ML16237A033
| ML16237A033 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/31/2016 |
| From: | Nick Taylor NRC/RGN-IV/DRP/RPB-B |
| To: | Diya F Union Electric Co |
| Taylor N | |
| References | |
| IR 2016005 | |
| Download: ML16237A033 (6) | |
See also: IR 05000483/2016005
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 31, 2016
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
(REPORT 05000483/2016005)
Dear Mr. Diya:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Callaway Plant. The NRC reviewed the most recent quarterly
performance indicators (PIs) in addition to inspection results and enforcement actions from
July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your
facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Callaway Plant operated in a manner that preserved public
health and safety and met all cornerstone objectives. The NRC determined the performance at
Callaway Plant during the most recent quarter was within the Licensee Response Column of the
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the
nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline
inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
F. Diya
- 2 -
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Chief
Projects Branch B
Division of Reactor Projects
Docket No. 50-483
License No. NPF-30
Enclosure:
Callaway Plant Inspection/Activity Plan
Page 1 of 2
08/30/2016
09:32:44
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Callaway
Inspection / Activity Plan
07/01/2016 - 06/30/2018
BASELINE
- PLANT MODS
1
1
IP
Adverse Weather (Site/Imminent)
7111101-Imminent
01/01/2016
12/31/2016
EB1-07T
- CWY HEAT SINK PERFORMANCE
1
1
IP
Heat Sink Performance
7111107T
09/26/2016
09/30/2016
- RADIATION SAFETY
3
1
IP
Occupational ALARA Planning and Controls
11/07/2016
11/11/2016
1
IP
Occupational Dose Assessment
11/07/2016
11/11/2016
- EP PERFORMANCE INDICATORS
1
1
IP
Drill/Exercise Performance
71151-EP01
11/14/2016
11/18/2016
1
IP
ERO Readiness
71151-EP02
11/14/2016
11/18/2016
1
IP
Alert & Notification System Reliability
71151-EP03
11/14/2016
11/18/2016
- BIENNIAL EP PROGRAM INSPECTION
1
1
IP
Alert and Notification System Testing
7111402
11/14/2016
11/18/2016
1
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
11/14/2016
11/18/2016
1
IP
Emergency Action Level and Emergency Plan Changes
7111404
11/14/2016
11/18/2016
1
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
11/14/2016
11/18/2016
- ROUTINE INSPECTION (ONE WEEK IN MONTH)
1
1
IP
Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1
02/01/2017
02/28/2017
EXAM
- INIT EXAM
4
1
INITIAL EXAM CALLAWAY (09/2017)
X02591
08/14/2017
08/18/2017
1
INITIAL EXAM CALLAWAY (09/2017)
X02591
09/11/2017
09/15/2017
- RS TEAM
5
1
IP
Radiation Monitoring Instrumentation
02/27/2017
03/03/2017
1
IP
Radioactive Gaseous and Liquid Effluent Treatment
02/27/2017
03/03/2017
1
IP
Radiological Environmental Monitoring Program
02/27/2017
03/03/2017
1
IP
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
02/27/2017
03/03/2017
- BIENNIAL EP EXERCISE INSPECTION
4
1
IP
Exercise Evaluation
7111401
04/24/2017
04/28/2017
1
IP
Emergency Action Level and Emergency Plan Changes
7111404
04/24/2017
04/28/2017
- EP PERFORMANCE INDICATOR VERIFICATION
1
1
IP
Drill/Exercise Performance
71151-EP01
04/24/2017
04/28/2017
1
IP
ERO Readiness
71151-EP02
04/24/2017
04/28/2017
1
IP
Alert & Notification System Reliability
71151-EP03
04/24/2017
04/28/2017
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
CWY
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
Page 2 of 2
08/30/2016
09:32:44
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Callaway
Inspection / Activity Plan
07/01/2016 - 06/30/2018
BRQ
- BIENNIAL REQUAL INSPECTION
3
1
IP
Licensed Operator Requalification Program
7111111B
06/12/2017
06/16/2017
EB1-21M
- CWY COMPONENT DESIGN BASES INSPECTION
6
1
IP
Component Design Bases Inspection (Teams)
7111121M
07/31/2017
09/01/2017
- RADIATION SAFETY
3
1
IP
Radiological Hazard Assessment and Exposure Controls
10/16/2017
10/20/2017
1
IP
Occupational ALARA Planning and Controls
10/16/2017
10/20/2017
1
IP
Occupational Exposure Control Effectiveness
71151-OR01
10/16/2017
10/20/2017
1
IP
RETS/ODCM Radiological Effluent Occurrences
71151-PR01
10/16/2017
10/20/2017
- INSERVICE INSPECTION RFO22
1
1
IP
Inservice Inspection Activities - PWR
7111108P
10/16/2017
10/27/2017
- EP PROGRAM INSPECTION
1
1
IP
Alert and Notification System Testing
7111402
04/23/2018
04/27/2018
1
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
04/23/2018
04/27/2018
1
IP
Emergency Action Level and Emergency Plan Changes
7111404
04/23/2018
04/27/2018
1
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
04/23/2018
04/27/2018
1
IP
Drill/Exercise Performance
71151-EP01
04/23/2018
04/27/2018
1
IP
ERO Readiness
71151-EP02
04/23/2018
04/27/2018
1
IP
Alert & Notification System Reliability
71151-EP03
04/23/2018
04/27/2018
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
CWY
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
SUNSI Review
By:
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE: RIV
SPE:DRP/B
D: DRS
D: DRP
C: DRP/B
NAME
DProulx
AVegel
TWPruett
NTaylor
SIGNATURE
/RA/
/RA Jeff Clark for/
/RA/
/RA/
DATE
8/22/16
8/22/16
8/23/16
8/23/16
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
(REPORT 05000483/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov