ML19274F033: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 5 | | page count = 5 | ||
| project = TAC:43083, TAC:43202, TAC:43282 | |||
| stage = Meeting | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
v-is u | |||
bJ | bJ | ||
.4 A | |||
June 4, 1979 GCOrylit POWCf cnas. F. v.wn-r vme n_ | |||
Enwreenn 3 | Enwreenn 3 fW o!!!"o m1? C ' < | ||
On January 10, 1979, members of the NRC staff met with Georgia Power Company representatives at your of fices in Bethesda, Maryland, to discuss a proposed modification to the Reactor Protection System Motor-Generator Sets (RPS M-G Sets) . As described in the meeting minutes issued by the NRC dated January 17, 1979, three items of additional information were requested. The following discussions will address each of the three requested items: | ''n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, P. C. | ||
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 ADDITIONAL INFORMATION ON RPS M-G SETS Gentlemen: | |||
On January 10, 1979, members of the NRC staff met with Georgia Power Company representatives at your of fices in Bethesda, Maryland, to discuss a proposed modification to the Reactor Protection System Motor-Generator Sets (RPS M-G Sets). | |||
As described in the meeting minutes issued by the NRC dated January 17, 1979, three items of additional information were requested. | |||
The following discussions will address each of the three requested items: | |||
1. | |||
Trip Setpoints - the values used ts trip setpoints vary slightly from the limiting values in the Technical Specifications. However, in each case the proposed design va.ue is on the conservative side of the Technical Specification value such that the associated trip vould occur sooner than if the trip value were the same as the Technical Specification value. | |||
These values were chosen to allow for the various setpoint tolerances associated with the protective relaya. | |||
2. | |||
Time relay - the attached "RPS Modification Setpoint Justifica: ion" discusses the basis of the final time delay values which were established. | |||
In each case the final time delay value is substantially less than the 6 records discussed in the January 10, 1979, meeting. | |||
The attachment goes on to conclude that no equipment damage will occur as a result of the time delays propcaed. | The attachment goes on to conclude that no equipment damage will occur as a result of the time delays propcaed. | ||
3. | |||
In the event that the RPS M-G Set must be removed from operation, power to the RPS would be supplied through an alternate feed. This alternate feed is a high quality supply and contains protective relaying and annunciation in the control room should it become degraded. | Alternate Power Supniv - our submittal of May 22, 1979, proposed a 30 day limit on continuous use of an alternate feed to power one division Reactor Protection System. | ||
7906 0 80c24//f | The 30 day limit is based on the estimated length of time required to repair a M-G Set, with allowance made for contingencies. He estimate a major repair, such as rewinding a motor, could take up to three weeks, assuming no delivery or material problems. | ||
We have added an additional week to allow for potential material or delivery problems which could be associated with a major repair. | |||
In the event that the RPS M-G Set must be removed from operation, power to the RPS would be supplied through an alternate feed. | |||
This alternate feed is a high quality supply and contains protective relaying and annunciation in the control room should it become degraded. | |||
7906 0 80c24// | |||
r f | |||
A Georgia Power n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Two The power is supplied from offsite 230 KV tie lines through startup transformer 2D with startup transformer 2C providing backup. These trans-formers step the voltage down to 4160-volts and supply essential buses 2E, 2F and 2G. These buses are located in separate rooms in the diesel building and supply power to essential loads required during abnormal operational transients and accidents. The 230 KV systems in the switchyard are protected by undervoltage relays and the frequency of the grid remains between 59.5 and 60.1 hertz. The electrical generators in the grid have frequency protection which is more stringent than the protection provided on the RPS M-G Sets. | A Georgia Power n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Two The power is supplied from offsite 230 KV tie lines through startup transformer 2D with startup transformer 2C providing backup. | ||
These trans-formers step the voltage down to 4160-volts and supply essential buses 2E, 2F and 2G. | |||
These buses are located in separate rooms in the diesel building and supply power to essential loads required during abnormal operational transients and accidents. The 230 KV systems in the switchyard are protected by undervoltage relays and the frequency of the grid remains between 59.5 and 60.1 hertz. | |||
The electrical generators in the grid have frequency protection which is more stringent than the protection provided on the RPS M-G Sets. | |||
The frequency throughout the grid is monitored continuously. | The frequency throughout the grid is monitored continuously. | ||
