Line 32: Line 32:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, John L. Digitally signed by John L. Dixon Dixon Date: 2020.11.09 14:51:06 -06'00'
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects  
John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313, 05000368, and 07200013 License Nos. DPR-51 and NPF-6
 
Docket Nos. 05000313, 05000368, and 07200013 License Nos. DPR-51 and NPF-6  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000313, 05000368, and 07200013 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2020003, 05000368/2020003, and 07200013/2020001 Enterprise Identifier: I-2020-003-0003 and I-2020-001-0094 Licensee: Entergy Operations, Inc.
Docket Numbers:
05000313, 05000368, and 07200013  
 
License Numbers:
DPR-51 and NPF-6  
 
Report Numbers:
05000313/2020003, 05000368/2020003, and 07200013/2020001  


Facility: Arkansas Nuclear One Location: Russellville, AR Inspection Dates: July 1, 2020 to September 30, 2020 Inspectors: R. Alexander, Senior Emergency Preparedness Inspector L. Brookhart, Senior Spent Fuel Storage Inspector M. Davis, Transportation and Storage Safety Inspector T. DeBey, Resident Inspector M. Doyle, Operations Engineer C. Henderson, Senior Resident Inspector J. Kirkland, Senior Operations Engineer J. Melfi, Senior Resident Inspector T. Sullivan, Resident Inspector Approved By: John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Enclosure
Enterprise Identifier: I-2020-003-0003 and I-2020-001-0094
 
Licensee:
Entergy Operations, Inc.
 
Facility:
Arkansas Nuclear One  
 
Location:
Russellville, AR  
 
Inspection Dates:
July 1, 2020 to September 30, 2020  
 
Inspectors:
R. Alexander, Senior Emergency Preparedness Inspector  
 
L. Brookhart, Senior Spent Fuel Storage Inspector  
 
M. Davis, Transportation and Storage Safety Inspector  
 
T. DeBey, Resident Inspector  
 
M. Doyle, Operations Engineer  
 
C. Henderson, Senior Resident Inspector  
 
J. Kirkland, Senior Operations Engineer  
 
J. Melfi, Senior Resident Inspector  
 
T. Sullivan, Resident Inspector  
 
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 47: Line 91:


===List of Findings and Violations===
===List of Findings and Violations===
 
Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2020003-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.
Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone           Significance                               Cross-Cutting       Report Aspect              Section Mitigating           Green                                       None                71111.15 Systems              NCV 05000368/2020003-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.


===Additional Tracking Items===
===Additional Tracking Items===
Line 67: Line 110:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.01) ==
===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal summer heat and storms for the following systems:
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal summer heat and storms for the following systems:
* Unit 1 and Unit 2 switchyard
* Unit 1 and Unit 2 switchyard
* Cooling water intake structure
* Cooling water intake structure


==71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01) ==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=2}}
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 1 emergency feedwater while performing surveillance on emergency feedwater initiation and control on September 9, 2020
: (1) Unit 1 emergency feedwater while performing surveillance on emergency feedwater initiation and control on September 9, 2020
: (2) Unit 2 service water system on October 1, 2020
: (2) Unit 2 service water system on October 1, 2020


==71111.05 - Fire Protection Fire Area Walkdown and Inspection Sample (IP Section 03.01) ==
==71111.05 - Fire Protection==
{{IP sample|IP=IP 71111.05|count=5}}
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)===
 
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Unit 1 lube oil reservoir room, Fire Area B-1, Fire Zone 175-CC, on July 1, 2020
: (1) Unit 1 lube oil reservoir room, Fire Area B-1, Fire Zone 175-CC, on July 1, 2020
Line 91: Line 131:
: (5) Unit 2 motor control center and access corridor, Fire Area JJ, Fire Zone 2109-U, on September 22, 2020
: (5) Unit 2 motor control center and access corridor, Fire Area JJ, Fire Zone 2109-U, on September 22, 2020


==71111.07A - Heat Sink Performance Annual Review (IP Section 03.01) ==
==71111.07A - Heat Sink Performance==
{{IP sample|IP=IP 71111.07A|count=1}}
===Annual Review (IP Section 03.01) (1 Sample)===
 
The inspectors evaluated readiness and performance of:
The inspectors evaluated readiness and performance of:
: (1) Unit 2 emergency diesel generator 1 jacket water heat exchanger on September 10, 2020
: (1) Unit 2 emergency diesel generator 1 jacket water heat exchanger on September 10, 2020


==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
===Requalification Examination Results (IP Section 03.03) (2 Samples)===
===Requalification Examination Results (IP Section 03.03) (2 Samples)===
: (1) The inspectors reviewed and evaluated the Unit 1 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.
: (1) The inspectors reviewed and evaluated the Unit 1 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.
Line 104: Line 142:


==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)===
===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)===
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on June 12 and June 19, 2020.
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on June 12 and June 19, 2020.
Line 123: Line 160:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during an unplanned down power to investigate a possible feedwater heater tube leak on September 9, 2020.
: (1) The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during an unplanned down power to investigate a possible feedwater heater tube leak on September 9, 2020.


===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated operator requalification training for a steam           generator tube rupture on September 24, 2020.
: (1) The inspectors observed and evaluated operator requalification training for a steam generator tube rupture on September 24, 2020.
 
==71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) ==
{{IP sample|IP=IP 71111.12|count=1}}


==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (1 Sample)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Unit 2 in core instrument flange number 2, 4, and 6 leakage during Refueling Outage 2R27 on August 19, 2020
: (1) Unit 2 in core instrument flange number 2, 4, and 6 leakage during Refueling Outage 2R27 on August 19, 2020


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 145: Line 178:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
: (1) Unit 1 safety-related 4160 volt switchgear overcurrent relay Part 21 operability on September 8, 2020
: (1) Unit 1 safety-related 4160 volt switchgear overcurrent relay Part 21 operability on September 8, 2020 (2)2VEF-24C emergency diesel generator exhaust fan thermal overload failure on September 9, 2020
: (2) 2VEF-24C emergency diesel generator exhaust fan thermal overload failure on September 9, 2020
: (3) Unit 1 containment cooler VCC-2A/D operability on September 9, 2020
: (3) Unit 1 containment cooler VCC-2A/D operability on September 9, 2020
: (4) Unit 2 service water pump A failure to start due to anti-pump breaker failure operability on September 10, 2020
: (4) Unit 2 service water pump A failure to start due to anti-pump breaker failure operability on September 10, 2020
Line 155: Line 186:
: (6) Unit 2 emergency diesel generator A and B day tank level controller operability on September 29, 2020
: (6) Unit 2 emergency diesel generator A and B day tank level controller operability on September 29, 2020


==71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01) ==
==71111.19 - Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=3}}
===Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)===
 
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:
: (1) Containment sump isolation valve 2CV-5650-2 to emergency core cooling system B suction on August 26, 2020
: (1) Containment sump isolation valve 2CV-5650-2 to emergency core cooling system B suction on August 26, 2020
Line 163: Line 193:
: (3) Unit 2 emergency diesel generator A train on September 15, 2020
: (3) Unit 2 emergency diesel generator A train on September 15, 2020


==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:  


===Surveillance Tests (other) (IP Section 03.01) (1 Sample)===
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
: (1) Unit 2 service water systems A and B as-left flow test on September 23, 2020
: (1) Unit 2 service water systems A and B as-left flow test on September 23, 2020


==71114.02 - Alert and Notification System Testing Inspection Review (IP Section 02.01-02.04) ==
==71114.02 - Alert and Notification System Testing==
{{IP sample|IP=IP 71114.02|count=1}}
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2019, and August 30, 2020.
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2019, and August 30, 2020.


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
: (1) The inspectors evaluated the readiness of the licensee's Emergency Response           Organization between September 1, 2019, and August 30, 2020.
: (1) The inspectors evaluated the readiness of the licensee's Emergency Response Organization between September 1, 2019, and August 30, 2020.


==71114.04 - Emergency Action Level and Emergency Plan Changes Inspection Review (IP Section 02.01-02.03) ==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
{{IP sample|IP=IP 71114.04|count=1}}
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The inspectors evaluated the following Emergency Plan Implementing Procedure changes and the licensee's Emergency Plan change review process per 10 CFR 50.54(q):
: (1) The inspectors evaluated the following Emergency Plan Implementing Procedure changes and the licensee's Emergency Plan change review process per 10 CFR 50.54(q):
* EN-EP-310, Emergency Response Organization Notification System, Revision 9
* EN-EP-310, Emergency Response Organization Notification System, Revision 9
* EN-EP-801, Emergency Response Organization, Revision 17
* EN-EP-801, Emergency Response Organization, Revision 17
* OP-1904.002, Offsite Dose Projections, Revisions 48 and 49 This evaluation does not constitute NRC approval.
* OP-1904.002, Offsite Dose Projections, Revisions 48 and 49  


==71114.05 - Maintenance of Emergency Preparedness Inspection Review (IP Section 02.01 - 02.11) ==
This evaluation does not constitute NRC approval.
{{IP sample|IP=IP 71114.05|count=1}}
 
==71114.05 - Maintenance of Emergency Preparedness==
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
: (1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2019, and August 30, 2020.
: (1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2019, and August 30, 2020.


==71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02) ==
==71114.06 - Drill Evaluation==
{{IP sample|IP=IP 71114.06|count=1}}
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
 
The inspectors evaluated:
The inspectors evaluated:
: (1) Unit 2 dynamic simulator examination performance indicator opportunity on July 22,
: (1) Unit 2 dynamic simulator examination performance indicator opportunity on July 22,


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
EP01: Drill/Exercise Performance (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
    (1)   (July 1, 2019 - June 30, 2020)
(1)  
(July 1, 2019 - June 30, 2020)  


===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
    (1)   (July 1, 2019 - June 30, 2020)
(1) (July 1, 2019 - June 30, 2020)  


===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
    (1)   (July 1, 2019 - June 30, 2020)
(1) (July 1, 2019 - June 30, 2020)  


===MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)===
===MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)===
: (1) Unit 1 (July 1, 2019 - June 30, 2020)
: (1) Unit 1 (July 1, 2019 - June 30, 2020)
: (2) Unit 2 (July 1, 2019 - June 30, 2020)
: (2) Unit 2 (July 1, 2019 - June 30, 2020)  


===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)===
===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)===
: (1) Unit 1 (July 1, 2019 - June 30, 2020)
: (1) Unit 1 (July 1, 2019 - June 30, 2020)
: (2) Unit 2 (July 1, 2019 - June 30, 2020)
: (2) Unit 2 (July 1, 2019 - June 30, 2020)  


===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===
===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===
Line 219: Line 252:
: (2) Unit 2 (July 1, 2019 - June 30, 2020)
: (2) Unit 2 (July 1, 2019 - June 30, 2020)


==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03) ==
==71152 - Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=3}}
===Annual Follow-up of Selected Issues (IP Section 02.03) (3 Samples)===
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Unit 2 shutdown cooling control valve 2CV-1456-2 failure to operate on August 14, 2020
: (1) Unit 2 shutdown cooling control valve 2CV-1456-2 failure to operate on August 14, 2020
: (2) Unit 2 emergency feedwater isolation valve 2CV-1039-1 failure to close on September 8, 2020
: (2) Unit 2 emergency feedwater isolation valve 2CV-1039-1 failure to close on September 8, 2020
: (3) Unit 2 emergency diesel generator day tank level enclosure temperature on September 29, 2020
: (3) Unit 2 emergency diesel generator day tank level enclosure temperature on September 29, 2020  


===71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01) ===
===71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)===
{{IP sample|IP=IP 71153|count=2}}
{{IP sample|IP=IP 71153|count=2}}
: (1) The inspectors evaluated the stuck control element assemblies in Unit 2 and the licensees response on August 6, 2020.
: (1) The inspectors evaluated the stuck control element assemblies in Unit 2 and the licensees response on August 6, 2020.
Line 243: Line 275:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone           Significance                               Cross-Cutting       Report Aspect              Section Mitigating           Green                                     None                71111.15 Systems              NCV 05000368/2020003-01 Open/Closed The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.
Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
 
Green NCV 05000368/2020003-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.


=====Description:=====
=====Description:=====
Line 254: Line 288:
Corrective Actions: The licensee replaced all enclosure filters in both emergency diesel generators fuel oil transfer electronic enclosures and replaced the cooling fan in the train B emergency diesel generator enclosure to resolve the immediate air flow issues. The bottom (inlet) filters on the enclosures were cleaned in January 2020 and then documented in July 2020 as being dirty again. A corrective action was proposed to increase the preventive maintenance frequency to semiannual for these filters. A procedure improvement form was also submitted to improve the preventive maintenance and to clearly indicate that two filters are present on each enclosure.
Corrective Actions: The licensee replaced all enclosure filters in both emergency diesel generators fuel oil transfer electronic enclosures and replaced the cooling fan in the train B emergency diesel generator enclosure to resolve the immediate air flow issues. The bottom (inlet) filters on the enclosures were cleaned in January 2020 and then documented in July 2020 as being dirty again. A corrective action was proposed to increase the preventive maintenance frequency to semiannual for these filters. A procedure improvement form was also submitted to improve the preventive maintenance and to clearly indicate that two filters are present on each enclosure.


Corrective Action References: Condition Reports CR-ANO-2-2020-00100, CR-ANO-2-2020-00101, CR-ANO-2-2020-00117, CR-ANO-2-2020-00560, CR-ANO-2-2020-02904, CR-ANO-2-2020-02921, CR-ANO-2-2020-02924, CR-ANO-2-2020-02971, and CR-ANO-2-2020-03036
Corrective Action References: Condition Reports CR-ANO-2-2020-00100, CR-ANO-2-2020-00101, CR-ANO-2-2020-00117, CR-ANO-2-2020-00560, CR-ANO-2-2020-02904, CR-ANO-2-2020-02921, CR-ANO-2-2020-02924, CR-ANO-2-2020-02971, and CR-ANO-2-2020-03036  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 281: Line 315:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation   Description or Title                                       Revision or
Inspection
Procedure                                                                                            Date
Procedure
2690/011   Corrective Action CR-ANO-       C-2019-03560, C-2019-03563(1), C-2019-04471, C-2020-
Type
Documents                      01137, C-2020-01138, C-2020-01139
Designation
Procedures       EN-FAP-OU-111 Examination of VSC Top End Steel Components AMP           0
Description or Title
EN-FAP-OU-112 Examination of MTC Assembly AMP                           0
Revision or
EN-FAP-OU-113 Dry Fuel Tollgate Assessment                               0
Date
EN-FAP-OU-114 VSC-24 Lead Cask Inspection                               0
2690/011
EN-FAP-OU-115 Examination of VCC Assembly Ventilation Ducts & Annulus   0
Corrective Action
Documents
CR-ANO-
C-2019-03560, C-2019-03563(1), C-2019-04471, C-2020-
01137, C-2020-01138, C-2020-01139
Procedures
EN-FAP-OU-111
Examination of VSC Top End Steel Components AMP
EN-FAP-OU-112
Examination of MTC Assembly AMP
EN-FAP-OU-113
Dry Fuel Tollgate Assessment
EN-FAP-OU-114
VSC-24 Lead Cask Inspection
EN-FAP-OU-115
Examination of VCC Assembly Ventilation Ducts & Annulus
AMP
AMP
EN-FAP-OU-116 Examination of VCC Assembly Exterior AMP                   0
EN-FAP-OU-116
EN-LI-102     Corrective Action Program                                 38
Examination of VCC Assembly Exterior AMP
EN-LI-113     Licensing Basis Document Change Process                   18
EN-LI-102
EN-OE-100     Operating Experience Program                               32
Corrective Action Program
OP-3401.001   Conduct of Dry Fuel Storage (DFS)                         3
EN-LI-113
OP-3401.002   VSC-24 Aging Management Annual Examination of VCC         0
Licensing Basis Document Change Process
EN-OE-100
Operating Experience Program
OP-3401.001
Conduct of Dry Fuel Storage (DFS)
OP-3401.002
VSC-24 Aging Management Annual Examination of VCC
Exterior
Exterior
OP-3401.003   VSC-24 Aging Management 5 Year Examination of VSC         0
OP-3401.003
VSC-24 Aging Management 5 Year Examination of VSC
Assembly Ventilation Ducts and Annulus
Assembly Ventilation Ducts and Annulus
OP-3401.004   VSC-24 Aging Management 10 Year Examination of VSC         0
OP-3401.004
VSC-24 Aging Management 10 Year Examination of VSC
Top End Steel Components
Top End Steel Components
OP-3401.005   VSC-24 Aging Management 20 Year Examination of VSC         0
OP-3401.005
VSC-24 Aging Management 20 Year Examination of VSC
Lead Cask
Lead Cask
OP-3401.006   VSC-24 Aging Management 10 Year Examination of MTC         1
OP-3401.006
VSC-24 Aging Management 10 Year Examination of MTC
Assembly
Assembly
Work Orders       WO 50239086   5YR Inspection of VCC Interior Surface and Exterior of MSB 0
Work Orders
WO 52883726   20YR Examination VCC Lead Cask                             1
WO 50239086
WO 52883728   10YR Examination VCC Top End Steel                         1
5YR Inspection of VCC Interior Surface and Exterior of MSB
71111.01   Corrective Action CR-ANO-       C-2019-03814, C-2020-02001, C-2020-02080, C-2020-
WO 52883726
Documents                      02131
20YR Examination VCC Lead Cask
71111.01   Procedures       OP-3305.004   ANO Transformer Yard Controls                             0
WO 52883728
71111.04   Corrective Action CR-ANO-       1-2020-00290, 1-2020-00952, 1-2020-01168, 1-2020-01211,
10YR Examination VCC Top End Steel
Documents                      1-2020-01215, 2-2020-01466, 2-2020-01931, 2-2020-02388,
71111.01
2-2020-02389, 2-2020-02446, 2-2020-02458, 2-2020-02646,
Corrective Action
Inspection Type             Designation     Description or Title                                       Revision or
Documents
Procedure                                                                                                Date
CR-ANO-
C-2019-03814, C-2020-02001, C-2020-02080, C-2020-
2131
71111.01
Procedures
OP-3305.004
ANO Transformer Yard Controls
71111.04
Corrective Action
Documents
CR-ANO-
1-2020-00290, 1-2020-00952, 1-2020-01168, 1-2020-01211,
1-2020-01215, 2-2020-01466, 2-2020-01931, 2-2020-02388,
2-2020-02389, 2-2020-02446, 2-2020-02458, 2-2020-02646,  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2-2020-02733, 2-2020-02852
2-2020-02733, 2-2020-02852
71111.04   Drawings         M-2210           P&ID Service Water System
71111.04
71111.04   Miscellaneous     STM-2-42         Service Water and Auxiliary Cooling Water Systems
Drawings
71111.04   Procedures       OP-1106.006     Emergency Feedwater Pump Operation                         114
M-2210
71111.04   Procedures       OP-2104.029     Service Water System Operations                           117
P&ID Service Water System
71111.04   Procedures       OP-3305.001     Ops System Alignment Tests                                 1
71111.04
71111.04   Work Orders       WO               52863446
Miscellaneous
71111.05   Calculations     CALC-83-E-0063- Flooding Depth due to Fire Protection Discharges and       4
STM-2-42
Service Water and Auxiliary Cooling Water Systems
71111.04
Procedures
OP-1106.006
Emergency Feedwater Pump Operation
114
71111.04
Procedures
OP-2104.029
Service Water System Operations
117
71111.04
Procedures
OP-3305.001
Ops System Alignment Tests
71111.04
Work Orders
WO
2863446
71111.05
Calculations
CALC-83-E-0063-
Flooding Depth due to Fire Protection Discharges and
Known Elevations of Safety Related Electrical Equipment
Known Elevations of Safety Related Electrical Equipment
71111.05   Calculations     CALC-90-R-1014- Penetration 0175-1A-0088                                   0
71111.05
71111.05   Corrective Action CR-ANO          1-2018-00221, 1-2018-00911
Calculations
CALC-90-R-1014-
Penetration 0175-1A-0088
71111.05
Corrective Action
Documents
Documents
71111.05   Drawings         FP-2103, Sheet 1 Fire Zoned Intermediate Floor Plan El. 368'-0" and 372'-0" 38
CR-ANO
71111.05   Fire Plans       PFP-U1           ANO Prefire Plan (Unit 1)                                 21
1-2018-00221, 1-2018-00911
71111.05   Fire Plans       PFP-U2           ANO Prefire Plan (Unit 2)                                 17
71111.05
71111.05   Miscellaneous                     Arkansas Nuclear One - Unit 1 and Unit 2 Fire Hazard       19
Drawings
FP-2103, Sheet 1
Fire Zoned Intermediate Floor Plan El. 368'-0" and 372'-0"
71111.05
Fire Plans
PFP-U1
ANO Prefire Plan (Unit 1)
71111.05
Fire Plans
PFP-U2
ANO Prefire Plan (Unit 2)
71111.05
Miscellaneous
Arkansas Nuclear One - Unit 1 and Unit 2 Fire Hazard
Analysis
Analysis
71111.05   Miscellaneous     Fire Impairment 6904, 7437
71111.05
71111.05   Procedures       OP-1203.049     Fires In Areas Affecting Safe Shutdown                     15
Miscellaneous
71111.05   Procedures       OP-1203.055     Actions for Turbine Generator Fires                       0
Fire Impairment
71111.05   Procedures       OP-2203.034     Fire or Explosion                                         26
6904, 7437
71111.05   Procedures       OP-2203.049     Fires in Areas Affecting Safe Shutdown                     20
71111.05
71111.07A Calculations     CALC 91-D-2003-
Procedures
71111.07A Corrective Action CR-ANO-         2-2018-00735, 2-2020-00960, 2-2020-02617, 2-2020-02804,
OP-1203.049
Documents                          2-2020-03093
Fires In Areas Affecting Safe Shutdown
71111.07A Procedures         OP-2104.029     Service Water System Operations                           117
71111.05
71111.07A Procedures         OP-2305.062     Service Water System Flow Testing                         4
Procedures
71111.07A Work Orders       WO               354436, 499061, 517346, 52865292, 52877528, 52891262
OP-1203.055
71111.11B Corrective Action CR-ANO-         2-2019-01432, 2-2020-00206, 2-2020-02164, 2-2020-02611,
Actions for Turbine Generator Fires
Documents                          C-2018-02463, C-2018-02830, C-2018-03594, C-2019-
71111.05
Procedures
OP-2203.034
Fire or Explosion
71111.05
Procedures
OP-2203.049
Fires in Areas Affecting Safe Shutdown
71111.07A Calculations
CALC 91-D-2003-
 
71111.07A Corrective Action
Documents
CR-ANO-
2-2018-00735, 2-2020-00960, 2-2020-02617, 2-2020-02804,
2-2020-03093
71111.07A Procedures
OP-2104.029
Service Water System Operations
117
71111.07A Procedures
OP-2305.062
Service Water System Flow Testing
71111.07A Work Orders
WO
354436, 499061, 517346, 52865292, 52877528, 52891262
71111.11B Corrective Action
Documents
CR-ANO-
2-2019-01432, 2-2020-00206, 2-2020-02164, 2-2020-02611,
C-2018-02463, C-2018-02830, C-2018-03594, C-2019-
00110, C-2019-00443, C-2019-00776, C-2019-00828, C-
00110, C-2019-00443, C-2019-00776, C-2019-00828, C-
Inspection Type         Designation   Description or Title                                       Revision or
 
