ML020460012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:P     Dke                                                           Duke Energy 0   Energy                                                       Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 W. R. McCollum, Jr.                                               (864) 885-3107 OFFICE Vice President                                                     (864) 885-3564 FAX February 4,     2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
{{#Wiki_filter:P Dke Duke Energy 0 Energy Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 W. R. McCollum, Jr.
(864) 885-3107 OFFICE Vice President (864) 885-3564 FAX February 4, 2002 U.
S.
Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555  


==Subject:==
==Subject:==
Oconee Nuclear Station Docket 50-269, -270, -287 Selected Licensee Commitments Manual (SLC)
Oconee Nuclear Station Docket 50-269,  
-270,  
-287 Selected Licensee Commitments Manual (SLC)
Gentlemen:
Gentlemen:
Pursuant to 10CFR 50.4 and 50.71, please find attached 7 copies of the latest     revisions to the Oconee Selected Licensee Commitments Manual (SLC). The SLC Manual is Chapter 16.0 of the Oconee Updated Final Safety Analysis Report (UFSAR).       This manual is intended to contain commitments and other station issues that warrant higher control, but are not appropriate for inclusion into the Technical Specifications (TS).       Instead of being updated with the annual UFSAR Update, the SLC Manual will be updated as necessary throughout the year.
Pursuant to 10CFR 50.4 and 50.71, please find attached 7 copies of the latest revisions to the Oconee Selected Licensee Commitments Manual (SLC).
Very truly yours,
The SLC Manual is Chapter 16.0 of the Oconee Updated Final Safety Analysis Report (UFSAR).
      .R.     McCollum, Jr.
This manual is intended to contain commitments and other station issues that warrant higher control, but are not appropriate for inclusion into the Technical Specifications (TS).
V ice President Oconee Nuclear tation CMB/cmb Attachment xc:       Luis A. Reyes Regional Administrator, Region II L. N. Olshan, ONRR M. C. Shannon Oconee Senior Resident Inspector
Instead of being updated with the annual UFSAR Update, the SLC Manual will be updated as necessary throughout the year.
Very truly yours,  
.R.
McCollum, Jr.
V ice President Oconee Nuclear tation CMB/cmb Attachment xc:
Luis A.
Reyes Regional Administrator, Region II L.
N. Olshan, ONRR M. C. Shannon Oconee Senior Resident Inspector


February 4, 2002 To: Manual Holders
February 4, 2002 To: Manual Holders  


==Subject:==
==Subject:==
Oconee Selected Licensee Commitments Manual (SLC)
Oconee Selected Licensee Commitments Manual (SLC)
Revision On January 16, 2002, Station Management approved revisions to SLC Table of Contents, which were implemented on January 17, 2002. These changes revise the SLC Table of Contents to correct typographical errors that have occurred since conversion of SLC to the new ITS format. It also deletes the title   of SLC 16.6.10, Containment Hydrogen Recombiner System. SLC 16.6.10 was deleted from SLC's on December 20, 2001.
Revision On January 16, 2002, Station Management approved revisions to SLC Table of Contents, which were implemented on January 17, 2002.
Remove these pages                     Insert these pages SLC LOEP  Pages 1-11                  SLC LOEP Pages 1-11 SLC Page 16.0-1                       SLC page 16.0-1 SLC Page 16.0-2                      SLC Page 16.0-2 SLC Page 16.0-3                      SLC Page 16.0-3 SLC Page  16.0-4                      SLC Page 16.0-4 SLC Page 16.0-5                      SLC Page 16.0-5 SLC Page 16.0-6                      SLC Page 16.0-6 Any questions concerning these revisions may be directed to Reene Gambrell at ext. 3364.
These changes revise the SLC Table of Contents to correct typographical errors that have occurred since conversion of SLC to the new ITS format.
It also deletes the title of SLC 16.6.10, Containment Hydrogen Recombiner System.
SLC 16.6.10 was deleted from SLC's on December 20, 2001.
Remove these pages SLC LOEP Pages 1-11 SLC Page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Insert these pages SLC LOEP Pages 1-11 SLC page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Any questions concerning these revisions may be directed to Reene Gambrell at ext. 3364.
Regulatory Compliance By: Conice Breazeale Regulatory Compliance
Regulatory Compliance By: Conice Breazeale Regulatory Compliance


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe               Revision Date LOEP 1                     1/17/02 LOEP 2                     9/20/01 LOEP 3                     12/20/01 LOEP 4                     8/09/01 LOEP 5                     12/18/01 LOEP 6                     11/14/01 LOEP 7                     7/12/01 LOEP 8                     7/12/01 LOEP 9                       12/11/01 LOEP 10                     1/14/02 LOEP 11                     11/30/99 16.0-1                       1/17/02 16.0-2                       1/17/02 16.0-3                       1/17/02 16.0-4                       1/17/02 16.0-5                       1/17/02 16.0-6                       1/17/02 16.1-1                     3/27/99 16.2-1                     3/27/99 16.2-2                     3/27/99 16.2-3                     3/27/99 16.3-1                     3/27/99 16.5.1-1                   7/18/00 16.5.1-2                     7/18/00 16.5.1-3                     7/18/00 16.5.2-1                   5/11/99 16.5.2-2                   5/11/99 16.5.2-3                   5/11/99 16.5.2-4                     Delete 5/11/99 16.5.2-5                     Delete 5/11/99 16.5.3-1                     10/18/01 16.5.3-2                     10/18/01 16.5.3-3                     10/18/01 16.5.4-1                   3/27/99 16.5.5-1                     3/27/99 16.5.6-1                     3/27/99 16.5.7-1                     3/27/99 16.5.7-2                     3/27/99 LOEP 1
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date LOEP 1 1/17/02 LOEP 2 9/20/01 LOEP 3 12/20/01 LOEP 4 8/09/01 LOEP 5 12/18/01 LOEP 6 11/14/01 LOEP 7 7/12/01 LOEP 8 7/12/01 LOEP 9 12/11/01 LOEP 10 1/14/02 LOEP 11 11/30/99 16.0-1 1/17/02 16.0-2 1/17/02 16.0-3 1/17/02 16.0-4 1/17/02 16.0-5 1/17/02 16.0-6 1/17/02 16.1-1 3/27/99 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 7/18/00 16.5.1-2 7/18/00 16.5.1-3 7/18/00 16.5.2-1 5/11/99 16.5.2-2 5/11/99 16.5.2-3 5/11/99 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 10/18/01 16.5.3-2 10/18/01 16.5.3-3 10/18/01 16.5.4-1 3/27/99 16.5.5-1 3/27/99 16.5.6-1 3/27/99 16.5.7-1 3/27/99 16.5.7-2 3/27/99 LOEP 1


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe                 Revision Date 16.5.7-3                     9/02/99 16.5.7-4                     5/1/00 16.5.7-5                     5/1/00 16.5.7-6                     9/02/99 16.5.8-1                     3/27/99 16.5.8-2                     3/27/99 16.5.9-1                     3/27/99 16.5.9-2                     3/27/99 16.5.10-1                     5/11/99 16.5.10-2                     1/31/00 16.5.11-1                     1/31/00 16.5.12-1                     3/27/99 16.5.13-1                     3/27/99 16.5.13-2                     12/01/99 16.5.13-3                     12/01/99 16.6.1-1                     9/20/01 16.6.1-2                     9/20/01 16.6.1-3                     9/20/01 16.6.1-4                     9/20/01 16.6.1-5                     9/20/01 16.6.2-1                     3/27/99 16.6.2-2                     3/27/99 16.6.2-3                     2/17/00 16.6.2-4                     10/4/00 16.6.2-5                     10/4/00 16.6.2-6                     10/4/00 16.6.2-7                     2/17/00 16.6.2-8                     Delete 16.6.2-9                     Delete 16.6.2-10                     Delete 16.6.2-11                     Delete 16.6.2-12                     Delete 16.6.3-1                     3/27/99 16.6.4-1                     3/27/99 16.6.4-2                     3/27/99 LOEP 2
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.5.7-3 9/02/99 16.5.7-4 5/1/00 16.5.7-5 5/1/00 16.5.7-6 9/02/99 16.5.8-1 3/27/99 16.5.8-2 3/27/99 16.5.9-1 3/27/99 16.5.9-2 3/27/99 16.5.10-1 5/11/99 16.5.10-2 1/31/00 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 9/20/01 16.6.1-2 9/20/01 16.6.1-3 9/20/01 16.6.1-4 9/20/01 16.6.1-5 9/20/01 16.6.2-1 3/27/99 16.6.2-2 3/27/99 16.6.2-3 2/17/00 16.6.2-4 10/4/00 16.6.2-5 10/4/00 16.6.2-6 10/4/00 16.6.2-7 2/17/00 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 3/27/99 16.6.4-1 3/27/99 16.6.4-2 3/27/99 LOEP 2