Diesel generators 2A and 2C supply Unit 2 essential buses 2E and 2G, respectively. Diesel generator 1B is a shared facility and can supply either Unit 1 essential bus IF or Unit 2 essential bus 2F. Automatic starting of the diesel generator units supplying Unit 2 will be initiated by undervoltage on essential buses 2E, 2F and 2G (starts diesel associated with that individual bus). This includes a voltage dip to 60 percent of nominal voltage for 60 hertz or more on the essential buses or a failure in any of the redundant trains sensing voltage. | Diesel generators 2A and 2C supply Unit 2 essential buses 2E and 2G, respectively. Diesel generator 1B is a shared facility and can supply either Unit 1 essential bus IF or Unit 2 essential bus 2F. | ||
The two essential 600-volt buses 2C and 2D are normally supplied from separate 4160-volt buses 2E and 2G through their own transformers. One spare 4160-600 volt transformer (2CD), supplied from 4160-volt bus 2F, is provided as a spare source for either essential 600-volt bus. The 600-volt essential buses are located in separate rooms in the control building. | Automatic starting of the diesel generator units supplying Unit 2 will be initiated by undervoltage on essential buses 2E, 2F and 2G (starts diesel associated with that individual bus). | ||
The 120-208 volt AC Instrument Power System is an essential power system supplied f rom the 600-volt essential buses 2C and 2D through two 122.5 KVA, 3 phase essential transformer to essential cabinets 2A and 2B. The RPS contains a manual throw switch which will allow it to receive power from either essential cabinet. The essential cabinet supply essential and nonessential loads. | This includes a voltage dip to 60 percent of nominal voltage for 60 hertz or more on the essential buses or a failure in any of the redundant trains sensing voltage. | ||
Failure of a nonessential load will not affect the ability of this system to supply the essential loads. All essential equipment involved in this system is designed to Class lE requirements. In addition, the 4160 volt and 600 volt essential buses have undervoltage annunciation in the control room. | The two essential 600-volt buses 2C and 2D are normally supplied from separate 4160-volt buses 2E and 2G through their own transformers. | ||
Should a loss of offsite power occur while the RPS is being supplied by the alternate feed, power would be lost to one division of RPS, thus meeting the design objective of the RPS (capability to scram the reactor) as stated in the Technical Specifications. The alternate power supply would subsequently be sequenced onto a 4160-volt bus supplied by a diesel-generator which would start with loss of offsite power, ensuring the capability to monitor the essential functions performed by the RPS following a reactor scram. | One spare 4160-600 volt transformer (2CD), supplied from 4160-volt bus 2F, is provided as a spare source for either essential 600-volt bus. | ||
The 600-volt essential buses are located in separate rooms in the control building. | |||
The 120-208 volt AC Instrument Power System is an essential power system supplied f rom the 600-volt essential buses 2C and 2D through two 122.5 KVA, 3 phase essential transformer to essential cabinets 2A and 2B. | |||
The RPS contains a manual throw switch which will allow it to receive power from either essential cabinet. The essential cabinet supply essential and nonessential loads. | |||
Failure of a nonessential load will not affect the ability of this system to supply the essential loads. All essential equipment involved in this system is designed to Class lE requirements. | |||
In addition, the 4160 volt and 600 volt essential buses have undervoltage annunciation in the control room. | |||
Should a loss of offsite power occur while the RPS is being supplied by the alternate feed, power would be lost to one division of RPS, thus meeting the design objective of the RPS (capability to scram the reactor) as stated in the Technical Specifications. | |||
The alternate power supply would subsequently be sequenced onto a 4160-volt bus supplied by a diesel-generator which would start with loss of offsite power, ensuring the capability to monitor the essential functions performed by the RPS following a reactor scram. | |||
~. | |||
Georgia Power d Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Three As shown above, the alternate feed to RPS is a well regulated, high quality feed which provides adequate protection for the equipment supplied. | Georgia Power d Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Three As shown above, the alternate feed to RPS is a well regulated, high quality feed which provides adequate protection for the equipment supplied. | ||
We, therefore, believe that a specification which allows the RPS to be supplied from the alternate feed for 30 days is entirely justified. | We, therefore, believe that a specification which allows the RPS to be supplied from the alternate feed for 30 days is entirely justified. | ||
Yours very truly, vcd '7V d,' u as. F. Whitmer RDB/MRD/mb Attachment xc: | Yours very truly, vcd '7V d,' u as. F. Whitmer RDB/MRD/mb Attachment xc: | ||
