{{#Wiki_filter:February 13, | {{#Wiki_filter:February 13, 2007 | ||
Kevin Walsh | |||
Vice President Operations | |||
Waterford 3 | Waterford 3 | ||
Entergy Operations, Inc. | Entergy Operations, Inc. | ||
17265 River Road | 17265 River Road | ||
Killona, LA 70066- | Killona, LA 70066-0751 | ||
On December 31, 2006, the NRC completed an inspection at your Waterford Steam | SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INTEGRATED | ||
on January 16, 2007, with you and other members of your staff.This inspection examined activities conducted under your license as they relate to safety | INSPECTION REPORT 05000382/2006005 | ||
Dear Mr. Walsh: | |||
On December 31, 2006, the NRC completed an inspection at your Waterford Steam Electric | |||
Station, Unit 3. The enclosed report documents the inspection findings, which were discussed | |||
on January 16, 2007, with you and other members of your staff. | |||
This inspection examined activities conducted under your license as they relate to safety and | |||
compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed | The inspectors reviewed selected procedures and records, observed activities, and interviewed | ||
personnel.This report documents two self-revealing and one NRC identified findings of very low | personnel. | ||
This report documents two self-revealing and one NRC identified findings of very low safety | |||
significance (Green). These findings were determined to involve violations of NRC | |||
requirements. Additionally, a licensee-identified violation, which was determined to be of very | requirements. Additionally, a licensee-identified violation, which was determined to be of very | ||
low safety significance is listed in this report. However, because of the very low safety | low safety significance is listed in this report. However, because of the very low safety | ||
| Line 36: | Line 46: | ||
Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011; the Director, Office of | Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011; the Director, Office of | ||
Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the | Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the | ||
NRC Resident Inspector at the Waterford Steam Electric Station, Unit 3, facility. | NRC Resident Inspector at the Waterford Steam Electric Station, Unit 3, facility. | ||
Entergy Operations, Inc.-2-In accordance with 10 CFR 2.390 of the | |||
Entergy Operations, Inc. | |||
-2- | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its | |||
enclosures, and your response, if any, will be made available electronically for public inspection | |||
in the NRC Public Document Room or from the Publicly Available Records (PARS) component | in the NRC Public Document Room or from the Publicly Available Records (PARS) component | ||
of | of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at | ||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely, | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
/RA/ | /RA/ | ||
Jeff A. Clark, | Jeff A. Clark, Chief | ||
Division of Reactor | Project Branch E | ||
Division of Reactor Projects | |||
Docket: 50-382 | |||
License: NPF-38 | |||
Enclosure: NRC Inspection Report 050000382/2006005 | |||
w/Attachment: Supplemental Information | |||
cc w/enclosure: | |||
Executive Vice President and | |||
Chief Operating Officer | Chief Operating Officer | ||
Entergy Operations, Inc. | Entergy Operations, Inc. | ||
P.O. Box 31995 | P.O. Box 31995 | ||
Jackson, MS 39286- | Jackson, MS 39286-1995 | ||
Vice President, Operations Support | |||
Entergy Operations, Inc. | |||
P.O. Box 31995 | P.O. Box 31995 | ||
Jackson, MS 39286- | Jackson, MS 39286-1995 | ||
General Manager, Plant Operations | |||
Waterford 3 SES | |||
Entergy Operations, Inc. | Entergy Operations, Inc. | ||
17265 River Road | 17265 River Road | ||
Killona, LA 70057- | Killona, LA 70057-3093 | ||
Manager, Licensing | |||
Entergy Operations, Inc. | |||
17265 River Road | 17265 River Road | ||
Killona, LA 70057- | Killona, LA 70057-3093 | ||
Chairman | |||
Louisiana Public Service Commission | |||
P.O. Box 91154 | P.O. Box 91154 | ||
Baton Rouge, LA 70825-1697 | Baton Rouge, LA 70825-1697 | ||
Entergy Operations, Inc.-3-Director, Nuclear Safety | |||
Entergy Operations, Inc. | |||
-3- | |||
Director, Nuclear Safety Assurance | |||
Entergy Operations, Inc. | |||
17265 River Road | 17265 River Road | ||
Killona, LA 70057- | Killona, LA 70057-3093 | ||
Richard Penrod, Senior Environmental | |||
Scientist, State Liaison Officer | |||
Office of Environmental Services | Office of Environmental Services | ||
Northwestern State University | Northwestern State University | ||
Russsell Hall, Room 201 | Russsell Hall, Room 201 | ||
Natchitoches, LA | Natchitoches, LA 71497 | ||
Parish President | |||
Council | Council | ||
St. Charles Parish | |||
P.O. Box 302 | P.O. Box 302 | ||
Hahnville, LA | Hahnville, LA 70057 | ||
Chairperson | |||
Denton Field Office | |||
Chemical and Nuclear Preparedness and Protection Division | Chemical and Nuclear Preparedness and Protection Division | ||
Office of Infrastructure Protection | Office of Infrastructure Protection | ||
| Line 75: | Line 113: | ||
800 North Loop 288 | 800 North Loop 288 | ||
Federal Regional Center | Federal Regional Center | ||
Denton, TX 76201-3698 | Denton, TX 76201-3698 | ||
Entergy Operations, Inc.-4-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (GFL1)Branch Chief, DRP/E (ZKD)Senior Project Engineer, DRP/E (VGG)Team Leader, DRP/TSS (RLN1)RITS Coordinator (MSH3)Regional State Liaison Officer (WAM)NSIR/DPR/EPD (JTJ1)NSIR/DPR/EPD (REK)DRS STA (DAP)D. Cullison, OEDO RIV Coordinator (DGC)ROPreports | |||
WAT Site Secretary (AHY)SUNSI Review Completed: | Entergy Operations, Inc. | ||
G Non-Publicly Available | -4- | ||
G Sensitive Non- | Electronic distribution by RIV: | ||
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket:50- | Regional Administrator (BSM1) | ||
Report No.:05000382/2006005 | DRP Director (ATH) | ||
Licensee:Entergy Operations, Inc. | DRS Director (DDC) | ||
Facility:Waterford Steam Electric Station, Unit 3 | DRS Deputy Director (RJC1) | ||
Location:Hwy. 18 Killona, Louisiana Dates:October 8 through December 31, 2006 | Senior Resident Inspector (GFL1) | ||
Inspectors:G. Larkin, Senior Resident | Branch Chief, DRP/E (ZKD) | ||
Senior Project Engineer, DRP/E (VGG) | |||
Team Leader, DRP/TSS (RLN1) | |||
RITS Coordinator (MSH3) | |||
Regional State Liaison Officer (WAM) | |||
NSIR/DPR/EPD (JTJ1) | |||
NSIR/DPR/EPD (REK) | |||
DRS STA (DAP) | |||
D. Cullison, OEDO RIV Coordinator (DGC) | |||
ROPreports | |||
WAT Site Secretary (AHY) | |||
SUNSI Review Completed: _JAC____ | |||
ADAMS: / Yes | |||
G No Initials: __JAC____ | |||
/ Publicly Available G Non-Publicly Available G Sensitive | |||
/ Non-Sensitive | |||
R:\\_REACTORS\\_WAT\\2006\\WT2006-05RP-GFL.wpd | |||
RI:DRP/E | |||
SRI:DRP/E | |||
C:DRS/EB1 | |||
C:DRS/OB | |||
C:DRS/EB2 | |||
DHOverland | |||
GFLarkin | |||
WBJones | |||
ATGody | |||
LJSmith | |||
T-JAC | |||
T-JAC | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
2/5/07 | |||
2/5/07 | |||
2/5/07 | |||
2/8/07 | |||
2/8/07 | |||
C:PSB | |||
C:DRP/E | |||
MPShannon | |||
JAClark | |||
/RA/ | |||
/RA/ | |||
2/8/07 | |||
2/13/07 | |||
OFFICIAL RECORD COPY | |||
T=Telephone E=E-mail F=Fax | |||
Enclosure | |||
U.S. NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
Docket: | |||
50-382 | |||
License No.: | |||
NPF-38 | |||
Report No.: | |||
05000382/2006005 | |||
Licensee: | |||
Entergy Operations, Inc. | |||
Facility: | |||
Waterford Steam Electric Station, Unit 3 | |||
Location: | |||
Hwy. 18 | |||
Killona, Louisiana | |||
Dates: | |||
October 8 through December 31, 2006 | |||
Inspectors: | |||
G. Larkin, Senior Resident Inspector | |||
D. Overland, Resident Inspector | |||
J. Kirkland, Project Engineer, Project Branch E | J. Kirkland, Project Engineer, Project Branch E | ||
T. McKernon, Senior Operations Engineer, Operations Branch | T. McKernon, Senior Operations Engineer, Operations Branch | ||
| Line 92: | Line 199: | ||
G. George, Reactor Inspector, Engineering Branch 1 | G. George, Reactor Inspector, Engineering Branch 1 | ||
P. Elkmann, Emergency Preparedness Inspector, Operations | P. Elkmann, Emergency Preparedness Inspector, Operations | ||
Branch | |||
Approved By: | |||
Program | Jeff A. Clark, Chief, Project Branch E | ||
ATTACHMENTS: Supplemental Information | |||
Enclosure | |||
SUMMARY OF FINDINGS | |||
IR05000382/2006-005; 10/08/2006-12/31/2006; Waterford Steam Electric Station, Unit 3; | |||
Postmaintenance Testing; Refueling and Other Outage Activities; Emergency Plan Biennial | |||
Program Inspection | |||
The report covered a 3-month period of inspection by resident inspectors, a project engineer, a | |||
senior operations engineer, a senior health physics inspector, a reactor inspector, and an | |||
emergency preparedness inspector. The inspectors identified two Green findings, which were | emergency preparedness inspector. The inspectors identified two Green findings, which were | ||
noncited violations, and one apparent violation with potential safety significance greater than | noncited violations, and one apparent violation with potential safety significance greater than | ||
Green. The significance of most findings is indicated by their color (Green, White, Yellow, or | Green. The significance of most findings is indicated by their color (Green, White, Yellow, or | ||
Red) using Inspection Manual Chapter 0609, | Red) using Inspection Manual Chapter 0609, Significance Determination Process. Findings | ||
for which the Significance Determination Process does not apply may be Green or be assigned | for which the Significance Determination Process does not apply may be Green or be assigned | ||
a severity level after NRC management review. The | a severity level after NRC management review. The NRCs program for overseeing the safe | ||
operation of commercial nuclear power reactors is described in NUREG-1649, | operation of commercial nuclear power reactors is described in NUREG-1649, Reactor | ||
Oversight Process, | Oversight Process, Revision 3, dated July 2000. | ||
A. | |||
*Green. A self-revealing violation of very low safety significance of | NRC-Identified and Self-Revealing Findings | ||
Cornerstone: Initiating Events | |||
* | |||
Green. A self-revealing violation of very low safety significance of Technical | |||
Specification 6.8.1.a was identified for an inadequate procedure for installing a | |||
bolted joint that provided structural support for the pressurizer. Specifically, the | bolted joint that provided structural support for the pressurizer. Specifically, the | ||
installation procedure required applying 8750 ft-lbs torque to make up a bolted | installation procedure required applying 8750 ft-lbs torque to make up a bolted | ||
| Line 110: | Line 230: | ||
torque on several bolts exceeded 13,400 ft-lbs. The improper bolt tensioning | torque on several bolts exceeded 13,400 ft-lbs. The improper bolt tensioning | ||
resulted in failure of 1 of 16 bolts and the partial cracking of 3 other bolts that | resulted in failure of 1 of 16 bolts and the partial cracking of 3 other bolts that | ||
potentially could affect the | potentially could affect the pressurizers function in a safe shutdown earthquake | ||
event. The licensee has since replaced all pressurizer skirt bolting and installed | event. The licensee has since replaced all pressurizer skirt bolting and installed | ||
the bolting to an approved torque specification.This finding is more than minor because if left uncorrected it could have | the bolting to an approved torque specification. | ||
This finding is more than minor because if left uncorrected it could have become | |||
a more safety significant concern. The finding was associated with the | |||
equipment performance attribute of the Initiating Events cornerstone, and it | equipment performance attribute of the Initiating Events cornerstone, and it | ||
affected the cornerstone objective to limit the likelihood of those events that | affected the cornerstone objective to limit the likelihood of those events that | ||
| Line 120: | Line 242: | ||
that exceeded the Technical Specification limit for reactor coolant system | that exceeded the Technical Specification limit for reactor coolant system | ||
leakage. Therefore, this issue screened out in Phase 1 of the Manual | leakage. Therefore, this issue screened out in Phase 1 of the Manual | ||
Chapter 0609 | Chapter 0609 Significance Determination Process, because there was no | ||
actual loss of safety function (Section 1R20). | actual loss of safety function (Section 1R20). | ||
Enclosure-2-Cornerstone: Mitigating Systems*Green. A self-revealing violation of very low safety significance of 10 | |||
Enclosure | |||
-2- | |||
Cornerstone: Mitigating Systems | |||
* | |||
Green. A self-revealing violation of very low safety significance of 10 CFR | |||
Part 50, Appendix B, Criterion XVI, Corrective Action, was identified for the | |||
failure to implement effective corrective actions to prevent recurrence of a | failure to implement effective corrective actions to prevent recurrence of a | ||
significant condition adverse to quality. Specifically, on multiple occasions | significant condition adverse to quality. Specifically, on multiple occasions | ||
Valve SI-405B failed to stroke open while attempting to place shutdown cooling | Valve SI-405B failed to stroke open while attempting to place shutdown cooling | ||
Train B in service. This violation of Appendix B, Criterion XVI, is being treated as | Train B in service. This violation of Appendix B, Criterion XVI, is being treated as | ||
a noncited violation and was entered into the | a noncited violation and was entered into the licensees corrective action | ||
program.This finding is greater than minor because it affects the Mitigating | program. | ||
This finding is greater than minor because it affects the Mitigating Systems | |||
cornerstone attribute of equipment operability, availability, and reliability of | |||
systems that respond to initiating events. This finding was evaluated using the | systems that respond to initiating events. This finding was evaluated using the | ||
significance determination process and was determined to be a finding of very | significance determination process and was determined to be a finding of very | ||
| Line 138: | Line 268: | ||
evaluate the problem such that the resolutions addressed the causes and | evaluate the problem such that the resolutions addressed the causes and | ||
therefore, corrective actions were inadequate to prevent repetition | therefore, corrective actions were inadequate to prevent repetition | ||
(Section 1R19).Cornerstone: Emergency Preparedness | (Section 1R19). | ||
*Green. The inspector identified a noncited violation of 10 CFR 50.54(q) | Cornerstone: Emergency Preparedness | ||
* | |||
Green. The inspector identified a noncited violation of 10 CFR 50.54(q) for | |||
failure to conduct during 2005 an offsite drill involving a simulated contaminated | |||
individual with provision for participation by local medical support services as | individual with provision for participation by local medical support services as | ||
required by the | required by the licensees emergency plan. The licensees failure to conduct the | ||
drill is a performance deficiency because the licensee identified the | drill is a performance deficiency because the licensee identified the drills | ||
postponement in October 2005, but did not appropriately reschedule the drill. In | postponement in October 2005, but did not appropriately reschedule the drill. In | ||
addition, the licensee did not request NRC approval to deviate from this | addition, the licensee did not request NRC approval to deviate from this | ||
emergency plan requirement.This finding is greater than minor because a degraded proficiency in | emergency plan requirement. | ||
This finding is greater than minor because a degraded proficiency in providing | |||
appropriate medical treatment for a contaminated individual has a potential | |||
impact on the safety of licensee employees and the public. The finding is of very | impact on the safety of licensee employees and the public. The finding is of very | ||
low safety significance because the licensee failed to conduct only one required | low safety significance because the licensee failed to conduct only one required | ||
| Line 152: | Line 287: | ||
noncited violation of 10 CFR 50.54(q) and 10 CFR Part 50, Appendix E, IV, F.1. | noncited violation of 10 CFR 50.54(q) and 10 CFR Part 50, Appendix E, IV, F.1. | ||
The licensee has entered this issue into their corrective action system as | The licensee has entered this issue into their corrective action system as | ||
Condition Report 2006-4429 (Section 1EP5). | Condition Report 2006-4429 (Section 1EP5). | ||
Enclosure-3-B.Licensee-Identified | |||
have been entered into the | Enclosure | ||
corrective actions are listed in Section 4OA7 of this report. | -3- | ||
Enclosure-4-REPORT | B. | ||
Licensee-Identified Violations | |||
Violations of very low safety significance, which were identified by the licensee have | |||
been reviewed by the inspectors. Corrective actions taken or planned by the licensee | |||
have been entered into the licensees corrective action program. These violations and | |||
corrective actions are listed in Section 4OA7 of this report. | |||
Enclosure | |||
-4- | |||
REPORT DETAILS | |||
Summary of Plant Status: The plant was operated at approximately 100 percent power from | |||
October 8 to November 22, 2006, when reactor power was reduced to 85 percent power to | |||
comply with a Technical Specification requirement to reduce power to compensate for a main | comply with a Technical Specification requirement to reduce power to compensate for a main | ||
steam safety valve lift point setting found outside of its allowed tolerance. Reactor power was | steam safety valve lift point setting found outside of its allowed tolerance. Reactor power was | ||
| Line 162: | Line 308: | ||
commenced a plant shutdown for Refueling Outage 14. Operators restarted the reactor plant | commenced a plant shutdown for Refueling Outage 14. Operators restarted the reactor plant | ||
on December 26, 2006 and reached 100 percent power on December 30, 2006, and remained | on December 26, 2006 and reached 100 percent power on December 30, 2006, and remained | ||
at 100 percent power through the end of the report period.1.REACTOR | at 100 percent power through the end of the report period. | ||
(1) reviewed plant procedures, the Updated Final Safety Analysis Report, and | 1. | ||
REACTOR SAFETY | |||
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity | |||
1R01 | |||
Adverse Weather Protection (71111.01) | |||
.1 | |||
Readiness For Seasonal Susceptibilities | |||
a. | |||
Inspection Scope | |||
The inspectors completed a review of the licensees readiness of seasonal | |||
susceptibilities involving low seasonal temperatures and high winds. The inspectors: | |||
(1) reviewed plant procedures, the Updated Final Safety Analysis Report, and Technical | |||
Specifications to ensure that operator actions defined in adverse weather procedures | |||
maintained the readiness of essential systems; (2) walked down portions of the three | maintained the readiness of essential systems; (2) walked down portions of the three | ||
systems listed below to ensure that adverse weather protection features (heat tracing, | systems listed below to ensure that adverse weather protection features (heat tracing, | ||
| Line 170: | Line 328: | ||
levels to ensure the licensee could maintain the readiness of essential systems required | levels to ensure the licensee could maintain the readiness of essential systems required | ||
by plant procedures; and (4) reviewed the corrective action program to determine if the | by plant procedures; and (4) reviewed the corrective action program to determine if the | ||
licensee identified and corrected problems related to adverse weather conditions. *December 13, 2006: Main Steam System, Firewater System, and | licensee identified and corrected problems related to adverse weather conditions. | ||
* | |||
Document W3-DBD-003, | December 13, 2006: Main Steam System, Firewater System, and Emergency | ||
Enclosure-5- | Feedwater System | ||
Documents reviewed by the inspectors included Operations Procedure OP-901-521, | |||
Severe Weather and Flooding, Revision 4-3, Operations Procedure OP-002-007, | |||
Freeze Protection and Temperature Maintenance, Revision 11, and Design Basis | |||
Document W3-DBD-003, Emergency Feedwater System. | |||
The inspectors completed one sample. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
Enclosure | |||
-5- | |||
1R04 | |||
Equipment Alignment (71111.04) | |||
.1 | |||
Partial Walkdown | |||
a. | |||
Inspection Scope | |||
The inspectors: (1) walked down portions of the two below listed risk important systems | |||
and reviewed plant procedures and documents to verify that critical portions of the | |||
selected systems were correctly aligned; and (2) compared deficiencies identified during | selected systems were correctly aligned; and (2) compared deficiencies identified during | ||
the walk down to the | the walk down to the licensees Updated Final Safety Analysis Report and corrective | ||
action program to ensure problems were being identified and corrected. *October 10, 2006: Chemical and Volume Control System Train A | action program to ensure problems were being identified and corrected. | ||
*December 11, 2006: Shutdown Cooling System Train A | * | ||
Documents reviewed by the inspectors are listed in the attachment. The | October 10, 2006: Chemical and Volume Control System Train A | ||
* | |||
December 11, 2006: Shutdown Cooling System Train A | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed two samples. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R05 | |||
Fire Protection (71111.05) | |||
.1 | |||
Quarterly Inspection | |||
a. | |||
Inspection Scope | |||
The inspectors walked down the six below listed plant areas to assess the material | |||
condition of active and passive fire protection features and their operational lineup and | |||
readiness. The inspectors: (1) verified that transient combustibles and hot work | readiness. The inspectors: (1) verified that transient combustibles and hot work | ||
activities were controlled in accordance with plant procedures; (2) observed the | activities were controlled in accordance with plant procedures; (2) observed the | ||
| Line 191: | Line 383: | ||
compensatory measures were commensurate with the significance of the deficiency; | compensatory measures were commensurate with the significance of the deficiency; | ||
and (7) reviewed the Updated Final Safety Analysis Report to determine if the licensee | and (7) reviewed the Updated Final Safety Analysis Report to determine if the licensee | ||
identified and corrected fire protection problems. *October 10, 2006: Fire Zones RAB 16, 23, 36, 39, and Fuel Handling Building | identified and corrected fire protection problems. | ||
*October 16, 2006: Fire Zones RAB 2, 16, 18 and 19 | * | ||
Enclosure-6-*October 18, 2006: Fire Zones RAB 2, 8A, 36, 37, and ultimate heat sink Train A*November 21, 2006: Fire Zones RAB 1E, 6, 7, 11, 12, 13 | October 10, 2006: Fire Zones RAB 16, 23, 36, 39, and Fuel Handling Building | ||
*November 30, 2006: Fire Zones RAB 2, 8B, 23, 31, 39 | * | ||
*December 5, 2006: Fire Zones RAB 15, 19, 20, 21, 22, Containment Building,Cooling Tower | October 16, 2006: Fire Zones RAB 2, 16, 18 and 19 | ||
Enclosure | |||
-6- | |||
* | |||
October 18, 2006: Fire Zones RAB 2, 8A, 36, 37, and ultimate heat sink Train A | |||
* | |||
November 21, 2006: Fire Zones RAB 1E, 6, 7, 11, 12, 13 | |||
* | |||
November 30, 2006: Fire Zones RAB 2, 8B, 23, 31, 39 | |||
* | |||
December 5, 2006: Fire Zones RAB 15, 19, 20, 21, 22, Containment Building, | |||
Cooling Tower A | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed six samples. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R06 | |||
Flood Protection Measures (71111.06) | |||
.2 | |||
Semi-annual Internal Flooding | |||
a. | |||
Inspection Scope | |||
The inspectors: (1) reviewed the Updated Final Safety Analysis Report, the flooding | |||
analysis, and plant procedures to assess seasonal susceptibilities involving external | |||
flooding; (2) reviewed the Updated Final Safety Analysis Report and corrective action | flooding; (2) reviewed the Updated Final Safety Analysis Report and corrective action | ||
program to determine if the licensee identified and corrected flooding problems; | program to determine if the licensee identified and corrected flooding problems; | ||
| Line 205: | Line 422: | ||
floodline, (b) floor and wall penetration seals, (c) watertight door seals, (d) common | floodline, (b) floor and wall penetration seals, (c) watertight door seals, (d) common | ||
drain lines and sumps, (e) sump pumps, level alarms, and control circuits, and | drain lines and sumps, (e) sump pumps, level alarms, and control circuits, and | ||
(f) temporary or removable flood barriers. *December 5, 2006: Reactor Containment Building | (f) temporary or removable flood barriers. | ||
The inspectors reviewed calculation MN(Q)-6-4, | * | ||
Enclosure-7- | December 5, 2006: Reactor Containment Building | ||
The inspectors reviewed calculation MN(Q)-6-4, Water Level Inside Containment, | |||
dated November 2, 1978. | |||
The inspectors completed one sample. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
Enclosure | |||
-7- | |||
1R11 | |||
Licensed Operator Requalification Program (71111.11) | |||
.1 | |||
Biennial Inspection | |||
a. | |||
Inspection Scope | |||
The inspector reviewed the annual operating examination test results for 2006. Since | |||
this was the first half of the biennial requalification cycle, the licensee was not required | |||
to administer a written examination. These results were assessed to determine if they | to administer a written examination. These results were assessed to determine if they | ||