Procedure                                                                                        Date
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2019-01696, C-2019-01697, C-2019-01698, C-2019-01736,
2019-01696, C-2019-01697, C-2019-01698, C-2019-01736,
C-2019-02123, C-2019-02285, C-2019-02290, C-2019-
C-2019-02123, C-2019-02285, C-2019-02290, C-2019-
Line 356: Line 512:
C-2019-04702, C-2019-04875, C-2020-00867, C-2020-
C-2019-04702, C-2019-04875, C-2020-00867, C-2020-
01323
01323
71111.11B Miscellaneous               Cycle 2005 - LOR Biennial Written Exam Details - Exam - 2 - 06/19/2020
71111.11B Miscellaneous
Cycle 2005 - LOR Biennial Written Exam Details - Exam - 2 -
RO
RO
71111.11B Miscellaneous               Cycle 2005 - LOR Biennial Written Exam Details - Exam - 1 - 06/12/2020
06/19/2020
71111.11B Miscellaneous
Cycle 2005 - LOR Biennial Written Exam Details - Exam - 1 -
SRO
SRO
71111.11B Miscellaneous JPM-A2JPM-RO- 2D-36 Battery Eliminator Startup                            0
06/12/2020
71111.11B Miscellaneous
JPM-A2JPM-RO-
2D36
2D36
71111.11B Miscellaneous JPM-A2JPM-RO- Shift Running CCW pumps                                    10
2D-36 Battery Eliminator Startup
71111.11B Miscellaneous
JPM-A2JPM-RO-
CCW02
CCW02
71111.11B Miscellaneous JPM-A2JPM-RO- Perform Emergency Boration (Alternate Success Path)        5
Shift Running CCW pumps
71111.11B Miscellaneous
JPM-A2JPM-RO-
CVCS2
CVCS2
71111.11B Miscellaneous JPM-A2JPM-RO- Perform service water emergency makeup to the SFP (with     0
Perform Emergency Boration (Alternate Success Path)
FPEM1        Loop 1 service water)
71111.11B Miscellaneous
71111.11B Miscellaneous JPM-A2JPM-RO- SIT Isolation                                              0
JPM-A2JPM-RO-
FPEM1
Perform service water emergency makeup to the SFP (with
Loop 1 service water)
71111.11B Miscellaneous
JPM-A2JPM-RO-
SIT10
SIT10
71111.11B Miscellaneous JPM-A2JPM-   Classify an Emergency Event                                0
SIT Isolation
71111.11B Miscellaneous
JPM-A2JPM-
SRO-EAL30
SRO-EAL30
71111.11B Miscellaneous SES-2-009     Dynamic Exam Scenario, Week of 7/6/20                       8
Classify an Emergency Event
71111.11B Miscellaneous SES-2-034     Dynamic Exam Scenario, Week of 7/6/20                       6
71111.11B Miscellaneous
71111.11B Procedures   DG-TRNA-015- Simulator Exam Security Guidelines                          18
SES-2-009
Dynamic Exam Scenario, Week of 7/6/20
71111.11B Miscellaneous
SES-2-034
Dynamic Exam Scenario, Week of 7/6/20
71111.11B Procedures
DG-TRNA-015-
EXAMSEC
EXAMSEC
71111.11B Procedures   EN-TQ-114     Licensed Operator Requalification Training Program         13
Simulator Exam Security Guidelines
71111.11B Procedures
EN-TQ-114
Licensed Operator Requalification Training Program
Description
Description
71111.11B Procedures   EN-TQ-210     Conduct of Simulator Training                               15
71111.11B Procedures
71111.11B Procedures   EN-TQ-217     Examination Security                                       9
EN-TQ-210
71111.11B Procedures   TQF-114-     Annual Operating Exam JPM Quality Checklist                 5
Conduct of Simulator Training
71111.11B Procedures
EN-TQ-217
Examination Security
71111.11B Procedures
TQF-114-
AOESIM
Annual Operating Exam JPM Quality Checklist
71111.11B Procedures
TQF-114-
AOESIM
AOESIM
71111.11B Procedures    TQF-114-      Annual Operating Exam Simulator Scenario Set Quality       8
Annual Operating Exam Simulator Scenario Set Quality
AOESIM        Checklist
Checklist  
Inspection Type             Designation     Description or Title                                   Revision or
 
Procedure                                                                                            Date
Inspection
71111.12   Calculations     CALC-18-E-0007-
Procedure
71111.12   Corrective Action CR-ANO-         2-2017-03388, 2-2018-00852, 2-2018-00883, 2-2019-03313,
Type
Documents                          2-2020-00513, 2-2020-00968, 2-2020-01078, 2-2020-01234,
Designation
Description or Title
Revision or
Date
71111.12
Calculations
CALC-18-E-0007-
 
71111.12
Corrective Action
Documents
CR-ANO-
2-2017-03388, 2-2018-00852, 2-2018-00883, 2-2019-03313,
2-2020-00513, 2-2020-00968, 2-2020-01078, 2-2020-01234,
2-2020-01395, 2-2020-01424, 2-2020-01447, 2-2020-01486,
2-2020-01395, 2-2020-01424, 2-2020-01447, 2-2020-01486,
2-2020-01611, 2-2020-01615, 2-2020-01642, 2-2020-01658,
2-2020-01611, 2-2020-01615, 2-2020-01642, 2-2020-01658,
Line 396: Line 599:
20-02807, 2-2020-02850, 2-2020-03044, 2-2020-03057,
20-02807, 2-2020-02850, 2-2020-03044, 2-2020-03057,
C-2018-03338
C-2018-03338
71111.12   Drawings         M-2210, Sheet 1- P&ID
71111.12
Drawings
M-2210, Sheet 1-
4, 6
4, 6
71111.12   Drawings         M-2242-AA-26
P&ID
71111.12   Miscellaneous     GL-89-10         Safety Related MOV Testing and Surveillance
71111.12
71111.12   Miscellaneous     PEAR-95-0290
Drawings
71111.12   Procedures       OP-2507.004     ICI Flange Disassembly                                 17
M-2242-AA-26  
71111.12   Procedures       OP-2507.005     ICI Flange Reassembly and Cable Connections             24
 
71111.12   Work Orders       WO               501163, 507265, 519374, 547841
71111.12
71111.13   Corrective Action CR-ANO-         1-2017-04444, 1-2017-05061, 1-2020-00295, 1-2020-00481,
Miscellaneous
Documents                          1-2020-00932, 1-2020-01002, 2-2020-03044, 2-2020-03057
GL-89-10
71111.13   Engineering       EC-63596
Safety Related MOV Testing and Surveillance
71111.12
Miscellaneous
PEAR-95-0290  
 
71111.12
Procedures
OP-2507.004
ICI Flange Disassembly
71111.12
Procedures
OP-2507.005
ICI Flange Reassembly and Cable Connections
71111.12
Work Orders
WO
501163, 507265, 519374, 547841
71111.13
Corrective Action
Documents
CR-ANO-
1-2017-04444, 1-2017-05061, 1-2020-00295, 1-2020-00481,
1-2020-00932, 1-2020-01002, 2-2020-03044, 2-2020-03057
71111.13
Engineering
Changes
Changes
71111.13   Engineering       EC-70622
EC-63596
 
71111.13
Engineering
Changes
Changes
71111.13   Engineering       EC-72994
EC-70622
 
71111.13
Engineering
Changes
Changes
71111.13   Procedures       EN-WM-104       On-Line Risk Assessment                                 22
EC-72994
71111.13   Procedures       OP-2104.036     Emergency Diesel Generator Operations                   98
 
71111.13   Work Orders       WO               304158, 436716
71111.13
71111.15   Calculations     974603P201-03   EDG Fuel Oil Day Tank Level Switches                   1
Procedures
71111.15   Calculations     CALC-20-E-0010-
EN-WM-104
71111.15   Calculations     CALC-90-D-6028-
On-Line Risk Assessment
Inspection Type             Designation     Description or Title                                   Revision or
71111.13
Procedure                                                                                            Date
Procedures
71111.15   Calculations     CALC-90-E-0013-
OP-2104.036
71111.15   Calculations     CALC-91-R-2013- SW Performance Testing Method                           28
Emergency Diesel Generator Operations
71111.15   Corrective Action CR-ANO-         1-2005-00816, 1-2005-02753, 1-2006-00167, 1-2020-00363,
71111.13
Documents                        1-2020-00585,1-2020-01025, 2-2014-02605, 2-2014-02827,
Work Orders
WO
304158, 436716
71111.15
Calculations
974603P201-03
EDG Fuel Oil Day Tank Level Switches
71111.15
Calculations
CALC-20-E-0010-
 
71111.15
Calculations
CALC-90-D-6028-
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.15
Calculations
CALC-90-E-0013-
 
71111.15
Calculations
CALC-91-R-2013-
SW Performance Testing Method
71111.15
Corrective Action
Documents
CR-ANO-
1-2005-00816, 1-2005-02753, 1-2006-00167, 1-2020-00363,
1-2020-00585,1-2020-01025, 2-2014-02605, 2-2014-02827,
2-2018-01147, 2-2018-01686, 2-2020-00100, 2-2020-02446,
2-2018-01147, 2-2018-01686, 2-2020-00100, 2-2020-02446,
2-2020-02458, 2-2020-02584, 2-2020-02606, 2-2020-02733,
2-2020-02458, 2-2020-02584, 2-2020-02606, 2-2020-02733,
2-2020-03095, C-2020-01563, C-2020-01706
2-2020-03095, C-2020-01563, C-2020-01706
71111.15   Corrective Action CR-ANO-        2-2020-00560
71111.15
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71111.15   Engineering       EC-77690
CR-ANO-
2-2020-00560
71111.15
Engineering
Changes
Changes
71111.15   Engineering       EC-77691
EC-77690
 
71111.15
Engineering
Changes
Changes
71111.15   Engineering       EC-87790
EC-77691
 
71111.15
Engineering
Changes
Changes
71111.15   Miscellaneous     2-BOP-UT-16-
EC-87790
2
 
71111.15   Miscellaneous     2-BOP-UT-18-
71111.15
006
Miscellaneous
71111.15   Miscellaneous     2-BOP-UT-18-
2-BOP-UT-16-
008
2  
71111.15   Miscellaneous     2-BOP-UT-20-
 
046
71111.15
71111.15   Miscellaneous     2-BOP-UT-20-
Miscellaneous
049
2-BOP-UT-18-
71111.15   Miscellaneous     ER-2000-2646-
006  
003
 
71111.15   Miscellaneous     ER974603P201   Replace EDG Day Tank Level Control Switches             09/1998
71111.15
71111.15   Procedures       OP-1104.033     Supplement 5
Miscellaneous
Inspection Type             Designation     Description or Title                                   Revision or
2-BOP-UT-18-
Procedure                                                                                            Date
008  
71111.15   Procedures       OP-2104.029     Service Water Operations Change                         117
 
71111.15   Procedures       OP-2104.036     Emergency Diesel Generator Operations                   98
71111.15
71111.15   Procedures       OP-2204.012H   Annunciator 2K08 Corrective Action                     39
Miscellaneous
71111.15   Work Orders       WO             393099, 394916, 503684, 545948, 50274573, 52746504,
2-BOP-UT-20-
046  
 
71111.15
Miscellaneous
2-BOP-UT-20-
049  
 
71111.15
Miscellaneous
ER-2000-2646-
003  
 
71111.15
Miscellaneous
ER974603P201
Replace EDG Day Tank Level Control Switches
09/1998
71111.15
Procedures
OP-1104.033
Supplement 5  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.15
Procedures
OP-2104.029
Service Water Operations Change
117
71111.15
Procedures
OP-2104.036
Emergency Diesel Generator Operations
71111.15
Procedures
OP-2204.012H
Annunciator 2K08 Corrective Action
71111.15
Work Orders
WO
393099, 394916, 503684, 545948, 50274573, 52746504,
2858463, 52868957
2858463, 52868957
71111.19   Corrective Action CR-ANO-        2-2020-03061, 2-2020-03062, 2-2020-03170
71111.19
Corrective Action
Documents
Documents
71111.19   Work Orders       WO             502990, 542752, 545039, 549683, 52618649, 52858463,
CR-ANO-
2-2020-03061, 2-2020-03062, 2-2020-03170
71111.19
Work Orders
WO
2990, 542752, 545039, 549683, 52618649, 52858463,
2858572, 52859347, 52861717, 52868160, 52873681,
2858572, 52859347, 52861717, 52868160, 52873681,
2877528
2877528
71111.22   Calculations     CALC-90-E-0116-
71111.22
71111.22   Corrective Action CR-ANO-        2-2018-03994, 2-2020-00960, 2-2020-01794, 2-2020-01795,
Calculations
Documents                        2-2020-01796, 2-2020-01797, C-2020-01460
CALC-90-E-0116-
71111.22  Corrective Action CR-RBS-        2020-01723 (CA-14)
 