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe                 Revision Date 16.6.4-3                     3/27/99 16.6.4-4                     3/27/99 16.6.4-5                     1/31/00 16.6.4-6                     3/27/99 16.6.5-1                     12/14/00 16.6.6-1                     3/27/99 16.6.7-1                     3/27/99 16.6.8-1                     3/27/99 16.6.9-1                     6/12/01 16.6.9-2                     3/27/99 16.6.10-1                     12/20/01 16.6.10-2                     Delete 16.6.10-3                     Delete 16.6.12-1                     02/15/01 16.6.12-2                     02/15/01 16.6.12-3                     02/15/01 16.6.12-4                     Delete 16.6.12-5                     Delete 16.6.12-6                     Delete 16.6.12-7                     Delete 16.6.13-1                     7/31/01 16.6.13-2                     7/31/01 16.7.1-1                     3/27/99 16.7.1-2                     3/27/99 16.7.2-1                     1/31/00 16.7.2-2                     5/23/01 16.7.2-3                     1/31/00 16.7.3-1                     3/27/99 16.7.3-2                     3/27/99 16.7.4-1                     3/27/99 16.7.5-1                     10/04/99 16.7.5-2                     3/27/99 16.7.5-3                     10/04/99 16.7.5-4                     10/04/99 16.7.6-1                     3/27/99 16.7.7-1                     3/27/99 16.7.7-2                     3/27/99 16.7.8-1                     3/27/99 LOEP 3
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.6.4-3 3/27/99 16.6.4-4 3/27/99 16.6.4-5 1/31/00 16.6.4-6 3/27/99 16.6.5-1 12/14/00 16.6.6-1 3/27/99 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 6/12/01 16.6.9-2 3/27/99 16.6.10-1 12/20/01 16.6.10-2 Delete 16.6.10-3 Delete 16.6.12-1 02/15/01 16.6.12-2 02/15/01 16.6.12-3 02/15/01 16.6.12-4 Delete 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 7/31/01 16.6.13-2 7/31/01 16.7.1-1 3/27/99 16.7.1-2 3/27/99 16.7.2-1 1/31/00 16.7.2-2 5/23/01 16.7.2-3 1/31/00 16.7.3-1 3/27/99 16.7.3-2 3/27/99 16.7.4-1 3/27/99 16.7.5-1 10/04/99 16.7.5-2 3/27/99 16.7.5-3 10/04/99 16.7.5-4 10/04/99 16.7.6-1 3/27/99 16.7.7-1 3/27/99 16.7.7-2 3/27/99 16.7.8-1 3/27/99 LOEP 3


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page                 Revision Date 16.7.8-2                     3/27/99 16.7.9-1                     3/27/99 16.7.10-1                   3/27/99 16.7.10-2                   3/27/99 16.7.11-1                   3/27/99 16.7.11-2                     3/27/99 16.7.11-3                     3/27/99 16.7.12-1                     3/27/99 16.7.12-2                     3/27/99 16.7.13-1                     3/27/99 16.7.13-2                     3/27/99 16.7.13-3                     6/29/99 16.7.14-1                     2/17/00 16.7.14-2                     2/17/00 16.7.14-3                     2/17/00 16.7.14-4                     2/17/00 16.8.1-1                     8/09/01 16.8.1-2                     8/09/01 16.8.2-1                     3/27/99 16.8.3-1                     3/27/99 16.8.3-2                     1/31/00 16.8.3-3                     1/31/00 16.8.3-4                     3/27/99 16.8.3-5                     1/31/00 16.8.3-6                     1/31/00 16.8.3-7                     1/31/00 16.8.4-1                     9/18/99 16.8.4-2                     02/15/01 16.8.4-3                     02/15/01 16.8.4-4                     02/15/01 16.8.4-5                     02/15/01 16.8.4-6                     02/15/01 16.8.4-7                     02/15/01 16.8.4-8                     02/15/01 16.8.4-9                     02/15/01 16.8.5-1                     9/30/99 16.8.5-2                     1/31/00 16.8.5-3                     1/31/00 16.8.5-4                     9/30/99 16.8.5-5                     1/31/00 16.8.6-1                     3/27/99 LOEP 4
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.7.8-2 3/27/99 16.7.9-1 3/27/99 16.7.10-1 3/27/99 16.7.10-2 3/27/99 16.7.11-1 3/27/99 16.7.11-2 3/27/99 16.7.11-3 3/27/99 16.7.12-1 3/27/99 16.7.12-2 3/27/99 16.7.13-1 3/27/99 16.7.13-2 3/27/99 16.7.13-3 6/29/99 16.7.14-1 2/17/00 16.7.14-2 2/17/00 16.7.14-3 2/17/00 16.7.14-4 2/17/00 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 3/27/99 16.8.3-1 3/27/99 16.8.3-2 1/31/00 16.8.3-3 1/31/00 16.8.3-4 3/27/99 16.8.3-5 1/31/00 16.8.3-6 1/31/00 16.8.3-7 1/31/00 16.8.4-1 9/18/99 16.8.4-2 02/15/01 16.8.4-3 02/15/01 16.8.4-4 02/15/01 16.8.4-5 02/15/01 16.8.4-6 02/15/01 16.8.4-7 02/15/01 16.8.4-8 02/15/01 16.8.4-9 02/15/01 16.8.5-1 9/30/99 16.8.5-2 1/31/00 16.8.5-3 1/31/00 16.8.5-4 9/30/99 16.8.5-5 1/31/00 16.8.6-1 3/27/99 LOEP 4


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe               Revision Date 16.8.6-2                     1/31/00 16.8.6-3                     1/31/00 16.8.7-1                     1/31/00 16.8.8-1                     1/31/00 16.9.1-1                     1/31/00 16.9.1-2                   3/27/99 16.9.1-3                   3/27/99 16.9.1-4                   3/27/99 16.9.1-5                   6/12/01 16.9.2-1                     12/18/01 16.9.2-2                     12/18/01 16.9.2-3                     12/18/01 16.9.2-4                     12/18/01 16.9.2-5                     12/18/01 16.9.3-1                     1/31/00 16.9.3-2                     1/31/00 16.9.4-1                     1/31/00 16.9.4-2                     1/31/00 16.9.4-3                     1/31/00 16.9.4-4                     3/27/99 16.9.4-5                     6/12/01 16.9.5-1                     1/31/00 16.9.5-2                   4/29/99 16.9.5-3                   4/29/99 16.9.5-4                     6/12/01 16.9.6-1                     3/27/99 16.9.6-2                     3/27/99 16.9.6-3                     3/27/99 16.9.6-4                     3/27/99 16.9.6-5                     3/27/99 16.9.6-6                     3/27/99 16.9.6-7                     3/27/99 16.9.6-8                     3/27/99 16.9.6-9                     11/30/99 16.9.7-1                     3/27/01 16.9.7-2                     3/27/01 16.9.7-3                     3/27/01 16.9.7-4                     3/27/01 16.9.7-5                     3/27/01 LOEP 5
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.8.6-2 1/31/00 16.8.6-3 1/31/00 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.9.1-1 1/31/00 16.9.1-2 3/27/99 16.9.1-3 3/27/99 16.9.1-4 3/27/99 16.9.1-5 6/12/01 16.9.2-1 12/18/01 16.9.2-2 12/18/01 16.9.2-3 12/18/01 16.9.2-4 12/18/01 16.9.2-5 12/18/01 16.9.3-1 1/31/00 16.9.3-2 1/31/00 16.9.4-1 1/31/00 16.9.4-2 1/31/00 16.9.4-3 1/31/00 16.9.4-4 3/27/99 16.9.4-5 6/12/01 16.9.5-1 1/31/00 16.9.5-2 4/29/99 16.9.5-3 4/29/99 16.9.5-4 6/12/01 16.9.6-1 3/27/99 16.9.6-2 3/27/99 16.9.6-3 3/27/99 16.9.6-4 3/27/99 16.9.6-5 3/27/99 16.9.6-6 3/27/99 16.9.6-7 3/27/99 16.9.6-8 3/27/99 16.9.6-9 11/30/99 16.9.7-1 3/27/01 16.9.7-2 3/27/01 16.9.7-3 3/27/01 16.9.7-4 3/27/01 16.9.7-5 3/27/01 LOEP 5