Mr. Ruble A. Thomas George F. Trowbridge, Esquire | |||
_~ | |||
-~ | |||
t | t | ||
'1PS MODIFICATION SETPOINT JUSTIFICATION In regards to the proposed set points of 129 VAC for the overvoltage trip, the 110 VAC for the undervoltage trip and the 57.2 HZ for the underfrequency trip being different than the currently approved Technical Specification li=its of 132 VAC, 108 VAC and 57 HZ we offer the following. Although the proposed setpoints are slightly different then the currently approved Technical Specification limits each of the proposed setpoints is on the conservative side. The reason for the different settings is to take into account the various tolerances in the protective relays. | |||
We have reexamined the time delays which were preliminarily indicated as 6 seconds for both the undervoltage (UV) and underfrequency (UF) relays. Our purpose was to lower the tLae delay of the relays to a value which while still preventing unnecessary plant shutdowns due to transient conditions would facilitate the justification of the time delays in respect to the capabilities of the connected equipment. The result of this examination has shown that the minimum tLac delay for the UV and UF relays could be 2.15 seconds and 2.25 seconds respectively. These time delays will prevent unnecessary plant shutdowns due to any expected transient conditions. In addition the values being much lower than 6 seconds simplify the task of justification in respect to the capabilities of the connected equipment. An exa=ination of the connected loads with respect to the time delays of 2.15 seconds and 2.25 seconds was made and the results are as follows. | We have reexamined the time delays which were preliminarily indicated as 6 seconds for both the undervoltage (UV) and underfrequency (UF) relays. Our purpose was to lower the tLae delay of the relays to a value which while still preventing unnecessary plant shutdowns due to transient conditions would facilitate the justification of the time delays in respect to the capabilities of the connected equipment. The result of this examination has shown that the minimum tLac delay for the UV and UF relays could be 2.15 seconds and 2.25 seconds respectively. These time delays will prevent unnecessary plant shutdowns due to any expected transient conditions. In addition the values being much lower than 6 seconds simplify the task of justification in respect to the capabilities of the connected equipment. An exa=ination of the connected loads with respect to the time delays of 2.15 seconds and 2.25 seconds was made and the results are as follows. | ||
Underfrecuency Relav: Trio Frecuency 57.2 HZ, Time delay 2.25 seconds The purpose of the underfrequency relay circuitry is to protect the connected load from exposure to low frequency while the RPS MG set coasts to a stop. With prolonged supply voltage interruptions to the drive motor or in any case of metor failure or motor starter failure, the MG set will eventually coast to a stop. The rate of declining frequency at full load conditions as per speci-fication of the MG set is no greater than 1.485 HZ per second. In the case of supply voltage interruptions at full load the equipment connected to the RPS bus will see a mini =um frequency of approximately 56 HZ before the UF relay causes the RPS bus to be deenergized. The immediate effect on devices such as relays, contactors and solenoids is an increase in current and conse-quently heag due to the change of that portion of impedance due to inductive reactance. It is reasonable to assume that devices such as relays, contactors and solenoids which are rated to operate indefinitely at 5% below 60 B2 will operate without damage at slightly less frequency for 2.25 seconds. In the case of the power supplies for neutron monitoring, process radiation moni-toring and off-gas monitoring the reduced frequency causes no harmful effects as these devices are designed with suitable filters (considering the worst case) for frequency ranges of 53 to 63 HZ. A final point should be made in regards to the new underfrequency relay. The existing MG set underfrequency relays deenergized the RPS bus at 54 HZ for many years. Although this re-laying had no intentional time delay, an actual time delay was inherent in the system. As the MG set would coast down from rated speed, a sLailar time e | Underfrecuency Relav: Trio Frecuency 57.2 HZ, Time delay 2.25 seconds The purpose of the underfrequency relay circuitry is to protect the connected load from exposure to low frequency while the RPS MG set coasts to a stop. With prolonged supply voltage interruptions to the drive motor or in any case of metor failure or motor starter failure, the MG set will eventually coast to a stop. The rate of declining frequency at full load conditions as per speci-fication of the MG set is no greater than 1.485 HZ per second. In the case of supply voltage interruptions at full load the equipment connected to the RPS bus will see a mini =um frequency of approximately 56 HZ before the UF relay causes the RPS bus to be deenergized. The immediate effect on devices such as relays, contactors and solenoids is an increase in current and conse-quently heag due to the change of that portion of impedance due to inductive reactance. | ||