71111.22
Corrective Action
Documents
Documents
71111.22   Engineering       EC-61132
CR-ANO-
2-2018-03994, 2-2020-00960, 2-2020-01794, 2-2020-01795,
2-2020-01796, 2-2020-01797, C-2020-01460
71111.22
Corrective Action
Documents
CR-RBS-
20-01723 (CA-14)
71111.22
Engineering
Changes
Changes
71111.22   Engineering       EC-79644
EC-61132
 
71111.22
Engineering
Changes
Changes
71111.22   Engineering       EC-86561
EC-79644
 
71111.22
Engineering
Changes
Changes
71111.22   Procedures       OP-2104.033
EC-86561
71111.22   Procedures       OP-2305.062
 
71111.22   Work Orders       WO             517346
71111.22
71114.02   Corrective Action CR-ANO-        C-2019-03166, C-2019-03621, C-2020-01425
Procedures
OP-2104.033  
 
71111.22
Procedures
OP-2305.062  
 
71111.22
Work Orders
WO
517346
71114.02
Corrective Action
Documents
Documents
71114.02   Miscellaneous                     Design Report Update: Upgraded Public Alert and         May 2009,
CR-ANO-
Notification System (ANS) - Arkansas Nuclear One       as Revised
C-2019-03166, C-2019-03621, C-2020-01425
71114.02
Miscellaneous
Design Report Update: Upgraded Public Alert and
Notification System (ANS) - Arkansas Nuclear One
May 2009,
as Revised
May 2016
May 2016
71114.02   Miscellaneous                     Design Report Update: Upgraded Public Alert and         Supplement
71114.02
Notification System (ANS) - Arkansas Nuclear One       1 (February
Miscellaneous
Design Report Update: Upgraded Public Alert and
Notification System (ANS) - Arkansas Nuclear One
Supplement
(February
2017)
2017)
71114.02   Miscellaneous                     FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power 06/28/2016
71114.02
Inspection Type             Designation     Description or Title                                       Revision or
Miscellaneous
Procedure                                                                                                Date
FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power
06/28/2016  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Plant Alert and Notification System (ANS) Design Report
Plant Alert and Notification System (ANS) Design Report
Update
Update
71114.02   Miscellaneous                     FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power     02/28/2017
71114.02
Miscellaneous
FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power
Plant Alert and Notification System (ANS) Design Report
Plant Alert and Notification System (ANS) Design Report
Update Supplement (1) dated February 2017
Update Supplement (1) dated February 2017
71114.02   Procedures                       Arkansas Dept. of Health - Guidelines for Siren Warning     10/2012
2/28/2017
71114.02
Procedures
Arkansas Dept. of Health - Guidelines for Siren Warning
System
System
71114.02   Procedures       Form 1903.004-K Alert and Notification System Oversight Activity           12/18/2019
10/2012
71114.02   Procedures       Form 1903.004-L Offsite Training Program Oversight                         09/16/2019,
71114.02
Procedures
Form 1903.004-K
Alert and Notification System Oversight Activity
2/18/2019
71114.02
Procedures
Form 1903.004-L
Offsite Training Program Oversight
09/16/2019,
09/23/2019
09/23/2019
71114.03   Corrective Action CR-ANO-         C-2019-03276, C-2019-04446, C-2019-04623, C-2019-
71114.03
Documents                        04759, C-2020-00132, C-2020-00136, C-2020-00380
Corrective Action
71114.03   Miscellaneous                     Entergy - Arkansas Nuclear One On-Shift Staffing Analysis   2
Documents
CR-ANO-
C-2019-03276, C-2019-04446, C-2019-04623, C-2019-
04759, C-2020-00132, C-2020-00136, C-2020-00380
71114.03
Miscellaneous
Entergy - Arkansas Nuclear One On-Shift Staffing Analysis
Final Report
Final Report
71114.03   Procedures       EN-EP-310       Emergency Response Organization Notification System         9
71114.03
71114.03   Procedures       Form 1903.062C 2019 3rd Quarter Staffing Drill Report - Yellow Team       09/25/2019
Procedures
EN-EP-310
Emergency Response Organization Notification System
71114.03
Procedures
Form 1903.062C
2019 3rd Quarter Staffing Drill Report - Yellow Team
September 22, 2019 (Sunday) @ 0800
September 22, 2019 (Sunday) @ 0800
71114.03   Procedures       Form 1903.062C 2019 4th Quarter Staffing Drill Report - Green Team         12/03/2019
09/25/2019
71114.03
Procedures
Form 1903.062C
2019 4th Quarter Staffing Drill Report - Green Team
November 26, 2019 (Tuesday) @ 0445
November 26, 2019 (Tuesday) @ 0445
71114.03   Procedures       Form 1903.062C 2020 1st Quarter Staffing Drill Report - Green Team January 01/15/2020
2/03/2019
71114.03
Procedures
Form 1903.062C
20 1st Quarter Staffing Drill Report - Green Team January
15, 2020 (Wednesday) @ 0530
15, 2020 (Wednesday) @ 0530
71114.03   Procedures       Form 1903.062C 2020 1st Quarter Staffing Drill Report - Red Team January   01/30/2020
01/15/2020
71114.03
Procedures
Form 1903.062C
20 1st Quarter Staffing Drill Report - Red Team January
27, 2019 (Monday) @ 1830
27, 2019 (Monday) @ 1830
71114.03   Procedures       Form 1903.062C 2020 2nd Quarter Staffing Drill Report - Yellow Team May   06/09/2020
01/30/2020
71114.03
Procedures
Form 1903.062C
20 2nd Quarter Staffing Drill Report - Yellow Team May
30, 2020 (Saturday) @ 0800
30, 2020 (Saturday) @ 0800
71114.03   Procedures       OP-1203.048     Security Event                                             39
06/09/2020
71114.03   Procedures       OP-1903.011     Emergency Response/Notifications                           58
71114.03
71114.04   Miscellaneous                     10 CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose       01/08/2020
Procedures
OP-1203.048
Security Event
71114.03
Procedures
OP-1903.011
Emergency Response/Notifications
71114.04
Miscellaneous
CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose
Projections, Rev. 48
Projections, Rev. 48
71114.04   Miscellaneous                     10 CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose       04/08/2020
01/08/2020
71114.04
Miscellaneous
CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose
Projections, Rev. 49
Projections, Rev. 49
71114.04   Miscellaneous                     10 CFR 50.54(q)(2) Review: EN-EP-310, Emergency             03/11/2020
04/08/2020
71114.04
Miscellaneous
CFR 50.54(q)(2) Review: EN-EP-310, Emergency
Response Organization Notification System, Rev. 9
Response Organization Notification System, Rev. 9
71114.04   Miscellaneous                     10 CFR 50.54(q)(2) Review: EN-EP-801, Emergency             11/04/2019
03/11/2020
Inspection Type             Designation   Description or Title                                     Revision or
71114.04
Procedure                                                                                          Date
Miscellaneous
CFR 50.54(q)(2) Review: EN-EP-801, Emergency
11/04/2019  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Response Organization, Revision 17
Response Organization, Revision 17
71114.04   Procedures       EN-EP-305     Emergency Planning 10CFR50.54(q) Review Program         8
71114.04
71114.05   Corrective Action CR-ANO-       1-2018-04530, 1-2019-02362, 1-2019-03789, 1-2019-03821,
Procedures
Documents                      1-2019-04609, 1-2020-01010, 2-2020-00305, 2-2020-00344,
EN-EP-305
Emergency Planning 10CFR50.54(q) Review Program
71114.05
Corrective Action
Documents
CR-ANO-
1-2018-04530, 1-2019-02362, 1-2019-03789, 1-2019-03821,
1-2019-04609, 1-2020-01010, 2-2020-00305, 2-2020-00344,
2-2020-00663, 2-2020-02801, C-2019-01494, C-2019-
2-2020-00663, 2-2020-02801, C-2019-01494, C-2019-
03094, C-2019-03102, C-2019-03203, C-2019-03223, C-
03094, C-2019-03102, C-2019-03203, C-2019-03223, C-
Line 534: Line 988:
00385, C-2020-00506, C-2020-00864, C-2020-00979, C-
00385, C-2020-00506, C-2020-00864, C-2020-00979, C-
20-00988, C-2020-01166, C-2020-01211, C-2020-01389,
20-00988, C-2020-01166, C-2020-01211, C-2020-01389,
C-2020-01390, C-2020-01435
C-2020-01390, C-2020-01435  
71114.05   Corrective Action CR-ANO-      C-2020-02577
 