were consistent with NUREG 1021, | were consistent with NUREG 1021, Operator Licensing Examination Standards for | ||
Power Reactors, | Power Reactors, guidance and Manual Chapter 0609, Appendix I, Operator | ||
Requalification Human Performance Significance Determination Process, | Requalification Human Performance Significance Determination Process, | ||
requirements. This review included examination of test results for a total of 42 licensed | requirements. This review included examination of test results for a total of 42 licensed | ||
operators, a total of 9 crews, which included: shift-standing senior operators, staff | operators, a total of 9 crews, which included: shift-standing senior operators, staff | ||
senior operators, shift-standing reactor operators, and staff reactor operators. All crews | senior operators, shift-standing reactor operators, and staff reactor operators. All crews | ||
and individuals passed the requalification examinations.The inspector completed one sample. | and individuals passed the requalification examinations. | ||
. | The inspector completed one sample. | ||
operator performance, and to assess the | b. | ||
Findings | |||
No findings of significance were identified. | |||
.2 | |||
Quarterly Inspection | |||
a. | |||
Inspection Scope | |||
On November 6-7, 2006, the inspectors observed training of senior reactor operators | |||
and reactor operators to identify deficiencies and discrepancies in the training, to assess | |||
operator performance, and to assess the evaluators critique. The training scenario | |||
involved a simulated plant shutdown exercise in preparation for the plant shutdown on | involved a simulated plant shutdown exercise in preparation for the plant shutdown on | ||
November 26, 2006 for a plant refueling outage. Documents reviewed by the inspectors included: | November 26, 2006 for a plant refueling outage. | ||
*Operations Procedure OP-010-005, | Documents reviewed by the inspectors included: | ||
*Emergency Planning Procedure EP-001-001, | * | ||
Enclosure-8- | Operations Procedure OP-010-005, Plant Shutdown, Revision 5 | ||
* | |||
Emergency Planning Procedure EP-001-001, Recognition and Classification of | |||
Emergency Conditions, Revision 21 | |||
The inspectors completed one sample. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
Enclosure | |||
-8- | |||
1R12 | |||
Maintenance Effectiveness (71111.12) | |||
a. | |||
Inspection Scope | |||
The inspectors reviewed the two below listed Maintenance Rule scoped systems that | |||
have displayed performance problems to: (1) verify the appropriate handling of | |||
structure, system, and component performance or condition problems; (2) verify the | structure, system, and component performance or condition problems; (2) verify the | ||
appropriate handling of degraded structure, system, and component functional | appropriate handling of degraded structure, system, and component functional | ||
| Line 228: | Line 488: | ||
(4) evaluate the handling of structure, system, and component issues reviewed under | (4) evaluate the handling of structure, system, and component issues reviewed under | ||
the requirements of the Maintenance Rule, 10 CFR Part 50 Appendix B, and the | the requirements of the Maintenance Rule, 10 CFR Part 50 Appendix B, and the | ||
Technical Specifications.*Essential Chill Water System*Startup Transformers (Offsite Power)Documents reviewed by the inspectors are listed in the attachment. The | Technical Specifications. | ||
* | |||
Essential Chill Water System | |||
* | |||
Startup Transformers (Offsite Power) | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed two samples. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R13 | |||
Maintenance Risk Assessments and Emergent Work Control (71111.13) | |||
.1 | |||
Risk Assessment and Management of Risk | |||
a. | |||
Inspection Scope | |||
The inspectors reviewed the four below listed assessment activities to verify: | |||
(1) performance of risk assessments when required by 10 CFR 50.65 (a)(4) and | |||
licensee procedures prior to changes in plant configuration for maintenance activities | licensee procedures prior to changes in plant configuration for maintenance activities | ||
and plant operations; (2) the accuracy, adequacy, and completeness of the information | and plant operations; (2) the accuracy, adequacy, and completeness of the information | ||
| Line 234: | Line 511: | ||
applicable, the appropriate licensee-established risk category according to the risk | applicable, the appropriate licensee-established risk category according to the risk | ||
assessment results and licensee procedures; and (4) the licensee identified and | assessment results and licensee procedures; and (4) the licensee identified and | ||
corrected problems related to maintenance risk assessments.*October 31, 2006: Planned maintenance activities on start up transformer Train B*November 29, 2006: Planned maintenance and operational activities | corrected problems related to maintenance risk assessments. | ||
Enclosure-9-Documents reviewed by the inspectors are listed in the attachment. The | * | ||
October 31, 2006: Planned maintenance activities on start up transformer | |||
Train B | |||
* | |||
November 29, 2006: Planned maintenance and operational activities during | |||
reactor coolant system midloop conditions | |||
* | |||
December 7, 2006: Planned maintenance activities to restore emergency diesel | |||
generator Train B following the integrated diesel test | |||
* | |||
December 18, 2006: Planned maintenance and operational activities during | |||
reactor coolant system midloop conditions | |||
Enclosure | |||
-9- | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed four samples. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R15 | |||
Operability Evaluations (71111.15) | |||
a. | |||
Inspection Scope | |||
The inspectors: (1) reviewed plant status documents such as operator shift logs, | |||
emergent work documentation, deferred modifications, and standing orders to | |||
determine if an operability evaluation was warranted for degraded components; | determine if an operability evaluation was warranted for degraded components; | ||
(2) referred to the Updated Final Safety Analysis Report and design-basis documents to | (2) referred to the Updated Final Safety Analysis Report and design-basis documents to | ||
| Line 243: | Line 545: | ||
Determination Process to evaluate the risk significance of degraded or inoperable | Determination Process to evaluate the risk significance of degraded or inoperable | ||
equipment; and (6) verified that the licensee has identified and implemented appropriate | equipment; and (6) verified that the licensee has identified and implemented appropriate | ||
corrective actions associated with degraded components.*October 19, 2006: Operability evaluation addressing pressurizer heater | corrective actions associated with degraded components. | ||
in Condition Report 2006-3357*December 22, 2006: Operability evaluation addressing steam Generator 32 | * | ||
completed three samples. b. | October 19, 2006: Operability evaluation addressing pressurizer heater capacity | ||
following a surveillance test as described in Condition Report 2006-3125 | |||
* | |||
November 11, 2006: Operability evaluation addressing containment fan cooler | |||
Train B flow control valve failing to control at intermediate flow rates as described | |||
in Condition Report 2006-3357 | |||
* | |||
December 22, 2006: Operability evaluation addressing steam Generator 32 tube | |||
sheet plugging as described in Condition Report 2006-4510 | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed three samples. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R19 | |||
Postmaintenance Testing (71111.19) | |||
a. | |||
Inspection Scope | |||
The inspectors selected the six below listed postmaintenance test activities of risk | |||
significant systems or components. For each item, the inspectors: (1) reviewed the | |||
applicable licensing basis and/or design-basis documents to determine the safety | applicable licensing basis and/or design-basis documents to determine the safety | ||
functions; (2) evaluated the safety functions that may have been affected by the | functions; (2) evaluated the safety functions that may have been affected by the | ||
maintenance activity; and (3) reviewed the test procedure to ensure it adequately tested | maintenance activity; and (3) reviewed the test procedure to ensure it adequately tested | ||
the safety function that may have been affected. The inspectors either witnessed or | the safety function that may have been affected. The inspectors either witnessed or | ||
Enclosure-10-reviewed test data to verify that acceptance criteria were met, plant impacts | |||
Enclosure | |||
-10- | |||
reviewed test data to verify that acceptance criteria were met, plant impacts were | |||
evaluated, test equipment was calibrated, procedures were followed, jumpers were | |||
properly controlled, the test data results were complete and accurate, the test | properly controlled, the test data results were complete and accurate, the test | ||
equipment was removed, the system was properly realigned, and deficiencies during | equipment was removed, the system was properly realigned, and deficiencies during | ||
testing were documented. The inspectors also reviewed the Updated Final Safety | testing were documented. The inspectors also reviewed the Updated Final Safety | ||
Analysis Report to determine if the licensee identified and corrected problems related to | Analysis Report to determine if the licensee identified and corrected problems related to | ||
postmaintenance testing. *October 11, 2006: Planned maintenance on chemical volume control | postmaintenance testing. | ||
*December 12, 2006: Planned maintenance on reactor coolant Loop 1 | * | ||
October 11, 2006: Planned maintenance on chemical volume control charging | |||
Pump B | |||
* | |||
October 12, 2006: Planned maintenance for reactor trip circuit breaker | |||
Number 7 | |||
* | |||
November 1, 2006: Planned maintenance for start-up transformer Train B | |||
6.9 kV circuit breaker | |||
* | |||
November 26, 2006: Emergent maintenance on reactor coolant Loop 1 | |||
shutdown cooling suction inside containment isolation Valve SI-405B | |||
* | |||
November 29, 2006: Planned maintenance on excore start-up Channel 2 | |||
* | |||
December 12, 2006: Planned maintenance on reactor coolant Loop 1 shutdown | |||
cooling suction outside containment isolation Valve SI-407B | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed six samples. | |||
b. | |||
Findings | |||
Introduction. A self-revealing violation of very low safety significance of 10 CFR Part 50, | |||
Appendix B, Criterion XVI, Corrective Action, was identified for the failure to implement | |||
effective corrective actions to prevent recurrence of a significant condition adverse to | effective corrective actions to prevent recurrence of a significant condition adverse to | ||
quality. Specifically, on multiple occasions Valve SI-405B failed to stroke open while | quality. Specifically, on multiple occasions Valve SI-405B failed to stroke open while | ||
attempting to place shutdown cooling Train B in service. The root cause analysis | attempting to place shutdown cooling Train B in service. The root cause analysis | ||
determined that | determined that the design of SI-405A(B) fluid reservoir was intolerant to operation with | ||
low pressure/level. | low pressure/level. This condition caused inadequate hydraulic pump discharge | ||
pressure that resulted in the failure of Valve SI-405B to stroke open. This violation of | pressure that resulted in the failure of Valve SI-405B to stroke open. This violation of | ||
Appendix B, Criterion XVI, is being treated as a noncited violation and was entered into | Appendix B, Criterion XVI, is being treated as a noncited violation and was entered into | ||
the | the licensees corrective action program. | ||
Description. On November 26, 2006, while in Mode 4, station operators performed | |||
Operating Procedure OP-903-033, Cold Shutdown IST Valve Test to stroke open | |||
Valve SI-405B in an effort to place shutdown cooling Train B in service. Valve SI-405B | Valve SI-405B in an effort to place shutdown cooling Train B in service. Valve SI-405B | ||
is a hydraulic pneumatic operated gate valve in the shutdown cooling return line from | is a hydraulic pneumatic operated gate valve in the shutdown cooling return line from | ||
| Line 270: | Line 619: | ||
Valve SI-405B has a safety function to open to allow flow through shutdown cooling | Valve SI-405B has a safety function to open to allow flow through shutdown cooling | ||
Train B. During the test, Valve SI-405B did not stroke fully open within its design time of | Train B. During the test, Valve SI-405B did not stroke fully open within its design time of | ||
15 minutes +/- 225 seconds, and automatically closed per its design. On its second | 15 minutes +/- 225 seconds, and automatically closed per its design. On its second | ||
Enclosure-11-attempt, Valve SI-405B fully opened, but not within the maximum inservice testing | |||
Specification 3.6.3, | Enclosure | ||
-11- | |||
attempt, Valve SI-405B fully opened, but not within the maximum inservice testing limit | |||
of 370 seconds. Valve SI-405B was declared inoperable and Technical | |||
Specification 3.6.3, Containment Isolation Valves, was entered. The licensee closed | |||
valve SI-407B to comply with Technical Specification 3.6.3. This caused shutdown | valve SI-407B to comply with Technical Specification 3.6.3. This caused shutdown | ||
cooling Train B to become unavailable. Later in Mode 5, Technical Specification 3.6.3 | cooling Train B to become unavailable. Later in Mode 5, Technical Specification 3.6.3 | ||
| Line 278: | Line 631: | ||
cooling Train B was restored to service. The licensee wrote Condition Report | cooling Train B was restored to service. The licensee wrote Condition Report | ||
CR-WF3-2006-3610 to document the open stroke failure of Valve SI-405B. The root | CR-WF3-2006-3610 to document the open stroke failure of Valve SI-405B. The root | ||
cause analysis determined that | cause analysis determined that the design of SI-405A(B) fluid reservoir is intolerant to | ||
operation with low pressure/level. | operation with low pressure/level. This condition caused inadequate hydraulic pump | ||
discharge pressure that resulted in the failure of Valve SI-405B to stroke open.The inspectors noted a similar event on April 17, 2005, that Valve SI-405B failed to | discharge pressure that resulted in the failure of Valve SI-405B to stroke open. | ||
The inspectors noted a similar event on April 17, 2005, that Valve SI-405B failed to fully | |||
open while operations was aligning shutdown cooling system Train B for service in | |||
Mode 4. Operators were performing Operating Procedure OP-903-033 testing to stroke | Mode 4. Operators were performing Operating Procedure OP-903-033 testing to stroke | ||
open Valve SI-405B. During testing, Valve SI-405B failed to reach the full open position | open Valve SI-405B. During testing, Valve SI-405B failed to reach the full open position | ||
| Line 289: | Line 644: | ||
determine the true cause(s) of the failures to operate. Condition | determine the true cause(s) of the failures to operate. Condition | ||
Report CR-WF3-2005-1362 implemented corrective actions to preclude recurrence, | Report CR-WF3-2005-1362 implemented corrective actions to preclude recurrence, | ||
including replacing the hydraulic actuators with a motor-operated actuator in May 2008.Condition Report CR-WF3-2006-3610 noted that Valve SI-405B had also failed to | including replacing the hydraulic actuators with a motor-operated actuator in May 2008. | ||
April 2002, and October 2000.Analysis. The deficiency associated with this finding was the failure to | Condition Report CR-WF3-2006-3610 noted that Valve SI-405B had also failed to stroke | ||
open satisfactorily due to various hydraulic system malfunction in October 2003, | |||
April 2002, and October 2000. | |||
Analysis. The deficiency associated with this finding was the failure to establish | |||
corrective measures to prevent recurrence of a significant condition adverse to quality. | |||
Specifically, corrective actions established to address the function of Valve SI-405B to | Specifically, corrective actions established to address the function of Valve SI-405B to | ||
cycle open were not effectively implemented and failed to prevent recurrence resulting in | cycle open were not effectively implemented and failed to prevent recurrence resulting in | ||
| Line 305: | Line 664: | ||
area. This assessment was based on the fact that the licensee failed to thoroughly | area. This assessment was based on the fact that the licensee failed to thoroughly | ||
evaluate the problem such that the resolutions addressed the causes and, therefore, | evaluate the problem such that the resolutions addressed the causes and, therefore, | ||
corrective actions were inadequate to prevent repetition.Enforcement. 10 CFR Part 50, Appendix B, Criterion XVI, | corrective actions were inadequate to prevent repetition. | ||
promptly identified and corrected. In the case of significant conditions adverse to | Enforcement. 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires | ||
Enclosure-12-quality, the measures shall assure that the cause of the condition is determined | in part, that measures be established to assure that conditions adverse to quality are | ||
promptly identified and corrected. In the case of significant conditions adverse to | |||
Enclosure | |||
-12- | |||
quality, the measures shall assure that the cause of the condition is determined and | |||
corrective action taken to preclude repetition. The failure to establish corrective | |||
measures to prevent recurrence of Valve SI-405B failure to stroke open during actual | measures to prevent recurrence of Valve SI-405B failure to stroke open during actual | ||
and test demands conditions impacted the ability of a risk significant system to perform | and test demands conditions impacted the ability of a risk significant system to perform | ||
| Line 316: | Line 681: | ||
program as Condition Report CR-WF3-2006-3610, this violation is being treated as a | program as Condition Report CR-WF3-2006-3610, this violation is being treated as a | ||
noncited violation, consistent with Section VI.A of the NRC Enforcement Policy | noncited violation, consistent with Section VI.A of the NRC Enforcement Policy | ||
(NCV 05000382/2006005-01, Recurring Failure of Valve SI-405B to Open). | (NCV 05000382/2006005-01, Recurring Failure of Valve SI-405B to Open). | ||
1R20 | |||
Refueling and Other Outage Activities (71111.20) | |||
The inspectors reviewed the following risk significant refueling items or outage activities | |||
to verify defense in depth commensurate with the outage risk control plan, compliance | |||
with the Technical Specifications, and adherence to commitments in response to | with the Technical Specifications, and adherence to commitments in response to | ||
Generic Letter 88-17, | Generic Letter 88-17, Loss of Decay Heat Removal: (1) the risk control plan; | ||
(2) tagging/clearance activities; (3) reactor coolant system instrumentation; (4) electrical | (2) tagging/clearance activities; (3) reactor coolant system instrumentation; (4) electrical | ||
power; (5) decay heat removal; (6) spent fuel pool cooling; (7) inventory control; | power; (5) decay heat removal; (6) spent fuel pool cooling; (7) inventory control; | ||
| Line 324: | Line 693: | ||
conditions; (11) refueling activities; (12) heatup and cooldown activities; (13) restart | conditions; (11) refueling activities; (12) heatup and cooldown activities; (13) restart | ||
activities; and (14) licensee identification and implementation of appropriate corrective | activities; and (14) licensee identification and implementation of appropriate corrective | ||
actions associated with refueling and outage activities. The inspectors | actions associated with refueling and outage activities. The inspectors containment | ||
inspections included observations of the containment sump for damage and debris; and | inspections included observations of the containment sump for damage and debris; and | ||
supports, braces, and snubbers for evidence of excessive stress, water hammer, or | supports, braces, and snubbers for evidence of excessive stress, water hammer, or | ||
aging. Documents reviewed by the inspectors included the Refueling Outage 14 Risk | aging. Documents reviewed by the inspectors included the Refueling Outage 14 Risk | ||
Assessment Plan. | |||
Assessment Plan. The inspectors completed one sample.b. | The inspectors completed one sample. | ||
b. | |||
Findings | |||
Introduction. A self-revealing violation of very low safety significance of Technical | |||
Specification 6.8.1.a was identified for an inadequate procedure for installing a bolted | |||
joint that provided structural support for the pressurizer. Specifically, the installation | joint that provided structural support for the pressurizer. Specifically, the installation | ||
procedure required applying 8750 ft-lbs torque to make up a bolted joint. Following | procedure required applying 8750 ft-lbs torque to make up a bolted joint. Following | ||
corrective actions, the licensee discovered that the break away torque on several bolts | corrective actions, the licensee discovered that the break away torque on several bolts | ||
exceeded 13,400 ft-lbs. The improper bolt tensioning resulted in failure of 1 of 16 bolts | exceeded 13,400 ft-lbs. The improper bolt tensioning resulted in failure of 1 of 16 bolts | ||
and the partial cracking of 3 other bolts that potentially could affect the | and the partial cracking of 3 other bolts that potentially could affect the pressurizers | ||
function in a safe shutdown earthquake event. The licensee has since replaced all | function in a safe shutdown earthquake event. The licensee has since replaced all | ||
pressurizer skirt bolting and installed the bolting to an approved torque specification.Description. On December 11, 2006, while performing a walkdown of the | pressurizer skirt bolting and installed the bolting to an approved torque specification. | ||
Description. On December 11, 2006, while performing a walkdown of the pressurizer | |||
cubicle, a technician noted that a 2-inch diameter bolt had severed into two pieces. The | |||
bolt was part of a bolted flange that joined the pressurizer skirt to the pressurizer | bolt was part of a bolted flange that joined the pressurizer skirt to the pressurizer | ||
support structure. The pressurizer skirt is a cylindrical steel shell welded to the bottom | support structure. The pressurizer skirt is a cylindrical steel shell welded to the bottom | ||
head of the pressurizer and provides structural support to the pressurizer. The | head of the pressurizer and provides structural support to the pressurizer. The | ||
pressurizer is a Category 1 seismic component, which is designed to remain functional | pressurizer is a Category 1 seismic component, which is designed to remain functional | ||
Enclosure-13-in the event of a safe shutdown earthquake. A steel bolted flange is attached to | |||
Enclosure | |||
-13- | |||
in the event of a safe shutdown earthquake. A steel bolted flange is attached to the | |||
bottom of the pressurizer skirt. The bolted flange on the pressurizer skirt mates with the | |||
top flange of a support structure. The support structure is a weldment anchored by bolts | top flange of a support structure. The support structure is a weldment anchored by bolts | ||
embedded in the concrete floor below the pressurizer. The failed bolt clamped the | embedded in the concrete floor below the pressurizer. The failed bolt clamped the | ||
pressurizer skirt flange to the top flange of the support structure. The licensee | pressurizer skirt flange to the top flange of the support structure. The licensee | ||
ultrasonically test inspected the remaining 15 pressurizer skirt bolts. They discovered | ultrasonically test inspected the remaining 15 pressurizer skirt bolts. They discovered | ||
flaws in 3 of the remaining 15 bolts. Licensee replaced all 16 bolts, nuts, and washers. A licensee review of plant records indicated that an April 1979, Field | flaws in 3 of the remaining 15 bolts. Licensee replaced all 16 bolts, nuts, and washers. | ||
A licensee review of plant records indicated that an April 1979, Field Change | |||
Procedure FSC-AS-1232, Pressurizer Support Structure, S.I. Tank Support Structures, | |||
R.C. Stops and Supports Structural Steel, installed the bolts to a torque value of | |||
8750 ft-lbs. The procedure did not specify if the bolts should be installed lubricated or | 8750 ft-lbs. The procedure did not specify if the bolts should be installed lubricated or | ||
unlubricated, however all the originally installed bolts were lubricated. During | unlubricated, however all the originally installed bolts were lubricated. During | ||
| Line 355: | Line 737: | ||
of preload is expected in the range of 5 to 15 percent. Additionally, vibration or | of preload is expected in the range of 5 to 15 percent. Additionally, vibration or | ||
time-varying mechanical or thermal loads on the joint due to system operations can | time-varying mechanical or thermal loads on the joint due to system operations can | ||
reduce bolt preload values further. A preliminary root cause evaluation indicates | reduce bolt preload values further. A preliminary root cause evaluation indicates that | ||
the bolts were overloaded during initial preloading at installation. This overloaded | |||
condition reduced the fatigue resistance of the bolting. Thermally induced prying on the | condition reduced the fatigue resistance of the bolting. Thermally induced prying on the | ||
bolts during pressurizer heatups and cooldowns was identified as a potentially | bolts during pressurizer heatups and cooldowns was identified as a potentially | ||
| Line 361: | Line 744: | ||
differences between the pressurizer skirt and the support structure. This was an | differences between the pressurizer skirt and the support structure. This was an | ||
expected occurrence, but excessive bolt preload increased the magnitude of the prying | expected occurrence, but excessive bolt preload increased the magnitude of the prying | ||
and reduce the capacity of the bolts to accept it. Analysis. The performance deficiency associated with this finding was the failure | and reduce the capacity of the bolts to accept it. | ||
Analysis. The performance deficiency associated with this finding was the failure to | |||
establish appropriate instructions for installing the pressurizer support skirt bolts. The | |||
work instruction did not provide adequate direction to torque the pressurizer skirt bolts | work instruction did not provide adequate direction to torque the pressurizer skirt bolts | ||
without lubrication. This contributed to the subsequent failure and cracking of several | without lubrication. This contributed to the subsequent failure and cracking of several | ||
| Line 372: | Line 757: | ||
a loss-of-coolant accident that exceeds the Technical Specification limit for reactor | a loss-of-coolant accident that exceeds the Technical Specification limit for reactor | ||
coolant system leakage. Therefore, this issue screened out in Phase 1 of the Manual | coolant system leakage. Therefore, this issue screened out in Phase 1 of the Manual | ||
Chapter 0609 | Chapter 0609 Significance Determination Process, because there was no actual loss | ||
of safety funtions.Enforcement. Technical Specification Section 6.8.1.a requires that written | of safety funtions. | ||
Enforcement. Technical Specification Section 6.8.1.a requires that written procedures | |||
shall be established, implemented, and maintained covering applicable procedures | |||
recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. | recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. | ||
Regulatory Guide 1.33, Appendix A, recommends that maintenance that can affect the | Regulatory Guide 1.33, Appendix A, recommends that maintenance that can affect the | ||
performance of safety-related equipment be performed in accordance with written | performance of safety-related equipment be performed in accordance with written | ||
procedures, documented instructions, or drawings appropriate to the circumstances. | procedures, documented instructions, or drawings appropriate to the circumstances. | ||
Enclosure-14-Contrary to these requirements, the licensee failed to ensure that Field | |||
Enclosure | |||
-14- | |||
Contrary to these requirements, the licensee failed to ensure that Field Change | |||
Request FCR-AS-1232 was adequate for the task. The pressurizer skirt bolted work | |||
instruction was inadequate because bolt lubrication was not addressed and resulted in | instruction was inadequate because bolt lubrication was not addressed and resulted in | ||
the failure of 4 of the 16 pressurizer skirt bolts. This issue was entered into the | the failure of 4 of the 16 pressurizer skirt bolts. This issue was entered into the | ||
licensees corrective action program as Condition Report CR-WF3-2006-4274. | |||
(NCV 05000382/2006005-02, Excess Torque Resulting in Pressurizer Skirt Bolt | (NCV 05000382/2006005-02, Excess Torque Resulting in Pressurizer Skirt Bolt | ||
Failures). | Failures). | ||
1R22 | |||
Surveillance Testing (71111.22) | |||
a. | |||
Inspection Scope | |||
The inspectors reviewed the Updated Final Safety Analysis Report, procedure | |||
requirements, and Technical Specifications to ensure that the four below listed | requirements, and Technical Specifications to ensure that the four below listed | ||
surveillance activities demonstrated that the structures, systems, and components | surveillance activities demonstrated that the structures, systems, and components | ||
| Line 399: | Line 794: | ||
correct; (14) reference setting data; and (15) annunciators and alarms setpoints. The | correct; (14) reference setting data; and (15) annunciators and alarms setpoints. The | ||
inspectors also verified that the licensee identified and implemented any needed | inspectors also verified that the licensee identified and implemented any needed | ||
corrective actions associated with the surveillance testing. *October 18, 2006; Surveillance Procedure STA-001-005, | corrective actions associated with the surveillance testing. | ||
* | |||
October 18, 2006; Surveillance Procedure STA-001-005, Leakage Testing of | |||
Air and Nitrogen Accumulators for Safety Related Valves, Revision 7. This test | |||
verified the leakage is within analyzed acceptable limits to fulfill the design | verified the leakage is within analyzed acceptable limits to fulfill the design | ||
function upon loss of instrument air.*October 23, 2006; Operations Procedure OP-903-068, | function upon loss of instrument air. | ||
diesel Generator A to satisfy Technical Specification requirements. *November 21, 2006; Maintenance Procedure MM-007-015, | * | ||
of the main steam safety valves prior to entering the refueling outage.*December 5, 2006; Operations Procedure OP-903-108, | October 23, 2006; Operations Procedure OP-903-068, Emergency Diesel | ||
Generator, Revision 14. This monthly test verified operability of emergency | |||
diesel Generator A to satisfy Technical Specification requirements. | |||
* | |||
November 21, 2006; Maintenance Procedure MM-007-015, Main Steam Safety | |||
Valve Test, Revision 9, Change 0. This test verified the lift pressures for three | |||
of the main steam safety valves prior to entering the refueling outage. | |||
* | |||
December 5, 2006; Operations Procedure OP-903-108, Safety Injection Flow | |||
Balance Test, Revision 5, Change 0. This test verified high-pressure safety | |||
injection (HPSI) flow from HPSI Pumps A, B, and AB through HPSI Headers A | injection (HPSI) flow from HPSI Pumps A, B, and AB through HPSI Headers A | ||
and B were within specifications.Documents reviewed by the inspectors are listed in the attachment. The | and B were within specifications. | ||
Enclosure-15- | Documents reviewed by the inspectors are listed in the attachment. The inspectors | ||
completed four samples. | |||
Enclosure | |||
-15- | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1R23 | |||
Temporary Plant Modifications (71111.23) | |||
a. | |||
Inspection Scope | |||
The inspectors reviewed the Updated Final Safety Analysis Report, plant drawings, | |||
procedure requirements, and Technical Specifications to ensure that the two below | |||
listed temporary modifications were properly implemented. The inspectors: (1) verified | listed temporary modifications were properly implemented. The inspectors: (1) verified | ||
that the modifications did not have an effect on system operability/availability; (2) verified | that the modifications did not have an effect on system operability/availability; (2) verified | ||
| Line 416: | Line 836: | ||
and (5) verified that appropriate safety evaluations were completed. The inspectors | and (5) verified that appropriate safety evaluations were completed. The inspectors | ||
verified that licensee identified and implemented any needed corrective actions | verified that licensee identified and implemented any needed corrective actions | ||
associated with temporary modifications. *December 18, 2006: ER-W3-2006-0264-000, | associated with temporary modifications. | ||
compressor to support Refueling Outage 14.*December 28, 2006: ER-W3-2006-0375-000 and -001, | * | ||
December 18, 2006: ER-W3-2006-0264-000, Temporary Air Compressors to | |||
Augment Station Air, a temporary alteration to install a supplemental air | |||
compressor to support Refueling Outage 14. | |||
* | |||
December 28, 2006: ER-W3-2006-0375-000 and -001, Install Loose Parts | |||
Monitoring Sensors on the Steam Generators, a temporary alteration to install | |||
acoustic monitoring equipment to monitor for loose parts, associated with the | acoustic monitoring equipment to monitor for loose parts, associated with the | ||
tube support bar assemblies also known as batwings, in the steam generator | tube support bar assemblies also known as batwings, in the steam generator | ||
secondary upper shell area.Documents reviewed by the inspectors are listed in the attachment. The | secondary upper shell area. | ||
Cornerstone: Emergency Preparedness (EP) | Documents reviewed by the inspectors are listed in the attachment. The inspectors | ||
notification system in accordance with 10 CFR Part 50, Appendix E. The | completed two samples. | ||
and notification system testing program was compared with criteria in NUREG-0654, | b. | ||
Enclosure-16- | Findings | ||
Management Agency (FEMA) Report REP-10, | No findings of significance were identified. | ||
Notification Systems for Nuclear Power Plants, | Cornerstone: Emergency Preparedness (EP) | ||
FEMA-approved alert and notification system design report, | 1EP2 | ||
Waterford-3 Steam Electric Station, | Alert Notification System Testing (71114.02) | ||
the following procedures:*EPP-422, | a. | ||
*EPP-424, | Inspection Scope | ||
*Emergency Preparedness Desk Guide 16, | The inspector discussed with licensee staff the status of offsite siren and tone alert radio | ||
systems to determine the adequacy of licensee methods for testing the alert and | |||
notification system in accordance with 10 CFR Part 50, Appendix E. The licensees alert | |||
and notification system testing program was compared with criteria in NUREG-0654, | |||
Enclosure | |||
-16- | |||
Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and | |||
Preparedness in Support of Nuclear Power Plants, Revision 1, Federal Emergency | |||
Management Agency (FEMA) Report REP-10, Guide for the Evaluation of Alert and | |||
Notification Systems for Nuclear Power Plants, and the licensees current | |||
FEMA-approved alert and notification system design report, Alert/Notification System, | |||
Waterford-3 Steam Electric Station, dated March 2005. The inspector also reviewed | |||
the following procedures: | |||
* | |||
EPP-422, Siren and Helicopter Warning System Maintenance, Revision 3 | |||
* | |||
EPP-424, Siren Testing and Siren System Administrative Controls, Revision 9 | |||
* | |||
Emergency Preparedness Desk Guide 16, Siren System Administrative Data, | |||
Revision 11 | |||
The inspector completed one sample during the inspection. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1EP3 | |||
Emergency Response Organization Augmentation Testing (71114.03) | |||
a. | |||
Inspection Scope | |||
The inspector discussed with licensee staff the status of primary and backup systems | |||
for augmenting the on-shift emergency response staff to determine the adequacy of | |||
licensee methods for staffing emergency response facilities. The inspector reviewed the | licensee methods for staffing emergency response facilities. The inspector reviewed the | ||
results of 15 licensee augmentation drills performed from August 2005 through | results of 15 licensee augmentation drills performed from August 2005 through | ||
November 2006 as listed in the Attachment to this report, and the listed references | November 2006 as listed in the Attachment to this report, and the listed references | ||
related to the emergency response organization augmentation system, to evaluate the | related to the emergency response organization augmentation system, to evaluate the | ||
licensees ability to staff the emergency response facilities in accordance with the | |||
licensee emergency plan and the requirements of 10 CFR Part 50 Appendix E.The inspector completed one sample during the inspection. | licensee emergency plan and the requirements of 10 CFR Part 50 Appendix E. | ||
Procedure EP-001-001, | The inspector completed one sample during the inspection. | ||
Enclosure-17-These revisions implemented an NEI 99-01, | b. | ||
approval was obtained. These revisions were compared to the criteria of NUREG-0654, | Findings | ||
Support of Nuclear Power Plants, | No findings of significance were identified. | ||
for Development of Emergency Action Levels, | 1EP4 | ||
Emergency Action Level and Emergency Plan Changes (71114.04) | |||
a. | |||
Inspection Scope | |||
The inspector performed an in-office review of Revision 33 to the Waterford Steam | |||
Electric Station Emergency Plan, and Revision 21 to Emergency Plan Implementing | |||
Procedure EP-001-001, Recognition and Classification of Emergency Conditions. | |||
Enclosure | |||
-17- | |||
These revisions implemented an NEI 99-01, Methodology for Development of | |||
Emergency Action Levels, Revision 4, emergency action scheme for which prior NRC | |||
approval was obtained. | |||
These revisions were compared to the criteria of NUREG-0654, Criteria for Preparation | |||
and Evaluation of Radiological Emergency Response Plans and Preparedness in | |||
Support of Nuclear Power Plants, Revision 1, to the criteria of NEI 99-01, Methodology | |||
for Development of Emergency Action Levels, Revision 4, to the NRC Safety Analysis | |||
Report dated June 20, 2005, and to the standards in 10 CFR 50.47(b) to determine if | Report dated June 20, 2005, and to the standards in 10 CFR 50.47(b) to determine if | ||
the revisions were adequately conducted according to the requirements of | the revisions were adequately conducted according to the requirements of | ||
10 CFR 50.54(q). These reviews were not documented in a safety evaluation report and | 10 CFR 50.54(q). These reviews were not documented in a safety evaluation report and | ||
did not constitute approval of licensee changes, therefore these revisions are subject to | did not constitute approval of licensee changes, therefore these revisions are subject to | ||
future inspection.The inspector completed two samples during the inspection. | future inspection. | ||
The inspector completed two samples during the inspection. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
1EP5 | |||
Correction of Emergency Preparedness Weaknesses and Deficiencies (71114.05) | |||
a. | |||
Inspection Scope | |||
The inspector reviewed the licensees corrective action program requirements in | |||
Procedures EN-LI-102, Corrective Action Process, Revision 2, and EN-LI-119, | |||
Apparent Cause Evaluation Process, Revision 3. The inspector reviewed summaries | |||
of 194 corrective action requests associated with emergency preparedness issues | of 194 corrective action requests associated with emergency preparedness issues | ||
during calendar years 2005 and 2006 and selected 15 for detailed review against the | during calendar years 2005 and 2006 and selected 15 for detailed review against the | ||
program requirements. The inspector reviewed the | program requirements. The inspector reviewed the licensees after-action report for a | ||
significant event (Hurricane Katrina) using the requirements of Procedure UNT-006-10, | significant event (Hurricane Katrina) using the requirements of Procedure UNT-006-10, | ||
Event Notification and Reporting, Revision 17. The inspector evaluated the response | |||
to the corrective action requests to determine the | to the corrective action requests to determine the licensees ability to identify, evaluate, | ||
and correct problems in accordance with the licensee program requirements and | and correct problems in accordance with the licensee program requirements and | ||
10 CFR 50.47(b)(14) and 10 CFR Part 50, Appendix E.The inspector reviewed the | 10 CFR 50.47(b)(14) and 10 CFR Part 50, Appendix E. | ||
The inspector reviewed the licensees audit program requirements in | |||
Procedure EN-QV-109, Audit Process, Revision 8, quality assurance audits conducted | |||
in 2005 and 2006, and licensee self-assessments of emergency preparedness. The | in 2005 and 2006, and licensee self-assessments of emergency preparedness. The | ||
inspector also reviewed other documents listed in the attachment to this report.The inspector completed one sample during the inspection. | inspector also reviewed other documents listed in the attachment to this report. | ||
Enclosure-18-Description: The NRC identified a performance deficiency related to conduct of | The inspector completed one sample during the inspection. | ||
b. | |||
Findings | |||
Introduction: A Green noncited violation was identified for failure to conduct a required | |||
offsite medical drill during calendar year 2005, as required by 10 CFR 50.54(q). | |||
Enclosure | |||
-18- | |||
Description: The NRC identified a performance deficiency related to conduct of the | |||
licensees drill and exercise program, in that an annual offsite medical drill involving a | |||
simulated contaminated individual was not performed during calendar year 2005 as | simulated contaminated individual was not performed during calendar year 2005 as | ||
required by the Waterford Steam Electric Station Emergency Plan. The licensee has | required by the Waterford Steam Electric Station Emergency Plan. The licensee has | ||
| Line 467: | Line 960: | ||
individual. Ochsner Clinic had last performed a drill with simulated medical treatment of | individual. Ochsner Clinic had last performed a drill with simulated medical treatment of | ||
a contaminated individual in 2003, and another drill was scheduled for | a contaminated individual in 2003, and another drill was scheduled for | ||
October 17, 2006. That drill did not occur.As a result of the impact of Hurricanes Katrina and Rita on offsite infrastructure,Ochsner Clinic informally communicated to the licensee that conducting the drill as | October 17, 2006. That drill did not occur. | ||
As a result of the impact of Hurricanes Katrina and Rita on offsite infrastructure, | |||
Ochsner Clinic informally communicated to the licensee that conducting the drill as | |||
scheduled would be a hardship due to reduced staffing at the facilities. On | scheduled would be a hardship due to reduced staffing at the facilities. On | ||
October 3, 2005, the State of Louisiana Department of Environment Quality wrote to the | October 3, 2005, the State of Louisiana Department of Environment Quality wrote to the | ||
| Line 473: | Line 968: | ||
Region VI, requesting postponement of the 2005 Biennial Exercise and several offsite | Region VI, requesting postponement of the 2005 Biennial Exercise and several offsite | ||
emergency preparedness drills scheduled for the week beginning October 17, 2005, one | emergency preparedness drills scheduled for the week beginning October 17, 2005, one | ||
of which being the | of which being the licensees offsite medical drill. The licensee submitted a request | ||
(ML0529903030) to the NRC on October 24, 2005, requesting a rescheduling | (ML0529903030) to the NRC on October 24, 2005, requesting a rescheduling | ||
exemption for the 2005 Biennial Exercise. The inspector determined the | exemption for the 2005 Biennial Exercise. The inspector determined the licensees | ||
request for a scheduling exemption was limited to the 2005 Biennial exercise and did not | request for a scheduling exemption was limited to the 2005 Biennial exercise and did not | ||
include a request for relief from the emergency plan requirement to conduct the offsite | include a request for relief from the emergency plan requirement to conduct the offsite | ||
medical drill.The U.S. Department of Homeland Security, Federal Emergency Management Agency,Region VI, responded on October 14, 2005, to the State of Louisiana letter of | medical drill. | ||
The U.S. Department of Homeland Security, Federal Emergency Management Agency, | |||
Region VI, responded on October 14, 2005, to the State of Louisiana letter of | |||
October 3, 2005, approving the postponement of the 2005 Biennial Exercise and the | October 3, 2005, approving the postponement of the 2005 Biennial Exercise and the | ||
offsite emergency preparedness drills scheduled for the week beginning | offsite emergency preparedness drills scheduled for the week beginning | ||
October 17, 2005. The Federal Emergency Management Agency, Region VI, letter | October 17, 2005. The Federal Emergency Management Agency, Region VI, letter | ||
stated in part, | stated in part, . . . we concur that . . .the out of sequence drills scheduled for the week | ||
of October | of October 17th should be postponed. . . ., and . . . we will be contacting your | ||
organization in the near future to reschedule the drills. . . . The inspector determined | |||
that the offsite medical drill was not subsequently rescheduled. The NRC responded | that the offsite medical drill was not subsequently rescheduled. The NRC responded | ||
(ML053270770) on November 17, 2005, to the | (ML053270770) on November 17, 2005, to the licensees letter of October 24, 2005, | ||
approving rescheduling the 2005 Biennial Exercise to 2006; this exercise was | approving rescheduling the 2005 Biennial Exercise to 2006; this exercise was | ||
subsequently conducted June 28, 2006.The inspector determined the licensee conducted an offsite medical drill with | subsequently conducted June 28, 2006. | ||
The inspector determined the licensee conducted an offsite medical drill with West | |||
Jefferson Medical Center on October 25, 2006 (Drill 2006-09), which the licensee | |||
intended as meeting the 2006 annual drill requirement, not the rescheduled 2005 drill | intended as meeting the 2006 annual drill requirement, not the rescheduled 2005 drill | ||
requirement. West Jefferson Medical Center had also drilled the simulated medical | requirement. West Jefferson Medical Center had also drilled the simulated medical | ||
treatment of a contaminated individual in 2004. Ochsner Clinic is scheduled to perform | treatment of a contaminated individual in 2004. Ochsner Clinic is scheduled to perform | ||
a drill with simulated medical treatment of a contaminated individual in October 2007, | a drill with simulated medical treatment of a contaminated individual in October 2007, | ||
approximately 4 years after their most recent medical drill in 2003.Analysis: The inspector determined that the failure to conduct a required offsite | approximately 4 years after their most recent medical drill in 2003. | ||
the Waterford Steam Electric Station Emergency Plan, and the cause was within the | Analysis: The inspector determined that the failure to conduct a required offsite medical | ||
Enclosure-19- | drill is a performance deficiency because the licensee failed to meet a requirement of | ||
the Waterford Steam Electric Station Emergency Plan, and the cause was within the | |||
Enclosure | |||
-19- | |||
licenseess ability to foresee, correct, and prevent. The finding had a credible impact on | |||
the Emergency Preparedness cornerstone objective because it involved the ability to | |||
maintain the proficiency of offsite personnel whose assistance may be needed in the | maintain the proficiency of offsite personnel whose assistance may be needed in the | ||
event of a radiation emergency, and affected the attributes of emergency response | event of a radiation emergency, and affected the attributes of emergency response | ||
| Line 505: | Line 1,010: | ||
safety significance because the licensee failed to conduct only one required drill during | safety significance because the licensee failed to conduct only one required drill during | ||
the inspection period January 2005 through December 2006, and the drill was not | the inspection period January 2005 through December 2006, and the drill was not | ||
appropriately rescheduled with NRC approval.Enforcement: Part 50.54(q) of Title 10 of the Code of Federal Regulations states, | appropriately rescheduled with NRC approval. | ||
Enforcement: Part 50.54(q) of Title 10 of the Code of Federal Regulations states, in | |||
part, A licensee authorized to possess and operate a nuclear power reactor shall follow | |||
and maintain in effect emergency plans which meet the standards in §50.47(b) and the | and maintain in effect emergency plans which meet the standards in §50.47(b) and the | ||
requirements in Appendix E of this part. | requirements in Appendix E of this part. 10 CFR 50.47(b)(14) states, in part, ...periodic | ||
employees and exercising, by periodic drills, of radiation emergency plans to ensure | drills will be conducted to develop and maintain key skills... 10 CFR Part 50, | ||
Appendix E, IV, F.1 states, in part, The program to provide for: (a) The training of | |||
employees and exercising, by periodic drills, of radiation emergency plans to ensure that | |||
employees of the licensee are familiar with their specific emergency response duties, | |||
and (b) The participation in the training and drills by other persons whose assistance | and (b) The participation in the training and drills by other persons whose assistance | ||
may be needed in the event of a radiation emergency shall be described. . . vii. Medical | may be needed in the event of a radiation emergency shall be described. . . vii. Medical | ||
Support Personnel. | Support Personnel. Section 8.1.2.4(4) of the Waterford Steam Electric Station | ||
Emergency Plan, Revision 33, states, in part, | Emergency Plan, Revision 33, states, in part, A medical emergency drill, involving a | ||
simulated contaminated individual, which includes provisions for participation by | simulated contaminated individual, which includes provisions for participation by the | ||
conducted annually. | local support services (i.e. ambulance and offsite medical treatment facility) shall be | ||
conducted annually. Between January 1 and December 31, 2005, the licensee did not | |||
conduct a drill involving a simulated contaminated individual with provision for | conduct a drill involving a simulated contaminated individual with provision for | ||
participation by local support services. Because this failure is of very low safety | participation by local support services. Because this failure is of very low safety | ||
significance and has been entered into the | significance and has been entered into the licensees corrective action system | ||
(Condition Report 2006-4429), this violation is being treated as an noncited violation | (Condition Report 2006-4429), this violation is being treated as an noncited violation | ||
