| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| author name = Taylor N H
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Diya F
| addressee name = Diya F
Line 9: Line 9:
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Taylor N H
| contact person = Taylor N
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| document type = Inspection Plan, Inspection Report, Letter
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000483/2016005]]
See also: [[see also::IR 05000483/2016005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
REGION IV 1600 E LAMAR BLVD
REGION IV  
ARLINGTON, TX 76011
1600 E LAMAR BLVD  
-4511 August 31, 2016
ARLINGTON, TX 76011-4511  
Mr. Fadi Diya, Senior Vice President
August 31, 2016  
  and Chief Nuclear Officer
Mr. Fadi Diya, Senior Vice President  
Union Electric Company
  and Chief Nuclear Officer  
P.O. Box 620
Union Electric Company  
Fulton, MO 65251  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
P.O. Box 620  
(REPORT 05000483/2016005)
Fulton, MO 65251   
Dear Mr. Diya: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
SUBJECT:  
completed its mid-cycle performance review of Callaway Plant.  The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June
MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT  
30, 2016.  This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
(REPORT 05000483/2016005)  
  The NRC determined that overall, Callaway Plant
Dear Mr. Diya:  
operated in a manner that preserved public health and safety and met all cornerstone objectives.  The NRC determined the performance at  
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle  
Callaway Plant
performance review of Callaway Plant.  The NRC reviewed the most recent quarterly  
during the most recent quarter was within the Licensee Response Column of the  
performance indicators (PIs) in addition to inspection results and enforcement actions from  
NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).  Therefore, the
July 1, 2015 through June 30, 2016.  This letter informs you of the NRCs assessment of your  
NRC plans to conduct ROP baseline inspections at your facility.  The enclosed inspection plan lists the inspections scheduled through June 30 , 2018.  Routine inspections performed by resident inspectors are not included in the inspection plan.
facility during this period and its plans for future inspections at your facility.    
  The inspections listed during the second half
The NRC determined that overall, Callaway Plant operated in a manner that preserved public  
of the inspection plan are tentative and may be revised at the end
health and safety and met all cornerstone objectives.  The NRC determined the performance at  
-of-cycle performance review.  The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.  The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.  This inspection plan does not include security related inspections, which  
Callaway Plant during the most recent quarter was within the Licensee Response Column of the  
will be sent via separate, non
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very  
-publicly available correspondence.
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the  
In response to the accident at Fukushima, the Commission issued Order EA
nominal, expected range (i.e., Green).  Therefore, the NRC plans to conduct ROP baseline  
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
inspections at your facility.   
-Design-Basis External Events
The enclosed inspection plan lists the inspections scheduled through June 30, 2018.  Routine  
," and Order EA
inspections performed by resident inspectors are not included in the inspection plan. The
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in  
inspections listed during the second half of the inspection plan are tentative and may be revised  
development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff  
at the end-of-cycle performance review.  The NRC provides the inspection plan to allow for the  
 
resolution of any scheduling conflicts and personnel availability issues.  The NRC will contact  
F. Diya - 2 - will confirm through inspections the full implementation of the orders mentioned above by performing
you as soon as possible to discuss changes to the inspection plan should circumstances  
Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
warrant any changes.  This inspection plan does not include security related inspections, which  
-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
will be sent via separate, non-publicly available correspondence.  
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order  
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the  
Reliable Spent Fuel Pool Instrumentation.  The NRC conducted audits of licensee efforts  
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the  
Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff
 
F. Diya  
- 2 -  
will confirm through inspections the full implementation of the orders mentioned above by  
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies  
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness  
Communication/Staffing/Multi-Unit Dose Assessment Plans.   
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the  
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the  
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning  
in calendar year 2017.  This will be the final mid-cycle assessment letter.  The staff will continue  
to conduct quarterly assessment meetings and communicate changes in the assessment of  
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,  
Operating Reactor Assessment Program.  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the  
NRC Public Document Room or from the Publicly Available Records (PARS) component of  
NRC Public Document Room or from the Publicly Available Records (PARS) component of  
NRC's Agencywide
NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is  
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public  
-rm/adams.html
Electronic Reading Room).  
(the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.  
Please contact  
Sincerely,  
me at 817-200-1141 with any questions you have regarding this letter.
/RA/  
Sincerely, /RA/ Nicholas H. Taylor, Chief
Nicholas H. Taylor, Chief  
Projects Branch B
Projects Branch B  
Division of Reactor Projects Docket No. 50
Division of Reactor Projects  
-483 License No. NPF
Docket No. 50-483  
-30 Enclosure:
License No. NPF-30  
Callaway Plant Inspection/Activity Plan
Enclosure:  
 
