IR 05000280/2017009: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (8 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML17101A808 | ||
| issue date = | | issue date = 04/11/2017 | ||
| title = | | title = NRC Team Inspection Report 05000280/2017009 and 05000281/2017009 | ||
| author name = | | author name = Mckenna P | ||
| author affiliation = NRC/RGN-II/DRP/RPB7 | | author affiliation = NRC/RGN-II/DRP/RPB7 | ||
| addressee name = Stoddard D | | addressee name = Stoddard D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
| license number = DPR-032, DPR-037 | | license number = DPR-032, DPR-037 | ||
| contact person = | | contact person = Philip J. McKenna | ||
| document report number = IR 2017009 | | document report number = IR 2017009 | ||
| document type = Inspection Report, Letter | | document type = Inspection Report, Letter | ||
| page count = | | page count = 14 | ||
}} | }} | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:April 11, 2017 | ||
==SUBJECT:== | |||
SURRY POWER STATION - NRC TEAM INSPECTION REPORT 05000280/2017009 AND 05000281/2017009 | |||
==Dear Mr. Stoddard:== | |||
On March 16, 2017, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station. The enclosed report documents the inspection results, which were discussed with Mr. R. Simmons and other members of your staff on March 16, 2017. | |||
The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of Mr. Daniel G. activities, and interviews with station personnel. | |||
The | |||
No NRC-identified or self-revealing findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Philip J. McKenna, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects | |||
License | Docket No.: | ||
50-280, 50-281 License No.: DPR-32, DPR-37 | |||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000280/2017009 | IR 05000280/2017009, 05000281/2017009 w/Attachment: Supplemental Information | ||
REGION II== | |||
Docket No.: | |||
50-280, 50-281 | |||
License No.: | |||
DPR-32, DPR-37 | |||
Report No.: | |||
05000280/2017009, 05000281/2017009 | |||
Licensee: | |||
Virginia Electric and Power Company (VEPCO) | |||
Facility: | |||
Surry Power Station, Units 1 and 2 | |||
Location: | |||
5850 Hog Island Road Surry, VA 23883 | |||
Dates: | |||
March 13 - 16, 2017 | |||
Inspectors: | |||
S. Freeman, Senior Reactor Analyst, RII (Team Leader) | |||
G. MacDonald, Senior Reactor Analyst, RII C. Jones, Resident Inspector, Surry | |||
Approved by: | |||
Philip J. McKenna, Acting Chief | |||
Reactor Projects Branch 7 | |||
Division of Reactor Projects | |||
Enclosure | |||
== | =SUMMARY= | ||
IR 05000280/2017009, 05000281/2017009; 03/13/2017 - 03/16/2017; Surry Power Station | |||
Units 1 and 2; Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans issued December 23, 2015. | |||
The inspection covered a one-week inspection by two senior reactor analysts and one resident inspector. No NRC-identified or self-revealing findings were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5. | |||
===NRC-Identified and Self-Revealing Findings=== | |||
None | |||
===Licensee-Identified Violations=== | |||
None | None | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
4. Other Activities | ===4. Other Activities=== | ||
{{a|4OA5}} | |||
==4OA5 Other Activities (TI 2515/191)== | |||
==4OA5 Other Activities | The objective of Temporary Instruction (TI) 2015/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, is to verify that licensees have adequately implemented the mitigation strategies as described in the licensees Final Integrated Plan, which was described in letters dated January 25, 2016, (ADAMS Accession No. ML16033A353) and July 20, 2015, (ADAMS Accession No. ML15205A342) and the NRCs plant safety evaluation (ADAMS Accession No. ML16158A432) and to verify that the licensees installed reliable water-level measurement instrumentation in their spent fuel pools. The purpose of this TI is also to verify the licensees have implemented Emergency Preparedness (EP) enhancements as described in their site-specific submittals and the NRCs safety assessments, including multi-unit dose assessment capability and enhancements to ensure that staffing is sufficient and communications can be maintained during such an event. | ||
The objective of Temporary Instruction (TI) 2015/191, | |||
The inspection verifies that plans for complying with NRC Orders EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ADAMS Accession No. ML12054A736) and EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verifies implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013, (ADAMS Accession No. ML12339A262). | The inspection verifies that plans for complying with NRC Orders EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ADAMS Accession No. ML12054A736) and EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verifies implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013, (ADAMS Accession No. ML12339A262). | ||
The team discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify that the strategies could be implemented as stated in the | The team discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify that the strategies could be implemented as stated in the licensees submittals and the NRC staff prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged. Specific details of the teams inspection activities are described in the following sections. | ||
1. Mitigation Strategies for Beyond-Design Basis External Events | ===1. Mitigation Strategies for Beyond-Design Basis External Events=== | ||
