Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0631104352006-11-0707 November 2006 Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Project stage: Request 05000260/LER-2007-001, Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test2007-03-0202 March 2007 Re Automatic Turbine Trip and Reactor Scram Due to Equipment Failure During Performance of the Main Generator Rheostat Test Project stage: Request ML0711300782007-04-18018 April 2007 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Supplemental Response to Requests for Additional Information (RAI) Project stage: Supplement ML0711503662007-04-24024 April 2007 Units 1, 2, & 3 - Fire Protection Program - Post-Fire Operator Manual Actions Project stage: Request ML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721303752007-07-31031 July 2007 CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting 05000259/LER-2007-005, Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank2007-08-0808 August 2007 Regarding Automatic Reactor Scram Due to Turbine Trip as a Result of Invalid High Level in Moisture Separator Drain Tank Project stage: Request ML0723602572007-08-21021 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Limit Curves Project stage: Request ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request 05000296/LER-2007-003, Leak in an ASME Class I Code Reactor Pressure Boundary Pipe2007-11-21021 November 2007 Leak in an ASME Class I Code Reactor Pressure Boundary Pipe Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0804304462008-02-11011 February 2008 Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures Project stage: Request ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0805001712008-05-0202 May 2008 Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other 2007-07-05
[Table View] |
Text
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT Meeting with NRC Extended Power Uprate and Transition to NFPA 805 Update Rockville, Maryland September 15, 2011
Agenda
Introductions
Background
Containment Accident Pressure
Replacement Steam Dryers
Submittal and Review Schedule
NFPA 805 Transition Status 1
=
Background===
Browns Ferry Nuclear (BFN) Extended Power Uprate (EPU) application currently under NRC review for all three units will result in 14.3 percent increase above current licensed power.
In September 2009, the NRC placed the application review on hold pending development of guidance on credit for Containment Accident Pressure (CAP).
Two outstanding issues for the BFN EPU remained to be resolved:
CAP Steam dryers
TVA met with NRC on December 15, 2010 to:
Confirm outstanding project scope Communicate planned CAP mitigation strategy relative to draft NRC guidelines Communicate plans for steam dryers 2
Background (continued)
NRC guidance associated with CAP:
In January 2011, NRC Staff requested approval to resume review of EPU license amendment requests (LARs) using the revised CAP guidance.
In March 2011, the Commissioners issued a memorandum that approved the revised CAP guidance provided by the Staff and allowed work on EPU LARs to resume.
Based on issuance of NRC guidance on CAP, TVA determined that submittal of key assumptions (as discussed in December 15, 2010 meeting) was not necessary.
On May 15, 2011, the NRC issued a letter to TVA stating that, based on development of CAP review criteria, the NRC is prepared to resume review of the BFN EPU application.
3
Containment Accident Pressure
TVA identified and evaluated changes/modifications to eliminate or minimize CAP credit for limiting events, using NRC CAP guidance.
At this time, using NPSHr (net positive suction head required) 3 percent curves eliminates CAP credit for the station blackout (SBO) and anticipated transient without scram (ATWS) events.
The following actions are planned to eliminate CAP credit for fire events:
TVA plans to revise the Generic Letter 89-13 heat exchanger analysis and program to support taking credit for improved residual heat removal (RHR) heat exchanger performance.
TVA plans to increase suppression pool inventory using Condensate Storage Tank water.
Increased suppression pool water inventory combined with improved RHR heat exchanger performance reduces peak suppression pool temperature, increases RHR pump static head, and eliminates CAP credit.
4
Containment Accident Pressure (continued)
NRC CAP credit guidance introduced an uncertainty adder to NPSHr for a design basis loss-of-coolant accident (LOCA) event. The Boiling Water Reactor Owners Group (BWROG) has been developing a generic approach for addressing the NPSH uncertainty adder.
TVA plans to use the BWROG approach.
Improving RHR heat exchanger performance eliminates CAP credit for the long-term (i.e., >10 minutes) LOCA event.
TVA plans to take CAP credit only for the short-term (i.e., <10 minutes) LOCA event in accordance with the NRC guidance.
TVA will request formal NRC acceptance of the analysis for CAP credit for short-term LOCA.
5
Containment Accident Pressure (continued)
The following summarizes the CAP credit approach for the BFN EPU application:
Event Current Need Approach Short-term LOCA
(< 10 minutes)
Need CAP credit for RHR and Core Spray due to run-out flow rate and suction strainer loading Request formal NRC acceptance of CAP credit Long-term LOCA
(> 10 minutes)
Need small amount of CAP credit for Core Spray Eliminate CAP by improving RHR heat exchanger performance Fire Protection Need large amount of CAP credit for RHR Eliminate CAP by improving RHR heat exchanger performance and increasing suppression pool inventory SBO CAP credit not required CAP credit not required ATWS CAP credit not required CAP credit not required 6
Replacement Steam Dryers
In December 2009, TVA determined that NRC concerns with analyses of existing steam dryers could not be resolved, and replacement steam dryers (RSDs) would be required.
An RSD specification was developed and provided to prospective vendors.
The RSD work scope consists of three phases:
Phase I, Design and Analysis Phase II, Fabrication Phase III, Installation
Negotiations are in progress with General Electric Hitachi for RSD design, analysis, fabrication, and installation.
7
Submittal and Review Schedule
The proposed EPU schedule is based on overall resource and risk considerations for TVA.
The EPU schedule assumes the following:
RSD analysis and design will not begin until the formal acceptance of the CAP analysis by the NRC.
RSD fabrication will not begin until NRC issues the EPU amendment.
8
Submittal and Review Schedule (continued)
TVA Submittals
EPU CAP Analysis Report May 2012 Schedule assumes BWROG input is received in March 2012 TVA will request NRC formal acceptance of CAP Analysis Report
EPU Steam Dryer Analysis Report Spring 2014 NRC Review Expectations
Acceptance of CAP Analysis Report Spring 2013
Issue EPU Amendment 2015 9
NFPA 805 Transition Status Major Milestones Achieved
NFPA Code compliance evaluations
Nuclear safety capability assessment (NSCA) component selection, logics, cable selection, and cable routing (final owner reviews pending)
Scoping fire modeling (generic treatments calculation)
Remaining Major Milestones
Fire PRA completion (including peer review)
Fire area assessments and variance from deterministic requirements (VFDR) resolutions
Fire risk evaluations
LAR preparation and submittal 10