ML20140G928: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1 | {{#Wiki_filter:1 r | ||
s | |||
~ | |||
i i | i i | ||
April 9,1982 MEMORANDUM FOR: | April 9,1982 MEMORANDUM FOR: | ||
P. Pomeroy, ACRS Consultant M. Trifunac, ACRS Consultant FRO 1: | |||
D. C. Fischer, Reactor Engineer j | |||
==SUBJECT:== | ==SUBJECT:== | ||
MIDLAND PLANT SEISMIC SITE-SPECIFIC RESPONSE SPECTRA At the request of Dr. Okrent and as we recently discussed on the telephone, I an forwarding information on the Midland Plant seismic site-specific spectra | MIDLAND PLANT SEISMIC SITE-SPECIFIC RESPONSE SPECTRA At the request of Dr. Okrent and as we recently discussed on the telephone, I an forwarding information on the Midland Plant seismic site-specific spectra for your review. Please provide Dr. Okrent with your corssents on this subject (preferably in writing) by April 30, 1982. Using your coments the ACRS Sub-comittee on Midland Plant Units 1 & 2 will detemine if the plant's seismic site-specific spectra needs to be specifically addressed at the May 20-21,1982 Midland Subconnittee meeting in Midland, MI. | ||
If the Subcomittee decides to discuss this topic at the May 20-21 meeting, your attendance at that meeting may be requested. | |||
Docunents attached include: | Docunents attached include: | ||
: 1. Testinony before the Atomic Safety and Licensing Board ( ASLB), | : 1. Testinony before the Atomic Safety and Licensing Board ( ASLB), | ||
| Line 34: | Line 35: | ||
: 3. Testimony before the ASLB, testimony of Richard J. Holt, Western Geophysical Corporation. | : 3. Testimony before the ASLB, testimony of Richard J. Holt, Western Geophysical Corporation. | ||
: 4. Testimony before the ASLB, testimony of Dr. Paul F. Hadala, Assistant Chief of the Geotechnical Laboratory of the U.S. Amy Engineer Waterways Experiment Station, dated Sept. 29, 1981. | : 4. Testimony before the ASLB, testimony of Dr. Paul F. Hadala, Assistant Chief of the Geotechnical Laboratory of the U.S. Amy Engineer Waterways Experiment Station, dated Sept. 29, 1981. | ||
: 5. NRC Staff sumary of the Sept. 8,1981 meeting on Midland l | : 5. NRC Staff sumary of the Sept. 8,1981 meeting on Midland l | ||
Seismic Input Paraneters, dated Dec. 3.1981. | |||
: 6. " Site Specific Response Spectra Midland Plant - Units 1 & 2" final reoort part 1, addendum to part 1, part 2, and part 3 l | : 6. " Site Specific Response Spectra Midland Plant - Units 1 & 2" final reoort part 1, addendum to part 1, part 2, and part 3 l | ||
prepared for Consumers Power Company by Weston Geophysical Corporation. | prepared for Consumers Power Company by Weston Geophysical Corporation. | ||
F0/A-85-66 dp'3 8510000239 850930 PDR FOIA BRUNNER85-602 PDR | |||
Y i | |||
I | I P. Pomeroy, ACRS Consultant M. Trifunac, ACRS Consultant i | ||
I | I | ||
: 7. " Basis for the Rejection of the 1966 Parkfield Earthquake Accelerocra'ns for use in Midland Plant Site Specific Spectra" dated July 1981; prepared for Consu'wrs Power Company by Weston | : 7. " Basis for the Rejection of the 1966 Parkfield Earthquake Accelerocra'ns for use in Midland Plant Site Specific Spectra" dated July 1981; prepared for Consu'wrs Power Company by Weston Geophysical Corporation. | ||
: 8. Meno from J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geological and Seisnological Branch Input to the Midland l | i | ||
: 8. Meno from J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geological and Seisnological Branch Input to the Midland l | |||
SER. | |||
i | i | ||
: 9. Memo fron J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geotechnical Engineering Branch Input to the Midland SER. | : 9. Memo fron J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geotechnical Engineering Branch Input to the Midland SER. | ||