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page                 Revision Date 16.9.7-6                     3/27/01 16.9.7-7                     3/27/01 16.9.7-8                       Delete 16.9.7-9                       Delete 16.9.8-1                     6/24/99 16.9.8-2                       Delete 16.9.8-3                       Delete 16.9.8-4                       Delete 16.9.8-5                       Delete 16.9.8-6                       Delete 16.9.8-7                       Delete 16.9.8a-1                     3/27/99 16.9.8a-2                     3/27/99 16.9.8a-3                     3/27/99 16.9.9-1                       3/27/99 16.9.9-2                       3/27/99 16.9.10-1                     3/27/99 16.9.10-2                     3/27/99 16.9.11-1                     4/13/00 16.9.11-2                     4/13/00 16.9.11-3                     4/13/00 16.9.11-4                     4/13/00 16.9.11-5                     4/13/00 16.9.11-6                     4/13/00 16.9.11-7                     4/13/00 16.9.11-8                     4/13/00 16.9.12-1                     11/14/01 16.9.12-2                     11/14/01 16.9.12-3                     11/14/01 16.9.12-4                     11/14/01 16.9.12-5                     11/14/01 16.9.12-6                     11/14/01 16.9.12-7                     11/14/01 16.9.12-8                     11/14/01 16.9.12-9                     11/14/01 16.9.12-10                     11/14/01 16.9.12-11                     11/14/01 16.9.12-12                     11/14/01 16.9.12-13                     11/14/01 16.9.12-14                     11/14/01 16.9.13-1                     3/27/99 LOEP 6
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.7-6 3/27/01 16.9.7-7 3/27/01 16.9.7-8 Delete 16.9.7-9 Delete 16.9.8-1 6/24/99 16.9.8-2 Delete 16.9.8-3 Delete 16.9.8-4 Delete 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 3/27/99 16.9.8a-2 3/27/99 16.9.8a-3 3/27/99 16.9.9-1 3/27/99 16.9.9-2 3/27/99 16.9.10-1 3/27/99 16.9.10-2 3/27/99 16.9.11-1 4/13/00 16.9.11-2 4/13/00 16.9.11-3 4/13/00 16.9.11-4 4/13/00 16.9.11-5 4/13/00 16.9.11-6 4/13/00 16.9.11-7 4/13/00 16.9.11-8 4/13/00 16.9.12-1 11/14/01 16.9.12-2 11/14/01 16.9.12-3 11/14/01 16.9.12-4 11/14/01 16.9.12-5 11/14/01 16.9.12-6 11/14/01 16.9.12-7 11/14/01 16.9.12-8 11/14/01 16.9.12-9 11/14/01 16.9.12-10 11/14/01 16.9.12-11 11/14/01 16.9.12-12 11/14/01 16.9.12-13 11/14/01 16.9.12-14 11/14/01 16.9.13-1 3/27/99 LOEP 6


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page                 Revision Date 16.9.14-1                     3/27/99 16.9.15-1                     3/27/99 16.9.15-2                     3/27/99 16.9.15-3                     3/27/99 16.9.16-1                     3/27/99 16.9.16-2                     5/23/01 16.9.16-3                     5/23/01 16.9.17-1                     5/23/01 16.9.17-2                     3/27/99 16.9.18-1                     11/21/00 16.9.18-2                     3/27/99 16.9.18-3                     11/21/00 16.9.18-4                     11/21/00 16.9.18-5                     11/21/00 16.9.18-6                     11/21/00 16.9.18-7                     11/21/00 16.9.18-8                     11/21/00 16.9.18-9                     11/21/00 16.10.1-1                     3/27/99 16.10.1-2                     3/27/99 16.10.1-3                     12/20/00 16.10.2-1                     3/27/99 16.10.3-1                     3/27/99 16.10.3-2                     3/27/99 16.10.4-1                     1/31/00 16.10.5-1                     3/27/99 16.10.6-1                     3/27/99 16.10.7-1                     4/29/99 16.10.7-2                     4/29/99 16.10.7-3                     1/31/00 16.10.7-4                     4/29/99 16.10.7-5                     4/29/99 16.10.7-6                     4/29/99 16.10.7-7                     4/29/99 16.10.7-8                     4/29/99 16.10.7-9                     4/29/99 16.11.1-1                     7/12/01 16.11.1-2                     7/12/01 16.11.1-3                     7/12/01 16.11.1-4                     7/12/01 16.11.1-5                     7/12/01 LOEP 7
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.14-1 3/27/99 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 3/27/99 16.9.16-2 5/23/01 16.9.16-3 5/23/01 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 11/21/00 16.9.18-2 3/27/99 16.9.18-3 11/21/00 16.9.18-4 11/21/00 16.9.18-5 11/21/00 16.9.18-6 11/21/00 16.9.18-7 11/21/00 16.9.18-8 11/21/00 16.9.18-9 11/21/00 16.10.1-1 3/27/99 16.10.1-2 3/27/99 16.10.1-3 12/20/00 16.10.2-1 3/27/99 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 1/31/00 16.10.5-1 3/27/99 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.11.1-1 7/12/01 16.11.1-2 7/12/01 16.11.1-3 7/12/01 16.11.1-4 7/12/01 16.11.1-5 7/12/01 LOEP 7


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page                 Revision Date 16.11.1-6                     7/12/01 16.11.1-7                     7/12/01 16.11.2-1                     1/31/00 16.11.2-2                     3/27/99 16.11.2-3                     1/31/00 16.11.2-4                     3/27/99 16.11.2-5                     1/31/00 16.11.2-6                     1/31/00 16.11.3-1                     1/31/00 16.11.3-2                     1/31/00 16.11.3-3                     3/27/99 16.11.3-4                     3/27/99 16.11.3-5                     1/31/00 16.11.3-6                     1/31/00 16.11.3-7                     1/31/00 16.11.3-8                     11/14/00 16.11.3-9                     1/31/00 16.11.3-10                     1/31/00 16.11.3-11                   3/27/99 16.11.3-12                     1/31/00 16.11.3-13                     1/31/00 16.11.3-14                   3/27/99 16.11.3-15                   3/27/99 16.11.3-16                   3/27/99 16.11.3-17                   3/27/99 16.11.3-18                     1/31/00 16.11.4-1                     3/27/99 16.11.4-2                     9/01/99 16.11.4-3                     3/27/99 16.11.4-4                     1/31/00 16.11.4-5                     1/31/00 16.11.4-6                     3/27/99 16.11.5-1                     1/31/00 16.11.5-2                     1/31/00 16.11.5-3                     1/31/00 16.11.6-1                     1/31/00 LOEP 8
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.1-6 7/12/01 16.11.1-7 7/12/01 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 1/31/00 16.11.3-2 1/31/00 16.11.3-3 3/27/99 16.11.3-4 3/27/99 16.11.3-5 1/31/00 16.11.3-6 1/31/00 16.11.3-7 1/31/00 16.11.3-8 11/14/00 16.11.3-9 1/31/00 16.11.3-10 1/31/00 16.11.3-11 3/27/99 16.11.3-12 1/31/00 16.11.3-13 1/31/00 16.11.3-14 3/27/99 16.11.3-15 3/27/99 16.11.3-16 3/27/99 16.11.3-17 3/27/99 16.11.3-18 1/31/00 16.11.4-1 3/27/99 16.11.4-2 9/01/99 16.11.4-3 3/27/99 16.11.4-4 1/31/00 16.11.4-5 1/31/00 16.11.4-6 3/27/99 16.11.5-1 1/31/00 16.11.5-2 1/31/00 16.11.5-3 1/31/00 16.11.6-1 1/31/00 LOEP 8


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page                 Revision Date 16.11.6-2                     1/31/00 16.11.6-3                     3/27/99 16.11.6-4                     3/27/99 16.11.6-5                     3/27/99 16.11.6-6                     3/27/99 16.11.6-7                     3/27/99 16.11.6-8                     3/27/99 16.11.6-9                     1/31/00 16.11.6-10                     1/31/00 16.11.7-1                     1/31/00 16.11.7-2                     1/31/00 16.11.7-3                     3/27/99 16.11.7-4                     1/31/00 16.11.8-1                     1/31/00 16.11.8-2                     1/31/00 16.11.9-1                     11/14/00 16.11.9-2                     1/31/00 16.11.9-3                     1/31/00 16.11.10-1                     6/30/99 16.11.10-2                     3/27/99 16.11.11-1                     3/27/99 16.11.12-1                     3/27/99 16.11.12-2                     3/27/99 16.11.13-1                     3/27/99 16.11.13-2                     3/27/99 16.11.14-1                     3/27/99 16.11.14-2                     3/27/99 16.12.1-1                     3/27/99 16.12.2-1                     6/6/00 16.12.2-2                     6/6/00 16.12.3-1                     3/27/99 16.12.4-1                     3/27/99 16.12.5-1                     3/27/99 16.13.1-1                     12/11/01 16.13.1-2                     12/11/01 16.13.1-3                     12/11/01 16.13.1-4                     12/11/01 LOEP 9
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.6-2 1/31/00 16.11.6-3 3/27/99 16.11.6-4 3/27/99 16.11.6-5 3/27/99 16.11.6-6 3/27/99 16.11.6-7 3/27/99 16.11.6-8 3/27/99 16.11.6-9 1/31/00 16.11.6-10 1/31/00 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 1/31/00 16.11.8-2 1/31/00 16.11.9-1 11/14/00 16.11.9-2 1/31/00 16.11.9-3 1/31/00 16.11.10-1 6/30/99 16.11.10-2 3/27/99 16.11.11-1 3/27/99 16.11.12-1 3/27/99 16.11.12-2 3/27/99 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 16.12.1-1 3/27/99 16.12.2-1 6/6/00 16.12.2-2 6/6/00 16.12.3-1 3/27/99 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.13.1-1 12/11/01 16.13.1-2 12/11/01 16.13.1-3 12/11/01 16.13.1-4 12/11/01 LOEP 9


