Letter Sequence Request |
|---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13339A428, ML14126A377, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARDCL-11-102, Expected Submittal Dates for Licensee Event Report Supplements2011-09-27027 September 2011 Expected Submittal Dates for Licensee Event Report Supplements Project stage: Request ML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request DCL-11-104, Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support.2011-10-26026 October 2011 Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support. Project stage: Request ML11307A3312011-10-26026 October 2011 License Amendment Request 11-07 Process Protection System Replacement Project stage: Request 05000275/LER-2011-006, For Diablo Canyon, Unit 1, Regarding Loss of Control Room Envelope Due to the Work Control Shift Foreman Incorrectly Authorizing Removal of a Blank Flange2011-10-28028 October 2011 For Diablo Canyon, Unit 1, Regarding Loss of Control Room Envelope Due to the Work Control Shift Foreman Incorrectly Authorizing Removal of a Blank Flange Project stage: Request ML11307A2672011-10-28028 October 2011 Invensys Operations Management Submittal to Support License Amendment Request from PG&E for Replacement of the Eagle 21 Process Protection System at Diablo Canyon Power Plant Project stage: Request ML1133403042011-12-12012 December 2011 Request for Withholding Information from Public Disclosure, 10/28/11 Affidavit Executed by R. Shaffer, Invensys Operations Management, 4 Software Requirements Specification Documents Project stage: Withholding Request Acceptance ML1133402882011-12-12012 December 2011 Request for Withholding Information from Public Disclosure, 10/26/11 Affidavit Executed by R. Shaffler, Invensys Operations Management, 11 V10 Tricon Documents Project stage: Withholding Request Acceptance ML1134000942011-12-14014 December 2011 Request for Withholding Information from Public Disclosure, 9/27/11 Affidavit Executed by J. Gresham, Westinghouse, WNA-DS-02442-PGE, Revision 2, System Requirements Specification Project stage: Withholding Request Acceptance ML1134000972011-12-14014 December 2011 Request for Withholding Information from Public Disclosure, 9/28/11 Affidavit Executed by S. Roberts, CS Innovations, LLC, Four Proprietary Documents Project stage: Withholding Request Acceptance ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1201301352012-01-0606 January 2012 1/18/2012 Revised Notice of Meeting with Pacific Gas and Electric Co., to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1201200052012-01-13013 January 2012 Acceptance Review Letter, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: Acceptance Review ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210200652012-04-16016 April 2012 Summary of Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1211703372012-05-0404 May 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1213500372012-05-15015 May 2012 Forthcoming Meeting on with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 & Pre-submittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523; ME8517-ME851 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement2012-06-0606 June 2012 Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T2012-08-0202 August 2012 Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI 2012-04-02
[Table View] |
Text
The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Pacific Gas and Electric Company' Barry S. Allen Diablo Canyon Power Plant Vice President, Nuclear Services Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 February 2, 2015 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 PG&E Letter DCL-1 5-009 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement
References:
- 1. PG&E Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011 (ADAMS Accession No. MLI 1307A331).
- 2. PG&E Letter DCL-13-043, "Supplement to License Amendment Request 11-07, 'Process Protection System Replacement,"' dated April 30, 2013 (ADAMS Accession No. ML13121A089).
- 3. Digital Instrumentation and Controls Digital I&C-ISG-06, "Task Working Group #6: Licensing Process, Interim Staff Guidance,"
Revision 1, January 19, 2011 (ADAMS Accession No. MLl10140103).
- 4. NRC Letter "Summary of December 19, 2012, Teleconference Meeting with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523)," dated January 10, 2013 (ADAMS Accession No. ML12361A360).
- 5. NRC Letter "Summary of March 27, 2013, Teleconference Public with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523),"
dated June 4, 2013 (ADAMS Accession No. ML13149A068).
