| title = Browns Ferry, Units 1 and 2, Presentation Slides: February 26, 2009 Meeting with the Tennessee Valley Authority (TVA) to Discuss Proposed Extended Power Uprate (EPU) Analyses Revision
| title = Presentation Slides: February 26, 2009 Meeting with the Tennessee Valley Authority (TVA) to Discuss Proposed Extended Power Uprate (EPU) Analyses Revision
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:"Jl (I) 0 tT~
""'t <
t: _.
l>> =
""'t (I) 1\\)5:
en l>>
""'t 1\\),<
0 o
l>>
<05.
Z
~
::I:
(;
o
"'0 o
:D m
"'tJC aJ-I
::Dm Oz
:Ez zm
(/)~
"m mm
::D<
::D>>
-<I Zl e:m 0-<
I>>
me:
>>-1
::D:::I:
-cO I::D z-l <
 
[lID Agenda
* Results of Revised NPSH/COP Calculation
* ACRS COP Questions
* Follow-up Questions from Site Visit
* Review of TVA Realistic Fire Analysis
* NRC Request for Gothic Case Inputs James Emens 2
 
Revised NPSH/COP SHORT TERM LOCAIIID
* RHR flow into broken loop reduced from 11,500 gpm to 11,000 gpm NPSHA calculation uses 11,500 gpm NPSHR calculation uses actual flow - 11,000 gpm Lower flow reduces NPSH R from 28.4 feet to 25.6 feet @ 10 minutes
* Initial drywell humidity changed from 100% to 50%
Parametric analysis varying the drywell air relative humidity from 00/0 to 100% was performed Concluded that the drywell humidity cannot exceed 50% without producing condensation in excess of TS allowable unidentified leakage of 5 gpm Change increases amount of noncondensible gases in containment post-LOCA J. D. Wolcott 3
 
Revised NPSH/COP SHORT TERM LOCA [II]
* NPSH R for RHR pump Changed from Single Value to Time Dependant Value Provided by Sulzer Report Intact loop @ 10,000 gpm o
25.5 feet o
25.7 feet ----724.3 feet over 10 minute duration Broken Loop @ 11,000 gpm o
28.4 feet o
27 feet ----7 25.6 feet over 10 minute duration J.D. Wolcott 4
 
Revised NPSH/COP SHORT TERM LOCAUID Case Pump Maximum Required COP (psi)
Minimum Containment Margin (psi)
Duration COP Needed (minutes)
LOCAST CS 2
.4 9
RHR-IL
.8 1.6 5
RHR BL 3.3
-0.9 10 Revised Short-Term LOCA Calculation Results LOCAST CS 2
1.3 8.9 RHR-IL
.2 2.6 3.2 RHR BL 2.1 0.7 9.3 J. D. Wolcott 5
 
COP Available and COP Required Short-Term LOCA (revised) [II]
160 *
(
i 22
;r Atmospheric Pressure 120
+ 14 110 12 lL----.....,------~-----""T"""-----_=:_----::::_----_:'
100, << I 60010 150 140
!&#xa3;
~...
:l is... 130 8
E l-
~
Wetwell Pressure RHR Pump Broken Loop Containment Pressure Required cs Pump Containment Pressure Required
~
RHR Pump LPCI Loop Containment Pressure Required 20 18 ii
'iii
.e:
~
16...
:l III III
~...
D.
o 100 200 400 500 J. D. Wolcott 6
 
[II]
COP Available and COP Required Short-Term LOCA (previous) 160
* i i 22 150 20
[
~
~
"1V[
E CIl I
120 140 130 RH R Pump Broken Loop Containment Pressure Required CS Pump Contalnmem Pressure Required RHR Pump LPCI Loop Containment Pressure Required 16 14 18
:i ell.e:
~
:::l ell ell CIl...
a...
110 12 J.D.Wolcott 100 500 400 300 Time (seconds) 200 100 o
11-----""""'!'------.....,-------~-----_:_:_:_-----_::_-----_;'1 10
, << I 600 7
 
[iI]
Revised NPSH/COP Appendix R
* NPSHR Changed from Time-Dependent to Fixed Value Based on 3% Head Loss Hydraulic Institute standard for NPSHR 8000 hour time-dependent NPSHr is conservative for limited duration Appendix R event (25.2 feet at peak SP temperature)
Revised calculation uses a fixed NPSHR (17 feet), which is equivalent to 3% loss in TDH 3% curves based on certified tests from BFN and other plants for same model pumps Use is recommended in BWROG COP Topical Report NEDC-33347P J. D. Wolcott 8
 
