ML16133A467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16133A467
| number = ML16133A467
| issue date = 04/28/2016
| issue date = 04/28/2016
| title = McGuire Nuclear Station - Technical Specification 3.7.9, Amendments 282 and 261
| title = Technical Specification 3.7.9, Amendments 282 and 261
| author name =  
| author name =  
| author affiliation = Duke Energy Corp
| author affiliation = Duke Energy Corp
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:0 0 Distribution:
{{#Wiki_filter:0 0
Duke Energy Date: 4l28l2016 Document Transmittal  
Distribution:
#: TR-NUC-MC-002842  
Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM  
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
: 2. Mc Ginnis, Vickie L 3. Mccree, Victor M Released By: 4. OPS HUMAN PERFORMANCE  
 
-Facility:
==Purpose:==
MCGUIRE NUCLEAR STATION Duke Energy 5. OPS TRNG MGR. SUBJECT 13225 Hagers Ferry Road 6. QATS-MNS TS 3.7.9 -AMENDMENT 282l261 Document Management  
~
: 7. RESIDENT NRC INSPECT MG02DM 8. SCIENTECH  
: 2. Mc Ginnis, Vickie L
: CLEARwrR, FL Huntersville, NC 28078 9. SERV BLDG FILE ROOM -
: 3. Mccree, Victor M Released By:
: 10. U S NUC REG WASHINGTON, DC 11. USNRC 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 FYII: 2 3 4 5 6 7 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
: 4. OPS HUMAN PERFORMANCE -
0 0 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
Facility: MCGUIRE NUCLEAR STATION Duke Energy
CRAVS .3.7.9 0 TE-----------------------------------------------
: 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Ferry Road
: 6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
: 7. RESIDENT NRC INSPECT MG02DM
: 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
: 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-~n~[gy.com
: 10. U S NUC REG WASHINGTON, DC
: 11. USNRC
: 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:
2 3
4 5
6 7
8 9
10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:  
 
0 0
3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
CRAVS  
.3.7.9  
--------------------------------~-------N 0 TE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION A. One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status. other than Condition B. B. One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
ACTIONS CONDITION REQUIRED ACTION A.
boundary in MODE 1,2,3, or 4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological,  
One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.
: chemical, and smoke hazards will not exceed limits. AND 8.3 Restore CRE boundary to OPERABLE status. c. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. COMPLETION TIME 7 days* Immediately 24 hours 90 days 6 hours 36 hours .(continued)
other than Condition B.
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
B.
E. Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0 fuel assemblies, or during CORE AL TERA TIONS. OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
F. Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). 0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE AL TERA TIONS. AND D.2.2 Suspend movement of irradiated fuel assemblies.
boundary in MODE 1,2,3, or 4.
E.1 Suspend CORE AL TERA TIONS. AND E.2 Suspend movement of irradiated fuel assemblies.
AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 0 0 G. CONDITION One or more CRA VS train(s) heater inoperable.
AND 8.3 Restore CRE boundary to OPERABLE status.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification 5.6.6. CRAVS 3.7.9 COMPLETION TIME 7 days 7 days ----------------------------------------------------NOTE-----------------------------------------------------------
: c.
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP).
Required Action and C.1 Be in MODE 3.
The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing.
associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.
Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
C.2 Bein MODE 5.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 0 0 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;:::
COMPLETION TIME 7 days*
10 continuous hours with the heaters operating.
Immediately 24 hours 90 days 6 hours 36 hours  
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
.(continued)
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with* the VFTP In accordance with the Surveillance Frequency Control Proo ram
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261  
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261 0 0 Distribution:
 
Duke Energy Date: 4l28l2016 Document Transmittal  
CONDITION D.
#: TR-NUC-MC-002842  
Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM  
E.
: 2. Mc Ginnis, Vickie L 3. Mccree, Victor M Released By: 4. OPS HUMAN PERFORMANCE  
Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0
-Facility:
fuel assemblies, or during CORE AL TERA TIONS.
MCGUIRE NUCLEAR STATION Duke Energy 5. OPS TRNG MGR. SUBJECT 13225 Hagers Ferry Road 6. QATS-MNS TS 3.7.9 -AMENDMENT 282l261 Document Management  
OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
: 7. RESIDENT NRC INSPECT MG02DM 8. SCIENTECH  
F.
: CLEARwrR, FL Huntersville, NC 28078 9. SERV BLDG FILE ROOM -
Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
: 10. U S NUC REG WASHINGTON, DC 11. USNRC 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 FYII: 2 3 4 5 6 7 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:
0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.
0 0 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS) LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
OR D.2.1 Suspend CORE AL TERA TIONS.
CRAVS .3.7.9 0 TE-----------------------------------------------
AND D.2.2 Suspend movement of irradiated fuel assemblies.
E.1 Suspend CORE AL TERA TIONS.
AND E.2 Suspend movement of irradiated fuel assemblies.
F.1 Enter LCO 3.0.3.
CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229  
 
