about This is SE control of subcontractors and vendors. reference 72

'

Furthermore, Section 4.1.2 identifies Global Instrumentation and Control Production as a provider for this project. This section does not describe how WEC will manage and integrate the work performed by GICP.

Please provide this information.

PG&E Response: This will be addressed by an update to 6116-00000 (new Revision 7) that will contain an updated Section to address the project specific portions of the ALS Configuration Management Plan (6002-00002).

144 Rjs/ga Environmental qualification: EMl/RFI Open Added 01 on 3/18/15 Clarify if CD-ER 993754-30 demonstrates Triconex components comply with RG 1.180 conducted emissions levels for CE101 and CE102 testing.

Basis:

Project Traceability Matrix (Document No. 993754-1-804) Item 445 identifies CD-ER 993754-30 with regard to 120VAC power module exceeding allowable levels specified in RG 1.180. This line item refers to qualified AC power line filters provided.

PG&E Response: In progress.

Aug_ust 20, 2015"11r111~t F. ?01.S DCPP PPS Open Item Summary Table Page 11 of 22 No Src/RI I Issue Description P&GE response: Status I RA/ No. I RA/ Comments (Date Sent) Response (Due Date) 145 RA Remaining Document Submittals 7/10/1 - Added new documents identified during Next Supplement: (to include) second ALS audit to be docketed.

  • Removal of Printers from system
  • Response to ALS ASAl's DCL-15-072 Is being processed in
  • T.S. Implementation Commitment byNRC 6/16/15 Added PG&E Documents: 6116-00204 EQ DCPP Seismic Calculation I IERS (See 01101) (Ref. 166 no docket) Evaluation to list.

Interface Requirements Specification (Current docketed revision is 7) (Reference 67) Added 01 on 3/18/15 Functional Requirements Specification (Current docketed revision is 7) (Reference 68)

Controller Transfer Functions Design Input Specification (Current docketed revision is 1) (Reference 208)

PG&E Failure Modes and Effects Analysis (FMEA) (No reference yet)

Licensee Scope Requirements Traceability Matrix (ATM) (No reference yet)

ALS Documents:

The following documents were identified in ISG-06 matrix as part of Phases 1 and 2 submittals for the Diablo Canyon LAA. Several of these documents have been submitted but have been superseded. Please docket the latest revision of the following documents:

6116-10020, "Diablo Canyon PPS Software Safety Plan" (Ref. 182) 6116-00003, "Diablo Canyon PPS VV Plan" (Ref. 91) 6116-00000, "Diablo Canyon Management Plan" (Ref. 72) 6116-00005, "Diablo Canyon PPS System Test Plan" (Ref. 93) 6116 70140, "PPS /\LS Test Design SpeGifisation" (NR) 6116-70030. "Diablo Canyon PPS System Design Specification"

Auqu~L20, 2015A11rn 1~t Fi ?01 Fi DCPP PPS Open Item Summary Table Page 12 of 22 No I Src/RI I Issue Description P&GE response: I Status I RAI No. I RAI Comments (Date Sent) Response (Due Date) 6116-10216, "Diablo Canyon PPS VV Simulation Environment Specification" (Ref. 205) DCL-15-009 6116-00100, TxB1 and TxB2 Communications Protocol Specification" (NR) 6116-00054, "Diablo Canyon PPS ISG04 Matrix" (NR) 6116-00204, "Diablo Canyon PPS ALS Subsystem Equipment Qualification Evaluation" (Ref. 225) 6116-00011, "ALS System Design Specification" (Docketed version is 1) (Ref. 112) 6116-00400. "ALS Configuration Management Report" 6116-00401, "ALS Configuration Management Baseline Report" ALS Platform Documents 6002-00002, "ALS Configuration Management Plan" (Ref. 70) 6002-00006, "ALS Security Plan" Rev. 3 llifil_(Rev. 1 is docketed ML13036A380) 6002-00030, "ALS Design Tools" Rev. 12 (Ref. 150 Rev. 9)

Tricon Documents:

993754-11-854-1 Revision 1 Protection Set I Factory Acceptance Report (filled out test paperwork does not need to be included) (Reference 192) 993754-11-854-0 Revision 1 Protection Set I HVT Report (Reference 188) 993754-11-861 Revision 2 VnV Design Phase Summary Report PPS I (Reference 179) 993754-11-862 Revision 1 VnV Implementation Phase Summary Report PPS I (Reference 180) 993754-11-818 Revision O Protection Set I System Time Response Confirmation Report (Reference 196) 993754-12-818 Revision O Protection Set II System Time Response Confirmation Report (Reference 197) 993754-12-854-0 Revision O Protection Set II HVT Report (Refeence 189) 993754-12-854-1 Revision O Protection Set II Factory Acceptance Report (Reference 193)