consistent with Section VI.A of the NRC Enforcement Policy: | consistent with Section VI.A of the NRC Enforcement Policy: | ||
NCV 05000382/2006-005-03, Failure to Conduct a Required Offsite Medical Drill in | NCV 05000382/2006-005-03, Failure to Conduct a Required Offsite Medical Drill in | ||
2005. | |||
2. | |||
RADIATION SAFETY | |||
Occupational Radiation Safety (OS) | |||
2OS1 Access Control to Radiologically Significant Areas (71121.01) | |||
a. | |||
Inspection Scope | |||
This area was inspected to assess the licensees performance in implementing physical | |||
and administrative controls for airborne radioactivity areas, radiation areas, high | |||
radiation areas, and worker adherence to these controls. The inspector used the | |||
requirements in 10 CFR Part 20, the Technical Specifications, and the licensees | |||
procedures required by Technical Specifications as criteria for determining compliance. | |||
Enclosure | |||
-20- | |||
During the inspection, the inspector interviewed the radiation protection manager, | |||
radiation protection supervisors, and radiation workers. The inspector performed | |||
independent radiation dose rate measurements and reviewed the following items: | |||
* | |||
Performance indicator events and associated documentation packages reported | |||
by the licensee in the Occupational Radiation Safety Cornerstone | |||
* | |||
Controls (surveys, posting, and barricades) of multiple radiation, high radiation, | |||
or airborne radioactivity areas | |||
* | |||
Radiation work permits, procedures, engineering controls, and air sampler | |||
locations | |||
* | |||
Conformity of electronic personal dosimeter alarm set points with survey | |||
indications and plant policy; workers knowledge of required actions when their | |||
electronic personnel dosimeter noticeably malfunctions or alarms | |||
* | |||
Barrier integrity and performance of engineering controls in three airborne | |||
radioactivity areas | |||
* | |||
Adequacy of the licensees internal dose assessment for any actual internal | |||
exposure greater than 50 millirem Committed Effective Dose Equivalent | |||
* | |||
Physical and programmatic controls for highly activated or contaminated | |||
materials (nonfuel) stored within spent fuel and other storage pools | |||
* | |||
Self-assessments, audits, and special reports related to the access control | |||
program since the last inspection | |||
* | |||
Corrective action documents related to access controls | |||
* | |||
Licensee actions in cases of repetitive deficiencies or significant individual | |||
deficiencies | |||
* | |||
Radiation work permit briefings and worker instructions | |||
* | |||
Adequacy of radiological controls such as, required surveys, radiation protection | |||
job coverage, and contamination controls during job performance | |||
* | |||
Dosimetry placement in high radiation work areas with significant dose rate | |||
gradients | |||
* | |||
Changes in licensee procedural controls of high dose rate - high radiation areas | |||
and very high radiation areas | |||
* | |||
Controls for special areas that have the potential to become very high radiation | |||
areas during certain plant operations | |||
* | |||
Posting and locking of entrances to all accessible high dose rate - high radiation | |||
areas and very high radiation areas | |||
Enclosure | |||
-21- | |||
* | |||
Radiation worker and radiation protection technician performance with respect to | |||
radiation protection work requirements | |||
The inspector completed 17 of the required 21 samples. | |||
b. | |||
* | Findings | ||
No findings of significance were identified. | |||
2OS2 ALARA Planning and Controls (71121.02) | |||
inspector used the requirements in 10 CFR Part 20 and the | a. | ||
Inspection Scope | |||
The inspector assessed licensee performance with respect to maintaining individual and | |||
collective radiation exposures as low as is reasonably achievable (ALARA). The | |||
inspector used the requirements in 10 CFR Part 20 and the licensees procedures | |||
required by Technical Specifications as criteria for determining compliance. The | required by Technical Specifications as criteria for determining compliance. The | ||
inspector interviewed licensee personnel and reviewed:*Current 3-year rolling average collective exposure | inspector interviewed licensee personnel and reviewed: | ||
*Five outage work activities scheduled during the inspection period and | * | ||
personnel collective exposures*Site specific ALARA procedures | Current 3-year rolling average collective exposure | ||
*Interfaces between operations, radiation protection, maintenance, | * | ||
*Workers use of the low dose waiting areas | Five outage work activities scheduled during the inspection period and associated | ||
*First-line job supervisors | work activity exposure estimates, which were likely to result in the highest | ||
Enclosure-22- | personnel collective exposures | ||
* | |||
guidance of Nuclear Energy Institute 99-02, | Site specific ALARA procedures | ||
Guideline, | * | ||
Interfaces between operations, radiation protection, maintenance, maintenance | |||
planning, scheduling, and engineering groups | |||
* | |||
Integration of ALARA requirements into work procedure and radiation work permit | |||
documents | |||
* | |||
Exposure tracking system | |||
* | |||
Workers use of the low dose waiting areas | |||
* | |||
First-line job supervisors contribution to ensuring work activities are conducted in | |||
a dose efficient manner | |||
* | |||
Source-term control strategy or justifications for not pursuing such exposure | |||
reduction initiatives | |||
* | |||
Specific sources identified by the licensee for exposure reduction actions and | |||
priorities established for these actions, and results since the last refueling cycle | |||
* | |||
Radiation worker and radiation protection technician performance during work | |||
activities in radiation areas, airborne radioactivity areas, or high radiation areas | |||
The inspector completed 4 of the required 15 samples and 7 of the optional samples. | |||
Enclosure | |||
-22- | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
4. | |||
OTHER ACTIVITIES (OA) | |||
4OA1 Performance Indicator Verification (71151) | |||
.1 | |||
Mitigating Systems and Barrier Integrity | |||
a. | |||
Inspection Scope | |||
The inspectors sampled licensee submittals for the three performance indicators listed | |||
below for the period from July 1, 2004, through September 30, 2006. The definitions and | |||
guidance of Nuclear Energy Institute 99-02, Regulatory Assessment Indicator | |||
Guideline, Revision 4, were used to verify the licensees basis for reporting each data | |||
element in order to verify the accuracy of performance indicator data reported during the | element in order to verify the accuracy of performance indicator data reported during the | ||
assessment period. The inspectors reviewed licensee event reports, monthly operating | assessment period. The inspectors reviewed licensee event reports, monthly operating | ||
reports, and operating logs as part of the assessment. Licensee performance indicator | reports, and operating logs as part of the assessment. Licensee performance indicator | ||
data were also reviewed against the requirements of Procedure EN-LI-114, | data were also reviewed against the requirements of Procedure EN-LI-114, | ||
Performance Indicator Process, Revision 1. | |||
*Reactor Coolant System | * | ||
Safety System Functional Failures | |||
* | |||
Reactor Coolant System Specific Activity | |||
* | |||
Reactor Coolant System Leakage | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed three samples. | |||
b. | b. | ||
Findings | |||
No findings of significance were identified. | |||
.2 | |||
(Closed) Temporary Instruction 2515/169: Mitigating Systems Performance Index | |||
Verification | |||
a. | |||
Inspection Scope | |||
During this inspection period, the inspectors completed a review of the licensees | |||
implementation of the mitigating systems performance index in accordance with the | |||
guidance provided in Temporary Instruction 2515/169. The review examined the | guidance provided in Temporary Instruction 2515/169. The review examined the | ||
licensees mitigating systems performance index basis documents (W3-SA-06-00001, | |||
Revision 0) and verified the established system boundaries and monitored components | Revision 0) and verified the established system boundaries and monitored components | ||
were consistent with guidance provided in NEI 99-02, | were consistent with guidance provided in NEI 99-02, Reactor Oversight Process | ||
Performance Indicators, | Performance Indicators, Revision 4. The inspectors verified that the licensee did not | ||
include credit for unavailability hours for | include credit for unavailability hours for short term unavailability or operator recovery | ||
actions to restore the risk-significant function as is allowed by NEI 99-02.Additionally, the inspectors reviewed the baseline mitigating systems performance | actions to restore the risk-significant function as is allowed by NEI 99-02. | ||
verification included all planned and unplanned unavailability. The plant specific data for | Additionally, the inspectors reviewed the baseline mitigating systems performance index | ||
Enclosure-23-2005 to 2006 was also reviewed to ensure the licensee properly accounted for the | unavailability time using plant specific values for the period of 2002 to 2004. The | ||
verification included all planned and unplanned unavailability. The plant specific data for | |||
Enclosure | |||
-23- | |||
2005 to 2006 was also reviewed to ensure the licensee properly accounted for the actual | |||
unavailability hours of mitigating systems performance index systems. For the same | |||
period, the mitigating systems performance index component unreliability data was | period, the mitigating systems performance index component unreliability data was | ||
examined to ensure the licensee identified all failures of monitored components. The | examined to ensure the licensee identified all failures of monitored components. The | ||
| Line 567: | Line 1,208: | ||
unavailability and unreliability data was compared with performance indicator data | unavailability and unreliability data was compared with performance indicator data | ||
submitted to the NRC to ensure that any discrepancies would not result in a change to | submitted to the NRC to ensure that any discrepancies would not result in a change to | ||
the index color. | the index color. | ||
b. | |||
Findings | |||
No findings of significance were identified. This completes the inspection requirements | |||
for this Temporary Instruction. | |||
.3 | |||
Emergency Preparedness | |||
a. | |||
Inspection Scope | |||
The inspector reviewed licensee evaluations for the three Emergency Preparedness | |||
cornerstone performance indicators of Drill and Exercise Performance, Emergency | |||
Response Organization Participation, and Alert and Notification System Reliability, for the | Response Organization Participation, and Alert and Notification System Reliability, for the | ||
period October 1, 2005, through September 30, 2006. The definitions and guidance of | period October 1, 2005, through September 30, 2006. The definitions and guidance of | ||
NEI 99-02, | NEI 99-02, Regulatory Assessment Indicator Guideline, Revisions 2 through 4, and the | ||
licensee Performance Indicator Procedures EN-LI-114, | licensee Performance Indicator Procedures EN-LI-114, Performance Indicator Process, | ||
Revision 2, and EN-EP-201, | Revision 2, and EN-EP-201, Emergency Planning Performance Indicators, Revision 5, | ||
were used to verify the accuracy of the | were used to verify the accuracy of the licensees evaluations for each performance | ||
indicator reported during the assessment period. The inspector reviewed 100 percent of drill and exercise scenarios and licensed | indicator reported during the assessment period. | ||
The inspector reviewed 100 percent of drill and exercise scenarios and licensed operator | |||
simulator training sessions, notification forms, and attendance and critique records | |||
associated with training sessions, drills, and exercises conducted during the verification | associated with training sessions, drills, and exercises conducted during the verification | ||
period. The inspector reviewed 18 emergency responder qualification, training, and drill | period. The inspector reviewed 18 emergency responder qualification, training, and drill | ||
participation records. The inspector reviewed alert and notification system testing | participation records. The inspector reviewed alert and notification system testing | ||
procedures, maintenance records, and 100 percent of siren test records. The inspector | procedures, maintenance records, and 100 percent of siren test records. The inspector | ||
also reviewed other documents listed in the attachment to this report. The inspector completed three samples during the inspection. | also reviewed other documents listed in the attachment to this report. | ||
performance indicator data reported during that period, performance indicator definitions | The inspector completed three samples during the inspection. | ||
Enclosure-24-and guidance contained in NEI 99-02, | b. | ||
Licensee records reviewed included corrective action documentation that | Findings | ||
No findings of significance were identified. | |||
.4 | |||
Occupational Radiation Safety and Public Radiation Safety | |||
a. | |||
Inspection Scope | |||
The inspector sampled licensee submittals for the performance indicators listed below for | |||
the period from April 2006 through October 2006. To verify the accuracy of the | |||
performance indicator data reported during that period, performance indicator definitions | |||
Enclosure | |||
-24- | |||
and guidance contained in NEI 99-02, Regulatory Assessment Indicator Guideline, | |||
Revision 2, were used to verify the basis in reporting for each data element. | |||
* | |||
Occupational Exposure Control Effectiveness Performance Indicators | |||
Licensee records reviewed included corrective action documentation that identified | |||
occurrences in high radiation areas with dose rates greater than 1,000 millirem per hour | |||
at 30 centimeters (as defined in technical specifications), very high radiation areas (as | at 30 centimeters (as defined in technical specifications), very high radiation areas (as | ||
defined in 10 CFR 20.1003), and unplanned personnel exposures (as defined in | defined in 10 CFR 20.1003), and unplanned personnel exposures (as defined in | ||
| Line 589: | Line 1,259: | ||
that were accountable for collecting and evaluating the performance indicator data. In | that were accountable for collecting and evaluating the performance indicator data. In | ||
addition, the inspector toured plant areas to verify that high radiation and very high | addition, the inspector toured plant areas to verify that high radiation and very high | ||
radiation areas were properly controlled.The inspector completed the required sample (1) in this cornerstone. | radiation areas were properly controlled. | ||
*Radiological Effluent Technical Specification/Offsite Dose Calculation Manual Radiological Effluent Occurrences Licensee records reviewed included corrective action documentation that | The inspector completed the required sample (1) in this cornerstone. | ||
* | |||
Radiological Effluent Technical Specification/Offsite Dose Calculation Manual | |||
Radiological Effluent Occurrences | |||
Licensee records reviewed included corrective action documentation that identified | |||
occurrences for liquid or gaseous effluent releases that exceeded performance indicator | |||
thresholds and those reported to the NRC. The inspector interviewed licensee personnel | thresholds and those reported to the NRC. The inspector interviewed licensee personnel | ||
that were accountable for collecting and evaluating the performance indicator data. The inspector completed the required sample (1) in this cornerstone. | that were accountable for collecting and evaluating the performance indicator data. | ||
The inspector completed the required sample (1) in this cornerstone. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
4OA2 Identification and Resolution of Problems (71152) | |||
.1 | |||
Routine Review of Identification and Resolution of Problems | |||
a. | |||
Inspection Scope | |||
The inspectors performed a daily screening of items entered into the licensees corrective | |||
action program. This assessment was accomplished by reviewing condition reports and | |||
event trend reports and attending daily operational meetings. The inspectors: | event trend reports and attending daily operational meetings. The inspectors: | ||
(1) verified that equipment, human performance, and program issues were being | (1) verified that equipment, human performance, and program issues were being | ||
| Line 599: | Line 1,284: | ||
into the corrective action program; (2) verified that corrective actions were commensurate | into the corrective action program; (2) verified that corrective actions were commensurate | ||
with the significance of the issue; and (3) identified conditions that might warrant | with the significance of the issue; and (3) identified conditions that might warrant | ||
additional follow-up through other baseline inspection procedures. | additional follow-up through other baseline inspection procedures. | ||
b. | |||
Enclosure-25- | Findings | ||
No findings of significance were identified. | |||
Enclosure | |||
-25- | |||
.2 | |||
Selected Issue Follow-up Inspection | |||
a. | |||
Inspection Scope | |||
In addition to the routine review, the inspectors selected the one below listed issue for a | |||
more in-depth review. The inspectors considered the following during the review of the | |||
licensees actions: (1) complete and accurate identification of the problem in a timely | |||
manner; (2) evaluation and disposition of operability/reportability issues; (3) consideration | manner; (2) evaluation and disposition of operability/reportability issues; (3) consideration | ||
of extent of condition, generic implications, common cause, and previous occurrences; | of extent of condition, generic implications, common cause, and previous occurrences; | ||
(4) classification and prioritization of the resolution of the problem; (5) identification of | (4) classification and prioritization of the resolution of the problem; (5) identification of | ||
root and contributing causes of the problem; (6) identification of corrective actions; and | root and contributing causes of the problem; (6) identification of corrective actions; and | ||
(7) completion of corrective actions in a timely manner. *December 18, 2006: Operator Workarounds | (7) completion of corrective actions in a timely manner. | ||
Documents reviewed by the inspectors are listed in the attachment. The | * | ||
December 18, 2006: Operator Workarounds | |||
Documents reviewed by the inspectors are listed in the attachment. The inspectors | |||
completed one sample. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
.3 | |||
Semiannual Trend Review | |||
a. | |||
Inspection Scope | |||
The inspectors completed a semiannual trend review of repetitive or closely related | |||
issues associated with the essential chiller low evaporator pressure trips that were | |||
documented in condition reports, system and component health reports, quality | documented in condition reports, system and component health reports, quality | ||
assurance audits, trend reports, the | assurance audits, trend reports, the licensees internal performance indicators, and NRC | ||
inspection reports to identify trends that might indicate the existence of more safety | inspection reports to identify trends that might indicate the existence of more safety | ||
significant issues. The inspectors | significant issues. The inspectors review consisted of the 6-month period of July 1 to | ||
December 31, 2006. When warranted, some of the samples expanded beyond those | December 31, 2006. When warranted, some of the samples expanded beyond those | ||
dates to fully assess the issue. The inspectors also reviewed corrective action program | dates to fully assess the issue. The inspectors also reviewed corrective action program | ||
items associated with troubleshooting. The inspectors compared and contrasted their | items associated with troubleshooting. The inspectors compared and contrasted their | ||
results with the results contained in the | results with the results contained in the licensees quarterly trend reports. Corrective | ||
actions associated with a sample of the issues identified in the | actions associated with a sample of the issues identified in the licensees trend report | ||
were reviewed for adequacy. Documents reviewed by the inspectors are listed in the attachment. The | were reviewed for adequacy. | ||
Enclosure-26- | Documents reviewed by the inspectors are listed in the attachment. The inspectors | ||
completed one sample. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
Enclosure | |||
-26- | |||
.4 | |||
Annual Sample Review | |||
a. | |||
Inspection Scope | |||
The emergency preparedness inspector selected 15 condition reports for detailed review. | |||
The reports were reviewed to ensure that the full extent of the issues were identified, an | |||
appropriate evaluation was performed, and appropriate corrective actions were specified | appropriate evaluation was performed, and appropriate corrective actions were specified | ||
and prioritized. The inspector evaluated the condition reports using licensee | and prioritized. The inspector evaluated the condition reports using licensee | ||
Procedures EN-LI-102, | Procedures EN-LI-102, Corrective Action Process, Revision 2, and EN-LI-119, | ||
Apparent Cause Evaluation Process, Revision 3. | |||
The health physics inspector evaluated the effectiveness of the licensees problem | |||
identification and resolution process with respect to the following inspection areas: | |||
* | |||
Access Control to Radiologically Significant Areas (Section 2OS1) | |||
* | |||
ALARA Planning and Controls (Section 2OS2) | |||
b. | |||
Findings and Observations | |||
No findings of significance were identified. | |||
4OA3 Event Follow-up (71153) | |||
.1 | |||
(Closed) LER 05000382/2005-005-00: Manual Reactor Trip Upon Loss of All Circulating | |||
Water Pumps and Lowering Condenser Vacuum | |||
On November 11, 2005, the licensee manually tripped the reactor due to lowering main | |||
condenser vacuum, caused by a loss of all circulating water pumps. Lowering main | |||
condenser vacuum resulted in loss of main feedwater to the steam generators causing | condenser vacuum resulted in loss of main feedwater to the steam generators causing | ||
steam generator levels to lower resulting in an automatic actuation of the emergency | steam generator levels to lower resulting in an automatic actuation of the emergency | ||
| Line 631: | Line 1,367: | ||
inspectors and no findings of significance were identified and no violation of NRC | inspectors and no findings of significance were identified and no violation of NRC | ||
requirements occurred. The licensee documented the failed equipment in Condition | requirements occurred. The licensee documented the failed equipment in Condition | ||
Report CR-WF3-2005-4593. This LER is closed. | Report CR-WF3-2005-4593. This LER is closed. | ||
Guide 1.45, | .2 | ||
(Closed) LER 05000382/2005-002-01: RCS Leakage Detection Instrumentation and | |||
Regulatory Guide 1.45 | |||
On November 15, 2005, the licensee determined that Technical Specification 3.4.5.1, | |||
Leakage Detection Systems, did not meet the design requirements of Regulatory | |||
Guide 1.45, Reactor Coolant Pressure Boundary Leakage Detection System. | |||
Specifically, the containment fan cooler condensate flow switches did not meet the | Specifically, the containment fan cooler condensate flow switches did not meet the | ||
design requirements for detecting a one gallon per minute reactor coolant system leak. | design requirements for detecting a one gallon per minute reactor coolant system leak. | ||
This deficiency was previously dispositioned in NRC Inspection | This deficiency was previously dispositioned in NRC Inspection | ||
Report 05000382/2005005, Section 1R22, | Report 05000382/2005005, Section 1R22, Surveillance Testing, as a Green noncited | ||
violation (NCV 05000382/2005005-01). This LER is closed. | violation (NCV 05000382/2005005-01). This LER is closed. | ||
Enclosure-27- | |||
audit and evaluation was performed during spring of 2006. | Enclosure | ||
-27- | |||
4OA5 Other Activities | |||
.1 | |||
Institute of Nuclear Power Operations (INPO) Audit and Evaluation Review | |||
The inspectors completed a review of the INPO audit and evaluation report for Entergy | |||
Operations Waterford 3 Steam Electric Station during this inspection period. The INPO | |||
audit and evaluation was performed during spring of 2006. | |||
.2 | |||
(Closed) NRC Temporary Instruction 2515/166: PWR Containment Sump Blockage | |||
a. | |||
Inspection Scope | |||
The inspectors reviewed Waterford 3's implementation of plant modifications and | |||
procedure changes committed to in their response to Generic Letter 2004-02. | |||
The inspectors observed installation of the containment recirculation sump strainers and | |||
relocation of tri-sodium phosphate baskets. In addition, the inspectors verified that | |||
Waterford 3 has implemented specific procedure changes to control tags, labels, tape, | Waterford 3 has implemented specific procedure changes to control tags, labels, tape, | ||
and other objects inside the containment building. At the time of the exit meeting, | and other objects inside the containment building. At the time of the exit meeting, | ||
Waterford 3 was in the final stages of implementing changes to the containment coatings | Waterford 3 was in the final stages of implementing changes to the containment coatings | ||