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages PaQe                 Revision Date 16.13.1-5                     12/11/01 16.13.1-6                     12/11/01 16.13.1-7                     12/11/01 16.13.1-8                     12/11/01 16.13.1-9                     12/11/01 16.13.2-1                     1/14/02 16.13.2-2                     1/14/02 16.13.2-3                     1/14/02 16.13.2-4                     1/14/02 16.13.3-1                     1/14/02 16.13.3-2                     1/14/02 16.13.4-1                     3/27/99 16.13.5-1                     Delete 16.13.5-2                     Delete 16.13.6-1                     3/27/99 16.13.7-1                     10/11/99 16.13.8-1                     3/27/99 16.13.9-1                     3/27/99 16.13.9-2                     3/27/99 16.13.10-1                   3/27/99 16.13.11-1                   3/27/99 16.14.1-1                     3/27/99 16.14.2-1                     3/27/99 16.14.2-2                     3/27/99 16.14.3-1                     3/27/99 16.14.4-1                     3/27/99 16.15.1-1                     3/27/99 16.15.1-2                     3/27/99 16.15.1-3                     3/27/99 16.15.1-4                     3/27/99 16.15.1-5                     1/31/00 16.15.2-1                     3/27/99 16.15.2-2                     3/27/99 16,15.2-3                     3/27/99 16.15.2-4                     12/20/00 16.15.2-5                     12/20/00 16.15.3-1                     3/27/99 16.15.3-2                     3/27/99 LOEP 10
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages PaQe Revision Date 16.13.1-5 12/11/01 16.13.1-6 12/11/01 16.13.1-7 12/11/01 16.13.1-8 12/11/01 16.13.1-9 12/11/01 16.13.2-1 1/14/02 16.13.2-2 1/14/02 16.13.2-3 1/14/02 16.13.2-4 1/14/02 16.13.3-1 1/14/02 16.13.3-2 1/14/02 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 10/11/99 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 3/27/99 16.14.2-1 3/27/99 16.14.2-2 3/27/99 16.14.3-1 3/27/99 16.14.4-1 3/27/99 16.15.1-1 3/27/99 16.15.1-2 3/27/99 16.15.1-3 3/27/99 16.15.1-4 3/27/99 16.15.1-5 1/31/00 16.15.2-1 3/27/99 16.15.2-2 3/27/99 16,15.2-3 3/27/99 16.15.2-4 12/20/00 16.15.2-5 12/20/00 16.15.3-1 3/27/99 16.15.3-2 3/27/99 LOEP 10


Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe                 Revision Date 16.15.3-3                   3/27/99 16.15.3-4                   3/27/99 16.15.3-5                   3/27/99 LOEP 11
Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.15.3-3 3/27/99 16.15.3-4 3/27/99 16.15.3-5 3/27/99 LOEP 11


TABLE OF CONTENTS SECTION TITLE                                                              PAGE NO 16.0   SELECTED LICENSEE COMMITMENTS                                     16.1-1
SECTION NO 16.0 16.1 16.2 16.3 16.4 16.5 16.5.1 16.5.2 16.5.3 16.5.4 16.5.5 16.5.6 16.5.7 16.5.8 16.5.9 16.5.10 16.5.11 16.5.12 16.5.13 16.6 16.6.1 16.6.2 16.6.3 01/17/02 I TABLE OF CONTENTS TITLE SELECTED LICENSEE COMMITMENTS INTRODUCTION APPLICABILITY DEFINITIONS COMMITMENTS RELATED TO REACTOR COMPONENTS REACTOR COOLANT SYSTEM (RCS)
Reactor Coolant System Vents Low Temperature Overpressure Protection System Loss of Decay Heat Removal
[DELETED]
[DELETED]
[DELETED]
Chemistry Requirements Pressurizer Testing Following Opening of System (Core Barrel Bolt Inspections)
Loss of Reactor Coolant Subcriticality RCS Leak Testing Following Opening of System High Pressure Injection (HPI) and the Chemical Addition Systems ENGINEERED SAFETY FEATURES Containment Leakage Tests Containment Tendon Surveillance Program Containment Heat Removal Verification Frequency PAGE 16.1-1 16.1-1 16.2-1 16.3-1 Pending 16.5.1-1 16.5.1-1 16.5.2.1 16.5.3-1 16.5.4-1 16.5.5-1 16.5.6-1 16.5.7-1 16.5.8-1 16.5.9.1 16.5.10-1 16.5.11-1 16.5.12-1 16.5.13-1 16.6.1-1 16.6.1-1 16.6.2-1 16.6.3-1 I
16.0-1


==16.1    INTRODUCTION==
SECTION NO 16.6.4 16.6.5 16.6.6 16.6.7 16.6.8 16.6.9 16.6.10 16.6.11 16.6.12 16.6.13 16.7 16.7.1 16.7.2 16.7.3 16.7.4 16.7.5 16.7.6 16.7.7 16.7.8 16.7.9 16.7.10 16.7.11 16.7.12 01/17/02 I TABLE OF CONTENTS (continued)
16.1-1 16.2    APPLICABILITY                                                      16.2-1 16.3    DEFINITIONS                                                        16.3-1 16.4    COMMITMENTS RELATED TO REACTOR COMPONENTS                          Pending 16.5    REACTOR COOLANT SYSTEM (RCS)                                      16.5.1-1 16.5.1  Reactor Coolant System Vents                                      16.5.1-1 16.5.2 Low Temperature Overpressure Protection System                    16.5.2.1    I 16.5.3  Loss of Decay Heat Removal                                        16.5.3-1 16.5.4  [DELETED]                                                          16.5.4-1 16.5.5  [DELETED]                                                          16.5.5-1 16.5.[DELETED]                                                         16.5.6-1 16.5.7  Chemistry Requirements                                            16.5.7-1 16.5.8  Pressurizer                                                      16.5.8-1 16.5.9 Testing Following Opening of System (Core Barrel Bolt Inspections) 16.5.9.1 16.5.10  Loss of Reactor Coolant                                          16.5.10-1 16.5.11 Subcriticality                                                    16.5.11-1 16.5.12  RCS Leak Testing Following Opening of System                      16.5.12-1 16.5.13  High Pressure Injection (HPI) and the Chemical Addition Systems  16.5.13-1 16.6    ENGINEERED SAFETY FEATURES                                        16.6.1-1 16.6.1   Containment Leakage Tests                                        16.6.1-1 16.6.2  Containment Tendon Surveillance Program                          16.6.2-1 16.6.3  Containment Heat Removal Verification Frequency                  16.6.3-1 16.0-1                                  01/17/02 I
TITLE Low Pressure Injection (LPI) System Leakage Core Flood Tank (CFT) Discharge Valve Breakers Core Flooding System Test Borated Water Storage Tank (BWST) Outlet Valve Control Low Pressure Injection (LPI) System Valve Test Restrictions Containment Purge Valve Testing
[DELETED]
Reserved Additional High Pressure Injection (HPI) Requirements Additional Requirements to Support Low Pressure Injection (LPI)
Operability INSTRUMENTATION Accident Monitoring Instrumentation - Noble Gas Effluent Monitor (RIA-56)
Anticipated Transients Without Scram Emergency Feedwater - Low Level Initiation
[DELETED]
Steam Generator Overfill Protection
[DELETED]
Position Indicator Channel Testing I ncore Instrumentation RCP Monitor Core Flood Tank (CFT) Instrumentation Display Instrumentation SSF Diesel Generator (DG) Air Start System Pressure Instrumentation PAGE 16.6.4-1 16.6.5-1 16.6.6-1 16.6.7-1 16.6.8-1 16.6.9-1 16.6.10-1 16.6.12-1 16.6.13-1 16.7.1-1 16.7.1-1 16.7.2-1 16.7.3-1 16.7.4-1 16.7.5-1 16.7.6-1 16.7.7-1 16.7.8-1 16.7.9-1 16.7.10-1 16.7.11-1 16.7.12-1 16.0-2