0 0
G.
CONDITION One or more CRA VS train(s) heater inoperable.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.
G.2 Initiate action in accordance with Specification 5.6.6.
CRAVS 3.7.9 COMPLETION TIME 7 days 7 days  
----------------------------------------------------NOTE-----------------------------------------------------------
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261  
 
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.
SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*
the VFTP In accordance with the Surveillance Frequency Control Proo ram
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261  
 
0 0
Distribution:
Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842
: 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
 
==Purpose:==
~
: 2. Mc Ginnis, Vickie L
: 3. Mccree, Victor M Released By:
: 4. OPS HUMAN PERFORMANCE -
Facility: MCGUIRE NUCLEAR STATION Duke Energy
: 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Ferry Road
: 6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
: 7. RESIDENT NRC INSPECT MG02DM
: 8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
: 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-~n~[gy.com
: 10. U S NUC REG WASHINGTON, DC
: 11. USNRC
: 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1
ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:
2 3
4 5
6 7
8 9
10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:  
 
0 0
3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)
LCO 3.7.9 Two CRA VS trains shall be OPERABLE.
CRAVS  
.3.7.9  
--------------------------------~-------N 0 TE-----------------------------------------------
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
The control room envelope (CRE) boundary may be opened intermittently under administrative control.
APPLICABILITY:
APPLICABILITY:
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONS CONDITION REQUIRED ACTION A. One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status. other than Condition B. B. One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
ACTIONS CONDITION REQUIRED ACTION A.
boundary in MODE 1,2,3, or 4. AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological,  
One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.
: chemical, and smoke hazards will not exceed limits. AND 8.3 Restore CRE boundary to OPERABLE status. c. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. COMPLETION TIME 7 days* Immediately 24 hours 90 days 6 hours 36 hours .(continued)
other than Condition B.
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261 CONDITION D. Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
B.
E. Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0 fuel assemblies, or during CORE AL TERA TIONS. OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.
F. Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B). 0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode. OR D.2.1 Suspend CORE AL TERA TIONS. AND D.2.2 Suspend movement of irradiated fuel assemblies.
boundary in MODE 1,2,3, or 4.
E.1 Suspend CORE AL TERA TIONS. AND E.2 Suspend movement of irradiated fuel assemblies.
AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.
F.1 Enter LCO 3.0.3. CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229 0 0 G. CONDITION One or more CRA VS train(s) heater inoperable.
AND 8.3 Restore CRE boundary to OPERABLE status.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status. G.2 Initiate action in accordance with Specification 5.6.6. CRAVS 3.7.9 COMPLETION TIME 7 days 7 days ----------------------------------------------------NOTE-----------------------------------------------------------
: c.
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP).
Required Action and C.1 Be in MODE 3.
The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing.
associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.
Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
C.2 Bein MODE 5.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261 0 0 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;:::
COMPLETION TIME 7 days*
10 continuous hours with the heaters operating.
Immediately 24 hours 90 days 6 hours 36 hours  
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP). SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal. SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
.(continued)
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with* the VFTP In accordance with the Surveillance Frequency Control Proo ram
McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261  
 
CONDITION D.
Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
E.
Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0
fuel assemblies, or during CORE AL TERA TIONS.
OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
F.
Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).
0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.
OR D.2.1 Suspend CORE AL TERA TIONS.
AND D.2.2 Suspend movement of irradiated fuel assemblies.
E.1 Suspend CORE AL TERA TIONS.
AND E.2 Suspend movement of irradiated fuel assemblies.
F.1 Enter LCO 3.0.3.
CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229  
 
0 0
G.
CONDITION One or more CRA VS train(s) heater inoperable.
REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.
G.2 Initiate action in accordance with Specification 5.6.6.
CRAVS 3.7.9 COMPLETION TIME 7 days 7 days  
----------------------------------------------------NOTE-----------------------------------------------------------
* 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261  
 
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.
SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.
SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.
CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*
the VFTP In accordance with the Surveillance Frequency Control Proo ram
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261}}
* 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261}}

Latest revision as of 23:55, 9 January 2025

Technical Specification 3.7.9, Amendments 282 and 261
ML16133A467
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/28/2016
From:
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16133A467 (5)


Text

0 0

Distribution:

Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM

Purpose:

~

2. Mc Ginnis, Vickie L
3. Mccree, Victor M Released By:
4. OPS HUMAN PERFORMANCE -

Facility: MCGUIRE NUCLEAR STATION Duke Energy

5. OPS TRNG MGR.

SUBJECT 13225 Hagers Ferry Road

6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
7. RESIDENT NRC INSPECT MG02DM
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
9. SERV BLDG FILE ROOM -

MNSDCRM@dyke-~n~[gy.com

10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:

2 3

4 5

6 7

8 9

10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

0 0

3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRA VS trains shall be OPERABLE.

CRAVS

.3.7.9


~-------N 0 TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY:

MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION A.

One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.

other than Condition B.

B.

One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 8.3 Restore CRE boundary to OPERABLE status.

c.

Required Action and C.1 Be in MODE 3.

associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.

C.2 Bein MODE 5.

COMPLETION TIME 7 days*

Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CONDITION D.

Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

E.

Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0

fuel assemblies, or during CORE AL TERA TIONS.

OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F.

Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.

OR D.2.1 Suspend CORE AL TERA TIONS.

AND D.2.2 Suspend movement of irradiated fuel assemblies.

E.1 Suspend CORE AL TERA TIONS.

AND E.2 Suspend movement of irradiated fuel assemblies.

F.1 Enter LCO 3.0.3.

CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229

0 0

G.

CONDITION One or more CRA VS train(s) heater inoperable.

REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.

G.2 Initiate action in accordance with Specification 5.6.6.

CRAVS 3.7.9 COMPLETION TIME 7 days 7 days


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

0 0

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.

SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.

SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.

CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*

the VFTP In accordance with the Surveillance Frequency Control Proo ram

  • 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261

0 0

Distribution:

Duke Energy Date: 4l28l2016 Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM

Purpose:

~

2. Mc Ginnis, Vickie L
3. Mccree, Victor M Released By:
4. OPS HUMAN PERFORMANCE -

Facility: MCGUIRE NUCLEAR STATION Duke Energy

5. OPS TRNG MGR.

SUBJECT 13225 Hagers Ferry Road

6. QATS-MNS TS 3.7.9 - AMENDMENT 282l261 Document Management
7. RESIDENT NRC INSPECT MG02DM
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078
9. SERV BLDG FILE ROOM -

MNSDCRM@dyke-~n~[gy.com

10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ;;.~.,\\<: FYII:

2 3

4 5

6 7

8 9

10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

0 0

3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRA VS trains shall be OPERABLE.

CRAVS

.3.7.9


~-------N 0 TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY:

MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION A.

One CRA VS train A.1 Restore CRA VS train to inoperable for reasons OPERABLE status.

other than Condition B.

B.

One or more CRA VS B.1 trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 8.3 Restore CRE boundary to OPERABLE status.

c.

Required Action and C.1 Be in MODE 3.

associated Completion Time of Condition A or B AND not met in MODE 1, 2, 3, or4.

C.2 Bein MODE 5.

COMPLETION TIME 7 days*

Immediately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90 days 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CONDITION D.

Required Action and associated Completion Time of Condition A not met in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

E.

Two CRA VS trains inoperable in MODE 5 or 6, or during movement of irradiated 0

fuel assemblies, or during CORE AL TERA TIONS.

OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F.

Two CRA VS trains inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

0 McGuire Units 1 and 2 REQUIRED ACTION D.1 Place OPERABLE CRAVS train in emergency mode.

OR D.2.1 Suspend CORE AL TERA TIONS.

AND D.2.2 Suspend movement of irradiated fuel assemblies.

E.1 Suspend CORE AL TERA TIONS.

AND E.2 Suspend movement of irradiated fuel assemblies.

F.1 Enter LCO 3.0.3.

CRAVS 3.7.9 COMPLETION TIME Immediately Immediately Immediately Immediately Immediately Immediately (continued) 3.7.9-2 Amendment Nos. 249/229

0 0

G.

CONDITION One or more CRA VS train(s) heater inoperable.

REQUIRED ACTION G.1 Restore CRAVS train(s) heater to OPERABLE status.

G.2 Initiate action in accordance with Specification 5.6.6.

CRAVS 3.7.9 COMPLETION TIME 7 days 7 days


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

0 0

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours with the heaters operating.

SR 3.7.9.2 Perform required CRAVS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.9.3 Verify each CRAVS train actuates on an actual or simulated actuation signal.

SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.

CRAVS 3.7.9 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with*

the VFTP In accordance with the Surveillance Frequency Control Proo ram

  • 1n accordance with the Control Room Envelope Habitability Program McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261