assessment program, the latent debris assessment program, and the containment | assessment program, the latent debris assessment program, and the containment | ||
strainer inspection program. At the time of the inspection, industry testing for chemical effects on | strainer inspection program. | ||
At the time of the inspection, industry testing for chemical effects on containment | |||
recirculation sumps was not complete. Since the testing was not complete, Waterford 3 | |||
evaluated the new recirculation sump modifications to the original design basis, | evaluated the new recirculation sump modifications to the original design basis, | ||
Regulatory Guide 1.82, Revision 0. The inspectors reviewed the 10CFR 50.59 | Regulatory Guide 1.82, Revision 0. The inspectors reviewed the 10CFR 50.59 | ||
evaluation to verify that the design meets the original design basis. | evaluation to verify that the design meets the original design basis. | ||
b. | |||
Findings | |||
No findings of significance were identified. This completes the inspection requirements | |||
for this Temporary Instruction. | |||
4OA6 Meetings, Including Exit | |||
Exit Meeting Summary | |||
.1 | |||
On September 25, 2006, the operations inspector discussed the inspection results of the | |||
licensed operator annual requalification examination with Mr. A. Hill, Operations Training | |||
Supervisor. A telephone exit was held with Mr. Hill on September 25, 2006. The | Supervisor. A telephone exit was held with Mr. Hill on September 25, 2006. The | ||
licensee acknowledged the findings presented in both the briefing and the final exit | licensee acknowledged the findings presented in both the briefing and the final exit | ||
meeting. | meeting. | ||
.2 | |||
On December 1, 2006, the health physics inspector presented the Occupational | |||
Radiation Safety inspection results to Ms. K. Cook, Acting General Manager, Plant | |||
Operations, and other members of the staff who acknowledged the findings. The | Operations, and other members of the staff who acknowledged the findings. The | ||
inspector confirmed that proprietary information was not provided or examined during the | inspector confirmed that proprietary information was not provided or examined during the | ||
inspection. | inspection. | ||
Enclosure-28- | |||
Enclosure | |||
-28- | |||
.3 | |||
On December 8, 2006, the inspectors presented the results of Temporary | |||
Instruction 2515/166 to Mr. K. Walsh, Waterford 3 Site Vice President, and other | |||
members of licensee management. Licensee management acknowledged the inspection | members of licensee management. Licensee management acknowledged the inspection | ||
findings. The inspectors identified that they had reviewed proprietary information but had | findings. The inspectors identified that they had reviewed proprietary information but had | ||
returned it to licensee personnel. | returned it to licensee personnel. | ||
.4 | |||
On December 20, 2006, the inspector presented the inspection results to Mr. K. Walsh, | |||
Site Vice President, and other members of his staff who acknowledged the findings. The | |||
inspector confirmed that proprietary information was not provided or examined during the | inspector confirmed that proprietary information was not provided or examined during the | ||
inspection. | inspection. | ||
.5 | |||
On January 16, 2007, the resident inspectors presented the inspection results to | |||
Mr. K. Walsh and other members of licensee management at the conclusion of the | |||
inspection. The licensee acknowledged the findings presented. The inspectors asked | inspection. The licensee acknowledged the findings presented. The inspectors asked | ||
the licensee whether any materials examined during the inspection should be considered | the licensee whether any materials examined during the inspection should be considered | ||
proprietary. No proprietary information was identified. | proprietary. No proprietary information was identified. | ||
the NRC Enforcement Policy for being dispositioned as an NCV.*Part 50 of Title 10 of the Code of Federal Regulations, Appendix E, IV, B,requires a licensee establish emergency action levels based on in-plant | 4OA7 Licensee-Identified Violations | ||
The following violation of very low safety significance (Green) was identified by the | |||
licensee and is a violation of NRC requirements, which meets the criteria of Section VI of | |||
the NRC Enforcement Policy for being dispositioned as an NCV. | |||
* | |||
Part 50 of Title 10 of the Code of Federal Regulations, Appendix E, IV, B, | |||
requires a licensee establish emergency action levels based on in-plant | |||
conditions and instrumentation. Contrary to this, the licensee changed | conditions and instrumentation. Contrary to this, the licensee changed | ||
radiological accident assumptions in their Updated Final Safety Analysis Report | radiological accident assumptions in their Updated Final Safety Analysis Report in | ||
were not made. This was identified in the | 1994, 2001, and 2003, and corresponding changes to emergency action levels | ||
were not made. This was identified in the licensees corrective action program as | |||
Condition Report 2005-3292. This finding is of very low safety significance | Condition Report 2005-3292. This finding is of very low safety significance | ||
because the affected emergency action levels were at the Notification of Unusual | because the affected emergency action levels were at the Notification of Unusual | ||
Event and Alert emergency classifications and did not affect classification at the | Event and Alert emergency classifications and did not affect classification at the | ||
Site Area Emergency or General Emergency levels.ATTACHMENT: SUPPLEMENTAL INFORMATION | Site Area Emergency or General Emergency levels. | ||
ATTACHMENT: SUPPLEMENTAL INFORMATION | |||
Attachment | |||
A-1 | |||
SUPPLEMENTAL INFORMATION | |||
KEY POINTS OF CONTACT | |||
Licensee Personnel | |||
S. Anders, Superintendent, Plant Security | |||
J. Brawley, ALARA Coordinator, Radiation Protection | |||
K. Cook, Acting General manager, Plant Operations | K. Cook, Acting General manager, Plant Operations | ||
L. Dauzat, Operations Supervisor, Radiation Protection | L. Dauzat, Operations Supervisor, Radiation Protection | ||
| Line 687: | Line 1,483: | ||
K. Walsh, Vice President, Operations | K. Walsh, Vice President, Operations | ||
B. Williams, Director, Engineering | B. Williams, Director, Engineering | ||
R. Williams, Licensing | R. Williams, Licensing Engineer | ||
ITEMS OPENED, CLOSED, AND DISCUSSED | |||
Opened | |||
05000382/2006-005-01 | |||
NCV | |||
NUMARC 93- | Recurring Failure of Valve SI-405B to Open | ||
3 | (Section 1R19) | ||
05000382/2006-005-02 | |||
NCV | |||
Excess Torque Resulting in Pressurizer Skirt Bolt | |||
Failures (Section 1R20) | |||
05000382/2006-005-03 | |||
NCV | |||
Failure to Conduct a Required Offsite medical Drill in | |||
2005 (Section 1EP5) | |||
Closed | |||
05000382/2006-005-01 | |||
NCV | |||
Recurring Failure of Valve SI-405B to Open | |||
(Section 1R19) | |||
05000382/2006-005-02 | |||
NCV | |||
Excess Torque Resulting in Pressurizer Skirt Bolt | |||
Failures (Section 1R20) | |||
05000382/2005-002-01 | |||
LER | |||
RCS Leakage Detection Instrumentation and Regulatory | |||
Guide 1.45 | |||
05000382/2005-005-00 | |||
LER | |||
Manual Reactor Trip Upon Loss of All Circulating Water | |||
Pumps and Lowering Condenser Vacuum | |||
05000382/2006-005-03 | |||
NCV | |||
Failure to Conduct a Required Offsite medical Drill in | |||
2005 (Section 1EP5) | |||
Attachment | |||
A-2 | |||
LIST OF DOCUMENTS REVIEWED | |||
Section 1R04: Equipment Alignment (71111.04) | |||
Procedures | |||
Number | |||
Title | |||
Revision | |||
OP-002-005 | |||
Chemical and Volume Control | |||
Revision 21 | |||
Miscellaneous Documents | |||
Updated Final Safety Analysis Report | |||
Flow Diagram - Chemical and Volume Control System, G168, Sheet 2, Rev. 48 | |||
Section 1R05: Fire Protection (71111.05) | |||
Procedure | |||
NUMBER | |||
TITLE | |||
REVISION | |||
Administrative Procedure | |||
UNT-005-013 | |||
Fire Protection Program | |||
9 | |||
Operating Procedure 009-004 | |||
Fire Protection | |||
11-8 | |||
Maintenance Procedure MM- | |||
007-010 | |||
Fire Extinguisher Inspection and | |||
Extinguisher Replacement | |||
13 | |||
Administrative | |||
Procedure UNT-005-013 | |||
Fire Protection Program | |||
9 | |||
Fire Protection Procedure FP- | |||
001-015 | |||
Fire Protection System | |||
Impairments | |||
17 | |||
Fire Protection Procedure FP- | |||
001-017 | |||
Transient Combustibles | |||
19 | |||
Training Manual Procedure | |||
NTP-202 | |||
Fire Protection Training | |||
11-4 | |||
Section 1R12: Maintenance Rule (71111.12) | |||
Procedures | |||
Number | |||
Title | |||
Revision | |||
DC-121 | |||
Maintenance Rule | |||
1 | |||
NUMARC 93-01 | |||
Industry Guideline for Monitoring the Effectiveness | |||
of Maintenance at Nuclear Power Plants | |||
3 | |||
Attachment | |||
A-3 | |||
Condition Reports | |||
CR-WF3-2005-3084 | |||
CR-WF3-2005-3270 | |||
CR-WF3-2005-3692 | CR-WF3-2005-3692 | ||
CR-WF3-2005-4852 | CR-WF3-2005-4852 | ||
| Line 700: | Line 1,591: | ||
CR-WF3-2006-0191 | CR-WF3-2006-0191 | ||
CR-WF3-2006-0212 | CR-WF3-2006-0212 | ||
CR-WF3-2006- | CR-WF3-2006-0346 | ||
CR-WF3-2006-0395 | |||
CR-WF3-2006-0397 | |||
CR-WF3-2006-0467 | CR-WF3-2006-0467 | ||
CR-WF3-2006-0733 | CR-WF3-2006-0733 | ||
| Line 706: | Line 1,599: | ||
CR-WF3-2006-0857 | CR-WF3-2006-0857 | ||
CR-WF3-2006-1266 | CR-WF3-2006-1266 | ||
CR-WF3-2006- | CR-WF3-2006-1297 | ||
CR-WF3-2006-1926 | |||
CR-WF3-2006-2247 | |||
CR-WF3-2006-2384 | CR-WF3-2006-2384 | ||
CR-WF3-2006-2398 | CR-WF3-2006-2398 | ||
| Line 712: | Line 1,607: | ||
CR-WF3-2006-2819 | CR-WF3-2006-2819 | ||
CR-WF3-2006-3276 | CR-WF3-2006-3276 | ||
CR-WF3-2006- | CR-WF3-2006-3285 | ||
Miscellaneous Documents | |||
Engineering Report W-SE- | |||
2005-001 | |||
Waterford 3 Maintenance Rule Periodic (a)(3) | |||
Assessment | Assessment | ||
0 | |||
OP-903- | Section 1R15: Operability Evaluations | ||
OP-035- | Procedures: | ||
NUMBER | |||
TITLE | |||
REVISION | |||
EN-OP-104 | |||
Operability Evaluation | |||
1 | |||
OP-903-097 | |||
Pressurizer Heater Capacity Verification | |||
8 | |||
OP-035-000 | |||
Notification Matrix | |||
6 | |||
Miscellaneous Documents | |||
NUMBER | |||
TITLE/SUBJECT | |||
REVISION | |||
Waterford 3 LER | |||
2003-001-000 | |||
Loose Breaker Fuse Rendered One Bank of Pressurizer | |||
Proportional Heaters Inoperable | |||
0 | |||
Condition Reports | |||
CR-WF3-2006-3125 | |||
CR-WF3-2006-3128 | |||
CR-WF3-2004-0846 | CR-WF3-2004-0846 | ||
CR-WF3-2006-4510 | CR-WF3-2006-4510 | ||
CR-WF3-2000- | CR-WF3-2000-0228 | ||
CR-WF3-2006-4501 | |||
CR-WF3-1997-2491 | |||
CR-WF3-2006-3357 | CR-WF3-2006-3357 | ||
CR-WF3-2006- | CR-WF3-2006-2418 | ||
CR-WF3-2003- | CR-WF3-1997-2226 | ||
CR-WF3-2002-1757 | |||
2 | CR-WF3-2003-0827 | ||
Section 1R19: Postmaintenance Testing (71111.19) | |||
9 | |||
Attachment | |||
A-4 | |||
Procedures | |||
NUMBER | |||
TITLE | |||
REVISION | |||
EPP-462, | MI-003-115 | ||
Desk Guide 20, | Startup and Control Drawer Calibration Channel | ||
Drill 2005-03, | 1 or 2 | ||
Drill 2005-07, | 3 | ||
MI-012-012 | |||
November 2 (all 2006)Section 1EP4: Emergency Action Level and Emergency Plan Changes (71114.04)Safety Evaluation Report, | Removal and Installation of Excore Detectors | ||
June 20, | 3 | ||
QA-7-2005-WF3-1, | OP-903-101 | ||
Startup Channel Functional Test Channel 1 and | |||
2 | |||
6 | |||
OP-903-033 | |||
Cold Shutdown IST Valve Tests | |||
20 | |||
OP-903-003 | |||
Charging Pump operability Check | |||
Rev. 11. | |||
Change 1 | |||
ENS-MA-114 | |||
Post Maintenance Testing | |||
5 | |||
Miscellaneous Documents | |||
NUMBER | |||
TITLE/SUBJECT | |||
REVISION | |||
CEP-IST-1 | |||
IST Bases Document | |||
3 | |||
Condition Reports | |||
CR-WF3-2006-3610 | |||
CR-WF3-2005-1362 | |||
CR-WF3-2000-1347 | |||
Work Orders | |||
44779-01, 65817-01, 73483, | |||
Procedures | |||
Number | |||
Title | |||
Revision | |||
OP-903-003 | |||
Charging Pump Operability Check | |||
Revision 11, | |||
Change 1 | |||
OP-903-121 | |||
Safety Systems Quarterly IST Valve Tests | |||
7 | |||
OP-903-127 | |||
Reactor Trip Circuit Breaker Post | |||
Maintenance Test | |||
3 | |||
OP-903-013 | |||
Monthly Channel Checks | |||
14 | |||
OP-903-011 | |||
High Pressure Safety Injection Pump | |||
Preservice Operability Check | |||
9 | |||
Attachment | |||
A-5 | |||
CEP-IST-1 | |||
IST Bases Document | |||
3 | |||
Work Orders | |||
50947-1, 51041014-01, 63598-01, | |||
Section 1R23: Temporary Plant Modifications (71111.23) | |||
Procedure | |||
NUMBER | |||
TITLE | |||
REVISIONS | |||
EN-LI-113 | |||
Licensing Basis Document Change | |||
Process | |||
1 | |||
Miscellaneous Documents | |||
NUMBER | |||
TITLE/SUBJECT | |||
REVISION | |||
ER-W3-2006-0264- | |||
000 | |||
Temporary Air Compressors to Augment Station Air | |||
0 | |||
NRC Information | |||
Notice 2004-17 | |||
Loose Part Detection and Computerized Eddy Current | |||
Data Analysis in Steam Generators | |||
0 | |||
ER-W3-2006-0375- | |||
000 | |||
Install Loose Parts Monitoring Sensors on the Steam | |||
Generators | |||
0 | |||
Condition Reports | |||
CR-WF3-2006-4524 | |||
Work Order | |||
84381 | |||
Section 1EP3: Emergency Response Organization Augmentation Testing (71114.03) | |||
EP-002-015, Emergency Responder Activation, Revision 8 | |||
EP-003-070, Emergency Communications Systems Routine Testing, Revision 24 | |||
EPP-462, Evaluation of Pager Tests, Revision 0 | |||
Desk Guide 20, Evaluation of Pager Tests, Revision 20 | |||
Drill 2005-03, Unannounced Off-Hours Callout Drill, conducted August 11, 2005 | |||
Drill 2005-07, Backup Emergency Response Organization Pager Code Drill, conducted | |||
Attachment | |||
A-6 | |||
September 12, 2005 | |||
Drill 2006-07, Backup Emergency Response Organization Pager Code Drill, conducted | |||
November 14, 2006 | |||
Evaluation Worksheets for Pager Tests conducted: January 31, February 22, March 18, April 9, | |||
May 9, June 22, July 25, November 8 (all 2005), January 15, February 22, September 6, and | |||
November 2 (all 2006) | |||
Section 1EP4: Emergency Action Level and Emergency Plan Changes (71114.04) | |||
Safety Evaluation Report, Proposed Emergency Action Levels Based on Revision 4 to Nuclear | |||
Energy Institute 99-01, Entergy Operations Inc., Waterford Steam Electric Station, Unit 3, dated | |||
June 20, 2005 | |||
Section 1EP5: Correction of Emergency Preparedness Weaknesses and | |||
Deficiencies (71114.05) | |||
EP-002-150, Emergency Plan Implementing Records, | |||
W3D3-2005-011, Hurricane Katrina Event Report | |||
QA-7-2005-WF3-1, Quality Assurance Audit Report: Emergency Plan | |||
QA-7-2005-WF3-1, Followup to the 2005 QA Emergency Planning Audit | QA-7-2005-WF3-1, Followup to the 2005 QA Emergency Planning Audit | ||
QA-7-2006-WF3-1, | QA-7-2006-WF3-1, Quality Assurance Audit Report: Emergency Plan | ||
QS-2005-W3-003, | QS-2005-W3-003, Quality Assurance Surveillance Report: Emergency Plan Respiratory | ||
Equipment and Reviews of CR-ECH-2004-00096 and CR-ECH-2004-0389" | |||
Evaluation Reports for: | |||
Drill 2005-01, conducted February 17, 2005 | |||
Drill 2005-04, conducted August 4, 2005 | |||
Drill 2005-06, conducted December 7, 2005 | Drill 2005-06, conducted December 7, 2005 | ||
Drill 2006-02, conducted May 25, 2006 | Drill 2006-02, conducted May 25, 2006 | ||
| Line 750: | Line 1,790: | ||
Drill 2006-04, conducted July 27, 2006 | Drill 2006-04, conducted July 27, 2006 | ||
Drill 2006-05, conducted September 21, 2006 | Drill 2006-05, conducted September 21, 2006 | ||
Drill 2006-09, | Drill 2006-09, Offsite Medical Response Drill, conducted October 25, 2006 | ||
LO-WLO-2005-0043, | LO-WLO-2005-0043, 1st and 2nd Quarter 2005 Roll-Up Assessment: Emergency Planning | ||
Department | |||
LO-WLO-2005-0082, 3rd Quarter 2005 Roll-Up Assessment: Emergency Planning Department | |||
Attachment | |||
A-7 | |||
LO-WLO-2005-0106, 4th Quarter 2005 Roll-Up Assessment: Emergency Planning Department | |||
LO-WLO-2006-0044, 1st Quarter 2006 Roll-Up Assessment: Emergency Planning Department | |||
Assessment Report LO-WLO-2005, | LO-WLO-2006-0069, 2nd Quarter 2006 Roll-Up Assessment: Emergency Planning Department | ||
Assessment Report LO-WLO-2006-041, | LO-WLO-2006-0103, 3rd Quarter 2006 Roll-Up Assessment: Emergency Planning Department | ||
Assessment, | SNAPSHOT Assessment, Siren Battery Storage, October 19, 2005 | ||
Condition Reports:2005-0046, -1060, -3292, -3471, -3602, -3702, -4407, -4899 | Assessment Report LO-WLO-2005, Emergency Planning Performance Indicator Assessment, | ||
2006-0234, -897, -1195, -1639, -1900, -2088, -2852, -3247, - | October 26, 2005 | ||
ENS-RP-106, Radiological Survey Documentation, Revision | Assessment Report LO-WLO-2006-00, Emergency Response Organization Staffing, September | ||
25, 2006 | |||
Assessment Report LO-WLO-2006-041, Emergency Planning Performance Indicator | |||
Assessment, April 21, 2006 | |||
Assessment Report LO-WLO-2006-000, Emergency Planning Performance Indicator | |||
Assessment, October 29, 2006 | |||
EN-HU-103, Human Performance Error Reviews, Revision 0 | |||
Condition Reports: | |||
2005-0046, -1060, -3292, -3471, -3602, -3702, -4407, -4899 | |||
2006-0234, -897, -1195, -1639, -1900, -2088, -2852, -3247, -4418 | |||
Section 2OS1: Access Controls to Radiologically Significant Areas (71121.01) | |||
Corrective Action Documents | |||
2006-03645, 2006-03661, 2006-03721,2006-03736, 2006-03739, 2006-03741, 2006-03812, | |||
Procedures | |||
ENS-RP-102, | |||
Radiological Control, Revision 0 | |||
ENS-RP-105, Radiation Work Permits, Revision 7 | |||
ENS-RP-106, Radiological Survey Documentation, Revision 0 | |||
Audits and Assessments | |||
LO-WLO-2006-00067-01, Access Control to Radiologically Significant Areas | |||
Radiation Work Permit | |||
RWP-2006-0005, Tours and Inspections | |||
RWP-2006-0508, Reactor Coolant Pump Motor and Seal Replacement | |||
RWP-2006-0509, Primary Manways | RWP-2006-0509, Primary Manways | ||
RWP-2006-0510, Nozzle Dams | RWP-2006-0510, Nozzle Dams | ||
RWP-2006-0511, Eddy Current Steam Generators | RWP-2006-0511, Eddy Current Steam Generators | ||
RWP-2006-0600, Health Physics Surveys | RWP-2006-0600, Health Physics Surveys | ||
RWP-2006-0601, Rigging RWP | RWP-2006-0601, Rigging RWP | ||
Attachment | |||
A-8 | |||
RWP-2006-0603, Minor Maintenance Locked High Radiation Areas | |||
RWP-2006-0608, Safety Injection Sump Installation | |||
RWP-2006-0614, Pressurizer Manway and Valves | RWP-2006-0614, Pressurizer Manway and Valves | ||
RWP-2006-0618, Remove/Replace Insulation in the Reactor Building and Annulus | RWP-2006-0618, Remove/Replace Insulation in the Reactor Building and Annulus | ||
RWP-2006-0702, Reactor Disassembly | RWP-2006-0702, Reactor Disassembly | ||
RWP-2006-0708, Remove/Replace Startup Detector No. 2 Section 2OS2: ALARA Planning and Controls (71121.02) | RWP-2006-0708, Remove/Replace Startup Detector No. 2 | ||
Section 2OS2: ALARA Planning and Controls (71121.02) | |||
Procedures | |||
CE-002-006, Maintaining Reactor Coolant Chemistry, Revision 13 | |||
EN-RP-104, Personnel Contamination Events, Revision 1 | |||
EN-RP-109, Hot Spot Program, Revision 2 | EN-RP-109, Hot Spot Program, Revision 2 | ||
EN-RP-110, ALARA Program, Revision 2 | EN-RP-110, ALARA Program, Revision 2 | ||
HP-002-222, Steam Generator Radiological Controls, Revision | HP-002-222, Steam Generator Radiological Controls, Revision 7 | ||
Section 4OA1: Performance Indicator Verification (71151) | |||
EN-LI- | Procedures | ||
OP-002- | EN-LI-114, Performance Indicator Process, Revision 1 | ||
EP-001- | Miscellaneous Documents | ||
QA/Oversight Observations, November 28, 2008 | |||
RF-14 Actual RCS Cleanup, November 28, 2008 | |||
Waterford Steam Electric Station Emergency | 4OA2 | ||
Operations Department Performance | Identification and Resolution of Problems (71152) | ||
Procedure | |||
NUMBER | |||
TITLE | |||
REVISIONS | |||
OP-903-094 | |||
ESTAS Subgroup Relay Test - Operating | |||
10 | |||
EN-LI-113 | |||
Licensing Basis Document Change | |||
Process | |||
1 | |||
EN-LI-102 | |||
Corrective Action Process | |||
7 | |||
OP-002-004 | |||
Chilled Water System | |||
12 | |||
OP-002-003 | |||
Component Cooling Water System | |||
12 and 13 | |||
EP-001-001 | |||
Recognition and Classification of | |||
Emergency Conditions | |||
20-2 and 21 | |||
EP-002-010 | |||
Notifications and Communications | |||
30 | |||
EP-002-052 | |||
Protective Action Guidelines | |||
19 | |||
Attachment | |||
A-9 | |||
Miscellaneous Documents | |||
NUMBER | |||
TITLE/SUBJECT | |||
REVISION | |||
ER-W3-00-0541-00 | |||
Evaluate the Essential Chilled Water Leaving | |||
Temperature Setpoint | |||
0 | |||
Quarterly Trend | |||
Report | |||
2nd Quarter 2006 | |||
0 | |||
Desk Guide 17 | |||
Drill Control Team Documentation | |||
2 | |||
Training Evaluation Action Request 2006-1230 | |||
Waterford Steam Electric Station Emergency Plan | |||
33 | |||
Operations Department Performance Indicator | |||
2006 | |||
Condition Reports | |||
CR-WF3-1993-0265 | |||
CR-WF3-1993-0289 | |||
CR-WF3-1994-0642 | CR-WF3-1994-0642 | ||
CR-WF3-1995-0963 | CR-WF3-1995-0963 | ||
| Line 791: | Line 1,917: | ||
CR-WF3-1995-1047 | CR-WF3-1995-1047 | ||
CR-WF3-1996-0043 | CR-WF3-1996-0043 | ||
CR-WF3-1996- | CR-WF3-1996-0084 | ||
CR-WF3-1996-1852 | |||
CR-WF3-1997-0028 | |||
CR-WF3-1997-0288 | CR-WF3-1997-0288 | ||
CR-WF3-1997-2778 | CR-WF3-1997-2778 | ||
| Line 797: | Line 1,925: | ||
CR-WF3-2000-0054 | CR-WF3-2000-0054 | ||
CR-WF3-2000-0150 | CR-WF3-2000-0150 | ||
CR-WF3-2000- | CR-WF3-2000-1553 | ||
CR-WF3-2002-1876 | |||
CR-WF3-2006-3402 | |||
CR-WF3-2006-3487 | CR-WF3-2006-3487 | ||
CR-WF3-2006-4165 | CR-WF3-2006-4165 | ||
CR-WF3-2006-0609 | CR-WF3-2006-0609 | ||
CR-WF3-2006-1145 | CR-WF3-2006-1145 | ||
CR-WF3-2006- | CR-WF3-2006-3402 | ||
4OA5 Other: NRC Temporary Instructions 2515/166 | |||
Calculation | |||
NUMBER | |||
B430, Sht. X-23J- | TITLE | ||
B430, Sht. X-23J- | REVISION | ||
GENE-0000-0054-9349 | |||
SIS Sump Strainer Stress Report | |||
0 | |||
Engineering Requests | |||
NUMBER | |||
TITLE | |||
REVISION | |||
ER-W3-2003-0394-001 | |||
Safety Injection Sump | |||
Modifications | |||
0 | |||
Drawings | |||
NUMBER | |||
TITLE | |||
REVISION | |||
06-594, Sht. #1 | |||
Waterford 3 Containment & | |||
Strainers | |||
A | |||
06-595, Sht. #2 | |||
Waterford 3 Containment & | |||
Strainers | |||
A | |||
06-596, Sht. #3 | |||
Waterford 3 Containment & | |||
A | |||
Attachment | |||
A-10 | |||
Strainers | |||
06-597, Sht. #4 | |||
Waterford 3 Containment & | |||
Strainers | |||
A | |||
06-598, Sht. #5 | |||
Waterford 3 Containment & | |||
Strainers | |||
A | |||
06-486, Sht. #0 | |||
LT-SI-7145AS & LT-SI-7145BS | |||
Local Mounts | |||
4 | |||
B430, Sht. X-23J-45 | |||
Instrument Installation Details | |||
1 | |||
B430, Sht. X-23D-8A | |||
Instrument Installation Details | |||
2 | |||
B430, Sht. X-23J-25A | |||
Instrument Installation Details | |||
5 | |||
B430, Sht. X-23J-44 | |||
Instrument Installation Details | |||
2 | |||
B430, Sht. X-23J-28 | |||
Instrument Installation Details | |||
8 | |||
Condition Reports | |||
CR-WF3-2006-03273 | |||
Miscellaneous | |||
NUMBER | |||
TITLE | |||
REVISION/DATE | |||
LPL-EQMI-08.01 | |||
Environmental Qualification | |||
Maintenance Input for Rosemount | |||
Model 1153 Series A, B &D, 1154 & | Model 1153 Series A, B &D, 1154 & | ||
1154 Series H Transmitters and | 1154 Series H Transmitters and | ||
1159 Remote Seals | 1159 Remote Seals | ||
9 | |||
SQ-IC-03 | |||
Rosemount Pressure Transmitters | |||
13 | |||
LPL-EQA-08.01B | |||
Environmental Qualification | |||
Assessment for the Rosemount | |||
1154 Transmitters Used in the | 1154 Transmitters Used in the | ||
Waterford SES Unit No. 3 | Waterford SES Unit No. 3 | ||
3 | |||
LPL-EQA-08.01F | |||
Environmental Qualification | |||
Assessment for the Rosemount | |||
1159 Remote Seal System Used in | 1159 Remote Seal System Used in | ||
the Waterford SES Unit No. 3 | the Waterford SES Unit No. 3 | ||
0 | |||
NOECP-333, Att. 7.1 | |||
Construction Material Testing | |||
Document, Grout/Mortar Data, Lab | |||
No. W2576, WO No. 76399 | No. W2576, WO No. 76399 | ||
2 | 2 | ||
}} | }} | ||
Latest revision as of 03:13, 15 January 2025
| ML070450251 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/13/2007 |
| From: | Clark J NRC/RGN-IV/DRP/RPB-E |
| To: | Walsh K Entergy Operations |
| References | |
| IR-06-005 | |
| Download: ML070450251 (43) | |
See also: IR 05000382/2006005
Text
February 13, 2007
Kevin Walsh
Vice President Operations
Waterford 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INTEGRATED
INSPECTION REPORT 05000382/2006005
Dear Mr. Walsh:
On December 31, 2006, the NRC completed an inspection at your Waterford Steam Electric
Station, Unit 3. The enclosed report documents the inspection findings, which were discussed
on January 16, 2007, with you and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
This report documents two self-revealing and one NRC identified findings of very low safety
significance (Green). These findings were determined to involve violations of NRC
requirements. Additionally, a licensee-identified violation, which was determined to be of very
low safety significance is listed in this report. However, because of the very low safety
significance and because they were entered into your corrective action program, the NRC is
treating these violations as noncited violations (NCVs), consistent with Section VI.A.1 of the
NRC Enforcement Policy. If you contest any NCV in this report, you should provide a response
within 30 days of the date of this inspection report, with the basis for your denial, to the
U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC
20555-0001, with copies to the Regional Administrator, U.S. Nuclear Regulatory Commission,
Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011; the Director, Office of
Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the
NRC Resident Inspector at the Waterford Steam Electric Station, Unit 3, facility.