TABLE OF CONTENTS (continued)
SECTION NO 16.7.13 16.7.14 16.8 16.8.1 16.8.2 16.8.3 16.8.4 16.8.5 16.8.6 16.8.7 16.8.8 16.9 16.9.1 16.9.2 16.9.3 16.9.4 16.9.5 16.9.6 TABLE OF CONTENTS (continued)
SECTION TITLE                                                            PAGE NO 16.6.4  Low Pressure Injection (LPI) System Leakage                      16.6.4-1 16.6.5  Core Flood Tank (CFT) Discharge Valve Breakers                  16.6.5-1 16.6.6  Core Flooding System Test                                        16.6.6-1 16.6.7 Borated Water Storage Tank (BWST) Outlet Valve Control          16.6.7-1 16.6.8 Low Pressure Injection (LPI) System Valve Test Restrictions      16.6.8-1 16.6.9  Containment Purge Valve Testing                                  16.6.9-1 16.6.10 [DELETED]                                                        16.6.10-1 16.6.11 Reserved 16.6.12 Additional High Pressure Injection (HPI) Requirements            16.6.12-1 16.6.13 Additional Requirements to Support Low Pressure Injection (LPI)  16.6.13-1 Operability 16.7   INSTRUMENTATION                                                  16.7.1-1 16.7.1  Accident Monitoring Instrumentation - Noble Gas Effluent Monitor 16.7.1-1 (RIA-56) 16.7.2 Anticipated Transients Without Scram                            16.7.2-1 16.7.3 Emergency Feedwater - Low Level Initiation                      16.7.3-1 16.7.4 [DELETED]                                                        16.7.4-1 16.7.5 Steam Generator Overfill Protection                              16.7.5-1 16.7.6 [DELETED]                                                         16.7.6-1 16.7.7  Position Indicator Channel Testing                              16.7.7-1 16.7.8   Incore Instrumentation                                          16.7.8-1 16.7.9   RCP Monitor                                                      16.7.9-1 16.7.10 Core Flood Tank (CFT) Instrumentation                            16.7.10-1 16.7.11  Display Instrumentation                                          16.7.11-1 16.7.12 SSF Diesel Generator (DG) Air Start System Pressure              16.7.12-1 Instrumentation 16.0-2                                01/17/02 I
TITLE SSF Instrumentation Rod Withdrawal Limit Alarm ELECTRIC POWER SYSTEM Control of Room Temperature for Station Blackout
 
[DELETED]
TABLE OF CONTENTS (continued)
Power Battery Parameters Keowee Operational Restrictions 125Vdc Vital I&C System Ground Locating Policy Lee/Central Alternate Power System Auctioneering Diodes External Grid Trouble Protection System AUXILIARY SYSTEMS Fire Suppression Water Supply Systems Sprinkler and Spray Systems Keowee CO2 Systems Fire Hose Stations Fire Barriers Fire Detection Instrumentation 16.9.7 Keowee Lake Level 16.9.8
SECTION  TITLE                                                            PAGE NO 16.7.13  SSF Instrumentation                                              16.7.13-1 16.7.14  Rod Withdrawal Limit Alarm                                      16.7.14-1 16.8    ELECTRIC POWER SYSTEM                                            16.8.1-1 16.8.1  Control of Room Temperature for Station Blackout                16.8.1-1 16.8.2  [DELETED]                                                        16.8.2-1 16.8.3  Power Battery Parameters                                        16.8.3-1 16.8.4  Keowee Operational Restrictions                                  16.8.4-1 16.8.5  125Vdc Vital I&C System Ground Locating Policy                  16.8.5-1 16.8.6  Lee/Central Alternate Power System                              16.8.6-1 16.8.7  Auctioneering Diodes                                            16.8.7-1 16.8.8  External Grid Trouble Protection System                          16.8.8-1 16.9    AUXILIARY SYSTEMS                                                16.9.1-1 16.9.1    Fire Suppression Water Supply Systems                          16.9.1-1 16.9.2  Sprinkler and Spray Systems                                      16.9.2-1 16.9.3    Keowee CO 2 Systems                                            16.9.3-1 16.9.4    Fire Hose Stations                                              16.9.4-1 16.9.5    Fire Barriers                                                    16.9.5-1 16.9.6    Fire Detection Instrumentation                                  16.9.6-1 16.9.7    Keowee Lake Level                                                16.9.7-1 16.9.8    [DELETED]                                                        16.9.8-1 16.9.8a  HPSW Requirements to Support Loss of LPSW                        16.9.8a-1 16.9.9  Auxiliary Service Water (ASW) System and Main Steam Atmospheric  16.9.9-1 Dump Valves 16.9.10  Component Cooling (CC) and HPI Seal Injection to Reactor        16.9.10-1 Coolant Pumps 16.9.11  Turbine Building Flood Protection Measures                      16.9.11-1 16.0-3                                01/17/02
[DELETED]
16.9.8a HPSW Requirements to Support Loss of LPSW 16.9.9 Auxiliary Service Water (ASW) System and Main Steam Atmospheric Dump Valves 16.9.10 Component Cooling (CC) and HPI Seal Injection to Reactor Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.0-3 PAGE 16.7.13-1 16.7.14-1 16.8.1-1 16.8.1-1 16.8.2-1 16.8.3-1 16.8.4-1 16.8.5-1 16.8.6-1 16.8.7-1 16.8.8-1 16.9.1-1 16.9.1-1 16.9.2-1 16.9.3-1 16.9.4-1 16.9.5-1 16.9.6-1 16.9.7-1 16.9.8-1 16.9.8a-1 16.9.9-1 16.9.10-1 16.9.11-1 01/17/02


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
SECTION TITLE                                                     PAGE NO 16.9.12 Additional Low Pressure Service Water (LPSW) And         16.9.12-1 Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System                                 16.9.13-1 16.9.14 SSF Diesel Generator Inspection Requirements             16.9.14-1 16.9.15 Radioactive Material Sources                             16.9.15-1 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist         16.9.16-1 (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated             16.9.17-1 temperature and pressure) 16.9.18 Snubbers                                                 16.9.18-1 16.10   STEAM & POWER CONVERSION SYSTEMS                         16.10.1-1 16.10.1 Condensate Inventory Requirements for Emergency Feedwater 16.10.1-1 16.10.2 Steam Generator Secondary Side Pressure and               16.10.2-1 Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing         16.10.3-1 16.10.4 Low Presssure Service Water (LPSW) System Testing         16.10.4-1  I Main Steam Line Break (MSLB) Feedwater Isolation Features 16.10.5-1 16.10.5 16.10.6 Emergency Feedwater Controls                             16.10.6-1 16.10.7 Alternate Source of Emergency Feedwater (EFW)             16.10.7-1 16.11   RADIOLOGICAL EFFLUENTS CONTROL                          16.11.1-1 16.11.1 Radioactive Liquid Effluents                            16.11.1-1 16.11.2 Radioactive Gaseous Effluents                            16.11.2-1 16.11.3  Radioactive Effluent Monitoring Instrumentation          16.11.3-1 16.11.4  Operational Safety Review                                16.11.4-1 16.11.5  Solid Radioactive Waste                                  16.11.5-1 16.0-4                         01/17/02 I
SECTION NO TITLE 01/17/02 I PAGE 16.9.12 Additional Low Pressure Service Water (LPSW) And Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.14 SSF Diesel Generator Inspection Requirements 16.9.15 Radioactive Material Sources 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated temperature and pressure) 16.9.18 Snubbers 16.10 STEAM & POWER CONVERSION SYSTEMS 16.10.1 Condensate Inventory Requirements for Emergency Feedwater 16.10.2 Steam Generator Secondary Side Pressure and Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.4 Low Presssure Service Water (LPSW) System Testing 16.10.5 Main Steam Line Break (MSLB) Feedwater Isolation Features 16.10.6 Emergency Feedwater Controls 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1 Radioactive Liquid Effluents 16.11.2 Radioactive Gaseous Effluents 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.4 Operational Safety Review 16.11.5 Solid Radioactive Waste 16.9.12-1 16.9.13-1 16.9.14-1 16.9.15-1 16.9.16-1 16.9.17-1 16.9.18-1 16.10.1-1 16.10.1-1 16.10.2-1 16.10.3-1 16.10.4-1 16.10.5-1 16.10.6-1 16.10.7-1 16.11.1-1 16.11.1-1 16.11.2-1 16.11.3-1 16.11.4-1 16.11.5-1 I
16.0-4


