IR 05000331/2019002: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 1, 2019 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 34: | Line 34: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 05000331 License No. DPR-49 | |||
Billy Dickson, Chief Branch 2 Division of Reactor Projects | |||
Docket No. 05000331 License No. DPR-49 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated | As stated | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number: 05000331 License Number: DPR-49 Report Number: 05000331/2019002 Enterprise Identifier: I-2019-002-0067 Licensee: NextEra Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, Iowa Inspection Dates: April 01, 2019 to June 30, 2019 Inspectors: B. Bartlett, Project Engineer J. Beavers, Senior Resident Inspector G. Hansen, Sr. Emergency Preparedness Inspector D. Johnson, Sr. Emergency Preparedness Specialist V. Myers, Senior Health Physicist C. Norton, Senior Resident Inspector T. Ospino, Reactor Engineer J. Rutkowski, Project Engineer Approved By: Billy Dickson, Chief Branch 2 Division of Reactor Projects | Docket Number: | ||
05000331 | |||
License Number: | |||
DPR-49 | |||
Report Number: | |||
05000331/2019002 | |||
Enterprise Identifier: I-2019-002-0067 | |||
Licensee: | |||
NextEra Energy Duane Arnold, LLC | |||
Facility: | |||
Duane Arnold Energy Center | |||
Location: | |||
Palo, Iowa | |||
Inspection Dates: | |||
April 01, 2019 to June 30, 2019 | |||
Inspectors: | |||
B. Bartlett, Project Engineer | |||
J. Beavers, Senior Resident Inspector | |||
G. Hansen, Sr. Emergency Preparedness Inspector | |||
D. Johnson, Sr. Emergency Preparedness Specialist | |||
V. Myers, Senior Health Physicist | |||
C. Norton, Senior Resident Inspector | |||
T. Ospino, Reactor Engineer | |||
J. Rutkowski, Project Engineer | |||
Approved By: | |||
Billy Dickson, Chief | |||
Branch 2 | |||
Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | ||
List of Findings and Violations Failure to Notify Radiation Protection of Change In Work Scope Cornerstone | ===List of Findings and Violations=== | ||
Failure to Notify Radiation Protection of Change In Work Scope Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety Green NCV 05000331/2019002-01 Open/Closed | |||
[H.4] - Teamwork 71124.01 The inspectors reviewed a self-revealed finding of very low safety significance (Green) and an associated Non-Cited Violation (NCV) of TS 5.4.1, Procedures, when the licensee failed to implement contamination control procedures when machining a contaminated main steam isolation valve disk without radiation protection knowledge. | |||
Failure to Manage Outage Risk Activities Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000331/2019002-02 Open/Closed | |||
[H.5] - Work Management 71153 A self-revealed finding of very low safety significance (i.e., Green) was identified for the licensees failure to have appropriately managed risk activity as required by WM-AA-100-1000, Work Activity Risk Management, Revision 16. Specifically, plant personnel failed to reevaluate risk when a change in work scope occurred during outage work activities. | |||
===Additional Tracking Items=== | |||
Type Issue Number Title Report Section Status LER 05000331/2019-001- | |||
LER 2019-001-00 for Duane Arnold Energy Center, | |||
Manual Reactor Scram Due to Lowering Reactor Water Level | Manual Reactor Scram Due to Lowering Reactor Water Level 71153 Closed | ||
=PLANT STATUS= | =PLANT STATUS= | ||
| Line 61: | Line 113: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
==71111.01 - Adverse Weather Protection== | ==71111.01 - Adverse Weather Protection== | ||
===Summer Readiness Sample (IP Section 03.01) (1 Sample)=== | |||
===Summer Readiness Sample (IP Section 03.01)=== | |||
: (1) The inspectors evaluated summer readiness of offsite and alternate alternating current power systems on June 4, 2019 | : (1) The inspectors evaluated summer readiness of offsite and alternate alternating current power systems on June 4, 2019 | ||
==71111.04 - Equipment Alignment== | ==71111.04 - Equipment Alignment== | ||
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)=== | |||
===Partial Walkdown Sample (IP Section 03.01)=== | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | ||
: (1) High pressure coolant injection system following maintenance on April 18, 2019 | : (1) High pressure coolant injection system following maintenance on April 18, 2019 (2) | ||
'A' core spray system on June 7, 2019 | |||
==71111.04S - Equipment Alignment== | |||
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)=== | |||
: (1) Control building chilled water system on June 25, 2019 | : (1) Control building chilled water system on June 25, 2019 | ||
==71111.05Q - Fire Protection== | ==71111.05Q - Fire Protection== | ||
===Quarterly Inspection (IP Section 03.01) (6 Samples)=== | |||
===Quarterly Inspection (IP Section 03.01)=== | |||
The inspectors evaluated fire protection program implementation in the following selected areas: | The inspectors evaluated fire protection program implementation in the following selected areas: | ||
: (1) Fire Zone OAG-PA East on April 9, 2019 | : (1) Fire Zone OAG-PA East on April 9, 2019 | ||
| Line 95: | Line 138: | ||
==71111.06 - Flood Protection Measures== | ==71111.06 - Flood Protection Measures== | ||
===Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)=== | |||
===Inspection Activities - Internal Flooding (IP Section 02.02a.)=== | |||
The inspectors evaluated internal flooding mitigation protections in the: | The inspectors evaluated internal flooding mitigation protections in the: | ||
: (1) Reactor Building on June 4, 2019 | : (1) Reactor Building on June 4, 2019 | ||
==71111.07A - Heat Sink Performance== | ==71111.07A - Heat Sink Performance== | ||
===Annual Review (IP Section 02.01) (1 Sample)=== | |||
The inspectors evaluated readiness and performance of: | |||
(1) | |||
'B' residual heat removal service water and emergency service water stilling basin on June 19, 2019 | |||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample) | |||
: (1) The inspectors observed and evaluated a reactor plant power evolution and rod sequence exchange on April 14, 2019 | |||
=== | ===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)=== | ||
: (1) The inspectors observed and evaluated licensed operator requalification activity on April 16, 2019 | : (1) The inspectors observed and evaluated licensed operator requalification activity on April 16, 2019 | ||
==71111.12 - Maintenance Effectiveness== | ==71111.12 - Maintenance Effectiveness== | ||
===Routine Maintenance Effectiveness Inspection (IP Section 02.01) (3 Samples)=== | |||
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | |||
(1) | |||
'A' standby diesel generator aux cooling water relay on April 4, 2019 (2) | |||
'B' diesel generator air compressor on May 28, 2019 (3) | |||
'A' residual heat removal service water pump replacement on June 5, 2019 | |||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | ==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | ||
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)=== | |||
The inspectors evaluated the risk assessments for the following planned and emergent work activities: | |||
(1) | |||
'A' and 'B' rod block monitor emergency work activities on May 8, 2019 | |||
: (2) Control room annunciator emergency work activities on May 12, 2019 (3) | |||
'B' moisture separator reheater drain tank drain valve emergent work activities on June 5, 2019 | |||
: (2) Control room annunciator emergency work activities on May 12, 2019 | |||
==71111.15 - Operability Determinations and Functionality Assessments== | ==71111.15 - Operability Determinations and Functionality Assessments== | ||
===Operability Determination or Functionality Assessment (IP Section 02.02) (2 Samples)=== | |||
===Operability Determination or Functionality Assessment (IP Section 02.02)=== | |||
The inspectors evaluated the following operability determinations and functionality assessments: | The inspectors evaluated the following operability determinations and functionality assessments: | ||
: (1) Condition Report 02313285; CV4421 'D' Outboard Main Steam Isolation Valve position lights indicate dual on May 5, 2019 | : (1) Condition Report 02313285; CV4421 'D' Outboard Main Steam Isolation Valve position lights indicate dual on May 5, 2019 | ||
| Line 147: | Line 181: | ||
==71111.18 - Plant Modifications== | ==71111.18 - Plant Modifications== | ||
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample) | |||
The inspectors evaluated the following temporary or permanent modifications: | The inspectors evaluated the following temporary or permanent modifications: | ||
| Line 155: | Line 187: | ||
==71111.19 - Post-Maintenance Testing== | ==71111.19 - Post-Maintenance Testing== | ||
===Post Maintenance Test Sample (IP Section 03.01) (2 Samples)=== | |||
The inspectors evaluated the following post maintenance tests: | |||
(1) | |||
'A' standby diesel generator 1G031/CW replacement post maintenance testing on April 4, 2019 (2) | |||
'A' residual heat removal service water pump replacement post maintenance testing on June 7, 2019 | |||
==71111.22 - Surveillance Testing== | ==71111.22 - Surveillance Testing== | ||