- 6. NRC Letter "Summary of September 24, 2014, Teleconference Meeting with Pacific Gas and ElectricCompany on Digital Replacement of the Process Protection System Portion of the Reactor The CD in Attachment 1 of the Enclosure Contains Proprietary Information
/cO (
When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway
- Diablo Canyon - Palo Verde
The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 F
Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 2 Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523)," dated November 17, 2014 (ADAMS Accession No. ML14295A733).
Dear Commissioners and Staff:
In Reference 1, as supplemented in Reference 2, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) 11-07 to request NRC staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Westinghouse Advanced Logic System Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Advanced Logic System. The LAR format and contents in References 1 and 2 are consistent with the guidance provided in Enclosure E and Section C.3, respectively, of Digital Instrumentation and Controls (I&C) Revision 1 of Interim Staff Guidance Digital I&C-ISG-06, "Task Working Group #6: Licensing Process," (ISG-06) (Reference 3). In Reference 4, the Staff documented its acceptance of Reference 1 for review.
This letter submits the Westinghouse ISG-06 Phase 2 Independent Verification and Validation (VV) document "6116-10216, Diablo Canyon PPS W Simulation Environment Specification," Revision 0. The NRC requested this document be submitted in Open Item 41 contained in Enclosure 2 of Reference 5.
This letter submits the Westinghouse ISG-06 Phase 2 Equipment Qualification (EQ) document "EQ-QR-120-PGE, Advanced Logic System and Line Sense Module Equipment Qualification Summary Report," Revision 0. This document provides information to address Open Item 101 contained in Enclosure 2 of Reference 6.
This letter submits the Westinghouse Quality Assurance document "6116-00001, Diablo Canyon Process Protection System Quality Assurance Plan," Revision 0.
The NRC requested this document be submitted in Open Item 124 contained in of Reference 6.
This letter submits the Westinghouse Requirement Traceability document 6116-00059, "Diablo Canyon Process Protection System ALS Subsystem Requirements Traceability Matrix," Revision 3. The NRC requested this document be submitted in Open Item 93 contained in Enclosure 2 of Reference 6.
The Westinghouse documents are listed in the table in Attachment 1 to the Enclosure and are contained on one compact disc (CD), labeled "Advanced Logic The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A
member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway 9 Diablo Canyon
The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 3 System Revised Phase 2 Documents - Proprietary." The contents are in Adobe Acrobat portable document format. These documents are predominantly proprietary in content and therefore non-proprietary versions of the documents are not provided.
The documents listed in Table 1 in Attachment 1 to the Enclosure and contained on the CD in Attachment 1 to the Enclosure contain information proprietary to Westinghouse Electric Company LLC. Accordingly, Attachment 2 to the Enclosure includes a Westinghouse application for withholding proprietary information letter CAW-15-4078, an accompanying affidavit, a Proprietary Information Notice, and a Copyright Notice. The affidavit is signed by Westinghouse Electric Company LLC, the owner of the information. The affidavit sets forth the basis on which the Westinghouse proprietary information contained in Attachment 1 to the Enclosure may be withheld from public disclosure by the NRC, and it addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the NRC's regulations. PG&E requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the Westinghouse affidavit, copyright, or proprietary aspects of the application for withholding related to the Westinghouse proprietary information provided in Attachment 1 of the Enclosure should reference Westinghouse Letter CAW-15-4078 and be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Building 3 Suite 310, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania, 16066.
A copy of the proprietary CD is being provided to the Regional Administrator, Region IV, the DCPP NRR Project Manager, the DCPP NRC Senior Resident Inspector, and Branch Chief, California Department of Public Health.
If you have any questions, or require additional information, please contact Mr. Philippe Soenen at (805) 545-6984.
This communication does not contain regulatory commitments (as defined by NEI 99-04).
I state under penalty of perjury that the foregoing is true and correct.
Executed on February 2, 2015.
Sincerely, Barry S. Allen Vice President, Nuclear Services The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A
member of the STARS (Strategic Teaming and Resource Sharing)
Alliance Callaway
The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 4 kjse/4328 Enclosure cc:
Diablo Distribution cc/enc:
Marc L. Dapas, NRC Region IV Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Department of Public Health The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A