Auqust 20, 2015A11rn1~t Fi ?01Fi DCPP PPS Open Item Summary Table Page 13 of 22 No Src/RI I Issue Description P&GE response: Status I RAJ No. I RAJ Comments (Date Sent) Response (Due Date) 993754-12-862 Revision O VnV Implementation Phase Summary Report PPS II-IV (Reference 202) 993754-13-818 Revision O Protection Set Ill System Time Response Confirmation Report (Reference 198) 993754-13-854-0 Revision O Protection Set Ill HVT Report (Reference 190) 993754-13-854-1 Revision O Protection Set Ill Factory Acceptance Report (Reference 194) 993754-14-818 Revision O Protection Set IV System Time Response Confirmation Report (Reference 199) 993754-14-854-0 Revision O Protection Set IV HVT Report (Reference 191) 993754-14-854-1 Revision O Protection Set IV Factory Acceptance Report (Reference 195) 993754-1-915 Revision 9 Safety Analysis (Reference 200 PG&E Response: The ALS documents have been uploaded to the Share Point Site and will all be docketed, except for the NA 4.50 and NA 4.51 procedures which are quality assurance procedures that are part of the Westinghouse Quality Management System (QMS) and can be made available for audit purposes. (Staff agrees that these two documents can be removed from docketing list) 146 I Rjs/ga I Environmental Qualification: I Open I RAI 7 4 I I 6/16/15 - The EQ evaluation In the response to 01 94 (ASAl-04), PG&E referred to document 6116- document will need 00204, Revision 1, "ALS Subsystem Equipment Qualification to be submitted on Evaluation." The NRC staff needs to review this document. Please docket as a basis place on sharepoint or provide on docket. for our EQ SE safety conclusions.

PG&E Response: 6116-00204-R1 was placed on the Sharepoint site in the (Added to 01 145)

ALS directory on 4/14/15.

Added on 4/8/15 147 Rjs/ga \ Environmental Qualification: Temperature and Humidity Open Added on 4/8/15 Clarify if FAS Section 3.1.4.1 specifies the temperature and relative humidity worst case conditions expected in the cable spreading room (i.e., mild environment) for normal, abnormal, and accident conditions.

Aug_u_$L20, 2015A11niwt Fo ?01Fo DCPP PPS Open Item Summary Table Page 14 of 22

"

No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

Has an evaluation been performed for the plant-specific configuration of Tricon and ALS components to determine:

a. Maximum temperature rise in each cabinet,
b. Maximum ambient temperature in the cable spreading room, and
c. Design basis temperature margin has not been affected?

The licensee has specified a broader range of relative humidity than the qualified and tested range for the ALS and Tricon platforms. Clarify how the use of the ALS and Tricon subsystems is acceptable for the broader range of 0% to 95% RH specified in the FRS Section 3.1.4.1.2 when subsystems were ~ested to a narrower range.

Provide DCM T-20, Environmental Qualification including Appendix A titled "Environmental Conditions for EQ of Electric Equipment." This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments. This reference is cited in Section 3.11.2.1 of the UFSAR under Accident Environments PG&E Response. DCM T-20 has been put on the sharepoint site in the DCM directory. It lists CSR Normal Operation humidity level range as 20%

to 90% on page 31 in Table A4.2-1. It also seems to list the same area humidity range as 0% to 95% on page 32 and this includes a note identifying a basis for this range and states it is an abnormal, non-condensing relative humidity specification.

8/5/15 ALS Humidity Tests. Additional information on humidity testing has been added to SOS, 6116-00011, Revision 8. The methodology to gerform the humiditv environmental testina is contained in WCAP-8587-<NP) Rev.

AuqusJ20, 2015A11rn1gt n ?01n

~

DCPP PPS Open Item Summary -

Table Page 15 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 6-A, "Methodology for Qualifying Westinghouse WRD (Water Reactor Division} Su1212lied NSSS Safety Related Electrical Egui12ment 1" Westinghouse Electric Com[2any LLC, and justifies the 0% to 95% relative humidity levels based on test levels of 35% to 95% relative humidity. The low humidity is not an environmental failure mechanism for electronic egui12ment, and, therefore, all humidity conditions below 35% (0-35%

relative humidity} are envelo12ed by the more conservative humidity levels included in the test. The only failure mechanism associated with low humidity is electrostatic discharge [ESD], which is addressed by item R161 O of the SOS, 6116-00011.