71114.05
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71114.05   Engineering       KLD TR - 1097 Arkansas Nuclear One - 2019 Population Update Analysis  09/21/2019
CR-ANO-
C-2020-02577
71114.05
Engineering
Evaluations
Evaluations
71114.05  Engineering      KLD TR - 1167 Arkansas Nuclear One - 2020 Population Update Analysis   09/08/2020
KLD TR - 1097
Arkansas Nuclear One - 2019 Population Update Analysis
09/21/2019
71114.05
Engineering
Evaluations
Evaluations
71114.05   Miscellaneous                   Arkansas Nuclear One (ANO) Medical Emergency Report -   07/21/2020
KLD TR - 1167
Arkansas Nuclear One - 2020 Population Update Analysis
09/08/2020
71114.05
Miscellaneous
Arkansas Nuclear One (ANO) Medical Emergency Report -
October 5, 2019 (corrected)
October 5, 2019 (corrected)
71114.05   Miscellaneous                   Letter of Agreement Between Entergy Operations, Inc. and 05/01/2019
07/21/2020
71114.05
Miscellaneous
Letter of Agreement Between Entergy Operations, Inc. and
Saint Mary's Regional Medical Center
Saint Mary's Regional Medical Center
71114.05   Miscellaneous                   10 CFR 50.54(q)(2) Review: CR-ANO-C-2020-979 and OP-     07/07/2020
05/01/2019
71114.05
Miscellaneous
CFR 50.54(q)(2) Review: CR-ANO-C-2020-979 and OP-
1903.060
1903.060
71114.05   Miscellaneous                   Arkansas Nuclear One Yellow Team Site Drill Report -     09/19/2020
07/07/2020
71114.05
Miscellaneous
Arkansas Nuclear One Yellow Team Site Drill Report -
August 21, 2019
August 21, 2019
71114.05   Miscellaneous                   Arkansas Nuclear One ERO Team Yellow Site Drill Report - 03/05/2020
09/19/2020
71114.05
Miscellaneous
Arkansas Nuclear One ERO Team Yellow Site Drill Report -
February 5, 2020
February 5, 2020
71114.05   Miscellaneous                   Arkansas Nuclear One HP/Post Accident Drill Report -     09/08/2020
03/05/2020
71114.05
Miscellaneous
Arkansas Nuclear One HP/Post Accident Drill Report -
August 4, 2020
August 4, 2020
71114.05   Miscellaneous                   Scenario EOF-PI-2019-04, Blue Team Drill Report         09/26/2019
09/08/2020
71114.05   Miscellaneous                   Scenario EOF-PI-2019-04, Red Team Drill Report           09/12/2019
71114.05
71114.05   Miscellaneous                   Scenario EOF-PI-2020-01, Green Team Drill Report         02/12/2020
Miscellaneous
Inspection Type         Designation     Description or Title                                         Revision or
Scenario EOF-PI-2019-04, Blue Team Drill Report
Procedure                                                                                            Date
09/26/2019
71114.05   Miscellaneous                 Arkansas Nuclear One (ANO) HP/RP ENVIRONMENTAL               09/08/2020
71114.05
Miscellaneous
Scenario EOF-PI-2019-04, Red Team Drill Report
09/12/2019
71114.05
Miscellaneous
Scenario EOF-PI-2020-01, Green Team Drill Report
2/12/2020  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71114.05
Miscellaneous
Arkansas Nuclear One (ANO) HP/RP ENVIRONMENTAL
Drill Report - August 6, 2020
Drill Report - August 6, 2020
71114.05   Miscellaneous                 Arkansas Nuclear One (ANO) Strength Development -           08/2020
09/08/2020
71114.05
Miscellaneous
Arkansas Nuclear One (ANO) Strength Development -
Emergency Planning Virtual Tabletop - August 2020
Emergency Planning Virtual Tabletop - August 2020
71114.05   Miscellaneous                 Scenario EOF-PI-2020-02, Yellow Team Drill - June 25,       06/25/2020
08/2020
71114.05
Miscellaneous
Scenario EOF-PI-2020-02, Yellow Team Drill - June 25,
20
20
71114.05   Miscellaneous                 Arkansas Nuclear One Emergency Plan                         45
06/25/2020
71114.05   Miscellaneous ANO-2019-016   Letter of Agreement Between Entergy Operations, Inc. and     12/26/2019
71114.05
Miscellaneous
Arkansas Nuclear One Emergency Plan
71114.05
Miscellaneous
ANO-2019-016
Letter of Agreement Between Entergy Operations, Inc. and
the Board of Trustees of the University of Arkansas by and
the Board of Trustees of the University of Arkansas by and
on behalf of the University of Arkansas for Medical Sciences
on behalf of the University of Arkansas for Medical Sciences
Hospital
Hospital
71114.05   Miscellaneous EP-2019-015 MS- 2019 Medical Drill with Pope County EMS and University of   10/07/2019
2/26/2019
71114.05
Miscellaneous
EP-2019-015 MS-
2019 Medical Drill with Pope County EMS and University of
Arkansas Medical Services
Arkansas Medical Services
71114.05   Miscellaneous QA-07-2019-     Quality Assurance Audit Report - Emergency Preparedness     05/20/2019
10/07/2019
ANO-1          (50.54(t)(1) & (2))
71114.05
71114.05   Miscellaneous QA-7-2020-ANO- Quality Assurance Audit Report - Emergency Preparedness     05/11/2020
Miscellaneous
(50.54(t)(1) & (2))
QA-07-2019-
71114.05   Procedures   EN-EP-306       Drills and Exercises                                         10
ANO-1
71114.05   Procedures   EN-EP-308       Emergency Planning Critiques                                 6
Quality Assurance Audit Report - Emergency Preparedness  
71114.05   Procedures   EN-LI-102       Corrective Action Program                                   41
(50.54(t)(1) & (2))
71114.05   Procedures   Form 1903.004-N Annual LOA/Contracts Review                                 12/17/2019
05/20/2019
71114.05   Procedures   Form 1903.060A Control Room Kits Inventory                                 09/02/2020
71114.05
71114.05   Procedures   Form 1903.060B Onsite Radiological Monitoring Kit Inventory                 08/18/2020
Miscellaneous
71114.05   Procedures   Form 1903.060C Technical Support Center Kit Inventory                       08/18/2020
QA-7-2020-ANO-
71114.05   Procedures   Form 1903.060E Emergency Operations Facility Kit Inventory                 08/18/2020
Quality Assurance Audit Report - Emergency Preparedness  
71114.05   Procedures   Form 1903.060F Field Monitoring Kit Inventory Form (Kits A-D)               08/18/2020
(50.54(t)(1) & (2))
71114.05   Procedures   Form 1903.060J St. Mary's Hospital Kit Inventory                           08/18/2020
05/11/2020
71114.05   Procedures   Form 1903.060Q Monthly Emergency Kit Surveillance                           08/18/2020
71114.05
71114.05   Procedures   Form 1903.060U UAMS Hospital Kit Inventory                                 08/18/2020
Procedures
71114.05   Procedures   OP-1903.004     Admin. & Maintenance of the Emergency Plan &                 36
EN-EP-306
Drills and Exercises
71114.05
Procedures
EN-EP-308
Emergency Planning Critiques
71114.05
Procedures
EN-LI-102
Corrective Action Program
71114.05
Procedures
Form 1903.004-N
Annual LOA/Contracts Review
2/17/2019
71114.05
Procedures
Form 1903.060A
Control Room Kits Inventory
09/02/2020
71114.05
Procedures
Form 1903.060B
Onsite Radiological Monitoring Kit Inventory
08/18/2020
71114.05
Procedures
Form 1903.060C
Technical Support Center Kit Inventory
08/18/2020
71114.05
Procedures
Form 1903.060E
Emergency Operations Facility Kit Inventory
08/18/2020
71114.05
Procedures
Form 1903.060F
Field Monitoring Kit Inventory Form (Kits A-D)
08/18/2020
71114.05
Procedures
Form 1903.060J
St. Mary's Hospital Kit Inventory
08/18/2020
71114.05
Procedures
Form 1903.060Q
Monthly Emergency Kit Surveillance
08/18/2020
71114.05
Procedures
Form 1903.060U
UAMS Hospital Kit Inventory
08/18/2020
71114.05
Procedures
OP-1903.004
Admin. & Maintenance of the Emergency Plan &
Implementing Procedures
Implementing Procedures
71114.05   Procedures   OP-1903.011Y   Emergency Class Initial Notification Message                 50
71114.05
71114.05   Procedures   OP-1903.060     Emergency Supplies & Equipment                               46
Procedures
Inspection Type             Designation     Description or Title                                     Revision or
OP-1903.011Y
Procedure                                                                                              Date
Emergency Class Initial Notification Message
71114.05   Procedures       OP-1903.069     Equipment Important to Emergency Response                 10
71114.05
71114.05   Self-Assessments LO-ALO-2019-     2020 Pre-NRC Evaluated Exercise Assessment                05/27/2020
Procedures
OP-1903.060
Emergency Supplies & Equipment  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71114.05
Procedures
OP-1903.069
Equipment Important to Emergency Response
71114.05
Self-Assessments LO-ALO-2019-
0087
0087
71114.05   Work Orders       WO               509704, 5276021, 531729, 536314-01, 547435
20 Pre-NRC Evaluated Exercise Assessment
71114.06   Miscellaneous     SES-2-059       Dynamic Exam Scenario                                     2
05/27/2020
71114.06   Miscellaneous     SES-2-072       Dynamic Exam Scenario                                     0
71114.05
71151     Corrective Action CR-ANO-          C-2020-01424
Work Orders
WO
509704, 5276021, 531729, 536314-01, 547435
71114.06
Miscellaneous
SES-2-059
Dynamic Exam Scenario
71114.06
Miscellaneous
SES-2-072
Dynamic Exam Scenario
71151
Corrective Action
Documents
Documents
71151      Corrective Action CR-ANO-         C-2020-02559, C-2020-02575
CR-ANO-
C-2020-01424
71151
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
71151     Miscellaneous                     Siren Testing Verification Checklists from ADH (September
CR-ANO-
C-2020-02559, C-2020-02575
71151
Miscellaneous
Siren Testing Verification Checklists from ADH (September
2019 - June 2020)
2019 - June 2020)
71151     Miscellaneous                     Monthly DEP PI Opportunity Listing (September 2019 - June
71151
Miscellaneous
Monthly DEP PI Opportunity Listing (September 2019 - June
20)
20)
71151     Miscellaneous                     ANO Key ERO Participation Rosters (3Q/2019 - 2Q/2020)
71151
71151     Miscellaneous                     3Q19 MSPI T-Sheets EDG-HPI
Miscellaneous
71151     Miscellaneous                     1Q20 MSPI T-Sheets EDG-HPI
ANO Key ERO Participation Rosters (3Q/2019 - 2Q/2020)
71151     Miscellaneous                     2Q20 MSPI T-Sheets EDG-HPI
71151
71151     Miscellaneous                     4Q19 MSPI T-Sheets EDG-HPI
Miscellaneous
71151     Miscellaneous     20QTR-1         Limited Focus PI Drill - Green Team                       02/25/2020
3Q19 MSPI T-Sheets EDG-HPI
71151     Miscellaneous     DEP PI 20190717 DEP Opportunity Package: SMPI July                       07/02/2019
71151
71151     Miscellaneous     DEP PI 20190903 DEP Opportunity Package: Red Team                         09/12/2019
Miscellaneous
71151     Miscellaneous     DEP PI 20191101 DEP Opportunity Package: SMPI November                   11/01/2019
1Q20 MSPI T-Sheets EDG-HPI
71151     Miscellaneous     DEP PI 20200610 DEP Opportunity Package: Red Team                         06/18/2020
71151
71151     Miscellaneous     EOF-PI-2019-04   DEP Opportunity Package: Blue Team                       09/26/2019
Miscellaneous
71151     Procedures       EN-FAP-EP-005   Emergency Preparedness Performance Indicators             13
2Q20 MSPI T-Sheets EDG-HPI
71152     Corrective Action CR-ANO-         2-2018-00852, 2-2018-00883, 2-2019-03313, 2-2020-00560,
71151
Documents                          2-2020-01987, 2-2020-01996, 2-2020-02451, 2-2020-02455,
Miscellaneous
4Q19 MSPI T-Sheets EDG-HPI
71151
Miscellaneous
20QTR-1
Limited Focus PI Drill - Green Team
2/25/2020
71151
Miscellaneous
DEP PI 20190717
DEP Opportunity Package: SMPI July
07/02/2019
71151
Miscellaneous
DEP PI 20190903
DEP Opportunity Package: Red Team
09/12/2019
71151
Miscellaneous
DEP PI 20191101
DEP Opportunity Package: SMPI November
11/01/2019
71151
Miscellaneous
DEP PI 20200610
DEP Opportunity Package: Red Team
06/18/2020
71151
Miscellaneous
EOF-PI-2019-04
DEP Opportunity Package: Blue Team
09/26/2019
71151
Procedures
EN-FAP-EP-005
Emergency Preparedness Performance Indicators
71152
Corrective Action
Documents
CR-ANO-
2-2018-00852, 2-2018-00883, 2-2019-03313, 2-2020-00560,
2-2020-01987, 2-2020-01996, 2-2020-02451, 2-2020-02455,
2-2020-02467, 2-2020-02850, 2-2020-02904, 2-2020-02921,
2-2020-02467, 2-2020-02850, 2-2020-02904, 2-2020-02921,
2-2020-02924, 2-2020-02971, 2-2020-03036, C-2018-03338
2-2020-02924, 2-2020-02971, 2-2020-03036, C-2018-03338
71152     Drawings         E-2299, Sheet 1A
71152
Inspection Type             Designation     Description or Title                                   Revision or
Drawings
Procedure                                                                                            Date
E-2299, Sheet 1A  
71152     Drawings         E-2638, Sheet 1
 
71152     Drawings         M-2242-AA-26
Inspection
71152     Drawings         P&ID M-2210     6PEAR-95-0290
Procedure
Type
Designation
Description or Title
Revision or
Date
71152
Drawings
E-2638, Sheet 1  
 
71152
Drawings
M-2242-AA-26  
 
71152
Drawings
P&ID M-2210
SHEET 1-4
SHEET 1-4
71152     Engineering       EC-86561
6PEAR-95-0290
 
71152
Engineering
Changes
Changes
71152     Miscellaneous     GL-89-10       Safety Related MOV Testing and Surveillance
EC-86561
71152     Procedures       EN-LI-100       10 CFR 50.59 Evals                                     20
 
71152     Procedures       EN-LI-100       Process Applicability Determination                     29
71152
71152     Procedures       OP-2104.029     Service Water Operations                               39
Miscellaneous
71152     Procedures       OP-2305.005     Valve Stroke and Position Verification                 16
GL-89-10
71152     Work Orders       WO             501163, 517346, 545045, 547841
Safety Related MOV Testing and Surveillance
71153     Corrective Action CR-ANO-        2-2020-02964, 2-2020-03214, 2-2020-03218, C-2020-02529
71152
Procedures
EN-LI-100
CFR 50.59 Evals
71152
Procedures
EN-LI-100
Process Applicability Determination
71152
Procedures
OP-2104.029
Service Water Operations
71152
Procedures
OP-2305.005
Valve Stroke and Position Verification
71152
Work Orders
WO
501163, 517346, 545045, 547841
71153
Corrective Action
Documents
Documents
71153     Drawings         M-2205, Sheet 1 Piping and Instrument Diagram - Extraction Steam Heater 45
CR-ANO-
2-2020-02964, 2-2020-03214, 2-2020-03218, C-2020-02529
71153
Drawings
M-2205, Sheet 1
Piping and Instrument Diagram - Extraction Steam Heater
Vents and Drains
Vents and Drains
71153     Drawings         M-2205, Sheet 4 Piping and Instrument Diagram - Extraction Steam Heater 13
71153
Drawings
M-2205, Sheet 4
Piping and Instrument Diagram - Extraction Steam Heater
Vents and Drains
Vents and Drains
71153     Drawings         M-2206, Sheet 1 Steam Generator Secondary System                       154
71153
24
Drawings
M-2206, Sheet 1
Steam Generator Secondary System
154
}}
}}

