ML20147B282: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:._.
{{#Wiki_filter:._.
I From:     John S. Phite   (JRW1)f 4 To:       DJH h14.41   j g7-                                     ,
I From:
Date:     Fri ay, J     16, 1995 5:23 pm                         i
John S. Phite (JRW1)f 4 To:
DJH h14.41 g7-j Date:
Fri ay, J 16, 1995 5:23 pm i


==Subject:==
==Subject:==
Salem Enforcement Conference (6/23) -For Forwarded mail received from: GSB DAN, R. COOPER ALSO FAVORS THIS BASED UPON DISCUSSION WITH LICENSEE...A SINGLE CONFERENCE WOULD BE LESS IMPACT ON THE LICENSEE AND US... CURRENTLY THE IR 95-10 EXIT, WHICH CONTAINS THE NEXT THREE CRITERION 16 ISSUES (U-1 SWITCHGEAR FAN MOTORS, U-2 RHR LOOPS, AND U-2 EQUIPMENT HATCH) IS SCHEDULED FOR 6/22...I     ,
Salem Enforcement Conference (6/23) -For Forwarded mail received from: GSB DAN, R. COOPER ALSO FAVORS THIS BASED UPON DISCUSSION WITH LICENSEE...A SINGLE CONFERENCE WOULD BE LESS IMPACT ON THE LICENSEE AND US... CURRENTLY THE IR 95-10 EXIT, WHICH CONTAINS THE NEXT THREE CRITERION 16 ISSUES (U-1 SWITCHGEAR FAN MOTORS, U-2 RHR LOOPS, AND U-2 EQUIPMENT HATCH) IS SCHEDULED FOR 6/22...I PROPOSE THAT WE RESCHEDULE THE 6/23 EC TO ANOTHER DATE TO i
PROPOSE THAT WE RESCHEDULE THE 6/23 EC TO ANOTHER DATE TO         i ACCOMODATE ALL OF THE CRITERION 16 ISSUES IN A SINGLE MEETING (INCLUDING LOOP SEAL). PLEASE CONFER WITH OE...IF AGREEABLE I WILL RESCHEDULE.
ACCOMODATE ALL OF THE CRITERION 16 ISSUES IN A SINGLE MEETING (INCLUDING LOOP SEAL).
CC:       WDL, CSM, GSB, Files:     m0: MESSAGE
PLEASE CONFER WITH OE...IF AGREEABLE I WILL RESCHEDULE.
CC:
WDL, CSM, GSB, Files:
m0: MESSAGE
{
{
1
1
(
(
9701300131 970124 PDR     FOIA O'NEILL96-351     PDR}}
9701300131 970124 PDR FOIA O'NEILL96-351 PDR}}

Latest revision as of 13:45, 11 December 2024

Informs That Dr Coopers Agrees That Single Conference Would Be Less Impact on Licensee & Us.Requests That Conference Be Rescheduled to Accomodate Criterion 16 Issues
ML20147B282
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/16/1995
From: Holody D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20147B009 List:
References
FOIA-96-351 NUDOCS 9701300131
Download: ML20147B282 (1)


Text

._.

I From:

John S. Phite (JRW1)f 4 To:

DJH h14.41 g7-j Date:

Fri ay, J 16, 1995 5:23 pm i

Subject:

Salem Enforcement Conference (6/23) -For Forwarded mail received from: GSB DAN, R. COOPER ALSO FAVORS THIS BASED UPON DISCUSSION WITH LICENSEE...A SINGLE CONFERENCE WOULD BE LESS IMPACT ON THE LICENSEE AND US... CURRENTLY THE IR 95-10 EXIT, WHICH CONTAINS THE NEXT THREE CRITERION 16 ISSUES (U-1 SWITCHGEAR FAN MOTORS, U-2 RHR LOOPS, AND U-2 EQUIPMENT HATCH) IS SCHEDULED FOR 6/22...I PROPOSE THAT WE RESCHEDULE THE 6/23 EC TO ANOTHER DATE TO i

ACCOMODATE ALL OF THE CRITERION 16 ISSUES IN A SINGLE MEETING (INCLUDING LOOP SEAL).

PLEASE CONFER WITH OE...IF AGREEABLE I WILL RESCHEDULE.

CC:

WDL, CSM, GSB, Files:

m0: MESSAGE

{

1

(

9701300131 970124 PDR FOIA O'NEILL96-351 PDR