====a. Inspection Scope==== | |||
The team examined the licensees established guidelines and implementing procedures for the beyond-design basis mitigation strategies. The team assessed how the licensee coordinated and documented the interface/transition between existing off-normal and emergency operating procedures with the newly developed mitigation strategies. The team selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios. The team verified that a preventive maintenance program had been established for the Diverse and Flexible Coping Strategies (FLEX) portable equipment and that periodic equipment inventories were in place and being conducted. Additionally, the team examined the introductory and planned periodic/refresher training provided to the Operations and Security staff most likely to be tasked with implementation of the FLEX mitigation strategies. The team also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel. Documents reviewed are listed in the attachment. | |||
b. | |||
Assessment | |||
Based on samples selected for review, the inspectors verified that the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittals and the associated safety evaluation and determined that the licensee was generally in compliance with NRC Order EA-12-049. The inspectors verified that the licensee satisfactorily: | |||
* developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events. | * developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events. | ||
* integrated the FSGs into existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures. | * integrated the FSGs into existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures. | ||
| Line 87: | Line 117: | ||
* developed means to ensure that the necessary off-site FLEX equipment would be available from off-site locations. | * developed means to ensure that the necessary off-site FLEX equipment would be available from off-site locations. | ||
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the | The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensees corrective action program. | ||
====c. Findings==== | ====c. Findings==== | ||
No findings were | No findings identified. | ||
===2. Spent Fuel Pool Instrumentation=== | |||
====a. Inspection Scope==== | |||
The team examined the licensees newly installed spent fuel pool instrumentation. | |||
Specifically, the inspectors verified the sensors were installed as described in the plant-specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel were physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment. | |||
b. | |||
Assessment | |||
Based on samples selected for review, the inspectors determined that the licensee satisfactorily installed and established control of the spent fuel pool (SFP)instrumentation as described in the plant specific submittals and the associated safety evaluation and determined that the licensee is generally in compliance with NRC Order EA-12-051. The inspectors verified that the licensee satisfactorily: | |||
* installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittals and safety evaluation. | * installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittals and safety evaluation. | ||
* installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittals. | * installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittals. | ||
* trained their staff to | * trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation. | ||
* developed and issued procedures for maintenance, testing, and use of the reliable SFP instrumentation. | * developed and issued procedures for maintenance, testing, and use of the reliable SFP instrumentation. | ||
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the | The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensees corrective action program. | ||
====c. Findings==== | ====c. Findings==== | ||
| Line 109: | Line 144: | ||
===3. Staffing and Communication Request for Information=== | ===3. Staffing and Communication Request for Information=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Through discussions with plant staff, review of documentation and plant walkdowns, the team verified that the licensee had implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of offsite | Through discussions with plant staff, review of documentation and plant walkdowns, the team verified that the licensee had implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of offsite power scenario as described in the licensees staffing assessment and the NRC safety assessment. The team also verified that the licensee had implemented dose assessment (including releases from spent fuel pools) capability using the licensees site-specific dose assessment software and approach as described in the licensees multi-unit dose assessment submittal. Documents reviewed are listed in the attachment. | ||
power scenario as described in the | |||
b. | |||
Assessment | |||
following: | The inspectors reviewed information provided in the licensees multi-unit dose submittal and in response to the NRCS March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that resulted in an extended loss of all alternating current power (ELAP) to the site and impedes access to the site. The inspectors verified the following: | ||
* Licensee satisfactorily implemented required staffing | * Licensee satisfactorily implemented required staffing change(s) to support an ELAP scenario. | ||
