{{#Wiki_filter:July 12, 2007Mr. Robert J. Duncan II, Vice PresidentShearon Harris Nuclear Power Plant, Unit 1Carolina Power & Light CompanyP.O. Box 165New Hill, NC 27562
{{#Wiki_filter:July 12, 2007 Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant, Unit 1 Carolina Power & Light Company P.O. Box 165 New Hill, NC 27562


==SUBJECT:==
==SUBJECT:==
REQUESTS FOR ADDITIONAL INFORMATION REGARDING THEENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWERPLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)
REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWER PLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)


==Dear Mr. Duncan:==
==Dear Mr. Duncan:==
On November 14, 2006, Carolina Power & Light Company (CP&L) submitted an application forlicense renewal of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). As part of theenvironmental review for license renewal, the U.S. Nuclear Regulatory Commission (NRC) staffconducted an environmental site audit at the HNP during the week of June 4, 2007. In advanceof the audit, NRC staff submitted (by letter dated May 21, 2007) a list of information that wouldfacilitate the staff's review during the environmental site audit. We appreciate the efforts ofyour staff to make the requested information available during the audit.During the staff's review of the information, and based on discussions with your staff, we haveidentified areas where additional information is needed to complete our review. Enclosed is alist of requested information. The enclosure includes a list of documents referenced in theEnvironmental Report that the staff needs to evaluate to complete its review; the enclosure alsocontains the staff's requests for additional information in the form of numbered questions.Additionally, the NRC staff held a telephone conference call on July 11, 2007, with members ofyour staff to discuss a potential revision of the SAMA analysis for HNP. CP&L staff indicatedthat an amendment to the application to correct the SAMA analysis will be submitted to theNRC by the end of August 2007.
On November 14, 2006, Carolina Power & Light Company (CP&L) submitted an application for license renewal of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). As part of the environmental review for license renewal, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an environmental site audit at the HNP during the week of June 4, 2007. In advance of the audit, NRC staff submitted (by {{letter dated|date=May 21, 2007|text=letter dated May 21, 2007}}) a list of information that would facilitate the staffs review during the environmental site audit. We appreciate the efforts of your staff to make the requested information available during the audit.
R. J. Duncan II We request that you provide your response to this request within 30 days of the date of thisletter, in order to support the license renewal review schedule. If you have any questions,please contact me at 301-415-4049 or via e-mail at shq@nrc.gov
During the staffs review of the information, and based on discussions with your staff, we have identified areas where additional information is needed to complete our review. Enclosed is a list of requested information. The enclosure includes a list of documents referenced in the Environmental Report that the staff needs to evaluate to complete its review; the enclosure also contains the staffs requests for additional information in the form of numbered questions.
.Sincerely, /RA/Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-400
Additionally, the NRC staff held a telephone conference call on July 11, 2007, with members of your staff to discuss a potential revision of the SAMA analysis for HNP. CP&L staff indicated that an amendment to the application to correct the SAMA analysis will be submitted to the NRC by the end of August 2007.
 
R. J. Duncan II We request that you provide your response to this request within 30 days of the date of this letter, in order to support the license renewal review schedule. If you have any questions, please contact me at 301-415-4049 or via e-mail at shq@nrc.gov.
Sincerely,
/RA/
Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-400


==Enclosure:==
==Enclosure:==
As statedcc w/encl: See next page R. J. Duncan II We request that you provide your response to this request within 30 days of the date of thisletter, in order to support the license renewal review schedule. If you have any questions, please contact me at 301-415-4049 or via e-mail at shq@nrc.gov
As stated cc w/encl: See next page
.Sincerely, /RA/Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-400
 
R. J. Duncan II We request that you provide your response to this request within 30 days of the date of this letter, in order to support the license renewal review schedule. If you have any questions, please contact me at 301-415-4049 or via e-mail at shq@nrc.gov.
Sincerely,
/RA/
Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-400