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
SECTION TITLE                                                     PAGE NO 16.11.6 Radiological Environmental Monitoring                     16.11.6-1 16.11.7 Dose calculations                                         16.11.7-1 16.11.8 Reports                                                   16.11.8-1 16.11.9 Radioactive Effluent Release Report                       16.11.9-1 16.11.10 Radiological Environmental Operating Report               16.11.10-1 16.11.11 Iodine Radiation Monitoring Filters                       16.11.11-1 16.11.12 Radioactive Material in Outside Temporary                 16.11.12-1 Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup                   16.11.13-1 Tank Exceeding Limit 16.11.14 Explosive Gas Mixture                                     16.11.14-1 16.12   REFUELING OPERATIONS                                       16.12.1-1 16.12.1 Decay Time for Movement of Irradiated Fuel                 16.12.1-1 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling   16.12.2-1 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.3-1 16.12.4 Handling of Irradiated Fuel Assemblies                     16.12.4-1 16.12.5 Loads Suspended Over Spent Fuel in Spent Fuel Pool         16.12.5-1 16.13    CONDUCT OF OPERATIONS                                      16.13.1-1 16.13.1 Minimum Station Staffing Requirements                      16.13.1-1 16.13.2  Technical Review and Control                              16.13.2-1 16.13.3 Plant Operations Review Committee                          16.13.3-1 16.13.4  Reactivity Anomaly                                        16.13.4-1 16.13.5  [DELETED]                                                  16.13.5-1 16.13.6  Retraining and Replacement of Station Personnel            16.13.6-1 16.0-5                          01/17/02 I
SECTION NO TITLE 01/17/02 I 16.11.6 Radiological Environmental Monitoring 16.11.7 Dose calculations 16.11.8 Reports 16.11.9 Radioactive Effluent Release Report 16.11.10 Radiological Environmental Operating Report 16.11.11 Iodine Radiation Monitoring Filters 16.11.12 Radioactive Material in Outside Temporary Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.12 REFUELING OPERATIONS 16.12.1 Decay Time for Movement of Irradiated Fuel 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.4 Handling of Irradiated Fuel Assemblies 16.12.5 Loads Suspended Over Spent Fuel in Spent Fuel Pool 16.13 CONDUCT OF OPERATIONS 16.13.1 Minimum Station Staffing Requirements 16.13.2 Technical Review and Control 16.13.3 Plant Operations Review Committee 16.13.4 Reactivity Anomaly 16.13.5
[DELETED]
16.13.6 Retraining and Replacement of Station Personnel 16.0-5 PAGE 16.11.6-1 16.11.7-1 16.11.8-1 16.11.9-1 16.11.10-1 16.11.11-1 16.11.12-1 16.11.13-1 16.11.14-1 16.12.1-1 16.12.1-1 16.12.2-1 16.12.3-1 16.12.4-1 16.12.5-1 16.13.1-1 16.13.1-1 16.13.2-1 16.13.3-1 16.13.4-1 16.13.5-1 16.13.6-1


TABLE OF CONTENTS (continued)
TABLE OF CONTENTS (continued)
SECTION   TITLE                                                    PAGE NO 16.13.7   Procedures for Control of pH in Recirculated             16.13.7-1 Coolant after Loss-of-Coolant Accident (LOCA) & Long-term Emergency Core Cooling Systems 16.13.8  Respiratory Protective Program                           16.13.8-1 16.13.9  Startup Report                                            16.13.9-1 16.13..10 Core Operating Limits Report                              16.13.10-1 16.13.11  Procedure for Station Survey Following an Earthquake      16.13.11-1 16.14    CONTROL RODS AND POWER DISTRIBUTION                      16.14.1-1 16.14.1  APSR Movement                                            16.14.1-1 16.14.2  Control Rod Program Verification                          16.14.2-1 16.14.3  Power Mapping                                            16.14.3-1 16.14.4  Control Rod Drive Patch Panels                            16.14.4-1 16.15    VENTILATION FILTER TESTING PROGRAM                        16.15.1-1 16.15.1  Penetration Room Ventilation Room System Testing          16.15.1-1 16.15.2  Control Room Pressurization and Filtering System          16.15.2-1 16.15.3  Spent Fuel Pool Ventilation System                        16.15.3-1 16.0-6                         01/17/021}}
TITLE SECTION NO 16.13.7 16.13.8 16.13.9 16.13..10 16.13.11 16.14 16.14.1 16.14.2 16.14.3 16.14.4 16.15 16.15.1 16.15.2 16.15.3 PAGE Procedures for Control of pH in Recirculated Coolant after Loss-of-Coolant Accident (LOCA) & Long-term Emergency Core Cooling Systems Respiratory Protective Program Startup Report Core Operating Limits Report Procedure for Station Survey Following an Earthquake CONTROL RODS AND POWER DISTRIBUTION APSR Movement Control Rod Program Verification Power Mapping Control Rod Drive Patch Panels VENTILATION FILTER TESTING PROGRAM Penetration Room Ventilation Room System Testing Control Room Pressurization and Filtering System Spent Fuel Pool Ventilation System 01/17/021 16.13.7-1 16.13.8-1 16.13.9-1 16.13.10-1 16.13.11-1 16.14.1-1 16.14.1-1 16.14.2-1 16.14.3-1 16.14.4-1 16.15.1-1 16.15.1-1 16.15.2-1 16.15.3-1 16.0-6}}

Latest revision as of 20:01, 16 January 2025

Selected License Commitments Manual
ML020460012
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/04/2002
From: Mccollum W
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML020460012 (19)


Text

P Dke Duke Energy 0 Energy Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 W. R. McCollum, Jr.

(864) 885-3107 OFFICE Vice President (864) 885-3564 FAX February 4, 2002 U.

S.

Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Oconee Nuclear Station Docket 50-269,

-270,

-287 Selected Licensee Commitments Manual (SLC)

Gentlemen:

Pursuant to 10CFR 50.4 and 50.71, please find attached 7 copies of the latest revisions to the Oconee Selected Licensee Commitments Manual (SLC).

The SLC Manual is Chapter 16.0 of the Oconee Updated Final Safety Analysis Report (UFSAR).

This manual is intended to contain commitments and other station issues that warrant higher control, but are not appropriate for inclusion into the Technical Specifications (TS).

Instead of being updated with the annual UFSAR Update, the SLC Manual will be updated as necessary throughout the year.

Very truly yours,

.R.

McCollum, Jr.

V ice President Oconee Nuclear tation CMB/cmb Attachment xc:

Luis A.

Reyes Regional Administrator, Region II L.

N. Olshan, ONRR M. C. Shannon Oconee Senior Resident Inspector

February 4, 2002 To: Manual Holders

Subject:

Oconee Selected Licensee Commitments Manual (SLC)

Revision On January 16, 2002, Station Management approved revisions to SLC Table of Contents, which were implemented on January 17, 2002.

These changes revise the SLC Table of Contents to correct typographical errors that have occurred since conversion of SLC to the new ITS format.

It also deletes the title of SLC 16.6.10, Containment Hydrogen Recombiner System.

SLC 16.6.10 was deleted from SLC's on December 20, 2001.

Remove these pages SLC LOEP Pages 1-11 SLC Page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Insert these pages SLC LOEP Pages 1-11 SLC page 16.0-1 SLC Page 16.0-2 SLC Page 16.0-3 SLC Page 16.0-4 SLC Page 16.0-5 SLC Page 16.0-6 Any questions concerning these revisions may be directed to Reene Gambrell at ext. 3364.

Regulatory Compliance By: Conice Breazeale Regulatory Compliance

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date LOEP 1 1/17/02 LOEP 2 9/20/01 LOEP 3 12/20/01 LOEP 4 8/09/01 LOEP 5 12/18/01 LOEP 6 11/14/01 LOEP 7 7/12/01 LOEP 8 7/12/01 LOEP 9 12/11/01 LOEP 10 1/14/02 LOEP 11 11/30/99 16.0-1 1/17/02 16.0-2 1/17/02 16.0-3 1/17/02 16.0-4 1/17/02 16.0-5 1/17/02 16.0-6 1/17/02 16.1-1 3/27/99 16.2-1 3/27/99 16.2-2 3/27/99 16.2-3 3/27/99 16.3-1 3/27/99 16.5.1-1 7/18/00 16.5.1-2 7/18/00 16.5.1-3 7/18/00 16.5.2-1 5/11/99 16.5.2-2 5/11/99 16.5.2-3 5/11/99 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 10/18/01 16.5.3-2 10/18/01 16.5.3-3 10/18/01 16.5.4-1 3/27/99 16.5.5-1 3/27/99 16.5.6-1 3/27/99 16.5.7-1 3/27/99 16.5.7-2 3/27/99 LOEP 1

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.5.7-3 9/02/99 16.5.7-4 5/1/00 16.5.7-5 5/1/00 16.5.7-6 9/02/99 16.5.8-1 3/27/99 16.5.8-2 3/27/99 16.5.9-1 3/27/99 16.5.9-2 3/27/99 16.5.10-1 5/11/99 16.5.10-2 1/31/00 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 9/20/01 16.6.1-2 9/20/01 16.6.1-3 9/20/01 16.6.1-4 9/20/01 16.6.1-5 9/20/01 16.6.2-1 3/27/99 16.6.2-2 3/27/99 16.6.2-3 2/17/00 16.6.2-4 10/4/00 16.6.2-5 10/4/00 16.6.2-6 10/4/00 16.6.2-7 2/17/00 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 3/27/99 16.6.4-1 3/27/99 16.6.4-2 3/27/99 LOEP 2

