DCL-15-009, Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement

From kanterella
(Redirected from DCL-15-009)
Jump to navigation Jump to search

Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement
ML15062A386
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/02/2015
From: Allen B
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15062A397 List:
References
DCL-15-009
Download: ML15062A386 (4)


Text

The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Pacific Gas and Electric Company' Barry S. Allen Diablo Canyon Power Plant Vice President, Nuclear Services Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 February 2, 2015 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 PG&E Letter DCL-1 5-009 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement

References:

1. PG&E Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011 (ADAMS Accession No. MLI 1307A331).
2. PG&E Letter DCL-13-043, "Supplement to License Amendment Request 11-07, 'Process Protection System Replacement,"' dated April 30, 2013 (ADAMS Accession No. ML13121A089).
3. Digital Instrumentation and Controls Digital I&C-ISG-06, "Task Working Group #6: Licensing Process, Interim Staff Guidance,"

Revision 1, January 19, 2011 (ADAMS Accession No. MLl10140103).

4. NRC Letter "Summary of December 19, 2012, Teleconference Meeting with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523)," dated January 10, 2013 (ADAMS Accession No. ML12361A360).
5. NRC Letter "Summary of March 27, 2013, Teleconference Public with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523),"

dated June 4, 2013 (ADAMS Accession No. ML13149A068).

6. NRC Letter "Summary of September 24, 2014, Teleconference Meeting with Pacific Gas and ElectricCompany on Digital Replacement of the Process Protection System Portion of the Reactor The CD in Attachment 1 of the Enclosure Contains Proprietary Information

/cO (

When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Diablo Canyon - Palo Verde
  • Wolf Creek

The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 F

Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 2 Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 and ME7523)," dated November 17, 2014 (ADAMS Accession No. ML14295A733).

Dear Commissioners and Staff:

In Reference 1, as supplemented in Reference 2, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) 11-07 to request NRC staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Westinghouse Advanced Logic System Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Advanced Logic System. The LAR format and contents in References 1 and 2 are consistent with the guidance provided in Enclosure E and Section C.3, respectively, of Digital Instrumentation and Controls (I&C) Revision 1 of Interim Staff Guidance Digital I&C-ISG-06, "Task Working Group #6: Licensing Process," (ISG-06) (Reference 3). In Reference 4, the Staff documented its acceptance of Reference 1 for review.

This letter submits the Westinghouse ISG-06 Phase 2 Independent Verification and Validation (VV) document "6116-10216, Diablo Canyon PPS W Simulation Environment Specification," Revision 0. The NRC requested this document be submitted in Open Item 41 contained in Enclosure 2 of Reference 5.

This letter submits the Westinghouse ISG-06 Phase 2 Equipment Qualification (EQ) document "EQ-QR-120-PGE, Advanced Logic System and Line Sense Module Equipment Qualification Summary Report," Revision 0. This document provides information to address Open Item 101 contained in Enclosure 2 of Reference 6.

This letter submits the Westinghouse Quality Assurance document "6116-00001, Diablo Canyon Process Protection System Quality Assurance Plan," Revision 0.

The NRC requested this document be submitted in Open Item 124 contained in of Reference 6.

This letter submits the Westinghouse Requirement Traceability document 6116-00059, "Diablo Canyon Process Protection System ALS Subsystem Requirements Traceability Matrix," Revision 3. The NRC requested this document be submitted in Open Item 93 contained in Enclosure 2 of Reference 6.

The Westinghouse documents are listed in the table in Attachment 1 to the Enclosure and are contained on one compact disc (CD), labeled "Advanced Logic The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway 9 Diablo Canyon

  • Wolf Creek

The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 3 System Revised Phase 2 Documents - Proprietary." The contents are in Adobe Acrobat portable document format. These documents are predominantly proprietary in content and therefore non-proprietary versions of the documents are not provided.

The documents listed in Table 1 in Attachment 1 to the Enclosure and contained on the CD in Attachment 1 to the Enclosure contain information proprietary to Westinghouse Electric Company LLC. Accordingly, Attachment 2 to the Enclosure includes a Westinghouse application for withholding proprietary information letter CAW-15-4078, an accompanying affidavit, a Proprietary Information Notice, and a Copyright Notice. The affidavit is signed by Westinghouse Electric Company LLC, the owner of the information. The affidavit sets forth the basis on which the Westinghouse proprietary information contained in Attachment 1 to the Enclosure may be withheld from public disclosure by the NRC, and it addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390 of the NRC's regulations. PG&E requests that the Westinghouse proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the Westinghouse affidavit, copyright, or proprietary aspects of the application for withholding related to the Westinghouse proprietary information provided in Attachment 1 of the Enclosure should reference Westinghouse Letter CAW-15-4078 and be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Building 3 Suite 310, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania, 16066.

A copy of the proprietary CD is being provided to the Regional Administrator, Region IV, the DCPP NRR Project Manager, the DCPP NRC Senior Resident Inspector, and Branch Chief, California Department of Public Health.

If you have any questions, or require additional information, please contact Mr. Philippe Soenen at (805) 545-6984.

This communication does not contain regulatory commitments (as defined by NEI 99-04).

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 2, 2015.

Sincerely, Barry S. Allen Vice President, Nuclear Services The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • DiabLo Canyon
  • WoLf Creek

The CD in Attachment 1 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Document Control Desk PG&E Letter DCL-15-009 February 2, 2015 Page 4 kjse/4328 Enclosure cc:

Diablo Distribution cc/enc:

Marc L. Dapas, NRC Region IV Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Department of Public Health The CD in Attachment 1 of the Enclosure Contains Proprietary Information When separated from the CD in Attachment 1 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

ALliance Callaway

  • Diablo Canyon
  • Wolf Creek