==Enclosure:==
==Enclosure:==
As statedcc w/encl: See next page Adams Accession No.: ML071660322OFFICEPM:DLR:REBBLA:DLRBC:DLR:REBBNAMES. HernandezS. FigueroaR. Franovich DATE07/11/0707/11/0707/12/07OFFICIAL RECORD COPY Letter to R. Duncan from S. Hernandez Dated July 12, 2007
As stated cc w/encl: See next page Adams Accession No.: ML071660322 OFFICE PM:DLR:REBB LA:DLR BC:DLR:REBB NAME S. Hernandez S. Figueroa R. Franovich DATE 07/11/07 07/11/07 07/12/07 OFFICIAL RECORD COPY
 
Letter to R. Duncan from S. Hernandez Dated July 12, 2007


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION REGARDING THEENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWER PLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)DISTRIBUTION
REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWER PLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)
:E-MailP.T. Kuo/S. Lee (RidsNrrDlr)
DISTRIBUTION:
E-Mail P.T. Kuo/S. Lee (RidsNrrDlr)
R. Franovich (RidsNrrDlrRebb)
R. Franovich (RidsNrrDlrRebb)
E. Benner (RidsNrrDlrReba)
E. Benner (RidsNrrDlrReba)
S. Hernandez J. Muir C. Quinly (quinly2@llnl.gov)
S. Hernandez J. Muir C. Quinly (quinly2@llnl.gov)
M. Heath L. Regner P. O'Bryan, RI M. King, RI OGC (RidsOGCMailRoom)
M. Heath L. Regner P. OBryan, RI M. King, RI OGC (RidsOGCMailRoom)
D. Roth, OGC DLR/REBB EnclosureRequests for Additional Information (RAIs) Regardingthe Analysis of Severe Accident Mitigation Alternatives (SAMAs)for the Shearon Harris Nuclear Plant (HNP)RAI #1 - Provide the following reference documents:Document NameIdentifierList of chemicals used on the grounds of the plant and transmission linecorridors including, but not limited to, pesticides and herbicides.Binder #2Information about on-site and transmission line vegetation managementprogram plans and any plans regarding transmission lines that cross water bodies. Binder #3CP&L 1998b. Threatened and Endangered Species Self-Assessment Report.Memo. August 12.Binder #5Progress Energy. 2001. Harris Nuclear Plant 2000 Environmental MonitoringReport. Environmental Services Section, New Hill, NC. September. Binder #7Progress Energy. 2003. Harris Nuclear Plant 2002 Environmental MonitoringReport. Environmental Services Section, New Hill, NC. November. Binder #8CP&L. 1994. Harris Nuclear Power Plant 1992 Environmental Report.Environmental Services Section, New Hill, NC.Binder #9Maps showing locations of known threatened and endangered (T&E) speciesoccurrences. (Provide this document for NRC Official Use Only- NotPublicly Available)Binder #13Copies of all air permits for stationary air emission sources. Binder #20 CP&L's database/tracking system for non-radiological waste streamsBinder #27 Copies of the Hazardous Waste permit and associated reports required by theState and a copy of the Hazardous Waste Minimization Plan. Binder #28CP&L's Waste Minimization/Pollution Prevention Plan.Binder #29 If available, the NRC staff would like to see CP&L's copy of the HazardousMaterial Registration Certificate, and any Emergency Planning and Community Right to Know Act (EPCRA) reports. Binder #31Report showing the amount of non-radiological waste generated in HNP duringthe last five years. Non-radiological waste includes: medical, office, hazardous, universal wastes, and sanitary wastes from the treatment plant. Binder #33Letter to J. Barber from B.C. Waldrep Re: Industrial Landfill Closure.Dated04/19/2005Letter to B.C. Waldrep from J. Barber Re: Industrial Landfill Closure.Dated05/25/2005 Document NameIdentifier-2-HNP Employee residence data. September 2004.Dated09/01/2004Letter from E. McCartney to Mr. Alan Klimek re: HNP 2005 EnvironmentalMonitoring Report.Dated12/19/2006NCDENR Underground Storage Tank Operating Permit Application.ID-006715 Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES #NC0039586.Dated02/27/2004Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES.Dated10/07/2004Letter from Waldrup to Mr. K. Schuster re: Retraction of Notice of Violation.Dated11/17/2004Letter from L. Rose to B.C. Waldrep re: Water Quality Monitoring Plan.Dated11/18/2004Letter from B.C. Waldrep to Mr. K. Schuster re: Draft Water Quality Monitoring Plan.Dated08/23/2004Letter from E. McCartney to Mr. K. Schuster re: Non-Discharge permit forpump and haul of wastewater.Dated04/11/2006Letter from E. McCartney to Barry Herzberg re: Waste water pump and haulpermit.Dated05/25/2006Letter from B. C. Waldrep to Mr. K. Schuster re: Overflow reporting Form.Dated02/23/2004Letter from E. McCartney to Mr. Holley re: Erosion Control Plan forLandscaping near Harris Plant.Dated08/14/2005Letter from Benjamin to Corlett re: Shearon Harris Nuclear Power Plant(USFWS).Dated02/16/2006Real Estate Department Property Environmental Due Diligence - (Provide thisdocument for NRC Oficial Use Only-Not Publicly Available)
D. Roth, OGC DLR/REBB
.EVX-REDX 00002Procedures for protection of cultural resources during operations andmaintenance - (Provide this document for NRC Oficial Use Only-NotPublicly Available)
 