Latest revision as of 13:51, 29 November 2024

Integrated Inspection Report 05000313/2020003 and 05000368/2020003 and Independent Spent Fuel Storage Installation Aging Management Inspection Report 07200013/2020001
ML20314A323
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/09/2020
From: John Dixon
NRC Region 4
To: Dinelli J
Entergy Operations
References
IR 2020001
Download: ML20314A323 (27)


Text

November 9, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000313/2020003 AND 05000368/2020003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION AGING MANAGEMENT INSPECTION REPORT 07200013/2020001

Dear Mr. Dinelli:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2. On October 15, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects

Docket Nos. 05000313, 05000368, and 07200013 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313, 05000368, and 07200013

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2020003, 05000368/2020003, and 07200013/2020001

Enterprise Identifier: I-2020-003-0003 and I-2020-001-0094

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

July 1, 2020 to September 30, 2020

Inspectors:

R. Alexander, Senior Emergency Preparedness Inspector

L. Brookhart, Senior Spent Fuel Storage Inspector

M. Davis, Transportation and Storage Safety Inspector

T. DeBey, Resident Inspector

M. Doyle, Operations Engineer

C. Henderson, Senior Resident Inspector

J. Kirkland, Senior Operations Engineer

J. Melfi, Senior Resident Inspector

T. Sullivan, Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000368/2020003-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at full power where it remained for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.

Unit 2 began the inspection period at full power and remained at full power until September 9, 2020, when the unit reduced power to 94 percent to investigate a suspected leak in high pressure feedwater heater 2E1B. After determination there was no leak, Unit 2 returned to full power on September 10, 2020, where it remained for the rest of the reporting period except for minor reductions in power to support scheduled surveillances.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk-significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal summer heat and storms for the following systems:
  • Cooling water intake structure

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency feedwater while performing surveillance on emergency feedwater initiation and control on September 9, 2020
(2) Unit 2 service water system on October 1, 2020

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 lube oil reservoir room, Fire Area B-1, Fire Zone 175-CC, on July 1, 2020
(2) Unit 2 lower north electrical penetration room, Fire Area B-3, Fire Zone 2112-BB, on July 1, 2020
(3) Unit 2 motor-driven emergency feedwater pump room, Fire Area FF, Fire Zone 2025-JJ, on July 6, 2020
(4) Unit 1 upper north piping penetration room, Fire Area B-1, Fire Zone 79-U, on July 6, 2020
(5) Unit 2 motor control center and access corridor, Fire Area JJ, Fire Zone 2109-U, on September 22, 2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 2 emergency diesel generator 1 jacket water heat exchanger on September 10, 2020

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (2 Samples)

(1) The inspectors reviewed and evaluated the Unit 1 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.
(2) The inspectors reviewed and evaluated the Unit 2 licensed operator examination failure rates for the requalification annual operating examination administered June 2020 through July 2020.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on June 12 and June 19, 2020.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during an unplanned down power to investigate a possible feedwater heater tube leak on September 9, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operator requalification training for a steam generator tube rupture on September 24, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2 in core instrument flange number 2, 4, and 6 leakage during Refueling Outage 2R27 on August 19, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 emergency diesel generator 1 maintenance outage window on September 16, 2020
(2) Unit 1 intermediate cooling water heat exchanger E-28A/B tube plugging margin on September 18, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 safety-related 4160 volt switchgear overcurrent relay Part 21 operability on September 8, 2020 (2)2VEF-24C emergency diesel generator exhaust fan thermal overload failure on September 9, 2020
(3) Unit 1 containment cooler VCC-2A/D operability on September 9, 2020
(4) Unit 2 service water pump A failure to start due to anti-pump breaker failure operability on September 10, 2020
(5) Unit 2 emergency diesel generator B wall thinning of silencer operability on September 23, 2020
(6) Unit 2 emergency diesel generator A and B day tank level controller operability on September 29, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Containment sump isolation valve 2CV-5650-2 to emergency core cooling system B suction on August 26, 2020
(2) Unit 2 charging pump A on September 11, 2020
(3) Unit 2 emergency diesel generator A train on September 15, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 2 service water systems A and B as-left flow test on September 23, 2020

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2019, and August 30, 2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the licensee's Emergency Response Organization between September 1, 2019, and August 30, 2020.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following Emergency Plan Implementing Procedure changes and the licensee's Emergency Plan change review process per 10 CFR 50.54(q):
  • EN-EP-310, Emergency Response Organization Notification System, Revision 9
  • EN-EP-801, Emergency Response Organization, Revision 17
  • OP-1904.002, Offsite Dose Projections, Revisions 48 and 49

This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2019, and August 30, 2020.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Unit 2 dynamic simulator examination performance indicator opportunity on July 22,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1)

(July 1, 2019 - June 30, 2020)

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) (July 1, 2019 - June 30, 2020)

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) (July 1, 2019 - June 30, 2020)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2019 - June 30, 2020)
(2) Unit 2 (July 1, 2019 - June 30, 2020)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (3 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 2 shutdown cooling control valve 2CV-1456-2 failure to operate on August 14, 2020
(2) Unit 2 emergency feedwater isolation valve 2CV-1039-1 failure to close on September 8, 2020
(3) Unit 2 emergency diesel generator day tank level enclosure temperature on September 29, 2020

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) The inspectors evaluated the stuck control element assemblies in Unit 2 and the licensees response on August 6, 2020.
(2) The inspectors evaluated a 5 percent down power for a suspected feedwater heater leak in Unit 2 and the licensees response on September 9,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 2690/011 - Review of Aging Management Programs at Independent Spent Fuel Storage Installations The inspectors evaluated whether the licensee had adequate procedures in place to implement an Aging Management Program (AMP) for their independent spent fuel storage installation (ISFSI) from September 17-20, 2019, and conducted an in-office review of additional information including the inspection results from July 14-16, 2020, and September 28-30, 2020.

Review of Aging Management Programs at Independent Spent Fuel Storage Installations (1 Sample)

(1) The overall program and implementing procedures that the licensee had in place to implement the AMP were inspected in accordance with paragraphs 03.01-03.10 of the temporary instruction and the inspectors found the licensees program and procedures consistent with the AMP provided in the renewed Certificate of Compliance (CoC) for the Westinghouse Electric Companys ventilated storage casks (VSCs) system (Docket No. 72-1007), formerly EnergySolutions. However, the licensee did not perform all the required AMP inspections within the period specified in the renewed CoC license Condition 5.iii and VSC's Final Safety Analysis Report (FSAR) as updated. The licensee had up to 2 years to complete the inspections after the effective date of the CoC renewal, which was September 20, 2017, or within 1 year of the 20th anniversary of the first cask loaded at the site, whichever was later. The licensee loaded the first VSC-24 cask on December 12, 1996. Therefore, the last day to implement the AMP inspections was September 20, 2019.

Following the missed AMP inspections, the licensee submitted an exemption from the regulations delineated in 10 CFR 72.212(b)(3), 10 CFR 72.212(b)(5)(i), and 10 CFR 212(b)(11) to provide additional time to perform the required AMP inspections including the lead cask inspection. The licensee proposed to conduct the missed AMP inspections within the next 6 months and concluded that nothing significant would be expected since aging is a long-term degradation issue. The NRC technical staff reviewed and assessed the information presented within the exemption request and found the information acceptable to conduct the AMP inspection within the next 6 months. The technical reviewers and inspectors determined that the risk would be extremely low because of the continuous monitoring of the storage casks and the results of previous aging management inspections conducted at two other sites, which identified no major issues on the VSC-24 storage system. Based on the NRCs technical review of the exemption request, the inspectors decided to treat this issue like a missed technical specification surveillance, which generally allows up to 25 percent additional time to perform and complete a missed surveillance. This issue was determined to constitute a violation of minor significance that is not subject to enforcement action in accordance with Section 2.2.2.e. of the Enforcement Policy.

The licensee completed the remaining AMP inspections during the final week in March 2020 and presented the results of the inspection to the inspection staff in April 2020. The results of the AMP inspections did not show any major degradation of the selected VSC-24 storage systems located on the site.

INSPECTION RESULTS

Failure to Properly Evaluate Design Change to Emergency Diesel Generator Day Tank Level Control and Indication Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems

Green NCV 05000368/2020003-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components. Specifically, the licensee failed to properly evaluate the electrical and thermal loads within the enclosures, resulting in a reasonable doubt with respect to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures.

Description:

On January 15, 2020, the inspectors noted that there appeared to be no cooling air flow through the electrical enclosures containing the day tank level control and indication systems for both Unit 2 emergency diesel generators. These enclosures contain the power supplies and electronic equipment needed to detect the diesel fuel oil level in the day tanks, to actuate the fuel transfer components to add fuel to the day tanks, and to provide alarms to the control room if an abnormal condition was detected. Based on the inspectors questioning, the licensee wrote Condition Report (CR) CR-ANO-2-2020-00100 to document that an air filter on the emergency diesel generator A equipment box was dirty.

Subsequently, the licensee wrote Condition Report CR-ANO-2-2020-00117 to document that the cooling fan on the emergency diesel generator B enclosure was not running.

Maintenance performed every 2 years (Work Order (WO) 52743222 and WO 52751639 in 2018) required that the enclosure ventilation filter be cleaned; however, it implied that one filter exists on each enclosure when there are actually two. The site engineering department evaluated the heat load and electrical power load for the control enclosures and identified that the original (1997) engineering evaluation had errors. The actual electrical and thermal loads were significantly higher than the original analysis. Measurements and analyses performed in July 2020 had significant uncertainty and did not support the original engineering evaluation that no cooling air flow was needed. The inspectors questioned the data and the site responded with additional measurements and analyses (with minimal uncertainty) in September 2020 that demonstrated a maximum estimated enclosure temperature that would be below the 140 °F design limit of the limiting internal components. The estimated enclosure electrical heat load started with the original analysis of ~5.5 Watts (W), increased to the July estimate of ~72 W and ended with the September value of ~43 W. The final information does support that forced cooling is not needed to maintain the electronic components within their design specifications.

Corrective Actions: The licensee replaced all enclosure filters in both emergency diesel generators fuel oil transfer electronic enclosures and replaced the cooling fan in the train B emergency diesel generator enclosure to resolve the immediate air flow issues. The bottom (inlet) filters on the enclosures were cleaned in January 2020 and then documented in July 2020 as being dirty again. A corrective action was proposed to increase the preventive maintenance frequency to semiannual for these filters. A procedure improvement form was also submitted to improve the preventive maintenance and to clearly indicate that two filters are present on each enclosure.

Corrective Action References: Condition Reports CR-ANO-2-2020-00100, CR-ANO-2-2020-00101, CR-ANO-2-2020-00117, CR-ANO-2-2020-00560, CR-ANO-2-2020-02904, CR-ANO-2-2020-02921, CR-ANO-2-2020-02924, CR-ANO-2-2020-02971, and CR-ANO-2-2020-03036

Performance Assessment:

Performance Deficiency: The licensee failed to appropriately verify the adequacy of a design change made in 1997 for safety-related emergency diesel generator fuel oil day tank transfer components.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the errors were such that there was a reasonable doubt as to the qualification of the day tank level control electronics to be able to operate in the environment of the enclosures. The licensee performed new types of evaluations to reach the final conclusion that the enclosure components would remain within their design criteria.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding had very low safety significance (Green) because the finding did not involve the design or qualification of a mitigating structure, system, or component, did not represent a loss of system or function, did not represent an actually loss of function of at least a single train or two separate safety systems, and did not represent an actual loss of function of one or more nontechnical specification trains of equipment designated as high safety significance in accordance with the licensees maintenance rule program.