Entergy Operations, Inc.
-2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its
enclosures, and your response, if any, will be made available electronically for public inspection
in the NRC Public Document Room or from the Publicly Available Records (PARS) component
of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Jeff A. Clark, Chief
Project Branch E
Division of Reactor Projects
Docket: 50-382
License: NPF-38
Enclosure: NRC Inspection Report 050000382/2006005
w/Attachment: Supplemental Information
cc w/enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70825-1697
Entergy Operations, Inc.
-3-
Director, Nuclear Safety Assurance
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Richard Penrod, Senior Environmental
Scientist, State Liaison Officer
Office of Environmental Services
Northwestern State University
Russsell Hall, Room 201
Natchitoches, LA 71497
Parish President
Council
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Chairperson
Denton Field Office
Chemical and Nuclear Preparedness and Protection Division
Office of Infrastructure Protection
Preparedness Directorate
Dept. of Homeland Security
800 North Loop 288
Federal Regional Center
Denton, TX 76201-3698
Entergy Operations, Inc.
-4-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (GFL1)
Branch Chief, DRP/E (ZKD)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (MSH3)
Regional State Liaison Officer (WAM)
NSIR/DPR/EPD (JTJ1)
NSIR/DPR/EPD (REK)
D. Cullison, OEDO RIV Coordinator (DGC)
ROPreports
WAT Site Secretary (AHY)
SUNSI Review Completed: _JAC____
ADAMS: / Yes
G No Initials: __JAC____
/ Publicly Available G Non-Publicly Available G Sensitive
/ Non-Sensitive
R:\\_REACTORS\\_WAT\\2006\\WT2006-05RP-GFL.wpd
RI:DRP/E
SRI:DRP/E
C:DRS/EB1
C:DRS/OB
C:DRS/EB2
DHOverland
GFLarkin
WBJones
ATGody
LJSmith
T-JAC
T-JAC
/RA/
/RA/
/RA/
2/5/07
2/5/07
2/5/07
2/8/07
2/8/07
C:PSB
C:DRP/E
MPShannon
JAClark
/RA/
/RA/
2/8/07
2/13/07
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket:
50-382
License No.:
Report No.:
Licensee:
Entergy Operations, Inc.
Facility:
Waterford Steam Electric Station, Unit 3
Location:
Hwy. 18
Killona, Louisiana
Dates:
October 8 through December 31, 2006
Inspectors:
G. Larkin, Senior Resident Inspector
D. Overland, Resident Inspector
J. Kirkland, Project Engineer, Project Branch E
T. McKernon, Senior Operations Engineer, Operations Branch
L. Carson II, Senior Health Physics Inspector, Plant Support
Branch
G. George, Reactor Inspector, Engineering Branch 1
P. Elkmann, Emergency Preparedness Inspector, Operations
Branch
Approved By:
Jeff A. Clark, Chief, Project Branch E
ATTACHMENTS: Supplemental Information
Enclosure
SUMMARY OF FINDINGS
IR05000382/2006-005; 10/08/2006-12/31/2006; Waterford Steam Electric Station, Unit 3;
Postmaintenance Testing; Refueling and Other Outage Activities; Emergency Plan Biennial
Program Inspection
The report covered a 3-month period of inspection by resident inspectors, a project engineer, a
senior operations engineer, a senior health physics inspector, a reactor inspector, and an
emergency preparedness inspector. The inspectors identified two Green findings, which were
noncited violations, and one apparent violation with potential safety significance greater than
Green. The significance of most findings is indicated by their color (Green, White, Yellow, or
Red) using Inspection Manual Chapter 0609, Significance Determination Process. Findings
for which the Significance Determination Process does not apply may be Green or be assigned
a severity level after NRC management review. The NRCs program for overseeing the safe
operation of commercial nuclear power reactors is described in NUREG-1649, Reactor
Oversight Process, Revision 3, dated July 2000.
A.
NRC-Identified and Self-Revealing Findings
Cornerstone: Initiating Events
Green. A self-revealing violation of very low safety significance of Technical Specification 6.8.1.a was identified for an inadequate procedure for installing a
bolted joint that provided structural support for the pressurizer. Specifically, the
installation procedure required applying 8750 ft-lbs torque to make up a bolted
joint. Following corrective actions, the licensee discovered that the break away
torque on several bolts exceeded 13,400 ft-lbs. The improper bolt tensioning
resulted in failure of 1 of 16 bolts and the partial cracking of 3 other bolts that
potentially could affect the pressurizers function in a safe shutdown earthquake
event. The licensee has since replaced all pressurizer skirt bolting and installed
the bolting to an approved torque specification.
This finding is more than minor because if left uncorrected it could have become
a more safety significant concern. The finding was associated with the
equipment performance attribute of the Initiating Events cornerstone, and it
affected the cornerstone objective to limit the likelihood of those events that
upset plant stability and challenge critical safety functions during power
operations. This finding was determined to have very low safety significance
because a seismic event would not have resulted in a loss-of-coolant accident
that exceeded the Technical Specification limit for reactor coolant system
leakage. Therefore, this issue screened out in Phase 1 of the Manual
Chapter 0609 Significance Determination Process, because there was no
actual loss of safety function (Section 1R20).
Enclosure
-2-
Cornerstone: Mitigating Systems
Green. A self-revealing violation of very low safety significance of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, was identified for the
failure to implement effective corrective actions to prevent recurrence of a
significant condition adverse to quality. Specifically, on multiple occasions
Valve SI-405B failed to stroke open while attempting to place shutdown cooling
Train B in service. This violation of Appendix B, Criterion XVI, is being treated as
a noncited violation and was entered into the licensees corrective action
program.
This finding is greater than minor because it affects the Mitigating Systems
cornerstone attribute of equipment operability, availability, and reliability of
systems that respond to initiating events. This finding was evaluated using the
significance determination process and was determined to be a finding of very
low safety significance because, in each condition identified, it did not represent
an actual loss of a safety function. The inspectors also determined that the
cause of the condition had crosscutting aspects associated with the corrective
action program component in the problem identification and resolution area.
This assessment was based on the fact that the licensee failed to thoroughly
evaluate the problem such that the resolutions addressed the causes and
therefore, corrective actions were inadequate to prevent repetition
(Section 1R19).
Cornerstone: Emergency Preparedness
Green. The inspector identified a noncited violation of 10 CFR 50.54(q) for
failure to conduct during 2005 an offsite drill involving a simulated contaminated
individual with provision for participation by local medical support services as
required by the licensees emergency plan. The licensees failure to conduct the
drill is a performance deficiency because the licensee identified the drills
postponement in October 2005, but did not appropriately reschedule the drill. In
addition, the licensee did not request NRC approval to deviate from this
emergency plan requirement.
This finding is greater than minor because a degraded proficiency in providing
appropriate medical treatment for a contaminated individual has a potential
impact on the safety of licensee employees and the public. The finding is of very
low safety significance because the licensee failed to conduct only one required
drill during the inspection period January 2005 through December 2006, and the
drill was not appropriately rescheduled with NRC approval. This finding is a
noncited violation of 10 CFR 50.54(q) and 10 CFR Part 50, Appendix E, IV, F.1.
The licensee has entered this issue into their corrective action system as
Condition Report 2006-4429 (Section 1EP5).
Enclosure
-3-
B.
Licensee-Identified Violations
Violations of very low safety significance, which were identified by the licensee have
been reviewed by the inspectors. Corrective actions taken or planned by the licensee
have been entered into the licensees corrective action program. These violations and
corrective actions are listed in Section 4OA7 of this report.
Enclosure
-4-
REPORT DETAILS
Summary of Plant Status: The plant was operated at approximately 100 percent power from
October 8 to November 22, 2006, when reactor power was reduced to 85 percent power to
comply with a Technical Specification requirement to reduce power to compensate for a main
steam safety valve lift point setting found outside of its allowed tolerance. Reactor power was
increased to 100 percent power on November 23, 2006. On November 25, 2006, operators
commenced a plant shutdown for Refueling Outage 14. Operators restarted the reactor plant
on December 26, 2006 and reached 100 percent power on December 30, 2006, and remained
at 100 percent power through the end of the report period.
1.
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity
1R01
Adverse Weather Protection (71111.01)
.1
Readiness For Seasonal Susceptibilities
a.
Inspection Scope
The inspectors completed a review of the licensees readiness of seasonal
susceptibilities involving low seasonal temperatures and high winds. The inspectors:
(1) reviewed plant procedures, the Updated Final Safety Analysis Report, and Technical
Specifications to ensure that operator actions defined in adverse weather procedures
maintained the readiness of essential systems; (2) walked down portions of the three
systems listed below to ensure that adverse weather protection features (heat tracing,
space heaters and weatherized enclosures) were sufficient to support operability,
including the ability to perform safe shutdown functions; (3) evaluated operator staffing
levels to ensure the licensee could maintain the readiness of essential systems required
by plant procedures; and (4) reviewed the corrective action program to determine if the
licensee identified and corrected problems related to adverse weather conditions.
December 13, 2006: Main Steam System, Firewater System, and Emergency
Feedwater System
Documents reviewed by the inspectors included Operations Procedure OP-901-521,
Severe Weather and Flooding, Revision 4-3, Operations Procedure OP-002-007,
Freeze Protection and Temperature Maintenance, Revision 11, and Design Basis
Document W3-DBD-003, Emergency Feedwater System.
The inspectors completed one sample.
b.
Findings
No findings of significance were identified.
Enclosure
-5-
1R04
Equipment Alignment (71111.04)
.1
Partial Walkdown
a.
Inspection Scope
The inspectors: (1) walked down portions of the two below listed risk important systems
and reviewed plant procedures and documents to verify that critical portions of the
selected systems were correctly aligned; and (2) compared deficiencies identified during
the walk down to the licensees Updated Final Safety Analysis Report and corrective
action program to ensure problems were being identified and corrected.
October 10, 2006: Chemical and Volume Control System Train A
December 11, 2006: Shutdown Cooling System Train A
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed two samples.
b.
Findings
No findings of significance were identified.
1R05
Fire Protection (71111.05)
.1
Quarterly Inspection
a.
Inspection Scope
The inspectors walked down the six below listed plant areas to assess the material
condition of active and passive fire protection features and their operational lineup and
readiness. The inspectors: (1) verified that transient combustibles and hot work
activities were controlled in accordance with plant procedures; (2) observed the
condition of fire detection devices to verify they remained functional; (3) observed fire
suppression systems to verify they remained functional and that access to manual
actuators was unobstructed; (4) verified that fire extinguishers and hose stations were
provided at their designated locations and that they were in a satisfactory condition;
(5) verified that passive fire protection features (electrical raceway barriers, fire doors,
fire dampers, steel fire proofing, penetration seals, and oil collection systems) were in a
satisfactory material condition; (6) verified that adequate compensatory measures were
established for degraded or inoperable fire protection features and that the
compensatory measures were commensurate with the significance of the deficiency;
and (7) reviewed the Updated Final Safety Analysis Report to determine if the licensee
identified and corrected fire protection problems.
October 10, 2006: Fire Zones RAB 16, 23, 36, 39, and Fuel Handling Building
October 16, 2006: Fire Zones RAB 2, 16, 18 and 19
Enclosure
-6-
October 18, 2006: Fire Zones RAB 2, 8A, 36, 37, and ultimate heat sink Train A
November 21, 2006: Fire Zones RAB 1E, 6, 7, 11, 12, 13
November 30, 2006: Fire Zones RAB 2, 8B, 23, 31, 39
December 5, 2006: Fire Zones RAB 15, 19, 20, 21, 22, Containment Building,
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed six samples.
b.
Findings
No findings of significance were identified.
1R06
Flood Protection Measures (71111.06)
.2
Semi-annual Internal Flooding
a.
Inspection Scope
The inspectors: (1) reviewed the Updated Final Safety Analysis Report, the flooding
analysis, and plant procedures to assess seasonal susceptibilities involving external
flooding; (2) reviewed the Updated Final Safety Analysis Report and corrective action
program to determine if the licensee identified and corrected flooding problems;
(3) inspected underground bunkers/manholes to verify the adequacy of (a) sump
pumps, (b) level alarm circuits, (c) cable splices subject to submergence, and
(d) drainage for bunkers/manholes; (4) verified that operator actions for coping with
flooding can reasonably achieve the desired outcomes; and (5) walked down the one
below listed areas to verify the adequacy of: (a) equipment seals located below the
floodline, (b) floor and wall penetration seals, (c) watertight door seals, (d) common
drain lines and sumps, (e) sump pumps, level alarms, and control circuits, and
(f) temporary or removable flood barriers.
December 5, 2006: Reactor Containment Building
The inspectors reviewed calculation MN(Q)-6-4, Water Level Inside Containment,
dated November 2, 1978.
The inspectors completed one sample.
b.
Findings
No findings of significance were identified.
Enclosure
-7-
1R11
Licensed Operator Requalification Program (71111.11)
.1
Biennial Inspection
a.
Inspection Scope
The inspector reviewed the annual operating examination test results for 2006. Since
this was the first half of the biennial requalification cycle, the licensee was not required
to administer a written examination. These results were assessed to determine if they
were consistent with NUREG 1021, Operator Licensing Examination Standards for
Power Reactors, guidance and Manual Chapter 0609, Appendix I, Operator
Requalification Human Performance Significance Determination Process,
requirements. This review included examination of test results for a total of 42 licensed
operators, a total of 9 crews, which included: shift-standing senior operators, staff
senior operators, shift-standing reactor operators, and staff reactor operators. All crews
and individuals passed the requalification examinations.
The inspector completed one sample.
b.
Findings
No findings of significance were identified.
.2
Quarterly Inspection
a.
Inspection Scope
On November 6-7, 2006, the inspectors observed training of senior reactor operators
and reactor operators to identify deficiencies and discrepancies in the training, to assess
operator performance, and to assess the evaluators critique. The training scenario
involved a simulated plant shutdown exercise in preparation for the plant shutdown on
November 26, 2006 for a plant refueling outage.
Documents reviewed by the inspectors included:
Operations Procedure OP-010-005, Plant Shutdown, Revision 5
Emergency Planning Procedure EP-001-001, Recognition and Classification of
Emergency Conditions, Revision 21
The inspectors completed one sample.
b.
Findings
No findings of significance were identified.
Enclosure
-8-
1R12
Maintenance Effectiveness (71111.12)
a.
Inspection Scope
The inspectors reviewed the two below listed Maintenance Rule scoped systems that
have displayed performance problems to: (1) verify the appropriate handling of
structure, system, and component performance or condition problems; (2) verify the
appropriate handling of degraded structure, system, and component functional
performance; (3) evaluate the role of work practices and common cause problems; and
(4) evaluate the handling of structure, system, and component issues reviewed under
the requirements of the Maintenance Rule, 10 CFR Part 50 Appendix B, and the
Technical Specifications.
Essential Chill Water System
Startup Transformers (Offsite Power)
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed two samples.
b.
Findings
No findings of significance were identified.
1R13
Maintenance Risk Assessments and Emergent Work Control (71111.13)
.1
Risk Assessment and Management of Risk
a.
Inspection Scope
The inspectors reviewed the four below listed assessment activities to verify:
(1) performance of risk assessments when required by 10 CFR 50.65 (a)(4) and
licensee procedures prior to changes in plant configuration for maintenance activities
and plant operations; (2) the accuracy, adequacy, and completeness of the information
considered in the risk assessment; (3) that the licensee recognizes, and/or enters as
applicable, the appropriate licensee-established risk category according to the risk
assessment results and licensee procedures; and (4) the licensee identified and
corrected problems related to maintenance risk assessments.
October 31, 2006: Planned maintenance activities on start up transformer
Train B
November 29, 2006: Planned maintenance and operational activities during
reactor coolant system midloop conditions
December 7, 2006: Planned maintenance activities to restore emergency diesel
generator Train B following the integrated diesel test
December 18, 2006: Planned maintenance and operational activities during
reactor coolant system midloop conditions
Enclosure
-9-
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed four samples.
b.
Findings
No findings of significance were identified.
1R15
Operability Evaluations (71111.15)
a.
Inspection Scope
The inspectors: (1) reviewed plant status documents such as operator shift logs,
emergent work documentation, deferred modifications, and standing orders to
determine if an operability evaluation was warranted for degraded components;
(2) referred to the Updated Final Safety Analysis Report and design-basis documents to
review the technical adequacy of licensee operability evaluations; (3) evaluated
compensatory measures associated with operability evaluations; (4) determined
degraded component impact on any Technical Specifications; (5) used the Significance
Determination Process to evaluate the risk significance of degraded or inoperable
equipment; and (6) verified that the licensee has identified and implemented appropriate
corrective actions associated with degraded components.
October 19, 2006: Operability evaluation addressing pressurizer heater capacity
following a surveillance test as described in Condition Report 2006-3125
November 11, 2006: Operability evaluation addressing containment fan cooler
Train B flow control valve failing to control at intermediate flow rates as described
in Condition Report 2006-3357
December 22, 2006: Operability evaluation addressing steam Generator 32 tube
sheet plugging as described in Condition Report 2006-4510
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed three samples.
b.
Findings
No findings of significance were identified.
1R19
Postmaintenance Testing (71111.19)
a.
Inspection Scope
The inspectors selected the six below listed postmaintenance test activities of risk
significant systems or components. For each item, the inspectors: (1) reviewed the
applicable licensing basis and/or design-basis documents to determine the safety
functions; (2) evaluated the safety functions that may have been affected by the
maintenance activity; and (3) reviewed the test procedure to ensure it adequately tested
the safety function that may have been affected. The inspectors either witnessed or
Enclosure
-10-
reviewed test data to verify that acceptance criteria were met, plant impacts were
evaluated, test equipment was calibrated, procedures were followed, jumpers were
properly controlled, the test data results were complete and accurate, the test
equipment was removed, the system was properly realigned, and deficiencies during
testing were documented. The inspectors also reviewed the Updated Final Safety
Analysis Report to determine if the licensee identified and corrected problems related to
postmaintenance testing.
October 11, 2006: Planned maintenance on chemical volume control charging
Pump B
October 12, 2006: Planned maintenance for reactor trip circuit breaker
Number 7
November 1, 2006: Planned maintenance for start-up transformer Train B
6.9 kV circuit breaker
November 26, 2006: Emergent maintenance on reactor coolant Loop 1
shutdown cooling suction inside containment isolation Valve SI-405B
November 29, 2006: Planned maintenance on excore start-up Channel 2
December 12, 2006: Planned maintenance on reactor coolant Loop 1 shutdown
cooling suction outside containment isolation Valve SI-407B
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed six samples.
b.
Findings
Introduction. A self-revealing violation of very low safety significance of 10 CFR Part 50,
Appendix B, Criterion XVI, Corrective Action, was identified for the failure to implement
effective corrective actions to prevent recurrence of a significant condition adverse to
quality. Specifically, on multiple occasions Valve SI-405B failed to stroke open while
attempting to place shutdown cooling Train B in service. The root cause analysis
determined that the design of SI-405A(B) fluid reservoir was intolerant to operation with
low pressure/level. This condition caused inadequate hydraulic pump discharge
pressure that resulted in the failure of Valve SI-405B to stroke open. This violation of
Appendix B, Criterion XVI, is being treated as a noncited violation and was entered into
the licensees corrective action program.
Description. On November 26, 2006, while in Mode 4, station operators performed
Operating Procedure OP-903-033, Cold Shutdown IST Valve Test to stroke open
Valve SI-405B in an effort to place shutdown cooling Train B in service. Valve SI-405B
is a hydraulic pneumatic operated gate valve in the shutdown cooling return line from
the reactor coolant system to the low-pressure safety injection Pump B suction.
Valve SI-405B has a safety function to open to allow flow through shutdown cooling
Train B. During the test, Valve SI-405B did not stroke fully open within its design time of
15 minutes +/- 225 seconds, and automatically closed per its design. On its second
Enclosure
-11-
attempt, Valve SI-405B fully opened, but not within the maximum inservice testing limit
of 370 seconds. Valve SI-405B was declared inoperable and Technical Specification 3.6.3, Containment Isolation Valves, was entered. The licensee closed
valve SI-407B to comply with Technical Specification 3.6.3. This caused shutdown
cooling Train B to become unavailable. Later in Mode 5, Technical Specification 3.6.3
no longer applied and the licensee was allowed to open Valve SI-407B and shutdown
cooling Train B was restored to service. The licensee wrote Condition Report
CR-WF3-2006-3610 to document the open stroke failure of Valve SI-405B. The root
cause analysis determined that the design of SI-405A(B) fluid reservoir is intolerant to
operation with low pressure/level. This condition caused inadequate hydraulic pump
discharge pressure that resulted in the failure of Valve SI-405B to stroke open.
The inspectors noted a similar event on April 17, 2005, that Valve SI-405B failed to fully
open while operations was aligning shutdown cooling system Train B for service in
Mode 4. Operators were performing Operating Procedure OP-903-033 testing to stroke
open Valve SI-405B. During testing, Valve SI-405B failed to reach the full open position
within the maximum allowable time. A root cause evaluation concluded that the valve
was intolerant to minor degradation of various subcomponents in the system, which
caused a diversion of sufficient hydraulic fluid flow to stroke open the valve. The
licensee stated that there was very limited data to support historical failure analysis to
determine the true cause(s) of the failures to operate. Condition
Report CR-WF3-2005-1362 implemented corrective actions to preclude recurrence,
including replacing the hydraulic actuators with a motor-operated actuator in May 2008.
Condition Report CR-WF3-2006-3610 noted that Valve SI-405B had also failed to stroke
open satisfactorily due to various hydraulic system malfunction in October 2003,
April 2002, and October 2000.
Analysis. The deficiency associated with this finding was the failure to establish
corrective measures to prevent recurrence of a significant condition adverse to quality.
Specifically, corrective actions established to address the function of Valve SI-405B to
cycle open were not effectively implemented and failed to prevent recurrence resulting in
Valve SI-405B being declared inoperable. The inspectors determined that the issue was
more than minor in significance since it affected the Mitigating Systems cornerstone
attribute of equipment operability, availability, and reliability of systems that respond to
initiating events. The inspectors evaluated the finding using Inspection
Manual Chapter 0609, Significance Determination Process (SDP), Appendix A, SDP
Phase 1 Screening Worksheet for Initiating Events, Mitigating Systems, and Barrier
cornerstones to assess the safety significance. The finding was determined to be of
very low risk significance because, in each condition identified, it did not represent an
actual loss of a safety function. This finding had crosscutting aspects associated with
the corrective action program component in the problem identification and resolution
area. This assessment was based on the fact that the licensee failed to thoroughly
evaluate the problem such that the resolutions addressed the causes and, therefore,
corrective actions were inadequate to prevent repetition.
Enforcement. 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires
in part, that measures be established to assure that conditions adverse to quality are
promptly identified and corrected. In the case of significant conditions adverse to
Enclosure
-12-
quality, the measures shall assure that the cause of the condition is determined and
corrective action taken to preclude repetition. The failure to establish corrective
measures to prevent recurrence of Valve SI-405B failure to stroke open during actual
and test demands conditions impacted the ability of a risk significant system to perform
as designed and is a violation of 10 CFR Part 50, Appendix B, Criterion XVI. Corrective
actions for Valve SI-405B per Condition Report CR-WF3-2005-1362 failed to preclude
an additional failure as documented in Condition Report CR-WF3-2006-3610. Because
this violation was of very low safety significance and was entered in the corrective action
program as Condition Report CR-WF3-2006-3610, this violation is being treated as a
noncited violation, consistent with Section VI.A of the NRC Enforcement Policy
(NCV 05000382/2006005-01, Recurring Failure of Valve SI-405B to Open).
