Forwards Request for Addl Info Re Revision Levels of Reg Guides & Description of QA Procedures,In Order to Continue Review of Revision 5 to Suppl IV of full-term License Application
ML17244A611
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/05/1979
From: Ziemann D
Office of Nuclear Reactor Regulation
To: White L
ROCHESTER GAS & ELECTRIC CORP.
References
NUDOCS 7907190807
Download: ML17244A611 (6)


Text

Docket No. 50-244 TRIBUTION c e TERA NRC R

'CRS (16)

Local PDR DKDavis ORB ¹2 Reading NRR Reading YStello DEisetihut BGrikles RYol'amer Iar.

Leon D.! Ilhlte, Jr.

TJCariter Yice President OELD Electric and Steam Production, plaE (3)

Rochester

.Gas 8 Electric Corporation DLZiemann 89 East Avenue JJShea Rochester, New York 14649 WHaass

Dear Hr. White:

JRBuchanan-We have revii wed Revision 5 to Supplement IY of the Full-Term License Application for the R.

E. Ginna Nuclear Power Plant submitted April 23, 1979, which responded to our letter dated February.8, 1979.

To continue our quality Assura'ncaa.review, additional information is required.

Please provide the information, described in the enclosure, within 30 days of the date of this letter.

r

'1 1

I\\

1

'I e

Sincerely,

Enclosure:

Request for Additional Information Original l;igneIi iIP L,2Rmue~-

Dennis L. Ziemann, Chief Operating Reactors Branch ¹2 Division of Operating Reactors e

cc w/enclosure:

See next page OUIINAIIE~

OATC~

H 6

ah

~ ~

,/79 DO '2 DOR:ORB JJShea

'6/

./7 DOR'ORB ¹2 DLZijepann 6/ $ /79 g Oov199 So 7 r

I

~

~ \\ ~ e

~

~ ~ ~

~

e ~ e ~ ~

NRC PORM 518 (976) NR 0240 er ~

V,e, OOVORNIamNT PRINTINO OIeIeICOI Iea ~

aee Ie ~

I S'

s' 1

~

Mr. Leon D. Mhite, Jr.

cc w/enclosure:

Lex K. Larson, Esquire

LeBoeuf, Lamb, Leiby 5 MacRae 1757 N Street, N.

W.

Mashington, D.

C.

20036 Mr. Michael Slade

'250 Crown Point Drive

Webster, New York 14580

- Rochester Committee for Scientific Information Robert E. Lee, Ph.D.

P. 0.

Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza

Albany, New York 12223 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14604

, RE(VEST FOR ADDITIONAL INFOfNATION R.

E. Ginna Nuclear Power Plant lA.

The Narch 9, 1979 letter indicated that "pages IY-3 and IY-4 are being revised to reflect the revision 1evels of Regulatory Guides...."-

a)

In Revision 5, on page IV-3, it is not clear which revision of Regulatory Guide 1.8 is being referenced.

Reference "a," relative to revision 1 of Regulatory Guide l.8, also refers io revision 0

of the Orange Book.

Revision 0 of the Orange Hook should not be referenced because it contains revision 0 of the regulatory guidance.

b)

In Revision 5, on page IV-3, it is not clear which revision of Regulatory Guide 1.28 is being referenced.

Reference "b,"

relative to revision 2 of Regulatory Guide 1.28, also refers to revision 1 of the Gray Book.

Revision l of the Gray Book should not be referenced because it contains revision 0 of the regulatory guidance.

c)

To the extent that operations phase activities parallel design and construction activities, page IV-4 should include a commit-ment to Regulatory Guide 1.94.

2A.'he f~iarch 9, 1979 letter indicated that "the description of the guality Assurance Manager on page IV-6 will be revised to provide this cIarification."

The clarification on1y addresses training.

It should also address the other duties, listed below, which revision 3 to Supplement IV indicated were assigned to the guali".y Assurance

Engineer, gA Program.

a)

Preparation and maintenance of the guality Assurance Procedures Manua.l, b)

Preparation and maintenance of the quality assurance audit schedule.

c)

Preparation of corrective action report summaries on quality assurance deficiencies.

d)

Preparation of audit status reports.

5A.

, 10A.

Please identify who (by position title) or what organization i' responsible for these activities.

The statement replaced in page IV-10 relative to review and approval of deviations from quality standards has omitted "deviations from."

Typographical error on gage IV-19.

Ninth line in Section IY-10, "instructions apd contained" should be "instructions are contained."

12A.

The last sentence of section IV.ll states:

"Ginna Station is responsible...."

Indicate the involvement of the quality Control Engineer shown on page IY-45.

VJ