ML17254A791: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17254A791
| number = ML17254A791
| issue date = 06/30/1984
| issue date = 06/30/1984
| title = Rev 9 to QA Program for Station Operation.
| title = Rev 9 to QA Program for Station Operation
| author name =  
| author name =  
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION R. E. GINNA NUCLEAR POWER PLANT UNIT NO.         l Revision           9 to:
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION R. E.
Quality Assurance Program For Station Operation DOCKET NO.             50-244 June 1984 8 840608 Bijp61500~80gp0024~
GINNA NUCLEAR POWER PLANT UNIT NO. l Revision 9 to:
AgOCK      Pgg,
Quality Assurance Program For Station Operation DOCKET NO. 50-244 June 1984 8 840608 Bijp61500~80gp0024~
                      ~,",',~'>>
~,",',~'>>
P
AgOCK
: Pgg, P


4   1 )
4 1
)
I
I


Introduction In a May 28, 1974 letter fromm Mr. Robert A. Purple, the United States Atomic Energy Commission asked several questions on the R. E. Ginna Quality Assurance Program for Station Operation. The information requested and furthe" clarification of the program are provided in Supplement IV to the Technical Supplement accompanying Application for a Full-Term Operating License. Supplement IV is a revised description of the R. E. Ginna Quality Program for Station Operation and supersedes II
Introduction In a {{letter dated|date=May 28, 1974|text=May 28, 1974 letter}} fromm Mr. Robert A. Purple, the United States Atomic Energy Commission asked several questions on the R. E. Ginna Quality Assurance Program for Station Operation.
                                                          'ssurance Supplement      in its entirety. The following revisions have been made to the description of the program:
The information requested and furthe" clarification of the program are provided in Supplement IV to the Technical Supplement accompanying Application for a Full-Term Operating License.
Section IV.2 Additions, That all Quality Assurance, Quality Control, Eng'n-eering, and Purchasing procedures are reviewed for
Supplement IV is a revised description of the R. E. Ginna Quality
    ,adequacy at least once every two years.
'ssurance Program for Station Operation and supersedes Supplement II in its entirety.
That the list of structures, systems, and components covered by the quality assurance program are based on the list in Section 1.2.1 of the FSAR.
The following revisions have been made to the description of the program:
Section IV.2 Additions, That all Quality Assurance, Quality Control, Eng'n-
: eering, and Purchasing procedures are reviewed for
,adequacy at least once every two years.
That the list of structures,
: systems, and components covered by the quality assurance program are based on the list in Section 1.2.1 of the FSAR.
That management review of the quality assurance program may be in a form other than an audit.
That management review of the quality assurance program may be in a form other than an audit.
That the Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years.
That the Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years.
That the Chairman of the Nuclear Safety Audit and Review Board reports to the Chairman of the Board of Rochester Gas and Electric Corporation on NSARB activities.
That the Chairman of the Nuclear Safety Audit and Review Board reports to the Chairman of the Board of Rochester Gas and Electric Corporation on NSARB activities.
Section.IV.3 Additions That spare or replacement parts meet, at least, the requirements of the original design.
Section.IV.3 Additions That spare or replacement parts meet, at least, the requirements of the original design.
IV-i               Revision     1 August 1974
IV-i Revision 1
August 1974
 
f l


f l That for plant modification, the design engineer selects and reviews materials, parts, and equipment for suitability of application.
That for plant modification, the design engineer selects and reviews materials, parts, and equipment for suitability of application.
That design deficiencies are documented and controlled in accordance with Section IV.16.
That design deficiencies are documented and controlled in accordance with Section IV.16.
That design documents are collected, stored, and main-tained in accordance with Section II.17 and a listing of which design documents are maintained.
That design documents are collected,
Clarification Clarified which design   documents are reviewed by Quality Assurance.
: stored, and main-tained in accordance with Section II.17 and a listing of which design documents are maintained.
Section IV.4 Additions That procurement documents   for spare or replacement parts are processed in the   same manner as other procurement documents.
Clarification Clarified which design documents are reviewed by Quality Assurance.
Section IV.4 Additions That procurement documents for spare or replacement parts are processed in the same manner as other procurement documents.
That the review and approval of procurement documents is reflected on the document or on a control form which is attached to the procurement document.
That the review and approval of procurement documents is reflected on the document or on a control form which is attached to the procurement document.
That the documents are available     for verification in Purchasing and plant records.
That the documents are available for verification in Purchasing and plant records.
That Quality Control reviews procurement 'documents for spare and replacement parts for similarity to the original requirements, and adequacy of quality require-ments.
That Quality Control reviews procurement
Section IV.5 Clarification Clarifies which   documents are reviewed by Quality
'documents for spare and replacement parts for similarity to the original requirements, and adequacy of quality require-ments.
Section IV.5 Clarification Clarifies which documents are reviewed by Quality
- ";Assurance.
- ";Assurance.
Section IV.6 Addition Made   procurement document review requirements consistent with Section IV.4.
Section IV.6 Addition Made procurement document review requirements consistent with Section IV.4.
ZV-ii                 Revision l August 1974
ZV-ii Revision l August 1974


That suppliers of materials, equipment, and services are required by procurement documents to provide control of manufacturing inspection and testing instructions.
That suppliers of materials, equipment, and services are required by procurement documents to provide control of manufacturing inspection and testing instructions.
Section IV.9 Additions Made   procurement document review requirements consistent with Section IV.4.
Section IV.9 Additions Made procurement document review requirements consistent with Section IV.4.
Added Quality Control responsibilities for sur-veillance and inspection of special process activi-ties.
Added Quality Control responsibilities for sur-veillance and inspection of special process activi-ties.
Section IV.10 Additions That   all documentation necessary to perform an inspection is available to the inspector prior to .the performance of the activity.
Section IV.10 Additions That all documentation necessary to perform an inspection is available to the inspector prior to.the performance of the activity.
That Quality Control inspection procedures include the identification of quality characteristics to be inspected and a description of the method of inspection to be used, the identification of the organization responsible for performing the inspection, the'cceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.
That Quality Control inspection procedures include the identification of quality characteristics to be inspected and a description of the method of inspection to be used, the identification of the organization responsible for performing the inspection, the'cceptance and rejection criteria, the requirements for the recording of inspection
: results, and the requirements for providing evidence of completion and certification of the inspection activity.
That inspection equipment is calibrated in accor-dance with Section IV.12 and that calibration status is verified prior to performing the inspection activity.
That inspection equipment is calibrated in accor-dance with Section IV.12 and that calibration status is verified prior to performing the inspection activity.
Section   IV.ll Addition That test, procedures include test methods and test .
Section IV.ll Addition That test, procedures include test methods and test.
instrumentation definition.
instrumentation definition.
IV-iii             Revision 1 August 1974
IV-iii Revision 1
August 1974


Section IV.12 Addition That shop standards calibration is traceable to national standards or, where national standards are not available, the basis of calibration is documented.
Section IV.12 Addition That shop standards calibration is traceable to national standards or, where national standards are not available, the basis of calibration is documented.
Section   'ZV.14 Addition That written procedures control the use of hold tags, test tags and labels and that the procedures require the recording of the name of the person placing and removing the tag.
Section
'ZV.14 Addition That written procedures control the use of hold tags, test tags and labels and that the procedures require the recording of the name of the person placing and removing the tag.
Section ZV.15 Addition That Quality Control issues monthly material defic'ency report summaries, that these summaries are reviewed and analyzed by Quality Assurance, and that when unsatisfactory trends are noted, they are reported to management, using the corrective action report in accordance with Section ZV.16.
Section ZV.15 Addition That Quality Control issues monthly material defic'ency report summaries, that these summaries are reviewed and analyzed by Quality Assurance, and that when unsatisfactory trends are noted, they are reported to management, using the corrective action report in accordance with Section ZV.16.
Section XV.17 Additions That plant records include operating logs,  drawings, specifications, calibration procedures and reports, nonconformance reports, and the results of inspec-tions, tests, audits and the monitoring of plant activities and material analyses.
Section XV.17 Additions That plant records include operating logs, specifications, calibration procedures and nonconformance
That quality assurance records of special process activities are maintained by. Engineering and that they include the qualification records of personnel, procedures, and equipment.
: reports, and the results of tions, tests, audits and the monitoring of activities and material analyses.
: drawings, reports, inspec-plant That quality assurance records of special process activities are maintained by. Engineering and that
 
they include the qualification records of personnel, procedures, and equipment.
That inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
That inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
ZV-iv               Revision   1 August 1974
ZV-iv Revision 1
August 1974
 
7


7 Section IV.18 Addition That Quality Assurance is responsible for conducting the audits listed in Table IV.18-1.
Section IV.18 Addition That Quality Assurance is responsible for conducting the audits listed in Table IV.18-1.
In July 1974, the United States Atomic Energy Commission requested   information on the conformance of the R. E. Ginna Quality Assurance Program for. Station Operation to the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants",:Revision 0 dated October 1973 (Orange Book Revision 0). The infor-mation requested is provided in Revision 1 to Supplement IV to the Technical Supplement               Application for a Full- erm Operating License. accompanying The following changes have been made to Supplement IV:
In July 1974, the United States Atomic Energy Commission requested information on the conformance of the R. E. Ginna Quality Assurance Program for.Station Operation to the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants",:Revision 0 dated October 1973 (Orange Book Revision 0).
Section IV.l Additions A description of the extent to which the quality assurance program conforms to the document entitled "Guidance on Quality Assurance Requirements During The Operations Phase of Nuclear Power Plants",
The infor-mation requested is provided in Revision 1 to Supplement IV to the Technical Supplement accompanying Application for a Full-erm Operating License.
The following changes have been made to Supplement IV:
Section IV.l Additions A description of the extent to which the quality assurance program conforms to the document entitled "Guidance on Quality Assurance Requirements During The Operations Phase of Nuclear Power Plants",
Revision 0 dated October 1973 (Orange Book - Revision 0).
Revision 0 dated October 1973 (Orange Book - Revision 0).
On October 1, 1974, Rochester Gas and Electric Cor-poration revised its corporate structure. This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program. In addition, the RG&E commitment to the "Orange Book" in August has necessitated some shifting of responsibilities. The changes RG&E has made are reflected in Revision 2 to Supplement IV to the Technical Supplement accompanying Application for a Full Term Operating License.
On October 1, 1974, Rochester Gas and Electric Cor-poration revised its corporate structure.
The changes affect every section of the supplement except sections 12 '& 14 'ha'nge pages aie listed in Instructions-2 and each revised page is marked with revision level.     In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.
This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.
Revision 2 November 1, 1974
In addition, the RG&E commitment to the "Orange Book" in August has necessitated some shifting of responsibilities.
The changes RG&E has made are reflected in Revision 2 to Supplement IV to the Technical Supplement accompanying Application for a Full Term Operating License.
The changes affect every section of the supplement except sections 12
'& 14 'ha'nge pages aie listed in Instructions-2 and each revised page is marked with revision level.
In addition, the latest revision is marked with a vertical line in the left hand margin of each page.
The revision level is noted by an arabic numeral next to each vertical line.
Revision 2
November 1, 1974


Tables and figures which have been completely revised are shown by revis'ion level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement II and Supplement IV. Some editorial corrections have been made, and these are also marked.
Tables and figures which have been completely revised are shown by revis'ion level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement II and Supplement IV.
Effective February 1, 1976, three additional organizations in the Rochester Gas and Electric Corporation have been assigned responsi-bilities for control of quality related activities. The changes are reflected in Revision 3 to Supplement IV to the Technical Supplement Accompanying Application for a Full Term Operating License. Revision 3 also reflects some reclarification of terms and responsibilities which do not lesson our program commitments.
Some editorial corrections have been
Reclarification changes are concentrated in sections IV-3, IV-4, IV-5, IV-6 and IV-15. Change pages are listed in Instructions-3 and each revised page is marked with revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.
: made, and these are also marked.
Effective February 1, 1976, three additional organizations in the Rochester Gas and Electric Corporation have been assigned responsi-bilities for control of quality related activities.
The changes are reflected in Revision 3 to Supplement IV to the Technical Supplement Accompanying Application for a Full Term Operating License.
Revision 3 also reflects some reclarification of terms and responsibilities which do not lesson our program commitments.
Reclarification changes are concentrated in sections IV-3, IV-4, IV-5, IV-6 and IV-15.
Change pages are listed in Instructions-3 and each revised page is marked with revision level.
In addition, the latest revision is marked with a vertical line in the left hand margin of each page.
The revision level is noted by an arabic numeral next to each vertical line.
Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement IIand Supplement IV.
Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement IIand Supplement IV.
During July, 1978, Rochester Gas and Electric Corporation revised its corporate structure. This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.
During July, 1978, Rochester Gas and Electric Corporation revised its corporate structure.
Revision 4 also'eflects some reclarification of terms and respon-sibilities which do not lessen Rochester Gas and Electric Cor-poration program commitments. Reclarification changes are concentrated in sections IV-l, IV-2, IV-3, IV-7, IV-10 and IV-15.
This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.
Change pages are listed in Instructions-4 and each revised page is marked with revision level. Since single spacing of each page has reduced the number of pages, each page beginning with IV-1 is numbered consecutively resulting in the Revision 4 notation at the bottom for that page containing different information than the corresponding page number of previous revisions.
Revision 4 also'eflects some reclarification of terms and respon-sibilities which do not lessen Rochester Gas and Electric Cor-poration program commitments.
Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page   IV-vii.
Reclarification changes are concentrated in sections IV-l, IV-2, IV-3, IV-7, IV-10 and IV-15.
IV-vA           Revision 5 April 1979
Change pages are listed in Instructions-4 and each revised page is marked with revision level.
Since single spacing of each page has reduced the number of pages, each page beginning with IV-1 is numbered consecutively resulting in the Revision 4 notation at the bottom for that page containing different information than the corresponding page number of previous revisions.
Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii.
IV-vA Revision 5
April 1979


In a February'8, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 4. Revision 5 provides the additional information and better clarification of the program consistent with that which was forwarded in Rochester Gas and Electric letter -                              dated March 9, 1979. Change pages are   listed in Instructions     5,                 and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line. Tables which have been re-vised are shown by revision level at the bottom of the page.
In a February'8, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 4.
In a "June 5, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 5. Revision 6 provides the additional information consistent with that which was forwarded in Rochester Gas and Electric letter dated June 25, 1979.       Change pages are listed in Instruction 6, and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page.       The re-vision level is noted by arabic numeral next to each vertical line.
Revision 5 provides the additional information and better clarification of the program consistent with that which was forwarded in Rochester Gas and Electric {{letter dated|date=March 9, 1979|text=letter dated March 9, 1979}}.
Change pages are listed in Instructions - 5, and each revised page is marked with a revision level.
In addition, the latest revision is marked with a vertical line in the left hand margin of each page.
The revision level is noted by an arabic numeral next to each vertical line.
Tables which have been re-vised are shown by revision level at the bottom of the page.
In a "{{letter dated|date=June 5, 1979|text=June 5, 1979 letter}} from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 5.
Revision 6 provides the additional information consistent with that which was forwarded in Rochester Gas and Electric {{letter dated|date=June 25, 1979|text=letter dated June 25, 1979}}.
Change pages are listed in Instruction 6,
and each revised page is marked with a revision level.
In addition, the latest revision is marked with a vertical line in the left hand margin of each page.
The re-vision level is noted by arabic numeral next to each vertical line.
Revision 7 was prepared to indicate recent organization changes in the corporate structure, Quality Assurance and General Maintenance.
Revision 7 was prepared to indicate recent organization changes in the corporate structure, Quality Assurance and General Maintenance.
Change pages are listed in Instructions - 7, and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.
Change pages are listed in Instructions - 7, and each revised page is marked with a revision level.
Nuclear Regulatory Commission Generic Letter 81-01 issued May 4, 1981 that the quality assurance program commit to USNRC Regulatory                             'equested Guides 1.146 and. regulatory positions C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58 Revision 1. Revision 8 incorporates those commitments.
In addition, the latest revision is marked with a vertical line in the left hand margin of each page.
This revision also describes a change in responsiblity for pro-curement of nuclear fuel from the Director, Strategic and Fuel Planning to the Engineering Department and provides updated organizational charts for those previously provided. In addition, the latest revision is marked by a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.
The revision level is noted by an arabic numeral next to each vertical line.
Nuclear Regulatory Commission Generic Letter 81-01 issued May 4, 1981
'equested that the quality assurance program commit to USNRC Regulatory Guides 1.146 and. regulatory positions C.5, 6,
7, 8 and 10 of Regulatory Guide 1.58 Revision 1.
Revision 8 incorporates those commitments.
This revision also describes a change in responsiblity for pro-curement of nuclear fuel from the Director, Strategic and Fuel Planning to the Engineering Department and provides updated organizational charts for those previously provided.
In addition, the latest revision is marked by a vertical line in the left hand margin of each page.
The revision level is noted by an arabic numeral next to each vertical line.
This revision incorporates recent changes in the corporate structure.
This revision incorporates recent changes in the corporate structure.
Prefix IV is also being deleted from each page to recognize
Prefix IV is also being deleted from each page to recognize that,'Technical'Supplenent
                      'Accompanying Application For A Full Term   that,'Technical'Supplenent Operating License is being superse'ded during 1984. In addition, commencing with this revision only the latest revision will be indicated by a vertical line in the left hand margin of each page.
'Accompanying Application For A Full Term Operating License is being superse'ded during 1984.
Revision 9 June 1984 vB
In addition, commencing with this revision only the latest revision will be indicated by a vertical line in the left hand margin of each page.
vB Revision 9
June 1984


S r
S
( ~
~
r (


TABLE OF CONTENTS Section             Title                               Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program
TABLE OF CONTENTS Section Title Pacae 2.
: 2.      Organization
3.
: 3.      Design Control
4.
: 4.      Procurement Document Control                     10
5.
: 5.      Instructions, Procedures   and Drawings         12
6.
: 6.      Document   Control                               13
QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program Organization Design Control Procurement Document Control Instructions, Procedures and Drawings Document Control 10 12 13 7.
: 7.       Control of Purchased Material, Equipment         15 and Services B.       Identification and Control of Materials,         19 Parts and Components
Control of Purchased Material, Equipment and Services 15 B.
: 9.      Control of Special Processes                     20
9.
: 10.      Inspection                                       20 Test Control                                     22
10.
: 12.      Control of Measuring and Test Equipment         23
12.
: 13.      Handling, Storage and Shipping
13.
: 14.      Inspection, Test and Operating Status           25
14.
: 15.      Nonconforming Materials, Parts and               26 Components
15.
: 16.      Corrective Action                               27
16.
: 17.      Quality Assurance Records                       28
17.
:'18.:    Audits                                          29'
:'18.:
Identification and Control of Materials, Parts and Components Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment Handling, Storage and Shipping Inspection, Test and Operating Status Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 19 20 20 22 23 25 26 27 28 29'


1 I
1 I


LIST OF TABLES Tab e Number                                     Pacae l-l           Quality Assurance Program Procedures Subject Listing 32 4-1          Procurement Document Requirements 18-1          Audit List LIST OF FIGURES Fi re Number       Title                        Page 2-1           Management  Organization 2-2           Deleted 2-3           Ginna  Station Organization 2-4           General Maintenance Organization      48 2-5           Engineering Department Organization    49 I
LIST OF TABLES Tab e Number l-l 4-1 18-1 Quality Assurance Program Procedures Subject Listing Procurement Document Requirements Audit List Pacae 32 LIST OF FIGURES Fi re Number 2-1 2-2 2-3 2-4 2-5 I
I 2-6           Review and   Audit Functions           50
I 2-6 Title Management Organization Deleted Ginna Station Organization General Maintenance Organization Engineering Department Organization Review and Audit Functions Page 48 49 50


UALITY ASSURANCE   PROGRAM FOR STATION OPERATION ualit   Assurance Pro ram The quality assurance program described in this Supplement has been developed by the Rochester Gas and Electric Cor-poration to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.     This program applies to all activities affecting   the safety related functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, refueling, modification, test and inspection. In addition, the quality assurance program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71.
UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The quality assurance program described in this Supplement has been developed by the Rochester Gas and Electric Cor-poration to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.
The basic Rochester Gas and Electric Corporation quality assurance   policy is established by the Chairman of the Board and Chief Executive Officer in his Corporate Statement Assurance Policy. This policy is implemented by the of'uality Vice President, Electric and Steam Production, through the Manager, Quality Assurance, and the Ginna Station Superintendent.
This program applies to all activities affecting the safety related functions of the structures,
The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual is prepared, reviewed, and maintained by Quality Assurance and approved by the Vice President, Electric and Steam Production.
: systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.
The program   is implemented through Quality Assurance, Ginna Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing Procedures.       These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Assurance.       The procedures are contained in separate manuals maintained by the responsible organization. All" these procedures are reviewed for adequacy at least once every two years by the responsible organization. Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in the   procedures.
These quality affecting activities include operation, maintenance, repair, inservice inspection, refueling, modification, test and inspection.
Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.
In addition, the quality assurance program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71.
The quality assurance program covers all existing Seismic Category I structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are
The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board and Chief Executive Officer in his Corporate Statement of'uality Assurance Policy.
This policy is implemented by the Vice President, Electric and Steam Production, through the
: Manager, Quality Assurance, and the Ginna Station Superintendent.
The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program.
The manual is prepared,
: reviewed, and maintained by Quality Assurance and approved by the Vice President, Electric and Steam Production.
The program is implemented through Quality Assurance, Ginna
: Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing Procedures.
These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Assurance.
The procedures are contained in separate manuals maintained by the responsible organization.
All"these procedures are reviewed for adequacy at least once every two years by the responsible organization.
Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in the procedures.
Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.
Organizational responsibilities are described in Section 2.
The quality assurance program covers all existing Seismic Category I structures,
: systems, and components, including their foundations and supports.
Activities affecting the quality of these structures,
: systems, and components are


controlled to an extent consistent with their importance ta safety. A detailed listing of the structures, systems, and components covered by. the quality assurance program, based on Section 1.2.1 of the Final Facility Description and Safety Analysis Report, is contained in the Quality Assurance Manual.
controlled to an extent consistent with their importance ta safety.
Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings. The listing of structures, systems, and components covered by the quality assurance program and the system flow drawings are prepared and main-tained by Engineering and reviewed and concurred with by Quality Assurance.
A detailed listing of the structures,
Modifications or additions to existing structures, systems, and components are designated the same seismic classifica-tion as the existing system. New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29.
: systems, and components covered by. the quality assurance
Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced. Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures. Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure. Training of personnel not in the quality assurance organization is the responsibility of each department performing an activity affecting quality. Quality Assurance assists in establishing training requirements and assures that personnel are trained by auditing training records.
: program, based on Section 1.2.1 of the Final Facility Description and Safety Analysis Report, is contained in the Quality Assurance Manual.
Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings.
The listing of structures,
: systems, and components covered by the quality assurance program and the system flow drawings are prepared and main-tained by Engineering and reviewed and concurred with by Quality Assurance.
Modifications or additions to existing structures,
: systems, and components are designated the same seismic classifica-tion as the existing system.
New structures,
: systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29.
Supervisory personnel are indoctrinated in quality assurance
: policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced.
Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements,
: purpose, scope, and implementation of quality related manuals and procedures.
Refresher sessions are held periodically and retraining is required whenever a
new procedure is issued or a major revision is made to an existing procedure.
Training of personnel not in the quality assurance organization is the responsibility of each department performing an activity affecting quality.
Quality Assurance assists in establishing training requirements and assures that personnel are trained by auditing training records.
In addition to training in quality assurance, each depart-ment conducts on-the-job training to the extent necessary to assure that personnel are qualified for their primary work assignments.
In addition to training in quality assurance, each depart-ment conducts on-the-job training to the extent necessary to assure that personnel are qualified for their primary work assignments.
The Ginna Station Supeiintendent is responsible for the formal training, qualification, licensing, and requali-fication of operators, as necessary. Where necessary, peisonnel are trained in 'radiation protection, plant s'afety and security.
The Ginna Station Supeiintendent is responsible for the formal training, qualification, licensing, and requali-fication of operators, as necessary.
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years to assure that meaningful and is effectively complying with corporate it is policy and 10CFR50, Appendix B. This review consists of
Where necessary, peisonnel are trained in 'radiation protection, plant s'afety and security.
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B.
This review consists of
.audits or a review equivalent to an audit performed by
.audits or a review equivalent to an audit performed by


