Pacific Gas and Electric Company September 27, 2011 PG&E Letter DCL-11 -1 02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Diablo Canyon Unit 1 Docket No. 50-275, OL-DPR-80 Kenneth J. Peters VP Engineering & Projects Expected Submittal Dates for Licensee Event Report Supplements Diablo Canyon Power Plant Mail Code 104/ 6/603 P. O. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 Fax: 805.545. 4884

References:

1. LER 1-2011-004-00: Emergency Diesel Generators Actuated Upon 230 kV Isolation Due to Maintenance Activities on Relay Panel, dated June 30, 2011 (DCL-11-078)
2. LER 1-2011-005-00: Emergency Diesel Generator Actuations Upon Loss of 230 kV Startup Due to Electrical Maintenance Testing Activities, dated July 22,2011 (DCL-11-083)

Dear Commissioners and Staff:

Pacific Gas and Electric (PG&E) Company submitted two Licensee Event Reports (LERs) to the NRC related to emergency diesel generator actuations upon loss of 230 kV startup power (References 1 and 2). In each LER, PG&E indicated that it would provide a supplement report to specify the cause and corrective actions by September 15, 2011, following the completion of a root cause evaluation (RCE). However, the RCE report has not yet been approved.

Based on the current plan for completion, the LER supplements are expected to be submitted by October 31,2011. PG&E discussed this delay with the NRC Project Manager for Diablo Canyon Power Plant on September 15, 2011.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. WolfCreek

U.S. Nuclear Regulatory Commission September 27,2011 Page 2 dnpo/50428464 cc/enc:

Elmo E. Collins, NRC Region IV PG&E Letter DCL-11-1 02 Michael S. Peck, NRC Senior Resident Inspector James T. Polickoski, NRR Project Manager Alan B. Wang, NRR Project Manager INPO Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. WolfCreek