It is reasonable to assume that devices such as relays, contactors and solenoids which are rated to operate indefinitely at 5% below 60 B2 will operate without damage at slightly less frequency for 2.25 seconds. In the case of the power supplies for neutron monitoring, process radiation moni-toring and off-gas monitoring the reduced frequency causes no harmful effects as these devices are designed with suitable filters (considering the worst case) for frequency ranges of 53 to 63 HZ. | |||
A final point should be made in regards to the new underfrequency relay. The existing MG set underfrequency relays deenergized the RPS bus at 54 HZ for many years. Although this re-laying had no intentional time delay, an actual time delay was inherent in the system. As the MG set would coast down from rated speed, a sLailar time e | |||
*lW" MW mo od | *lW" MW mo od | ||
RPS Modificatien Setnoint .Tustification, Cont. | RPS Modificatien Setnoint.Tustification, Cont. | ||
I delav to the new time delay, vould occur before 54 EZ was attained. To our knowledge no components have been adversely effected by operation at frequencys below rated frec.uency for these s=311 tire delays. | I delav to the new time delay, vould occur before 54 EZ was attained. To our knowledge no components have been adversely effected by operation at frequencys below rated frec.uency for these s=311 tire delays. | ||
In su= mary a tire delay of 2.25 seconds at 57.2 IIZ, while still allowing nor=al system operation during expected transients, will protect the connected loads frem any possible damage and in no way will prevent the successful automatic or manual shutdown of the plant. | In su= mary a tire delay of 2.25 seconds at 57.2 IIZ, while still allowing nor=al system operation during expected transients, will protect the connected loads frem any possible damage and in no way will prevent the successful automatic or manual shutdown of the plant. | ||
| Line 56: | Line 85: | ||
Therefore, these devices would be disconnected from the bus immediately at 81.6 volts by the undervoltage relay before they became unseated. The re-maining devices which include General Electric contactors and relays as well as Asco solenoids could conceivably become unseated due to low voltage before the undervoltage relay is instantaneous. In this case these devices would draw an increased current for 2.15 seconds. We have contacted the vendors of these devices and have been assured that no thermal damage would occur if the devict were unscated for small amounts of tL=e such as 2.15 seconds. | Therefore, these devices would be disconnected from the bus immediately at 81.6 volts by the undervoltage relay before they became unseated. The re-maining devices which include General Electric contactors and relays as well as Asco solenoids could conceivably become unseated due to low voltage before the undervoltage relay is instantaneous. In this case these devices would draw an increased current for 2.15 seconds. We have contacted the vendors of these devices and have been assured that no thermal damage would occur if the devict were unscated for small amounts of tL=e such as 2.15 seconds. | ||
In st==ary a tL=c delay of 2.15 seconds at 110 VAC, while still allowing nor=al system operation during expected transients, will protect the connected loads, remove a malfunctioning MG set frem service and in no way prevent the successful auta=atic or manual shutdown of the plant. | In st==ary a tL=c delay of 2.15 seconds at 110 VAC, while still allowing nor=al system operation during expected transients, will protect the connected loads, remove a malfunctioning MG set frem service and in no way prevent the successful auta=atic or manual shutdown of the plant. | ||
,...l....._.y _... | |||
,}} | |||
Latest revision as of 04:09, 3 January 2025
| ML19274F033 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/04/1979 |
| From: | Whitmer C GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| TAC-43083, TAC-43202, TAC-43282, NUDOCS 7906080246 | |
| Download: ML19274F033 (5) | |
Text
.
v-is u
bJ
.4 A
June 4, 1979 GCOrylit POWCf cnas. F. v.wn-r vme n_
Enwreenn 3 fW o!!!"o m1? C ' <
n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, P. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 ADDITIONAL INFORMATION ON RPS M-G SETS Gentlemen:
On January 10, 1979, members of the NRC staff met with Georgia Power Company representatives at your of fices in Bethesda, Maryland, to discuss a proposed modification to the Reactor Protection System Motor-Generator Sets (RPS M-G Sets).
As described in the meeting minutes issued by the NRC dated January 17, 1979, three items of additional information were requested.
The following discussions will address each of the three requested items:
1.
Trip Setpoints - the values used ts trip setpoints vary slightly from the limiting values in the Technical Specifications. However, in each case the proposed design va.ue is on the conservative side of the Technical Specification value such that the associated trip vould occur sooner than if the trip value were the same as the Technical Specification value.