ALS Tem12erature Test: Testing was 12erformed to envelo12e a tem12erature range of 40-140°F 1 consistent with the ALS 12latform reguirements.

The tem12erature in the cable s12reading room is monitored and controlled to 103 degrees F (101 degree set12oint with 2 degrees allowed for instrument uncertainty} by Egui12ment Control Guideline 23.1, "Area Tem12erature Monitoring." If the tem12erature exceeds 103, actions are reguired to restore the tem12erature to less than 103 degrees F in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or 012en the cabinet doors and verify tem12erature less than 119 degrees, or 12erform an evaluation of 012erability, or to declare the egui12ment in the cabinet ino12erable.

The humidity in the cable s12reading room is monitored and controlled to less than 90% relative humidity. If 90% relative humidity is exceeded, 12rocedural actions reguire restoration of the humidity to within limits.

Procedure OP H-10:1V, "Combating High Humidity Inside the CSR" 12rovides guidance to restore humidity to within limits.

PG&E will 12erform a calculation of the maximum tem12erature rise in the cabinets with egui12ment installed to address this 012en Item. The schedule for calculation is being develo12ed.

-

AuQust 20, 2015/\.11rn1~t fi ?01 fi

~

DCPP PPS Open Item Summary Table Page 16 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date) 148 Rjs/ga Environmental Qualification: EMl/RFI Open Added on 4/8/15

1. Clarify if EMl/RFI levels in the cable spreading room are within the tested operating envelopes for Tricon and ALS components. Was the plant-specific electromagnetic environment confirmed to be similar to that identified in EPRI TR-102323? Note: This is a follow-up to 01 101 which also asks for plant specific environmental conditions.
2. Clarify how EMC requirements are met with regard to power sources including those cases where the plant-specific system differs from the Tricon and ALS tested subsystems.
a. Clarify how the PPS AC and DC power sources are deployed to accomplish the isolation features that can affect EMl/RFI test results.
b. Clarify how the PPS AC and DC power sources have been qualified for EMC.
c. Clarify how the installation limitation for the safety power supply is met as described in Section 7.2 of the ALS Platform EQ Summary Report.
3. Identify the qualification test documentation for the rack power supplies specified in Section 4.6.3 of the LAR (Ancillary Safety-Related Equipment Utilized in the PPS Replacement Project) to show testing was done in accordance with EPRI TR-107330 and RG 1.180.

AuQust 20, 2015/\iJmJ~t Fi ?01 Fi

~

DCPP PPS Open Item Summary Table Page 17 of 22 No Src/RI Issue Description P&GE response: Status RA/ No. RA/ Comments (Date Sent) Response (Due Date)

4. For the ALS subsystem components, identify the LAR section and supporting documentation that explains how the plant design basis criteria for PPS power quality are maintained to meet the requirements for exemption to CE101 testing.

PG&E Response. PG&E to discuss with staff if EMl/RFI testing done in 1990s for Eagle-21 installation (re12ort submitted to NRG) can be credited.

IA PF9§Fess.

149 Rjs/ga Environmental Qualification: Seismic Open Added on 4/8/15

1. Provide the response spectra for Attachments C and H to DCM C-17
a. The contents for Attachment H to DCM C-17 reference several response spectra that are not included in the document. In particular, horizontal and torsional spectra are identified in the contents of the document but were not actually shown as figures in the document.
b. DCM C-17 also includes ground response spectra for the Auxiliary Building in Attachment C.
2. Provide supporting documentation to show how the DCM C-17 and DCM C-25 node-specific floor response spectra were used to develop the IERS for both Tricon and ALS subsystems. For the ALS subsystem, provide SAP No 9000040848-000-00 (Legacy Cale No. IS-0228) which is referenced in the Review of EQLR-2248.