: 10. Meno from J. Knight (HRR/DC) to R. Tyfesco (NRR/DL) dated April 5, 1982 re Structural Engineering Branch Input to the Midland SER. | : 10. Meno from J. Knight (HRR/DC) to R. Tyfesco (NRR/DL) dated April 5, 1982 re Structural Engineering Branch Input to the Midland SER. | ||
: 11. Meno fron J. Knight (NRR/DE) to E. Adensan (HRR/DL) re Hydrologic Engineering Input to the Midland SER. | : 11. Meno fron J. Knight (NRR/DE) to E. Adensan (HRR/DL) re Hydrologic Engineering Input to the Midland SER. | ||
cc: | |||
D. Okrent, w/ attach. | |||
C. Siess, w/ attach. | C. Siess, w/ attach. | ||
M. Bender,w/o attach. | |||
J. McKinley, w/o attach: | j J. McKinley, w/o attach: | ||
J. C. Ebersole, w/o attach. | J. C. Ebersole, w/o attach. | ||
l W. Mathis, w/o attach. | l W. Mathis, w/o attach. | ||
D. Moeller, " | l D. Moeller, " | ||
W. Lipinski," | |||
J. Osterberg, " | |||
f | t f | ||
Z. Zudans, l | E. Epler, Z. Zudans, l | ||
R Scavuzzo, F. Parker, l | |||
l | -}} | ||
Latest revision as of 16:21, 11 December 2024
Text
1 r
s
~
i i
April 9,1982 MEMORANDUM FOR:
P. Pomeroy, ACRS Consultant M. Trifunac, ACRS Consultant FRO 1:
D. C. Fischer, Reactor Engineer j
SUBJECT:
MIDLAND PLANT SEISMIC SITE-SPECIFIC RESPONSE SPECTRA At the request of Dr. Okrent and as we recently discussed on the telephone, I an forwarding information on the Midland Plant seismic site-specific spectra for your review. Please provide Dr. Okrent with your corssents on this subject (preferably in writing) by April 30, 1982. Using your coments the ACRS Sub-comittee on Midland Plant Units 1 & 2 will detemine if the plant's seismic site-specific spectra needs to be specifically addressed at the May 20-21,1982 Midland Subconnittee meeting in Midland, MI.
If the Subcomittee decides to discuss this topic at the May 20-21 meeting, your attendance at that meeting may be requested.
Docunents attached include:
- 1. Testinony before the Atomic Safety and Licensing Board ( ASLB),
NRC Staff brief in support of the use of a site-specific response spectrun to comply with the requirenents of 10 CFR Part 100, Appendix A.
- 2. Testimony before the ASLB, testinony of Jeffrey K. Kimball (NRR/DE/GSB) dated Sept. 29, 1981.
- 3. Testimony before the ASLB, testimony of Richard J. Holt, Western Geophysical Corporation.
- 4. Testimony before the ASLB, testimony of Dr. Paul F. Hadala, Assistant Chief of the Geotechnical Laboratory of the U.S. Amy Engineer Waterways Experiment Station, dated Sept. 29, 1981.
- 5. NRC Staff sumary of the Sept. 8,1981 meeting on Midland l
Seismic Input Paraneters, dated Dec. 3.1981.
- 6. " Site Specific Response Spectra Midland Plant - Units 1 & 2" final reoort part 1, addendum to part 1, part 2, and part 3 l
prepared for Consumers Power Company by Weston Geophysical Corporation.
F0/A-85-66 dp'3 8510000239 850930 PDR FOIA BRUNNER85-602 PDR
Y i
I P. Pomeroy, ACRS Consultant M. Trifunac, ACRS Consultant i
I
- 7. " Basis for the Rejection of the 1966 Parkfield Earthquake Accelerocra'ns for use in Midland Plant Site Specific Spectra" dated July 1981; prepared for Consu'wrs Power Company by Weston Geophysical Corporation.
i
- 8. Meno from J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geological and Seisnological Branch Input to the Midland l
SER.
i
- 9. Memo fron J. Knight (NRR/DE) to R. Tedesco (NRR/0L) dated April 6, 1982 re Geotechnical Engineering Branch Input to the Midland SER.
- 10. Meno from J. Knight (HRR/DC) to R. Tyfesco (NRR/DL) dated April 5, 1982 re Structural Engineering Branch Input to the Midland SER.
- 11. Meno fron J. Knight (NRR/DE) to E. Adensan (HRR/DL) re Hydrologic Engineering Input to the Midland SER.
cc:
D. Okrent, w/ attach.
C. Siess, w/ attach.
M. Bender,w/o attach.
j J. McKinley, w/o attach:
J. C. Ebersole, w/o attach.
l W. Mathis, w/o attach.
l D. Moeller, "
W. Lipinski,"
J. Osterberg, "
t f
E. Epler, Z. Zudans, l
R Scavuzzo, F. Parker, l
-