.Binder #34Reports related to original cultural resource work conducted - (Provide thisdocument for NRC Oficial Use Only-Not Publicly Available)
Enclosure Requests for Additional Information (RAIs)
.Binder #36 RAI #2 -Have there been past Notice of Violations issued to Harris regarding air pollution       issues during the last 5 years? If so please provide information on the violations       received.RAI #3 -Provide a summary compiling the annual emissions for all criteria pollutants from HNP during the last 2 years.RAI #4 -Provide the annual amount of solid waste generated at HNP during the last 5 years.
Regardingthe Analysis of Severe Accident Mitigation Alternatives (SAMAs) for the Shearon Harris Nuclear Plant (HNP)
Shearon Harris Nuclear Power Plant, Unit 1 cc:David T. ConleyAssociate General Counsel II -
RAI #1 - Provide the following reference documents:
Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551Resident Inspector / Harris NPSc/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998Ms. Margaret A. ForceAssistant Attorney General State of North Carolina Post Office Box 629 Raleigh, NC 27602Public Service CommissionState of South Carolina Post Office Drawer 11649 Columbia, SC 29211Ms. Beverly Hall, Section ChiefDivision of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721Mr. J. Paul Fulford, ManagerPerformance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company Post Office Box 1551 Raleigh, NC 27602-1551Mr. Eric McCartneyPlant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165Mr. Chris L. BurtonDirector of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, NC 27562-0165Mr. Robert P. GruberExecutive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326Chairman of the North Carolina   Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510Mr. Herb Council, ChairBoard of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602Mr. Tommy Emerson, ChairBoard of County Commissioners of Chatham County P. O. Box 87 Pittsboro, NC 27312Mr. Thomas J. Natale, ManagerSupport Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165Mr. David H. Corlett, SupervisorLicensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Shearon Harris Nuclear Power Plant, Unit 1 cc:-2-Mr. John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128Mr. Gordon A. CleftonNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC   20006-2708}}
Document Name Identifier List of chemicals used on the grounds of the plant and transmission line corridors including, but not limited to, pesticides and herbicides.
Binder #2 Information about on-site and transmission line vegetation management program plans and any plans regarding transmission lines that cross water bodies.
Binder #3 CP&L 1998b. Threatened and Endangered Species Self-Assessment Report.
Memo. August 12.
Binder #5 Progress Energy. 2001. Harris Nuclear Plant 2000 Environmental Monitoring Report. Environmental Services Section, New Hill, NC. September.
Binder #7 Progress Energy. 2003. Harris Nuclear Plant 2002 Environmental Monitoring Report. Environmental Services Section, New Hill, NC. November.
Binder #8 CP&L. 1994. Harris Nuclear Power Plant 1992 Environmental Report.
Environmental Services Section, New Hill, NC.
Binder #9 Maps showing locations of known threatened and endangered (T&E) species occurrences. (Provide this document for NRC Official Use Only-Not Publicly Available)
Binder #13 Copies of all air permits for stationary air emission sources.
Binder #20 CP&L's database/tracking system for non-radiological waste streams Binder #27 Copies of the Hazardous Waste permit and associated reports required by the State and a copy of the Hazardous Waste Minimization Plan.
Binder #28 CP&L's Waste Minimization/Pollution Prevention Plan.
Binder #29 If available, the NRC staff would like to see CP&L's copy of the Hazardous Material Registration Certificate, and any Emergency Planning and Community Right to Know Act (EPCRA) reports.
Binder #31 Report showing the amount of non-radiological waste generated in HNP during the last five years. Non-radiological waste includes: medical, office, hazardous, universal wastes, and sanitary wastes from the treatment plant.
Binder #33 Letter to J. Barber from B.C. Waldrep Re: Industrial Landfill Closure.
Dated 04/19/2005 Letter to B.C. Waldrep from J. Barber Re: Industrial Landfill Closure.
Dated 05/25/2005
 