1 4' company personnel   or outside organizations. Reviews will be conducted every six months during the first two years that the program is implemented.
1 4'
The quality assurance program is designed to meet the require-ments of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regula-tory Guides and ANSI Standards:
 
: a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion and Training."
company personnel or outside organizations.
: b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."
Reviews will be conducted every six months during the first two years that the program is implemented.
: c. AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements   for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."
The quality assurance program is designed to meet the require-ments of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants."
: d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Require-ments During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0)
The program conforms to the following NRC Regula-tory Guides and ANSI Standards:
: e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements   for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."
a.
: f. NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements   for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."
NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion and Training."
: g. NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements   for Water-Cooled Nuclear Power Plants."
b.
: h. NRC Regulatory. Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."
NRC Regulatory Guide 1.28, Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."
i.; NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements   for the Design of Nuclear Power Plants."
c.
: j. NRC Regulatory Guide 1.74, Revision 0, "Quality Terms and Definitions."                   Assur-'nce
AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."
: k. NRC Regulatory Guide 1.88, Revision 2, "Collections, Storage and Maintenance of Nuclear Power Plant Records."
d.
AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation),"
and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Require-ments During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0) e.
AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."
f.
NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements for Packaging,
: Shipping, Receiving,
: Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."
g.
NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants."
h.
NRC Regulatory. Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."
i.;
NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."
j.
NRC Regulatory Guide 1.74, Revision 0, "Quality Assur-'nce Terms and Definitions."
k.
NRC Regulatory Guide 1.88, Revision 2, "Collections, Storage and Maintenance of Nuclear Power Plant Records."


s I
s I


Note:   When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate stroage locations in separate buildings which are physically isolated from each other.
Note:
: 1. NRC Regulatory Guide 1.116, Revision O-R, "Quality Assurance Requirements for Installation, Inspection,   and Testing of Mechanical Equipment and Systems."
When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate stroage locations in separate buildings which are physically isolated from each other.
: m. NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements   for Control of Procurement of Items and Services for Nuclear Power Plants."
1.
: n. ANSI N45.2.12, D3, R4, 2/74 ~~Requirements for Auditing of Quality   Assurance Programs for Nuclear Power Plants."
NRC Regulatory Guide 1.116, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems."
: o. NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality   Assurance Program Audit Personnel for Nuclear Power Plants."
m.
Or anization The major   organizations participating in the quality assur-ance program are the Purchasing,   Engineering, Ginna Station, General Maintenance, Electric Meter and Laboratory Department; Quality Assurance and Quality Control Groups; the Plant Operations Review Committee; and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart showing these organizations and their relationship to the corporate organization.
NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."
n.
ANSI N45.2.12, D3, R4, 2/74 ~~Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants."
o.
NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants."
Or anization The major organizations participating in the quality assur-ance program are the Purchasing, Engineering, Ginna Station, General Maintenance, Electric Meter and Laboratory Department; Quality Assurance and Quality Control Groups; the Plant Operations Review Committee; and the Nuclear Safety Audit and Review Board.
Figure 2-1 is an organizational chart showing these organizations and their relationship to the corporate organization.
Positions responsible for the principal elements of the quality assurance program are:
Positions responsible for the principal elements of the quality assurance program are:
Chairman of the Board Vice President, Electric and Steam Production Vice President and Chief Engineer Manager, Quality Assurance Purchasing Agent Ginna Station Superintendent Ginna Station, Quality Control Engineer Superintendent, Electric Meter and Laboratory Superintendent, General Maintenance General Maintenance Quality Control Coordinator Manager, Materials Engineering In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Ginna Station Superintendent and the Nuclear Safety Audit and
Chairman of the Board Vice President, Electric and Steam Production Vice President and Chief Engineer Manager, Quality Assurance Purchasing Agent Ginna Station Superintendent Ginna Station, Quality Control Engineer Superintendent, Electric Meter and Laboratory Superintendent, General Maintenance General Maintenance Quality Control Coordinator Manager, Materials Engineering In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.
These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.
The Plant Operations Review Committee acts in an advisory capacity to the Ginna Station Superintendent and the Nuclear Safety Audit and
 
I
)
j


I ) j Review Board advises the Vice President,     Electric and Steam Production. The qualifications of members and the respon-sibilities of these organizations are described in Appendix       A to Provisional Operating Licensed No. DPR-18, Section 6.0, Technical Specifications.
Review Board advises the Vice President, Electric and Steam Production.
The Chairman of the Board of the Rochester Gas and Electric Corporation directed the establishment of the quality assur-ance program and issued the governing policy statement.       He has established the Nuclear Safety Audit and Review Board to review and audit plant operations. The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Executive Vice President on all activities of the Nuclear Safety Audit and Review Board.
The qualifications of members and the respon-sibilities of these organizations are described in Appendix A to Provisional Operating Licensed No. DPR-18, Section 6.0, Technical Specifications.
The Vice President, Electric and Steam Production has cor-porate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.       He is responsible for establishing the policies and requirements necessary to assure safe and reliable operations of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications. He has overall responsibility for and authority to direct quality affecting activities. He has assigned the responsibility for the detailed development and overall coordination of the quality assurance program to the Manager, Quality Assurance.
The Chairman of the Board of the Rochester Gas and Electric Corporation directed the establishment of the quality assur-ance program and issued the governing policy statement.
He has established the Nuclear Safety Audit and Review Board to review and audit plant operations.
The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Executive Vice President on all activities of the Nuclear Safety Audit and Review Board.
The Vice President, Electric and Steam Production has cor-porate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.
He is responsible for establishing the policies and requirements necessary to assure safe and reliable operations of Ginna Station.
He is also responsible for those items delineated in Section 6.0, Technical Specifications.
He has overall responsibility for and authority to direct quality affecting activities.
He has assigned the responsibility for the detailed development and overall coordination of the quality assurance program to the Manager, Quality Assurance.
The responsibility for proper implementation of the quality assurance program requirements at Ginna Station has been assigned to the Ginna Station Superintendent.
The responsibility for proper implementation of the quality assurance program requirements at Ginna Station has been assigned to the Ginna Station Superintendent.
The   Vice President and Chief Engineer has corporate respon-sibility for   the design and construction of nuclear power plants and related major modifications. In this capacity, the Vice President and Chief Engineer is responsible for directing and supervising the Engineering Department as shown in Figure 2-5.
The Vice President and Chief Engineer has corporate respon-sibility for the design and construction of nuclear power plants and related major modifications.
The Vice President and   Chief Engineer has the responsibility
In this capacity, the Vice President and Chief Engineer is responsible for directing and supervising the Engineering Department as shown in Figure 2-5.
  'or   preparing drawings   and specifications for the procurement of materials and components for plant maintenance and modifi-cation as required. He is responsible for reviewing operating and fuel handling procedures referred to him by the Ginna Station Superintendent and for reviewing unique maintenance.
The Vice President and Chief Engineer has the responsibility
. and repair"procedures for major equipment.       He is also- res-,
'or preparing drawings and specifications for the procurement of materials and components for plant maintenance and modifi-cation as required.
He is responsible for reviewing operating and fuel handling procedures referred to him by the Ginna Station Superintendent and for reviewing unique maintenance.
. and repair"procedures for major equipment.
He is also-res-,
ponsible for the coordination of all procurement activitie's associated with the fabrication of nuclear fuel.
ponsible for the coordination of all procurement activitie's associated with the fabrication of nuclear fuel.
The Manager, Quality Assurance, is responsible for estab-lishing and executing the overall quality assurance program.
The Manager, Quality Assurance, is responsible for estab-lishing and executing the overall quality assurance program.
He is responsible for assuring'that the program satisfies the requirements of 10CFR50, Appendix B, and for keeping the total program updated. He is responsible for assuring that
He is responsible for assuring'that the program satisfies the requirements of 10CFR50, Appendix B, and for keeping the total program updated.
He is responsible for assuring that
 
a


a all'he   planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity. He has the authority and organizational freedom to assure all necessary quality affecting activities are performed. He is responsible for maintaining a quality assurance staff, Figure 2-1, for the conduct of staff training, for directing its activities and for establishing and implementing a comprehensive audit program.
all'he planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed.
The Manager,   Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years is in quality assurance and three years in the design or operation of nuclear or fossil fuel power plants.
He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.
The Manager, Quality Assurance and the Quality Assurance Staff are responsible for supervising both the on-site and off-site Quality Assurance program. This includes writing Quality Assurance policies and procedures, and reviewing the procedures of the organizations participating in the Quality Assurance program. They are also 'responsible for auditing all aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected.
He has the authority and organizational freedom to assure all necessary quality affecting activities are performed.
They are responsible for assuring that proper codes, standards, and,quality requirements are specified in design, procurement, and installation documents. They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveil-lances at these supplier's facilities. In addition, the staff assists the Manager, Quality Assurance, in the prepa-ration of the audit schedule, audit status reports, corrective action report summaries and in the preparation and maintenance of the Quality Assurance Procedures Manual.
He is responsible for maintaining a quality assurance staff, Figure 2-1, for the conduct of staff training, for directing its activities and for establishing and implementing a comprehensive audit program.
The Purchasing Agent is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements. He maintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Engineering, Quality Assurance and the other involved depart-ments as, appropriate.
The Manager, Quality Assurance is at least six years of responsible years is in quality assurance and or operation of nuclear or fossil a graduate engineer with experience, of which two three years in the design fuel power plants.
The Ginna   Station Superintendent is responsible to the Superintendent,   Nuclear Production for safe operation of Ginna Station. He is responsible for the performance of the Ginna Station operation, maintenance, repair, refueling, inservice inspection, modification, test and inspection quality affecting activities in accordance with the require-ments of the quality assurance program. He is responsible
The Manager, Quality Assurance and the Quality Assurance Staff are responsible for supervising both the on-site and off-site Quality Assurance program.
This includes writing Quality Assurance policies and procedures, and reviewing the procedures of the organizations participating in the Quality Assurance program.
They are also 'responsible for auditing all aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected.
They are responsible for assuring that proper codes, standards, and,quality requirements are specified in design, procurement, and installation documents.
They are responsible for assuring that the suppliers of safety-related
: material, equipment and services are properly qualified, and they are responsible for conducting audits and surveil-lances at these supplier's facilities.
In addition, the staff assists the Manager, Quality Assurance, in the prepa-ration of the audit schedule, audit status reports, corrective action report summaries and in the preparation and maintenance of the Quality Assurance Procedures Manual.
The Purchasing Agent is responsible for the procurement of materials,
: services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.
He maintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Engineering, Quality Assurance and the other involved depart-ments as, appropriate.
The Ginna Station Superintendent is responsible to the Superintendent, Nuclear Production for safe operation of Ginna Station.
He is responsible for the performance of the Ginna Station operation, maintenance, repair, refueling, inservice inspection, modification, test and inspection quality affecting activities in accordance with the require-ments of the quality assurance program.
He is responsible


for providing qualified personnel to perform these activi-ties in accordance with approved drawings, specifications, and procedures. He is also responsible for those items delineated in Section 6.0, Technical Specifications.
for providing qualified personnel to perform these activi-ties in accordance with approved drawings, specifications, and procedures.
The Ginna Station Assistant Superintendent supports the Ginna Station Superintendent in discharging his respon-sibilities. He is responsible for the day-to-day operation of the station and implementing the policies, procedures, and directions of the Ginna Station Superintendent.
He is also responsible for those items delineated in Section 6.0, Technical Specifications.
The Ginna Station Quality Control Engineer reports adminis-tratively to the Nuclear Assurance Manager and is responsible to the Station Superintendent for supervising the station Quality Control Organization, which is responsible for assuring that activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures. In his day-to-day acti-vities, the Quality Control Engineer reports to the Ginna Station Superintendent and is a member of the Plant Operations Review Committee. He also reviews procurement documents initiated at the station. He is responsible for the coordination of inspection activities and for assuring that inspection'equirements are included in approved pro-cedures. He is also responsible for the receipt inspection of incoming materials, parts, and components and the pro-cessing of nonconformance reports. He coordinates the processing of corrective action reports, and assures that corrective action is taken. He is responsible for routine surveillance of other groups involved in quality affecting activities and provides the Ginna Station Superintendent with objective information concerning the quality of these activities.
The Ginna Station Assistant Superintendent supports the Ginna Station Superintendent in discharging his respon-sibilities.
The Ginna Station Quality Control Engineer is assisted in the performance of his duties by a staff which reviews documents and which performs inspection and surveillance activities. Additional inspectors are assigned to this group as required by the level of work activities.
He is responsible for the day-to-day operation of the station and implementing the policies, procedures, and directions of the Ginna Station Superintendent.
The Ginna Station Quality Control Engineer reports adminis-tratively to the Nuclear Assurance Manager and is responsible to the Station Superintendent for supervising the station Quality Control Organization, which is responsible for assuring that activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.
In his day-to-day acti-vities, the Quality Control Engineer reports to the Ginna Station Superintendent and is a member of the Plant Operations Review Committee.
He also reviews procurement documents initiated at the station.
He is responsible for the coordination of inspection activities and for assuring that inspection'equirements are included in approved pro-cedures.
He is also responsible for the receipt inspection of incoming materials,
: parts, and components and the pro-cessing of nonconformance reports.
He coordinates the processing of corrective action reports, and assures that corrective action is taken.
He is responsible for routine surveillance of other groups involved in quality affecting activities and provides the Ginna Station Superintendent with objective information concerning the quality of these activities.
The Ginna Station Quality Control Engineer is assisted in the performance of his duties by a staff which reviews documents and which performs inspection and surveillance activities.
Additional inspectors are assigned to this group as required by the level of work activities.
In addition to the Ginna Station Quality Control Engineer, the Ginna Station Superintendent is assisted by other desig-nated staff members, Figure 2-3, in the implementation of certain quality assurance program requirements, at the plant;
In addition to the Ginna Station Quality Control Engineer, the Ginna Station Superintendent is assisted by other desig-nated staff members, Figure 2-3, in the implementation of certain quality assurance program requirements, at the plant;
'hese staff   members are assigned responsibility for testing, storage of material and equipment, operating and test status control, calibration   and control of measuring and test equipment not used by Quality Control, maintenance of material handling equipment, operator training, and control of all activities involving operation, maintenance, repair, refueling and modification.
'hese staff members are assigned responsibility for testing, storage of material and equipment, operating and test status control, calibration and control of measuring and test equipment not used by Quality Control, maintenance of material handling equipment, operator training, and control of all activities involving operation, maintenance, repair, refueling and modification.


The Superintendent, General Maintenance, is responsible for supervising and directing a staff, Figure 2-4, which super-
The Superintendent, General Maintenance, is responsible for supervising and directing a staff, Figure 2-4, which super-
.vises the performance and verification of safety related maintenance, repair and modification activities performed at the General Maintenance facility. He is also responsible for the routine maintenance of material handling equipment, control of special processes and establishment of the inser-vice inspection program.
.vises the performance and verification of safety related maintenance, repair and modification activities performed at the General Maintenance facility.
The General Maintenance Quality Control Coordinator is responsible to the Superintendent, General Maintenance, for performing or directing the performance of verification activities for which General Maintenance Quality Control is responsible. In this capacity he is responsible for assuring that activities, affecting quality, are carried out in accordance with approved drawings, specifications and proce-dures. He is also responsible for the preparation of Quality Maintenance procedures and for the training of General Maintenance personnel in the implementation of these procedures.
He is also responsible for the routine maintenance of material handling equipment, control of special processes and establishment of the inser-vice inspection program.
He also coordinates receipt inspection of incoming materials, parts and components, performs routine surveillance of General Maintenance activities and coordinates the processing of nonconformance reports, corrective action reports and the replies to audit reports.
The General Maintenance Quality Control Coordinator is responsible to the Superintendent, General Maintenance, for performing or directing the performance of verification activities for which General Maintenance Quality Control is responsible.
The Manager,   Materials Engineering is responsible to the Superintendent, General Maintenance for the development and qualification of procedures utilized for special processes.
In this capacity he is responsible for assuring that activities, affecting quality, are carried out in accordance with approved drawings, specifications and proce-dures.
He is also responsible for assuring that personnel are trained and qualified for activities involving nondestructive examination and for providing functional guidance and direction in those methods for which he is a qualified Level III. He is also responsible for establishing the inservice inspection program.
He is also responsible for the preparation of Quality Maintenance procedures and for the training of General Maintenance personnel in the implementation of these procedures.
The Superintendent, Electric Meter and Laboratory is respon-sible for providing routine maintenance and testing services for Ginna Station safety related protective relays as requested.
He also coordinates receipt inspection of incoming materials, parts and components, performs routine surveillance of General Maintenance activities and coordinates the processing of nonconformance
Desi   Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.
: reports, corrective action reports and the replies to audit reports.
The Manager, Materials Engineering is responsible to the Superintendent, General Maintenance for the development and qualification of procedures utilized for special processes.
He is also responsible for assuring that personnel are trained and qualified for activities involving nondestructive examination and for providing functional guidance and direction in those methods for which he is a qualified Level III.
He is also responsible for establishing the inservice inspection program.
The Superintendent, Electric Meter and Laboratory is respon-sible for providing routine maintenance and testing services for Ginna Station safety related protective relays as requested.
Desi Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.
4 I
4 I
Engineering is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.
Engineering is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.
Ginna Station is responsible for the design and control of design activities for minor modifications of structures, systems, or components. Ginna Station is also responsible for classifying station originated modifications   as either
Ginna Station is responsible for the design and control of design activities for minor modifications of structures,
: systems, or components.
Ginna Station is also responsible for classifying station originated modifications as either


Major or Minor. Engineering reviews and concurs with modifi-cations being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and limited to the extent that the change does not impact existing performance requirements.     (2) Additions within Seismic Category I buildings which perform no safety functions and which either interface. with Seismic Category I items or whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level. (3) Changes to a safety related system determined not to be major (i.e.vents, drains, alarms, indicating lights, etc.).
Major or Minor.
Design control is implemented by means of procedures which include: design considerations, design review requirements; internal   and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action. Design con-siderations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analysis; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; quality standards and other quality assurance requirements. Design verification utilizes various methods such as formal design reviews, alternate calculations, or'tests as appropriate to assure the adequacy of the design.
Engineering reviews and concurs with modifi-cations being classified as Minor.
The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Engineering department design engineers or consulting engineers as re-quested. For Minor modification station design, this may be done by Ginna Station and or Engineering department design engineers as appropriate.
Minor modifications typically involve (1) component changes which involve vendor design and limited to the extent that the change does not impact existing performance requirements.
Spare or replacement parts must at least meet the original equipment technical and quality requirements.       For plant modifications, standard "off-the-shelf" commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by the design engineer.
(2) Additions within Seismic Category I buildings which perform no safety functions and which either interface. with Seismic Category I items or whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level.
Design changes,   are normally reviewed and approved   in accor-dance   with the same procedures as the original design.
(3) Changes to a safety related system determined not to be major (i.e.vents,
: drains, alarms, indicating lights, etc.).
Design control is implemented by means of procedures which include:
design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action.
Design con-siderations
: include, as appropriate:
: physics, stress, materials, thermal, hydraulic, radiation and accident analysis; appropriate design bases,
: codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; quality standards and other quality assurance requirements.
Design verification utilizes various methods such as formal design reviews, alternate calculations, or'tests as appropriate to assure the adequacy of the design.
The design of plant modifications is verified by an engineer other than the one who performed the original design.
For Major modification design, this may be done by Engineering department design engineers or consulting engineers as re-quested.
For Minor modification station design, this may be done by Ginna Station and or Engineering department design engineers as appropriate.
Spare or replacement parts must at least meet the original equipment technical and quality requirements.
For plant modifications, standard "off-the-shelf" commercial or pre-viously approved materials,
: parts, and equipment are selected and reviewed for suitability of application by the design engineer.
Design changes, are normally reviewed and approved in accor-dance with the same procedures as the original design.
Supplemental procedures are established for the review and
Supplemental procedures are established for the review and
'approvai of field'changes. In general, 'design changes including field changes, are reviewed and approved by the organizations or individuals that performed the original design, review and approval. Where this is not practical, other responsible design organizations or individuals designated, prov'ided they have access to pertinent back-ground information and are competent in the specific design area.
'approvai of field'changes.
In general, 'design changes including field changes, are reviewed and approved by the organizations or individuals that performed the original
: design, review and approval.
Where this is not practical, other responsible design organizations or individuals designated, prov'ided they have access to pertinent back-ground information and are competent in the specific design area.


  ~
~
~
Design   verification and field change systems are methods utilized to detect, document and correct design process errors and deficiencies. In addition, the corrective action system, described in section 16, is utilized to control and document   corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adverse to quality.
~
Quality Assurance is responsible for assuring that design control procedures, whether the'ork is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design control procedures are reviewed to assure that an independent verification is per formed.
Design verification and field change systems are methods utilized to detect, document and correct design process errors and deficiencies.
Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and re-visions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.
In addition, the corrective action
Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate. Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.
: system, described in section 16, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adverse to quality.
Quality Assurance and Station Quality Control through pre-paration assistance and/or review assure the proper inclusion of quality standards in the design of major and minor modifi-cations, respectively. Quality Assurance is also responsible for assuring that adequate inspection requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when   they occur.
Quality Assurance is responsible for assuring that design control procedures, whether the'ork is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices,
: checks, and reviews.
Design control procedures are reviewed to assure that an independent verification is per formed.
Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and re-visions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information.
The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.
Design documents are collected,
: stored, and maintained in accordance with Section 6 and 17, as appropriate.
Design documents include design criteria, analyses, specifications,
: drawings, design review records, and changes thereto.
Quality Assurance and Station Quality Control through pre-paration assistance and/or review assure the proper inclusion of quality standards in the design of major and minor modifi-
: cations, respectively.
Quality Assurance is also responsible for assuring that adequate inspection requirements are included in specifications.
The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.
Plant modifications are controlled by means of applicable Ginna Station, Engineering and Quality Assurance procedures.
Plant modifications are controlled by means of applicable Ginna Station, Engineering and Quality Assurance procedures.
These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Proposed plant modifications, are reviewed by 'the Plant Operations'Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
These procedures provide for the preparation,
Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.
: review, and approval of design documents, safety analyses, and plant modification procedures.
Proposed plant modifications, are reviewed by 'the Plant Operations'Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
Procurement Document Control Procurement document control applies to the control of procurement documents for materials,
: parts, components, and services required to perform quality affecting activities.  