Callaway Plant Inspection/Activity Plan  
 
Page 1 of 2
Page 1 of 2
08/30/2016
08/30/2016
09:32:44 Report 22 Unit NumberPlanned Dates
09:32:44
Start          EndInspection ActivityTitle No. of Staff
Report 22
on SiteCallawayInspection / Activity Plan
Unit
07/01/2016
Number
-06/30/2018BASELINE-PLANT MODS
Planned Dates
1 1 IP A dverse Weather (Site/Imminent)7111101-Imminent
Start          End
Inspection Activity
Title
No. of Staff
on Site
Callaway
Inspection / Activity Plan
07/01/2016 - 06/30/2018
BASELINE
- PLANT MODS
1
1  
IP
Adverse Weather (Site/Imminent)
7111101-Imminent
01/01/2016
01/01/2016
12/31/2016
12/31/2016
EB1-07T-CWY HEAT SINK PERFORMANCE
EB1-07T
1 1 IP Heat Sink Performance7111107T 09/26/2016
- CWY HEAT SINK PERFORMANCE
1
1  
IP
Heat Sink Performance
7111107T
09/26/2016
09/30/2016
09/30/2016
RS 24-RADIATION SAFETY
RS 24
3 1 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016
- RADIATION SAFETY
1 IP Occupational Dose Assessment71124.0411/07/201611/11/2016
3
EP-1-EP PERFORMANCE INDICATORS
1  
1 1 IP Drill/Exercise Performance71151-EP0111/14/201611/18/2016
IP
1 IP ERO Readiness71151-EP0211/14/201611/18/2016
Occupational ALARA Planning and Controls
1 IP A lert & Notification System Reliability71151-EP0311/14/201611/18/2016
71124.02
EP-2-BIENNIAL EP PROGRAM INSPECTION
11/07/2016
1 1 IP A lert and Notification System Testing711140211/14/201611/18/2016
11/11/2016
1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016
1  
1 IP Emergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016
IP
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016
Occupational Dose Assessment
ISFSI-ROUTINE INSPECTION (ONE WEEK IN MONTH)
71124.04
1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
11/07/2016
60855.1 02/01/2017
11/11/2016
02/28/2017EXAM-INIT EXAM 4 1 INITIAL EXAM CALLAWAY (09/2017)
EP-1
X02591 08/14/2017
- EP PERFORMANCE INDICATORS
1
1  
IP
Drill/Exercise Performance
71151-EP01
11/14/2016
11/18/2016
1  
IP
ERO Readiness
71151-EP02
11/14/2016
11/18/2016
1  
IP
Alert & Notification System Reliability
71151-EP03
11/14/2016
11/18/2016
EP-2
- BIENNIAL EP PROGRAM INSPECTION
1
1  
IP
Alert and Notification System Testing
7111402
11/14/2016
11/18/2016
1  
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
11/14/2016
11/18/2016
1  
IP
Emergency Action Level and Emergency Plan Changes
7111404
11/14/2016
11/18/2016
1  
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
11/14/2016
11/18/2016
ISFSI
- ROUTINE INSPECTION (ONE WEEK IN MONTH)
1
1  
IP
Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1
02/01/2017
02/28/2017
EXAM
- INIT EXAM
4
1  
INITIAL EXAM CALLAWAY (09/2017)
X02591
08/14/2017
08/18/2017
08/18/2017
1 INITIAL EXAM CALLAWAY (09/2017)
1  
X0259109/11/2017
INITIAL EXAM CALLAWAY (09/2017)
X02591
09/11/2017
09/15/2017
09/15/2017
RS 5678-RS TEAM 5 1 IP Radiation Monitoring Instrumentation71124.05 02/27/2017
RS 5678
- RS TEAM
5
1  
IP
Radiation Monitoring Instrumentation
71124.05
02/27/2017
03/03/2017
03/03/2017
1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/27/2017
1  
IP
Radioactive Gaseous and Liquid Effluent Treatment
71124.06
02/27/2017
03/03/2017
03/03/2017
1 IP Radiological Environmental Monitoring Program71124.07 02/27/2017
1  
IP
Radiological Environmental Monitoring Program
71124.07
02/27/2017
03/03/2017
03/03/2017
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/27/2017
1  
IP
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
71124.08
02/27/2017
03/03/2017
03/03/2017
EP-2-BIENNIAL EP EXERCISE INSPECTION
EP-2
4 1 IP Exercise Evaluation7111401 04/24/2017
- BIENNIAL EP EXERCISE INSPECTION
4
1  
IP
Exercise Evaluation
7111401
04/24/2017
04/28/2017
04/28/2017
1 IP Emergency Action Level and Emergency Plan Changes7111404 04/24/2017
1  
IP
Emergency Action Level and Emergency Plan Changes
7111404
04/24/2017
04/28/2017
04/28/2017
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
EP-3
1 1 IP Drill/Exercise Performance71151-EP01
- EP PERFORMANCE INDICATOR VERIFICATION
1
1  
IP
Drill/Exercise Performance
71151-EP01
04/24/2017
04/24/2017
04/28/2017
04/28/2017
1 IP ERO Readiness71151-EP02
1  
IP
ERO Readiness
71151-EP02
04/24/2017
04/24/2017
04/28/2017
04/28/2017
1 IP A lert & Notification System Reliability71151-EP03
1  
IP
Alert & Notification System Reliability
71151-EP03
04/24/2017
04/24/2017
04/28/2017
04/28/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities.
and announced inspection procedures.  
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
CWY
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
 
