{{#Wiki_filter:January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:                   Sunil D. Weerakkody, Chief /RA/
{{#Wiki_filter:January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:                   Paul W. Lain, Team Leader /RA/
Sunil D. Weerakkody, Chief /RA/
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:
Paul W. Lain, Team Leader /RA/
NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation


Line 25: Line 27:


==Enclosure:==
==Enclosure:==
As stated CONTACT: Paul Lain, DRA/NRR (301) 415-2346
As stated CONTACT: Paul Lain, DRA/NRR (301) 415-2346


January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:                     Sunil D. Weerakkody, Chief /RA/
January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:                     Paul W. Lain, Team Leader /RA/
Sunil D. Weerakkody, Chief /RA/
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:
Paul W. Lain, Team Leader /RA/
NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation


Line 37: Line 40:


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION:
As stated DISTRIBUTION:
ADAMS                                 RidsNrrDirsIrib                JSHyslop, RES AFPB R/F                             PKoltay                         RidsRgn1MailCenter RidsNrrDra                            QNguyen                         RidsRgn2MailCenter RidsNrrDraAfpb                        CNolan, OE                     RidsRgn3MailCenter AFPB                                  MSalley, RES                   RidsRgn4MailCenter ADAMS Accession# (Package):             ML060240605                   ADAMS Accession# (Memo):   ML060250033 ADAMS Accession# (Enclosure & Att 1&2): ML060250034                   ADAMS Accession# (Att. 3): ML060250035 ADAMS Accession# (Att. 4):               ML060250036                   ADAMS Accession# (Att. 5): ML060250038 ADAMS Accession# (Att. 6):               ML060250039                   ADAMS Accession# (Att. 7): ML060250040 ADAMS Accession# (Att. 8):               ML060250041                   ADAMS Accession# (Att. 9): ML060250042 ADAMS Accession# (Att. 10):             ML060250043                   ADAMS Accession# (Att. 11): ML060250044 ADAMS Accession# (Att. 12):             ML060250046 OFFICE     NRR/DRA/AFPB           NRR/DRA/AFPB       NRR/DRA/AFPB             NRR/DRA/AFPB NAME       PLain                 RGallucci         RRadlinski /RA Sunil     SWeerakkody for/
ADAMS AFPB R/F RidsNrrDra RidsNrrDraAfpb AFPB RidsNrrDirsIrib PKoltay QNguyen CNolan, OE MSalley, RES JSHyslop, RES RidsRgn1MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter ADAMS Accession# (Package):
DATE       01/27/06               01/27/06           01/27/06                 01/27/06
ML060240605 ADAMS Accession# (Memo):
ML060250033 ADAMS Accession# (Enclosure & Att 1&2):
ML060250034 ADAMS Accession# (Att. 3):
ML060250035 ADAMS Accession# (Att. 4):
ML060250036 ADAMS Accession# (Att. 5):
ML060250038 ADAMS Accession# (Att. 6):
ML060250039 ADAMS Accession# (Att. 7):
ML060250040 ADAMS Accession# (Att. 8):
ML060250041 ADAMS Accession# (Att. 9):
ML060250042 ADAMS Accession# (Att. 10):
ML060250043 ADAMS Accession# (Att. 11): ML060250044 ADAMS Accession# (Att. 12):
ML060250046 OFFICE NRR/DRA/AFPB NRR/DRA/AFPB NRR/DRA/AFPB NRR/DRA/AFPB NAME PLain RGallucci RRadlinski /RA Sunil for/
SWeerakkody DATE 01/27/06 01/27/06 01/27/06 01/27/06


OFFICIAL RECORD COPY}}
OFFICIAL RECORD COPY}}

Latest revision as of 12:12, 15 January 2025

805 Transition Pilot Program Observation Visit November 2005 Trip Report
ML060250033
Person / Time
Site: Oconee, Harris  Duke Energy icon.png
Issue date: 01/27/2006
From: Lain P
NRC/NRR/ADRA/DRA/AFPB
To: Lyons J
NRC/NRR/ADRA/DRA
Lain P, NRR/DRA, 415-2346
Shared Package
ML060240605 List:
References
Download: ML060250033 (2)


Text

January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:

Sunil D. Weerakkody, Chief /RA/

Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:

Paul W. Lain, Team Leader /RA/

NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

805 TRANSITION PILOT PROGRAM OBSERVATION VISIT NOVEMBER 2005 TRIP REPORT Attached is the trip report from the first observation visit of pilot plants transitioning to the new risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations, Part 50.48(c) (National Fire Protection Association (NFPA) 805 Rule). The trip occurred November 7 through 10, 2005, at Duke Power headquarters in Charlotte, North Carolina and progress briefings were provided from the two utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant. A summary of the meeting is provided in the enclosed trip report and the agenda and handouts from the meeting are provided as attachments. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805.

The next observation visit is scheduled for March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC.

Enclosure:

As stated CONTACT: Paul Lain, DRA/NRR (301) 415-2346

January 27, 2006 MEMORANDUM TO: James E. Lyons, Director Division of Risk Assessment Office of Nuclear Reactor Regulation THRU:

Sunil D. Weerakkody, Chief /RA/

Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:

Paul W. Lain, Team Leader /RA/

NFPA 805 Transition Pilot Program Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

805 TRANSITION PILOT PROGRAM OBSERVATION VISIT NOVEMBER 2005 TRIP REPORT Attached is the trip report from the first observation visit of pilot plants transitioning to the new risk-informed, performance-based fire protection licensing basis in Title 10 of the Code of Federal Regulations, Part 50.48(c) (National Fire Protection Association (NFPA) 805 Rule). The trip occurred November 7 through 10, 2005, at Duke Power headquarters in Charlotte, North Carolina and progress briefings were provided from the two utilities with transitioning pilot plants; Duke Power for Oconee Nuclear Station and Progress Energy for the Shearon Harris Nuclear Plant. A summary of the meeting is provided in the enclosed trip report and the agenda and handouts from the meeting are provided as attachments. This trip report will be publically available to provide lessons learned to those non-pilot plants transitioning NFPA 805.

The next observation visit is scheduled for March 27 to 30, 2006 at Progress Energy headquarters in Raleigh, NC.

Enclosure:

As stated DISTRIBUTION:

ADAMS AFPB R/F RidsNrrDra RidsNrrDraAfpb AFPB RidsNrrDirsIrib PKoltay QNguyen CNolan, OE MSalley, RES JSHyslop, RES RidsRgn1MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter ADAMS Accession# (Package):

ML060240605 ADAMS Accession# (Memo):

ML060250033 ADAMS Accession# (Enclosure & Att 1&2):

ML060250034 ADAMS Accession# (Att. 3):

ML060250035 ADAMS Accession# (Att. 4):

ML060250036 ADAMS Accession# (Att. 5):

ML060250038 ADAMS Accession# (Att. 6):

ML060250039 ADAMS Accession# (Att. 7):

ML060250040 ADAMS Accession# (Att. 8):

ML060250041 ADAMS Accession# (Att. 9):

ML060250042 ADAMS Accession# (Att. 10):

ML060250043 ADAMS Accession# (Att. 11): ML060250044 ADAMS Accession# (Att. 12):

ML060250046 OFFICE NRR/DRA/AFPB NRR/DRA/AFPB NRR/DRA/AFPB NRR/DRA/AFPB NAME PLain RGallucci RRadlinski /RA Sunil for/

SWeerakkody DATE 01/27/06 01/27/06 01/27/06 01/27/06

OFFICIAL RECORD COPY