  ', ~ 4 I
, ~
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.
4 I
Procurement of materials, parts, components, and services is initiated by department staff personnel. Procurement proce-dures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase
: orders, service agreements, contracts, specifications, and drawings.
Procurement of materials,
: parts, components, and services is initiated by department staff personnel.
Procurement proce-dures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.
Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station and General Maintenance are reviewed by Quality Control and approved by the department superintendent or his designated representative.
Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station and General Maintenance are reviewed by Quality Control and approved by the department superintendent or his designated representative.
Procurement documents initiated in Engineering and Quality Assurance are reviewed by Quality Assurance and approved by the Chief Engineer, or designees.
Procurement documents initiated in Engineering and Quality Assurance are reviewed by Quality Assurance and approved by the Chief Engineer, or designees.
Procurement documents initiated at Electric Meter and Laboratory and General Maintenance are reviewed by Quality Assurance and approved by the department superintendent or designated alternate.
Procurement documents initiated at Electric Meter and Laboratory and General Maintenance are reviewed by Quality Assurance and approved by the department superintendent or designated alternate.
Evidence of review and approval of procurement documents is recorded on the documents or on the attached control form.
Evidence of review and approval of procurement documents is recorded on the documents or on the attached control form.
The attached control form identifies to Purchasing a procure-ment method which will ensure that the selected supplier is capable of providing the item or service in accordance wi'th the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corres-ponding procurement method are described in Section 7 After purchase requistions, service agreements, contracts, specifications, and drawings have received the required and approvals, a purchase order is issued by Purchasing re-'iews to the selected supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
The attached control form identifies to Purchasing a procure-ment method which will ensure that the selected supplier is capable of providing the item or service in accordance wi'th the requirements of the procurement documents.
Considerations used in selecting a supplier and for determining the corres-ponding procurement method are described in Section 7
After purchase requistions, service agreements, contracts, specifications, and drawings have received the required re-'iews and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7.
These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
Under no circumstances are purchasing requirements altered (except for quantity or pricing) during order placement unless review and concurrence is obtained from those who
Under no circumstances are purchasing requirements altered (except for quantity or pricing) during order placement unless review and concurrence is obtained from those who
        . were required to r'eview, concur with, and approve the original documents as described above. Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.
. were required to r'eview, concur with, and approve the original documents as described above.
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements. Quality Assurance/ Quality
Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.
          .Control review of the above includes checks to verify proper
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.
Quality Assurance/ Quality
.Control review of the above includes checks to verify proper


inclusion of quality standard, quality assurance program requirements, method or procurement and the applicable acceptance criteria. Quality Control also reviews procure-ment documents for spare or replacement parts for adequacy of quality'equirements and to determine similarity, compa-tibility, and the inclusion of the quality requirements and acceptance criteria of the original design.
inclusion of quality standard, quality assurance program requirements, method or procurement and the applicable acceptance criteria.
Instructions, Procedures and Drawin s Each Rochester Gas and Electric company organization is responsible for developing, reviewing, approving, and imple-menting procedures as required to implement the quality assurance program. These procedures cover activities such as document control, bilities and duties oftraining  of personnel, and responsi-personnel. Quality Assurance reviews and concurs with these procedures. Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.
Quality Control also reviews procure-ment documents for spare or replacement parts for adequacy of quality'equirements and to determine similarity, compa-tibility, and the inclusion of the quality requirements and acceptance criteria of the original design.
Instructions, Procedures and Drawin s Each Rochester Gas and Electric company organization is responsible for developing, reviewing, approving, and imple-menting procedures as required to implement the quality assurance program.
These procedures cover activities such as document control, training of personnel, and responsi-bilities and duties of personnel.
Quality Assurance reviews and concurs with these procedures.
Table 1-1 provides a
summary of the subject matter contained in the procedures which are used to implement the quality assurance program.
Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.
Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.
Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, modification, testing and inspection. This includes instruc-tions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, offnormal, or alarm conditions, combat of emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling.
Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, modification, testing and inspection.
Ginna Station is responsible for the preparation and imple-mentation of quality control inspection procedures utilized for detailed station inspection activities. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Engineering or the equipment supplier.                         ,*
This includes instruc-tions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation;
General Maintenance is responsible for providing and for implementing instructions and procedures associated with special processes, the routine maintenance and inspection of cranes and handling equipment, as well as shop work required to support, Ginna Station maintenance, repair and modifica-tion activities. General Maintenance is also responsible for the preparation and for the implementation of quality control inspection procedures utilized for detailed inspec-tion activities at their facilities.
: startup, operation, and shutdown of safety related systems; correction of abnormal, offnormal, or alarm conditions, combat of emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling.
 
Ginna Station is responsible for the preparation and imple-mentation of quality control inspection procedures utilized for detailed station inspection activities.
Electric Meter and Laboratory is responsible for the prepa-ration and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible. Electric Meter and Laboratory also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.
Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications.
Engineering is responsible for providing approved specifi-cations, and drawings associated with major modifications and when minor modifications necessitate drawings or speci-fications. These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings. Engineering has established procedures for revising drawings and specifications.
Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Engineering or the equipment supplier.
General Maintenance is responsible for providing and for implementing instructions and procedures associated with special processes, the routine maintenance and inspection of cranes and handling equipment, as well as shop work required to support, Ginna Station maintenance, repair and modifica-tion activities.
General Maintenance is also responsible for the preparation and for the implementation of quality control inspection procedures utilized for detailed inspec-tion activities at their facilities.
Electric Meter and Laboratory is responsible for the prepa-ration and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible.
Electric Meter and Laboratory also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.
Engineering is responsible for providing approved specifi-
: cations, and drawings associated with major modifications and when minor modifications necessitate drawings or speci-fications.
These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.
Engineering has established procedures for revising drawings and specifications.
These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
Persons preparing and approving, documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.
Persons preparing and approving, documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.
Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, surveillance by Quality Control personnel, as described in Section 10 and audits by Quality Assurance as described in Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures   and drawings.
Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents.
Document Control Procedures are established to control the issuance of pro-cedures, instructions, drawings; and specifications.
In addition, surveillance by Quality Control personnel, as described in Section 10 and audits by Quality Assurance as described in Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.
Standard document control requirements are contained in the Quality Assurance Manual. The Ginna Station Superintendent is responsible for the control of all documents issued at Ginna Station. General Maintenance and Electric Meter and Laboratory are responsible for the control of 'documents issued by their respective organizations. Engineering controls all documents issued by Engineering, Quality Assurance and Purchasing. Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.
Document Control Procedures are established to control the issuance of pro-
 
: cedures, instructions, drawings; and specifications.
The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequte, and include appropriate qualitative and quanti-tative requirements. Departmental Quality Control repre-sentatives review departmental maintenance, repair, refueling and modification procedures, prior to use, to assure quality assurance requirements are included. The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0 Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible tech-nical person associated with that activity. Ginna Station, General Maintenance, Engineering, Purchasing, and Electric Meter and Laboratory quality assurance implementing procedures require the review and concurrence of Quality Assurance and the approval of the appropriate department supervisor.
Standard document control requirements are contained in the Quality Assurance Manual.
The Ginna Station Superintendent is responsible for the control of all documents issued at Ginna Station.
General Maintenance and Electric Meter and Laboratory are responsible for the control of 'documents issued by their respective organizations.
Engineering controls all documents issued by Engineering, Quality Assurance and Purchasing.
Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.
The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents.
Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequte, and include appropriate qualitative and quanti-tative requirements.
Departmental Quality Control repre-sentatives review departmental maintenance, repair, refueling and modification procedures, prior to use, to assure quality assurance requirements are included.
The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0 Technical Specifications.
Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible tech-nical person associated with that activity.
Ginna Station, General Maintenance, Engineering, Purchasing, and Electric Meter and Laboratory quality assurance implementing procedures require the review and concurrence of Quality Assurance and the approval of the appropriate department supervisor.
Quality Assurance procedures are approved by the Manager, Quality Assurance.
Quality Assurance procedures are approved by the Manager, Quality Assurance.
The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.
Types of documents which are controlled include Technical Specifications, FSAR, Technical Supplements, Quality Assur-ance Manual, procedures (such as quality assurance, engi-neering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifica-
It specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
  .tions and drawings. Suppliers. of materials, equipment, and' services are required in procurement documents to provide for control of documents, including manufacturing, inspection and testing instructions.
Types of documents which are controlled include Technical Specifications, FSAR, Technical Supplements, Quality Assur-ance Manual, procedures (such as quality assurance, engi-
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required; to pro-perly review and approve documents such as procedures,
: neering, purchasing,
. instructions, specifications, and drawings; to provide the
: repair, maintenance, test, calibration, fuel handling, modification, and administrative),
 
specifica-
'
.tions and drawings.
  \
Suppliers. of materials, equipment, and' services are required in procurement documents to provide for control of documents, including manufacturing, inspection and testing instructions.
The Quality Assurance Manual further requires that each organization provide in its procedures for measures:
to assure that documents are available when required; to pro-perly review and approve documents such as procedures,
. instructions, specifications, and drawings; to provide the  
\\


same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.
same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.
Quality Assurance and the Quality Control organizations, in the responsible departments, are responsible for review and concurrence of procurement documents and, therefore, procure-ment document control requirements.
Quality Assurance and the Quality Control organizations, in the responsible departments, are responsible for review and concurrence of procurement documents and, therefore, procure-ment document control requirements.
Quality Assurance and the Quality Control organizations are further responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.
Quality Assurance and the Quality Control organizations are further responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.
Control of Purchased Material   E i ment and Services Procurement documents, supplier selection, planning for item or service acceptance control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.
Control of Purchased Material E i ment and Services Procurement documents, supplier selection, planning for item or service acceptance control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.
All procurement is conducted in accordance with proc'urement documents as stated in Section 4. .All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.
All procurement is conducted in accordance with proc'urement documents as stated in Section 4.
Procurement planning   is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the
.All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.
- control of the supplier performance. Source inspection (surveillance) certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items. In lieu of these methods, acceptance of services is based on either 'or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.). The extent of. the acceptance methods and as-sociated verificati'on act'ivities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.
Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the
- control of the supplier performance.
Source inspection (surveillance) certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items.
In lieu of these
: methods, acceptance of services is based on either 'or a combination of:
(1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.).
The extent of. the acceptance methods and as-sociated verificati'on act'ivities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.
Consideration for the control of supplier performance includes the necessity for document, submittals or surveillance, and under what situation the supplier is to report nonconformances.
Consideration for the control of supplier performance includes the necessity for document, submittals or surveillance, and under what situation the supplier is to report nonconformances.
Results of the planning are incorporated in the procurement documents and or on the attached procurement control form as described in Section 4.
Results of the planning are incorporated in the procurement documents and or on the attached procurement control form as described in Section 4.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.
The evaluation which is accomplished during the procurement
: planning, determines the necessity for the supplier-selection to be from the approved suppliers list maintained by Purchasing.
Purchasing utilizes the approved suppliers list for the selection source of those suppliers required to have a
satisfactory quality assurance program.
The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item, if the source is to be restricted to the original supplier.
For engineered and off-the-shelf items, procured from suppliers required to have a quality assurance program and for which item acceptance is based other than on receipt inspection, supplier selection is from the approved suppliers list or one who is in the process of being added to the list, after having had its capability evaluated to purchaser satisfaction.
Other off-the-shelf items, that are manufactured to industry standards, that are typically utilized in applications other than nuclear, and for which item acceptance is based exclusively on receipt inspection may be purchased from sources other than the.approved suppliers list.
These other sources may include the manufacturer of the replacement part, authorized distributor for the manufac-turer's replacement parts and distributor of catalog items which satisfy the guidelines of not requiring status on the approved suppliers list.
Departmental procedures establish guidelines for source selection evaluations and for documenting the results on the procurement control form through indication of the corresponding procurement method.
The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.
Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments, as appropriate.
For Engineered items, Engineering is responsible for evalu-ating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design,
: service, item, or component delineated in the procurement documents.
As part of this review, the supplier's design capabilities',
machinery capabilities, handling capabilities, testing facilities, service capabili-
: ties, and experience are reviewed.
Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accor-dance with applicable
: codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric requirements.
The review includes consideration of:
company organization,


Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. The evaluation which is accomplished during the procurement planning, determines the necessity for the supplier- selection to be from the approved suppliers list maintained by Purchasing.
quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, accept-ance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors.
Purchasing utilizes the approved suppliers list for the selection source of those suppliers required to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item,    if source is to be restricted to the original supplier. For the engineered and off-the-shelf items, procured from suppliers required to have a quality assurance program and for which item acceptance is based other than on receipt inspection, supplier selection is from the approved suppliers list or one who is in the process of being added to the list, after having had its capability evaluated to purchaser satisfaction. Other off-the-shelf items, that are manufactured to industry standards, that        typically utilized in applications other than nuclear, areand for which item acceptance is based exclusively on receipt inspection may be purchased from sources other than the .approved suppliers list. These other sources may include the manufacturer of the replacement part, authorized distributor for the manufac-turer's replacement parts and distributor of catalog items which satisfy the guidelines of not requiring status on the approved suppliers list. Departmental procedures establish guidelines for source selection evaluations and for documenting the results on the procurement control form through indication of the corresponding procurement method. The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.
Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assur-ance requirements.
Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance,  Purchasing and other departments,  as appropriate.
Ginna Station, General Maintenance, Quality Assurance and Electric Meter and Laboratory evaluate the suppliers of inspection, test; and calibration services which they. intend to use.
For Engineered items, Engineering is responsible for evalu-ating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents. As part of this review, the supplier's design capabilities', machinery capabilities, handling capabilities, testing ties,  and experience facilities, service capabili-are reviewed.
The departments responsible for performing supplier evalu-ations shall document their results in reports which discuss areas investigated,
Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accor-dance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric requirements.
: findings, and conclusions.
The review includes consideration of: company organization,
As applicable, concurrence of Purchasing, Engineering, Quality Assurance, Ginna Station, General Maintenance, and Electric Meter and Laboratory is required to place a supplier on the qualified suppliers'ist.
 
One organization can remove a supplier from the list without concurrence of the others.
quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, accept-ance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assur-ance requirements.
Measures are established by Engineering and Quality Assurance to control supplier performance for engineered items.
Ginna Station, General Maintenance,   Quality Assurance and Electric Meter and Laboratory evaluate the suppliers of inspection, test; and calibration services which they. intend to use.
These measures typically include the processing of change infor-mation, surveillance of supplier activities and the control of documents exchanged with the supplier.
The departments responsible for performing supplier evalu-ations shall document their results in reports which discuss areas investigated, findings, and conclusions. As applicable, concurrence of Purchasing, Engineering, Quality Assurance, Ginna Station, General Maintenance, and Electric Meter and Laboratory is required to place a supplier on the qualified suppliers'ist.     One organization can remove a supplier from the list without concurrence of the others.
In addition, each department procuring off-the-shelf items or services esta-blishes similar measures for the control of supplier perfor-mance.
Measures   are established by Engineering and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change infor-mation, surveillance of supplier activities and the control of documents exchanged with the supplier. In addition, each department procuring off-the-shelf items or services esta-blishes similar measures for the control of supplier perfor-mance. With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.
With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.
Quality Assurance is responsible for determining and document-ing the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveil-lance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.
Quality Assurance is responsible for determining and document-ing the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection,
: testing, and shipping, and for providing the required surveillance.
The objective of supplier surveil-lance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.
For complex engineered items, Quality Assurance and Engi-
For complex engineered items, Quality Assurance and Engi-
-neering're responsible 'for joint development of surveillance
-neering're responsible 'for joint development of surveillance
                                                              '*
~
                                                                  ~
plans in advance of surveillance trips to identify areas to be reviewed.
plans in advance of surveillance trips to identify areas to be reviewed.
The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance represen-
The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement.
When a deviation from purchase order requirements is noted, the Quality Assurance represen-


tative'has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.
tative'has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.
Ginna Station Quality Control is responsible for surveillance of site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
Ginna Station Quality Control is responsible for surveillance of site contractors to assure that they meet all technical and quality requirements.
The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
Department superintendents are responsible for receiving and storing items pending their acceptance. Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Control that the item has
Department superintendents are responsible for receiving and storing items pending their acceptance.
                                                            'rrived.
Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Control that the item has
Quality Control is responsible for receipt inspection upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection in-cludes the use of written procedures or checklists to verify that the items and services conform to the procurement docu-ments (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained. In the event a final source inspection for the acceptance is conducted prior to receipt by RGK, Quality Control performs an inspection for shipping damage or lost parts and a document check to assure that the required docu-mentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.
'rrived.
If the item and documentation are adequate, Quality Control labels the item as "Accepted," files the documentation and receipt inspection results, and releases .the item for storage or use. If the item j.s nonconforming or the documentation is unsatisfactory,'uality Control initiates a nonconforma'nce report which is controlled in accordance with Section IV.15.
Quality Control is responsible for receipt inspection upon delivery of items and associated services for maintenance, repair, modification, and refueling.
All items issued must bear an acceptance tag and have docu-mentation to support the acceptability of the item. In the event the traceability is lost or the 'documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.
This inspection in-cludes the use of written procedures or checklists to verify that the items and services conform to the procurement docu-ments (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use.
 
Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained.
Identification   and Control of Materials Parts   and Com onents The identification and control of materials, parts, and components   is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication, storage, or installation.
In the event a final source inspection for the acceptance is conducted prior to receipt by RGK, Quality Control performs an inspection for shipping damage or lost parts and a document check to assure that the required docu-mentation has been reviewed and is complete.
Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:
A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents
traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release for manufacturing, shipping, construction, and installation.
: checked, and the inspection results.
Engineering and Quality Assurance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and control of materials, parts, or components, as appropriate.     Suppliers are required to assure that all required documentation for an item is prop-erly identified and related to the item. Each item is re-quired to be physically identified, either by marking on the item or by tags. Physical identification by purchase order number is used to the maximum extent possible for relating an item at any time to applicable documentation.       Identifi-cation is either on the item or records traceable to the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate     means are employed.
If the item and documentation are adequate, Quality Control labels the item as "Accepted," files the documentation and receipt inspection results, and releases
The Ginna   Station Superintendent is responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant. Procedures covering the identification and control of materials, parts, and components at the plant are approved by the Ginna Station Superintendent.     The superintendents of other departments which receive material which is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining
.the item for storage or use.
If the item j.s nonconforming or the documentation is unsatisfactory,'uality Control initiates a nonconforma'nce report which is controlled in accordance with Section IV.15.
All items issued must bear an acceptance tag and have docu-mentation to support the acceptability of the item.
In the event the traceability is lost or the 'documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.
Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication,
: storage, or installation.
Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project.
The identification and control requirements cover items such as:
traceability to associated documents such as drawings, specifications, purchase
: orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials,
: parts, and components prior to release for manufacturing, shipping, construction, and installation.
Engineering and Quality Assurance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and control of materials,
: parts, or components, as appropriate.
Suppliers are required to assure that all required documentation for an item is prop-erly identified and related to the item.
Each item is re-quired to be physically identified, either by marking on the item or by tags.
Physical identification by purchase order number is used to the maximum extent possible for relating an item at any time to applicable documentation.
Identifi-cation is either on the item or records traceable to the item.
Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.
The Ginna Station Superintendent is responsible for main-taining identification and control of materials,
: parts, or components
: received, stored, installed, and used at the plant.
Procedures covering the identification and control of materials,
: parts, and components at the plant are approved by the Ginna Station Superintendent.
The superintendents of other departments which receive material which is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining
,identification and control of material, parts, or components,.
,identification and control of material, parts, or components,.
stored or used in their area of responsibility.
stored or used in their area of responsibility.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.
 
Control of S ecial Processes Written procedures are established to control special pro-
Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicabl~ codes, standards, and design specifications. Qualification of personnel and procedures complies with the requirements of applicable codes and standards. When special process qualifi-cation requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.
: cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicabl~ codes, standards, and design specifications.
Qualification of personnel and procedures complies with the requirements of applicable codes and standards.
When special process qualifi-cation requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Quality Assurance and Quality Control personnel are respon-sible for reviewing procurement documents to ensure that requirements for control of special processes are included.
Quality Assurance and Quality Control personnel are respon-sible for reviewing procurement documents to ensure that requirements for control of special processes are included.
Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering.
Rochester Gas and Electric procedures for special processes are prepared,
: reviewed, and approved by Materials Engineering.
Special process procedures submitted by suppliers and con-tractors are reviewed and concurred with by Materials Engi-neering.
Special process procedures submitted by suppliers and con-tractors are reviewed and concurred with by Materials Engi-neering.
The Ginna Station Maintenance Engineer and Quality Control Engineer are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards. The Manager, Materials Engineering is responsible for the qualification of NDE personnel and procedures. The Manager, Materials Engineering is responsible for the qualification of welding procedures and the training and qualification of welders.
The Ginna Station Maintenance Engineer and Quality Control Engineer are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable
: codes, specifications, and standards.
The Manager, Materials Engineering is responsible for the qualification of NDE personnel and procedures.
The Manager, Materials Engineering is responsible for the qualification of welding procedures and the training and qualification of welders.
Ginna Station maintains records for personnel and procedures to demonstrate that required qualifications have been obtained and are kept current.
Ginna Station maintains records for personnel and procedures to demonstrate that required qualifications have been obtained and are kept current.
Quality Assurance and Quality Control perform surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure com-pliance with procedures.
Quality Assurance and Quality Control perform surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure com-pliance with procedures.
I Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-cations, codes, standards, or regulatory requirements. For clarification and to distinguish from preventative mainte-nance inspections the following controls are associated with
I Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-
 
: cations, codes, standards, or regulatory requirements.
'
For clarification and to distinguish from preventative mainte-nance inspections the following controls are associated with I
I


the quality assurance function inspections and referred to as verification inspections. Instructions for conducting detailed verification inspections, are contained in inspection procedures. These inspection procedures and all.supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.
the quality assurance function inspections and referred to as verification inspections.
Inspection requirements and hold points are utilized to verify conformance of activities to the documented instruc-tions, specifications, and drawings for accomplishing the activity. Inspection procedures include the of quality characteristics to be inspected, a identification description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity. Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.       Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
Instructions for conducting detailed verification inspections, are contained in inspection procedures.
Quality Control personnel are responsible .for performing verification inspections, as required,     during plant operation, maintenance, repair, in-service inspection, refueling, modi-fication, and testing when the work is performed by Rochester Gas and Electric personnel. When the work is performed by outside contractors, Quality Control is responsible     for sur-veillance of the subcontractor's inspection activities. All inspection equipment is calibrated and controlled with Section 12. Calibration status is verified byininspection accordance personnel prior to performing an inspection operation.
These inspection procedures and all.supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.
In the event an inspection of               material or products is impossible or impractical, processed indirect control by monitoring processing methods, equipment, and personnel is provided.
Inspection requirements and hold points are utilized to verify conformance of activities to the documented instruc-tions, specifications, and drawings for accomplishing the activity.
Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.
Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work.
Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.
Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
Quality Control personnel are responsible.for performing verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modi-
: fication, and testing when the work is performed by Rochester Gas and Electric personnel.
When the work is performed by outside contractors, Quality Control is responsible for sur-veillance of the subcontractor's inspection activities.
All inspection equipment is calibrated and controlled in accordance with Section 12.
Calibration status is verified by inspection personnel prior to performing an inspection operation.
In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing
: methods, equipment, and personnel is provided.
Both inspection and process monitoring are required when control is inadequate without both.
Both inspection and process monitoring are required when control is inadequate without both.
Quality Assurance is responsible for the adequate inclusion of inspection requirements in specifications.
Quality Assurance is responsible for the adequate inclusion of inspection requirements in specifications.
The Ginna Station Quality Control Engineer is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing procedures. He is also..responsible for the assignment of qualified inspection personnel required for inspection of quality affecting activities and for coordinating the performance of and conducting the surveil-lance of inservice inspection.
The Ginna Station Quality Control Engineer is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing procedures.
 
He is also..responsible for the assignment of qualified inspection personnel required for inspection of quality affecting activities and for coordinating the performance of and conducting the surveil-lance of inservice inspection.
The General Maintenance Quality Control Coordinator is responsible for assuring that adequate inspection require-ments are included in procedures, instructions and/or check-lists controlling maintenance, modification and repair activities and related fabrication processes at the General Maintenance facility.
The General Maintenance Quality Control Coordinator is responsible for assuring that adequate inspection require-ments are included in procedures, instructions and/or check-lists controlling maintenance, modification and repair activities and related fabrication processes at the General Maintenance facility.
With the exception of that which pertains to Pump and Valve Testing, the Supervisor, Materials Engineering is responsible for establishing the requirements for the Inservice Inspection Program. Quality Assurance is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
With the exception of that which pertains to Pump and Valve
Test Control Whenever testing   is required to demonstrate that a material, part,   component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification, control, and documen-tation of all tests, and the preparation of written proce-dures required for satisfactory accomplishment of the testing.
: Testing, the Supervisor, Materials Engineering is responsible for establishing the requirements for the Inservice Inspection Program.
Written test procedures and checklists include: necessary test equipment and calibration requirements; material require-ments; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed perfor-mance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-tions for disposition of deviations; data collection require-ments; and test result approval.
Quality Assurance is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.
The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
Test Control Whenever testing is required to demonstrate that a material,
: part, component, or system will perform satisfactorily in
: service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications,
: codes, standards, and regulatory requirements.
The test program requires the identification, control, and documen-tation of all tests, and the preparation of written proce-dures required for satisfactory accomplishment of the testing.
Written test procedures and checklists include:
necessary test equipment and calibration requirements; material require-ments; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed perfor-mance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-tions for disposition of deviations; data collection require-ments; and test result approval.
The Ginna Station Superintendent is responsible for the station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.
The Ginna Station Superintendent is responsible for the station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.
Test procedures are prepared by the plant staff, reviewed by
Test procedures are prepared by the plant staff, reviewed by
. the. Plant, Operations Review -Committee and Quality Control, .
. the. Plant, Operations Review -Committee and Quality Control, and approved by the Ginna Station Superintendent.
and approved by the Ginna Station Superintendent. The Ginna Station Superintendent is responsible for the performance of the required tests in a correct and timely manner utilizing written and approved procedures. When contractors. are employed for tests, the contractor is requried to perform testing in accordance with his quality assurance program requirements. All test results are required to be docu-mented; reviewed, and approved by those responsible for performing the test,.
The Ginna Station Superintendent is responsible for the performance of the required tests in a correct and timely manner utilizing written and approved procedures.
 
When contractors. are employed for tests, the contractor is requried to perform testing in accordance with his quality assurance program requirements.
When requested by Ginna Station, Electric Meter and Laboratory performs test activities to determine the cause of protective relay malfunctions. These test activities are-performed in accordance with approved procedures by qualified personnel.
All test results are required to be docu-mented;
Engineering and Quality Assurance are responsible for assuring that required tests for major modifications are included in specifications. Engineering assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test re-quirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements. Reviews of minor modification design by Station Quality Control verifies adequate inclusion of test requirements Control of Measurin   and Test E   i ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control require-ments of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.     Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy. Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other condi-tions affecting measurement capability.
: reviewed, and approved by those responsible for performing the test,.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next calibration date on the equipment; a system providing trace-ability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibrati'o'n 'results', abnormalities, .and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability"under normal use conditions. In the event 'a measuring instrument (i.e. shop or field standard) is found out of calibration, an investigation is conducted to determine the validity of previous measurements.
When requested by Ginna Station, Electric Meter and Laboratory performs test activities to determine the cause of protective relay malfunctions.
 
These test activities are-performed in accordance with approved procedures by qualified personnel.
Engineering and Quality Assurance are responsible for assuring that required tests for major modifications are included in specifications.
Engineering assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff.
The Ginna Station Technical Manager is responsible for the adequate inclusion of test re-quirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.
Reviews of minor modification design by Station Quality Control verifies adequate inclusion of test requirements Control of Measurin and Test E i ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control require-ments of measuring and test instruments,
: tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components,
: systems, and structures.
Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy.
Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other condi-tions affecting measurement capability.
Control of measuring and test equipment requires:
a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next calibration date on the equipment; a system providing trace-ability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibrati'o'n 'results',
abnormalities,
.and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability"under normal use conditions.
In the event 'a measuring instrument (i.e.
shop or field standard) is found out of calibration, an investigation is conducted to determine the validity of previous measurements.
J
J
  ~
~ ~
    ~


The Ginna Station Superintendent is resonsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements. Instruments specified in Section 4.1, Technical Specificatiohs, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.
The Ginna Station Superintendent is resonsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements.
Instruments specified in Section 4.1, Technical Specificatiohs, are included in the program.
: Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.
Measuring, test or inspection equipment used by Quality Control is included in the program.
Measuring, test or inspection equipment used by Quality Control is included in the program.
The Superintendent, General Maintenance, and Superintendent, Electric Meter and Laboratory, are responsible for esta-blishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective departments.
The Superintendent, General Maintenance, and Superintendent, Electric Meter and Laboratory, are responsible for esta-blishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective departments.
Handlin     Stora e and Shi   in The Ginna Station Superintendent is responsible for develop-ing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. The Superintendent, General Maintenance, and the Superintendent, Electric Meter and Laboratory, are responsible for preparing and implementing procedures   for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas. In addition, the Superintendent, General Maintenance, is responsible for preparing and implement-ing procedures for the routine maintenance and inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific written instructions and recommen-dations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in -addition to, specific manufacturer requirements, the department superintendent may invoke additional require-ments   in accordance with department procedures.
Handlin Stora e
The   Vice President and Chief Engineer is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appro-priate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for modi-
and Shi in The Ginna Station Superintendent is responsible for develop-ing and implementing procedures for the handling,
.fications. "These procedures ax'e prepared by contractors; by the station staff, or by staff members of General Maintenance or Electric Meter and Laboratory, as appropriate. Rochester Gas and   Electric procedures are reviewed and approved as described in Section 6.
: storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.
In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation
The Superintendent, General Maintenance, and the Superintendent, Electric Meter and Laboratory, are responsible for preparing and implementing procedures for the handling,
                          <<24-
: storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas.
In addition, the Superintendent, General Maintenance, is responsible for preparing and implement-ing procedures for the routine maintenance and inspection of lifting and handling equipment.
Under normal circumstances, manufacturer's specific written instructions and recommen-dations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements.
In the absence of, or in -addition to, specific manufacturer requirements, the department superintendent may invoke additional require-ments in accordance with department procedures.
The Vice President and Chief Engineer is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appro-priate, for the handling,
: shipping, storage,
: cleaning, and preservation of materials and equipment procured for modi-
.fications. "These procedures ax'e prepared by contractors; by the station staff, or by staff members of General Maintenance or Electric Meter and Laboratory, as appropriate.
Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.
In the preparation of procurement documents, department procedures, and contractor procedures, consideration of
: handling, shipping,
: storage, cleanliness, and preservation
<<24-


14.
is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.
Quality Assurance is responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Control is responsible for surveillance of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Quality Assurance is responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified.
: 14.      Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.     The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.
Quality Control is responsible for surveillance of handling,
The Ginna Station Superintendent is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance, repair, or modification in accordance with the approved Rochester Gas and Electric Intra-Station Holding Rules. The Ginna Station Superintendent designates personnel who have station holding authority.
: storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.
The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.
The Ginna Station Superintendent is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance,
: repair, or modification in accordance with the approved Rochester Gas and Electric Intra-Station Holding Rules.
The Ginna Station Superintendent designates personnel who have station holding authority.
Personnel who have station holding authority are responsible
Personnel who have station holding authority are responsible
      , for directing the status   change of equipment and systems in accordance with the approved company Intra-Station Holding Rules. System status is indicated through the use of hold tags and control logs.
, for directing the status change of equipment and systems in accordance with the approved company Intra-Station Holding Rules.
Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels. The procedures require the recording of the name of the person placing and removing the tag.
System status is indicated through the use of hold tags and control logs.
Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.
Equipment or system inspection and test status are indicated by use of test tags,
: labels, or work inspection and test status sheets.
Written procedures control the use of hold tags, test tags, and labels.
The procedures require the recording of the name of the person placing and removing the tag.
: Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use.
    ~
~
of tags, stamps, or'the'r suitable means.
of tags, stamps, or'the'r suitable means.
Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets and checklists to indicate status of the work, inspections and tests     and corresponding acceptance or rejection for a particular component, system, or structure. These job control forms are prepared jointly by the job supervisor and Quality Control and maintained at a designated control location to indicate the status and the completion of required inspections and tests.
Maintenance,
: repair, or modification of components,
: systems, or structures utilizes procedures, travelers, data sheets and checklists to indicate status of the work, inspections and tests and corresponding acceptance or rejection for a particular component,
: system, or structure.
These job control forms are prepared jointly by the job supervisor and Quality Control and maintained at a designated control location to indicate the status and the completion of required inspections and tests.  
~ e


~e Quality Control monitors the status change activities for their compliance to approved procedures and assures that reinspection results are properly logged. Quality Control also establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.
Quality Control monitors the status change activities for their compliance to approved procedures and assures that reinspection results are properly logged.
Nonconformin   Materials Parts, and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.
Quality Control also establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.
parts, or components which do not conform to the'aterials, drawing or specification requirements are identified with a hold tag and reported on a nonconformance report. Quality Control is responsible for issuing nonconformance reports, recommending disposition, initiating repair or rework, and inspecting and approving repaired or reworked items. Prior to installation or use, nonconforming items generally remain in a Quality Control receiving inspection area until approved disposition has been received. Nonconforming items which are released for installation to meet critical fabrication schedules are controlled by Quality Control to prevent inadvertant use prior to clearance of the nonconformance.
Nonconformin Materials
: Parts, and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.
'aterials,
: parts, or components which do not conform to the drawing or specification requirements are identified with a hold tag and reported on a nonconformance report.
Quality Control is responsible for issuing nonconformance
: reports, recommending disposition, initiating repair or rework, and inspecting and approving repaired or reworked items.
Prior to installation or use, nonconforming items generally remain in a Quality Control receiving inspection area until approved disposition has been received.
Nonconforming items which are released for installation to meet critical fabrication schedules are controlled by Quality Control to prevent inadvertant use prior to clearance of the nonconformance.
After installation or use, nonconforming items are identi-fied and controlled until approved disposition has been received.
After installation or use, nonconforming items are identi-fied and controlled until approved disposition has been received.
Nonconformances   identified at a supplier's facility and reported to RG&E, which have supplier recommended diposi-tions of use-as-is, or repair, are normally processed by the department originating the procurement. Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended dispo-sition. This also applies to nonconformances   discovered after receipt inspection, during handling or after instal-lation or use.
Nonconformances identified at a supplier's facility and reported to RG&E, which have supplier recommended diposi-tions of use-as-is, or repair, are normally processed by the department originating the procurement.
Items are repaired and reworked only in accordance with approved procedures and current drawings. Quality Control assures that approved procedures and/or drawings are avail-able for use prior to the repair or rework and reinspects all repaired or reworked items. The repair or rework must be verified as acceptable by an inspection of the affected item which is at least equal to the original inspection method.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended dispo-sition.
This also applies to nonconformances discovered after receipt inspection, during handling or after instal-lation or use.
Items are repaired and reworked only in accordance with approved procedures and current drawings.
Quality Control assures that approved procedures and/or drawings are avail-able for use prior to the repair or rework and reinspects all repaired or reworked items.
The repair or rework must be verified as acceptable by an inspection of the affected item which is at least equal to the original inspection method.
Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical.
Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical.
justification for acceptance. All such items are prior to use by the cognizant organization having .approved responsi-bility for the requirement. In addition, those "us'e-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Vice President, Electric and Steam Production.
justification for acceptance.
 
All such items are.approved prior to use by the cognizant organization having responsi-bility for the requirement.
k Quality Control issues monthly nonconformance report summaries which are reviewed and analyzed by Quality Assurance. Unsatisfactory trends are reported to management by means of the corrective action report in accordance with Section 16.
In addition, those "us'e-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Vice President, Electric and Steam Production.
Corrective Action Quality Assurance establishes the requirements for. identi-fication, review and correction of significant conditions adverse to quality. Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are reported on a correct'ive action report.
k Quality Control issues monthly nonconformance report summaries which are reviewed and analyzed by Quality Assurance.
Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies. The corrective action report identifies the
Unsatisfactory trends are reported to management by means of the corrective action report in accordance with Section 16.
Corrective Action Quality Assurance establishes the requirements for. identi-fication, review and correction of significant conditions adverse to quality.
Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are reported on a correct'ive action report.
Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant
: shutdown, high maintenance
: items, and operating procedure deficiencies.
The corrective action report identifies the
-condition, the cause of the condition, and the corrective action taken.
-condition, the cause of the condition, and the corrective action taken.
Corrective action reports may be initiated by Quality Assur-ance, Engineering, Ginna Station, General Maintenance, Electric Meter and Zaboratory or Purchasing staff personnel.
Corrective action reports may be initiated by Quality Assur-
Corrective action reports initiated at Ginna Station and General Maintenance are submitted to Quality Control for review and subsequent processing. Corrective action reports initiated by departments other than at Ginna Station or General Maintenance are reviewed and processed by Quality Assurance.
: ance, Engineering, Ginna Station, General Maintenance, Electric Meter and Zaboratory or Purchasing staff personnel.
When a significant condition adverse to quality at Ginna Station is identified, Quality Control evaluates the affect of continuing the activity. If continuing the activity would cover up or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken. The Ginna Station Quality Control Engineer has authority to stop work on maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies, at Ginna Station. The Ginna Station Quality Control Engineer may recommend stop work action to the Ginna Station Superintendent on operating deficiencies.
Corrective action reports initiated at Ginna Station and General Maintenance are submitted to Quality Control for review and subsequent processing.
Corrective action reports initiated by departments other than at Ginna Station or General Maintenance are reviewed and processed by Quality Assurance.
When a significant condition adverse to quality at Ginna Station is identified, Quality Control evaluates the affect of continuing the activity. If continuing the activity would cover up or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.
The Ginna Station Quality Control Engineer has authority to stop work on maintenance,
: repair, inservice inspection, refueling, modification, testing or inspection deficiencies, at Ginna Station.
The Ginna Station Quality Control Engineer may recommend stop work action to the Ginna Station Superintendent on operating deficiencies.
The Plant'Operations Review 'Committee reviews all corrective '"
The Plant'Operations Review 'Committee reviews all corrective '"
action reports initiated at Ginna Station and recommends interim corrective action   if the action does not represent a change in configuration of the deficient item. The Committee recommends permanent corrective action for all conditions adverse to quality which involve operating procedures.
action reports initiated at Ginna Station and recommends interim corrective action if the action does not represent a
 
change in configuration of the deficient item.
Significant conditions adverse to quality identfied in General Maintenance are processed by the Quality Control Coordinator. The General Maintenance Quality Control Coor-dinator has the authority to stop or limit work activities within his department.
The Committee recommends permanent corrective action for all conditions adverse to quality which involve operating procedures.
Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable. The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.
Significant conditions adverse to quality identfied in General Maintenance are processed by the Quality Control Coordinator.
Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action       been taken to preclude repe-tition. Quality Assurance has also reviews nonconformance report summaries for unsatisfactory trends and initiates a corrective action report   if such a trend occurs.
The General Maintenance Quality Control Coor-dinator has the authority to stop or limit work activities within his department.
Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a
design change are reviewed by Ginna Station or Engineering as applicable.
The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.
Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.
Quality Assurance also reviews nonconformance report summaries for unsatisfactory trends and initiates a
corrective action report if such a trend occurs.
Completed corrective action reports are submitted to the Vice President, Electric and Steam Production to keep him aware of significant conditions adverse to quality.
Completed corrective action reports are submitted to the Vice President, Electric and Steam Production to keep him aware of significant conditions adverse to quality.
ualit   Assurance Records Quality Assurance is resonsible for establishing the basic requirements for quality assurance record retention and maintenance. The Ginna Station Superintendent is for the retention and maintenance of plant records.responsible Engineer-ing is responsible for the retention and maintenance of Engineering records. Quality Assurance, Purchasing, Fuel Planning, General Maintenance and Electric Meter and Labora-tory departments are responsible for assuring the maintenance and retention of records which they -originate. This may be accomplished either by retaining the records in their depart-ment or by forwarding them to Ginna Station or Engineering, as appropriate. Each organization retaining records is responsible for preparation, review, approval, and imple-mentation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements. The records which fall within quality assur-ance record requirements include those records required by Section 6.10 of the Technical Specifications and the quality assurance'program.,     All,records associated wi'th the operation; maintenance, repair, inservice inspection, refueling, modifi-cation, inspection and testing of structures, systems, and components covered by the quality assurance program are included.
ualit Assurance Records Quality Assurance is resonsible for establishing the basic requirements for quality assurance record retention and maintenance.
Ginna Station records include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses;
The Ginna Station Superintendent is responsible for the retention and maintenance of plant records.
Engineer-ing is responsible for the retention and maintenance of Engineering records.
Quality Assurance, Purchasing, Fuel
: Planning, General Maintenance and Electric Meter and Labora-tory departments are responsible for assuring the maintenance and retention of records which they -originate.
This may be accomplished either by retaining the records in their depart-ment or by forwarding them to Ginna Station or Engineering, as appropriate.
Each organization retaining records is responsible for preparation, review, approval, and imple-mentation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements.
The records which fall within quality assur-ance record requirements include those records required by Section 6.10 of the Technical Specifications and the quality assurance'program.,
All,records associated wi'th the operation; maintenance, repair, inservice inspection, refueling, modifi-cation, inspection and testing of structures,
: systems, and components covered by the quality assurance program are included.
Ginna Station records include operating logs; the results of inspections,
: tests, and the monitoring of plant activities;
: drawings, procurement documents and material analyses; I ~
I


I~ I calibration procedures and reports; and nonconforming and of corrective action reports. Records of the qualification personnel, procedures, and equipment for special processes and the results of reviews are maintained by Engineering.
calibration procedures and reports; and nonconforming and corrective action reports.
Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained by Engineering.
The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements and responsi-bilities for preparation, inspection,     identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available to authorized personnel.
Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data
: recorder, the acceptance or rejection of the activity, and a
record of any nonconformances.
The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate.
Requirements and responsi-bilities for preparation, inspection, identification, review,
: storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures,
: codes, standards, and procurement documents.
Records are available to authorized personnel.
Removal from record storage is documented on sign-out cards and accountability is maintained by the responsible record
Removal from record storage is documented on sign-out cards and accountability is maintained by the responsible record
  .control activity.
.control activity.
Records are either stored in record storage facilities which are designed to prevent destruction of records through fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.
Records are either stored in record storage facilities which are designed to prevent destruction of records through fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.
Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.
Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.
The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.
The Ginna Station Superintendent is responsible for main-taining plant, operating records as required in Section 6.10, Technical Specifications.
The Ginna Station Superintendent is responsible for main-taining plant, operating records as required in Section 6.10, Technical Specifications.
Engineering is responsible fo'r maintaining design records, such as specifications, drawings, design review reports, and design control documentation; quality assurance records,
Engineering is responsible fo'r maintaining design records, such as specifications,
.''uch as, audit reports and supplier surveillance reports; purchasing records, such as supplier qualifications, bid and purchase   orders.                           .'valuatons, Audits Compliance with all aspects of the quality assurance program and the effectiveness of the program is determined by audits activities.
: drawings, design review reports, and design control documentation; quality assurance
of all organizations performing quality affectingaudits Quality Assurance is responsible   for conducting         of
: records,
 
.''uch as, audit reports and supplier surveillance reports; purchasing records, such as supplier qualifications, bid
each oiganization involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety important of activities being performed.
.'valuatons, and purchase orders.
Audits of Ginna Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing organizations are performed annually. Table 18-1 is a list of the activities to be audited in each of the organizations.
Audits Compliance with all aspects of the quality assurance program and the effectiveness of the program is determined by audits of all organizations performing quality affecting activities.
Audit. frequencies are based on the level of activity in each area. Audit schedules are established to assure that each of the activities are audited at the frequency specified'n Technical Specifications 6.0 which includes annually for those activities required to meet the criteria of Appendix B, 10CFR. Additional audits are conducted as required by special conditions or circumstances.
Quality Assurance is responsible for conducting audits of each oiganization involved in the quality assurance program on a planned, periodic basis.
Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited,       names and assignments of those who will perform the audit,the the scheduling arrangements, and the method of reporting findings and recommendations.     The audits are performed in accordance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.
Audit intervals are based on the status and safety important of activities being performed.
Audit results are documented and reported to the person having supervisory responsibility in the area audited, the Vice President, Electric and Steam Production, and the Nuclear Safety Audit and Review Board. Within a specified period of time, the person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies revealed by the audit, and document and report the corrective action.
Audits of Ginna Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing organizations are performed annually.
Table 18-1 is a list of the activities to be audited in each of the organizations.
Audit. frequencies are based on the level of activity in each area.
Audit schedules are established to assure that each of the activities are audited at the frequency specified'n Technical Specifications 6.0 which includes annually for those activities required to meet the criteria of Appendix B,
10CFR.
Additional audits are conducted as required by special conditions or circumstances.
Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names and assignments of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations.
The audits are performed in accordance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.
Audit results are documented and reported to the person having supervisory responsibility in the area audited, the Vice President, Electric and Steam Production, and the Nuclear Safety Audit and Review Board.
Within a specified period of time, the person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies revealed by the audit, and document and report the corrective action.
Quality Assurance is responsible for developing audit plans and audit checklists, designating and training audit personnel, and conducting audits.
Quality Assurance is responsible for developing audit plans and audit checklists, designating and training audit personnel, and conducting audits.
Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits of major contractors, subcontractors, and suppliers are conducted during the. early stages of design and procure-.
Audits of major contractors, subcontractors, and suppliers are conducted during the. early stages of design and procure-.
ment, as required,'o evaluate their quality assurance
: ment, as required,'o evaluate their quality assurance
'program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.     During the project, additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-
'program for compliance with all aspects of the procurement documents.
Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.
During the project, additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-
~mented in accordance with procurement documents.
Quality Assurance performs regular analyses of audit results to evaluate quality trends.
Results of these analyses will be provided to management for their regular review.
 