Page 2 of 2
Page 2 of 2
08/30/2016
08/30/2016
09:32:44 Report 22 Unit NumberPlanned Dates
09:32:44
Start          EndInspection ActivityTitle No. of Staff
Report 22
on SiteCallawayInspection / Activity Plan
Unit
07/01/2016
Number
-06/30/2018
Planned Dates
BRQ-BIENNIAL REQUAL INSPECTION
Start          End
3 1 IP Licensed Operator Requalification Program7111111B 06/12/2017
Inspection Activity
Title
No. of Staff
on Site
Callaway
Inspection / Activity Plan
07/01/2016 - 06/30/2018
BRQ
- BIENNIAL REQUAL INSPECTION
3
1  
IP
Licensed Operator Requalification Program
7111111B
06/12/2017
06/16/2017
06/16/2017
EB1-21M-CWY COMPONENT DESIGN BASES INSPECTION
EB1-21M
6 1 IP Component Design Bases Inspection (Teams)7111121M 07/31/2017
- CWY COMPONENT DESIGN BASES INSPECTION
6
1  
IP
Component Design Bases Inspection (Teams)
7111121M
07/31/2017
09/01/2017
09/01/2017
RS 12 PI-RADIATION SAFETY
RS 12 PI
3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017
- RADIATION SAFETY
3
1  
IP
Radiological Hazard Assessment and Exposure Controls
71124.01
10/16/2017
10/20/2017
1
IP
Occupational ALARA Planning and Controls
71124.02
10/16/2017
10/20/2017
10/20/2017
1 IP Occupational ALARA Planning and Controls71124.02 10/16/2017
1  
IP
Occupational Exposure Control Effectiveness
71151-OR01
10/16/2017
10/20/2017
10/20/2017
1 IP Occupational Exposure Control Effectiveness71151-OR01
1  
IP
RETS/ODCM Radiological Effluent Occurrences
71151-PR01
10/16/2017
10/16/2017
10/20/2017
10/20/2017
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
71111.08
- INSERVICE INSPECTION RFO22
1
1  
IP
Inservice Inspection Activities - PWR
7111108P
10/16/2017
10/16/2017
10/20/201771111.08-INSERVICE INSPECTION RFO22
1 1 IP Inservice Inspection Activities - PWR7111108P 10/16/2017
10/27/2017
10/27/2017
EP-1-EP PROGRAM INSPECTION
EP-1
1 1 IP A lert and Notification System Testing7111402 04/23/2018
- EP PROGRAM INSPECTION
1
1  
IP
Alert and Notification System Testing
7111402
04/23/2018
04/27/2018
04/27/2018
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 04/23/2018
1  
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
04/23/2018
04/27/2018
04/27/2018
1 IP Emergency Action Level and Emergency Plan Changes7111404 04/23/2018
1  
IP
Emergency Action Level and Emergency Plan Changes
7111404
04/23/2018
04/27/2018
04/27/2018
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 04/23/2018
1  
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
04/23/2018
04/27/2018
04/27/2018
1 IP Drill/Exercise Performance71151-EP01
1  
IP
Drill/Exercise Performance
71151-EP01
04/23/2018
04/23/2018
04/27/2018
04/27/2018
1 IP ERO Readiness71151-EP02
1  
IP
ERO Readiness
71151-EP02
04/23/2018
04/23/2018
04/27/2018
04/27/2018
1 IP A lert & Notification System Reliability71151-EP03
1  
IP
Alert & Notification System Reliability
71151-EP03
04/23/2018
04/23/2018
04/27/2018
04/27/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities.
and announced inspection procedures.  
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
CWY
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
 


