ML16133A467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:0 0 Distribution:
{{#Wiki_filter:0                                                                                   0 Date: 4l28l2016 Distribution:                                                               Duke Energy                       Document Transmittal #: TR-NUC-MC-002842
Duke Energy Date: 4l28l2016 Document Transmittal  
: 1. Gardner, Troy R
#: TR-NUC-MC-002842
: 2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM                          Purpose:~
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
Released By:
: 2. Mc Ginnis, Vickie L 3. Mccree, Victor M Released By: 4. OPS HUMAN PERFORMANCE  
: 3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION                            Duke Energy
-Facility:
: 4. OPS HUMAN PERFORMANCE -
MCGUIRE NUCLEAR STATION Duke Energy 5. OPS TRNG MGR. SUBJECT 13225 Hagers Ferry Road 6. QATS-MNS TS 3.7.9 -AMENDMENT 282l261 Document Management
SUBJECT                        13225 Hagers Ferry Road
: 7. RESIDENT NRC INSPECT MG02DM 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 9. SERV BLDG FILE ROOM -
: 5. OPS TRNG MGR.
: 10. U S NUC REG WASHINGTON, DC 11. USNRC 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 FYII: 2 3 4 5 6 7 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
MNS TS 3.7.9 - AMENDMENT 282l261                             Document Management
0 0 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
: 6. QATS-MG02DM
CRAVS .3.7.9 0 TE-----------------------------------------------
: 7. RESIDENT NRC INSPECT
The control room envelope (CRE) boundary may be opened intermittently under administrative control. APPLICABILITY:
: 8. SCIENTECH CLEARwrR, FL                                                                                           Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
: 9. SERV BLDG FILE ROOM -
ACTIONS CONDITION REQUIRED ACTION A. One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status. other than Condition B. B. One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions. boundary in MODE 1,2,3, or 4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND 8.3 Restore CRE boundary to OPERABLE status. c. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. COMPLETION TIME 7 days* Immediately 24 hours 90 days 6 hours 36 hours .(continued)
: 10. U S NUC REG WASHINGTON, DC
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
: 11. USNRC
E. Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0 fuel assemblies, or during CORE AL TERA TIONS. OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
: 12. WESTINGHOUSE ELECTRIC CO LLC                                                 Page 1of1 1
F. Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). 0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE AL TERA TIONS. AND D.2.2 Suspend movement of irradiated fuel assemblies.
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:
E.1 Suspend CORE AL TERA TIONS. AND E.2 Suspend movement of irradiated fuel assemblies.
2      3        4    5      6    7          8        9      10    11      12 FYII:  FYIIE   FYIIE     FYIIE R&AIE FYIIE R&AILP   R&AIE     FYIIE   R&AIE R&AIE   R&AIE 11 Remarks:
F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 0 0 G. CONDITION One or more CRA VS train(s) heater inoperable.
 
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification 5.6.6. CRAVS 3.7.9 COMPLETION TIME 7 days 7 days ----------------------------------------------------NOTE-----------------------------------------------------------
CRAVS
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
                                                                                                            .3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 0 0 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
LCO 3.7.9               Two CRAVS trains shall be OPERABLE.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program. CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with* the VFTP In accordance with the Surveillance Frequency Control Proo ram
0
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261 0 0 Distribution:
        --------------------------------~-------N TE-----------------------------------------------
Duke Energy Date: 4l28l2016 Document Transmittal  
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
#: TR-NUC-MC-002842
APPLICABILITY:          MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
ACTIONS CONDITION                              REQUIRED ACTION                      COMPLETION TIME A. One CRAVS train                  A.1      Restore CRAVS train to              7 days*
: 2. Mc Ginnis, Vickie L 3. Mccree, Victor M Released By: 4. OPS HUMAN PERFORMANCE
inoperable for reasons                      OPERABLE status.
-Facility:
other than Condition B.
MCGUIRE NUCLEAR STATION Duke Energy 5. OPS TRNG MGR. SUBJECT 13225 Hagers Ferry Road 6. QATS-MNS TS 3.7.9 -AMENDMENT 282l261 Document Management
0 B. One or more CRAVS                B.1                                           Immediately trains inoperable due to           Initiate action to implement inoperable CRE                             mitigating actions.
: 7. RESIDENT NRC INSPECT MG02DM 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 9. SERV BLDG FILE ROOM -
boundary in MODE 1,2,3, or 4.
: 10. U S NUC REG WASHINGTON, DC 11. USNRC 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 FYII: 2 3 4 5 6 7 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
AND                                           24 hours B.2       Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
0 0 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
AND                                           90 days 8.3       Restore CRE boundary to OPERABLE status.
CRAVS .3.7.9 0 TE-----------------------------------------------
: c. Required Action and               C.1       Be in MODE 3.                     6 hours associated Completion Time of Condition A or B         AND 0        not met in MODE 1, 2, 3, or4.                               C.2       Bein MODE 5.                       36 hours
The control room envelope (CRE) boundary may be opened intermittently under administrative control. APPLICABILITY:
                                                                                                    .(continued)
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
McGuire Units 1 and 2                           3.7.9-1                       Amendment No. 282/261
ACTIONS CONDITION REQUIRED ACTION A. One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status. other than Condition B. B. One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions. boundary in MODE 1,2,3, or 4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. AND 8.3 Restore CRE boundary to OPERABLE status. c. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. COMPLETION TIME 7 days* Immediately 24 hours 90 days 6 hours 36 hours .(continued)
 