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.6.4-3 3/27/99 16.6.4-4 3/27/99 16.6.4-5 1/31/00 16.6.4-6 3/27/99 16.6.5-1 12/14/00 16.6.6-1 3/27/99 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 6/12/01 16.6.9-2 3/27/99 16.6.10-1 12/20/01 16.6.10-2 Delete 16.6.10-3 Delete 16.6.12-1 02/15/01 16.6.12-2 02/15/01 16.6.12-3 02/15/01 16.6.12-4 Delete 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 7/31/01 16.6.13-2 7/31/01 16.7.1-1 3/27/99 16.7.1-2 3/27/99 16.7.2-1 1/31/00 16.7.2-2 5/23/01 16.7.2-3 1/31/00 16.7.3-1 3/27/99 16.7.3-2 3/27/99 16.7.4-1 3/27/99 16.7.5-1 10/04/99 16.7.5-2 3/27/99 16.7.5-3 10/04/99 16.7.5-4 10/04/99 16.7.6-1 3/27/99 16.7.7-1 3/27/99 16.7.7-2 3/27/99 16.7.8-1 3/27/99 LOEP 3

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.7.8-2 3/27/99 16.7.9-1 3/27/99 16.7.10-1 3/27/99 16.7.10-2 3/27/99 16.7.11-1 3/27/99 16.7.11-2 3/27/99 16.7.11-3 3/27/99 16.7.12-1 3/27/99 16.7.12-2 3/27/99 16.7.13-1 3/27/99 16.7.13-2 3/27/99 16.7.13-3 6/29/99 16.7.14-1 2/17/00 16.7.14-2 2/17/00 16.7.14-3 2/17/00 16.7.14-4 2/17/00 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 3/27/99 16.8.3-1 3/27/99 16.8.3-2 1/31/00 16.8.3-3 1/31/00 16.8.3-4 3/27/99 16.8.3-5 1/31/00 16.8.3-6 1/31/00 16.8.3-7 1/31/00 16.8.4-1 9/18/99 16.8.4-2 02/15/01 16.8.4-3 02/15/01 16.8.4-4 02/15/01 16.8.4-5 02/15/01 16.8.4-6 02/15/01 16.8.4-7 02/15/01 16.8.4-8 02/15/01 16.8.4-9 02/15/01 16.8.5-1 9/30/99 16.8.5-2 1/31/00 16.8.5-3 1/31/00 16.8.5-4 9/30/99 16.8.5-5 1/31/00 16.8.6-1 3/27/99 LOEP 4

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.8.6-2 1/31/00 16.8.6-3 1/31/00 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.9.1-1 1/31/00 16.9.1-2 3/27/99 16.9.1-3 3/27/99 16.9.1-4 3/27/99 16.9.1-5 6/12/01 16.9.2-1 12/18/01 16.9.2-2 12/18/01 16.9.2-3 12/18/01 16.9.2-4 12/18/01 16.9.2-5 12/18/01 16.9.3-1 1/31/00 16.9.3-2 1/31/00 16.9.4-1 1/31/00 16.9.4-2 1/31/00 16.9.4-3 1/31/00 16.9.4-4 3/27/99 16.9.4-5 6/12/01 16.9.5-1 1/31/00 16.9.5-2 4/29/99 16.9.5-3 4/29/99 16.9.5-4 6/12/01 16.9.6-1 3/27/99 16.9.6-2 3/27/99 16.9.6-3 3/27/99 16.9.6-4 3/27/99 16.9.6-5 3/27/99 16.9.6-6 3/27/99 16.9.6-7 3/27/99 16.9.6-8 3/27/99 16.9.6-9 11/30/99 16.9.7-1 3/27/01 16.9.7-2 3/27/01 16.9.7-3 3/27/01 16.9.7-4 3/27/01 16.9.7-5 3/27/01 LOEP 5

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.7-6 3/27/01 16.9.7-7 3/27/01 16.9.7-8 Delete 16.9.7-9 Delete 16.9.8-1 6/24/99 16.9.8-2 Delete 16.9.8-3 Delete 16.9.8-4 Delete 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 3/27/99 16.9.8a-2 3/27/99 16.9.8a-3 3/27/99 16.9.9-1 3/27/99 16.9.9-2 3/27/99 16.9.10-1 3/27/99 16.9.10-2 3/27/99 16.9.11-1 4/13/00 16.9.11-2 4/13/00 16.9.11-3 4/13/00 16.9.11-4 4/13/00 16.9.11-5 4/13/00 16.9.11-6 4/13/00 16.9.11-7 4/13/00 16.9.11-8 4/13/00 16.9.12-1 11/14/01 16.9.12-2 11/14/01 16.9.12-3 11/14/01 16.9.12-4 11/14/01 16.9.12-5 11/14/01 16.9.12-6 11/14/01 16.9.12-7 11/14/01 16.9.12-8 11/14/01 16.9.12-9 11/14/01 16.9.12-10 11/14/01 16.9.12-11 11/14/01 16.9.12-12 11/14/01 16.9.12-13 11/14/01 16.9.12-14 11/14/01 16.9.13-1 3/27/99 LOEP 6

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.9.14-1 3/27/99 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 3/27/99 16.9.16-2 5/23/01 16.9.16-3 5/23/01 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 11/21/00 16.9.18-2 3/27/99 16.9.18-3 11/21/00 16.9.18-4 11/21/00 16.9.18-5 11/21/00 16.9.18-6 11/21/00 16.9.18-7 11/21/00 16.9.18-8 11/21/00 16.9.18-9 11/21/00 16.10.1-1 3/27/99 16.10.1-2 3/27/99 16.10.1-3 12/20/00 16.10.2-1 3/27/99 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 1/31/00 16.10.5-1 3/27/99 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.11.1-1 7/12/01 16.11.1-2 7/12/01 16.11.1-3 7/12/01 16.11.1-4 7/12/01 16.11.1-5 7/12/01 LOEP 7

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.1-6 7/12/01 16.11.1-7 7/12/01 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 1/31/00 16.11.3-2 1/31/00 16.11.3-3 3/27/99 16.11.3-4 3/27/99 16.11.3-5 1/31/00 16.11.3-6 1/31/00 16.11.3-7 1/31/00 16.11.3-8 11/14/00 16.11.3-9 1/31/00 16.11.3-10 1/31/00 16.11.3-11 3/27/99 16.11.3-12 1/31/00 16.11.3-13 1/31/00 16.11.3-14 3/27/99 16.11.3-15 3/27/99 16.11.3-16 3/27/99 16.11.3-17 3/27/99 16.11.3-18 1/31/00 16.11.4-1 3/27/99 16.11.4-2 9/01/99 16.11.4-3 3/27/99 16.11.4-4 1/31/00 16.11.4-5 1/31/00 16.11.4-6 3/27/99 16.11.5-1 1/31/00 16.11.5-2 1/31/00 16.11.5-3 1/31/00 16.11.6-1 1/31/00 LOEP 8

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Page Revision Date 16.11.6-2 1/31/00 16.11.6-3 3/27/99 16.11.6-4 3/27/99 16.11.6-5 3/27/99 16.11.6-6 3/27/99 16.11.6-7 3/27/99 16.11.6-8 3/27/99 16.11.6-9 1/31/00 16.11.6-10 1/31/00 16.11.7-1 1/31/00 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 1/31/00 16.11.8-2 1/31/00 16.11.9-1 11/14/00 16.11.9-2 1/31/00 16.11.9-3 1/31/00 16.11.10-1 6/30/99 16.11.10-2 3/27/99 16.11.11-1 3/27/99 16.11.12-1 3/27/99 16.11.12-2 3/27/99 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 16.12.1-1 3/27/99 16.12.2-1 6/6/00 16.12.2-2 6/6/00 16.12.3-1 3/27/99 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.13.1-1 12/11/01 16.13.1-2 12/11/01 16.13.1-3 12/11/01 16.13.1-4 12/11/01 LOEP 9

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages PaQe Revision Date 16.13.1-5 12/11/01 16.13.1-6 12/11/01 16.13.1-7 12/11/01 16.13.1-8 12/11/01 16.13.1-9 12/11/01 16.13.2-1 1/14/02 16.13.2-2 1/14/02 16.13.2-3 1/14/02 16.13.2-4 1/14/02 16.13.3-1 1/14/02 16.13.3-2 1/14/02 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 10/11/99 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 3/27/99 16.14.2-1 3/27/99 16.14.2-2 3/27/99 16.14.3-1 3/27/99 16.14.4-1 3/27/99 16.15.1-1 3/27/99 16.15.1-2 3/27/99 16.15.1-3 3/27/99 16.15.1-4 3/27/99 16.15.1-5 1/31/00 16.15.2-1 3/27/99 16.15.2-2 3/27/99 16,15.2-3 3/27/99 16.15.2-4 12/20/00 16.15.2-5 12/20/00 16.15.3-1 3/27/99 16.15.3-2 3/27/99 LOEP 10

Oconee Nuclear Station Selected Licensee Commitments Revised 2/04/02 List of Effective Pages Paqe Revision Date 16.15.3-3 3/27/99 16.15.3-4 3/27/99 16.15.3-5 3/27/99 LOEP 11