   ML16237A03
   ML16237A033
3 SUNSI Review
  SUNSI Review  
By:  ADAMS  Yes    No  Publicly Available
By:   
  Non-Publicly Available
ADAMS  
  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE: RIV
  Yes    No  
SPE:DRP/B D: DRS D: DRP C: DRP/B   NAME DProulx AVegel TWPruett NTaylor   SIGNATURE /RA/ /RA Jeff Clark for/
  Publicly Available  
/RA/ /RA/   DATE 8/22/16 8/22/16 8/23/16 8/23/16  
Non-Publicly Available  
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016         SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
  Non-Sensitive  
  (REPORT 05000483/2016005)
  Sensitive  
  DISTRIBUTION
Keyword:  
: Regional Administrator (Kriss.Kennedy@nrc.gov)  
NRC-002  
OFFICE: RIV  
SPE:DRP/B  
D: DRS  
D: DRP  
C: DRP/B  
NAME  
DProulx  
AVegel  
TWPruett  
NTaylor  
SIGNATURE  
/RA/  
/RA Jeff Clark for/  
/RA/  
/RA/  
DATE  
8/22/16  
8/22/16  
8/23/16  
8/23/16  
 
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016  
SUBJECT:  
MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
(REPORT 05000483/2016005)  
   
   
Deputy Regional Administrator (Scott.Morris@nrc.gov)  
DISTRIBUTION:
DRP Director (Troy.Pruett@nrc.gov)  
Regional Administrator (Kriss.Kennedy@nrc.gov) 
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
  Senior Resident Inspector (Thomas.Hartman@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)  
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)  
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)  
Administrative Assistant (Dawn.Yancey@nrc.gov
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
Project Manager (John.Klos@nrc.gov)  
Administrative Assistant (Dawn.Yancey@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Project Manager (John.Klos@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)  
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV RSLO (Bill.Maier@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
Director, DIRS, NRR (Chris.Miller@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)  
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)  
Director, DORL, NRR (Anne.Boland@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)  
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)  
Director, NSIR (Brian.Holian@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)  
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)  
DRP Branch Chiefs (R4DRPBC@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)  
DRS Branch Chiefs (R4DRSBC@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)  
ROPreports.Resource@nrc.gov
DRP Branch Chiefs (R4DRPBC@nrc.gov)  
ROPassessment.Resource@nrc.gov
DRS Branch Chiefs (R4DRSBC@nrc.gov)  
ROPreports.Resource@nrc.gov  
ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 20:48, 9 January 2025

Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
ML16237A033
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Union Electric Co
Taylor N
References
IR 2016005
Download: ML16237A033 (6)


See also: IR 05000483/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

Dear Mr. Diya:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Callaway Plant. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Callaway Plant operated in a manner that preserved public

health and safety and met all cornerstone objectives. The NRC determined the performance at

Callaway Plant during the most recent quarter was within the Licensee Response Column of the

NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very

low (i.e., Green) safety significance, and all PIs indicated that your performance was within the

nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline

inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

F. Diya

- 2 -

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects

Docket No. 50-483

License No. NPF-30

Enclosure:

Callaway Plant Inspection/Activity Plan

Page 1 of 2

08/30/2016

09:32:44

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Callaway

Inspection / Activity Plan

07/01/2016 - 06/30/2018

BASELINE

- PLANT MODS

1

1

IP

Adverse Weather (Site/Imminent)