Revised NPSH/COP Appendix R 1m Case Appendix R Pump RHR Max Required Containment Pressure (psia) 24 Minimum Containment Margin (psi) 1.6 Duration COP Needed (hours) 69 Revised Appendix R Calculation Results Appendix R RHR 20.5 4.1 27.8 J. D. Wolcott 9
 
COP Available and COP Required Appendix R
[II]
(revised) 240,
, 40 220 ~
+ 35 200 -I I
./
+ 30 I
25 r;
'iii w_"'~'".
E::
ell...
~18&deg;11 (
::::I III III III
. 20 ~
{!!.160
~
140 W
... 15 120
_+10 Atmospheric Pressure I
100 I' I
, 5 o
3 6
9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 Time (hours)
J. D. Wolcott 10
 
COP Available and COP Required Appendix R 1m (previous) 240,
i 40 35 220 30 200 rOJI til Pressure GJ Iii 160 20 Ii.
I 140 *tvI
:l" 15 Atmospheric Pressure 120 10 100 '
, 5 o
3 6
9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 Time (hours)
J. D. Wolcott 25 Ii
.8:
GJ 5 til f...~m,...",~w_"
'(ij 11
 
ACRS COP QUESTIONS/SITE VISIT FOLLOW-UP UID QUESTIONS
* Review of ACRS COP Questions Additional information needed by NRC Staff Discussion with Sulzer Representative
* Follow-up Questions from BFN Site Visit Manual actions for second RHR pump Containment venting Removal from service of drywell blowers Transition from EOls to SSls J. D. Wolcott 12
 
'r
[II]
Review of TVA Realistic Fire Analysis
* ACRS Interest
* Status of Staff Review J. E. Emens 13
 
III]
NRC Request for Gothic Case Inputs
* Containment data (OPL-4a) is available
* Decay Heat Assumptions are available
* Identify any additional NRC needs
* Means of submittal to NRC B. C. Morris 14}}

Latest revision as of 12:52, 14 January 2025

Presentation Slides: February 26, 2009 Meeting with the Tennessee Valley Authority (TVA) to Discuss Proposed Extended Power Uprate (EPU) Analyses Revision
ML090710768
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/26/2009
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Orf, Tracy J.; NRR/DORL 415-2788
Shared Package
ML090710755 List:
References
TAC MD5262, TAC MD5263
Download: ML090710768 (14)


Text

"Jl (I) 0 tT~

""'t <

t: _.

l>> =

""'t (I) 1\\)5:

en l>>

""'t 1\\),<

0 o

l>>

<05.

Z

~

I:

(;

o

"'0 o

D m

"'tJC aJ-I

Dm Oz
Ez zm

(/)~

"m mm

D<
D>>

-<I Zl e:m 0-<

I>>

me:

>>-1

D:::I:

-cO I::D z-l <

[lID Agenda

  • Results of Revised NPSH/COP Calculation
  • Follow-up Questions from Site Visit
  • Review of TVA Realistic Fire Analysis
  • NRC Request for Gothic Case Inputs James Emens 2

Revised NPSH/COP SHORT TERM LOCAIIID

  • RHR flow into broken loop reduced from 11,500 gpm to 11,000 gpm NPSHA calculation uses 11,500 gpm NPSHR calculation uses actual flow - 11,000 gpm Lower flow reduces NPSH R from 28.4 feet to 25.6 feet @ 10 minutes
  • Initial drywell humidity changed from 100% to 50%

Parametric analysis varying the drywell air relative humidity from 00/0 to 100% was performed Concluded that the drywell humidity cannot exceed 50% without producing condensation in excess of TS allowable unidentified leakage of 5 gpm Change increases amount of noncondensible gases in containment post-LOCA J. D. Wolcott 3

Revised NPSH/COP SHORT TERM LOCA [II]

  • NPSH R for RHR pump Changed from Single Value to Time Dependant Value Provided by Sulzer Report Intact loop @ 10,000 gpm o

