MONTHYEARML20244A6451979-05-22022 May 1979 Requests Change to Tech Spec,App a to Ol,Modifying Surveillance Requirement 4.9.D Due to Incorporation of Redundant Breaker on Output of Reactor Protection Sys Motor Generator Sets Project stage: Other ML19274F0331979-06-0404 June 1979 Forwards Addl Info Re Trip Setpoints,Time Delay & Alternate Power Supply,Requested at 790110 NRC Meeting of NRC & Util in Bethesda,Md Project stage: Meeting ML19225B0111979-06-19019 June 1979 Summary of 790613 Meeting W/Util in Bethesda,Md Re Proposed Instrumentation on Changes to Be Completed Prior to Cycle 4 Operation Project stage: Meeting ML19224D0331979-06-25025 June 1979 Summarizes Actions Taken Re Alternate Power Supply to Reactor Protection Sys,In Light of NRC 790613 Meeting. Installation of Protective Breakers on Alternate Power Supply Cannot Be Assured by End of Refueling Outage Project stage: Meeting ML19207C2451979-08-0606 August 1979 Forwards Effluent Monitoring Results for Jan-June 1979 for License SNM-1168 Project stage: Other ML20008D8941980-10-15015 October 1980 Proposed Tech Specs 4.9,3.8 & 4.8 Re Reactor Protection Sys Electric Power Monitoring for Unit 1 & Operability & Surveillance of Ac Distribution Sys for Unit 2.Proposed Fee Determination Encl Project stage: Other ML20008D8761980-10-15015 October 1980 Application to Amend Licenses DPR-57 & NPF-5,changing Tech Specs Re Reactor Protection Sys Electric Power Monitoring for Unit 1 & Operability & Surveillance of Ac Distribution Sys Unit 2.Class III Fee Encl Project stage: Request ML19339C4701980-11-11011 November 1980 Responds to Verbal Requests for Info Re Reactor Protection Sys Motor Generator Set Power Monitoring Sys.Logic Is of Same Design Previously Reviewed on Unit 1.Collection of Data Re Setpoint Drift Underway Project stage: Other ML19350B0371981-03-0606 March 1981 Amend 23 to License NPF-5,adding Limiting Conditions for Operation & Surveillance Requirements for Sys Monitoring Output of Power Supply for Reactor Protection Sys Project stage: Other ML19350B0421981-03-0606 March 1981 Notice of Issuance & Availability of Amend 23 to License NPF-5 Project stage: Other ML19350B0411981-03-0606 March 1981 Safety Evaluation Supporting Amend 23 to License NPF-5 Project stage: Approval 1979-06-04
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
GeCMea Pow.*r Company 230 Peachtree street Post Off:ce Gon 4545 han'a Georcia 30302
'e errone 404 522-6060 GeorgiaPower W. A. Widner
/ ce Ns ce,! an Ge e a' Ya 3;e-
%uciear Generanon the southern e+ctnc sys:em November 11, 1980 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
205._
NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 RPS MG SET POWER MONITORING SYSTEM Gentlemen:
Ouring verbal discussion with members of your staff, Georgia Power Company has been asked to confirm that the RPS MG Set Power Monitoring System logic is of the same design as that previously reviewed on the Unit 1 docket.
In fact, we have reviewed the designs and can state that they are identical. except for the physical location of equipment.
We were also asked to elaborate on the experience we have had with setpoint drift en the power monitoring systems. We are collecting the data sheets which have been completed during routine surveillance testing and will summarize the results following our review.
Very truly yours, h7
~/
.[
I
/
W. A. Widner y to RDB/mb xc:
M. Manry R. F. Rogers, III
\\