These values were chosen to allow for the various setpoint tolerances associated with the protective relaya.
2.
Time relay - the attached "RPS Modification Setpoint Justifica: ion" discusses the basis of the final time delay values which were established.
In each case the final time delay value is substantially less than the 6 records discussed in the January 10, 1979, meeting.
The attachment goes on to conclude that no equipment damage will occur as a result of the time delays propcaed.
3.
Alternate Power Supniv - our submittal of May 22, 1979, proposed a 30 day limit on continuous use of an alternate feed to power one division Reactor Protection System.
The 30 day limit is based on the estimated length of time required to repair a M-G Set, with allowance made for contingencies. He estimate a major repair, such as rewinding a motor, could take up to three weeks, assuming no delivery or material problems.
We have added an additional week to allow for potential material or delivery problems which could be associated with a major repair.
In the event that the RPS M-G Set must be removed from operation, power to the RPS would be supplied through an alternate feed.
This alternate feed is a high quality supply and contains protective relaying and annunciation in the control room should it become degraded.
7906 0 80c24//
r f
A Georgia Power n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Two The power is supplied from offsite 230 KV tie lines through startup transformer 2D with startup transformer 2C providing backup.
These trans-formers step the voltage down to 4160-volts and supply essential buses 2E, 2F and 2G.
These buses are located in separate rooms in the diesel building and supply power to essential loads required during abnormal operational transients and accidents. The 230 KV systems in the switchyard are protected by undervoltage relays and the frequency of the grid remains between 59.5 and 60.1 hertz.
The electrical generators in the grid have frequency protection which is more stringent than the protection provided on the RPS M-G Sets.
The frequency throughout the grid is monitored continuously.
Diesel generators 2A and 2C supply Unit 2 essential buses 2E and 2G, respectively. Diesel generator 1B is a shared facility and can supply either Unit 1 essential bus IF or Unit 2 essential bus 2F.
Automatic starting of the diesel generator units supplying Unit 2 will be initiated by undervoltage on essential buses 2E, 2F and 2G (starts diesel associated with that individual bus).
This includes a voltage dip to 60 percent of nominal voltage for 60 hertz or more on the essential buses or a failure in any of the redundant trains sensing voltage.
The two essential 600-volt buses 2C and 2D are normally supplied from separate 4160-volt buses 2E and 2G through their own transformers.
One spare 4160-600 volt transformer (2CD), supplied from 4160-volt bus 2F, is provided as a spare source for either essential 600-volt bus.
The 600-volt essential buses are located in separate rooms in the control building.
The 120-208 volt AC Instrument Power System is an essential power system supplied f rom the 600-volt essential buses 2C and 2D through two 122.5 KVA, 3 phase essential transformer to essential cabinets 2A and 2B.
The RPS contains a manual throw switch which will allow it to receive power from either essential cabinet. The essential cabinet supply essential and nonessential loads.
Failure of a nonessential load will not affect the ability of this system to supply the essential loads. All essential equipment involved in this system is designed to Class lE requirements.
In addition, the 4160 volt and 600 volt essential buses have undervoltage annunciation in the control room.
Should a loss of offsite power occur while the RPS is being supplied by the alternate feed, power would be lost to one division of RPS, thus meeting the design objective of the RPS (capability to scram the reactor) as stated in the Technical Specifications.
The alternate power supply would subsequently be sequenced onto a 4160-volt bus supplied by a diesel-generator which would start with loss of offsite power, ensuring the capability to monitor the essential functions performed by the RPS following a reactor scram.
~.
Georgia Power d Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission June 4, 1979 Page Three As shown above, the alternate feed to RPS is a well regulated, high quality feed which provides adequate protection for the equipment supplied.
We, therefore, believe that a specification which allows the RPS to be supplied from the alternate feed for 30 days is entirely justified.
Yours very truly, vcd '7V d,' u as. F. Whitmer RDB/MRD/mb Attachment xc:
Mr. Ruble A. Thomas George F. Trowbridge, Esquire
_~
-~
t
'1PS MODIFICATION SETPOINT JUSTIFICATION In regards to the proposed set points of 129 VAC for the overvoltage trip, the 110 VAC for the undervoltage trip and the 57.2 HZ for the underfrequency trip being different than the currently approved Technical Specification li=its of 132 VAC, 108 VAC and 57 HZ we offer the following. Although the proposed setpoints are slightly different then the currently approved Technical Specification limits each of the proposed setpoints is on the conservative side. The reason for the different settings is to take into account the various tolerances in the protective relays.