Document Name Identifier HNP Employee residence data. September 2004.
Dated 09/01/2004 Letter from E. McCartney to Mr. Alan Klimek re: HNP 2005 Environmental Monitoring Report.
Dated 12/19/2006 NCDENR Underground Storage Tank Operating Permit Application.
ID-006715 Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES #NC0039586.
Dated 02/27/2004 Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES.
Dated 10/07/2004 Letter from Waldrup to Mr. K. Schuster re: Retraction of Notice of Violation.
Dated 11/17/2004 Letter from L. Rose to B.C. Waldrep re: Water Quality Monitoring Plan.
Dated 11/18/2004 Letter from B.C. Waldrep to Mr. K. Schuster re: Draft Water Quality Monitoring Plan.
Dated 08/23/2004 Letter from E. McCartney to Mr. K. Schuster re: Non-Discharge permit for pump and haul of wastewater.
Dated 04/11/2006 Letter from E. McCartney to Barry Herzberg re: Waste water pump and haul permit.
Dated 05/25/2006 Letter from B. C. Waldrep to Mr. K. Schuster re: Overflow reporting Form.
Dated 02/23/2004 Letter from E. McCartney to Mr. Holley re: Erosion Control Plan for Landscaping near Harris Plant.
Dated 08/14/2005 Letter from Benjamin to Corlett re: Shearon Harris Nuclear Power Plant (USFWS).
Dated 02/16/2006 Real Estate Department Property Environmental Due Diligence - (Provide this document for NRC Oficial Use Only-Not Publicly Available).
EVX-REDX 00002 Procedures for protection of cultural resources during operations and maintenance - (Provide this document for NRC Oficial Use Only-Not Publicly Available).
Binder #34 Reports related to original cultural resource work conducted - (Provide this document for NRC Oficial Use Only-Not Publicly Available).
Binder #36 RAI #2 - Have there been past Notice of Violations issued to Harris regarding air pollution issues during the last 5 years? If so please provide information on the violations received.
RAI #3 - Provide a summary compiling the annual emissions for all criteria pollutants from HNP during the last 2 years.
RAI #4 - Provide the annual amount of solid waste generated at HNP during the last 5 years.
 