Cross-Cutting Aspect: None. No cross-cutting aspect was assigned because this deficiency occurred in 1997 and is not indicative of current licensee performance.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion III, Design Control, requires, in part, that design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Contrary to the above, the licensee did not appropriately verify the adequacy of the design change made in 1997 for safety-related fuel oil transfer components located in the emergency diesel generator day tank level control enclosures by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program.

Specifically, the licensee failed to provide adequate design evaluations for the electrical and thermal loads within the day tank level control enclosures. Documentation that supported qualification of the day tank level control and indication components was not adequately developed to assure that the components would be capable of performing their functions correctly during a design basis event.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 17, 2020, the inspectors presented the annual and biennial requalification inspection results to Mr. J. Sullivan, General Manager, Plant Operations, and other members of the licensee staff.
  • On September 18, 2020, the inspectors presented the emergency preparedness program inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
  • On October 1, 2020, the inspectors presented the ISFSI aging management inspection results to Mr. R. Clark, Licensing Specialist, and other members of the licensee staff.
  • On October 15, 2020, the inspectors presented the integrated inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2690/011

Corrective Action

Documents

CR-ANO-

C-2019-03560, C-2019-03563(1), C-2019-04471, C-2020-

01137, C-2020-01138, C-2020-01139

Procedures

EN-FAP-OU-111

Examination of VSC Top End Steel Components AMP

EN-FAP-OU-112

Examination of MTC Assembly AMP

EN-FAP-OU-113

Dry Fuel Tollgate Assessment

EN-FAP-OU-114

VSC-24 Lead Cask Inspection

EN-FAP-OU-115

Examination of VCC Assembly Ventilation Ducts & Annulus

AMP

EN-FAP-OU-116

Examination of VCC Assembly Exterior AMP

EN-LI-102

Corrective Action Program

EN-LI-113

Licensing Basis Document Change Process

EN-OE-100

Operating Experience Program

OP-3401.001

Conduct of Dry Fuel Storage (DFS)

OP-3401.002

VSC-24 Aging Management Annual Examination of VCC

Exterior

OP-3401.003

VSC-24 Aging Management 5 Year Examination of VSC

Assembly Ventilation Ducts and Annulus

OP-3401.004

VSC-24 Aging Management 10 Year Examination of VSC

Top End Steel Components

OP-3401.005

VSC-24 Aging Management 20 Year Examination of VSC

Lead Cask

OP-3401.006

VSC-24 Aging Management 10 Year Examination of MTC

Assembly

Work Orders

WO 50239086

5YR Inspection of VCC Interior Surface and Exterior of MSB

WO 52883726

20YR Examination VCC Lead Cask

WO 52883728

10YR Examination VCC Top End Steel

71111.01

Corrective Action

Documents

CR-ANO-

C-2019-03814, C-2020-02001, C-2020-02080, C-2020-

2131

71111.01

Procedures

OP-3305.004

ANO Transformer Yard Controls

71111.04

Corrective Action

Documents

CR-ANO-

1-2020-00290, 1-2020-00952, 1-2020-01168, 1-2020-01211,

1-2020-01215, 2-2020-01466, 2-2020-01931, 2-2020-02388,

2-2020-02389, 2-2020-02446, 2-2020-02458, 2-2020-02646,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-2020-02733, 2-2020-02852

71111.04

Drawings

M-2210

P&ID Service Water System

71111.04

Miscellaneous

STM-2-42

Service Water and Auxiliary Cooling Water Systems

71111.04

Procedures

OP-1106.006

Emergency Feedwater Pump Operation

114

71111.04

Procedures

OP-2104.029

Service Water System Operations

117

71111.04

Procedures

OP-3305.001

Ops System Alignment Tests

71111.04

Work Orders

WO 2863446

71111.05

Calculations

CALC-83-E-0063-

Flooding Depth due to Fire Protection Discharges and

Known Elevations of Safety Related Electrical Equipment

71111.05

Calculations

CALC-90-R-1014-

Penetration 0175-1A-0088

71111.05

Corrective Action

Documents

CR-ANO

1-2018-00221, 1-2018-00911

71111.05

Drawings

FP-2103, Sheet 1

Fire Zoned Intermediate Floor Plan El. 368'-0" and 372'-0"

71111.05

Fire Plans

PFP-U1

ANO Prefire Plan (Unit 1)

71111.05

Fire Plans

PFP-U2

ANO Prefire Plan (Unit 2)

71111.05

Miscellaneous

Arkansas Nuclear One - Unit 1 and Unit 2 Fire Hazard

Analysis

71111.05

Miscellaneous

Fire Impairment

6904, 7437

71111.05

Procedures

OP-1203.049

Fires In Areas Affecting Safe Shutdown

71111.05

Procedures

OP-1203.055

Actions for Turbine Generator Fires

71111.05

Procedures

OP-2203.034

Fire or Explosion

71111.05

Procedures

OP-2203.049

Fires in Areas Affecting Safe Shutdown

71111.07A Calculations

CALC 91-D-2003-

71111.07A Corrective Action

Documents

CR-ANO-

2-2018-00735, 2-2020-00960, 2-2020-02617, 2-2020-02804,

2-2020-03093

71111.07A Procedures

OP-2104.029

Service Water System Operations

117

71111.07A Procedures

OP-2305.062

Service Water System Flow Testing

71111.07A Work Orders

WO 354436, 499061, 517346, 52865292, 52877528, 52891262

71111.11B Corrective Action

Documents

CR-ANO-

2-2019-01432, 2-2020-00206, 2-2020-02164, 2-2020-02611,

C-2018-02463, C-2018-02830, C-2018-03594, C-2019-

00110, C-2019-00443, C-2019-00776, C-2019-00828, C-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2019-01696, C-2019-01697, C-2019-01698, C-2019-01736,

C-2019-02123, C-2019-02285, C-2019-02290, C-2019-

2300, C-2019-02435, C-2019-02605, C-2019-02759, C-

2019-02760, C-2019-02761, C-2019-04220, C-2019-04684,

C-2019-04702, C-2019-04875, C-2020-00867, C-2020-

01323

71111.11B Miscellaneous

Cycle 2005 - LOR Biennial Written Exam Details - Exam - 2 -

RO

06/19/2020

71111.11B Miscellaneous

Cycle 2005 - LOR Biennial Written Exam Details - Exam - 1 -

SRO

06/12/2020

71111.11B Miscellaneous

JPM-A2JPM-RO-

2D36

2D-36 Battery Eliminator Startup

71111.11B Miscellaneous

JPM-A2JPM-RO-

CCW02

Shift Running CCW pumps

71111.11B Miscellaneous

JPM-A2JPM-RO-

CVCS2

Perform Emergency Boration (Alternate Success Path)

71111.11B Miscellaneous

JPM-A2JPM-RO-

FPEM1

Perform service water emergency makeup to the SFP (with

Loop 1 service water)

71111.11B Miscellaneous

JPM-A2JPM-RO-

SIT10

SIT Isolation

71111.11B Miscellaneous

JPM-A2JPM-

SRO-EAL30

Classify an Emergency Event

71111.11B Miscellaneous

SES-2-009

Dynamic Exam Scenario, Week of 7/6/20

71111.11B Miscellaneous

SES-2-034

Dynamic Exam Scenario, Week of 7/6/20

71111.11B Procedures

DG-TRNA-015-

EXAMSEC

Simulator Exam Security Guidelines

71111.11B Procedures

EN-TQ-114

Licensed Operator Requalification Training Program

Description

71111.11B Procedures

EN-TQ-210

Conduct of Simulator Training

71111.11B Procedures

EN-TQ-217

Examination Security

71111.11B Procedures

TQF-114-

AOESIM

Annual Operating Exam JPM Quality Checklist

71111.11B Procedures

TQF-114-

AOESIM

Annual Operating Exam Simulator Scenario Set Quality

Checklist

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Calculations

CALC-18-E-0007-

71111.12

Corrective Action

Documents

CR-ANO-

2-2017-03388, 2-2018-00852, 2-2018-00883, 2-2019-03313,

2-2020-00513, 2-2020-00968, 2-2020-01078, 2-2020-01234,

2-2020-01395, 2-2020-01424, 2-2020-01447, 2-2020-01486,

2-2020-01611, 2-2020-01615, 2-2020-01642, 2-2020-01658,

2-2020-01665, 2-2020-01709, 2-2020-01731, 2-2020-01802,

2-2020-01928, 2-2020-01987, 2-2020-01996, 2-2020-

01928, 2-2020-02035, 2-2020-02048, 2-2020-02455, 2-

20-02807, 2-2020-02850, 2-2020-03044, 2-2020-03057,

C-2018-03338

71111.12

Drawings

M-2210, Sheet 1-

4, 6

P&ID

71111.12

Drawings

M-2242-AA-26

71111.12

Miscellaneous

GL-89-10

Safety Related MOV Testing and Surveillance

71111.12

Miscellaneous

PEAR-95-0290

71111.12

Procedures

OP-2507.004

ICI Flange Disassembly

71111.12

Procedures

OP-2507.005

ICI Flange Reassembly and Cable Connections

71111.12

Work Orders

WO 501163, 507265, 519374, 547841

71111.13

Corrective Action

Documents

CR-ANO-

1-2017-04444, 1-2017-05061, 1-2020-00295, 1-2020-00481,

1-2020-00932, 1-2020-01002, 2-2020-03044, 2-2020-03057

71111.13

Engineering

Changes

EC-63596

71111.13

Engineering

Changes

EC-70622

71111.13

Engineering

Changes

EC-72994

71111.13

Procedures

EN-WM-104

On-Line Risk Assessment

71111.13

Procedures

OP-2104.036

Emergency Diesel Generator Operations

71111.13

Work Orders

WO 304158, 436716

71111.15

Calculations

974603P201-03

EDG Fuel Oil Day Tank Level Switches

71111.15

Calculations

CALC-20-E-0010-

71111.15

Calculations

CALC-90-D-6028-

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Calculations

CALC-90-E-0013-

71111.15

Calculations

CALC-91-R-2013-

SW Performance Testing Method

71111.15

Corrective Action

Documents

CR-ANO-

1-2005-00816, 1-2005-02753, 1-2006-00167, 1-2020-00363,

1-2020-00585,1-2020-01025, 2-2014-02605, 2-2014-02827,

2-2018-01147, 2-2018-01686, 2-2020-00100, 2-2020-02446,

2-2020-02458, 2-2020-02584, 2-2020-02606, 2-2020-02733,

2-2020-03095, C-2020-01563, C-2020-01706

71111.15

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

2-2020-00560

71111.15

Engineering

Changes

EC-77690

71111.15

Engineering

Changes

EC-77691

71111.15

Engineering

Changes

EC-87790

71111.15

Miscellaneous

2-BOP-UT-16-

2

71111.15

Miscellaneous

2-BOP-UT-18-

006

71111.15

Miscellaneous

2-BOP-UT-18-

008

71111.15

Miscellaneous

2-BOP-UT-20-

046

71111.15

Miscellaneous

2-BOP-UT-20-

049

71111.15

Miscellaneous

ER-2000-2646-

003

71111.15

Miscellaneous

ER974603P201

Replace EDG Day Tank Level Control Switches

09/1998

71111.15

Procedures

OP-1104.033

Supplement 5

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Procedures

OP-2104.029

Service Water Operations Change

117

71111.15

Procedures

OP-2104.036

Emergency Diesel Generator Operations

71111.15

Procedures

OP-2204.012H

Annunciator 2K08 Corrective Action

71111.15

Work Orders

WO 393099, 394916, 503684, 545948, 50274573, 52746504,

2858463, 52868957

71111.19

Corrective Action

Documents

CR-ANO-

2-2020-03061, 2-2020-03062, 2-2020-03170

71111.19

Work Orders

WO 2990, 542752, 545039, 549683, 52618649, 52858463,

2858572, 52859347, 52861717, 52868160, 52873681,

2877528

71111.22

Calculations

CALC-90-E-0116-

71111.22

Corrective Action

Documents

CR-ANO-

2-2018-03994, 2-2020-00960, 2-2020-01794, 2-2020-01795,

2-2020-01796, 2-2020-01797, C-2020-01460

71111.22

Corrective Action

Documents

CR-RBS-

20-01723 (CA-14)