* EP communications equipment and facilities were sufficient for dealing with an ELAP scenario. | * EP communications equipment and facilities were sufficient for dealing with an ELAP scenario. | ||
* Implemented dose assessment capabilities (including releases from spent fuel pools) using the | * Implemented dose assessment capabilities (including releases from spent fuel pools) using the licensees site-specific dose assessment software and approach. | ||
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensee's corrective action program. | The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensee's corrective action program. | ||
====c. Findings==== | ====c. Findings==== | ||
No findings | No findings identified. | ||
{{a|4OA6}} | |||
==4OA6 Exit== | ==4OA6 Exit== | ||
===Exit Meeting Summary=== | ===Exit Meeting Summary=== | ||
On March 16, 2017, the inspectors presented the inspection results to Mr. Roy Simmons and other members of the site staff. The inspectors confirmed that proprietary information was not provided or examined during the inspection. | |||
ATTACHMENT: | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
===Licensee personnel=== | ===Licensee personnel=== | ||
: | : | ||
| Line 152: | Line 182: | ||
: [[contact::J. Henderson]], Manager of Design Engineering | : [[contact::J. Henderson]], Manager of Design Engineering | ||
: [[contact::J. Holloway]], Engineering Supervisor | : [[contact::J. Holloway]], Engineering Supervisor | ||
: [[contact::E. Turko]], Engineering Supervisor | : [[contact::E. Turko]], Engineering Supervisor | ||
D Lawrence, Director of Nuclear Safety and Licensing | |||
: [[contact::L. Baker]], Manager of Nuclear Training | : [[contact::L. Baker]], Manager of Nuclear Training | ||
: [[contact::B. Garber]], Licensing Manager | : [[contact::B. Garber]], Licensing Manager | ||
| Line 166: | Line 196: | ||
==LIST OF REPORT ITEMS== | ==LIST OF REPORT ITEMS== | ||
===Opened and Closed=== | ===Opened and Closed=== | ||
None | None | ||
===Discussed=== | ===Discussed=== | ||
None | |||
None | |||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
}} | }} | ||
Latest revision as of 10:30, 9 January 2025
| ML17101A808 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/11/2017 |
| From: | Philip Mckenna Reactor Projects Branch 7 |
| To: | Stoddard D Virginia Electric & Power Co (VEPCO) |
| Philip J. McKenna | |
| References | |
| IR 2017009 | |
| Download: ML17101A808 (14) | |
Text
April 11, 2017
SUBJECT:
SURRY POWER STATION - NRC TEAM INSPECTION REPORT 05000280/2017009 AND 05000281/2017009
Dear Mr. Stoddard:
On March 16, 2017, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station. The enclosed report documents the inspection results, which were discussed with Mr. R. Simmons and other members of your staff on March 16, 2017.
The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of Mr. Daniel G. activities, and interviews with station personnel.
No NRC-identified or self-revealing findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Philip J. McKenna, Acting Chief Reactor Projects Branch 7 Division of Reactor Projects
Docket No.:
50-280, 50-281 License No.: DPR-32, DPR-37
Enclosure:
IR 05000280/2017009, 05000281/2017009 w/Attachment: Supplemental Information
REGION II==
Docket No.:
50-280, 50-281
License No.:
Report No.:
05000280/2017009, 05000281/2017009
Licensee:
Virginia Electric and Power Company (VEPCO)
Facility:
Surry Power Station, Units 1 and 2
Location:
5850 Hog Island Road Surry, VA 23883
Dates:
March 13 - 16, 2017
Inspectors:
S. Freeman, Senior Reactor Analyst, RII (Team Leader)
G. MacDonald, Senior Reactor Analyst, RII C. Jones, Resident Inspector, Surry
Approved by:
Philip J. McKenna, Acting Chief
Reactor Projects Branch 7
Division of Reactor Projects
Enclosure
SUMMARY
IR 05000280/2017009, 05000281/2017009; 03/13/2017 - 03/16/2017; Surry Power Station
Units 1 and 2; Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans issued December 23, 2015.
The inspection covered a one-week inspection by two senior reactor analysts and one resident inspector. No NRC-identified or self-revealing findings were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.
NRC-Identified and Self-Revealing Findings
None
Licensee-Identified Violations
None
REPORT DETAILS
4. Other Activities
4OA5 Other Activities (TI 2515/191)
The objective of Temporary Instruction (TI) 2015/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, is to verify that licensees have adequately implemented the mitigation strategies as described in the licensees Final Integrated Plan, which was described in letters dated January 25, 2016, (ADAMS Accession No. ML16033A353) and July 20, 2015, (ADAMS Accession No. ML15205A342) and the NRCs plant safety evaluation (ADAMS Accession No. ML16158A432) and to verify that the licensees installed reliable water-level measurement instrumentation in their spent fuel pools. The purpose of this TI is also to verify the licensees have implemented Emergency Preparedness (EP) enhancements as described in their site-specific submittals and the NRCs safety assessments, including multi-unit dose assessment capability and enhancements to ensure that staffing is sufficient and communications can be maintained during such an event.
The inspection verifies that plans for complying with NRC Orders EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ADAMS Accession No. ML12054A736) and EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verifies implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013, (ADAMS Accession No. ML12339A262).