25.5 feet o

25.7 feet ----724.3 feet over 10 minute duration Broken Loop @ 11,000 gpm o

28.4 feet o

27 feet ----7 25.6 feet over 10 minute duration J.D. Wolcott 4

Revised NPSH/COP SHORT TERM LOCAUID Case Pump Maximum Required COP (psi)

Minimum Containment Margin (psi)

Duration COP Needed (minutes)

LOCAST CS 2

.4 9

RHR-IL

.8 1.6 5

RHR BL 3.3

-0.9 10 Revised Short-Term LOCA Calculation Results LOCAST CS 2

1.3 8.9 RHR-IL

.2 2.6 3.2 RHR BL 2.1 0.7 9.3 J. D. Wolcott 5

COP Available and COP Required Short-Term LOCA (revised) [II]

160 *

(

i 22

r Atmospheric Pressure 120

+ 14 110 12 lL----.....,------~-----""T"""-----_=:_----::::_----_:'

100, << I 60010 150 140

~...

l is... 130 8

E l-

~

Wetwell Pressure RHR Pump Broken Loop Containment Pressure Required cs Pump Containment Pressure Required

~

RHR Pump LPCI Loop Containment Pressure Required 20 18 ii

'iii

.e:

~

16...

l III III

~...

D.

o 100 200 400 500 J. D. Wolcott 6

[II]

COP Available and COP Required Short-Term LOCA (previous) 160

  • i i 22 150 20

[

~

~

"1V[

E CIl I

120 140 130 RH R Pump Broken Loop Containment Pressure Required CS Pump Contalnmem Pressure Required RHR Pump LPCI Loop Containment Pressure Required 16 14 18

i ell.e:

~

l ell ell CIl...

a...

110 12 J.D.Wolcott 100 500 400 300 Time (seconds) 200 100 o

11-----""""'!'------.....,-------~-----_:_:_:_-----_::_-----_;'1 10

, << I 600 7

[iI]

Revised NPSH/COP Appendix R

  • NPSHR Changed from Time-Dependent to Fixed Value Based on 3% Head Loss Hydraulic Institute standard for NPSHR 8000 hour0.0926 days <br />2.222 hours <br />0.0132 weeks <br />0.00304 months <br /> time-dependent NPSHr is conservative for limited duration Appendix R event (25.2 feet at peak SP temperature)

Revised calculation uses a fixed NPSHR (17 feet), which is equivalent to 3% loss in TDH 3% curves based on certified tests from BFN and other plants for same model pumps Use is recommended in BWROG COP Topical Report NEDC-33347P J. D. Wolcott 8

Revised NPSH/COP Appendix R 1m Case Appendix R Pump RHR Max Required Containment Pressure (psia) 24 Minimum Containment Margin (psi) 1.6 Duration COP Needed (hours) 69 Revised Appendix R Calculation Results Appendix R RHR 20.5 4.1 27.8 J. D. Wolcott 9

COP Available and COP Required Appendix R

[II]

(revised) 240,

, 40 220 ~

+ 35 200 -I I

./

+ 30 I

25 r;

'iii w_"'~'".

E::

ell...

~18°11 (

I III III III

. 20 ~

{!!.160

~

140 W

... 15 120

_+10 Atmospheric Pressure I

100 I' I

, 5 o

3 6

9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 Time (hours)

J. D. Wolcott 10

COP Available and COP Required Appendix R 1m (previous) 240,

i 40 35 220 30 200 rOJI til Pressure GJ Iii 160 20 Ii.

I 140 *tvI

l" 15 Atmospheric Pressure 120 10 100 '

, 5 o

3 6

9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 Time (hours)

J. D. Wolcott 25 Ii

.8:

GJ 5 til f...~m,...",~w_"

'(ij 11

ACRS COP QUESTIONS/SITE VISIT FOLLOW-UP UID QUESTIONS

  • Review of ACRS COP Questions Additional information needed by NRC Staff Discussion with Sulzer Representative
  • Follow-up Questions from BFN Site Visit Manual actions for second RHR pump Containment venting Removal from service of drywell blowers Transition from EOls to SSls J. D. Wolcott 12

'r

[II]

Review of TVA Realistic Fire Analysis

  • Status of Staff Review J. E. Emens 13

III]

NRC Request for Gothic Case Inputs

  • Containment data (OPL-4a) is available
  • Decay Heat Assumptions are available
  • Identify any additional NRC needs
  • Means of submittal to NRC B. C. Morris 14