1R20
Refueling and Other Outage Activities (71111.20)
The inspectors reviewed the following risk significant refueling items or outage activities
to verify defense in depth commensurate with the outage risk control plan, compliance
with the Technical Specifications, and adherence to commitments in response to
Generic Letter 88-17, Loss of Decay Heat Removal: (1) the risk control plan;
(2) tagging/clearance activities; (3) reactor coolant system instrumentation; (4) electrical
power; (5) decay heat removal; (6) spent fuel pool cooling; (7) inventory control;
(8) reactivity control; (9) containment closure; (10) reduced inventory or midloop
conditions; (11) refueling activities; (12) heatup and cooldown activities; (13) restart
activities; and (14) licensee identification and implementation of appropriate corrective
actions associated with refueling and outage activities. The inspectors containment
inspections included observations of the containment sump for damage and debris; and
supports, braces, and snubbers for evidence of excessive stress, water hammer, or
aging. Documents reviewed by the inspectors included the Refueling Outage 14 Risk
Assessment Plan.
The inspectors completed one sample.
b.
Findings
Introduction. A self-revealing violation of very low safety significance of Technical Specification 6.8.1.a was identified for an inadequate procedure for installing a bolted
joint that provided structural support for the pressurizer. Specifically, the installation
procedure required applying 8750 ft-lbs torque to make up a bolted joint. Following
corrective actions, the licensee discovered that the break away torque on several bolts
exceeded 13,400 ft-lbs. The improper bolt tensioning resulted in failure of 1 of 16 bolts
and the partial cracking of 3 other bolts that potentially could affect the pressurizers
function in a safe shutdown earthquake event. The licensee has since replaced all
pressurizer skirt bolting and installed the bolting to an approved torque specification.
Description. On December 11, 2006, while performing a walkdown of the pressurizer
cubicle, a technician noted that a 2-inch diameter bolt had severed into two pieces. The
bolt was part of a bolted flange that joined the pressurizer skirt to the pressurizer
support structure. The pressurizer skirt is a cylindrical steel shell welded to the bottom
head of the pressurizer and provides structural support to the pressurizer. The
pressurizer is a Category 1 seismic component, which is designed to remain functional
Enclosure
-13-
in the event of a safe shutdown earthquake. A steel bolted flange is attached to the
bottom of the pressurizer skirt. The bolted flange on the pressurizer skirt mates with the
top flange of a support structure. The support structure is a weldment anchored by bolts
embedded in the concrete floor below the pressurizer. The failed bolt clamped the
pressurizer skirt flange to the top flange of the support structure. The licensee
ultrasonically test inspected the remaining 15 pressurizer skirt bolts. They discovered
flaws in 3 of the remaining 15 bolts. Licensee replaced all 16 bolts, nuts, and washers.
A licensee review of plant records indicated that an April 1979, Field Change
Procedure FSC-AS-1232, Pressurizer Support Structure, S.I. Tank Support Structures,
R.C. Stops and Supports Structural Steel, installed the bolts to a torque value of
8750 ft-lbs. The procedure did not specify if the bolts should be installed lubricated or
unlubricated, however all the originally installed bolts were lubricated. During
installation, lubrication reduces the friction between thread mating surfaces resulting in a
much higher bolt preload for the same torque values than for an unlubricated bolt.
When replacing the existing bolts, the licensee noted that some bolt break away torque
values exceeded 13,400 ft-lbs. Normally, following a bolted joint installation, some loss
of preload is expected in the range of 5 to 15 percent. Additionally, vibration or
time-varying mechanical or thermal loads on the joint due to system operations can
reduce bolt preload values further. A preliminary root cause evaluation indicates that
the bolts were overloaded during initial preloading at installation. This overloaded
condition reduced the fatigue resistance of the bolting. Thermally induced prying on the
bolts during pressurizer heatups and cooldowns was identified as a potentially
significant low-cycle fatigue load. This loading occurs as a result of temperature
differences between the pressurizer skirt and the support structure. This was an
expected occurrence, but excessive bolt preload increased the magnitude of the prying
and reduce the capacity of the bolts to accept it.
Analysis. The performance deficiency associated with this finding was the failure to
establish appropriate instructions for installing the pressurizer support skirt bolts. The
work instruction did not provide adequate direction to torque the pressurizer skirt bolts
without lubrication. This contributed to the subsequent failure and cracking of several
pressurizer skirt bolts. This finding is more than minor because if left uncorrected it
could have become a more safety significant concern. The finding was associated with
the equipment performance attribute of the Initiating Events cornerstone, and it affected
the cornerstone objective to limit the likelihood of those events that upset plant stability
and challenge critical safety functions during power operations. This finding is of very
low safe significance (Green), because a seismic event was determined to not result in
a loss-of-coolant accident that exceeds the Technical Specification limit for reactor
coolant system leakage. Therefore, this issue screened out in Phase 1 of the Manual
Chapter 0609 Significance Determination Process, because there was no actual loss
of safety funtions.
Enforcement. Technical Specification Section 6.8.1.a requires that written procedures
shall be established, implemented, and maintained covering applicable procedures
recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Regulatory Guide 1.33, Appendix A, recommends that maintenance that can affect the
performance of safety-related equipment be performed in accordance with written
procedures, documented instructions, or drawings appropriate to the circumstances.
Enclosure
-14-
Contrary to these requirements, the licensee failed to ensure that Field Change
Request FCR-AS-1232 was adequate for the task. The pressurizer skirt bolted work
instruction was inadequate because bolt lubrication was not addressed and resulted in
the failure of 4 of the 16 pressurizer skirt bolts. This issue was entered into the
licensees corrective action program as Condition Report CR-WF3-2006-4274.
(NCV 05000382/2006005-02, Excess Torque Resulting in Pressurizer Skirt Bolt
Failures).
1R22
Surveillance Testing (71111.22)
a.
Inspection Scope
The inspectors reviewed the Updated Final Safety Analysis Report, procedure
requirements, and Technical Specifications to ensure that the four below listed
surveillance activities demonstrated that the structures, systems, and components
tested were capable of performing their intended safety functions. The inspectors either
witnessed or reviewed test data to verify that the following significant surveillance test
attributes were adequate: (1) preconditioning; (2) evaluation of testing impact on the
plant; (3) acceptance criteria; (4) test equipment; (5) procedures; (6) jumper/lifted lead
controls; (7) test data; (8) testing frequency and method demonstrated Technical
Specification operability; (9) test equipment removal; (10) restoration of plant systems;
(11) fulfillment of ASME Code requirements; (12) updating of performance indicator
data; (13) engineering evaluations, root causes, and bases for returning tested
structures, systems, and components not meeting the test acceptance criteria were
correct; (14) reference setting data; and (15) annunciators and alarms setpoints. The
inspectors also verified that the licensee identified and implemented any needed
corrective actions associated with the surveillance testing.
October 18, 2006; Surveillance Procedure STA-001-005, Leakage Testing of
Air and Nitrogen Accumulators for Safety Related Valves, Revision 7. This test
verified the leakage is within analyzed acceptable limits to fulfill the design
function upon loss of instrument air.
October 23, 2006; Operations Procedure OP-903-068, Emergency Diesel
Generator, Revision 14. This monthly test verified operability of emergency
diesel Generator A to satisfy Technical Specification requirements.
November 21, 2006; Maintenance Procedure MM-007-015, Main Steam Safety
Valve Test, Revision 9, Change 0. This test verified the lift pressures for three
of the main steam safety valves prior to entering the refueling outage.
December 5, 2006; Operations Procedure OP-903-108, Safety Injection Flow
Balance Test, Revision 5, Change 0. This test verified high-pressure safety
injection (HPSI) flow from HPSI Pumps A, B, and AB through HPSI Headers A
and B were within specifications.
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed four samples.
Enclosure
-15-
b.
Findings
No findings of significance were identified.
1R23
Temporary Plant Modifications (71111.23)
a.
Inspection Scope
The inspectors reviewed the Updated Final Safety Analysis Report, plant drawings,
procedure requirements, and Technical Specifications to ensure that the two below
listed temporary modifications were properly implemented. The inspectors: (1) verified
that the modifications did not have an effect on system operability/availability; (2) verified
that the installation was consistent with modification documents; (3) ensured that the
postinstallation test results were satisfactory and that the impact of the temporary
modifications on permanently installed structures, systems, and components were
supported by the test; (4) verified that the modifications were identified on control room
drawings and that appropriate identification tags were placed on the affected drawings;
and (5) verified that appropriate safety evaluations were completed. The inspectors
verified that licensee identified and implemented any needed corrective actions
associated with temporary modifications.
December 18, 2006: ER-W3-2006-0264-000, Temporary Air Compressors to
Augment Station Air, a temporary alteration to install a supplemental air
compressor to support Refueling Outage 14.
December 28, 2006: ER-W3-2006-0375-000 and -001, Install Loose Parts
Monitoring Sensors on the Steam Generators, a temporary alteration to install
acoustic monitoring equipment to monitor for loose parts, associated with the
tube support bar assemblies also known as batwings, in the steam generator
secondary upper shell area.
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed two samples.
b.
Findings
No findings of significance were identified.
Cornerstone: Emergency Preparedness (EP)
1EP2
Alert Notification System Testing (71114.02)
a.
Inspection Scope
The inspector discussed with licensee staff the status of offsite siren and tone alert radio
systems to determine the adequacy of licensee methods for testing the alert and
notification system in accordance with 10 CFR Part 50, Appendix E. The licensees alert
and notification system testing program was compared with criteria in NUREG-0654,
Enclosure
-16-
Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and
Preparedness in Support of Nuclear Power Plants, Revision 1, Federal Emergency
Management Agency (FEMA) Report REP-10, Guide for the Evaluation of Alert and
Notification Systems for Nuclear Power Plants, and the licensees current
FEMA-approved alert and notification system design report, Alert/Notification System,
Waterford-3 Steam Electric Station, dated March 2005. The inspector also reviewed
the following procedures:
EPP-422, Siren and Helicopter Warning System Maintenance, Revision 3
EPP-424, Siren Testing and Siren System Administrative Controls, Revision 9
Emergency Preparedness Desk Guide 16, Siren System Administrative Data,
Revision 11
The inspector completed one sample during the inspection.
b.
Findings
No findings of significance were identified.
1EP3
Emergency Response Organization Augmentation Testing (71114.03)
a.
Inspection Scope
The inspector discussed with licensee staff the status of primary and backup systems
for augmenting the on-shift emergency response staff to determine the adequacy of
licensee methods for staffing emergency response facilities. The inspector reviewed the
results of 15 licensee augmentation drills performed from August 2005 through
November 2006 as listed in the Attachment to this report, and the listed references
related to the emergency response organization augmentation system, to evaluate the
licensees ability to staff the emergency response facilities in accordance with the
licensee emergency plan and the requirements of 10 CFR Part 50 Appendix E.
The inspector completed one sample during the inspection.
b.
Findings
No findings of significance were identified.
1EP4
Emergency Action Level and Emergency Plan Changes (71114.04)
a.
Inspection Scope
The inspector performed an in-office review of Revision 33 to the Waterford Steam
Electric Station Emergency Plan, and Revision 21 to Emergency Plan Implementing
Procedure EP-001-001, Recognition and Classification of Emergency Conditions.
Enclosure
-17-
These revisions implemented an NEI 99-01, Methodology for Development of
Emergency Action Levels, Revision 4, emergency action scheme for which prior NRC
approval was obtained.
These revisions were compared to the criteria of NUREG-0654, Criteria for Preparation
and Evaluation of Radiological Emergency Response Plans and Preparedness in
Support of Nuclear Power Plants, Revision 1, to the criteria of NEI 99-01, Methodology
for Development of Emergency Action Levels, Revision 4, to the NRC Safety Analysis
Report dated June 20, 2005, and to the standards in 10 CFR 50.47(b) to determine if
the revisions were adequately conducted according to the requirements of
10 CFR 50.54(q). These reviews were not documented in a safety evaluation report and
did not constitute approval of licensee changes, therefore these revisions are subject to
future inspection.
The inspector completed two samples during the inspection.
b.
Findings
No findings of significance were identified.
1EP5
Correction of Emergency Preparedness Weaknesses and Deficiencies (71114.05)
a.
Inspection Scope
The inspector reviewed the licensees corrective action program requirements in
Procedures EN-LI-102, Corrective Action Process, Revision 2, and EN-LI-119,
Apparent Cause Evaluation Process, Revision 3. The inspector reviewed summaries
of 194 corrective action requests associated with emergency preparedness issues
during calendar years 2005 and 2006 and selected 15 for detailed review against the
program requirements. The inspector reviewed the licensees after-action report for a
significant event (Hurricane Katrina) using the requirements of Procedure UNT-006-10,
Event Notification and Reporting, Revision 17. The inspector evaluated the response
to the corrective action requests to determine the licensees ability to identify, evaluate,
and correct problems in accordance with the licensee program requirements and
10 CFR 50.47(b)(14) and 10 CFR Part 50, Appendix E.
The inspector reviewed the licensees audit program requirements in
Procedure EN-QV-109, Audit Process, Revision 8, quality assurance audits conducted
in 2005 and 2006, and licensee self-assessments of emergency preparedness. The
inspector also reviewed other documents listed in the attachment to this report.
The inspector completed one sample during the inspection.
b.
Findings
Introduction: A Green noncited violation was identified for failure to conduct a required
offsite medical drill during calendar year 2005, as required by 10 CFR 50.54(q).
Enclosure
-18-
Description: The NRC identified a performance deficiency related to conduct of the
licensees drill and exercise program, in that an annual offsite medical drill involving a
simulated contaminated individual was not performed during calendar year 2005 as
required by the Waterford Steam Electric Station Emergency Plan. The licensee has
two offsite medical support facilities, the Ochsner Clinic and West Jefferson Medical
Center, and typically alternates performing the annual medical drill, so that each facility
has the opportunity to perform the simulated medical treatment of a contaminated
individual. Ochsner Clinic had last performed a drill with simulated medical treatment of
a contaminated individual in 2003, and another drill was scheduled for
October 17, 2006. That drill did not occur.
As a result of the impact of Hurricanes Katrina and Rita on offsite infrastructure,
Ochsner Clinic informally communicated to the licensee that conducting the drill as
scheduled would be a hardship due to reduced staffing at the facilities. On
October 3, 2005, the State of Louisiana Department of Environment Quality wrote to the
U.S. Department of Homeland Security, Federal Emergency Management Agency,
Region VI, requesting postponement of the 2005 Biennial Exercise and several offsite
emergency preparedness drills scheduled for the week beginning October 17, 2005, one
of which being the licensees offsite medical drill. The licensee submitted a request
(ML0529903030) to the NRC on October 24, 2005, requesting a rescheduling
exemption for the 2005 Biennial Exercise. The inspector determined the licensees
request for a scheduling exemption was limited to the 2005 Biennial exercise and did not
include a request for relief from the emergency plan requirement to conduct the offsite
medical drill.
The U.S. Department of Homeland Security, Federal Emergency Management Agency,
Region VI, responded on October 14, 2005, to the State of Louisiana letter of
October 3, 2005, approving the postponement of the 2005 Biennial Exercise and the
offsite emergency preparedness drills scheduled for the week beginning
October 17, 2005. The Federal Emergency Management Agency, Region VI, letter
stated in part, . . . we concur that . . .the out of sequence drills scheduled for the week
of October 17th should be postponed. . . ., and . . . we will be contacting your
organization in the near future to reschedule the drills. . . . The inspector determined
that the offsite medical drill was not subsequently rescheduled. The NRC responded
(ML053270770) on November 17, 2005, to the licensees letter of October 24, 2005,
approving rescheduling the 2005 Biennial Exercise to 2006; this exercise was
subsequently conducted June 28, 2006.
The inspector determined the licensee conducted an offsite medical drill with West
Jefferson Medical Center on October 25, 2006 (Drill 2006-09), which the licensee
intended as meeting the 2006 annual drill requirement, not the rescheduled 2005 drill
requirement. West Jefferson Medical Center had also drilled the simulated medical
treatment of a contaminated individual in 2004. Ochsner Clinic is scheduled to perform
a drill with simulated medical treatment of a contaminated individual in October 2007,
approximately 4 years after their most recent medical drill in 2003.
Analysis: The inspector determined that the failure to conduct a required offsite medical
drill is a performance deficiency because the licensee failed to meet a requirement of
the Waterford Steam Electric Station Emergency Plan, and the cause was within the
Enclosure
-19-
licenseess ability to foresee, correct, and prevent. The finding had a credible impact on
the Emergency Preparedness cornerstone objective because it involved the ability to
maintain the proficiency of offsite personnel whose assistance may be needed in the
event of a radiation emergency, and affected the attributes of emergency response
organization readiness and performance, and offsite emergency preparedness. This
finding is more than minor because a degraded proficiency in providing appropriate
medical treatment for a contaminated individual has a potential impact on the safety of
licensee employees and the public. This finding was evaluated using the Emergency
Preparedness Significance Determination Process and was determined to be of very low
safety significance because the licensee failed to conduct only one required drill during
the inspection period January 2005 through December 2006, and the drill was not
appropriately rescheduled with NRC approval.
Enforcement: Part 50.54(q) of Title 10 of the Code of Federal Regulations states, in
part, A licensee authorized to possess and operate a nuclear power reactor shall follow
and maintain in effect emergency plans which meet the standards in §50.47(b) and the
requirements in Appendix E of this part. 10 CFR 50.47(b)(14) states, in part, ...periodic
drills will be conducted to develop and maintain key skills... 10 CFR Part 50,
Appendix E, IV, F.1 states, in part, The program to provide for: (a) The training of
employees and exercising, by periodic drills, of radiation emergency plans to ensure that
employees of the licensee are familiar with their specific emergency response duties,
and (b) The participation in the training and drills by other persons whose assistance
may be needed in the event of a radiation emergency shall be described. . . vii. Medical
Support Personnel. Section 8.1.2.4(4) of the Waterford Steam Electric Station
Emergency Plan, Revision 33, states, in part, A medical emergency drill, involving a
simulated contaminated individual, which includes provisions for participation by the
local support services (i.e. ambulance and offsite medical treatment facility) shall be
conducted annually. Between January 1 and December 31, 2005, the licensee did not
conduct a drill involving a simulated contaminated individual with provision for
participation by local support services. Because this failure is of very low safety
significance and has been entered into the licensees corrective action system
(Condition Report 2006-4429), this violation is being treated as an noncited violation
consistent with Section VI.A of the NRC Enforcement Policy:
NCV 05000382/2006-005-03, Failure to Conduct a Required Offsite Medical Drill in
2005.
2.
RADIATION SAFETY
Occupational Radiation Safety (OS)
2OS1 Access Control to Radiologically Significant Areas (71121.01)
a.
Inspection Scope
This area was inspected to assess the licensees performance in implementing physical
and administrative controls for airborne radioactivity areas, radiation areas, high
radiation areas, and worker adherence to these controls. The inspector used the
requirements in 10 CFR Part 20, the Technical Specifications, and the licensees
procedures required by Technical Specifications as criteria for determining compliance.
Enclosure
-20-
During the inspection, the inspector interviewed the radiation protection manager,
radiation protection supervisors, and radiation workers. The inspector performed
independent radiation dose rate measurements and reviewed the following items:
Performance indicator events and associated documentation packages reported
by the licensee in the Occupational Radiation Safety Cornerstone
Controls (surveys, posting, and barricades) of multiple radiation, high radiation,
or airborne radioactivity areas
Radiation work permits, procedures, engineering controls, and air sampler
locations
Conformity of electronic personal dosimeter alarm set points with survey
indications and plant policy; workers knowledge of required actions when their
electronic personnel dosimeter noticeably malfunctions or alarms
Barrier integrity and performance of engineering controls in three airborne
radioactivity areas
Adequacy of the licensees internal dose assessment for any actual internal
exposure greater than 50 millirem Committed Effective Dose Equivalent
Physical and programmatic controls for highly activated or contaminated
materials (nonfuel) stored within spent fuel and other storage pools
Self-assessments, audits, and special reports related to the access control
program since the last inspection
Corrective action documents related to access controls
Licensee actions in cases of repetitive deficiencies or significant individual
deficiencies
Radiation work permit briefings and worker instructions
Adequacy of radiological controls such as, required surveys, radiation protection
job coverage, and contamination controls during job performance
Dosimetry placement in high radiation work areas with significant dose rate
gradients
Changes in licensee procedural controls of high dose rate - high radiation areas
and very high radiation areas
Controls for special areas that have the potential to become very high radiation
areas during certain plant operations
Posting and locking of entrances to all accessible high dose rate - high radiation
areas and very high radiation areas
Enclosure
-21-
Radiation worker and radiation protection technician performance with respect to
radiation protection work requirements
The inspector completed 17 of the required 21 samples.
b.
Findings
No findings of significance were identified.
2OS2 ALARA Planning and Controls (71121.02)
a.
Inspection Scope
The inspector assessed licensee performance with respect to maintaining individual and
collective radiation exposures as low as is reasonably achievable (ALARA). The
inspector used the requirements in 10 CFR Part 20 and the licensees procedures
required by Technical Specifications as criteria for determining compliance. The
inspector interviewed licensee personnel and reviewed:
Current 3-year rolling average collective exposure
Five outage work activities scheduled during the inspection period and associated
work activity exposure estimates, which were likely to result in the highest
personnel collective exposures
Site specific ALARA procedures
Interfaces between operations, radiation protection, maintenance, maintenance
planning, scheduling, and engineering groups
Integration of ALARA requirements into work procedure and radiation work permit
documents
Exposure tracking system
Workers use of the low dose waiting areas
First-line job supervisors contribution to ensuring work activities are conducted in
a dose efficient manner
Source-term control strategy or justifications for not pursuing such exposure
reduction initiatives
Specific sources identified by the licensee for exposure reduction actions and
priorities established for these actions, and results since the last refueling cycle
Radiation worker and radiation protection technician performance during work
activities in radiation areas, airborne radioactivity areas, or high radiation areas
The inspector completed 4 of the required 15 samples and 7 of the optional samples.
Enclosure
-22-
b.
Findings
No findings of significance were identified.
4.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151)
.1
Mitigating Systems and Barrier Integrity
a.
Inspection Scope
The inspectors sampled licensee submittals for the three performance indicators listed
below for the period from July 1, 2004, through September 30, 2006. The definitions and
guidance of Nuclear Energy Institute 99-02, Regulatory Assessment Indicator
Guideline, Revision 4, were used to verify the licensees basis for reporting each data
element in order to verify the accuracy of performance indicator data reported during the
assessment period. The inspectors reviewed licensee event reports, monthly operating
reports, and operating logs as part of the assessment. Licensee performance indicator
data were also reviewed against the requirements of Procedure EN-LI-114,
Performance Indicator Process, Revision 1.
Safety System Functional Failures
Reactor Coolant System Specific Activity
Reactor Coolant System Leakage
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed three samples.
b.
Findings
No findings of significance were identified.
.2
(Closed) Temporary Instruction 2515/169: Mitigating Systems Performance Index
Verification
a.
Inspection Scope
During this inspection period, the inspectors completed a review of the licensees
implementation of the mitigating systems performance index in accordance with the
guidance provided in Temporary Instruction 2515/169. The review examined the
licensees mitigating systems performance index basis documents (W3-SA-06-00001,
Revision 0) and verified the established system boundaries and monitored components
were consistent with guidance provided in NEI 99-02, Reactor Oversight Process
Performance Indicators, Revision 4. The inspectors verified that the licensee did not
include credit for unavailability hours for short term unavailability or operator recovery
actions to restore the risk-significant function as is allowed by NEI 99-02.
Additionally, the inspectors reviewed the baseline mitigating systems performance index
unavailability time using plant specific values for the period of 2002 to 2004. The
verification included all planned and unplanned unavailability. The plant specific data for
Enclosure
-23-
2005 to 2006 was also reviewed to ensure the licensee properly accounted for the actual
unavailability hours of mitigating systems performance index systems. For the same
period, the mitigating systems performance index component unreliability data was
examined to ensure the licensee identified all failures of monitored components. The
accuracy and completeness of the reported unavailability and unreliability data was
verified by reviewing operating logs, condition reports, and work order documents. The
unavailability and unreliability data was compared with performance indicator data
submitted to the NRC to ensure that any discrepancies would not result in a change to
the index color.
b.
Findings
No findings of significance were identified. This completes the inspection requirements
for this Temporary Instruction.
.3
a.
Inspection Scope
The inspector reviewed licensee evaluations for the three Emergency Preparedness
cornerstone performance indicators of Drill and Exercise Performance, Emergency
Response Organization Participation, and Alert and Notification System Reliability, for the
period October 1, 2005, through September 30, 2006. The definitions and guidance of
NEI 99-02, Regulatory Assessment Indicator Guideline, Revisions 2 through 4, and the
licensee Performance Indicator Procedures EN-LI-114, Performance Indicator Process,
Revision 2, and EN-EP-201, Emergency Planning Performance Indicators, Revision 5,
were used to verify the accuracy of the licensees evaluations for each performance
indicator reported during the assessment period.