71111.22

Engineering

Changes

EC-61132

71111.22

Engineering

Changes

EC-79644

71111.22

Engineering

Changes

EC-86561

71111.22

Procedures

OP-2104.033

71111.22

Procedures

OP-2305.062

71111.22

Work Orders

WO 517346

71114.02

Corrective Action

Documents

CR-ANO-

C-2019-03166, C-2019-03621, C-2020-01425

71114.02

Miscellaneous

Design Report Update: Upgraded Public Alert and

Notification System (ANS) - Arkansas Nuclear One

May 2009,

as Revised

May 2016

71114.02

Miscellaneous

Design Report Update: Upgraded Public Alert and

Notification System (ANS) - Arkansas Nuclear One

Supplement

(February

2017)

71114.02

Miscellaneous

FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power

06/28/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Plant Alert and Notification System (ANS) Design Report

Update

71114.02

Miscellaneous

FEMA Letter - Arkansas Nuclear One (ANO) Nuclear Power

Plant Alert and Notification System (ANS) Design Report

Update Supplement (1) dated February 2017

2/28/2017

71114.02

Procedures

Arkansas Dept. of Health - Guidelines for Siren Warning

System

10/2012

71114.02

Procedures

Form 1903.004-K

Alert and Notification System Oversight Activity

2/18/2019

71114.02

Procedures

Form 1903.004-L

Offsite Training Program Oversight

09/16/2019,

09/23/2019

71114.03

Corrective Action

Documents

CR-ANO-

C-2019-03276, C-2019-04446, C-2019-04623, C-2019-

04759, C-2020-00132, C-2020-00136, C-2020-00380

71114.03

Miscellaneous

Entergy - Arkansas Nuclear One On-Shift Staffing Analysis

Final Report

71114.03

Procedures

EN-EP-310

Emergency Response Organization Notification System

71114.03

Procedures

Form 1903.062C

2019 3rd Quarter Staffing Drill Report - Yellow Team

September 22, 2019 (Sunday) @ 0800

09/25/2019

71114.03

Procedures

Form 1903.062C

2019 4th Quarter Staffing Drill Report - Green Team

November 26, 2019 (Tuesday) @ 0445

2/03/2019

71114.03

Procedures

Form 1903.062C

20 1st Quarter Staffing Drill Report - Green Team January

15, 2020 (Wednesday) @ 0530

01/15/2020

71114.03

Procedures

Form 1903.062C

20 1st Quarter Staffing Drill Report - Red Team January

27, 2019 (Monday) @ 1830

01/30/2020

71114.03

Procedures

Form 1903.062C

20 2nd Quarter Staffing Drill Report - Yellow Team May

30, 2020 (Saturday) @ 0800

06/09/2020

71114.03

Procedures

OP-1203.048

Security Event

71114.03

Procedures

OP-1903.011

Emergency Response/Notifications

71114.04

Miscellaneous

CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose

Projections, Rev. 48

01/08/2020

71114.04

Miscellaneous

CFR 50.54(q)(2) Review: OP-1904.002, Offsite Dose

Projections, Rev. 49

04/08/2020

71114.04

Miscellaneous

CFR 50.54(q)(2) Review: EN-EP-310, Emergency

Response Organization Notification System, Rev. 9

03/11/2020

71114.04

Miscellaneous

CFR 50.54(q)(2) Review: EN-EP-801, Emergency

11/04/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Response Organization, Revision 17

71114.04

Procedures

EN-EP-305

Emergency Planning 10CFR50.54(q) Review Program

71114.05

Corrective Action

Documents

CR-ANO-

1-2018-04530, 1-2019-02362, 1-2019-03789, 1-2019-03821,

1-2019-04609, 1-2020-01010, 2-2020-00305, 2-2020-00344,

2-2020-00663, 2-2020-02801, C-2019-01494, C-2019-

03094, C-2019-03102, C-2019-03203, C-2019-03223, C-

2019-03229, C-2019-03766, C-2019-04061, C-2019-04476,

C-2019-04788, C-2020-00319, C-2020-00382, C-2020-

00385, C-2020-00506, C-2020-00864, C-2020-00979, C-

20-00988, C-2020-01166, C-2020-01211, C-2020-01389,

C-2020-01390, C-2020-01435

71114.05

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2020-02577

71114.05

Engineering

Evaluations

KLD TR - 1097

Arkansas Nuclear One - 2019 Population Update Analysis

09/21/2019

71114.05

Engineering

Evaluations

KLD TR - 1167

Arkansas Nuclear One - 2020 Population Update Analysis

09/08/2020

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) Medical Emergency Report -

October 5, 2019 (corrected)

07/21/2020

71114.05

Miscellaneous

Letter of Agreement Between Entergy Operations, Inc. and

Saint Mary's Regional Medical Center

05/01/2019

71114.05

Miscellaneous

CFR 50.54(q)(2) Review: CR-ANO-C-2020-979 and OP-

1903.060

07/07/2020

71114.05

Miscellaneous

Arkansas Nuclear One Yellow Team Site Drill Report -

August 21, 2019

09/19/2020

71114.05

Miscellaneous

Arkansas Nuclear One ERO Team Yellow Site Drill Report -

February 5, 2020

03/05/2020

71114.05

Miscellaneous

Arkansas Nuclear One HP/Post Accident Drill Report -

August 4, 2020

09/08/2020

71114.05

Miscellaneous

Scenario EOF-PI-2019-04, Blue Team Drill Report

09/26/2019

71114.05

Miscellaneous

Scenario EOF-PI-2019-04, Red Team Drill Report

09/12/2019

71114.05

Miscellaneous

Scenario EOF-PI-2020-01, Green Team Drill Report

2/12/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) HP/RP ENVIRONMENTAL

Drill Report - August 6, 2020

09/08/2020

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) Strength Development -

Emergency Planning Virtual Tabletop - August 2020

08/2020

71114.05

Miscellaneous

Scenario EOF-PI-2020-02, Yellow Team Drill - June 25,

20

06/25/2020

71114.05

Miscellaneous

Arkansas Nuclear One Emergency Plan

71114.05

Miscellaneous

ANO-2019-016

Letter of Agreement Between Entergy Operations, Inc. and

the Board of Trustees of the University of Arkansas by and

on behalf of the University of Arkansas for Medical Sciences

Hospital

2/26/2019

71114.05

Miscellaneous

EP-2019-015 MS-

2019 Medical Drill with Pope County EMS and University of

Arkansas Medical Services

10/07/2019

71114.05

Miscellaneous

QA-07-2019-

ANO-1

Quality Assurance Audit Report - Emergency Preparedness

(50.54(t)(1) & (2))

05/20/2019

71114.05

Miscellaneous

QA-7-2020-ANO-

Quality Assurance Audit Report - Emergency Preparedness

(50.54(t)(1) & (2))

05/11/2020

71114.05

Procedures

EN-EP-306

Drills and Exercises

71114.05

Procedures

EN-EP-308

Emergency Planning Critiques

71114.05

Procedures

EN-LI-102

Corrective Action Program

71114.05

Procedures

Form 1903.004-N

Annual LOA/Contracts Review

2/17/2019

71114.05

Procedures

Form 1903.060A

Control Room Kits Inventory

09/02/2020

71114.05

Procedures

Form 1903.060B

Onsite Radiological Monitoring Kit Inventory

08/18/2020

71114.05

Procedures

Form 1903.060C

Technical Support Center Kit Inventory

08/18/2020

71114.05

Procedures

Form 1903.060E

Emergency Operations Facility Kit Inventory

08/18/2020

71114.05

Procedures

Form 1903.060F

Field Monitoring Kit Inventory Form (Kits A-D)

08/18/2020

71114.05

Procedures

Form 1903.060J

St. Mary's Hospital Kit Inventory

08/18/2020

71114.05

Procedures

Form 1903.060Q

Monthly Emergency Kit Surveillance

08/18/2020

71114.05

Procedures

Form 1903.060U

UAMS Hospital Kit Inventory

08/18/2020

71114.05

Procedures

OP-1903.004

Admin. & Maintenance of the Emergency Plan &

Implementing Procedures

71114.05

Procedures

OP-1903.011Y

Emergency Class Initial Notification Message

71114.05

Procedures

OP-1903.060

Emergency Supplies & Equipment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Procedures

OP-1903.069

Equipment Important to Emergency Response

71114.05

Self-Assessments LO-ALO-2019-

0087

20 Pre-NRC Evaluated Exercise Assessment

05/27/2020

71114.05

Work Orders

WO 509704, 5276021, 531729, 536314-01, 547435

71114.06

Miscellaneous

SES-2-059

Dynamic Exam Scenario

71114.06

Miscellaneous

SES-2-072

Dynamic Exam Scenario

71151

Corrective Action

Documents

CR-ANO-

C-2020-01424

71151

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2020-02559, C-2020-02575

71151

Miscellaneous

Siren Testing Verification Checklists from ADH (September

2019 - June 2020)

71151

Miscellaneous

Monthly DEP PI Opportunity Listing (September 2019 - June

20)

71151

Miscellaneous

ANO Key ERO Participation Rosters (3Q/2019 - 2Q/2020)

71151

Miscellaneous

3Q19 MSPI T-Sheets EDG-HPI

71151

Miscellaneous

1Q20 MSPI T-Sheets EDG-HPI

71151

Miscellaneous

2Q20 MSPI T-Sheets EDG-HPI

71151

Miscellaneous

4Q19 MSPI T-Sheets EDG-HPI

71151

Miscellaneous

20QTR-1

Limited Focus PI Drill - Green Team

2/25/2020

71151

Miscellaneous

DEP PI 20190717

DEP Opportunity Package: SMPI July

07/02/2019

71151

Miscellaneous

DEP PI 20190903

DEP Opportunity Package: Red Team

09/12/2019

71151

Miscellaneous

DEP PI 20191101

DEP Opportunity Package: SMPI November

11/01/2019

71151

Miscellaneous

DEP PI 20200610

DEP Opportunity Package: Red Team

06/18/2020

71151

Miscellaneous

EOF-PI-2019-04

DEP Opportunity Package: Blue Team

09/26/2019

71151

Procedures

EN-FAP-EP-005

Emergency Preparedness Performance Indicators

71152

Corrective Action

Documents

CR-ANO-

2-2018-00852, 2-2018-00883, 2-2019-03313, 2-2020-00560,

2-2020-01987, 2-2020-01996, 2-2020-02451, 2-2020-02455,

2-2020-02467, 2-2020-02850, 2-2020-02904, 2-2020-02921,

2-2020-02924, 2-2020-02971, 2-2020-03036, C-2018-03338

71152

Drawings

E-2299, Sheet 1A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152

Drawings

E-2638, Sheet 1

71152

Drawings

M-2242-AA-26

71152

Drawings

P&ID M-2210

SHEET 1-4

6PEAR-95-0290

71152

Engineering

Changes

EC-86561

71152

Miscellaneous

GL-89-10

Safety Related MOV Testing and Surveillance

71152

Procedures

EN-LI-100

CFR 50.59 Evals

71152

Procedures

EN-LI-100

Process Applicability Determination

71152

Procedures

OP-2104.029

Service Water Operations

71152

Procedures

OP-2305.005

Valve Stroke and Position Verification

71152

Work Orders

WO 501163, 517346, 545045, 547841

71153

Corrective Action

Documents

CR-ANO-

2-2020-02964, 2-2020-03214, 2-2020-03218, C-2020-02529

71153

Drawings

M-2205, Sheet 1

Piping and Instrument Diagram - Extraction Steam Heater

Vents and Drains

71153

Drawings

M-2205, Sheet 4

Piping and Instrument Diagram - Extraction Steam Heater

Vents and Drains

71153

Drawings

M-2206, Sheet 1

Steam Generator Secondary System

154