We have reexamined the time delays which were preliminarily indicated as 6 seconds for both the undervoltage (UV) and underfrequency (UF) relays. Our purpose was to lower the tLae delay of the relays to a value which while still preventing unnecessary plant shutdowns due to transient conditions would facilitate the justification of the time delays in respect to the capabilities of the connected equipment. The result of this examination has shown that the minimum tLac delay for the UV and UF relays could be 2.15 seconds and 2.25 seconds respectively. These time delays will prevent unnecessary plant shutdowns due to any expected transient conditions. In addition the values being much lower than 6 seconds simplify the task of justification in respect to the capabilities of the connected equipment. An exa=ination of the connected loads with respect to the time delays of 2.15 seconds and 2.25 seconds was made and the results are as follows.
Underfrecuency Relav: Trio Frecuency 57.2 HZ, Time delay 2.25 seconds The purpose of the underfrequency relay circuitry is to protect the connected load from exposure to low frequency while the RPS MG set coasts to a stop. With prolonged supply voltage interruptions to the drive motor or in any case of metor failure or motor starter failure, the MG set will eventually coast to a stop. The rate of declining frequency at full load conditions as per speci-fication of the MG set is no greater than 1.485 HZ per second. In the case of supply voltage interruptions at full load the equipment connected to the RPS bus will see a mini =um frequency of approximately 56 HZ before the UF relay causes the RPS bus to be deenergized. The immediate effect on devices such as relays, contactors and solenoids is an increase in current and conse-quently heag due to the change of that portion of impedance due to inductive reactance.
It is reasonable to assume that devices such as relays, contactors and solenoids which are rated to operate indefinitely at 5% below 60 B2 will operate without damage at slightly less frequency for 2.25 seconds. In the case of the power supplies for neutron monitoring, process radiation moni-toring and off-gas monitoring the reduced frequency causes no harmful effects as these devices are designed with suitable filters (considering the worst case) for frequency ranges of 53 to 63 HZ.
A final point should be made in regards to the new underfrequency relay. The existing MG set underfrequency relays deenergized the RPS bus at 54 HZ for many years. Although this re-laying had no intentional time delay, an actual time delay was inherent in the system. As the MG set would coast down from rated speed, a sLailar time e
- lW" MW mo od
RPS Modificatien Setnoint.Tustification, Cont.
I delav to the new time delay, vould occur before 54 EZ was attained. To our knowledge no components have been adversely effected by operation at frequencys below rated frec.uency for these s=311 tire delays.
In su= mary a tire delay of 2.25 seconds at 57.2 IIZ, while still allowing nor=al system operation during expected transients, will protect the connected loads frem any possible damage and in no way will prevent the successful automatic or manual shutdown of the plant.
Undervoltace Relay: Trip Voltace 110 VAC, Tice Delav 2.15 Seconds The pricary purpose of the undervoltage relay circuitry is to procect the connected load from exposure to low voltage conditions and to disconnect a calfunctioning MG set due to regulator failure. It should be noted that while the undervoltage relay has a time delay of 2.15 seconds at 110 VAC and below, the relay is instantaneous at 81.6 volts and below. The type of failure due to low voltage that could result in damage to connected equip-ment is ther=al damage to coils and solenoids. This da= age cculd only result fro = coils and so.enoids being energized while not being picked-up or properly seated. It was found that the majority of relays connected to the RPS bus have a drop-out voltage which is much lower than 81.6 volts.
Therefore, these devices would be disconnected from the bus immediately at 81.6 volts by the undervoltage relay before they became unseated. The re-maining devices which include General Electric contactors and relays as well as Asco solenoids could conceivably become unseated due to low voltage before the undervoltage relay is instantaneous. In this case these devices would draw an increased current for 2.15 seconds. We have contacted the vendors of these devices and have been assured that no thermal damage would occur if the devict were unscated for small amounts of tL=e such as 2.15 seconds.
In st==ary a tL=c delay of 2.15 seconds at 110 VAC, while still allowing nor=al system operation during expected transients, will protect the connected loads, remove a malfunctioning MG set frem service and in no way prevent the successful auta=atic or manual shutdown of the plant.