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
CRAVS 3.7.9 CONDITION                   REQUIRED ACTION              COMPLETION TIME D. Required Action and       D.1    Place OPERABLE CRAVS        Immediately associated Completion           train in emergency mode.
E. Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0 fuel assemblies, or during CORE AL TERA TIONS. OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Time of Condition A not met in MODE 5 or 6, or   OR during movement of irradiated fuel           D.2.1  Suspend CORE                Immediately assemblies, or during             ALTERATIONS.
F. Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). 0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE AL TERA TIONS. AND D.2.2 Suspend movement of irradiated fuel assemblies.
CORE ALTERATIONS.
E.1 Suspend CORE AL TERA TIONS. AND E.2 Suspend movement of irradiated fuel assemblies.
AND D.2.2  Suspend movement of        Immediately irradiated fuel assemblies.
F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 0 0 G. CONDITION One or more CRA VS train(s) heater inoperable.
E. Two CRAVS trains        E.1    Suspend CORE                Immediately inoperable in MODE 5             ALTERATIONS.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification 5.6.6. CRAVS 3.7.9 COMPLETION TIME 7 days 7 days ----------------------------------------------------NOTE-----------------------------------------------------------
or 6, or during movement of irradiated   AND fuel assemblies, or 0        during CORE ALTERATIONS.
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
E.2    Suspend movement of irradiated fuel assemblies.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 0 0 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program. CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with* the VFTP In accordance with the Surveillance Frequency Control Proo ram
F. Two CRAVS trains         F.1    Enter LCO 3.0.3.            Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261}}
(continued) 0 McGuire Units 1 and 2                 3.7.9-2                     Amendment Nos. 249/229
 
CRAVS 3.7.9 CONDITION                                REQUIRED ACTION                    COMPLETION TIME G.       One or more CRAVS                  G.1     Restore CRAVS train(s)            7 days train(s) heater                            heater to OPERABLE inoperable.                                status.
G.2      Initiate action in                7 days accordance with Specification 5.6.6.
    ----------------------------------------------------NOTE-----------------------------------------------------------
  * 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
0 McGuire Units 1 and 2                               3.7.9-3                       Amendment No. 282/261
 
CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.7.9.1   Operate each CRAVS train for;;::: 10 continuous hours     In accordance with with the heaters operating.                               the Surveillance Frequency Control Program SR 3.7.9.2   Perform required CRAVS filter testing in accordance with   In accordance with*
the Ventilation Filter Testing Program (VFTP).             the VFTP SR 3.7.9.3   Verify each CRAVS train actuates on an actual or           In accordance with simulated actuation signal.                               the Surveillance Frequency Control Proo ram SR 3.7.9.4   Perform required CRE unfiltered air inleakage testing in
* 1n accordance with accordance with the Control Room Envelope Habitability     the Control Room Program.                                                   Envelope Habitability 0                                                                          Program 0
McGuire Units 1 and 2                    3.7.9-4                  Amendment No. 282/261
 
0                                                                                    0 Date: 4l28l2016 Distribution:                                                                Duke Energy                        Document Transmittal #: TR-NUC-MC-002842
: 1. Gardner, Troy R
: 2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM                          Purpose:~
Released By:
: 3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION                           Duke Energy
: 4. OPS HUMAN PERFORMANCE -
SUBJECT                         13225 Hagers Ferry Road
: 5. OPS TRNG MGR.
MNS TS 3.7.9 - AMENDMENT 282l261                             Document Management
: 6. QATS-MG02DM
: 7. RESIDENT NRC INSPECT
: 8. SCIENTECH CLEARwrR, FL                                                                                           Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
: 9. SERV BLDG FILE ROOM -
: 10. U S NUC REG WASHINGTON, DC
: 11. USNRC
: 12. WESTINGHOUSE ELECTRIC CO LLC                                                 Page 1of1 1
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:
2      3        4   5     6   7         8         9     10     11       12 FYII:  FYIIE   FYIIE     FYIIE R&AIE FYIIE R&AILP   R&AIE     FYIIE   R&AIE R&AIE   R&AIE 11 Remarks:
 
