ML16133A467
| ML16133A467 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/28/2016 |
| From: | Duke Energy Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML16133A467 (5) | |
Text
0 0
Distribution:
Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842
- 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
Purpose:
~
- 2. Mc Ginnis, Vickie L
- 3. Mccree, Victor M Released By:
- 4. OPS HUMAN PERFORMANCE -
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Ferry Road
- 6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
- 7. RESIDENT NRC INSPECT MG02DM
- 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
- 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-~n~[gy.com
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:
2 3
4 5
6 7
8 9
10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
0 0
3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
CRAVS
.3.7.9
~-------N 0 TE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION A.
One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.
other than Condition B.
B.
One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
boundary in MODE 1,2,3, or 4.
AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
AND 8.3 Restore CRE boundary to OPERABLE status.
- c.
Required Action and C.1 Be in MODE 3.
associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.
C.2 Bein MODE 5.
COMPLETION TIME 7 days*
Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours
.(continued)
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261
CONDITION D.
Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
E.
Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0
fuel assemblies, or during CORE AL TERA TIONS.
OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
F.
Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.
OR D.2.1 Suspend CORE AL TERA TIONS.
AND D.2.2 Suspend movement of irradiated fuel assemblies.
E.1 Suspend CORE AL TERA TIONS.
AND E.2 Suspend movement of irradiated fuel assemblies.
F.1 Enter LCO 3.0.3.
CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229
0 0
G.
CONDITION One or more CRA VS train(s) heater inoperable.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.
G.2 Initiate action in accordance with Specification 5.6.6.
CRAVS 3.7.9 COMPLETION TIME 7 days 7 days
NOTE-----------------------------------------------------------
- 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.
SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*
the VFTP In accordance with the Surveillance Frequency Control Proo ram
- 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261
0 0
Distribution:
Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842
- 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
Purpose:
~
- 2. Mc Ginnis, Vickie L
- 3. Mccree, Victor M Released By:
- 4. OPS HUMAN PERFORMANCE -
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Ferry Road
- 6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
- 7. RESIDENT NRC INSPECT MG02DM
- 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
- 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-~n~[gy.com
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:
2 3
4 5
6 7
8 9
10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
0 0
3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
CRAVS
.3.7.9
~-------N 0 TE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION A.
One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.
other than Condition B.
B.
One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
boundary in MODE 1,2,3, or 4.
AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
AND 8.3 Restore CRE boundary to OPERABLE status.
- c.
Required Action and C.1 Be in MODE 3.
associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.
C.2 Bein MODE 5.
COMPLETION TIME 7 days*
Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours
.(continued)
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261
CONDITION D.
Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
E.
Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0
fuel assemblies, or during CORE AL TERA TIONS.
OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
F.
Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.
OR D.2.1 Suspend CORE AL TERA TIONS.
AND D.2.2 Suspend movement of irradiated fuel assemblies.
E.1 Suspend CORE AL TERA TIONS.
AND E.2 Suspend movement of irradiated fuel assemblies.
F.1 Enter LCO 3.0.3.
CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229
0 0
G.
CONDITION One or more CRA VS train(s) heater inoperable.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.
G.2 Initiate action in accordance with Specification 5.6.6.
CRAVS 3.7.9 COMPLETION TIME 7 days 7 days
NOTE-----------------------------------------------------------
- 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.
SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*
the VFTP In accordance with the Surveillance Frequency Control Proo ram
- 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261