Auqust 20, 2015/\11rnwt Fi ?n1s

~

DCPP PPS Open Item Summary Table Page 18 of 22 No Src/RI Issue Description P&GE response: Status RAI No. RAI Comments (Date Sent) Response (Due Date)

a. DCM C-25 provides node-specific response spectra for Node #2 at the 140' elevation
b. DCM C-17 provides node-specific response spectra in attachment H at the 128' and 140' elevations
c. The review of EQLR-2248, Revision 1 shows IERS for the OBEA/SSEA and OBEB/SSEB versus the RRS for the ALS subsystem.
d. No documentation was found showing the development of the IERS from the node -specific floor response spectra.
3. Provide DCM T-24 for the seismic qualification of plant instrumentation and controls. DCM T-24 is referenced by DCM T-1O is identified in FRS Section 3.1.5.2. Clarify what category the ALS and Tricon subsystems fall under in DCM T-24 and how they meet the specific seismic qualification requirements in DCM T-24.
4. Provide documentation to clarify what Phase A and Phase B RRS are representing for the ALS subsystem. From the information we have reviewed, it is not clear how Figures 5-1 and 5-2 in the ALS EQ Plan were developed. For example, were they developed from the information in DCM C-17 and DCM C-25 or were they developed from some other basis?
5. Clarify the following information from the Seismic Test Report (Document No. 9600164-526) because this report only provides a discussion of results.
a. Provide comparison plots of the TRS and RRS to show the RRS levels were enveloped.
b. Clarify the resonance search results. The executive summary states that there were no resonances below 100

AuQU$1_20, 2015" 11rn wt Fi ?01 Fi

~

DCPP PPS Open Item Summary Table Page 19 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

Hz. Section 7.3 states that there was amplification between 20 and 70 Hz up to about 20 times.

c. Provide data to show statistical independence and stationarity of seismic time histories.
d. Reference 9.14 of the Tricon Seismic Test Report may contain this information (National Technical Systems Test Report No. TR62987-07N-SEI, "Test Report for Seismic Qualification of TR ICON v 1O Nuclear Qualification Project TRICON-Under-Test,"Rev. 0)

PG&E Response: Part 1. PG&E previously provided the applicable Auxiliary Building horizontal and torsional spectra at the 115 foot and 140 foot locations that bound the location of the PPS Replacement equipment on the Sharepoint site in the "Spectra" subdirectory in the NRC directory on 02/12/14 as part of the response to Open Item 101.

Requested following spectra be added to shared drive for SWRI access.

Aux Bldg. E-W Horizontal 11 Sft.

Aux Bldg N-S Horizontal 115ft.

Aux Bldg. T ortional 11 Sft.

Aux Bldg. E-W Horizontal 140ft.

Aux Bldg N-S Horizontal 140ft.

Aux Bldg. Tortional 140ft.

2015Auauci5.

Auqu~20, --- . -* --*v-- - ' 2015

-- - - DCPP PPS Open Item Summary Table Page 20 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RAJ Comments (Date Sent) Response (Due Date)

Part 2. In progress.

Part 3. DCM T-24 has been put on the sharepoint site in the DCM directory.

Part 4. SSE-A was developed in LTA-EQ-12-23 (and was derived from previous Eagle 21 seismic levels. Several limitations to the seismic spectra are noted in the letter, with the understanding that Diablo Canyon had the responsibility to confirm the final levels that are applicable to the ALS installation in their PGE cabinets.

SSE-B was developed in EQ EV 48 and was designed to envelop all locations within athe standard safety Corry cabinet under representative loading. These levels were originally developed for Common Q generic applications, specifically for the HSL modems, and were therefore decided to be applied to generic ALS applications. This seismic spectrum is not applicable to the Diablo Canyon project.

Part 5. In 13FegFess. 8/5/15 PG&E will perform shake tests of the cabinets with eguipment installed to address this Open Item. The schedule for tests and report are being develo12ed. The report for the tests will supersede previous Seismic Test Report Document No. 9600164-526.

150 RA Westinghouse and PG&E New PG&E letter DCL-15-072 identifies several modifications to section 4.8, compliance to ISG-04, in the LAA. These changes are inconsistent with the information provided in WEC 6116-00054, Diablo Canyon PPS ISG04 Matrix. So we will make a clarification in the safety evaluation stating the LAA supersedes the WEC document since design changes were not made (only clarifications).

Auw_st 20, 2015AurniF>t

..., fi '.201 fi DCPP PPS Open Item Summary Table Page 21 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

PG&E Resgonse: PG&E agrees with this NRG action because the LAA information 12rovided additional clarifications on how ISG-04 guidance is met for ALS.