SECTION NO 16.0 16.1 16.2 16.3 16.4 16.5 16.5.1 16.5.2 16.5.3 16.5.4 16.5.5 16.5.6 16.5.7 16.5.8 16.5.9 16.5.10 16.5.11 16.5.12 16.5.13 16.6 16.6.1 16.6.2 16.6.3 01/17/02 I TABLE OF CONTENTS TITLE SELECTED LICENSEE COMMITMENTS INTRODUCTION APPLICABILITY DEFINITIONS COMMITMENTS RELATED TO REACTOR COMPONENTS REACTOR COOLANT SYSTEM (RCS)

Reactor Coolant System Vents Low Temperature Overpressure Protection System Loss of Decay Heat Removal

[DELETED]

[DELETED]

[DELETED]

Chemistry Requirements Pressurizer Testing Following Opening of System (Core Barrel Bolt Inspections)

Loss of Reactor Coolant Subcriticality RCS Leak Testing Following Opening of System High Pressure Injection (HPI) and the Chemical Addition Systems ENGINEERED SAFETY FEATURES Containment Leakage Tests Containment Tendon Surveillance Program Containment Heat Removal Verification Frequency PAGE 16.1-1 16.1-1 16.2-1 16.3-1 Pending 16.5.1-1 16.5.1-1 16.5.2.1 16.5.3-1 16.5.4-1 16.5.5-1 16.5.6-1 16.5.7-1 16.5.8-1 16.5.9.1 16.5.10-1 16.5.11-1 16.5.12-1 16.5.13-1 16.6.1-1 16.6.1-1 16.6.2-1 16.6.3-1 I

16.0-1

SECTION NO 16.6.4 16.6.5 16.6.6 16.6.7 16.6.8 16.6.9 16.6.10 16.6.11 16.6.12 16.6.13 16.7 16.7.1 16.7.2 16.7.3 16.7.4 16.7.5 16.7.6 16.7.7 16.7.8 16.7.9 16.7.10 16.7.11 16.7.12 01/17/02 I TABLE OF CONTENTS (continued)

TITLE Low Pressure Injection (LPI) System Leakage Core Flood Tank (CFT) Discharge Valve Breakers Core Flooding System Test Borated Water Storage Tank (BWST) Outlet Valve Control Low Pressure Injection (LPI) System Valve Test Restrictions Containment Purge Valve Testing

[DELETED]

Reserved Additional High Pressure Injection (HPI) Requirements Additional Requirements to Support Low Pressure Injection (LPI)

Operability INSTRUMENTATION Accident Monitoring Instrumentation - Noble Gas Effluent Monitor (RIA-56)

Anticipated Transients Without Scram Emergency Feedwater - Low Level Initiation

[DELETED]

Steam Generator Overfill Protection

[DELETED]

Position Indicator Channel Testing I ncore Instrumentation RCP Monitor Core Flood Tank (CFT) Instrumentation Display Instrumentation SSF Diesel Generator (DG) Air Start System Pressure Instrumentation PAGE 16.6.4-1 16.6.5-1 16.6.6-1 16.6.7-1 16.6.8-1 16.6.9-1 16.6.10-1 16.6.12-1 16.6.13-1 16.7.1-1 16.7.1-1 16.7.2-1 16.7.3-1 16.7.4-1 16.7.5-1 16.7.6-1 16.7.7-1 16.7.8-1 16.7.9-1 16.7.10-1 16.7.11-1 16.7.12-1 16.0-2

SECTION NO 16.7.13 16.7.14 16.8 16.8.1 16.8.2 16.8.3 16.8.4 16.8.5 16.8.6 16.8.7 16.8.8 16.9 16.9.1 16.9.2 16.9.3 16.9.4 16.9.5 16.9.6 TABLE OF CONTENTS (continued)

TITLE SSF Instrumentation Rod Withdrawal Limit Alarm ELECTRIC POWER SYSTEM Control of Room Temperature for Station Blackout

[DELETED]

Power Battery Parameters Keowee Operational Restrictions 125Vdc Vital I&C System Ground Locating Policy Lee/Central Alternate Power System Auctioneering Diodes External Grid Trouble Protection System AUXILIARY SYSTEMS Fire Suppression Water Supply Systems Sprinkler and Spray Systems Keowee CO2 Systems Fire Hose Stations Fire Barriers Fire Detection Instrumentation 16.9.7 Keowee Lake Level 16.9.8

[DELETED]

16.9.8a HPSW Requirements to Support Loss of LPSW 16.9.9 Auxiliary Service Water (ASW) System and Main Steam Atmospheric Dump Valves 16.9.10 Component Cooling (CC) and HPI Seal Injection to Reactor Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.0-3 PAGE 16.7.13-1 16.7.14-1 16.8.1-1 16.8.1-1 16.8.2-1 16.8.3-1 16.8.4-1 16.8.5-1 16.8.6-1 16.8.7-1 16.8.8-1 16.9.1-1 16.9.1-1 16.9.2-1 16.9.3-1 16.9.4-1 16.9.5-1 16.9.6-1 16.9.7-1 16.9.8-1 16.9.8a-1 16.9.9-1 16.9.10-1 16.9.11-1 01/17/02

TABLE OF CONTENTS (continued)

SECTION NO TITLE 01/17/02 I PAGE 16.9.12 Additional Low Pressure Service Water (LPSW) And Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.14 SSF Diesel Generator Inspection Requirements 16.9.15 Radioactive Material Sources 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated temperature and pressure) 16.9.18 Snubbers 16.10 STEAM & POWER CONVERSION SYSTEMS 16.10.1 Condensate Inventory Requirements for Emergency Feedwater 16.10.2 Steam Generator Secondary Side Pressure and Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.4 Low Presssure Service Water (LPSW) System Testing 16.10.5 Main Steam Line Break (MSLB) Feedwater Isolation Features 16.10.6 Emergency Feedwater Controls 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1 Radioactive Liquid Effluents 16.11.2 Radioactive Gaseous Effluents 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.4 Operational Safety Review 16.11.5 Solid Radioactive Waste 16.9.12-1 16.9.13-1 16.9.14-1 16.9.15-1 16.9.16-1 16.9.17-1 16.9.18-1 16.10.1-1 16.10.1-1 16.10.2-1 16.10.3-1 16.10.4-1 16.10.5-1 16.10.6-1 16.10.7-1 16.11.1-1 16.11.1-1 16.11.2-1 16.11.3-1 16.11.4-1 16.11.5-1 I

16.0-4

TABLE OF CONTENTS (continued)

SECTION NO TITLE 01/17/02 I 16.11.6 Radiological Environmental Monitoring 16.11.7 Dose calculations 16.11.8 Reports 16.11.9 Radioactive Effluent Release Report 16.11.10 Radiological Environmental Operating Report 16.11.11 Iodine Radiation Monitoring Filters 16.11.12 Radioactive Material in Outside Temporary Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.12 REFUELING OPERATIONS 16.12.1 Decay Time for Movement of Irradiated Fuel 16.12.2 Area Radiation Monitoring for Fuel Loading and Refueling 16.12.3 Communication Between Control Room and Refueling Personnel 16.12.4 Handling of Irradiated Fuel Assemblies 16.12.5 Loads Suspended Over Spent Fuel in Spent Fuel Pool 16.13 CONDUCT OF OPERATIONS 16.13.1 Minimum Station Staffing Requirements 16.13.2 Technical Review and Control 16.13.3 Plant Operations Review Committee 16.13.4 Reactivity Anomaly 16.13.5

[DELETED]

16.13.6 Retraining and Replacement of Station Personnel 16.0-5 PAGE 16.11.6-1 16.11.7-1 16.11.8-1 16.11.9-1 16.11.10-1 16.11.11-1 16.11.12-1 16.11.13-1 16.11.14-1 16.12.1-1 16.12.1-1 16.12.2-1 16.12.3-1 16.12.4-1 16.12.5-1 16.13.1-1 16.13.1-1 16.13.2-1 16.13.3-1 16.13.4-1 16.13.5-1 16.13.6-1

TABLE OF CONTENTS (continued)

TITLE SECTION NO 16.13.7 16.13.8 16.13.9 16.13..10 16.13.11 16.14 16.14.1 16.14.2 16.14.3 16.14.4 16.15 16.15.1 16.15.2 16.15.3 PAGE Procedures for Control of pH in Recirculated Coolant after Loss-of-Coolant Accident (LOCA) & Long-term Emergency Core Cooling Systems Respiratory Protective Program Startup Report Core Operating Limits Report Procedure for Station Survey Following an Earthquake CONTROL RODS AND POWER DISTRIBUTION APSR Movement Control Rod Program Verification Power Mapping Control Rod Drive Patch Panels VENTILATION FILTER TESTING PROGRAM Penetration Room Ventilation Room System Testing Control Room Pressurization and Filtering System Spent Fuel Pool Ventilation System 01/17/021 16.13.7-1 16.13.8-1 16.13.9-1 16.13.10-1 16.13.11-1 16.14.1-1 16.14.1-1 16.14.2-1 16.14.3-1 16.14.4-1 16.15.1-1 16.15.1-1 16.15.2-1 16.15.3-1 16.0-6