Shearon Harris Nuclear Power Plant, Unit 1 cc:
David T. Conley Associate General Counsel II -
Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551 Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, NC 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, SC 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Eric McCartney Plant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Mr. Chris L. Burton Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, NC 27312 Mr. Thomas J. Natale, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
 
Shearon Harris Nuclear Power Plant, Unit 1 cc: Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128 Mr. Gordon A. Clefton Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-2708}}

Latest revision as of 23:14, 14 January 2025

Requests for Additional Information Regarding the Environmental Review for Shearon Harris Nuclear Power Plant License Renewal Application
ML071660322
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/12/2007
From: Hernandez-Quinones S
NRC/NRR/ADRO/DLR/REBB
To: Duncan R
Carolina Power & Light Co
Hernandez S, NRR/DLR/REBB, 415-4049
References
TAC MD3611
Download: ML071660322 (9)


Text

July 12, 2007 Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant, Unit 1 Carolina Power & Light Company P.O. Box 165 New Hill, NC 27562

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWER PLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)

Dear Mr. Duncan:

On November 14, 2006, Carolina Power & Light Company (CP&L) submitted an application for license renewal of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). As part of the environmental review for license renewal, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an environmental site audit at the HNP during the week of June 4, 2007. In advance of the audit, NRC staff submitted (by letter dated May 21, 2007) a list of information that would facilitate the staffs review during the environmental site audit. We appreciate the efforts of your staff to make the requested information available during the audit.

During the staffs review of the information, and based on discussions with your staff, we have identified areas where additional information is needed to complete our review. Enclosed is a list of requested information. The enclosure includes a list of documents referenced in the Environmental Report that the staff needs to evaluate to complete its review; the enclosure also contains the staffs requests for additional information in the form of numbered questions.

Additionally, the NRC staff held a telephone conference call on July 11, 2007, with members of your staff to discuss a potential revision of the SAMA analysis for HNP. CP&L staff indicated that an amendment to the application to correct the SAMA analysis will be submitted to the NRC by the end of August 2007.

R. J. Duncan II We request that you provide your response to this request within 30 days of the date of this letter, in order to support the license renewal review schedule. If you have any questions, please contact me at 301-415-4049 or via e-mail at shq@nrc.gov.

Sincerely,

/RA/

Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

As stated cc w/encl: See next page

R. J. Duncan II We request that you provide your response to this request within 30 days of the date of this letter, in order to support the license renewal review schedule. If you have any questions, please contact me at 301-415-4049 or via e-mail at shq@nrc.gov.

Sincerely,

/RA/

Samuel Hernandez, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

As stated cc w/encl: See next page Adams Accession No.: ML071660322 OFFICE PM:DLR:REBB LA:DLR BC:DLR:REBB NAME S. Hernandez S. Figueroa R. Franovich DATE 07/11/07 07/11/07 07/12/07 OFFICIAL RECORD COPY

Letter to R. Duncan from S. Hernandez Dated July 12, 2007

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE ENVIRONMENTAL REVIEW FOR SHEARON HARRIS NUCLEAR POWER PLANT LICENSE RENEWAL APPLICATION (TAC NO. MD3611)

DISTRIBUTION:

E-Mail P.T. Kuo/S. Lee (RidsNrrDlr)

R. Franovich (RidsNrrDlrRebb)

E. Benner (RidsNrrDlrReba)

S. Hernandez J. Muir C. Quinly (quinly2@llnl.gov)

M. Heath L. Regner P. OBryan, RI M. King, RI OGC (RidsOGCMailRoom)

D. Roth, OGC DLR/REBB

Enclosure Requests for Additional Information (RAIs)

Regardingthe Analysis of Severe Accident Mitigation Alternatives (SAMAs) for the Shearon Harris Nuclear Plant (HNP)

RAI #1 - Provide the following reference documents:

Document Name Identifier List of chemicals used on the grounds of the plant and transmission line corridors including, but not limited to, pesticides and herbicides.

Binder #2 Information about on-site and transmission line vegetation management program plans and any plans regarding transmission lines that cross water bodies.

Binder #3 CP&L 1998b. Threatened and Endangered Species Self-Assessment Report.

Memo. August 12.

Binder #5 Progress Energy. 2001. Harris Nuclear Plant 2000 Environmental Monitoring Report. Environmental Services Section, New Hill, NC. September.

Binder #7 Progress Energy. 2003. Harris Nuclear Plant 2002 Environmental Monitoring Report. Environmental Services Section, New Hill, NC. November.

