ML060250040
| ML060250040 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/08/2005 |
| From: | Duke Energy Corp |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML060240605 | List: |
| References | |
| Download: ML060250040 (7) | |
Text
1 Duke Power NFPA 805 Ch 4 Methodology Transition Oconee (ONS)
November 08, 2005 ATTACHMENT 7
2 Purpose
Present Draft Results of NEI 04-02 B-2 Nuclear Safety Transition - Methodology Review Worksheet
Review the level of detail provided in the Worksheet
Discuss what happens to the information in the Worksheet post transition
Discuss issues identified during review
3
See handout Nuclear Safety Transition -
Methodology Review Worksheets
4 Level of detail
For ease of review entire methodology statement from Oconee calculations /
analyses were pasted into the Table
Statements of compliance and exceptions were stated
5 Long term documentation
Table B-2 is a snapshot in time.
The method, assumptions, and criteria will be captured long term in site documents.
Changes can be made to the method going forward as long as the change criteria can be met
6
Transition of High-Low Pressure Interface Components
NEI 00-01 defines differently than NFPA 805
Will use NEI 00-01 and the Circuit Analysis Licensing Basis to transition without change analysis Issues
7
Availability and reliability of equipment selected shall be evaluated
Not specifically addressed in deterministic documents
It is inherent in the Fire PRA
Instrument Tubing
Not addressed in the current analysis Issues continued