The inspector reviewed 100 percent of drill and exercise scenarios and licensed operator
simulator training sessions, notification forms, and attendance and critique records
associated with training sessions, drills, and exercises conducted during the verification
period. The inspector reviewed 18 emergency responder qualification, training, and drill
participation records. The inspector reviewed alert and notification system testing
procedures, maintenance records, and 100 percent of siren test records. The inspector
also reviewed other documents listed in the attachment to this report.
The inspector completed three samples during the inspection.
b.
Findings
No findings of significance were identified.
.4
Occupational Radiation Safety and Public Radiation Safety
a.
Inspection Scope
The inspector sampled licensee submittals for the performance indicators listed below for
the period from April 2006 through October 2006. To verify the accuracy of the
performance indicator data reported during that period, performance indicator definitions
Enclosure
-24-
and guidance contained in NEI 99-02, Regulatory Assessment Indicator Guideline,
Revision 2, were used to verify the basis in reporting for each data element.
Occupational Exposure Control Effectiveness Performance Indicators
Licensee records reviewed included corrective action documentation that identified
occurrences in high radiation areas with dose rates greater than 1,000 millirem per hour
at 30 centimeters (as defined in technical specifications), very high radiation areas (as
defined in 10 CFR 20.1003), and unplanned personnel exposures (as defined in
NEI 99-02). Additional records reviewed included ALARA records and whole-body
counts of selected individual exposures. The inspector interviewed licensee personnel
that were accountable for collecting and evaluating the performance indicator data. In
addition, the inspector toured plant areas to verify that high radiation and very high
radiation areas were properly controlled.
The inspector completed the required sample (1) in this cornerstone.
Radiological Effluent Technical Specification/Offsite Dose Calculation Manual
Radiological Effluent Occurrences
Licensee records reviewed included corrective action documentation that identified
occurrences for liquid or gaseous effluent releases that exceeded performance indicator
thresholds and those reported to the NRC. The inspector interviewed licensee personnel
that were accountable for collecting and evaluating the performance indicator data.
The inspector completed the required sample (1) in this cornerstone.
b.
Findings
No findings of significance were identified.
4OA2 Identification and Resolution of Problems (71152)
.1
Routine Review of Identification and Resolution of Problems
a.
Inspection Scope
The inspectors performed a daily screening of items entered into the licensees corrective
action program. This assessment was accomplished by reviewing condition reports and
event trend reports and attending daily operational meetings. The inspectors:
(1) verified that equipment, human performance, and program issues were being
identified by the licensee at an appropriate threshold and that the issues were entered
into the corrective action program; (2) verified that corrective actions were commensurate
with the significance of the issue; and (3) identified conditions that might warrant
additional follow-up through other baseline inspection procedures.
b.
Findings
No findings of significance were identified.
Enclosure
-25-
.2
Selected Issue Follow-up Inspection
a.
Inspection Scope
In addition to the routine review, the inspectors selected the one below listed issue for a
more in-depth review. The inspectors considered the following during the review of the
licensees actions: (1) complete and accurate identification of the problem in a timely
manner; (2) evaluation and disposition of operability/reportability issues; (3) consideration
of extent of condition, generic implications, common cause, and previous occurrences;
(4) classification and prioritization of the resolution of the problem; (5) identification of
root and contributing causes of the problem; (6) identification of corrective actions; and
(7) completion of corrective actions in a timely manner.
December 18, 2006: Operator Workarounds
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed one sample.
b.
Findings
No findings of significance were identified.
.3
Semiannual Trend Review
a.
Inspection Scope
The inspectors completed a semiannual trend review of repetitive or closely related
issues associated with the essential chiller low evaporator pressure trips that were
documented in condition reports, system and component health reports, quality
assurance audits, trend reports, the licensees internal performance indicators, and NRC
inspection reports to identify trends that might indicate the existence of more safety
significant issues. The inspectors review consisted of the 6-month period of July 1 to
December 31, 2006. When warranted, some of the samples expanded beyond those
dates to fully assess the issue. The inspectors also reviewed corrective action program
items associated with troubleshooting. The inspectors compared and contrasted their
results with the results contained in the licensees quarterly trend reports. Corrective
actions associated with a sample of the issues identified in the licensees trend report
were reviewed for adequacy.
Documents reviewed by the inspectors are listed in the attachment. The inspectors
completed one sample.
b.
Findings
No findings of significance were identified.
Enclosure
-26-
.4
Annual Sample Review
a.
Inspection Scope
The emergency preparedness inspector selected 15 condition reports for detailed review.
The reports were reviewed to ensure that the full extent of the issues were identified, an
appropriate evaluation was performed, and appropriate corrective actions were specified
and prioritized. The inspector evaluated the condition reports using licensee
Procedures EN-LI-102, Corrective Action Process, Revision 2, and EN-LI-119,
Apparent Cause Evaluation Process, Revision 3.
The health physics inspector evaluated the effectiveness of the licensees problem
identification and resolution process with respect to the following inspection areas:
Access Control to Radiologically Significant Areas (Section 2OS1)
ALARA Planning and Controls (Section 2OS2)
b.
Findings and Observations
No findings of significance were identified.
4OA3 Event Follow-up (71153)
.1
(Closed) LER 05000382/2005-005-00: Manual Reactor Trip Upon Loss of All Circulating
Water Pumps and Lowering Condenser Vacuum
On November 11, 2005, the licensee manually tripped the reactor due to lowering main
condenser vacuum, caused by a loss of all circulating water pumps. Lowering main
condenser vacuum resulted in loss of main feedwater to the steam generators causing
steam generator levels to lower resulting in an automatic actuation of the emergency
feedwater system to restore steam generator level. Failure mode analysis identified a
degraded timer relay in the CW pump discharge valve control circuit as the most likely
cause. The relay was replaced prior to plant start up. The LER was reviewed by the
inspectors and no findings of significance were identified and no violation of NRC
requirements occurred. The licensee documented the failed equipment in Condition
Report CR-WF3-2005-4593. This LER is closed.
.2
(Closed) LER 05000382/2005-002-01: RCS Leakage Detection Instrumentation and
On November 15, 2005, the licensee determined that Technical Specification 3.4.5.1,
Leakage Detection Systems, did not meet the design requirements of Regulatory
Guide 1.45, Reactor Coolant Pressure Boundary Leakage Detection System.
Specifically, the containment fan cooler condensate flow switches did not meet the
design requirements for detecting a one gallon per minute reactor coolant system leak.
This deficiency was previously dispositioned in NRC Inspection
Report 05000382/2005005, Section 1R22, Surveillance Testing, as a Green noncited
violation (NCV 05000382/2005005-01). This LER is closed.
Enclosure
-27-
4OA5 Other Activities
.1
Institute of Nuclear Power Operations (INPO) Audit and Evaluation Review
The inspectors completed a review of the INPO audit and evaluation report for Entergy
Operations Waterford 3 Steam Electric Station during this inspection period. The INPO
audit and evaluation was performed during spring of 2006.
.2
(Closed) NRC Temporary Instruction 2515/166: PWR Containment Sump Blockage
a.
Inspection Scope
The inspectors reviewed Waterford 3's implementation of plant modifications and
procedure changes committed to in their response to Generic Letter 2004-02.
The inspectors observed installation of the containment recirculation sump strainers and
relocation of tri-sodium phosphate baskets. In addition, the inspectors verified that
Waterford 3 has implemented specific procedure changes to control tags, labels, tape,
and other objects inside the containment building. At the time of the exit meeting,
Waterford 3 was in the final stages of implementing changes to the containment coatings
assessment program, the latent debris assessment program, and the containment
strainer inspection program.
At the time of the inspection, industry testing for chemical effects on containment
recirculation sumps was not complete. Since the testing was not complete, Waterford 3
evaluated the new recirculation sump modifications to the original design basis,
Regulatory Guide 1.82, Revision 0. The inspectors reviewed the 10CFR 50.59
evaluation to verify that the design meets the original design basis.
b.
Findings
No findings of significance were identified. This completes the inspection requirements
for this Temporary Instruction.
4OA6 Meetings, Including Exit
Exit Meeting Summary
.1
On September 25, 2006, the operations inspector discussed the inspection results of the
licensed operator annual requalification examination with Mr. A. Hill, Operations Training
Supervisor. A telephone exit was held with Mr. Hill on September 25, 2006. The
licensee acknowledged the findings presented in both the briefing and the final exit
meeting.
.2
On December 1, 2006, the health physics inspector presented the Occupational
Radiation Safety inspection results to Ms. K. Cook, Acting General Manager, Plant
Operations, and other members of the staff who acknowledged the findings. The
inspector confirmed that proprietary information was not provided or examined during the
inspection.
Enclosure
-28-
.3
On December 8, 2006, the inspectors presented the results of Temporary
Instruction 2515/166 to Mr. K. Walsh, Waterford 3 Site Vice President, and other
members of licensee management. Licensee management acknowledged the inspection
findings. The inspectors identified that they had reviewed proprietary information but had
returned it to licensee personnel.
.4
On December 20, 2006, the inspector presented the inspection results to Mr. K. Walsh,
Site Vice President, and other members of his staff who acknowledged the findings. The
inspector confirmed that proprietary information was not provided or examined during the
inspection.
.5
On January 16, 2007, the resident inspectors presented the inspection results to
Mr. K. Walsh and other members of licensee management at the conclusion of the
inspection. The licensee acknowledged the findings presented. The inspectors asked
the licensee whether any materials examined during the inspection should be considered
proprietary. No proprietary information was identified.
4OA7 Licensee-Identified Violations
The following violation of very low safety significance (Green) was identified by the
licensee and is a violation of NRC requirements, which meets the criteria of Section VI of
the NRC Enforcement Policy for being dispositioned as an NCV.
Part 50 of Title 10 of the Code of Federal Regulations, Appendix E, IV, B,
requires a licensee establish emergency action levels based on in-plant
conditions and instrumentation. Contrary to this, the licensee changed
radiological accident assumptions in their Updated Final Safety Analysis Report in
1994, 2001, and 2003, and corresponding changes to emergency action levels
were not made. This was identified in the licensees corrective action program as
Condition Report 2005-3292. This finding is of very low safety significance
because the affected emergency action levels were at the Notification of Unusual
Event and Alert emergency classifications and did not affect classification at the
Site Area Emergency or General Emergency levels.
ATTACHMENT: SUPPLEMENTAL INFORMATION
Attachment
A-1
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
S. Anders, Superintendent, Plant Security
J. Brawley, ALARA Coordinator, Radiation Protection
K. Cook, Acting General manager, Plant Operations
L. Dauzat, Operations Supervisor, Radiation Protection
R. Dodds, Manager, Operations
C. Fugate, Assistant Manager, Operations (Shift)
T. Gaudet, Manager, Quality Assurance
J. Lewis, Manager, Emergency Preparedness
C. Miller, Supervisor, Radiation Protection
R. Murillo, Manager, Licensing
R. Peters, Director, Planning and Scheduling
B. Pilutti, Manager, Radiation Protection
O. Pipkins, Senior Licensing Engineer
R. Putnam, Manager, Engineering Programs
G. Scott, Licensing Engineer
K. Walsh, Vice President, Operations
B. Williams, Director, Engineering
R. Williams, Licensing Engineer
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
05000382/2006-005-01
Recurring Failure of Valve SI-405B to Open
(Section 1R19)
05000382/2006-005-02
Excess Torque Resulting in Pressurizer Skirt Bolt
Failures (Section 1R20)
05000382/2006-005-03
Failure to Conduct a Required Offsite medical Drill in
2005 (Section 1EP5)
Closed
05000382/2006-005-01
Recurring Failure of Valve SI-405B to Open
(Section 1R19)
05000382/2006-005-02
Excess Torque Resulting in Pressurizer Skirt Bolt
Failures (Section 1R20)
05000382/2005-002-01
LER
RCS Leakage Detection Instrumentation and Regulatory
Guide 1.45
05000382/2005-005-00
LER
Manual Reactor Trip Upon Loss of All Circulating Water
Pumps and Lowering Condenser Vacuum
05000382/2006-005-03
Failure to Conduct a Required Offsite medical Drill in
2005 (Section 1EP5)
Attachment
A-2
LIST OF DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment (71111.04)
Procedures
Number
Title
Revision
OP-002-005
Chemical and Volume Control
Revision 21
Miscellaneous Documents
Updated Final Safety Analysis Report
Flow Diagram - Chemical and Volume Control System, G168, Sheet 2, Rev. 48
Section 1R05: Fire Protection (71111.05)
Procedure
NUMBER
TITLE
REVISION
Administrative Procedure
UNT-005-013
9
Operating Procedure 009-004
Fire Protection
11-8
Maintenance Procedure MM-
007-010
Fire Extinguisher Inspection and
Extinguisher Replacement
13
Administrative
Procedure UNT-005-013
9
Fire Protection Procedure FP-
001-015
Fire Protection System
Impairments
17
Fire Protection Procedure FP-
001-017
Transient Combustibles
19
Training Manual Procedure
NTP-202
Fire Protection Training
11-4
Section 1R12: Maintenance Rule (71111.12)
Procedures
Number
Title
Revision
DC-121
Maintenance Rule
1
Industry Guideline for Monitoring the Effectiveness
of Maintenance at Nuclear Power Plants
3
Attachment
A-3
Condition Reports
Miscellaneous Documents
Engineering Report W-SE-
2005-001
Waterford 3 Maintenance Rule Periodic (a)(3)
Assessment
0
Section 1R15: Operability Evaluations
Procedures:
NUMBER
TITLE
REVISION
Operability Evaluation
1
OP-903-097
Pressurizer Heater Capacity Verification
8
OP-035-000
Notification Matrix
6
Miscellaneous Documents
NUMBER
TITLE/SUBJECT
REVISION
Waterford 3 LER
2003-001-000
Loose Breaker Fuse Rendered One Bank of Pressurizer
Proportional Heaters Inoperable
0
Condition Reports
Section 1R19: Postmaintenance Testing (71111.19)
Attachment
A-4
Procedures
NUMBER
TITLE
REVISION
MI-003-115
Startup and Control Drawer Calibration Channel
1 or 2
3
MI-012-012
Removal and Installation of Excore Detectors
3
OP-903-101
Startup Channel Functional Test Channel 1 and
2
6
OP-903-033
Cold Shutdown IST Valve Tests
20
OP-903-003
Charging Pump operability Check
Rev. 11.
Change 1
ENS-MA-114
Post Maintenance Testing
5
Miscellaneous Documents
NUMBER
TITLE/SUBJECT
REVISION
CEP-IST-1
IST Bases Document
3
Condition Reports
Work Orders
44779-01, 65817-01, 73483,
Procedures
Number
Title
Revision
OP-903-003
Charging Pump Operability Check
Revision 11,
Change 1
OP-903-121
Safety Systems Quarterly IST Valve Tests
7
OP-903-127
Reactor Trip Circuit Breaker Post
Maintenance Test
3
OP-903-013
Monthly Channel Checks
14
OP-903-011
High Pressure Safety Injection Pump
Preservice Operability Check
9
Attachment
A-5
CEP-IST-1
IST Bases Document
3
Work Orders
50947-1, 51041014-01, 63598-01,
Section 1R23: Temporary Plant Modifications (71111.23)
Procedure
NUMBER
TITLE
REVISIONS
Licensing Basis Document Change
Process
1
Miscellaneous Documents
NUMBER
TITLE/SUBJECT
REVISION
ER-W3-2006-0264-
000
Temporary Air Compressors to Augment Station Air
0
NRC Information Notice 2004-17
Loose Part Detection and Computerized Eddy Current
Data Analysis in Steam Generators
0
ER-W3-2006-0375-
000
Install Loose Parts Monitoring Sensors on the Steam
Generators
0
Condition Reports
Section 1EP3: Emergency Response Organization Augmentation Testing (71114.03)
EP-002-015, Emergency Responder Activation, Revision 8
EP-003-070, Emergency Communications Systems Routine Testing, Revision 24
EPP-462, Evaluation of Pager Tests, Revision 0
Desk Guide 20, Evaluation of Pager Tests, Revision 20
Drill 2005-03, Unannounced Off-Hours Callout Drill, conducted August 11, 2005
Drill 2005-07, Backup Emergency Response Organization Pager Code Drill, conducted
Attachment
A-6
September 12, 2005
Drill 2006-07, Backup Emergency Response Organization Pager Code Drill, conducted
November 14, 2006
Evaluation Worksheets for Pager Tests conducted: January 31, February 22, March 18, April 9,
May 9, June 22, July 25, November 8 (all 2005), January 15, February 22, September 6, and
November 2 (all 2006)
Section 1EP4: Emergency Action Level and Emergency Plan Changes (71114.04)
Safety Evaluation Report, Proposed Emergency Action Levels Based on Revision 4 to Nuclear
Energy Institute 99-01, Entergy Operations Inc., Waterford Steam Electric Station, Unit 3, dated
June 20, 2005
Section 1EP5: Correction of Emergency Preparedness Weaknesses and
Deficiencies (71114.05)
EP-002-150, Emergency Plan Implementing Records,
W3D3-2005-011, Hurricane Katrina Event Report
QA-7-2005-WF3-1, Quality Assurance Audit Report: Emergency Plan
QA-7-2005-WF3-1, Followup to the 2005 QA Emergency Planning Audit
QA-7-2006-WF3-1, Quality Assurance Audit Report: Emergency Plan
QS-2005-W3-003, Quality Assurance Surveillance Report: Emergency Plan Respiratory
Equipment and Reviews of CR-ECH-2004-00096 and CR-ECH-2004-0389"
Evaluation Reports for:
Drill 2005-01, conducted February 17, 2005
Drill 2005-04, conducted August 4, 2005
Drill 2005-06, conducted December 7, 2005
Drill 2006-02, conducted May 25, 2006
Drill 2006-03, conducted June 28, 2006
Drill 2006-04, conducted July 27, 2006
Drill 2006-05, conducted September 21, 2006
Drill 2006-09, Offsite Medical Response Drill, conducted October 25, 2006
LO-WLO-2005-0043, 1st and 2nd Quarter 2005 Roll-Up Assessment: Emergency Planning
Department
LO-WLO-2005-0082, 3rd Quarter 2005 Roll-Up Assessment: Emergency Planning Department
Attachment
A-7
LO-WLO-2005-0106, 4th Quarter 2005 Roll-Up Assessment: Emergency Planning Department
LO-WLO-2006-0044, 1st Quarter 2006 Roll-Up Assessment: Emergency Planning Department
LO-WLO-2006-0069, 2nd Quarter 2006 Roll-Up Assessment: Emergency Planning Department
LO-WLO-2006-0103, 3rd Quarter 2006 Roll-Up Assessment: Emergency Planning Department
SNAPSHOT Assessment, Siren Battery Storage, October 19, 2005
Assessment Report LO-WLO-2005, Emergency Planning Performance Indicator Assessment,
October 26, 2005
Assessment Report LO-WLO-2006-00, Emergency Response Organization Staffing, September
25, 2006
Assessment Report LO-WLO-2006-041, Emergency Planning Performance Indicator
Assessment, April 21, 2006
Assessment Report LO-WLO-2006-000, Emergency Planning Performance Indicator
Assessment, October 29, 2006
EN-HU-103, Human Performance Error Reviews, Revision 0
Condition Reports:
2005-0046, -1060, -3292, -3471, -3602, -3702, -4407, -4899
2006-0234, -897, -1195, -1639, -1900, -2088, -2852, -3247, -4418
Section 2OS1: Access Controls to Radiologically Significant Areas (71121.01)
Corrective Action Documents
2006-03645, 2006-03661, 2006-03721,2006-03736, 2006-03739, 2006-03741, 2006-03812,
Procedures
ENS-RP-102,
Radiological Control, Revision 0
ENS-RP-105, Radiation Work Permits, Revision 7
ENS-RP-106, Radiological Survey Documentation, Revision 0
Audits and Assessments
LO-WLO-2006-00067-01, Access Control to Radiologically Significant Areas
Radiation Work Permit
RWP-2006-0005, Tours and Inspections
RWP-2006-0508, Reactor Coolant Pump Motor and Seal Replacement
RWP-2006-0509, Primary Manways
RWP-2006-0510, Nozzle Dams
RWP-2006-0511, Eddy Current Steam Generators
RWP-2006-0600, Health Physics Surveys
RWP-2006-0601, Rigging RWP
Attachment
A-8
RWP-2006-0603, Minor Maintenance Locked High Radiation Areas
RWP-2006-0608, Safety Injection Sump Installation
RWP-2006-0614, Pressurizer Manway and Valves
RWP-2006-0618, Remove/Replace Insulation in the Reactor Building and Annulus
RWP-2006-0702, Reactor Disassembly
RWP-2006-0708, Remove/Replace Startup Detector No. 2
Section 2OS2: ALARA Planning and Controls (71121.02)
Procedures
CE-002-006, Maintaining Reactor Coolant Chemistry, Revision 13
EN-RP-104, Personnel Contamination Events, Revision 1
EN-RP-109, Hot Spot Program, Revision 2
EN-RP-110, ALARA Program, Revision 2
HP-002-222, Steam Generator Radiological Controls, Revision 7
Section 4OA1: Performance Indicator Verification (71151)
Procedures
EN-LI-114, Performance Indicator Process, Revision 1
Miscellaneous Documents
QA/Oversight Observations, November 28, 2008
RF-14 Actual RCS Cleanup, November 28, 2008
4OA2
Identification and Resolution of Problems (71152)
Procedure
NUMBER
TITLE
REVISIONS
OP-903-094
ESTAS Subgroup Relay Test - Operating
10
Licensing Basis Document Change
Process
1
Corrective Action Process
7
OP-002-004
Chilled Water System
12
OP-002-003
Component Cooling Water System
12 and 13
Recognition and Classification of
Emergency Conditions
20-2 and 21
Notifications and Communications
30
Protective Action Guidelines
19
Attachment
A-9
Miscellaneous Documents
NUMBER
TITLE/SUBJECT
REVISION
ER-W3-00-0541-00
Evaluate the Essential Chilled Water Leaving
Temperature Setpoint
0
Quarterly Trend
Report
2nd Quarter 2006
0
Desk Guide 17
Drill Control Team Documentation
2
Training Evaluation Action Request 2006-1230
Waterford Steam Electric Station Emergency Plan
33
Operations Department Performance Indicator
2006
Condition Reports
4OA5 Other: NRC Temporary Instructions 2515/166
Calculation
NUMBER
TITLE
REVISION
GENE-0000-0054-9349
SIS Sump Strainer Stress Report
0
Engineering Requests
NUMBER
TITLE
REVISION
ER-W3-2003-0394-001
Safety Injection Sump
Modifications
0
Drawings
NUMBER
TITLE
REVISION
06-594, Sht. #1
Waterford 3 Containment &
Strainers
A
06-595, Sht. #2
Waterford 3 Containment &
Strainers
A
06-596, Sht. #3
Waterford 3 Containment &
A
Attachment
A-10
Strainers06-597, Sht. #4
Waterford 3 Containment &
Strainers
A
06-598, Sht. #5
Waterford 3 Containment &
Strainers
A
06-486, Sht. #0
LT-SI-7145AS & LT-SI-7145BS
Local Mounts
4
B430, Sht. X-23J-45
Instrument Installation Details
1
B430, Sht. X-23D-8A
Instrument Installation Details
2
B430, Sht. X-23J-25A
Instrument Installation Details
5
B430, Sht. X-23J-44
Instrument Installation Details
2
B430, Sht. X-23J-28
Instrument Installation Details
8
Condition Reports
Miscellaneous
NUMBER
TITLE
REVISION/DATE
LPL-EQMI-08.01
Environmental Qualification
Maintenance Input for Rosemount
Model 1153 Series A, B &D, 1154 &
1154 Series H Transmitters and
1159 Remote Seals
9
SQ-IC-03
Rosemount Pressure Transmitters
13
LPL-EQA-08.01B
Environmental Qualification
Assessment for the Rosemount
1154 Transmitters Used in the
Waterford SES Unit No. 3
3
LPL-EQA-08.01F
Environmental Qualification
Assessment for the Rosemount
1159 Remote Seal System Used in
the Waterford SES Unit No. 3
0
NOECP-333, Att. 7.1
Construction Material Testing
Document, Grout/Mortar Data, Lab
No. W2576, WO No. 76399
2