Table l-l Quality Assurance Program Procedures Subject Listing ualit Assurance Procedures
.Appendix B Criteria Indoctrination of Quality Assurance and Supervisory Personnel Training of Quality Assurance Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance Procedures Quality Assurance Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's
'esign Documents Requisitioning Quality Assurance Services Quality Assurance Review of Rochester Gas and Electric Procurement Documents IV IV Preparation, Review and Approval of Rochester Gas and Electric Q.A. Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance Procedures IV Review of Departmental Procedures Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance Qualification of Suppliers Supplier Surveillance VI VI VII VII
~
~
mented in accordance with procurement documents.
I
 
~ F Table l-l (cont'd) ualit Assurance Procedures Appendix B
Quality Assurance performs regular analyses of audit results to evaluate quality trends. Results of these analyses will be provided to management for their regular review.
- Criteria Control of Supplier Performance Quality Assurance Bid Evaluations QA Review of Inservice Inspection Preparation, Review and Processing of Corrective Action Reports by Quality Assurance Qualification of Auditing Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit Findings Conduct of Quality Assurance During and in Follow-Up of USNRC and Management Audits VII VII XVI XVIII XVIII XVIII XVIII XVIII
 
~33 ~
Table  l-l Quality Assurance Program Procedures Subject Listing
                                                      .Appendix  B ualit  Assurance Procedures                    Criteria Indoctrination of Quality Assurance    and Supervisory Personnel Training of Quality Assurance Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance Procedures Quality Assurance Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's
'esign  Documents Requisitioning Quality Assurance Services                  IV Quality Assurance Review of Rochester Gas    and          IV Electric Procurement    Documents Preparation,  Review and Approval    of Rochester Gas      IV and Electric  Q.A. Specifications Preparation,  Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance Procedures Review  of Departmental Procedures                        VI Preparation, Review and Approval of Procedure            VI Deviation Requests by Quality Assurance Qualification of Suppliers                              VII Supplier Surveillance                                    VII
 
~ I ~
F Table l-l (cont'd)
Appendix  B ualit Assurance Procedures               - Criteria Control of Supplier Performance                     VII Quality Assurance Bid Evaluations                   VII QA Review of Inservice Inspection Preparation, Review and Processing of Corrective     XVI Action Reports by Quality Assurance Qualification of Auditing Personnel               XVIII Audit Scheduling and Planning                     XVIII Performance of Quality Assurance Audits           XVII I Reporting and Follow-Up of Audit Findings         XVIII Conduct of Quality Assurance During and in         XVIII Follow-Up of USNRC and Management Audits
                                      ~33 ~


Table 1-1 (cont'd)
Table 1-1 (cont'd)
                                                      .Appendix B Ginna Procedures                              Criteria Ginna Quality Assurance Program Implementation-Training of Ginna Personnel Ginna Organization Work   Start Authorization Modification Control Activities Ginna Station Modification Evaluation Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased           IV Materials, Parts, Components and Services Plant Procedures Plant Procedure Document Control                       VI Control of Engineering Documents                       VI Control of NRC Correspondence                           VI Receipt and Acceptance of Purchased Materials         VI I Supplier Qualification Technical Evaluation           VII Control of Purchased Services                         VII Control of Accepted Material, Parts .and Components Identification and Marking of Material               VIII
Ginna Procedures
'ontrol of Welding Welding Equipment Performance   Verification Nondestructive Examination                             IX Inspection and Surveillance   Activities
.Appendix B
Criteria Ginna Quality Assurance Program Implementation-Training of Ginna Personnel Ginna Organization Work Start Authorization Modification Control Activities Ginna Station Modification Evaluation Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased Materials, Parts, Components and Services Plant Procedures IV Plant Procedure Document Control Control of Engineering Documents Control of NRC Correspondence Receipt and Acceptance of Purchased Materials Supplier Qualification Technical Evaluation Control of Purchased Services Control of Accepted Material, Parts.and Components Identification and Marking of Material
'ontrol of Welding Welding Equipment Performance Verification Nondestructive Examination Inspection and Surveillance Activities VI VI VI VII VII VII VIII IX


Table l-l (cont'd)
Table l-l (cont'd)
Appendix   B Ginna Procedures                                      -
Ginna Procedures Appendix B
Criteria Qualification of Surveillance     and   Inspection Personnel Inservice Inspection                                         X, XIV Performance   of Tests                                           XI Qual ification o f Test Personnel                                 XI Calibration and Control of Test Instruments                     XII Calibration and Control of'echanical Measuring                   XII Tools and Equipment Calibration   and Control of Process System                     XII Instrumentation Control of Material Handling and Handling Equipment
- Criteria Qualification of Surveillance and Inspection Personnel Inservice Inspection Performance of Tests Qualification of Test Personnel Calibration and Control of Test Instruments X, XIV XI XI XII Calibration and Control of'echanical Measuring Tools and Equipment Calibration and Control of Process System Instrumentation XII XII Control of Material Handling and Handling Equipment
                                            ~
~
XIII Storage and Preservation of Materials
~
                        ~            ~
~
XIII Station Holding Roles                                           XIV Test Status Control                                             XIV Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports Corrective Action at Ginna Station                               XVI Control of Quality Assurance Records                           XVII Record Storage   Facility and Equipment                       XVII System and Equipment   Histories                               XVII Ginna Station Response to 'Internal'udits                     XVIII
Storage and Preservation of Materials Station Holding Roles Test Status Control XIII XIII XIV XIV Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports Corrective Action at Ginna Station Control of Quality Assurance Records Record Storage Facility and Equipment System and Equipment Histories Ginna Station Response to 'Internal'udits XVI XVII XVII XVII XVIII  


Table l-l (cont'd)
Table l-l (cont'd)
Appendix B En ineerin Procedures                         'riteria Indoctrination   and Training Engineering Department Organization and Responsibilities Preparation, Review and Aprpoval of Design Input Documents Preparation, Review and Approval of Design Analyses Engineering Drawings Preparation, Review and Approval of Specifications Design   Verification Design Interface Control Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase   Requisition                                   IV Engineering Procedures Engineering Procedure Deviation Request Distribution   and Control of Documents by               VI the Control Number Method Control of Documents by the List of                       VI Current Revisions Method J
En ineerin Procedures Appendix B
Distribution   and Coritrol of Documents by Project     VI Correspondence   Procedures Receipt, Control and Distribution of Drawings and Aperature Cards                                         ~ VI Supplier Evaluation                                    VII
'riteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Aprpoval of Design Input Documents Preparation, Review and Approval of Design Analyses Engineering Drawings Preparation, Review and Approval of Specifications Design Verification Design Interface Control Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition Engineering Procedures Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method IV VI Control of Documents by the List of Current Revisions Method J
Distribution and Coritrol of Documents by Project Correspondence Procedures
: Receipt, Control and Distribution of Drawings and Aperature Cards Supplier Evaluation VI VI
~ VI VII Table l-l (cont'd)
En ineerin Procedures Appendix B
" Criteria Preparation, Review and Approval of Bid Requests, Bid Evaluations and Recommendations for 'Award VII Engineering Review of Nonconforming Materials, Parts XV or Components Initiating and Responding to Corrective Action Reports XVI Records Engineering


Table l-l (cont'd) ineerin Procedures                              "Appendix  B En                                                  Criteria Preparation, Review and Approval of Bid Requests,            VII Bid Evaluations and Recommendations for 'Award Engineering Review of Nonconforming Materials, Parts          XV or Components Initiating  and Responding  to Corrective Action Reports    XVI Records                                                    XVII Engineering Response to Audits                             XVIII
===Response===
to Audits XVII XVIII


Table l-l (cont'd)
Table l-l (cont'd)
Appendix   B Purchasin Procedures                              '-
Purchasin Procedures Appendix B
Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities       II Preparation, Review, Approval and Issuance of                 IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation                         IV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation                                         VII Establishment and Maintenance of Qualified                   VII Suppliers List Supplier Nonconformance Processing Purchasing Department Response to Corrective                 XVI Action Reports and Corrective Action Reporting Purchasing Records                                         XVII Purchasing Response to Audits                             XVII I
'- Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities II Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation Establishment and Maintenance of Qualified Suppliers List Supplier Nonconformance Processing Purchasing Department
 
===Response===
to Corrective Action Reports and Corrective Action Reporting Purchasing Records Purchasing
 
===Response===
to Audits IV IV VII VII XVI XVII XVIII


4
4
' '


Table l-l (cont'd)
Table l-l (cont'd)
Appendix  B General Maintenance Procedures             .'Criteria Indoctrination and Training General Maintenance Organization and Responsibilities Preparation, Review and Approval of Purchase           IV Requisitions and Related Procurement Documents Quality Maintenance Procedures Quality Maintenance Procedure Deviation Request Preparation, Review and Approval of General Maintenance Fabrication Route Cards General Maintenance Instructions for Material Handling and Lifting Equipment Control and Distribution of Documents Regulating     VI Safety Related Activities Receipt and Acceptance of Purchased Materials         VII Control of Accepted Material, Parts and Components   VIII Traceability of Material                             VIII Issue, Control and Storage of Weld Consumables     VIII Welding Procedures                                     IX Welding Procedure   Qualification                     IX Heat Treating Procedures                               IX Welder Qualification and Currency                   IX
General Maintenance Procedures Appendix B
            'I
.'Criteria Indoctrination and Training General Maintenance Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Maintenance Procedures Quality Maintenance Procedure Deviation Request Preparation, Review and Approval of General Maintenance Fabrication Route Cards IV General Maintenance Instructions for Material Handling and Lifting Equipment Control and Distribution of Documents Regulating Safety Related Activities Receipt and Acceptance of Purchased Materials Control of Accepted Material, Parts and Components Traceability of Material
'n'service Inspection                                   IX Control, of Welding                                   IX Welding Equipment Performance   Verification         IX Nondestructive Examination Procedures                 IX
: Issue, Control and Storage of Weld Consumables Welding Procedures Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency
'I
'n'service Inspection VI VII VIII VIII VIII IX IX IX IX IX Control, of Welding Welding Equipment Performance Verification Nondestructive Examination Procedures IX IX IX Table l-l (cont'd)
General Maintenance Procedures
;Appendix B
" Criteria Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Certifications Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel IX IX Calibration and Control of Nondestructive Examination Instruments XII Inspection and Maintenance of Material Handling Equipment Overhead and Gantry Cranes Inspection and Maintenance of Portable Lifting and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems Slings and Related Apparatus Classification and Training of Material Handling Equipment Personnel Mobile Hydraulic Cranes Inspection and Maintenance of Jacks Forklift Loading Forks Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at General Mainten'ance XIII XIII XIII XIII XIII XIII XIII XIII XIII Quality Maintenance. Records General Maintenance


Table  l-l (cont'd)
===Response===
                                                      ;Appendix  B General Maintenance Procedures                  "  Criteria Nondestructive Examination Procedures Manual                IX Nondestructive Examination Personnel Certifications        IX Inspection and Surveillance Activities Qualification of Surveillance    and Inspection Personnel Calibration  and  Control of Nondestructive                XII Examination Instruments Inspection and Maintenance of Material Handling          XIII Equipment Overhead and Gantry Cranes                                XIII Inspection and Maintenance    of Portable Lifting        XIII and Handling Equipment Underhung Cranes,  Jib Cranes  and Monorail Systems    XIII Slings and Related Apparatus                              XIII Classification and Training of Material Handling          XIII Equipment Personnel Mobile Hydraulic Cranes                                  XIII Inspection and Maintenance of Jacks                      XIII Forklift Loading  Forks                                  XIII Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at General Mainten'ance Quality Maintenance. Records                              XVII General Maintenance Response to     Internal Audits     .XVII I 40
to Internal Audits XVII
.XVIII 40


Table l-l (cont'd)
Table l-l (cont'd)
Appendix  B Electric Meter and Laborator   Procedures "Criteria Quality Assurance Program Implementation for Electric Meter and Laboratory Department Training of Electric Meter and Laboratory Personnel Periodic Review of Quality Relay Procedures Electric Meter and Laboratory Organization Design/Modification Activities Control Control of Procurement Documents for Purchased         IV Materials, Parts, Components and Services Preparation, Review, and Approval of Electric Meter and Laboratory Procedures Control of Electric Meter and Laboratory Procedures
Electric Meter and Laborator Procedures Appendix B "Criteria Quality Assurance Program Implementation for Electric Meter and Laboratory Department Training of Electric Meter and Laboratory Personnel Periodic Review of Quality Relay Procedures Electric Meter and Laboratory Organization Design/Modification Activities Control Control of Procurement Documents for Purchased Materials, Parts, Components and Services Preparation,
                  ~
: Review, and Approval of Electric Meter and Laboratory Procedures Control of Electric Meter and Laboratory Procedures
VI Supplier Qualification Technical Evaluation
~
      ~                                      ~
~
VII Performance of Tests at Ginna Station
~
                            ~        ~
~
XI Performance of Tests at Electric Meter     and         XI Laboratory Shop Documentation,   Evaluation and Disposition of Test     XI Results Quali fication o f Test Personnel                       XI Calibration and Control   of Test Instruments         XII Control and Disposition of Nonconforming Materials Corrective Action at Electric Meter and Laboratory     XVI Control of Quality Assurance Records                 XVII Response to Internal QA Audits                      XVIII
~
 
Supplier Qualification Technical Evaluation Performance of Tests at Ginna Station Performance of Tests at Electric Meter and Laboratory Shop IV VI VII XI XI Documentation, Evaluation and Disposition of Test Results XI Qualification of Test Personnel Calibration and Control of Test Instruments Control and Disposition of Nonconforming Materials Corrective Action at Electric Meter and Laboratory Control of Quality Assurance Records
TABLE 4-1 Procurement Document  Re  irements Items to be considered  for inclusion in    procurement documents include:
: 1. Sco e  of Work - Detailed statement of the work to    be per-formed.
*2. Technical  Re  irements  - by reference to specific drawings, specifications, codes, regulations, procedures or instruc-tions including revisions, therto that describe the items or services to be furnished. Also identified shall be test, inspection and acceptance requirements, and any special re-quirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shpping and extended  storage.
*3. ualit Assurance'Pro ram Re irements  which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier in-corporate appropriate quality assurance program require-ments in subtier procurement documents.
*4. Ri ht of Access - to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.
*5. Documentation Re irements - Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calcu-lations and analyses.
*6. Nonconformances - Requirements for '.reporting and disposition of nonconformances to procurement requirements.
*  - Included in the review    by Quality Assurance/Quality Control.


TABLE 18-1 Audit List F nctional Or anization             Activities Audited Engineering                     Indoctrination   and   Training Design Control Procurement     Document     Control Document Control Records Procurement Control Purchasing                     Indoctrination   and   Training Procurement     Document     Control Procurement Control Ginna Station                 QA   Indoctrination and Training Ginna   Staff Training, Retraining-Qualification and Performance Modification Maintenance and Repair Procurement Control Document   Control and     Records Inservice Inspection Surveillance Testing Handling, Storage and Shipping Facility Operation Conformance to all provisions contained in Technical Specifications and applicable license conditions Refueling Control of Measuring and Test, Equipment Health Physics       6   Chemistry Security Plan and Procedures Emergency Plan and Procedures Inspection & Surveillance Fire Protection Corrective Action associated with deficiencies. occurring in facility equipment, struc-
===Response===
                                                                    .
to Internal QA Audits XI XII XVI XVII XVIII TABLE 4-1 Procurement Document Re irements Items to be considered for inclusion in procurement documents include:
tures, system or method of operation Transportation of Radioactive Waste
1.
Sco e of Work - Detailed statement of the work to be per-formed.
*2.
Technical Re irements - by reference to specific drawings, specifications,
: codes, regulations, procedures or instruc-tions including revisions, therto that describe the items or services to be furnished.
Also identified shall be test, inspection and acceptance requirements, and any special re-quirements for such activities as designing, identification, fabrication, cleaning,
: erecting, packaging,
: handling, shpping and extended storage.
*3.
ualit Assurance'Pro ram Re irements which require the supplier to have a
documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards.
Also included shall be the requirement that the supplier in-corporate appropriate quality assurance program require-ments in subtier procurement documents.
*4.
Ri ht of Access - to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser.
Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.
*5.
Documentation Re irements - Submittal approval and retention requirements for documents such as quality assurance
: manuals, special process and test procedures, materials records, calcu-lations and analyses.
*6.
Nonconformances
- Requirements for '.reporting and disposition of nonconformances to procurement requirements.
Included in the review by Quality Assurance/Quality Control.
TABLE 18-1 Audit List F nctional Or anization Activities Audited Engineering Indoctrination and Training Design Control Procurement Document Control Document Control Records Procurement Control Purchasing Indoctrination and Training Procurement Document Control Procurement Control Ginna Station QA Indoctrination and Training Ginna Staff Training, Retraining-Qualification and Performance Modification Maintenance and Repair Procurement Control Document Control and Records Inservice Inspection Surveillance Testing
: Handling, Storage and Shipping Facility Operation Conformance to all provisions contained in Technical Specifications and applicable license conditions Refueling Control of Measuring and
: Test, Equipment Health Physics 6
Chemistry Security Plan and Procedures Emergency Plan and Procedures Inspection
& Surveillance Fire Protection Corrective Action associated with deficiencies. occurring in facility equipment, struc-
: tures, system or method of operation Transportation of Radioactive Waste


TABLE 18-1 (cont'd.)
TABLE 18-1 (cont'd.)
Audit List Functional Or anization             Activities Audited Gdneral Maintenance            Indoctrination and Training Maintenance and Repair Procurement Control Document Control Fabrication Inspection Control Control of Measuring and Test Equipment Special Processes Handling, Storage and Shipping Electric Meter and Lab         Indoctrination and Training Procurement Control Document Control Handling and Shipping Control of Measuring and Test Equipment Test Control
Audit List Functional Or anization Gdneral Maintenance Activities Audited Indoctrination and Training Maintenance and Repair Procurement Control Document Control Fabrication Inspection Control Control of Measuring and Test Equipment Special Processes
: Handling, Storage and Shipping Electric Meter and Lab Indoctrination and Training Procurement Control Document Control Handling and Shipping Control of Measuring and Test Equipment Test Control


alhll   Ot IV<<l~ Tl ~ lth aht alh<<NCISauth           Lha<<uah 00                                   R. E.         GINNA NUCLEAR POWER PLANT Ihl                                              MANAGEMENT ORGANIZATION CHART ll<<1 ~ Df CON<<VWCLIIth TKI<<ONTNLE TDO     ~ l<<C t<<OTICIION t<<OOALW
alhll Ot IV<<l~ Tl~lth aht alh<<NCISauth ll<<1~ Df CON<<VWCLIIth Lha<<uah 00 Ihl R.
                                                                            ~ <<ELDEST ElfENT Nc VKE t<<E IDENT IINIOA                                                                I
E.
                                                                              ~ WDA t<<IICC<<1                                                      TKE     tafIKENT
GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART TKI<<ONTNLE TDO
~ fTKC WALL LESTKII                                                          0<<ES ~ 1<<WT I
~ l<<C t<<OTICIION t<<OOALW
~<<ELDEST IINIOA TKC t<<IICC<<1
~fWALL LESTKII al
~
~va aha I<<W
~
~VSLK Lttlhl tv<<Chil<<al LOCNI V>. ELCCIAK Taa<<WIITK<<L C<<LTDSVTKN
~
VIS IIIINN Sa<<I. EllCT IKTEA
~ Lal NIhIll00 DlDNW
~
CIWL1AVCIKW DIT, Dltf, a
I~l'ITLNI CWE fafCT. IllW.
INO<<KIN DENT VT Ehawfla IW ~
COITOTAVCIKN
~IWDA TKE tafIKENT 0<<ES ~ 1<<WT TKC 0<<EICSNI aht E<<NT Ilal<<ffA llul'Iaht CNKT CNOWCTA Vtl<<WTEWON OEIKALL NahaacA 0<<LLI IT I
I I
II' VKE thfDSENT ELEETAK ~ olcul NDLAD
~AOOVCTKW I
I I
I
~V<<EAWWIOEIK I
~LKLCU I
tOOOVCTNW I
I I
I I
lah<<KNCT usa<<wTEKKNT taaa<<K 0 DCAC
~<<<<ll ~Talhw I
I ElfENTNc VKE t<<E IDENT
~ICC taECOCNI Aalfl NIhlaf0
: LECVAITf, la a<<K
~WLSUCE DSWCTOA Ot
~EEafhff MlchaIwo
~Iltt I
II IIII I
I II I"I II III I
II I
falCIAK NCIEA
~ LU ~Taft IW Lht CDLKIAVCTION IND<<KID~
WO TLKL NLNLWlKNT I
I II IIIII I
II IIIIJ CE <<IALL NLWTCNLNCE
~Ialt
<<ECOSOC DOCVLKNT coh1<<DL, Dsulwo VO TalW<<W
~ Tat OVLLIIf LISWLNCE
~Iaft I
I I
I I
I I
I' I
at I
VKE thf DSENT                        ~ ICC taECOCNI V>. ELCCIAK                                        TKC 0<<EICSNI                                                            ELEETAK ~ olcul            NDLAD              Aalfl Taa<<WIITK<<L                                                aht                                                                  ~ AOOVCTKW C<<LTDSVTKN                                      E<<NT      Ilal<<ffA
                      ~  VIS I II INN                                                                                                                                            I I
I I          N  I hlaf 0 I        LECVAITf, al    ~    DIT, Dltf,          I ~ l'ITLNI CWE                      llul'Iaht CNKT                                                ~ V<<EAWWIOEIK LKLCU                  I          la a<<K I
    ~ va aha <<W ~    fafCT. IllW. a INO<<KIN                              CNOWCTA
                                                                                                                                                        ~
I        ~ WLS UCE
  ~ VSLK    Lttlhl  DENT      VT          Ehawfla    IW ~
COITOTAVCIKN tOOOVCTNW I
I I
I I
I tv<<Chil<<al      Sa<<I. EllCT N Ih Ill Dl DNW ~
II I
00                          Vtl<<WTEWON OEIKALL NahaacA 0<<LLI IT lah<<KNCT taaa<<K 0 usa<<wTEKKNT DCAC DSWCTOA
                                                                                                                                                                                            ~ EEafhf  f Ot LOCNI        IK TEA  ~  Lal        CIWL1AVCIKW                                                                                          ~ <<<<ll ~ Talhw I            I I
IW Lht                                                                  I Mlcha Iwo      falCIAK      NCIEA
        ~I ltt      ~  LU ~ Taft        I CDLKIAVCTION ND<<KID ~ WO I
I                        aaullull SNCAWTEWKNI I 0 IIaft
                                                                                                                                                                            ~
                                                                                                                                                                                <<ISK  ~ atl<<TKTW Ol' LKLCLA TLKL NLNLWlKNT                                                                    I                                                                00 casl1f I                                                                                                          I I                                                                                                          I I                                            <<ECOSOC DOCVLKNT                              OVLLII  f      I I                                            coh1<<DL, Dsulwo                              LISWLNCE I
I                                            VO TalW<<W    ~ Tat                            ~ I aft I
I                                              I                                                    I      I I                                              I                                                    I      I                                                                          I 0 U ION I                                              I                                                    I      I                                                                Df Cvhllf I                                              I                                                    I      I                                                            0<<0    au l II NW I                                              I                                                    I I
I I
I I
I at I
I I
                                                                                                                          'II "I                                               I       CE <<I ALL                OWLIIT              I I
~.
I             hj(LCLA                ~ LUI I                                               I     NLWTCNLNCE                CTW TWL              I     I             als<<ILNTC             0<<IALTN<<W I                                              I        ~I alt              COOS<<wlTOA            I      I              Nahaaf<<                Cfatt I                                               I                                                    I      I                                            I I                                              I                                  I                I      I                                            I I                                              I                                  I                I      I                                            I I                                              I                                  I                I      I I                                              I                                  I                I      I        OVLLIIT CDNTWL I                                              I                                  I                I                    Ihl<<KIA I                                              J                                  J                  ~.
OWLIIT CTWTWL COOS<<wlTOA II IIIJ I
Figure 2-1 Revision             9 June 1984
I I
I I
I I
II I
I I
I II'I I
I I
I II I
aaullull SNCAWTEWKNI hj(LCLA als<<ILNTC Nahaaf<<
~LUI 0<<IALTN<<W Cfatt I
II II OVLLIIT CDNTWL Ihl<<KIA I0I<<ISK
~Iaft
~atl<<TKTW Ol' LKLCLA 00 casl1f 0UIION DfCvhllf 0<<0 au l IINW Figure 2-1 Revision 9
June 1984


The figure, previously appearing on this page was deleted with the issuance of Revision 7, dated November 1980.
The figure, previously appearing on this page was deleted with the issuance of Revision 7, dated November 1980.