The inspectors evaluated the following surveillance tests: | |||
=== | ===Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)=== | ||
Containment Isolation Valve Testing (IP Section 03.01)=== | : (1) Surveillance Test Procedure 3.3.6.1-06; PCIS Main Steam Line Isolation Logic System Functional Test on May 7, 2019 | ||
: (1) Surveillance Test Procedure 3.3.6.1-06; PCIS Main Steam Line Isolation Logic System Functional Test on May 7, 2019 | |||
===Surveillance Tests (other) (IP Section 03.01) (2 Samples)=== | ===Surveillance Tests (other) (IP Section 03.01) (2 Samples)=== | ||
| Line 175: | Line 205: | ||
==71114.02 - Alert and Notification System Testing== | ==71114.02 - Alert and Notification System Testing== | ||
===Inspection Review (IP Section 02.01-02.04) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01-02.04)=== | |||
: (1) The inspectors evaluated the following maintenance and testing of the alert and notification system: | : (1) The inspectors evaluated the following maintenance and testing of the alert and notification system: | ||
* Annual siren inspection and maintenance records for the period from April 2017 through April 2019 | * Annual siren inspection and maintenance records for the period from April 2017 through April 2019 | ||
| Line 183: | Line 211: | ||
==71114.03 - Emergency Response Organization Staffing and Augmentation System== | ==71114.03 - Emergency Response Organization Staffing and Augmentation System== | ||
===Inspection Review (IP Section 02.01-02.02) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01-02.02)=== | |||
: (1) The inspectors evaluated the readiness of the Emergency Response Organization. | : (1) The inspectors evaluated the readiness of the Emergency Response Organization. | ||
==71114.05 - Maintenance of Emergency Preparedness== | ==71114.05 - Maintenance of Emergency Preparedness== | ||
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)=== | |||
===Inspection Review (IP Section 02.01 - 02.11)=== | |||
: (1) The inspectors evaluated the maintenance of the emergency preparedness program. | : (1) The inspectors evaluated the maintenance of the emergency preparedness program. | ||
==71114.06 - Drill Evaluation== | ==71114.06 - Drill Evaluation== | ||
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample) | |||
: (1) Emergency Response Organization training drill on May 22, | : (1) Emergency Response Organization training drill on May 22, | ||
==RADIATION SAFETY== | ==RADIATION SAFETY== | ||
==71124.01 - Radiological Hazard Assessment and Exposure Controls== | ==71124.01 - Radiological Hazard Assessment and Exposure Controls== | ||
Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Partial) | |||
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities. | The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities. | ||
(1) | |||
(Partial) | |||
* The inspectors evaluated the adequacy of surveys, radiation protection job coverage and contamination controls for valve work in the hot machine shop. | * The inspectors evaluated the adequacy of surveys, radiation protection job coverage and contamination controls for valve work in the hot machine shop. | ||
==71124.02 - Occupational ALARA Planning and Controls== | ==71124.02 - Occupational ALARA Planning and Controls== | ||
===Radiological Work Planning (IP Section 02.01) (1 Sample)=== | |||
Radiological Work Planning (IP Section 02.01)=== | |||
The inspectors evaluated the licensees radiological work planning. | The inspectors evaluated the licensees radiological work planning. | ||
(1) | |||
* Scaffold work | * Scaffold work | ||
* Electrical maintenance | * Electrical maintenance | ||
* Main steam isolation valves | * Main steam isolation valves | ||
* Refuel floor | * Refuel floor | ||
* In service inspection and flow assisted corrosion exams and support Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02) (1 Sample) | * In service inspection and flow assisted corrosion exams and support | ||
Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02) (1 Sample) | |||
The inspectors evaluated dose estimates and exposure tracking. | The inspectors evaluated dose estimates and exposure tracking. | ||
: (1) The inspectors reviewed the following ALARA planning documents: | : (1) The inspectors reviewed the following ALARA planning documents: | ||
| Line 229: | Line 251: | ||
* 18-MB; Main steam isolation valve inspections and repairs | * 18-MB; Main steam isolation valve inspections and repairs | ||
* 18-R1; Perform refuel floor activities | * 18-R1; Perform refuel floor activities | ||
* 18-S1S2; In service inspection and FAC exams and support The inspectors reviewed the following radiological outcome evaluations: | * 18-S1S2; In service inspection and FAC exams and support | ||
The inspectors reviewed the following radiological outcome evaluations: | |||
* 18-C1; Scaffolds in drywell and balance of plant | * 18-C1; Scaffolds in drywell and balance of plant | ||
* 18-EMISC; Electrical work in drywell and balance of plant | * 18-EMISC; Electrical work in drywell and balance of plant | ||
| Line 236: | Line 260: | ||
==71124.04 - Occupational Dose Assessment== | ==71124.04 - Occupational Dose Assessment== | ||
===Internal Dosimetry (IP Section 02.03) (1 Sample)=== | |||
===Internal Dosimetry (IP Section 02.03)=== | |||
The inspectors evaluated the internal dosimetry program implementation. | The inspectors evaluated the internal dosimetry program implementation. | ||
: (1) Whole Body Counts | : (1) Whole Body Counts | ||
| Line 245: | Line 266: | ||
* 18-002-D | * 18-002-D | ||
* 18-003-D | * 18-003-D | ||
* 18-004-D In-vitro internal monitoring | * 18-004-D | ||
* None available Dose assessments performed using air sampling and DAC-hr monitoring | |||
In-vitro internal monitoring | |||
* None available | |||
Dose assessments performed using air sampling and DAC-hr monitoring | |||
* None available | * None available | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71151 - Performance Indicator Verification | |||
The inspectors verified licensee performance indicators submittals listed below: | |||
BI02: RCS Leak Rate Sample (IP Section 02.11)=== | |||
BI02: RCS Leak Rate Sample (IP Section 02.11) === | |||
{{IP sample|IP=IP 71151|count=1}} | {{IP sample|IP=IP 71151|count=1}} | ||
: (1) Unit 1 (April 1, 2018 through March 31, 2019) | : (1) Unit 1 (April 1, 2018 through March 31, 2019) | ||
EP01: Drill/Exercise Performance (IP Section 02.12) (1 Sample) | |||
: (1) 1st Quarter 2018 - 4th Quarter 2018 | ===EP01: Drill/Exercise Performance (IP Section 02.12) (1 Sample)=== | ||
: (1) 1st Quarter 2018 - 4th Quarter 2018 | |||
===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)=== | ||
: (1) 1st Quarter 2018 - 4th Quarter 2018 EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample) | : (1) 1st Quarter 2018 - 4th Quarter 2018 | ||
: (1) 1st Quarter 2018 - 4th Quarter 2018 OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample) | |||
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)=== | |||
: (1) 1st Quarter 2018 - 4th Quarter 2018 | |||
===OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)=== | |||
: (1) 10/01/2018 - 03/31/2019 | : (1) 10/01/2018 - 03/31/2019 | ||
==71152 - Problem Identification and Resolution== | ==71152 - Problem Identification and Resolution== | ||
===Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)=== | |||
===Annual Follow-Up of Selected Issues (IP Section 02.03)=== | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | ||
: (1) FLEX 480 VAC diesel generator performance issues (Coolant Hose Leak) on May 22, 2019 | : (1) FLEX 480 VAC diesel generator performance issues (Coolant Hose Leak) on May 22, 2019 | ||
: (2) Control building chillers issues on June 27, 2019 | : (2) Control building chillers issues on June 27, 2019 | ||
===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01) === | ===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01)=== | ||
{{IP sample|IP=IP 71153|count=1}} | {{IP sample|IP=IP 71153|count=1}} | ||
: (1) Second stage heater tripped on May 2, 2019 | : (1) Second stage heater tripped on May 2, 2019 | ||
===Event Report (IP Section 03.02) (1 Sample)=== | ===Event Report (IP Section 03.02) (1 Sample)=== | ||
| Line 281: | Line 310: | ||
==INSPECTION RESULTS== | ==INSPECTION RESULTS== | ||
Observation: A Control Building Chiller Issues | Observation: A Control Building Chiller Issues 71152 The inspectors reviewed licensee problem identification and resolution activities associated with the A Control Building Chiller trips over the past 12 months. The licensees corrective action program documented issues associated with the 'A' Control Building Chiller. The licensee executed a plan of action setting up a data collection process by which they could track, prevent, and react to parameter fluctuations with a better understanding of the issue and potential solution(s). The inspectors determined the resolution of the A Control Building Chiller issues were deliberately pursued without any significant reduction of availability of this redundant train of safety equipment. | ||
Observation: FLEX 480 VAC Generator Performance Issues | Observation: FLEX 480 VAC Generator Performance Issues 71152 The inspectors reviewed the licensee's problem identification and resolution activities associated with the FLEX diesel generator coolant leaks over the past 12 months. The licensees corrective action program documented several FLEX diesel generator coolant hose failures and recommended corrective actions. Ultimately the FLEX diesel generator coolant hoses were replaced with upgraded hoses and the procedures associated with testing and walking down the FLEX diesel generators were revised to de-energize the block heaters while stored in the heated FLEX buildings. The licensee causal analysis determined that the failure of the FLEX diesel generator coolant hoses occurred because the original equipment supplier installed non-high temperature heater hoses during original manufacture. Although the inspectors determined there were possible early opportunities to resolve this issue no deviation from the corrective action program standards were identified. | ||
Failure to Notify Radiation Protection of Change In Work Scope Cornerstone | Failure to Notify Radiation Protection of Change In Work Scope Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety | ||
Green NCV 05000331/2019002-01 Open/Closed | |||
[H.4] - | |||
Teamwork 71124.01 The inspectors reviewed a self-revealed finding of very low safety significance (Green) and an associated Non-Cited Violation (NCV) of TS 5.4.1, Procedures, when the licensee failed to implement contamination control procedures when machining a contaminated main steam isolation valve disk without radiation protection knowledge. | |||
=====Description:===== | =====Description:===== | ||
| Line 294: | Line 328: | ||
Corrective Actions: Corrective actions completed included the decontamination of the machine shop as well as distribution of a summary of the event and the lessons learned to site personnel. | Corrective Actions: Corrective actions completed included the decontamination of the machine shop as well as distribution of a summary of the event and the lessons learned to site personnel. | ||
Corrective Action References: CR 02277223, Increased Contamination Found in Hot Machine Shop | Corrective Action References: CR 02277223, Increased Contamination Found in Hot Machine Shop | ||
=====Performance Assessment:===== | =====Performance Assessment:===== | ||
| Line 316: | Line 350: | ||
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy. | Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy. | ||
Failure to Manage Outage Risk Activities Cornerstone | Failure to Manage Outage Risk Activities Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events | ||
Green FIN 05000331/2019002-02 Open/Closed | |||
[H.5] - Work Management 71153 A self-revealed finding of very low safety significance (i.e., Green) was identified for the licensees failure to have appropriately managed risk activity as required by WM-AA-100-1000, Work Activity Risk Management, Revision 16. Specifically, plant personnel failed to reevaluate risk when a change in work scope occurred during outage work activities. | |||
=====Description:===== | =====Description:===== | ||
| Line 329: | Line 367: | ||
Corrective Actions: The licensee completed repairs through an engineering change and hard piping the failed control air filter bowl. The licensee also entered an action to revise component criticality for in-line air filters that could cause a plant transient or unplanned limiting condition for operability as single point vulnerabilities in keeping with the licensee's work activity risk management process. | Corrective Actions: The licensee completed repairs through an engineering change and hard piping the failed control air filter bowl. The licensee also entered an action to revise component criticality for in-line air filters that could cause a plant transient or unplanned limiting condition for operability as single point vulnerabilities in keeping with the licensee's work activity risk management process. | ||
Corrective Action References: Condition Report 2311443; Manual Reactor Scram Due to Lowering Reactor Water Level | Corrective Action References: Condition Report 2311443; Manual Reactor Scram Due to Lowering Reactor Water Level | ||
=====Performance Assessment:===== | =====Performance Assessment:===== | ||
| Line 340: | Line 378: | ||
Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed the significance of the finding using IMC 0609, Attachment 4, Initial Characterization of Findings, dated October 7, 2016; and IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, dated June 19, 2012. Using Exhibit 1, Initiating Event Screen Questions, the inspectors determined that the finding caused a reactor trip and required a detailed risk evaluation. | Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed the significance of the finding using IMC 0609, Attachment 4, Initial Characterization of Findings, dated October 7, 2016; and IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, dated June 19, 2012. Using Exhibit 1, Initiating Event Screen Questions, the inspectors determined that the finding caused a reactor trip and required a detailed risk evaluation. | ||
The Senior Reactor Analysts performed a detailed risk evaluation using a recently updated Duane Arnold Standardized Plant Analysis Risk Model. The model was recently revised to update the late injection function and will become the model of record, version 8.55. The Senior Reactor Analysts evaluated the event using the transient event tree rather than the loss of main feedwater event tree because main feedwater was recoverable from the main control room and could support early injection if successfully recovered, a function that was not modeled in the loss of main feedwater event tree. The Senior Reactor Analysts set the transient initiating event frequency to 1.0 because the performance deficiency resulted in a transient event. Early feedwater recovery was modeled by modifying the basic event MFW-XHE-XO-ERROR, Operator fails to maintain feedwater injection and late feedwater recovery was modeled using the basic event PCS-XHE-XL-TRAN, Operator fails to recover PCS | The Senior Reactor Analysts performed a detailed risk evaluation using a recently updated Duane Arnold Standardized Plant Analysis Risk Model. The model was recently revised to update the late injection function and will become the model of record, version 8.55. The Senior Reactor Analysts evaluated the event using the transient event tree rather than the loss of main feedwater event tree because main feedwater was recoverable from the main control room and could support early injection if successfully recovered, a function that was not modeled in the loss of main feedwater event tree. The Senior Reactor Analysts set the transient initiating event frequency to 1.0 because the performance deficiency resulted in a transient event. Early feedwater recovery was modeled by modifying the basic event MFW-XHE-XO-ERROR, Operator fails to maintain feedwater injection and late feedwater recovery was modeled using the basic event PCS-XHE-XL-TRAN, Operator fails to recover PCS | ||
[power conversion system] during Trans. The value of the early main feedwater recovery basic event was set to 2.2E-2. This basic event was estimated using Standardized Plant Analysis Risk Model-H, the NRCs method for human reliability analysis. The only performance shaping factor that was determined to be a performance driver was stress which was evaluated as high. The late recovery of the power conversion system basic event was modified to a value of 1E-3. For this basic event, the Senior Reactor Analysts assumed the operator failure would be dominated by action and the performance shaping factors were nominal. The basic event MSS-MSV-OC-STEAM, Steam Isolation Valves fail to remain open was set to True because the main steam isolation valves were closed by operators during the event. Recovery of the power conversion system includes re-opening the MSIVs and recovering main feedwater. | [power conversion system] during Trans. The value of the early main feedwater recovery basic event was set to 2.2E-2. This basic event was estimated using Standardized Plant Analysis Risk Model-H, the NRCs method for human reliability analysis. The only performance shaping factor that was determined to be a performance driver was stress which was evaluated as high. The late recovery of the power conversion system basic event was modified to a value of 1E-3. For this basic event, the Senior Reactor Analysts assumed the operator failure would be dominated by action and the performance shaping factors were nominal. The basic event MSS-MSV-OC-STEAM, Steam Isolation Valves fail to remain open was set to True because the main steam isolation valves were closed by operators during the event. Recovery of the power conversion system includes re-opening the MSIVs and recovering main feedwater. | ||
| Line 362: | Line 400: | ||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection Type | Inspection | ||
Procedure | |||
71111.01 | Type | ||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
71111.01 | |||
Corrective Action | |||
Documents | Documents | ||
Miscellaneous | Abnormal Operating Procedure 903; Severe Weather | ||
OP-AA-102-1002; Seasonal Readiness | Miscellaneous | ||
71111.04 | 2019 DAEC Seasonal Readiness Certification Letter | ||
Miscellaneous | 05/24/19 | ||
Procedures | OP-AA-102-1002; Seasonal Readiness | ||
Chiller Operability Including Operation at Reduced Loading | 71111.04 | ||
Control Building HVAC System Electrical Line-Up | Drawings | ||
Operating Instruction 730 Control Building HVAC System | BECH-M122 | ||
Surveillance Test Procedure 3.7.5-03 Control Building Chiller | P&ID High Pressure Coolant Injection System Steam Side | ||
Miscellaneous | |||
BECH-M123 | |||
P&ID High Pressure Coolant Injection Water Side | |||
Procedures | |||
Surveillance Test Procedure 3.7.5-03A A Control Building | |||
Chiller Operability Including Operation at Reduced Loading | |||
Control Building HVAC System Electrical Line-Up | |||
Operating Instruction 730 Control Building HVAC System | |||
130 | |||
Surveillance Test Procedure 3.7.5-03 Control Building Chiller | |||
Operability Including Operation at Reduced Loading | Operability Including Operation at Reduced Loading | ||
OI-152 | OI-152 | ||
Operating Instruction High Pressure Coolant Injection | |||
System | System | ||
71111.05Q Fire Plans | 119 | ||
PFP-OS-757 | 71111.05Q Fire Plans | ||
PFP-PH-757 | PFP-OE-757 | ||
PFP-RB-812 | Pre-Fire Plan OAG-PA East Elevation 757 | ||
PFP-RB-833 | PFP-OS-757 | ||
PFP-RB-855 | Pre-Fire Plans OAG-PA South Elevation 757 | ||
Procedures | PFP-PH-757 | ||
71111.06 | Pre-Fire Plans Pump House | ||
PFP-RB-812 | |||
Summary and Note Book | Pre-Fire Plans Reactor Building Elevation 812 | ||
DAEC-PSA-IF-10; Internal Flood Analysis Volume 2 of 2 | PFP-RB-833 | ||
Pre-Fire Plan Reactor Building Elevation 833 | |||
PFP-RB-855 | |||
Pre-Fire Plans Reactor Building Elevation 855 | |||
Procedures | |||
ACP 1412.2 | |||
Control of Combustibles | |||
71111.06 | |||
Corrective Action | |||
Documents | |||
Bases-EOP 3; Secondary Containment Control Guideline | |||
DAEC-PSA-IF-10; Internal Flood Analysis Volume 1 of 2 | |||
Summary and Note Book | |||
DAEC-PSA-IF-10; Internal Flood Analysis Volume 2 of 2 | |||
Flood Walkdown | Flood Walkdown | ||
71111.07A | 71111.07A | ||
Work Orders | |||
River Water Supply Pump House Stilling Basin Inspect and | |||
Clean | Clean | ||
71111.11Q Corrective Action | 71111.11Q Corrective Action | ||
Documents | |||
IPOI-3; Power Operations | Reactivity Management Plan Plant Down Power Sequence | ||
Inspection Type | Exchange | ||
04/02/2019 | |||
71111.12 | IPOI-3; Power Operations | ||
Aux Relate Temperature High | 160 | ||
CR 02314135; Arcing from 1K010B 'A' D/G A/C Air | |||
Compressor during Start | Inspection | ||
CR 02308401; A Standby Diesel Generator Aux Relate | Procedure | ||
Temperature High | Type | ||
CR 2314592; BECH-E105 not Updated per EMA A103647 | Designation | ||
Engineering | Description or Title | ||
Revision or | |||
Date | |||
71111.12 | |||
Condition Report 02308401; 'A' Standby Diesel Generator | |||
Aux Relate Temperature High | |||
CR 02314135; Arcing from 1K010B 'A' D/G A/C Air | |||
Compressor during Start | |||
CR 02308401; A Standby Diesel Generator Aux Relate | |||
Temperature High | |||
CR 2314592; BECH-E105 not Updated per EMA A103647 | |||
Engineering | |||
Changes | Changes | ||
Work Orders | EC 2314592; Replacement of 1K010B-M with New Motor | ||
Establish IST Reference Values | Work Orders | ||
Work Request 94194131; Arcing from 1K010B 'A' D/G A/C | Work Order 40647491; Replace 'A' RHRSW Pump and | ||
Air Compressor during Start | Establish IST Reference Values | ||
Work Order 40657678; 'A' Standby Diesel Generator | |||
Work Request 94194131; Arcing from 1K010B 'A' D/G A/C | |||
Air Compressor during Start | |||
Work Order 40657678; 'A' Standby Diesel Generator | |||
1G031/CW Replacement | 1G031/CW Replacement | ||
71111.13 | 71111.13 | ||
Corrective Action | |||
Work Request 94191917; 'B' Rod Block Monitor Averaging | Documents | ||
Card | Work Request 94191916; 'A' Rod Block Monitor Averaging | ||
Card | |||
CR 02307849 'A' Rod Block Monitor Anomalous Behavior | |||
CR 02307896 'B' Rod Block Monitor Anomalous Behavior | Work Request 94191917; 'B' Rod Block Monitor Averaging | ||
Miscellaneous | Card | ||
'A' and 'B' Rod Block Monitor Work Plant | |||
CR 02307849 | |||
'A' Rod Block Monitor Anomalous Behavior | |||
CR 02307896 | |||
'B' Rod Block Monitor Anomalous Behavior | |||
Miscellaneous | |||
Work Request 94193937; Annunciator Horn for 1C05, 1C04, | |||
and 1C03 will not Turn Off | and 1C03 will not Turn Off | ||
Work Orders | Work Orders | ||
Work Order 4066335; MSR Drain Tank Temporary Valve | |||
Control | Control | ||
71111.15 | 71111.15 | ||
Corrective Action | |||
Steam Isolation Valve Position Lights Indicate Dual | Documents | ||
BECH-E820<3>; Main Steam Isolation Valve Solenoid Valve | DAEC Operations Logbook | ||
and Position SW. Conn. Diagram | |||
APED-A71-003<11>; Elementary Diagram Nuclear Steam | Condition Report 02313285; CV 4421 D Outboard Main | ||
Steam Isolation Valve Position Lights Indicate Dual | |||
BECH-E820<3>; Main Steam Isolation Valve Solenoid Valve | |||
and Position SW. Conn. Diagram | |||
APED-A71-003<11>; Elementary Diagram Nuclear Steam | |||
Supply Shutoff System | |||
APED-A71-003<11A>; Elementary Diagram Nuclear Steam | |||
Inspection | |||
Procedure | |||
Type | |||
Designation | |||
Description or Title | |||
Revision or | |||
Date | |||
Supply Shutoff System | Supply Shutoff System | ||
Technical Specification 3.3.3.1; Post Accident Monitoring | |||
Instrumentation (and Bases); Amendment 25 | |||
DAEC Operations Logbook; June 13-June 17, 2019 | |||
Technical Specification 3.3.3.1; Post Accident Monitoring | |||
Instrumentation (and Bases); Amendment 25 | Technical Specification 3.3.3.1; Post Accident Monitoring | ||
DAEC Operations Logbook; June 13-June 17, 2019 | |||
Technical Specification 3.3.3.1; Post Accident Monitoring | |||
Instrument (and Bases); Amendment 25 | Instrument (and Bases); Amendment 25 | ||
71111.18 | 71111.18 | ||
BECH-M169 sh.<4> | Drawings | ||
Engineering | BECH-M144<1> | ||
06/19/2019 | |||
BECH-M169 sh.<4> | |||
06/19/2019 | |||
Engineering | |||
Changes | Changes | ||
71111.19 | Non-Essential Chiller | ||
1G031/CW Replacement | 71111.19 | ||
Work Order 40647491; Replace 'A' RHRSW Pump and | Work Orders | ||
Work Order 40657678; 'A' Standby Diesel Generator | |||
1G031/CW Replacement | |||
Work Order 40647491; Replace 'A' RHRSW Pump and | |||
Establish IST Reference Values | Establish IST Reference Values | ||
71111.22 | 71111.22 | ||
Corrective Action | |||
Procedures | Documents | ||
Surveillance Test Procedure 3.3.6.1-06; PCIS Main Steam | |||
Line Isolation Logic System Functional Test | |||
Procedures | |||
Surveillance Test Procedure 3.1.7-04; Standby Liquid | |||
Control Pump Test and Comprehensive Pump Test | Control Pump Test and Comprehensive Pump Test | ||
STP 3.5.1-10 | STP 3.5.1-10 | ||
HPCI System Operability Test and Comprehensive Pump | |||
Test | Test | ||
STP NS520001 | STP NS520001 | ||
71114.02 | HPCI System Leakage Inspection Walkdown | ||
71114.02 | |||
CR 02258158 | Corrective Action | ||
Documents | |||
CR 02222088 | |||
Create Work Order for 2017 Siren Replacements | |||
CR 02239448 | |||
Siren 07C (1301) Inoperable for December Monthly Test | |||
CR 02258158 | |||
Large Number of Amplifier Failures for April 2018 Monthly | |||
Test | Test | ||
Miscellaneous | Miscellaneous | ||
Annual Siren Inspection and Maintenance Records | |||
04/01/2017 - | |||
04/01/2019 | 04/01/2019 | ||
Monthly Alert Notification System (Siren) Test Results | Monthly Alert Notification System (Siren) Test Results | ||
04/01/2017 - | |||
04/01/2019 | 04/01/2019 | ||
FEMA Letter | FEMA Letter | ||
FEMA Letter | Duane Arnold Route Alerting Approval Letter | ||
FEMA REP-10 | 2/17/2012 | ||
Design Report | FEMA Letter | ||
Approval of DAEC Public Information Program Modification | |||
2/04/2019 | |||
FEMA REP-10 | |||
Design Report | |||
Appendix P | Appendix P | ||
Duane Arnold Energy Center Outdoor Warning System/Alert | |||
and Notification System (ANS) Upgrade Project | |||
01/06/2009 | |||
71114.02 Miscellaneous | 71114.02 | ||
Miscellaneous | |||
Iowa Homeland | |||
Security and | Security and | ||
Emergency | Emergency | ||
Management | Management | ||
Agency Letter | Agency Letter | ||
P100002777 | DAEC Siren Control Upgrade Project | ||
Procedures | 05/24/2018 | ||
GMP-ELEC-34 | P100002777 | ||
GMP-ELEC-34, | ANS Public Information Postcard | ||
01/01/2019 | |||
Procedures | |||
EPDM 1013 | |||
Emergency Siren (ANS) and Siren Sign Program | |||
GMP-ELEC-34 | |||
Whelan High Power Voice and Siren System | |||
GMP-ELEC-34, | |||
Section A | Section A | ||
GMP-ELEC-34, | Siren Inspection | ||
GMP-ELEC-34, | |||
Section B | Section B | ||
GMP-ELEC-34, | Voice and Siren Testing | ||
GMP-ELEC-34, | |||
Section C | Section C | ||
71114.03 Corrective Action CR 02214832 | Repair and Troubleshooting | ||
71114.03 | |||
Miscellaneous | Corrective Action | ||
Documents | |||
CR 02214832 | |||
EP Audit - Five ERO Positions are not 3 Deep | |||
CR 02274504 | |||
EP Procedures Conflict with Emergency Plan | |||
Miscellaneous | |||
ERO Augmentation Call In Drill Reports | |||
04/01/2017 - | |||
04/01/2019 | 04/01/2019 | ||
DAEC ERO Team Roster | DAEC ERO Team Roster | ||
ERO Member Training/Qualification Records (sample - 20 | 03/27/2019 | ||
ERO Member Training/Qualification Records (sample - 20 | |||
records) | records) | ||
Quarterly ERO Call-In Drill Reports | 05/01/2019 | ||
Quarterly ERO Call-In Drill Reports | |||
2nd Quarter | |||
2017 - 1st | 2017 - 1st | ||
Quarter 2019 | Quarter 2019 | ||
Procedures | Procedures | ||
DAEC | |||
Emergency Plan, | Emergency Plan, | ||
Section H | Section H | ||
EP-AA-107 | Emergency Facilities Staffing, Activation and Equipment | ||
EP-AA-107 | |||
Fleet Emergency Response Organization (ERO) Training | |||
Program | Program | ||
EPDM 1009 | EPDM 1009 | ||
Emergency Response Organization (ERO) Training and | |||
Qualification Program | Qualification Program | ||
EPDM 1016 | EPDM 1016 | ||
EPIP 6.1 | ERO Augmentation Drill and Testing Program | ||
Self-Assessments | EPIP 6.1 | ||
71114.05 Corrective Action CR 02206959 | Drill and Exercise Program | ||
Documents | Self-Assessments | ||
CR 02215168 | DAEC On-Shift Staffing Analysis | ||
CR 02258889 | 71114.05 | ||
CR 02305686 | Corrective Action | ||
CR 2206954 | CR 02206959 | ||
17TD2SIM -CAQ - Controller Deficiencies | |||
Documents | |||
CR 02207927 | |||
Controller Prompting During Tabletop | |||
CR 02215168 | |||
State and County Concerns for Emergency Planning | |||
CR 02258889 | |||
All Call Phone System Server Issues | |||
CR 02305686 | |||
19TD1-CR Event Response Team Pagers did not Activate | |||
CR 2206954 | |||
Shift Communicator Identified Incorrect EAL to Simulated Off | |||
Site | Site | ||
PCR 02299716 | PCR 02299716 | ||
RWT 2249730 | DAEC Plan "G" - Public Education and Information | ||
Miscellaneous | RWT 2249730 | ||
2018 Emergency Planning Generic RWT | |||
Miscellaneous | |||
KLD TR-993 | |||
Duane Arnold Energy Center 2018 Population Update | |||
Analysis | Analysis | ||
KLD-TR-910 | 03/08/2018 | ||
KLD-TR-910 | |||
Duane Arnold Energy Center Development of Evacuation | |||
Time Estimates for Revised EPZ Boundary | Time Estimates for Revised EPZ Boundary | ||
Procedures | 03/09/2017 | ||
EP-AA-100-1001 Guidelines for Maintaining Emergency Preparedness | Procedures | ||
EPIP 6.2 | DAEC Emergency Plan | ||
EP-AA-100-1001 | |||
Guidelines for Maintaining Emergency Preparedness | |||
EPIP 6.2 | |||
Maintenance of Emergency Response Facilities and | |||
Equipment | Equipment | ||
Self-Assessments | Self-Assessments | ||
2018 DAEC Onsite Medical Drill After-Action | |||
Report/Improvement Plan | Report/Improvement Plan | ||
KLD-1071 | 2/04/18 | ||
NEP#-2017-007 | KLD-1071 | ||
NEP#-2017-014 | 2019 Population Update Analysis | ||
NEP#-2017-017 | 03/07/2019 | ||
NEP#-2018-006 | NEP#-2017-007 | ||
NEP#-2018-008 | 2017 ERO Training Drill #1_Rev 1 | ||
NEP#-2018-011 | 07/25/2017 | ||
PDA 17-004 | NEP#-2017-014 | ||
2017 ERO Training Drill #2_Rev 1 | |||
08/10/2017 | |||
NEP#-2017-017 | |||
2017 Off Year Exercise (OEX) Report | |||
09/29/2017 | |||
NEP#-2018-006 | |||
2018 Dress Rehearsal (18DR) | |||
04/07/2018 | |||
NEP#-2018-008 | |||
2018 Exercise (18EX) Final Report | |||
05/21/2018 | |||
NEP#-2018-011 | |||
2018 Drill (18TD1) Final Report | |||
07/25/2018 | |||
PDA 17-004 | |||
DAEC Nuclear Assurance Report - Emergency | |||
Preparedness | Preparedness | ||
PDA 18-007 | 07/20/2017 | ||
PDA 18-007 | |||
DAEC Nuclear Assurance Report - Emergency | |||
Preparedness | Preparedness | ||
71114.06 Miscellaneous | 08/13/2018 | ||
Drill/Exercise Program | 71114.06 | ||
NRC Form 361; Reactor Plant Event Notification Worksheet | Miscellaneous | ||
Note-05; Duane Arnold Energy Center Emergency | Duane Arnold Energy Center Training Drill 19TD2 | ||
Drill/Exercise Program | |||
NRC Form 361; Reactor Plant Event Notification Worksheet | |||
Note-05; Duane Arnold Energy Center Emergency | |||
Notification | Notification | ||
71124.01 Corrective Action AR 02277223 | 71124.01 | ||
Corrective Action | |||
AR 02277223 | |||
Increased Contamination Found In Hot Machine Shop | |||
Documents | Documents | ||
Procedures | Procedures | ||
Radiation | RP-AA-100-1002 | ||
Radiation Worker Instruction and Responsibilities | |||
PDA-M- | Radiation | ||
Surveys | |||
PDA-M- | |||
20180822-3 | |||
Hot Machine Shop Contamination Survey | |||
08/22/2018 | |||
PDA-M- | |||
20180823-1 | 20180823-1 | ||
Radiation Work | Main Steam Isolation Valve Piston Contamination Follow Up | ||
08/23/2018 | |||
Radiation Work | |||
Permits (RWPs) | Permits (RWPs) | ||
71124.02 ALARA Plans | 18-0051 | ||
18-EMISC | Routine Work and Inspections | ||
18-MB | 71124.02 | ||
18-R1 | ALARA Plans | ||
18-S1S2 | 18-C1 | ||
Scaffolds in Drywell and Balance of Plant | |||
18-EMISC | |||
Electrical work in Drywell and Balance of Plant | |||
18-MB | |||
Main Steam Isolation Valve Inspections and Repairs | |||
18-R1 | |||
Refuel Floor Activities | |||
18-S1S2 | |||
In Service Inspection and Flow Assisted Corrosion Exams | |||
and Support | and Support | ||
71124.04 Calculations | 71124.04 | ||
Engineering | Calculations | ||
Calculation 18- | Radiological | ||
Engineering | |||
Calculation 18- | |||
001-D | 001-D | ||
Estimating the Committed Effective Dose Equivalent | |||
Exposure to Individual #1 in Main Steam Isolation Valve | |||
Calculation 18- | Machining Event | ||
08/27/2018 | |||
Radiological | |||
Engineering | |||
Calculation 18- | |||
2-D | 2-D | ||
Estimating Committed Effective Dose Equivalent Exposure | |||
to Individual #2 in Main Steam Isolation Valve Machining | |||
Event | |||
08/27/2018 | |||
Radiological | |||
Engineering | |||
Calculation 18- | Calculation 18- | ||
003-D | 003-D | ||
Estimating Committed Effective Dose Equivalent Exposure | |||
to Individual #1 in Reactor Head Seal Event | |||
09/21/2018 | |||
Radiological | |||
Engineering | |||
Calculation 18- | Calculation 18- | ||
004-D | 004-D | ||
Calibration | Estimating Committed Effective Dose Equivalent Exposure | ||
to Individual #2 in Reactor Head Seal Event | |||
Fastscan Whole Body Counter Calibration Report | 09/21/2018 | ||
Procedures | Calibration | ||
Records | |||
Fastscan Whole Body Counter Quality Assurance Sample | |||
Report | |||
08/23/2018 - | |||
09/20/2018 | |||
Fastscan Whole Body Counter Calibration Report | |||
10/03/2017 | |||
Procedures | |||
HPP 3104.02 | |||
Personnel Contamination Monitoring, Whole Body Counting | |||
and Decontamination | and Decontamination | ||
HPP 3109.72 | HPP 3109.72 | ||
Radiation | Operation of FastScan Whole Body Counter | ||
Sample 18-514 Refuel Floor High Contamination Area Gamma Analysis | Radiation | ||
71151 Corrective Action CR 2246165 | Surveys | ||
GEL Sample ID | |||
CR 2246166 | 2167001 | ||
LIA 2283966 | GEL Laboratories Radiological Certificate of Analysis | ||
Miscellaneous | 11/15/2018 | ||
Sample 18-514 | |||
Refuel Floor High Contamination Area Gamma Analysis | |||
09/20/2018 | |||
71151 | |||
Corrective Action | |||
Documents | |||
CR 2246165 | |||
Level 1 Assessment - Drill and Exercise Performance | |||
(DEP-PI) | |||
CR 2246166 | |||
Potential Trend - DEP-PI Recovery Plan | |||
LIA 2283966 | |||
LIA: Review Recent PB DEP-PI Failure | |||
Miscellaneous | |||
NRC Performance Indicator Data; Emergency Preparedness | |||
- Drill/Exercise Performance | |||
1st Quarter | |||
2018 - 4th | |||
Quarter 2018 | Quarter 2018 | ||
NRC Performance Indicator Data; Emergency Preparedness | NRC Performance Indicator Data; Emergency Preparedness | ||
- ERO Readiness | |||
1st Quarter | |||
2018 - 4th | |||
Quarter 2018 | Quarter 2018 | ||
NRC Performance Indicator Data; Emergency Preparedness | NRC Performance Indicator Data; Emergency Preparedness | ||
- Alert and Notification System Reliability | |||
1st Quarter | |||
2018 - 4th | |||
Quarter 2018 | Quarter 2018 | ||
NG-001L | NG-001L | ||
NRC PI Data Calculation, Review and Approval, for Second | |||
Quarter 2018 through First Quarter 2019 | Quarter 2018 through First Quarter 2019 | ||
Procedures | Procedures | ||
- | |||
EPDM | |||
1010 | 1010 | ||
71152 Corrective Action | EP Department Performance Indicators | ||
71152 | |||
Leak | Corrective Action | ||
CR 02270741; 'A' FLEX Diesel Engine Block Heater Hose | Documents | ||
Failure | CR 02249054; 'A' & 'B' FLEX Diesel Block Heater | ||
CR 02307857; Trend-FLEX 480 VAC Generator | |||
Performance Issues | CR 02307659; 'B' FLEX Diesel Generator Major Coolant | ||
CR 02273618; 'A' FLEX Diesel Generator Water Hose | Leak | ||
Replacement | |||
CR 02273619; 'B' FLEX Diesel Generator Water Hose | CR 02270741; 'A' FLEX Diesel Engine Block Heater Hose | ||
Replacement | Failure | ||
NS240502A; FLEX 480VAC Diesel Generator 1G101A | |||
Functional Test | CR 02307857; Trend-FLEX 480 VAC Generator | ||
NS240502B; FLEX 480VAC Diesel Generator 1G101B | Performance Issues | ||
Functional Test | |||
NS240503; FLEX Diesel Generator Monthly Walkdown | CR 02273618; 'A' FLEX Diesel Generator Water Hose | ||
NS240506A; FLEX 480VAC Diesel Generator 1G10A Load | Replacement | ||
Test | |||
NS240506B; FLEX 480VAC Diesel Generator 1G10B Load | CR 02273619; 'B' FLEX Diesel Generator Water Hose | ||
Test | Replacement | ||
ER02307857; Trend-FLEX 480 VAC Generator Performance | |||
NS240502A; FLEX 480VAC Diesel Generator 1G101A | |||
Functional Test | |||
NS240502B; FLEX 480VAC Diesel Generator 1G101B | |||
Functional Test | |||
NS240503; FLEX Diesel Generator Monthly Walkdown | |||
NS240506A; FLEX 480VAC Diesel Generator 1G10A Load | |||
Test | |||
NS240506B; FLEX 480VAC Diesel Generator 1G10B Load | |||
Test | |||
ER02307857; Trend-FLEX 480 VAC Generator Performance | |||
Issues | Issues | ||
Procedures | Procedures | ||
Work Orders | MA-AA-100-1011-F03 | ||
Work Order 40616626-01; Monthly Inspection with ESW | Work Orders | ||
Work Order 40610900-01; Quality Record | |||
Work Order 40616626-01; Monthly Inspection with ESW | |||
Secured | Secured | ||
71153 Corrective Action Abnormal Operating Procedure 255.2 Power/Reactivity | 71153 | ||
Corrective Action | |||
1C07B Moisture Separator Re-heater Second Stage Drain | Documents | ||
Tanks 1T-92A to 1T-92B Pressure Differential High | Abnormal Operating Procedure 255.2 Power/Reactivity | ||
Operating Shift Logs; May 1, 2019 | Abnormal Change | ||
Operating Shift White Paper on Moisture Separator Drain | |||
Tank High dp | 1C07B Moisture Separator Re-heater Second Stage Drain | ||
BECH-E108<004A>; Steam and Condensate System | Tanks 1T-92A to 1T-92B Pressure Differential High | ||
BECH-M104<2>; Feedwater Heaters 1E003A, 4A, 5A, 6A | |||
Miscellaneous | Operating Shift Logs; May 1, 2019 | ||
MA-AA-100; Conduct of Maintenance | |||
WM-AA-200; Work Management Process Overview | Operating Shift White Paper on Moisture Separator Drain | ||
WM-AA-100-1000; Work Activity Risk Management | Tank High dp | ||
EN-54012; DAEC Loss of Feed Reactor Trip | |||
Event Notification #54012; Loss of Feed Water Trip | BECH-E108<004A>; Steam and Condensate System | ||
BECH-M104<2>; Feedwater Heaters 1E003A, 4A, 5A, 6A | |||
Miscellaneous | |||
Work Order 40488545-01; 1C80 Repair Leak Issue | |||
MA-AA-100; Conduct of Maintenance | |||
WM-AA-200; Work Management Process Overview | |||
WM-AA-100-1000; Work Activity Risk Management | |||
EN-54012; DAEC Loss of Feed Reactor Trip | |||
Event Notification #54012; Loss of Feed Water Trip | |||
04/20/2019 | |||
}} | }} | ||
Latest revision as of 19:45, 4 January 2025
| ML19214A109 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 08/01/2019 |
| From: | Billy Dickson NRC/RGN-III |
| To: | Dean Curtland Nextera Energy |
| References | |
| IR 2019002 | |
| Download: ML19214A109 (26) | |
Text
August 1, 2019
SUBJECT:
DUANE ARNOLD ENERGY CENTERINTEGRATED INSPECTION REPORT 05000331/2019002
Dear Mr. Curtland:
On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Duane Arnold Energy Center. On July 11, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Two findings of very low safety significance (Green) are documented in this report. One of these findings involved violations of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Duane Arnold.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Duane Arnold. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Billy Dickson, Chief Branch 2 Division of Reactor Projects
Docket No. 05000331 License No. DPR-49
Enclosure:
As stated
Inspection Report
Docket Number:
05000331
License Number:
Report Number:
Enterprise Identifier: I-2019-002-0067
Licensee:
NextEra Energy Duane Arnold, LLC
Facility:
Duane Arnold Energy Center
Location:
Palo, Iowa
Inspection Dates:
April 01, 2019 to June 30, 2019
Inspectors:
B. Bartlett, Project Engineer
J. Beavers, Senior Resident Inspector
G. Hansen, Sr. Emergency Preparedness Inspector
D. Johnson, Sr. Emergency Preparedness Specialist
V. Myers, Senior Health Physicist
C. Norton, Senior Resident Inspector
T. Ospino, Reactor Engineer
J. Rutkowski, Project Engineer
Approved By:
Billy Dickson, Chief
Branch 2
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Duane Arnold Energy Center in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Notify Radiation Protection of Change In Work Scope Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety Green NCV 05000331/2019002-01 Open/Closed
[H.4] - Teamwork 71124.01 The inspectors reviewed a self-revealed finding of very low safety significance (Green) and an associated Non-Cited Violation (NCV) of TS 5.4.1, Procedures, when the licensee failed to implement contamination control procedures when machining a contaminated main steam isolation valve disk without radiation protection knowledge.
Failure to Manage Outage Risk Activities Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000331/2019002-02 Open/Closed
[H.5] - Work Management 71153 A self-revealed finding of very low safety significance (i.e., Green) was identified for the licensees failure to have appropriately managed risk activity as required by WM-AA-100-1000, Work Activity Risk Management, Revision 16. Specifically, plant personnel failed to reevaluate risk when a change in work scope occurred during outage work activities.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000331/2019-001-
LER 2019-001-00 for Duane Arnold Energy Center,
Manual Reactor Scram Due to Lowering Reactor Water Level 71153 Closed
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On April 13, 2019, the unit was down powered to 50 percent for a control rod sequence exchange. The unit was returned to rated thermal power on April 13, 2019. On April 20, 2019, the unit was manually shut down due to a loss of feedwater transient. The unit returned to rated thermal power on April 27, 2019, and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Summer Readiness Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated summer readiness of offsite and alternate alternating current power systems on June 4, 2019
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) High pressure coolant injection system following maintenance on April 18, 2019 (2)
'A' core spray system on June 7, 2019
71111.04S - Equipment Alignment
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) Control building chilled water system on June 25, 2019
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (6 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Fire Zone OAG-PA East on April 9, 2019
- (2) Fire Zone 16A, B, C, D, and E (Pump House) on April 9, 2019
- (3) Fire Zone OAG-PA South on April 9, 2019
- (4) Fire Zone 4A and B (Reactor Building Elevation 812') on April 10, 2019
- (5) Fire Zone 6A (Reactor Building Elevation 855') on April 10, 2019
- (6) Fire Zone 5C (Reactor Building Elevation 833') on April 10, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Reactor Building on June 4, 2019
71111.07A - Heat Sink Performance
Annual Review (IP Section 02.01) (1 Sample)
The inspectors evaluated readiness and performance of:
(1)
'B' residual heat removal service water and emergency service water stilling basin on June 19, 2019
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated a reactor plant power evolution and rod sequence exchange on April 14, 2019
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification activity on April 16, 2019
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (3 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
(1)
'A' standby diesel generator aux cooling water relay on April 4, 2019 (2)
'B' diesel generator air compressor on May 28, 2019 (3)
'A' residual heat removal service water pump replacement on June 5, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(1)
'A' and 'B' rod block monitor emergency work activities on May 8, 2019
- (2) Control room annunciator emergency work activities on May 12, 2019 (3)
'B' moisture separator reheater drain tank drain valve emergent work activities on June 5, 2019
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 02.02) (2 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Condition Report 02313285; CV4421 'D' Outboard Main Steam Isolation Valve position lights indicate dual on May 5, 2019
- (2) Condition Report 02317794; Torus Containment Post Accident Monitor on June 25, 2019
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Control building chiller on June 26, 2019
71111.19 - Post-Maintenance Testing
Post Maintenance Test Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated the following post maintenance tests:
(1)
'A' standby diesel generator 1G031/CW replacement post maintenance testing on April 4, 2019 (2)
'A' residual heat removal service water pump replacement post maintenance testing on June 7, 2019
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)
- (1) Surveillance Test Procedure 3.3.6.1-06; PCIS Main Steam Line Isolation Logic System Functional Test on May 7, 2019
Surveillance Tests (other) (IP Section 03.01) (2 Samples)
- (1) High Pressure Coolant Injection System Operability Test following maintenance on April 17, 2019
- (2) Field portions of Standby Liquid Control Pump Test and Comprehensive Pump Test on May 30, 2019
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
- (1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
- Annual siren inspection and maintenance records for the period from April 2017 through April 2019
- Monthly alert notification system (siren) tests for the period from April 2017 through April 2019
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspectors evaluated the readiness of the Emergency Response Organization.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the maintenance of the emergency preparedness program.
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
- (1) Emergency Response Organization training drill on May 22,
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Partial)
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.
(1)
(Partial)
- The inspectors evaluated the adequacy of surveys, radiation protection job coverage and contamination controls for valve work in the hot machine shop.
71124.02 - Occupational ALARA Planning and Controls
Radiological Work Planning (IP Section 02.01) (1 Sample)
The inspectors evaluated the licensees radiological work planning.
(1)
- Scaffold work
- Electrical maintenance
- Refuel floor
- In service inspection and flow assisted corrosion exams and support
Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02) (1 Sample)
The inspectors evaluated dose estimates and exposure tracking.
- (1) The inspectors reviewed the following ALARA planning documents:
- 18-C1; Scaffolds in drywell and balance of plant
- 18-EMISC; Electrical work in drywell and balance of plant
- 18-MB; Main steam isolation valve inspections and repairs
- 18-R1; Perform refuel floor activities
- 18-S1S2; In service inspection and FAC exams and support
The inspectors reviewed the following radiological outcome evaluations:
- 18-C1; Scaffolds in drywell and balance of plant
- 18-EMISC; Electrical work in drywell and balance of plant
- 18-MB; main steam isolation valve inspections and repairs
- 18-S1S2; In service inspection and flow assisted corrosion exams and support
71124.04 - Occupational Dose Assessment
Internal Dosimetry (IP Section 02.03) (1 Sample)
The inspectors evaluated the internal dosimetry program implementation.
- (1) Whole Body Counts
- 18-001-D
- 18-002-D
- 18-003-D
- 18-004-D
In-vitro internal monitoring
- None available
Dose assessments performed using air sampling and DAC-hr monitoring
- None available
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
BI02: RCS Leak Rate Sample (IP Section 02.11)===
- (1) Unit 1 (April 1, 2018 through March 31, 2019)
EP01: Drill/Exercise Performance (IP Section 02.12) (1 Sample)
- (1) 1st Quarter 2018 - 4th Quarter 2018
EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)
- (1) 1st Quarter 2018 - 4th Quarter 2018
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
- (1) 1st Quarter 2018 - 4th Quarter 2018
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) 10/01/2018 - 03/31/2019
71152 - Problem Identification and Resolution
Annual Follow-Up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) FLEX 480 VAC diesel generator performance issues (Coolant Hose Leak) on May 22, 2019
- (2) Control building chillers issues on June 27, 2019
71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01)
- (1) Second stage heater tripped on May 2, 2019
Event Report (IP Section 03.02) (1 Sample)
The inspectors evaluated the following licensee event reports (LERs):
- (1) LER 2019-001-00, Manual Reactor Scram due to Lowering Reactor Water Level (ADAMS accession: ML19171A191). The licensee documented two reportable events in this LER. The inspectors did not identify a performance deficiency or violation associated with the described invalid Group I isolation. The inspectors identified a finding associated with the manual scram.
INSPECTION RESULTS
Observation: A Control Building Chiller Issues 71152 The inspectors reviewed licensee problem identification and resolution activities associated with the A Control Building Chiller trips over the past 12 months. The licensees corrective action program documented issues associated with the 'A' Control Building Chiller. The licensee executed a plan of action setting up a data collection process by which they could track, prevent, and react to parameter fluctuations with a better understanding of the issue and potential solution(s). The inspectors determined the resolution of the A Control Building Chiller issues were deliberately pursued without any significant reduction of availability of this redundant train of safety equipment.
Observation: FLEX 480 VAC Generator Performance Issues 71152 The inspectors reviewed the licensee's problem identification and resolution activities associated with the FLEX diesel generator coolant leaks over the past 12 months. The licensees corrective action program documented several FLEX diesel generator coolant hose failures and recommended corrective actions. Ultimately the FLEX diesel generator coolant hoses were replaced with upgraded hoses and the procedures associated with testing and walking down the FLEX diesel generators were revised to de-energize the block heaters while stored in the heated FLEX buildings. The licensee causal analysis determined that the failure of the FLEX diesel generator coolant hoses occurred because the original equipment supplier installed non-high temperature heater hoses during original manufacture. Although the inspectors determined there were possible early opportunities to resolve this issue no deviation from the corrective action program standards were identified.
Failure to Notify Radiation Protection of Change In Work Scope Cornerstone Significance Cross-Cutting Aspect Report Section Occupational Radiation Safety
Green NCV 05000331/2019002-01 Open/Closed
[H.4] -
Teamwork 71124.01 The inspectors reviewed a self-revealed finding of very low safety significance (Green) and an associated Non-Cited Violation (NCV) of TS 5.4.1, Procedures, when the licensee failed to implement contamination control procedures when machining a contaminated main steam isolation valve disk without radiation protection knowledge.
Description:
On August 22, 2018, two individuals alarmed the personnel contamination monitors when exiting the Radiologically Controlled Area. The individuals were decontaminated, and internal dose assessments indicated minor intakes (less than two mrem) had occurred.
Upon investigation, it was determined that these individuals had been using a lathe to machine a contaminated main steam isolation valve disk during their shift without Radiation Protection knowledge. Procedure RP-AA-100-1002, Radiation Worker Instruction and Responsibilities, requires that radiation workers notify radiation protection prior to expanding work scope as well as prior to using grinding tools so that radiation protection can ensure appropriate controls are in place. The failure of the radiation workers to notify RP of the work being performed on the main steam isolation valve disk resulted in various radiological controls not being implemented. This included no contamination surveys being performed on the area of the disk being machined prior to or during machining as well as the installed high efficiency particulate air filter drawing a suction from the lathe not being used. Follow-up surveys of the disk indicated fixed contamination up to 40 mrad/hr beta and machine shop general contamination levels being higher than expected.
Corrective Actions: Corrective actions completed included the decontamination of the machine shop as well as distribution of a summary of the event and the lessons learned to site personnel.
Corrective Action References: CR 02277223, Increased Contamination Found in Hot Machine Shop
Performance Assessment:
Performance Deficiency: Radiation workers failed to inform radiation protection prior to expanding work scope as required by RP-AA-100-1002, Radiation Worker Instruction and Responsibilities.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Program & Process attribute of the Occupational Radiation Safety cornerstone. Specifically, the failure to notify radiation protection of changes in work scope prevented radiation protection from assessing the radiological hazards associated with the new work scope and implementing appropriate radiological controls to control those hazards, which could lead to unintended dose.
Significance: The inspectors assessed the significance of the finding using Appendix C, Occupational Radiation Safety SDP. Specifically, the inspectors determined that the finding was of very low safety significance (Green) because:
- (1) it did not involve as-low-as-reasonably-achievable planning or work controls,
- (2) there was no overexposure,
- (3) there was no substantial potential for an overexposure, and
- (4) the ability to assess dose was not compromised.
Cross-Cutting Aspect: H.4 - Teamwork: Individuals and work groups communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. Teamwork failed because maintenance did not ensure radiation protection was made aware of a work evolution that involved disassembling and machining a contaminated piece of equipment.
Enforcement:
Violation: Technical Specification Section 5.4.1, requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, Section 7, addresses "Procedures for Control of Radioactivity" and Section 7.e.4 addresses "Contamination Control". The licensee established Procedure RP-AA-100-1002, Revision 6, 3/7/2017, to address radiation worker responsibilities, including those needed to maintain contamination control. RP-AA-100-1002, Revision 6, Step 4.6.2.10, requires that radiation protection be notified prior to expanding the work scope so radiation protection can identify the potential changes in radiological conditions and institute appropriate controls for worker protection.
Contrary to the above, on August 22, 2018, the licensee failed to implement Step 4.6.2.10 of procedure RP-AA-100-1002. Specifically, the licensee failed to notify radiation protection prior to expanding the work scope to include machining of a contaminated main steam isolation valve disk.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Failure to Manage Outage Risk Activities Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events
Green FIN 05000331/2019002-02 Open/Closed
[H.5] - Work Management 71153 A self-revealed finding of very low safety significance (i.e., Green) was identified for the licensees failure to have appropriately managed risk activity as required by WM-AA-100-1000, Work Activity Risk Management, Revision 16. Specifically, plant personnel failed to reevaluate risk when a change in work scope occurred during outage work activities.
Description:
In September of 2016, Condition Report 02154562 identified that the drain fitting elbow on a control air filter bowl associated with the condensate demineralizer system was leaking air.
The associated Work Order 40488545 was planned as a simple work order to replace the 90 degree copper/brass elbow at the bottom drain connection of the filter bowl during the May 2019 refueling outage 26. During the work process, the plastic drain port was identified in the work order completion notes as being severely degraded and cracked. A new air filter was ordered as a contingency, but work steps were not changed to allow for replacement of the air filter and the new filter would not fit in this application without modifications to the piping system to account for differences in height and length of the new filter. The entire manifold containing the filter and regulator was brought to the shop to complete repairs. The existing drain fitting was initially tightened, and pressure tested in the shop, but the air leak was still present. The decision was made to bore out the existing threaded connection in the polycarbonate filter bowl and drill and tap one size larger (1/4-20)and adapt a 90 degree elbow directly to the threaded connection of the bowl without using the insert, gasket, and retainer. This larger elbow was not the elbow reserved on the work order.