CRAVS
                                                                                                            .3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9               Two CRAVS trains shall be OPERABLE.
0
        --------------------------------~-------N TE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:          MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION                              REQUIRED ACTION                      COMPLETION TIME A. One CRAVS train                  A.1      Restore CRAVS train to              7 days*
inoperable for reasons                      OPERABLE status.
other than Condition B.
0 B. One or more CRAVS                B.1                                           Immediately trains inoperable due to           Initiate action to implement inoperable CRE                             mitigating actions.
boundary in MODE 1,2,3, or 4.
AND                                           24 hours B.2       Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
AND                                           90 days 8.3       Restore CRE boundary to OPERABLE status.
: c. Required Action and               C.1       Be in MODE 3.                     6 hours associated Completion Time of Condition A or B         AND 0        not met in MODE 1, 2, 3, or4.                               C.2       Bein MODE 5.                       36 hours
                                                                                                    .(continued)
McGuire Units 1 and 2                           3.7.9-1                       Amendment No. 282/261
 
CRAVS 3.7.9 CONDITION                   REQUIRED ACTION              COMPLETION TIME D. Required Action and       D.1    Place OPERABLE CRAVS        Immediately associated Completion           train in emergency mode.
Time of Condition A not met in MODE 5 or 6, or   OR during movement of irradiated fuel           D.2.1  Suspend CORE                Immediately assemblies, or during             ALTERATIONS.
CORE ALTERATIONS.
AND D.2.2  Suspend movement of        Immediately irradiated fuel assemblies.
E. Two CRAVS trains        E.1    Suspend CORE                Immediately inoperable in MODE 5             ALTERATIONS.
or 6, or during movement of irradiated   AND fuel assemblies, or 0        during CORE ALTERATIONS.
E.2    Suspend movement of irradiated fuel assemblies.
Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
F. Two CRAVS trains         F.1    Enter LCO 3.0.3.            Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
(continued) 0 McGuire Units 1 and 2                 3.7.9-2                     Amendment Nos. 249/229
 
CRAVS 3.7.9 CONDITION                                REQUIRED ACTION                    COMPLETION TIME G.       One or more CRAVS                  G.1     Restore CRAVS train(s)            7 days train(s) heater                            heater to OPERABLE inoperable.                                status.
G.2      Initiate action in                7 days accordance with Specification 5.6.6.
    ----------------------------------------------------NOTE-----------------------------------------------------------
  * 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
0 McGuire Units 1 and 2                               3.7.9-3                       Amendment No. 282/261
 
CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.7.9.1   Operate each CRAVS train for;;::: 10 continuous hours     In accordance with with the heaters operating.                               the Surveillance Frequency Control Program SR 3.7.9.2   Perform required CRAVS filter testing in accordance with   In accordance with*
the Ventilation Filter Testing Program (VFTP).             the VFTP SR 3.7.9.3   Verify each CRAVS train actuates on an actual or           In accordance with simulated actuation signal.                               the Surveillance Frequency Control Proo ram SR 3.7.9.4   Perform required CRE unfiltered air inleakage testing in
* 1n accordance with accordance with the Control Room Envelope Habitability     the Control Room Program.                                                   Envelope Habitability 0                                                                          Program 0
McGuire Units 1 and 2                     3.7.9-4                 Amendment No. 282/261}}

Revision as of 19:02, 30 October 2019

Technical Specification 3.7.9, Amendments 282 and 261
ML16133A467
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/28/2016
From:
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16133A467 (5)


Text

0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM Purpose:~

Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.9 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:

2 3 4 5 6 7 8 9 10 11 12 FYII: FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

CRAVS

.3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.

0


~-------N TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status.

other than Condition B.

0 B. One or more CRAVS B.1 Immediately trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days 8.3 Restore CRE boundary to OPERABLE status.

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND 0 not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND fuel assemblies, or 0 during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F. Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued) 0 McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in 7 days accordance with Specification 5.6.6.


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours In accordance with with the heaters operating. the Surveillance Frequency Control Program SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with*

the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Proo ram SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in

  • 1n accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability 0 Program 0

McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261

0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM Purpose:~

Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.9 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:

2 3 4 5 6 7 8 9 10 11 12 FYII: FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

CRAVS

.3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.

0


~-------N TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status.

other than Condition B.

0 B. One or more CRAVS B.1 Immediately trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days 8.3 Restore CRE boundary to OPERABLE status.

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND 0 not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND fuel assemblies, or 0 during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F. Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued) 0 McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in 7 days accordance with Specification 5.6.6.


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours In accordance with with the heaters operating. the Surveillance Frequency Control Program SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with*

the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Proo ram SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in

  • 1n accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability 0 Program 0

McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261