)
)
'}
'}
Rochester Cas S Electric Corporation General Yaintenance Deparbnent Organization Chart SUPER I NTEHDEHT QUALITY CONTROL COORDIHATOR MANAGER FIELD SERVICE                                                        MANAGER MNACER        OPERATIONS              YANACER                YANAGER          INSPECTION SHOP            AHD          NATERIALS EHCIhsERINC    ADNI N I STRATIVE        AND OPERATIONS PROSPECT PLAHHINC          DIVISIOH                SERVICES      BVILDING SERVICES Figure 2-4 Revision    8 June 1983


<<
Rochester Cas S Electric Corporation General Yaintenance Deparbnent Organization Chart SUPER I NTEHDEHT QUALITY CONTROL COORDIHATOR MNACER SHOP OPERATIONS MANAGER FIELD SERVICE OPERATIONS AHD PROSPECT PLAHHINC YANACER NATERIALS EHCIhsERINC DIVISIOH YANAGER ADNINISTRATIVE SERVICES MANAGER INSPECTION AND BVILDING SERVICES Figure 2-4 Revision 8
ROCHESTER GAS AND ELECTRIC CORPORATION ENGINEERING DEPARTMENT ORGANIZATION VICE PRES! DENT CHIEc ENGINEER AS''eeTAVT CHIEF ENO!MEER-AS"!CTAVT CHIEF FVOINEER                                              ADM!NOSTRA~ !CV. MA!N~ EMAMCF ENO!MEERDI8 AMD COMSTRVCTIOM                                                  O'JA>>! e V ASS JRAMOE ~ DRAFT!MB.
June 1983
 
ROCHESTER GAS AND ELECTRIC CORPORATION ENGINEERING DEPARTMENT ORGANIZATION VICE PRES! DENT CHIEc ENGINEER AS"!CTAVT CHIEF FVOINEER ENO!MEERDI8 AMD COMSTRVCTIOM AS''eeTAVT CHIEF ENO!MEER-ADM!NOSTRA~ !CV.
MA!N~ EMAMCF O'JA>>! e V ASS JRAMOE ~
DRAFT!MB.
ENVIROME4 ~
ENVIROME4 ~
4'ANAGER MANAGER                          8 JP ER! MTEMDEMT                                MAVAOER 6TRJ" ~
4'ANAGER 6TRJ" ~
VRA'M3!
VRA'M3!
E>>ECTR! C4>>                                                                           C JA'!TY NEER! MG                      ENGINEER!MO                               BEVERA'A'NTE'lA'l F                       ASSJRA'.l F MA'44 'ER                           MANAGER                                 MAVAGER                                     C'JA>>! ~ Yi ME HAV!CA'                            NVCLEAR                              ENVIPCME4 A>>      e EN8!NEFe?'.V 8 NO! MES R! M3                      ENO! NEERLMO                              SC! EM "F4                                CO'RD'MA Cfi SJPEe?V,I:,e?
NEER!MG MANAGER E>>ECTR!C4>>
MAVAOER                          NINE MILE  i2                        CFF!CF. <<FRVICFS 6JPEPVIL:R Oc PROJECT E43'NEER! MO                                                              AND DCCJMEMT                                  DRAF'T!MO MANAGER COV PRO 3! MNA                         ADllLVISeRA e! VE MOD!FICATIOM PRO:ECT MANAGER                       PRCJE Figure 2-5 Revision 9 June l984
ENGINEER!MO 8JP ER!MTEMDEMT BEVERA'A'NTE'lA'l F MAVAOER CJA'!TY ASSJRA'.l F MA'44'ER ME HAV!CA' NO!MESR!M3 MANAGER NVCLEAR ENO!NEERLMO MAVAGER ENVIPCME4 e A>>
SC! EM"F4 C'JA>>! ~
Yi EN8!NEFe?'.V 8 CO'RD'MA Cfi MAVAOER E43'NEER! MO NINE MILE i2 PROJECT MANAGER SJPEe?V,I:,e?
CFF!CF.
<<FRVICFS AND DCCJMEMT COV PRO 6JPEPVIL:R Oc DRAF'T!MO 3!MNA MOD!FICATIOM PRO:ECT MANAGER ADllLVISeRA e!VE PRCJE Figure 2-5 Revision 9
June l984


                                                                                    ~ t Rochester Gas   and'Electric Corporation Ginna   Station Review and   Audits Functions NSARB PORC Clectric Heter                                     GeneraI              Engineering  Plant and Lab Purchasing               Slaintenance Ravf cM Audf t Figurc     2-a l ehruary   1   tg I(,
~ t Rochester Gas and'Electric Corporation Ginna Station Review and Audits Functions NSARB PORC Clectric Heter and Lab Purchasing GeneraI Slaintenance Engineering Plant Ravf cM Audft Figurc 2-a l ehruary 1
tg I(,


frl . k.
f l k.
v}}
r v}}

Latest revision as of 11:10, 8 January 2025

Rev 9 to QA Program for Station Operation
ML17254A791
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/30/1984
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17254A790 List:
References
NUDOCS 8406150058
Download: ML17254A791 (85)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION R. E.

GINNA NUCLEAR POWER PLANT UNIT NO. l Revision 9 to:

Quality Assurance Program For Station Operation DOCKET NO. 50-244 June 1984 8 840608 Bijp61500~80gp0024~

~,",',~'>>

AgOCK

Pgg, P

4 1

)

I

Introduction In a May 28, 1974 letter fromm Mr. Robert A. Purple, the United States Atomic Energy Commission asked several questions on the R. E. Ginna Quality Assurance Program for Station Operation.

The information requested and furthe" clarification of the program are provided in Supplement IV to the Technical Supplement accompanying Application for a Full-Term Operating License.

Supplement IV is a revised description of the R. E. Ginna Quality

'ssurance Program for Station Operation and supersedes Supplement II in its entirety.

The following revisions have been made to the description of the program:

Section IV.2 Additions, That all Quality Assurance, Quality Control, Eng'n-

eering, and Purchasing procedures are reviewed for

,adequacy at least once every two years.

That the list of structures,

systems, and components covered by the quality assurance program are based on the list in Section 1.2.1 of the FSAR.

That management review of the quality assurance program may be in a form other than an audit.

That the Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years.

That the Chairman of the Nuclear Safety Audit and Review Board reports to the Chairman of the Board of Rochester Gas and Electric Corporation on NSARB activities.

Section.IV.3 Additions That spare or replacement parts meet, at least, the requirements of the original design.

IV-i Revision 1

August 1974

f l

That for plant modification, the design engineer selects and reviews materials, parts, and equipment for suitability of application.

That design deficiencies are documented and controlled in accordance with Section IV.16.

That design documents are collected,

stored, and main-tained in accordance with Section II.17 and a listing of which design documents are maintained.

Clarification Clarified which design documents are reviewed by Quality Assurance.

Section IV.4 Additions That procurement documents for spare or replacement parts are processed in the same manner as other procurement documents.

That the review and approval of procurement documents is reflected on the document or on a control form which is attached to the procurement document.

That the documents are available for verification in Purchasing and plant records.

That Quality Control reviews procurement

'documents for spare and replacement parts for similarity to the original requirements, and adequacy of quality require-ments.

Section IV.5 Clarification Clarifies which documents are reviewed by Quality

- ";Assurance.

Section IV.6 Addition Made procurement document review requirements consistent with Section IV.4.

ZV-ii Revision l August 1974

That suppliers of materials, equipment, and services are required by procurement documents to provide control of manufacturing inspection and testing instructions.

Section IV.9 Additions Made procurement document review requirements consistent with Section IV.4.

Added Quality Control responsibilities for sur-veillance and inspection of special process activi-ties.

Section IV.10 Additions That all documentation necessary to perform an inspection is available to the inspector prior to.the performance of the activity.

That Quality Control inspection procedures include the identification of quality characteristics to be inspected and a description of the method of inspection to be used, the identification of the organization responsible for performing the inspection, the'cceptance and rejection criteria, the requirements for the recording of inspection

results, and the requirements for providing evidence of completion and certification of the inspection activity.

That inspection equipment is calibrated in accor-dance with Section IV.12 and that calibration status is verified prior to performing the inspection activity.

Section IV.ll Addition That test, procedures include test methods and test.

instrumentation definition.

IV-iii Revision 1

August 1974

Section IV.12 Addition That shop standards calibration is traceable to national standards or, where national standards are not available, the basis of calibration is documented.

Section

'ZV.14 Addition That written procedures control the use of hold tags, test tags and labels and that the procedures require the recording of the name of the person placing and removing the tag.

Section ZV.15 Addition That Quality Control issues monthly material defic'ency report summaries, that these summaries are reviewed and analyzed by Quality Assurance, and that when unsatisfactory trends are noted, they are reported to management, using the corrective action report in accordance with Section ZV.16.

Section XV.17 Additions That plant records include operating logs, specifications, calibration procedures and nonconformance

reports, and the results of tions, tests, audits and the monitoring of activities and material analyses.
drawings, reports, inspec-plant That quality assurance records of special process activities are maintained by. Engineering and that

they include the qualification records of personnel, procedures, and equipment.

That inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

ZV-iv Revision 1

August 1974

7

Section IV.18 Addition That Quality Assurance is responsible for conducting the audits listed in Table IV.18-1.

In July 1974, the United States Atomic Energy Commission requested information on the conformance of the R. E. Ginna Quality Assurance Program for.Station Operation to the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants",:Revision 0 dated October 1973 (Orange Book Revision 0).

The infor-mation requested is provided in Revision 1 to Supplement IV to the Technical Supplement accompanying Application for a Full-erm Operating License.

The following changes have been made to Supplement IV:

Section IV.l Additions A description of the extent to which the quality assurance program conforms to the document entitled "Guidance on Quality Assurance Requirements During The Operations Phase of Nuclear Power Plants",

Revision 0 dated October 1973 (Orange Book - Revision 0).

On October 1, 1974, Rochester Gas and Electric Cor-poration revised its corporate structure.

This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.

In addition, the RG&E commitment to the "Orange Book" in August has necessitated some shifting of responsibilities.

The changes RG&E has made are reflected in Revision 2 to Supplement IV to the Technical Supplement accompanying Application for a Full Term Operating License.

The changes affect every section of the supplement except sections 12

'& 14 'ha'nge pages aie listed in Instructions-2 and each revised page is marked with revision level.

In addition, the latest revision is marked with a vertical line in the left hand margin of each page.

The revision level is noted by an arabic numeral next to each vertical line.

Revision 2

November 1, 1974

Tables and figures which have been completely revised are shown by revis'ion level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement II and Supplement IV.

Some editorial corrections have been

made, and these are also marked.

Effective February 1, 1976, three additional organizations in the Rochester Gas and Electric Corporation have been assigned responsi-bilities for control of quality related activities.

The changes are reflected in Revision 3 to Supplement IV to the Technical Supplement Accompanying Application for a Full Term Operating License.

Revision 3 also reflects some reclarification of terms and responsibilities which do not lesson our program commitments.

Reclarification changes are concentrated in sections IV-3, IV-4, IV-5, IV-6 and IV-15.

Change pages are listed in Instructions-3 and each revised page is marked with revision level.

In addition, the latest revision is marked with a vertical line in the left hand margin of each page.

The revision level is noted by an arabic numeral next to each vertical line.

Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement IIand Supplement IV.

During July, 1978, Rochester Gas and Electric Corporation revised its corporate structure.

This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.

Revision 4 also'eflects some reclarification of terms and respon-sibilities which do not lessen Rochester Gas and Electric Cor-poration program commitments.

Reclarification changes are concentrated in sections IV-l, IV-2, IV-3, IV-7, IV-10 and IV-15.

Change pages are listed in Instructions-4 and each revised page is marked with revision level.

Since single spacing of each page has reduced the number of pages, each page beginning with IV-1 is numbered consecutively resulting in the Revision 4 notation at the bottom for that page containing different information than the corresponding page number of previous revisions.

Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii.

IV-vA Revision 5

April 1979

In a February'8, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 4.

Revision 5 provides the additional information and better clarification of the program consistent with that which was forwarded in Rochester Gas and Electric letter dated March 9, 1979.

Change pages are listed in Instructions - 5, and each revised page is marked with a revision level.

In addition, the latest revision is marked with a vertical line in the left hand margin of each page.

The revision level is noted by an arabic numeral next to each vertical line.

Tables which have been re-vised are shown by revision level at the bottom of the page.

In a "June 5, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 5.

Revision 6 provides the additional information consistent with that which was forwarded in Rochester Gas and Electric letter dated June 25, 1979.

Change pages are listed in Instruction 6,

and each revised page is marked with a revision level.

In addition, the latest revision is marked with a vertical line in the left hand margin of each page.

The re-vision level is noted by arabic numeral next to each vertical line.

Revision 7 was prepared to indicate recent organization changes in the corporate structure, Quality Assurance and General Maintenance.

Change pages are listed in Instructions - 7, and each revised page is marked with a revision level.

In addition, the latest revision is marked with a vertical line in the left hand margin of each page.

The revision level is noted by an arabic numeral next to each vertical line.

Nuclear Regulatory Commission Generic Letter 81-01 issued May 4, 1981

'equested that the quality assurance program commit to USNRC Regulatory Guides 1.146 and. regulatory positions C.5, 6,

7, 8 and 10 of Regulatory Guide 1.58 Revision 1.

Revision 8 incorporates those commitments.

This revision also describes a change in responsiblity for pro-curement of nuclear fuel from the Director, Strategic and Fuel Planning to the Engineering Department and provides updated organizational charts for those previously provided.

In addition, the latest revision is marked by a vertical line in the left hand margin of each page.

The revision level is noted by an arabic numeral next to each vertical line.

This revision incorporates recent changes in the corporate structure.

Prefix IV is also being deleted from each page to recognize that,'Technical'Supplenent

'Accompanying Application For A Full Term Operating License is being superse'ded during 1984.

In addition, commencing with this revision only the latest revision will be indicated by a vertical line in the left hand margin of each page.

vB Revision 9

June 1984

S

~

r (

TABLE OF CONTENTS Section Title Pacae 2.

3.

4.

5.

6.

QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program Organization Design Control Procurement Document Control Instructions, Procedures and Drawings Document Control 10 12 13 7.

Control of Purchased Material, Equipment and Services 15 B.

9.

10.

12.

13.

14.

15.

16.

17.

'18.:

Identification and Control of Materials, Parts and Components Control of Special Processes Inspection Test Control Control of Measuring and Test Equipment Handling, Storage and Shipping Inspection, Test and Operating Status Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 19 20 20 22 23 25 26 27 28 29'

1 I

LIST OF TABLES Tab e Number l-l 4-1 18-1 Quality Assurance Program Procedures Subject Listing Procurement Document Requirements Audit List Pacae 32 LIST OF FIGURES Fi re Number 2-1 2-2 2-3 2-4 2-5 I

I 2-6 Title Management Organization Deleted Ginna Station Organization General Maintenance Organization Engineering Department Organization Review and Audit Functions Page 48 49 50

UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The quality assurance program described in this Supplement has been developed by the Rochester Gas and Electric Cor-poration to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.

This program applies to all activities affecting the safety related functions of the structures,

systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.

These quality affecting activities include operation, maintenance, repair, inservice inspection, refueling, modification, test and inspection.

In addition, the quality assurance program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71.

The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board and Chief Executive Officer in his Corporate Statement of'uality Assurance Policy.

This policy is implemented by the Vice President, Electric and Steam Production, through the

Manager, Quality Assurance, and the Ginna Station Superintendent.

The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program.

The manual is prepared,

reviewed, and maintained by Quality Assurance and approved by the Vice President, Electric and Steam Production.

The program is implemented through Quality Assurance, Ginna

Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing Procedures.

These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Assurance.

The procedures are contained in separate manuals maintained by the responsible organization.

All"these procedures are reviewed for adequacy at least once every two years by the responsible organization.

Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in the procedures.

Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.

Organizational responsibilities are described in Section 2.

The quality assurance program covers all existing Seismic Category I structures,

systems, and components, including their foundations and supports.

Activities affecting the quality of these structures,

systems, and components are

controlled to an extent consistent with their importance ta safety.

A detailed listing of the structures,

systems, and components covered by. the quality assurance
program, based on Section 1.2.1 of the Final Facility Description and Safety Analysis Report, is contained in the Quality Assurance Manual.

Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings.

The listing of structures,

systems, and components covered by the quality assurance program and the system flow drawings are prepared and main-tained by Engineering and reviewed and concurred with by Quality Assurance.

Modifications or additions to existing structures,

systems, and components are designated the same seismic classifica-tion as the existing system.

New structures,

systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29.

Supervisory personnel are indoctrinated in quality assurance

policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced.

Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements,

purpose, scope, and implementation of quality related manuals and procedures.

Refresher sessions are held periodically and retraining is required whenever a

new procedure is issued or a major revision is made to an existing procedure.

Training of personnel not in the quality assurance organization is the responsibility of each department performing an activity affecting quality.

Quality Assurance assists in establishing training requirements and assures that personnel are trained by auditing training records.

In addition to training in quality assurance, each depart-ment conducts on-the-job training to the extent necessary to assure that personnel are qualified for their primary work assignments.

The Ginna Station Supeiintendent is responsible for the formal training, qualification, licensing, and requali-fication of operators, as necessary.

Where necessary, peisonnel are trained in 'radiation protection, plant s'afety and security.

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years to assure that it is meaningful and is effectively complying with corporate policy and 10CFR50, Appendix B.

This review consists of

.audits or a review equivalent to an audit performed by

1 4'

company personnel or outside organizations.

Reviews will be conducted every six months during the first two years that the program is implemented.

The quality assurance program is designed to meet the require-ments of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants."

The program conforms to the following NRC Regula-tory Guides and ANSI Standards:

a.

NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion and Training."

b.

NRC Regulatory Guide 1.28, Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."

c.

AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."

d.

AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation),"

and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Require-ments During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0) e.

AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."

f.

NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements for Packaging,

Shipping, Receiving,
Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."

g.

NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants."

h.

NRC Regulatory. Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."

i.;

NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."

j.

NRC Regulatory Guide 1.74, Revision 0, "Quality Assur-'nce Terms and Definitions."

k.

NRC Regulatory Guide 1.88, Revision 2, "Collections, Storage and Maintenance of Nuclear Power Plant Records."

s I

Note:

When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate stroage locations in separate buildings which are physically isolated from each other.

1.

NRC Regulatory Guide 1.116, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems."

m.

NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."

n.

ANSI N45.2.12, D3, R4, 2/74 ~~Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants."

o.

NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants."

Or anization The major organizations participating in the quality assur-ance program are the Purchasing, Engineering, Ginna Station, General Maintenance, Electric Meter and Laboratory Department; Quality Assurance and Quality Control Groups; the Plant Operations Review Committee; and the Nuclear Safety Audit and Review Board.

Figure 2-1 is an organizational chart showing these organizations and their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:

Chairman of the Board Vice President, Electric and Steam Production Vice President and Chief Engineer Manager, Quality Assurance Purchasing Agent Ginna Station Superintendent Ginna Station, Quality Control Engineer Superintendent, Electric Meter and Laboratory Superintendent, General Maintenance General Maintenance Quality Control Coordinator Manager, Materials Engineering In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.

These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.

The Plant Operations Review Committee acts in an advisory capacity to the Ginna Station Superintendent and the Nuclear Safety Audit and

I

)

j

Review Board advises the Vice President, Electric and Steam Production.

The qualifications of members and the respon-sibilities of these organizations are described in Appendix A to Provisional Operating Licensed No. DPR-18, Section 6.0, Technical Specifications.

The Chairman of the Board of the Rochester Gas and Electric Corporation directed the establishment of the quality assur-ance program and issued the governing policy statement.

He has established the Nuclear Safety Audit and Review Board to review and audit plant operations.

The Chairman of the Nuclear Safety Audit and Review Board is responsible to the Executive Vice President on all activities of the Nuclear Safety Audit and Review Board.

The Vice President, Electric and Steam Production has cor-porate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.

He is responsible for establishing the policies and requirements necessary to assure safe and reliable operations of Ginna Station.

He is also responsible for those items delineated in Section 6.0, Technical Specifications.

He has overall responsibility for and authority to direct quality affecting activities.

He has assigned the responsibility for the detailed development and overall coordination of the quality assurance program to the Manager, Quality Assurance.

The responsibility for proper implementation of the quality assurance program requirements at Ginna Station has been assigned to the Ginna Station Superintendent.

The Vice President and Chief Engineer has corporate respon-sibility for the design and construction of nuclear power plants and related major modifications.

In this capacity, the Vice President and Chief Engineer is responsible for directing and supervising the Engineering Department as shown in Figure 2-5.

The Vice President and Chief Engineer has the responsibility

'or preparing drawings and specifications for the procurement of materials and components for plant maintenance and modifi-cation as required.

He is responsible for reviewing operating and fuel handling procedures referred to him by the Ginna Station Superintendent and for reviewing unique maintenance.

. and repair"procedures for major equipment.

He is also-res-,

ponsible for the coordination of all procurement activitie's associated with the fabrication of nuclear fuel.

The Manager, Quality Assurance, is responsible for estab-lishing and executing the overall quality assurance program.

He is responsible for assuring'that the program satisfies the requirements of 10CFR50, Appendix B, and for keeping the total program updated.

He is responsible for assuring that

a

all'he planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed.

He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.

He has the authority and organizational freedom to assure all necessary quality affecting activities are performed.

He is responsible for maintaining a quality assurance staff, Figure 2-1, for the conduct of staff training, for directing its activities and for establishing and implementing a comprehensive audit program.

The Manager, Quality Assurance is at least six years of responsible years is in quality assurance and or operation of nuclear or fossil a graduate engineer with experience, of which two three years in the design fuel power plants.

The Manager, Quality Assurance and the Quality Assurance Staff are responsible for supervising both the on-site and off-site Quality Assurance program.

This includes writing Quality Assurance policies and procedures, and reviewing the procedures of the organizations participating in the Quality Assurance program.

They are also 'responsible for auditing all aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected.

They are responsible for assuring that proper codes, standards, and,quality requirements are specified in design, procurement, and installation documents.

They are responsible for assuring that the suppliers of safety-related

material, equipment and services are properly qualified, and they are responsible for conducting audits and surveil-lances at these supplier's facilities.

In addition, the staff assists the Manager, Quality Assurance, in the prepa-ration of the audit schedule, audit status reports, corrective action report summaries and in the preparation and maintenance of the Quality Assurance Procedures Manual.

The Purchasing Agent is responsible for the procurement of materials,

services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.

He maintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Engineering, Quality Assurance and the other involved depart-ments as, appropriate.

The Ginna Station Superintendent is responsible to the Superintendent, Nuclear Production for safe operation of Ginna Station.

He is responsible for the performance of the Ginna Station operation, maintenance, repair, refueling, inservice inspection, modification, test and inspection quality affecting activities in accordance with the require-ments of the quality assurance program.

He is responsible

for providing qualified personnel to perform these activi-ties in accordance with approved drawings, specifications, and procedures.

He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Ginna Station Assistant Superintendent supports the Ginna Station Superintendent in discharging his respon-sibilities.

He is responsible for the day-to-day operation of the station and implementing the policies, procedures, and directions of the Ginna Station Superintendent.

The Ginna Station Quality Control Engineer reports adminis-tratively to the Nuclear Assurance Manager and is responsible to the Station Superintendent for supervising the station Quality Control Organization, which is responsible for assuring that activities affecting quality are prescribed and carried out in accordance with approved drawings, specifications, and procedures.

In his day-to-day acti-vities, the Quality Control Engineer reports to the Ginna Station Superintendent and is a member of the Plant Operations Review Committee.

He also reviews procurement documents initiated at the station.

He is responsible for the coordination of inspection activities and for assuring that inspection'equirements are included in approved pro-cedures.

He is also responsible for the receipt inspection of incoming materials,

parts, and components and the pro-cessing of nonconformance reports.

He coordinates the processing of corrective action reports, and assures that corrective action is taken.

He is responsible for routine surveillance of other groups involved in quality affecting activities and provides the Ginna Station Superintendent with objective information concerning the quality of these activities.

The Ginna Station Quality Control Engineer is assisted in the performance of his duties by a staff which reviews documents and which performs inspection and surveillance activities.

Additional inspectors are assigned to this group as required by the level of work activities.

In addition to the Ginna Station Quality Control Engineer, the Ginna Station Superintendent is assisted by other desig-nated staff members, Figure 2-3, in the implementation of certain quality assurance program requirements, at the plant;

'hese staff members are assigned responsibility for testing, storage of material and equipment, operating and test status control, calibration and control of measuring and test equipment not used by Quality Control, maintenance of material handling equipment, operator training, and control of all activities involving operation, maintenance, repair, refueling and modification.

The Superintendent, General Maintenance, is responsible for supervising and directing a staff, Figure 2-4, which super-

.vises the performance and verification of safety related maintenance, repair and modification activities performed at the General Maintenance facility.

He is also responsible for the routine maintenance of material handling equipment, control of special processes and establishment of the inser-vice inspection program.

The General Maintenance Quality Control Coordinator is responsible to the Superintendent, General Maintenance, for performing or directing the performance of verification activities for which General Maintenance Quality Control is responsible.

In this capacity he is responsible for assuring that activities, affecting quality, are carried out in accordance with approved drawings, specifications and proce-dures.

He is also responsible for the preparation of Quality Maintenance procedures and for the training of General Maintenance personnel in the implementation of these procedures.

He also coordinates receipt inspection of incoming materials, parts and components, performs routine surveillance of General Maintenance activities and coordinates the processing of nonconformance

reports, corrective action reports and the replies to audit reports.

The Manager, Materials Engineering is responsible to the Superintendent, General Maintenance for the development and qualification of procedures utilized for special processes.

He is also responsible for assuring that personnel are trained and qualified for activities involving nondestructive examination and for providing functional guidance and direction in those methods for which he is a qualified Level III.

He is also responsible for establishing the inservice inspection program.

The Superintendent, Electric Meter and Laboratory is respon-sible for providing routine maintenance and testing services for Ginna Station safety related protective relays as requested.

Desi Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.

4 I

Engineering is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.

Ginna Station is responsible for the design and control of design activities for minor modifications of structures,

systems, or components.

Ginna Station is also responsible for classifying station originated modifications as either

Major or Minor.

Engineering reviews and concurs with modifi-cations being classified as Minor.

Minor modifications typically involve (1) component changes which involve vendor design and limited to the extent that the change does not impact existing performance requirements.

(2) Additions within Seismic Category I buildings which perform no safety functions and which either interface. with Seismic Category I items or whose failure could reduce the functioning of any safety related component required for safe shutdown of the plant to an unacceptable level.

(3) Changes to a safety related system determined not to be major (i.e.vents,

drains, alarms, indicating lights, etc.).

Design control is implemented by means of procedures which include:

design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action.

Design con-siderations

include, as appropriate:
physics, stress, materials, thermal, hydraulic, radiation and accident analysis; appropriate design bases,
codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; quality standards and other quality assurance requirements.

Design verification utilizes various methods such as formal design reviews, alternate calculations, or'tests as appropriate to assure the adequacy of the design.

The design of plant modifications is verified by an engineer other than the one who performed the original design.

For Major modification design, this may be done by Engineering department design engineers or consulting engineers as re-quested.

For Minor modification station design, this may be done by Ginna Station and or Engineering department design engineers as appropriate.

Spare or replacement parts must at least meet the original equipment technical and quality requirements.

For plant modifications, standard "off-the-shelf" commercial or pre-viously approved materials,

parts, and equipment are selected and reviewed for suitability of application by the design engineer.

Design changes, are normally reviewed and approved in accor-dance with the same procedures as the original design.

Supplemental procedures are established for the review and

'approvai of field'changes.

In general, 'design changes including field changes, are reviewed and approved by the organizations or individuals that performed the original

design, review and approval.

Where this is not practical, other responsible design organizations or individuals designated, prov'ided they have access to pertinent back-ground information and are competent in the specific design area.

~

~

Design verification and field change systems are methods utilized to detect, document and correct design process errors and deficiencies.

In addition, the corrective action

system, described in section 16, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adverse to quality.

Quality Assurance is responsible for assuring that design control procedures, whether the'ork is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices,

checks, and reviews.

Design control procedures are reviewed to assure that an independent verification is per formed.

Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and re-visions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information.

The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.

Design documents are collected,

stored, and maintained in accordance with Section 6 and 17, as appropriate.

Design documents include design criteria, analyses, specifications,

drawings, design review records, and changes thereto.

Quality Assurance and Station Quality Control through pre-paration assistance and/or review assure the proper inclusion of quality standards in the design of major and minor modifi-

cations, respectively.

Quality Assurance is also responsible for assuring that adequate inspection requirements are included in specifications.

The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.

Plant modifications are controlled by means of applicable Ginna Station, Engineering and Quality Assurance procedures.

These procedures provide for the preparation,

review, and approval of design documents, safety analyses, and plant modification procedures.

Proposed plant modifications, are reviewed by 'the Plant Operations'Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.

Procurement Document Control Procurement document control applies to the control of procurement documents for materials,

parts, components, and services required to perform quality affecting activities.

, ~

4 I

Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase

orders, service agreements, contracts, specifications, and drawings.

Procurement of materials,

parts, components, and services is initiated by department staff personnel.

Procurement proce-dures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.

Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station and General Maintenance are reviewed by Quality Control and approved by the department superintendent or his designated representative.

Procurement documents initiated in Engineering and Quality Assurance are reviewed by Quality Assurance and approved by the Chief Engineer, or designees.

Procurement documents initiated at Electric Meter and Laboratory and General Maintenance are reviewed by Quality Assurance and approved by the department superintendent or designated alternate.

Evidence of review and approval of procurement documents is recorded on the documents or on the attached control form.

The attached control form identifies to Purchasing a procure-ment method which will ensure that the selected supplier is capable of providing the item or service in accordance wi'th the requirements of the procurement documents.

Considerations used in selecting a supplier and for determining the corres-ponding procurement method are described in Section 7

After purchase requistions, service agreements, contracts, specifications, and drawings have received the required re-'iews and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7.

These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.

Under no circumstances are purchasing requirements altered (except for quantity or pricing) during order placement unless review and concurrence is obtained from those who

. were required to r'eview, concur with, and approve the original documents as described above.

Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.

Quality Assurance/ Quality

.Control review of the above includes checks to verify proper

inclusion of quality standard, quality assurance program requirements, method or procurement and the applicable acceptance criteria.

Quality Control also reviews procure-ment documents for spare or replacement parts for adequacy of quality'equirements and to determine similarity, compa-tibility, and the inclusion of the quality requirements and acceptance criteria of the original design.

Instructions, Procedures and Drawin s Each Rochester Gas and Electric company organization is responsible for developing, reviewing, approving, and imple-menting procedures as required to implement the quality assurance program.

These procedures cover activities such as document control, training of personnel, and responsi-bilities and duties of personnel.

Quality Assurance reviews and concurs with these procedures.

Table 1-1 provides a

summary of the subject matter contained in the procedures which are used to implement the quality assurance program.

Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.

Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, modification, testing and inspection.

This includes instruc-tions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation;

startup, operation, and shutdown of safety related systems; correction of abnormal, offnormal, or alarm conditions, combat of emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling.

Ginna Station is responsible for the preparation and imple-mentation of quality control inspection procedures utilized for detailed station inspection activities.

Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications.

Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Engineering or the equipment supplier.

General Maintenance is responsible for providing and for implementing instructions and procedures associated with special processes, the routine maintenance and inspection of cranes and handling equipment, as well as shop work required to support, Ginna Station maintenance, repair and modifica-tion activities.

General Maintenance is also responsible for the preparation and for the implementation of quality control inspection procedures utilized for detailed inspec-tion activities at their facilities.

Electric Meter and Laboratory is responsible for the prepa-ration and implementation of relay inspection and testing procedures as required to direct detailed inspections and testing activities for which they are responsible.

Electric Meter and Laboratory also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.

Engineering is responsible for providing approved specifi-

cations, and drawings associated with major modifications and when minor modifications necessitate drawings or speci-fications.

These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.

Engineering has established procedures for revising drawings and specifications.

These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.

Persons preparing and approving, documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.

Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents.

In addition, surveillance by Quality Control personnel, as described in Section 10 and audits by Quality Assurance as described in Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.

Document Control Procedures are established to control the issuance of pro-

cedures, instructions, drawings; and specifications.

Standard document control requirements are contained in the Quality Assurance Manual.

The Ginna Station Superintendent is responsible for the control of all documents issued at Ginna Station.

General Maintenance and Electric Meter and Laboratory are responsible for the control of 'documents issued by their respective organizations.

Engineering controls all documents issued by Engineering, Quality Assurance and Purchasing.

Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.

The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents.

Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequte, and include appropriate qualitative and quanti-tative requirements.

Departmental Quality Control repre-sentatives review departmental maintenance, repair, refueling and modification procedures, prior to use, to assure quality assurance requirements are included.

The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0 Technical Specifications.

Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible tech-nical person associated with that activity.

Ginna Station, General Maintenance, Engineering, Purchasing, and Electric Meter and Laboratory quality assurance implementing procedures require the review and concurrence of Quality Assurance and the approval of the appropriate department supervisor.

Quality Assurance procedures are approved by the Manager, Quality Assurance.

The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.

It specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.

Types of documents which are controlled include Technical Specifications, FSAR, Technical Supplements, Quality Assur-ance Manual, procedures (such as quality assurance, engi-

neering, purchasing,
repair, maintenance, test, calibration, fuel handling, modification, and administrative),

specifica-

.tions and drawings.

Suppliers. of materials, equipment, and' services are required in procurement documents to provide for control of documents, including manufacturing, inspection and testing instructions.

The Quality Assurance Manual further requires that each organization provide in its procedures for measures:

to assure that documents are available when required; to pro-perly review and approve documents such as procedures,

. instructions, specifications, and drawings; to provide the

\\

same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.

Quality Assurance and the Quality Control organizations, in the responsible departments, are responsible for review and concurrence of procurement documents and, therefore, procure-ment document control requirements.

Quality Assurance and the Quality Control organizations are further responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.

Control of Purchased Material E i ment and Services Procurement documents, supplier selection, planning for item or service acceptance control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.

All procurement is conducted in accordance with proc'urement documents as stated in Section 4.

.All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.

Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the

- control of the supplier performance.

Source inspection (surveillance) certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items.

In lieu of these

methods, acceptance of services is based on either 'or a combination of:

(1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.).

The extent of. the acceptance methods and as-sociated verificati'on act'ivities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.

Consideration for the control of supplier performance includes the necessity for document, submittals or surveillance, and under what situation the supplier is to report nonconformances.

Results of the planning are incorporated in the procurement documents and or on the attached procurement control form as described in Section 4.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.

The evaluation which is accomplished during the procurement

planning, determines the necessity for the supplier-selection to be from the approved suppliers list maintained by Purchasing.

Purchasing utilizes the approved suppliers list for the selection source of those suppliers required to have a

satisfactory quality assurance program.

The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item, if the source is to be restricted to the original supplier.

For engineered and off-the-shelf items, procured from suppliers required to have a quality assurance program and for which item acceptance is based other than on receipt inspection, supplier selection is from the approved suppliers list or one who is in the process of being added to the list, after having had its capability evaluated to purchaser satisfaction.

Other off-the-shelf items, that are manufactured to industry standards, that are typically utilized in applications other than nuclear, and for which item acceptance is based exclusively on receipt inspection may be purchased from sources other than the.approved suppliers list.

These other sources may include the manufacturer of the replacement part, authorized distributor for the manufac-turer's replacement parts and distributor of catalog items which satisfy the guidelines of not requiring status on the approved suppliers list.

Departmental procedures establish guidelines for source selection evaluations and for documenting the results on the procurement control form through indication of the corresponding procurement method.

The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.

Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments, as appropriate.

For Engineered items, Engineering is responsible for evalu-ating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design,

service, item, or component delineated in the procurement documents.

As part of this review, the supplier's design capabilities',

machinery capabilities, handling capabilities, testing facilities, service capabili-

ties, and experience are reviewed.

Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accor-dance with applicable

codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric requirements.

The review includes consideration of:

company organization,

quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, accept-ance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors.

Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assur-ance requirements.

Ginna Station, General Maintenance, Quality Assurance and Electric Meter and Laboratory evaluate the suppliers of inspection, test; and calibration services which they. intend to use.

The departments responsible for performing supplier evalu-ations shall document their results in reports which discuss areas investigated,

findings, and conclusions.

As applicable, concurrence of Purchasing, Engineering, Quality Assurance, Ginna Station, General Maintenance, and Electric Meter and Laboratory is required to place a supplier on the qualified suppliers'ist.

One organization can remove a supplier from the list without concurrence of the others.

Measures are established by Engineering and Quality Assurance to control supplier performance for engineered items.

These measures typically include the processing of change infor-mation, surveillance of supplier activities and the control of documents exchanged with the supplier.

In addition, each department procuring off-the-shelf items or services esta-blishes similar measures for the control of supplier perfor-mance.

With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.

Quality Assurance is responsible for determining and document-ing the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection,

testing, and shipping, and for providing the required surveillance.

The objective of supplier surveil-lance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.

For complex engineered items, Quality Assurance and Engi-

-neering're responsible 'for joint development of surveillance

~

plans in advance of surveillance trips to identify areas to be reviewed.

The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement.

When a deviation from purchase order requirements is noted, the Quality Assurance represen-

tative'has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.

Ginna Station Quality Control is responsible for surveillance of site contractors to assure that they meet all technical and quality requirements.

The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.

Department superintendents are responsible for receiving and storing items pending their acceptance.

Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Control that the item has

'rrived.

Quality Control is responsible for receipt inspection upon delivery of items and associated services for maintenance, repair, modification, and refueling.

This inspection in-cludes the use of written procedures or checklists to verify that the items and services conform to the procurement docu-ments (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use.

Documentary evidence sufficient to identify the codes, standards or specifications met by the purchased material, equipment, and services is retained.

In the event a final source inspection for the acceptance is conducted prior to receipt by RGK, Quality Control performs an inspection for shipping damage or lost parts and a document check to assure that the required docu-mentation has been reviewed and is complete.

A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents

checked, and the inspection results.

If the item and documentation are adequate, Quality Control labels the item as "Accepted," files the documentation and receipt inspection results, and releases

.the item for storage or use.

If the item j.s nonconforming or the documentation is unsatisfactory,'uality Control initiates a nonconforma'nce report which is controlled in accordance with Section IV.15.

All items issued must bear an acceptance tag and have docu-mentation to support the acceptability of the item.

In the event the traceability is lost or the 'documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.

Identification and Control of Materials Parts and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written requirements and applies to material, parts, or components in any stage of fabrication,

storage, or installation.

Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project.

The identification and control requirements cover items such as:

traceability to associated documents such as drawings, specifications, purchase

orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials,
parts, and components prior to release for manufacturing, shipping, construction, and installation.

Engineering and Quality Assurance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and control of materials,

parts, or components, as appropriate.

Suppliers are required to assure that all required documentation for an item is prop-erly identified and related to the item.

Each item is re-quired to be physically identified, either by marking on the item or by tags.

Physical identification by purchase order number is used to the maximum extent possible for relating an item at any time to applicable documentation.

Identifi-cation is either on the item or records traceable to the item.

Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.

The Ginna Station Superintendent is responsible for main-taining identification and control of materials,

parts, or components
received, stored, installed, and used at the plant.

Procedures covering the identification and control of materials,

parts, and components at the plant are approved by the Ginna Station Superintendent.

The superintendents of other departments which receive material which is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining

,identification and control of material, parts, or components,.

stored or used in their area of responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.

Control of S ecial Processes Written procedures are established to control special pro-

cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicabl~ codes, standards, and design specifications.

Qualification of personnel and procedures complies with the requirements of applicable codes and standards.

When special process qualifi-cation requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.

Quality Assurance and Quality Control personnel are respon-sible for reviewing procurement documents to ensure that requirements for control of special processes are included.

Rochester Gas and Electric procedures for special processes are prepared,

reviewed, and approved by Materials Engineering.

Special process procedures submitted by suppliers and con-tractors are reviewed and concurred with by Materials Engi-neering.

The Ginna Station Maintenance Engineer and Quality Control Engineer are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable

codes, specifications, and standards.

The Manager, Materials Engineering is responsible for the qualification of NDE personnel and procedures.

The Manager, Materials Engineering is responsible for the qualification of welding procedures and the training and qualification of welders.

Ginna Station maintains records for personnel and procedures to demonstrate that required qualifications have been obtained and are kept current.

Quality Assurance and Quality Control perform surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure com-pliance with procedures.

I Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-

cations, codes, standards, or regulatory requirements.

For clarification and to distinguish from preventative mainte-nance inspections the following controls are associated with I

the quality assurance function inspections and referred to as verification inspections.

Instructions for conducting detailed verification inspections, are contained in inspection procedures.

These inspection procedures and all.supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.

Inspection requirements and hold points are utilized to verify conformance of activities to the documented instruc-tions, specifications, and drawings for accomplishing the activity.

Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.

Verification inspections are performed by qualified inspection personnel who are independent of the personnel performing the work.

Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.

Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.

Quality Control personnel are responsible.for performing verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modi-

fication, and testing when the work is performed by Rochester Gas and Electric personnel.

When the work is performed by outside contractors, Quality Control is responsible for sur-veillance of the subcontractor's inspection activities.

All inspection equipment is calibrated and controlled in accordance with Section 12.

Calibration status is verified by inspection personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing

methods, equipment, and personnel is provided.

Both inspection and process monitoring are required when control is inadequate without both.

Quality Assurance is responsible for the adequate inclusion of inspection requirements in specifications.

The Ginna Station Quality Control Engineer is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing procedures.

He is also..responsible for the assignment of qualified inspection personnel required for inspection of quality affecting activities and for coordinating the performance of and conducting the surveil-lance of inservice inspection.

The General Maintenance Quality Control Coordinator is responsible for assuring that adequate inspection require-ments are included in procedures, instructions and/or check-lists controlling maintenance, modification and repair activities and related fabrication processes at the General Maintenance facility.

With the exception of that which pertains to Pump and Valve

Testing, the Supervisor, Materials Engineering is responsible for establishing the requirements for the Inservice Inspection Program.

Quality Assurance is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.

The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.

Test Control Whenever testing is required to demonstrate that a material,

part, component, or system will perform satisfactorily in
service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications,
codes, standards, and regulatory requirements.

The test program requires the identification, control, and documen-tation of all tests, and the preparation of written proce-dures required for satisfactory accomplishment of the testing.

Written test procedures and checklists include:

necessary test equipment and calibration requirements; material require-ments; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed perfor-mance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-tions for disposition of deviations; data collection require-ments; and test result approval.

The Ginna Station Superintendent is responsible for the station test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.

Test procedures are prepared by the plant staff, reviewed by

. the. Plant, Operations Review -Committee and Quality Control, and approved by the Ginna Station Superintendent.

The Ginna Station Superintendent is responsible for the performance of the required tests in a correct and timely manner utilizing written and approved procedures.

When contractors. are employed for tests, the contractor is requried to perform testing in accordance with his quality assurance program requirements.

All test results are required to be docu-mented;

reviewed, and approved by those responsible for performing the test,.

When requested by Ginna Station, Electric Meter and Laboratory performs test activities to determine the cause of protective relay malfunctions.

These test activities are-performed in accordance with approved procedures by qualified personnel.

Engineering and Quality Assurance are responsible for assuring that required tests for major modifications are included in specifications.

Engineering assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff.

The Ginna Station Technical Manager is responsible for the adequate inclusion of test re-quirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.

Reviews of minor modification design by Station Quality Control verifies adequate inclusion of test requirements Control of Measurin and Test E i ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control require-ments of measuring and test instruments,

tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components,
systems, and structures.

Calibration procedures include step-by-step methods for calibration and requirements for instrument accuracy.

Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other condi-tions affecting measurement capability.

Control of measuring and test equipment requires:

a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next calibration date on the equipment; a system providing trace-ability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items under the calibration system including the maintenance, calibrati'o'n 'results',

abnormalities,

.and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability"under normal use conditions.

In the event 'a measuring instrument (i.e.

shop or field standard) is found out of calibration, an investigation is conducted to determine the validity of previous measurements.

J

~ ~

The Ginna Station Superintendent is resonsible for the procedures and program required to assure control and calibration of measuring and test equipment at Ginna Station in accordance with the above requirements.