7111101-Imminent

01/01/2016

12/31/2016

EB1-07T

- CWY HEAT SINK PERFORMANCE

1

1

IP

Heat Sink Performance

7111107T

09/26/2016

09/30/2016

RS 24

- RADIATION SAFETY

3

1

IP

Occupational ALARA Planning and Controls

71124.02

11/07/2016

11/11/2016

1

IP

Occupational Dose Assessment

71124.04

11/07/2016

11/11/2016

EP-1

- EP PERFORMANCE INDICATORS

1

1

IP

Drill/Exercise Performance

71151-EP01

11/14/2016

11/18/2016

1

IP

ERO Readiness

71151-EP02

11/14/2016

11/18/2016

1

IP

Alert & Notification System Reliability

71151-EP03

11/14/2016

11/18/2016

EP-2

- BIENNIAL EP PROGRAM INSPECTION

1

1

IP

Alert and Notification System Testing

7111402

11/14/2016

11/18/2016

1

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

11/14/2016

11/18/2016

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

11/14/2016

11/18/2016

1

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

11/14/2016

11/18/2016

ISFSI

- ROUTINE INSPECTION (ONE WEEK IN MONTH)

1

1

IP

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1

02/01/2017

02/28/2017

EXAM

- INIT EXAM

4

1

INITIAL EXAM CALLAWAY (09/2017)

X02591

08/14/2017

08/18/2017

1

INITIAL EXAM CALLAWAY (09/2017)

X02591

09/11/2017

09/15/2017

RS 5678

- RS TEAM

5

1

IP

Radiation Monitoring Instrumentation

71124.05

02/27/2017

03/03/2017

1

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

02/27/2017

03/03/2017

1

IP

Radiological Environmental Monitoring Program

71124.07

02/27/2017

03/03/2017

1

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

02/27/2017

03/03/2017

EP-2

- BIENNIAL EP EXERCISE INSPECTION

4

1

IP

Exercise Evaluation

7111401

04/24/2017

04/28/2017

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

04/24/2017

04/28/2017

EP-3

- EP PERFORMANCE INDICATOR VERIFICATION

1

1

IP

Drill/Exercise Performance

71151-EP01

04/24/2017

04/28/2017

1

IP

ERO Readiness

71151-EP02

04/24/2017

04/28/2017

1

IP

Alert & Notification System Reliability

71151-EP03

04/24/2017

04/28/2017

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

CWY

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 2 of 2

08/30/2016

09:32:44

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Callaway

Inspection / Activity Plan

07/01/2016 - 06/30/2018

BRQ

- BIENNIAL REQUAL INSPECTION

3

1

IP

Licensed Operator Requalification Program

7111111B

06/12/2017

06/16/2017

EB1-21M

- CWY COMPONENT DESIGN BASES INSPECTION

6

1

IP

Component Design Bases Inspection (Teams)

7111121M

07/31/2017

09/01/2017

RS 12 PI

- RADIATION SAFETY

3

1

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

10/16/2017

10/20/2017

1

IP

Occupational ALARA Planning and Controls

71124.02

10/16/2017

10/20/2017

1

IP

Occupational Exposure Control Effectiveness

71151-OR01

10/16/2017

10/20/2017

1

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

10/16/2017

10/20/2017

71111.08

- INSERVICE INSPECTION RFO22

1

1

IP

Inservice Inspection Activities - PWR

7111108P

10/16/2017

10/27/2017

EP-1

- EP PROGRAM INSPECTION

1

1

IP

Alert and Notification System Testing

7111402

04/23/2018

04/27/2018

1

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

04/23/2018

04/27/2018

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

04/23/2018

04/27/2018

1

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

04/23/2018

04/27/2018

1

IP

Drill/Exercise Performance

71151-EP01

04/23/2018

04/27/2018

1

IP

ERO Readiness

71151-EP02

04/23/2018

04/27/2018

1

IP

Alert & Notification System Reliability

71151-EP03

04/23/2018

04/27/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

CWY

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

ML16237A033

SUNSI Review

By:

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE: RIV

SPE:DRP/B

D: DRS

D: DRP

C: DRP/B

NAME

DProulx

AVegel

TWPruett

NTaylor

SIGNATURE

/RA/

/RA Jeff Clark for/

/RA/

/RA/

DATE

8/22/16

8/22/16

8/23/16

8/23/16

Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov