Revison 2, Housekeeping Requirements for Water-Cooled Nuclear Power Plants
ML003740067
Person / Time
Issue date: 09/30/1977
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.039, Rev 2
Download: ML003740067 (2)


SU.S.

NUCLEAR REGULATORY COMMISSION

September 1St7 I-9

0*!

REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.31 HOUSEKEEPING REQUIREMENTS FOR

WATER-COOLED NUCLEAR POWER PLANTS

A. INTRODUCTION

Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR Part 50, "Licensing of Produc tion and Utilization Facilities," establishes overall quality assurance requirements for the design, con struction, and operation of safety-related structures, systems, and components of nuclear power plants.

This guide describes an acceptable method of com plying with the Commission's regulations with regard to housekeeping' requirements for the control of work activities, conditions, and environments at water-cooled nuclear power plant sites. The Advisory Committee on Reactor Safeguards has been con sulted concerning this guide and has concurred in the regulatory position.

B. DISCUSSION

Working Group N45-2.3 of the American National Standards Institute (ANSI) Standards Committee N45, Reactor Plants and Their Maintenance, has prepared a standard that defines the housekeeping re quirements for the control of work activities, condi tions, and environments that could affect the quality of a nuclear power plant during the construction phase. This standard was approved by Subcommittee N45-2, Nuclear Quality Assurance Standards, of the ANSI Standc"is Committee N45 and the full com mittee and its Secretariat. It was subsequently ap e Lines indicate substantive changes from previous issue.

I Housekeeping encompasses all activities related to control of cleanliness of facilities, cleanliness of material and equipment, fire prevention and fire protection including disposal of combustible materials and debris, control of access, and protection of materials.

proved and designated. N45.2.3-1973 by the American National Standards Institute on March 15,

1973.

The original issuance of this regulatory guide en dorsed as acceptable the guidelines (indicated by the verb "should") as well as the requirements included in this standard. Some uncertainty arose with regard to the NRC staff's intent with this endorsement. As a result of this uncertainty, the NRC staff reevaluated the guidelines contained in ANSI N45.2.3-1973 with respect to importance to safety. This guide has been revised to clarify NRC's position on the requirements and guidelines included in ANSI N45.2.3-1973.

Where conformance to this regulatory guide is in dicated in an application without further qualifica tion, this means conformance with the requirements of ANSI N45.2.3-1973, as supplemented or modified by the regulatory position of this guide.

C. REGULATORY POSITION

The requirements for the control of work activities, conditions, and environments at water-cooled nuclear power plant sites that are included in ANSI

Standard N45.2.3-1973, "Housekeeping During the Construction Phase of Nuclear Power Plants,'"

provide a method acceptable to the NRC staff for complying with the pertinent quality assurance re quirements of Appendix B to 10 CFR Part 50, subject to the following:

1. Subdivision 1.5 of ANSI N45.2.3-1973 states that other documents that are required to be included

2 Copies may be obtained from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, N.Y. 10017.

USNRC REGULATORY GUIDES

Comments ihoul be sent to the Secretary of the Commission. US. Nucear Rago IstOrv Commission, Washington. D.C.

20555. Attention: Ooclketinl ari Service Regulatory Guides are issued to describe and make avaglsble to she Public methods tDtoidhc acceptable to the NRC staff of imtplemeting specific parts of the Commission's regulations. to delineate techniques used by the staff in e*valiuatng specific problems The guisles are issued in the following ten broad divisions or postulated accidenis. or to provide guidence to applicants. Regulatory Guides are not substitutes for regulations, and compliance with them is not required.

1. Powei Reactors

6. Products Methods and solutions dilterent from those set out in the guides will be accept-

2. Research aid Test Reactors

7. Transportation able if they provide a basis for the findings requisite to Ihe issuance or continuance

3. Fuels and Material$ Facilities a. Occas*eiona*

HNeathi of a permit or license by the Commission.

4. Environmental and Siting

9. Antitrus ftReiew

5. Materials and Plant Protection

10. General Comments and suggestions for improvements in thes guides are encouraige at all Requests for single copie of issued guides wiehid may be reproduied) or for place times. and guides will be revised, as appropriate, to accommodate comnments and ment on an automatic distribution list ftr single copies of future uioc in secific to reflect now inlormation or experience.

This guide was revised as a result of divisions ihould be made in writing to the US. Nuclear Reguiltorv uamtmiseron.

substantive comments received from the public and additional st1ft5 vevw.

Washington. D.C.

20555. Attention:

Director. Division of Document Control.

I

as. a part or this standard are either identified at the point of rc.,rence or identified in P.,dgraph 5 of the standard. The specific acceptability of these listed dowuments has been or will be covered separately in other regulatory guides or in Commission regula tions, where appropriate.

2. Subdivision 3.2.3 of ANSI N45.2.3-1973 in cludes general guidelines and requirements for fire protection and prevention. The requirements and guidelines of Subdivision 3.2.3 are not considered a part of this regulatory guide, since this subject is ad dressed separately in more detail in other NRC docu ments. Thus, a commitment to follow this regulatory guide does not imply a commitment to follow the guidelines and requirements of Subdivision 3.2.3.

3. Although ANSI N45.2.3-1973 is entitled

"-Housekeeping During the Construction Phase of Nusclear Power Plants," the requirements included in thf standard, subject to the provision of Regulatory Position C.2, are considered to be applicable for on Eli mil I..

z

0

SaI

.!" *

r D a*

-z 0.

0

£m

%

z l.

housekeeping activities occurring during the opera tions phase that are comparable to those occurring during the construction phase.

D. IMPLEMENTATION

The purpose of this section is to provide informa tion to applicants regarding the NRC staff's plans for using this regulatory guide.

This guide reflects current NRC staff practice.

Therefore, except in those cases in which the appli cant proposes an acceptable alternative method for complying with specified portions of the Commis sion's regulations, the method described herein is be ing and will continue to be used in the evaluation of submittals for operating license or construction per mit applications until this guide is revised as a result of suggestions from the public or additional staff review.