151 RA PG&E New The PG&E "Quality Assurance Plan for the Diablo Canyon Process Protection System Replacement" state PG&E will perform management and oversight activities during the work performed by Invensys and Westinghouse/AL, as well as evaluate deviations or anomalies during software development, approved corrective actions, and coordinated the disposition of discrepancies in the course of V&V. Please indicate how these activities will be documented and when this information will be available.

PG&E Res12onse: In 12rogress.

152 RA PG&E New The PG&E "DCPP Project Procedure, System Verification and Validation Plan (SyVVP) for the PPS Replacement Project" defines activities for PG&E to perform, such as preparing the final system V&V report for Diablo Canyon PPS. Please indicate how these activities will be documented and when this information will be available.

PG&E Res12onse: In 12rogress.

153 RA PG&E New The FAS, TFS and IRS include requirements that are the responsibility of PG&E. Will PG&E prepare a traceability matrix to show how these requirements were fulfilled?

PG&E Res12onse: PG&E is gerforming a groject s12ecific traceability matrix to document how reguirements are met for PG&E sco12e egui12ment.

August 20, 2015AllrnJF>t

..., fi 2015 DCPP PPS Open Item Summary Table Page 22 of 22 No Src/RI Issue Description P&GE response: Status RA/No. RA/ Comments (Date Sent) Response (Due Date)

ENCLOSURE 3 PROJECT PLAN PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT. UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323

Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review Step Planned Date Task Actual Date 1 Oct. 26, PG&E LAR Submittal for NRC approval. Submittal Oct. 26, 2011 includes all Phase 1 documents needed to be 2011 docketed prior to acceptance for review per ISG-06, "Digital Licensing."

2 Jan. 12,2012 Acceptance Review complete. LAR accepted for Jan. 12, detailed technical review. Several issues identified 2012 that could present challenges for the staff to complete its review. Scheduled public meeting with PG&E to discuss the results of the acceptance review.

3 Jan. 13,2012 Acceptance letter sent to licensee. Jan. 13, 2012 4 Jan. 18,2012 Conduct Public Meeting to discuss staff's findings Jan. 18, during the LAR acceptance review. Staff proceeds 2012 with LAR technical review.

5 March 18, 2012 PG&E provides information requested in April 2, acceptance letter. Initiate bi-weekly telecoms with 2012 PG&E and its contractors to discuss potential RAI issues. Open Items spreadsheet will be maintained by NRC to document staff issues and planned licensee responses.

6 May 30, 2012 PG&E provides partial set of Phase 2 June 6, documentation per commitments made in LAR. 2012*

  • PG&E provided a subset of the Phase 2 documents on June ffh See step 14 which is a milestone for submittal of all remaining Phase 2 documents.

7 July First RAI sent to PG&E on Phase 1 documentation August 7, 2012 (e.g., specifications, plans, and equipment 2012 qualification). Continue review of the application.

Request 45 day response. (ML12208A364) 8 June SER for Tricon V10 Platform issued final. This May 15, 2012 platform becomes a Tier 1 review of the LAR. 2012 (ML12146A010) 8.1 June SER for Westinghouse ALS Platform issued final.

2013 This platform becomes a Tier 1 review of the LAR.

9 September 2012 Receive answers to first RAI. (ML12256A308) Sept. 11, 2012 10 November 2012 Audit trip to Invensys facility for thread audit; audit Nov. 13-the life cycle planning documents and outputs, with 16,2012 particular emphases on verification and validation, configuration management, quality Assurance, software safety, the Invensys application software development procedures, and aoolication software program design.

Page 1 of 4

Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review 10.1 December 2012 Audit report provided to PG&E. February 21,2013 11 February 2013 Audit trip to Westinghouse/CS! facility for thread February audit; audit the life cycle planning documents and 21,2013 outputs, with particular emphases on verification and validation, configuration management, quality Assurance, software safety, the W/ALS application software development procedures, and PPS ALS aoolication software proQram desiQn.

11.1 April Audit report provided to PG&E and its contractor. April 11, 2013 2013 12 March Second RAI Letter to PG&E on Phase 1 March 2013 documentation 20,2013 12.1 April Receive responses to Second set of RAl's May9, 2013 2013 13 April LAR revision and all supporting documentation April 30, 2013 associated with the change in ALS and Tricon V1 O 2013 workstation desiQns for the PPS are submitted.