Instruments specified in Section 4.1, Technical Specificatiohs, are included in the program.

Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.

Measuring, test or inspection equipment used by Quality Control is included in the program.

The Superintendent, General Maintenance, and Superintendent, Electric Meter and Laboratory, are responsible for esta-blishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective departments.

Handlin Stora e

and Shi in The Ginna Station Superintendent is responsible for develop-ing and implementing procedures for the handling,

storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.

The Superintendent, General Maintenance, and the Superintendent, Electric Meter and Laboratory, are responsible for preparing and implementing procedures for the handling,

storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas.

In addition, the Superintendent, General Maintenance, is responsible for preparing and implement-ing procedures for the routine maintenance and inspection of lifting and handling equipment.

Under normal circumstances, manufacturer's specific written instructions and recommen-dations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements.

In the absence of, or in -addition to, specific manufacturer requirements, the department superintendent may invoke additional require-ments in accordance with department procedures.

The Vice President and Chief Engineer is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appro-priate, for the handling,

shipping, storage,
cleaning, and preservation of materials and equipment procured for modi-

.fications. "These procedures ax'e prepared by contractors; by the station staff, or by staff members of General Maintenance or Electric Meter and Laboratory, as appropriate.

Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.

In the preparation of procurement documents, department procedures, and contractor procedures, consideration of

handling, shipping,
storage, cleanliness, and preservation

<<24-

14.

is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.

Quality Assurance is responsible for review of engineering specifications to assure that proper handling, storing, and shipping requirements have been specified.

Quality Control is responsible for surveillance of handling,

storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.

Ins ection Test and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.

The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.

The Ginna Station Superintendent is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance,

repair, or modification in accordance with the approved Rochester Gas and Electric Intra-Station Holding Rules.

The Ginna Station Superintendent designates personnel who have station holding authority.

Personnel who have station holding authority are responsible

, for directing the status change of equipment and systems in accordance with the approved company Intra-Station Holding Rules.

System status is indicated through the use of hold tags and control logs.

Equipment or system inspection and test status are indicated by use of test tags,

labels, or work inspection and test status sheets.

Written procedures control the use of hold tags, test tags, and labels.

The procedures require the recording of the name of the person placing and removing the tag.

Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use.

~

of tags, stamps, or'the'r suitable means.

Maintenance,

repair, or modification of components,
systems, or structures utilizes procedures, travelers, data sheets and checklists to indicate status of the work, inspections and tests and corresponding acceptance or rejection for a particular component,
system, or structure.

These job control forms are prepared jointly by the job supervisor and Quality Control and maintained at a designated control location to indicate the status and the completion of required inspections and tests.

~ e

Quality Control monitors the status change activities for their compliance to approved procedures and assures that reinspection results are properly logged.

Quality Control also establishes the procedures for implementing the inspection status sheets utilized during inservice inspection.

Nonconformin Materials

Parts, and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.

'aterials,

parts, or components which do not conform to the drawing or specification requirements are identified with a hold tag and reported on a nonconformance report.

Quality Control is responsible for issuing nonconformance

reports, recommending disposition, initiating repair or rework, and inspecting and approving repaired or reworked items.

Prior to installation or use, nonconforming items generally remain in a Quality Control receiving inspection area until approved disposition has been received.

Nonconforming items which are released for installation to meet critical fabrication schedules are controlled by Quality Control to prevent inadvertant use prior to clearance of the nonconformance.

After installation or use, nonconforming items are identi-fied and controlled until approved disposition has been received.

Nonconformances identified at a supplier's facility and reported to RG&E, which have supplier recommended diposi-tions of use-as-is, or repair, are normally processed by the department originating the procurement.

Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended dispo-sition.

This also applies to nonconformances discovered after receipt inspection, during handling or after instal-lation or use.

Items are repaired and reworked only in accordance with approved procedures and current drawings.

Quality Control assures that approved procedures and/or drawings are avail-able for use prior to the repair or rework and reinspects all repaired or reworked items.

The repair or rework must be verified as acceptable by an inspection of the affected item which is at least equal to the original inspection method.

Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical.

justification for acceptance.

All such items are.approved prior to use by the cognizant organization having responsi-bility for the requirement.

In addition, those "us'e-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Vice President, Electric and Steam Production.

k Quality Control issues monthly nonconformance report summaries which are reviewed and analyzed by Quality Assurance.

Unsatisfactory trends are reported to management by means of the corrective action report in accordance with Section 16.

Corrective Action Quality Assurance establishes the requirements for. identi-fication, review and correction of significant conditions adverse to quality.

Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and non-conformances are reported on a correct'ive action report.

Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant

shutdown, high maintenance
items, and operating procedure deficiencies.

The corrective action report identifies the

-condition, the cause of the condition, and the corrective action taken.

Corrective action reports may be initiated by Quality Assur-

ance, Engineering, Ginna Station, General Maintenance, Electric Meter and Zaboratory or Purchasing staff personnel.

Corrective action reports initiated at Ginna Station and General Maintenance are submitted to Quality Control for review and subsequent processing.

Corrective action reports initiated by departments other than at Ginna Station or General Maintenance are reviewed and processed by Quality Assurance.

When a significant condition adverse to quality at Ginna Station is identified, Quality Control evaluates the affect of continuing the activity. If continuing the activity would cover up or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.

The Ginna Station Quality Control Engineer has authority to stop work on maintenance,

repair, inservice inspection, refueling, modification, testing or inspection deficiencies, at Ginna Station.

The Ginna Station Quality Control Engineer may recommend stop work action to the Ginna Station Superintendent on operating deficiencies.

The Plant'Operations Review 'Committee reviews all corrective '"

action reports initiated at Ginna Station and recommends interim corrective action if the action does not represent a

change in configuration of the deficient item.

The Committee recommends permanent corrective action for all conditions adverse to quality which involve operating procedures.

Significant conditions adverse to quality identfied in General Maintenance are processed by the Quality Control Coordinator.

The General Maintenance Quality Control Coor-dinator has the authority to stop or limit work activities within his department.

Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a

design change are reviewed by Ginna Station or Engineering as applicable.

The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.

Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.

Quality Assurance also reviews nonconformance report summaries for unsatisfactory trends and initiates a

corrective action report if such a trend occurs.

Completed corrective action reports are submitted to the Vice President, Electric and Steam Production to keep him aware of significant conditions adverse to quality.

ualit Assurance Records Quality Assurance is resonsible for establishing the basic requirements for quality assurance record retention and maintenance.

The Ginna Station Superintendent is responsible for the retention and maintenance of plant records.

Engineer-ing is responsible for the retention and maintenance of Engineering records.

Quality Assurance, Purchasing, Fuel

Planning, General Maintenance and Electric Meter and Labora-tory departments are responsible for assuring the maintenance and retention of records which they -originate.

This may be accomplished either by retaining the records in their depart-ment or by forwarding them to Ginna Station or Engineering, as appropriate.

Each organization retaining records is responsible for preparation, review, approval, and imple-mentation of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements.

The records which fall within quality assur-ance record requirements include those records required by Section 6.10 of the Technical Specifications and the quality assurance'program.,

All,records associated wi'th the operation; maintenance, repair, inservice inspection, refueling, modifi-cation, inspection and testing of structures,

systems, and components covered by the quality assurance program are included.

Ginna Station records include operating logs; the results of inspections,

tests, and the monitoring of plant activities;
drawings, procurement documents and material analyses; I ~

I

calibration procedures and reports; and nonconforming and corrective action reports.

Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained by Engineering.

Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data

recorder, the acceptance or rejection of the activity, and a

record of any nonconformances.

The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate.

Requirements and responsi-bilities for preparation, inspection, identification, review,

storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures,
codes, standards, and procurement documents.

Records are available to authorized personnel.

Removal from record storage is documented on sign-out cards and accountability is maintained by the responsible record

.control activity.

Records are either stored in record storage facilities which are designed to prevent destruction of records through fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.

Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.

The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.

The Ginna Station Superintendent is responsible for main-taining plant, operating records as required in Section 6.10, Technical Specifications.

Engineering is responsible fo'r maintaining design records, such as specifications,

drawings, design review reports, and design control documentation; quality assurance
records,

.uch as, audit reports and supplier surveillance reports; purchasing records, such as supplier qualifications, bid

.'valuatons, and purchase orders.

Audits Compliance with all aspects of the quality assurance program and the effectiveness of the program is determined by audits of all organizations performing quality affecting activities.

Quality Assurance is responsible for conducting audits of each oiganization involved in the quality assurance program on a planned, periodic basis.

Audit intervals are based on the status and safety important of activities being performed.

Audits of Ginna Station, Engineering, General Maintenance, Electric Meter and Laboratory and Purchasing organizations are performed annually.

Table 18-1 is a list of the activities to be audited in each of the organizations.

Audit. frequencies are based on the level of activity in each area.

Audit schedules are established to assure that each of the activities are audited at the frequency specified'n Technical Specifications 6.0 which includes annually for those activities required to meet the criteria of Appendix B,

10CFR.

Additional audits are conducted as required by special conditions or circumstances.

Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names and assignments of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations.

The audits are performed in accordance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.

Audit results are documented and reported to the person having supervisory responsibility in the area audited, the Vice President, Electric and Steam Production, and the Nuclear Safety Audit and Review Board.

Within a specified period of time, the person having supervisory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies revealed by the audit, and document and report the corrective action.

Quality Assurance is responsible for developing audit plans and audit checklists, designating and training audit personnel, and conducting audits.

Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the. early stages of design and procure-.

ment, as required,'o evaluate their quality assurance

'program for compliance with all aspects of the procurement documents.

Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.

During the project, additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-

~mented in accordance with procurement documents.

Quality Assurance performs regular analyses of audit results to evaluate quality trends.

Results of these analyses will be provided to management for their regular review.

Table l-l Quality Assurance Program Procedures Subject Listing ualit Assurance Procedures

.Appendix B Criteria Indoctrination of Quality Assurance and Supervisory Personnel Training of Quality Assurance Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance Procedures Quality Assurance Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's

'esign Documents Requisitioning Quality Assurance Services Quality Assurance Review of Rochester Gas and Electric Procurement Documents IV IV Preparation, Review and Approval of Rochester Gas and Electric Q.A. Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance Procedures IV Review of Departmental Procedures Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance Qualification of Suppliers Supplier Surveillance VI VI VII VII

~

I

~ F Table l-l (cont'd) ualit Assurance Procedures Appendix B

- Criteria Control of Supplier Performance Quality Assurance Bid Evaluations QA Review of Inservice Inspection Preparation, Review and Processing of Corrective Action Reports by Quality Assurance Qualification of Auditing Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit Findings Conduct of Quality Assurance During and in Follow-Up of USNRC and Management Audits VII VII XVI XVIII XVIII XVIII XVIII XVIII

~33 ~

Table 1-1 (cont'd)

Ginna Procedures

.Appendix B

Criteria Ginna Quality Assurance Program Implementation-Training of Ginna Personnel Ginna Organization Work Start Authorization Modification Control Activities Ginna Station Modification Evaluation Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased Materials, Parts, Components and Services Plant Procedures IV Plant Procedure Document Control Control of Engineering Documents Control of NRC Correspondence Receipt and Acceptance of Purchased Materials Supplier Qualification Technical Evaluation Control of Purchased Services Control of Accepted Material, Parts.and Components Identification and Marking of Material

'ontrol of Welding Welding Equipment Performance Verification Nondestructive Examination Inspection and Surveillance Activities VI VI VI VII VII VII VIII IX

Table l-l (cont'd)

Ginna Procedures Appendix B

- Criteria Qualification of Surveillance and Inspection Personnel Inservice Inspection Performance of Tests Qualification of Test Personnel Calibration and Control of Test Instruments X, XIV XI XI XII Calibration and Control of'echanical Measuring Tools and Equipment Calibration and Control of Process System Instrumentation XII XII Control of Material Handling and Handling Equipment

~

~

~

Storage and Preservation of Materials Station Holding Roles Test Status Control XIII XIII XIV XIV Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports Corrective Action at Ginna Station Control of Quality Assurance Records Record Storage Facility and Equipment System and Equipment Histories Ginna Station Response to 'Internal'udits XVI XVII XVII XVII XVIII

Table l-l (cont'd)

En ineerin Procedures Appendix B

'riteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Aprpoval of Design Input Documents Preparation, Review and Approval of Design Analyses Engineering Drawings Preparation, Review and Approval of Specifications Design Verification Design Interface Control Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition Engineering Procedures Engineering Procedure Deviation Request Distribution and Control of Documents by the Control Number Method IV VI Control of Documents by the List of Current Revisions Method J

Distribution and Coritrol of Documents by Project Correspondence Procedures

Receipt, Control and Distribution of Drawings and Aperature Cards Supplier Evaluation VI VI

~ VI VII Table l-l (cont'd)

En ineerin Procedures Appendix B

" Criteria Preparation, Review and Approval of Bid Requests, Bid Evaluations and Recommendations for 'Award VII Engineering Review of Nonconforming Materials, Parts XV or Components Initiating and Responding to Corrective Action Reports XVI Records Engineering

Response

to Audits XVII XVIII

Table l-l (cont'd)

Purchasin Procedures Appendix B

'- Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities II Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation Establishment and Maintenance of Qualified Suppliers List Supplier Nonconformance Processing Purchasing Department

Response

to Corrective Action Reports and Corrective Action Reporting Purchasing Records Purchasing

Response

to Audits IV IV VII VII XVI XVII XVIII

4

Table l-l (cont'd)

General Maintenance Procedures Appendix B

.'Criteria Indoctrination and Training General Maintenance Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Maintenance Procedures Quality Maintenance Procedure Deviation Request Preparation, Review and Approval of General Maintenance Fabrication Route Cards IV General Maintenance Instructions for Material Handling and Lifting Equipment Control and Distribution of Documents Regulating Safety Related Activities Receipt and Acceptance of Purchased Materials Control of Accepted Material, Parts and Components Traceability of Material

Issue, Control and Storage of Weld Consumables Welding Procedures Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency

'I

'n'service Inspection VI VII VIII VIII VIII IX IX IX IX IX Control, of Welding Welding Equipment Performance Verification Nondestructive Examination Procedures IX IX IX Table l-l (cont'd)

General Maintenance Procedures

Appendix B

" Criteria Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Certifications Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel IX IX Calibration and Control of Nondestructive Examination Instruments XII Inspection and Maintenance of Material Handling Equipment Overhead and Gantry Cranes Inspection and Maintenance of Portable Lifting and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems Slings and Related Apparatus Classification and Training of Material Handling Equipment Personnel Mobile Hydraulic Cranes Inspection and Maintenance of Jacks Forklift Loading Forks Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at General Mainten'ance XIII XIII XIII XIII XIII XIII XIII XIII XIII Quality Maintenance. Records General Maintenance

Response

to Internal Audits XVII

.XVIII 40

Table l-l (cont'd)

Electric Meter and Laborator Procedures Appendix B "Criteria Quality Assurance Program Implementation for Electric Meter and Laboratory Department Training of Electric Meter and Laboratory Personnel Periodic Review of Quality Relay Procedures Electric Meter and Laboratory Organization Design/Modification Activities Control Control of Procurement Documents for Purchased Materials, Parts, Components and Services Preparation,

Review, and Approval of Electric Meter and Laboratory Procedures Control of Electric Meter and Laboratory Procedures

~

~

~

~

~

Supplier Qualification Technical Evaluation Performance of Tests at Ginna Station Performance of Tests at Electric Meter and Laboratory Shop IV VI VII XI XI Documentation, Evaluation and Disposition of Test Results XI Qualification of Test Personnel Calibration and Control of Test Instruments Control and Disposition of Nonconforming Materials Corrective Action at Electric Meter and Laboratory Control of Quality Assurance Records

Response

to Internal QA Audits XI XII XVI XVII XVIII TABLE 4-1 Procurement Document Re irements Items to be considered for inclusion in procurement documents include:

1.

Sco e of Work - Detailed statement of the work to be per-formed.

  • 2.

Technical Re irements - by reference to specific drawings, specifications,

codes, regulations, procedures or instruc-tions including revisions, therto that describe the items or services to be furnished.

Also identified shall be test, inspection and acceptance requirements, and any special re-quirements for such activities as designing, identification, fabrication, cleaning,

erecting, packaging,
handling, shpping and extended storage.
  • 3.

ualit Assurance'Pro ram Re irements which require the supplier to have a

documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards.

Also included shall be the requirement that the supplier in-corporate appropriate quality assurance program require-ments in subtier procurement documents.

  • 4.

Ri ht of Access - to include the facilities and records of the supplier for source inspection and audit by the Purchaser or parties designated by the purchaser.

Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.

  • 5.

Documentation Re irements - Submittal approval and retention requirements for documents such as quality assurance

manuals, special process and test procedures, materials records, calcu-lations and analyses.
  • 6.

Nonconformances

- Requirements for '.reporting and disposition of nonconformances to procurement requirements.

Included in the review by Quality Assurance/Quality Control.

TABLE 18-1 Audit List F nctional Or anization Activities Audited Engineering Indoctrination and Training Design Control Procurement Document Control Document Control Records Procurement Control Purchasing Indoctrination and Training Procurement Document Control Procurement Control Ginna Station QA Indoctrination and Training Ginna Staff Training, Retraining-Qualification and Performance Modification Maintenance and Repair Procurement Control Document Control and Records Inservice Inspection Surveillance Testing

Handling, Storage and Shipping Facility Operation Conformance to all provisions contained in Technical Specifications and applicable license conditions Refueling Control of Measuring and
Test, Equipment Health Physics 6

Chemistry Security Plan and Procedures Emergency Plan and Procedures Inspection

& Surveillance Fire Protection Corrective Action associated with deficiencies. occurring in facility equipment, struc-

tures, system or method of operation Transportation of Radioactive Waste

TABLE 18-1 (cont'd.)

Audit List Functional Or anization Gdneral Maintenance Activities Audited Indoctrination and Training Maintenance and Repair Procurement Control Document Control Fabrication Inspection Control Control of Measuring and Test Equipment Special Processes

Handling, Storage and Shipping Electric Meter and Lab Indoctrination and Training Procurement Control Document Control Handling and Shipping Control of Measuring and Test Equipment Test Control

alhll Ot IV<<l~ Tl~lth aht alh<<NCISauth ll<<1~ Df CON<<VWCLIIth Lha<<uah 00 Ihl R.

E.

GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART TKI<<ONTNLE TDO

~ l<<C t<<OTICIION t<<OOALW

~<<ELDEST IINIOA TKC t<<IICC<<1

~fWALL LESTKII al

~

~va aha I<<W

~

~VSLK Lttlhl tv<<Chil<<al LOCNI V>. ELCCIAK Taa<<WIITK<<L C<<LTDSVTKN

~

VIS IIIINN Sa<<I. EllCT IKTEA

~ Lal NIhIll00 DlDNW

~

CIWL1AVCIKW DIT, Dltf, a

I~l'ITLNI CWE fafCT. IllW.

INO<<KIN DENT VT Ehawfla IW ~

COITOTAVCIKN

~IWDA TKE tafIKENT 0<<ES ~ 1<<WT TKC 0<<EICSNI aht E<<NT Ilal<<ffA llul'Iaht CNKT CNOWCTA Vtl<<WTEWON OEIKALL NahaacA 0<<LLI IT I

I I

II' VKE thfDSENT ELEETAK ~ olcul NDLAD

~AOOVCTKW I

I I

I

~V<<EAWWIOEIK I

~LKLCU I

tOOOVCTNW I

I I

I I

lah<<KNCT usa<<wTEKKNT taaa<<K 0 DCAC

~<<<<ll ~Talhw I

I ElfENTNc VKE t<<E IDENT

~ICC taECOCNI Aalfl NIhlaf0

LECVAITf, la a<<K

~WLSUCE DSWCTOA Ot

~EEafhff MlchaIwo

~Iltt I

II IIII I

I II I"I II III I

II I

falCIAK NCIEA

~ LU ~Taft IW Lht CDLKIAVCTION IND<<KID~

WO TLKL NLNLWlKNT I

I II IIIII I

II IIIIJ CE <<IALL NLWTCNLNCE

~Ialt

<<ECOSOC DOCVLKNT coh1<<DL, Dsulwo VO TalW<<W

~ Tat OVLLIIf LISWLNCE

~Iaft I

I I

I I

at I

I I

II I

I I

I I

~.

OWLIIT CTWTWL COOS<<wlTOA II IIIJ I

I I

I I

I I

II I

I I

I II'I I

I I

I II I

aaullull SNCAWTEWKNI hj(LCLA als<<ILNTC Nahaaf<<

~LUI 0<<IALTN<<W Cfatt I

II II OVLLIIT CDNTWL Ihl<<KIA I0I<<ISK

~Iaft

~atl<<TKTW Ol' LKLCLA 00 casl1f 0UIION DfCvhllf 0<<0 au l IINW Figure 2-1 Revision 9

June 1984

The figure, previously appearing on this page was deleted with the issuance of Revision 7, dated November 1980.

)

'}

Rochester Cas S Electric Corporation General Yaintenance Deparbnent Organization Chart SUPER I NTEHDEHT QUALITY CONTROL COORDIHATOR MNACER SHOP OPERATIONS MANAGER FIELD SERVICE OPERATIONS AHD PROSPECT PLAHHINC YANACER NATERIALS EHCIhsERINC DIVISIOH YANAGER ADNINISTRATIVE SERVICES MANAGER INSPECTION AND BVILDING SERVICES Figure 2-4 Revision 8

June 1983

ROCHESTER GAS AND ELECTRIC CORPORATION ENGINEERING DEPARTMENT ORGANIZATION VICE PRES! DENT CHIEc ENGINEER AS"!CTAVT CHIEF FVOINEER ENO!MEERDI8 AMD COMSTRVCTIOM ASeeTAVT CHIEF ENO!MEER-ADM!NOSTRA~ !CV.

MA!N~ EMAMCF O'JA>>! e V ASS JRAMOE ~

DRAFT!MB.

ENVIROME4 ~

4'ANAGER 6TRJ" ~

VRA'M3!

NEER!MG MANAGER E>>ECTR!C4>>

ENGINEER!MO 8JP ER!MTEMDEMT BEVERA'A'NTE'lA'l F MAVAOER CJA'!TY ASSJRA'.l F MA'44'ER ME HAV!CA' NO!MESR!M3 MANAGER NVCLEAR ENO!NEERLMO MAVAGER ENVIPCME4 e A>>

SC! EM"F4 C'JA>>! ~

Yi EN8!NEFe?'.V 8 CO'RD'MA Cfi MAVAOER E43'NEER! MO NINE MILE i2 PROJECT MANAGER SJPEe?V,I:,e?

CFF!CF.

<<FRVICFS AND DCCJMEMT COV PRO 6JPEPVIL:R Oc DRAF'T!MO 3!MNA MOD!FICATIOM PRO:ECT MANAGER ADllLVISeRA e!VE PRCJE Figure 2-5 Revision 9

June l984

~ t Rochester Gas and'Electric Corporation Ginna Station Review and Audits Functions NSARB PORC Clectric Heter and Lab Purchasing GeneraI Slaintenance Engineering Plant Ravf cM Audft Figurc 2-a l ehruary 1

tg I(,

f l k.

r v