The team discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify that the strategies could be implemented as stated in the licensees submittals and the NRC staff prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged. Specific details of the teams inspection activities are described in the following sections.
1. Mitigation Strategies for Beyond-Design Basis External Events
a. Inspection Scope
The team examined the licensees established guidelines and implementing procedures for the beyond-design basis mitigation strategies. The team assessed how the licensee coordinated and documented the interface/transition between existing off-normal and emergency operating procedures with the newly developed mitigation strategies. The team selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios. The team verified that a preventive maintenance program had been established for the Diverse and Flexible Coping Strategies (FLEX) portable equipment and that periodic equipment inventories were in place and being conducted. Additionally, the team examined the introductory and planned periodic/refresher training provided to the Operations and Security staff most likely to be tasked with implementation of the FLEX mitigation strategies. The team also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel. Documents reviewed are listed in the attachment.
b.
Assessment
Based on samples selected for review, the inspectors verified that the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittals and the associated safety evaluation and determined that the licensee was generally in compliance with NRC Order EA-12-049. The inspectors verified that the licensee satisfactorily:
- developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events.
- integrated the FSGs into existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures.
- protected FLEX equipment from site-specific hazards.
- developed and implemented adequate testing and maintenance of FLEX equipment to ensure its availability and capability.
- trained the staff to assure personnel proficiency in the mitigation of beyond-design-basis events.
- developed means to ensure that the necessary off-site FLEX equipment would be available from off-site locations.
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensees corrective action program.
c. Findings
No findings identified.
2. Spent Fuel Pool Instrumentation
a. Inspection Scope
The team examined the licensees newly installed spent fuel pool instrumentation.
Specifically, the inspectors verified the sensors were installed as described in the plant-specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel were physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment.
b.
Assessment
Based on samples selected for review, the inspectors determined that the licensee satisfactorily installed and established control of the spent fuel pool (SFP)instrumentation as described in the plant specific submittals and the associated safety evaluation and determined that the licensee is generally in compliance with NRC Order EA-12-051. The inspectors verified that the licensee satisfactorily:
- installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittals and safety evaluation.
- installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittals.
- trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation.
- developed and issued procedures for maintenance, testing, and use of the reliable SFP instrumentation.
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensees corrective action program.
c. Findings
No findings were identified.
3. Staffing and Communication Request for Information
a. Inspection Scope
Through discussions with plant staff, review of documentation and plant walkdowns, the team verified that the licensee had implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of offsite power scenario as described in the licensees staffing assessment and the NRC safety assessment. The team also verified that the licensee had implemented dose assessment (including releases from spent fuel pools) capability using the licensees site-specific dose assessment software and approach as described in the licensees multi-unit dose assessment submittal. Documents reviewed are listed in the attachment.
b.
Assessment
The inspectors reviewed information provided in the licensees multi-unit dose submittal and in response to the NRCS March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that resulted in an extended loss of all alternating current power (ELAP) to the site and impedes access to the site. The inspectors verified the following:
- Licensee satisfactorily implemented required staffing change(s) to support an ELAP scenario.
- Implemented dose assessment capabilities (including releases from spent fuel pools) using the licensees site-specific dose assessment software and approach.
The inspectors verified that noncompliances with the current licensing requirements, and other issues identified during the inspection, were entered into the licensee's corrective action program.
c. Findings
No findings identified.
4OA6 Exit
Exit Meeting Summary
On March 16, 2017, the inspectors presented the inspection results to Mr. Roy Simmons and other members of the site staff. The inspectors confirmed that proprietary information was not provided or examined during the inspection.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- F. Mladen, Site Vice President
- R. Simmons, Plant Manager
- R. Johnson, Operations Manager
- T. Shell, Assistant Operations Manager
- H. Johnson, Superintendent of Shift Operations
- J. Rosenberger, Site Engineering Director
- J. Henderson, Manager of Design Engineering
- J. Holloway, Engineering Supervisor
- E. Turko, Engineering Supervisor
D Lawrence, Director of Nuclear Safety and Licensing
- L. Baker, Manager of Nuclear Training
- B. Garber, Licensing Manager
- L. Helstosky, Licensing Engineer
- D. Aitken, Licensing Engineer
- K. Rowland, General Project Manager
NRC personnel
- E. Andrews, Acting Senior Resident Inspector
LIST OF REPORT ITEMS
Opened and Closed
None
Discussed
None