Binder #8 CP&L. 1994. Harris Nuclear Power Plant 1992 Environmental Report.

Environmental Services Section, New Hill, NC.

Binder #9 Maps showing locations of known threatened and endangered (T&E) species occurrences. (Provide this document for NRC Official Use Only-Not Publicly Available)

Binder #13 Copies of all air permits for stationary air emission sources.

Binder #20 CP&L's database/tracking system for non-radiological waste streams Binder #27 Copies of the Hazardous Waste permit and associated reports required by the State and a copy of the Hazardous Waste Minimization Plan.

Binder #28 CP&L's Waste Minimization/Pollution Prevention Plan.

Binder #29 If available, the NRC staff would like to see CP&L's copy of the Hazardous Material Registration Certificate, and any Emergency Planning and Community Right to Know Act (EPCRA) reports.

Binder #31 Report showing the amount of non-radiological waste generated in HNP during the last five years. Non-radiological waste includes: medical, office, hazardous, universal wastes, and sanitary wastes from the treatment plant.

Binder #33 Letter to J. Barber from B.C. Waldrep Re: Industrial Landfill Closure.

Dated 04/19/2005 Letter to B.C. Waldrep from J. Barber Re: Industrial Landfill Closure.

Dated 05/25/2005

Document Name Identifier HNP Employee residence data. September 2004.

Dated 09/01/2004 Letter from E. McCartney to Mr. Alan Klimek re: HNP 2005 Environmental Monitoring Report.

Dated 12/19/2006 NCDENR Underground Storage Tank Operating Permit Application.

ID-006715 Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES #NC0039586.

Dated 02/27/2004 Letter from B.C. Waldrep to Mr. K. Schuster re: NPDES.

Dated 10/07/2004 Letter from Waldrup to Mr. K. Schuster re: Retraction of Notice of Violation.

Dated 11/17/2004 Letter from L. Rose to B.C. Waldrep re: Water Quality Monitoring Plan.

Dated 11/18/2004 Letter from B.C. Waldrep to Mr. K. Schuster re: Draft Water Quality Monitoring Plan.

Dated 08/23/2004 Letter from E. McCartney to Mr. K. Schuster re: Non-Discharge permit for pump and haul of wastewater.

Dated 04/11/2006 Letter from E. McCartney to Barry Herzberg re: Waste water pump and haul permit.

Dated 05/25/2006 Letter from B. C. Waldrep to Mr. K. Schuster re: Overflow reporting Form.

Dated 02/23/2004 Letter from E. McCartney to Mr. Holley re: Erosion Control Plan for Landscaping near Harris Plant.

Dated 08/14/2005 Letter from Benjamin to Corlett re: Shearon Harris Nuclear Power Plant (USFWS).

Dated 02/16/2006 Real Estate Department Property Environmental Due Diligence - (Provide this document for NRC Oficial Use Only-Not Publicly Available).

EVX-REDX 00002 Procedures for protection of cultural resources during operations and maintenance - (Provide this document for NRC Oficial Use Only-Not Publicly Available).

Binder #34 Reports related to original cultural resource work conducted - (Provide this document for NRC Oficial Use Only-Not Publicly Available).

Binder #36 RAI #2 - Have there been past Notice of Violations issued to Harris regarding air pollution issues during the last 5 years? If so please provide information on the violations received.

RAI #3 - Provide a summary compiling the annual emissions for all criteria pollutants from HNP during the last 2 years.

RAI #4 - Provide the annual amount of solid waste generated at HNP during the last 5 years.

Shearon Harris Nuclear Power Plant, Unit 1 cc:

David T. Conley Associate General Counsel II -

Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551 Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, NC 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, SC 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Eric McCartney Plant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Mr. Chris L. Burton Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, NC 27312 Mr. Thomas J. Natale, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

Shearon Harris Nuclear Power Plant, Unit 1 cc: Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128 Mr. Gordon A. Clefton Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-2708