14 August NSIR Cyber Security audit at Diablo Canyon site. August 8, 2013 2013 14.1 February 2014 Cyber Security Audit Report provided to licensee April 28, EICB Letter sent to PM 9/2/13 - ML13242A078 2014 NSIR Report - ML13339A428, ML13339A438 and ML13339A442 15 See Revised PG&E provides remaining set of Phase 2 Document Submittal documentation per commitments made in LAR. To Schedules include ALS PSAI related documents. See step 6 for initial submittal of Phase 2 documents.

16 See Revised All Documentation for DCPP W/CSI ALS and Document Submittal IOM/Triconex V10 processors applicable to the Schedules DCPP PPS LAR are submitted.

17 June 2014 Follow-up audit trip to Invensys facility for thread June 13, audit; audit the life cycle planning documents and 2014 outputs, with particular emphases on verification and validation, configuration management, quality assurance, software safety, the Invensys application software development procedures, and application software promam desiQn.

17.1 July 2014 Second Invensys audit report provided to PG&E. April 30, Report sent to DORL 8/14. ML14216A398 2015 Final report 4/30/15. ML15103A011/ML15103A010 Page 2 of 4

Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review 18 February Third RAI Letter to PG&E on Phase 2 February 2014 documentation 27, (e.g., FMEA, safety analysis, RTM, EQ test results, 2014 setpoint calculations.) ML14055A058 18.1 April Receive responses to third set of RAl's. April 30, 2014 DCL-14-036 - ML14121A002 2014 19 June 2015 Audit trip to W/ALS facilities for additional thread June 22-audit items; audit hardware and software 26,2015 installation plans, configuration management reports, detailed system and hardware design, completed test procedures, V&V activities, summary test results (including FAT) and incident reports, and application code listings.

Audit Plan - ML15090A716 19.1 August/September Audit report provided to PG&E.

2015 22 February 18 I Presentation to ACRS Subcommittee/Full ACRS February March Committee on DCPP PPS LAR Safety Evaluation. 18; 2014 March 6, 2014 November 2015, Presentation to ACRS Subcommittee/Full ACRS 22.1 and February 10, Committee on DCPP PPS LAR Safety Evaluation.

2016 23 September 2015 Complete draft technical SER for management review and approval.

24 September 2015 Issue completed draft technical SER to DORL 25 Novmber 2015 Draft SER sent it to PG&E, Invensys, and W/CSI to perform technical review and ensure no proprietary information was included.

26 December 2015 Receive comments from PG&E and its contractors on draft SER proprietary review.

27 March Approved License Amendment issued to PG&E 2016 28 TBD Inspection trip to DCPP for PPS Site Acceptance Testing (SAT), training and other preparation for installing the new system. To be coordinated with regional visit.

29 TBD Inspection trip to DCPP for PPS installation tests, training and other system installation activities for the new system. To be coordinated with region visit.

Page 3 of 4

Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS

{PPS) - LAR Review Page 4 of 4

  • The NRC staff and the licensee agreed to tentatively schedule the next periodic meeting on September 23, 2015.

Two members of the public were in attendance for the teleconference meeting and had no comments. Further, no public meeting feedback forms were submitted.

Please direct any inquiries to me at 301-415-1564 or at Siva.Lingam@nrc.gov.

IRA/

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. List of Attendees
2. Staff Identified Issues That are Open
3. Project Plan cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrLAJBurkhardt Resource RStattel, NRR/DE/EICB LPL4-1 Reading RidsNrrPMDiabloCanyon Resource SDarbali, NRR/DE/EICB RidsAcrsAcnw_MailCTR Resource RidsNsirDsp Resource RAlvarado, NRR/DE/EICB RidsNrrDeEicb Resource RidsRgn4MailCenter Resource SMakor, RIV/DRS/EB2 RidsNrrDorl Resource TWertz, NRR BMaier, RIV RidsNrrDorllpl4-1 Resource CRosales-Cooper, EDO RIV ADAMS A ccess1on N OS. M ee f mg N01cef ML15202A083 Mee f mg S ummary ML15233A006 OFFICE NRR/DORULPL4-1 /PM NRR/DORULPL4-1 /LA

' NRR/DE/EICB (A)

NAME Slingam JBurkhardt DRahn DATE 8/24/15 8/21/15 8/24/15 OFFICE NRR/DORULPL4-1 /BC NRR/DORULPL4-1 /PM NAME MMarkley Slingam (MMarkley for)

DATE 9/9/15 9/10/15 OFFICIAL RECORD COPY