ML19350B042

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 23 to License NPF-5
ML19350B042
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/06/1981
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19350B039 List:
References
TAC-43083, TAC-43202, TAC-43282, NUDOCS 8103190242
Download: ML19350B042 (2)


Text

.

7590-01 O

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-366 GEORGIA POWER COMPANY, ET AL.

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. _ Nuclear Regulatory Comission (the Commission) has issued Amendment No. 23 to Facility Operating License No. NPF-5, issued to Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, which revised the license and Technical Specifications for operation of the Edwin I. Hatch Nuclear Plant Unit No. 2 (the facility) located in Appling County, Georgia.

The amendment is effective as of its date of issuance.

This amendment deletes a satisfied license condition and revises the Technical Specifications to add Limiting Conditions for Operation and Surveil-lance Requirements for the system to monitor the output of the power supply for the Reactor Protection System. This amendnent also corrects an identified deficiency in the specifications for the AC inverter associated with the Low Pressure Injection ~ System.

The application for the amendment complies with the standards and requirementsoftheAtomicEnergyActof1954,asamended(theAct),and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

81081>90M

. 7590-01 e

Tne Comission has detemined that the issuance of this amendmer.t will not result in any significant environmental impact and that pursuant to 10 CFR 651.5(d)(4) an environmental impact statement or negative declara-tion and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with' respect to this action, see (1) the application for amendnent dated October 15, 1980, as supplemented November 11, 1980, (2) Amendment No. 23 to License No. NPF-5, and (3) the Comissio 's related Safety Evaluation. All of these items are available for public inspection at the Comission's Public Document Room,1717 H StrP?t, N. W., Washington, D. C and at the Appling County Puliic Library, Parker Street, Baxley, Georgia.

31513. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Atten-tion: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 6th day of March 1981.

FOR THE NUCLEAR REGULATORY COMMISSION Y

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing

~

0

+

- y y4