The reserved elbow had 1/8 female pipe threads and would not have adapted to the bowl connection. The elbow to bowl threaded connection was then coated with epoxy on both the external and internal surfaces of the bowl to elbow threaded connection as an additional barrier to prevent leakage. The completed repair was pressure tested in the shop with no leaks evident prior to installation in the plant.
On April 20, 2019, the control air filter bowl catastrophically failed sending a close signal to all condensate demineralizer filter flow control valves and initiated a total loss of feedwater transient. Both reactor feedwater pumps tripped on low suction pressure and reactor water level began lowering rapidly. Prior to the plant reaching the low level reactor trip setpoint, the operators manually tripped the reactor plant and restored water using alternative/emergency injections systems and restored plant parameter to a safe and stable condition. The licensees root cause evaluation stated the non-standard alteration of the filter bowl assembly contributed to the control air filter bowl failure, resultant loss of feedwater transient, and unplanned manual reactor trip.
Corrective Actions: The licensee completed repairs through an engineering change and hard piping the failed control air filter bowl. The licensee also entered an action to revise component criticality for in-line air filters that could cause a plant transient or unplanned limiting condition for operability as single point vulnerabilities in keeping with the licensee's work activity risk management process.
Corrective Action References: Condition Report 2311443; Manual Reactor Scram Due to Lowering Reactor Water Level
Performance Assessment:
Performance Deficiency: The failure to have appropriately managed risk activity as required by WM-AA-100-1000, Work Activity Risk Management, was a performance deficiency.
Specifically, the purpose of WM-AA-100-1000 was to appropriately manage the overall risk associated with outage work activities and step 4.7, Changing Scope of Work, required the reevaluation of risk associated if there is a significant change in work scope. During the outage repair work associated with a control air filter bowl, a significant change of work scope failed to reevaluate risk and the component ultimately failed catastrophically during the ensuing operating cycle.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Human Performance attribute of the Initiating Events cornerstone. Specifically, the failure to appropriately manage a risk activity contributed to the catastrophic failure of the control air filter bowl and caused a total loss of feedwater transient and an unplanned reactor trip.
Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed the significance of the finding using IMC 0609, Attachment 4, Initial Characterization of Findings, dated October 7, 2016; and IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, dated June 19, 2012. Using Exhibit 1, Initiating Event Screen Questions, the inspectors determined that the finding caused a reactor trip and required a detailed risk evaluation.
The Senior Reactor Analysts performed a detailed risk evaluation using a recently updated Duane Arnold Standardized Plant Analysis Risk Model. The model was recently revised to update the late injection function and will become the model of record, version 8.55. The Senior Reactor Analysts evaluated the event using the transient event tree rather than the loss of main feedwater event tree because main feedwater was recoverable from the main control room and could support early injection if successfully recovered, a function that was not modeled in the loss of main feedwater event tree. The Senior Reactor Analysts set the transient initiating event frequency to 1.0 because the performance deficiency resulted in a transient event. Early feedwater recovery was modeled by modifying the basic event MFW-XHE-XO-ERROR, Operator fails to maintain feedwater injection and late feedwater recovery was modeled using the basic event PCS-XHE-XL-TRAN, Operator fails to recover PCS
[power conversion system] during Trans. The value of the early main feedwater recovery basic event was set to 2.2E-2. This basic event was estimated using Standardized Plant Analysis Risk Model-H, the NRCs method for human reliability analysis. The only performance shaping factor that was determined to be a performance driver was stress which was evaluated as high. The late recovery of the power conversion system basic event was modified to a value of 1E-3. For this basic event, the Senior Reactor Analysts assumed the operator failure would be dominated by action and the performance shaping factors were nominal. The basic event MSS-MSV-OC-STEAM, Steam Isolation Valves fail to remain open was set to True because the main steam isolation valves were closed by operators during the event. Recovery of the power conversion system includes re-opening the MSIVs and recovering main feedwater.
The conditional core damage probability was estimated at 7.2E-7. The contributing core damage sequences involved transients with the failure of long term heat removal but successful depressurization, transients without successful depressurization, and anticipated transients without scram. The risk contribution from core damage was determined to be of very low safety significance (i.e., Green).
The finding was also evaluated for large early release probability using IMC 0609 Appendix H, Containment Integrity Significance Determination Process, dated February 25, 2019. In NRC inspection report 05000331/2009009, the Senior Reactor Analysts previously determined that the Large Early Release Frequency multiplier in table 6.2 of Appendix H for high reactor coolant system pressure sequences was conservative and that a Large Early Release Frequency multiplier based on a depressurized reactor coolant system and a flooded drywell floor was more appropriate (<0.1). In that analysis, the Senior Reactor Analysts also determined that for some sequences, accident sequence timing would allow for effective evacuation before a release occurred. For the current case, the Senior Reactor Analysts reviewed an evacuation time estimate provided by the licensee and re-confirmed that the timing of some of the core damage sequences would allow for effective evacuation prior to release. For these reasons, the Senior Reactor Analysts concluded in this analysis that the conditional large early release probability was reasonably less than 1E-7 and the risk contribution from large early release was also of very low safety significance (i.e., Green).
The inspectors determined that the finding involved the cross-cutting aspect of Work Management (H.5) under the area of Human Performance (H). With their root cause evaluation, the licensee identified that organization failed to recognize the risk associated with using the non-standard alternation of control air filter bowl assembly. A self-revealed finding of very low safety significance (i.e., Green) was identified for the licensees failure to have coordinated the risk associated with work on control air filter bowl assembly. This led to a total loss of feedwater transient and unplanned reactor trip.
Cross-Cutting Aspect: H.5 - Work Management: The organization implements a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process includes the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. Specifically, the planning, control, and execution of work activities associated with the control air filter bowl repairs failed to appropriately identify and manage the original and altered work processes with commensurate with risk. A run to maintenance failure would and did result in an unplanned reactor trip.
Enforcement:
Inspectors did not identify a violation of regulatory requirements associated with this finding.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 2, 2019, the inspectors presented the emergency preparedness baseline inspection results to Mr. D. Curtland and other members of the licensee staff.
- On May 3, 2019, the inspectors presented the radiation protection inspection results to Mr. D. Curtland, Site Director, and other members of the licensee staff.
- On July 11, 2019, the inspectors presented the integrated inspection results to Mr. D. Curtland and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Abnormal Operating Procedure 903; Severe Weather
Miscellaneous
2019 DAEC Seasonal Readiness Certification Letter
05/24/19
OP-AA-102-1002; Seasonal Readiness
Drawings
BECH-M122
P&ID High Pressure Coolant Injection System Steam Side
Miscellaneous
BECH-M123
P&ID High Pressure Coolant Injection Water Side
Procedures
Surveillance Test Procedure 3.7.5-03A A Control Building
Chiller Operability Including Operation at Reduced Loading
Control Building HVAC System Electrical Line-Up
Operating Instruction 730 Control Building HVAC System
130
Surveillance Test Procedure 3.7.5-03 Control Building Chiller
Operability Including Operation at Reduced Loading
OI-152
Operating Instruction High Pressure Coolant Injection
System
119
71111.05Q Fire Plans
Pre-Fire Plan OAG-PA East Elevation 757
Pre-Fire Plans OAG-PA South Elevation 757
Pre-Fire Plans Pump House
Pre-Fire Plans Reactor Building Elevation 812
Pre-Fire Plan Reactor Building Elevation 833
Pre-Fire Plans Reactor Building Elevation 855
Procedures
ACP 1412.2
Control of Combustibles
Corrective Action
Documents
Bases-EOP 3; Secondary Containment Control Guideline
DAEC-PSA-IF-10; Internal Flood Analysis Volume 1 of 2
Summary and Note Book
DAEC-PSA-IF-10; Internal Flood Analysis Volume 2 of 2
Flood Walkdown
Work Orders
River Water Supply Pump House Stilling Basin Inspect and
Clean
71111.11Q Corrective Action
Documents
Reactivity Management Plan Plant Down Power Sequence
Exchange
04/02/2019
IPOI-3; Power Operations
160
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Condition Report 02308401; 'A' Standby Diesel Generator
Aux Relate Temperature High
CR 02314135; Arcing from 1K010B 'A' D/G A/C Air
Compressor during Start
CR 02308401; A Standby Diesel Generator Aux Relate
Temperature High
CR 2314592; BECH-E105 not Updated per EMA A103647
Engineering
Changes
EC 2314592; Replacement of 1K010B-M with New Motor
Work Orders
Work Order 40647491; Replace 'A' RHRSW Pump and
Establish IST Reference Values
Work Request 94194131; Arcing from 1K010B 'A' D/G A/C
Air Compressor during Start
Work Order 40657678; 'A' Standby Diesel Generator
1G031/CW Replacement
Corrective Action
Documents
Work Request 94191916; 'A' Rod Block Monitor Averaging
Card
Work Request 94191917; 'B' Rod Block Monitor Averaging
Card
'A' and 'B' Rod Block Monitor Work Plant
CR 02307849
'A' Rod Block Monitor Anomalous Behavior
CR 02307896
'B' Rod Block Monitor Anomalous Behavior
Miscellaneous
Work Request 94193937; Annunciator Horn for 1C05, 1C04,
and 1C03 will not Turn Off
Work Orders
Work Order 4066335; MSR Drain Tank Temporary Valve
Control
Corrective Action
Documents
DAEC Operations Logbook
Condition Report 02313285; CV 4421 D Outboard Main
Steam Isolation Valve Position Lights Indicate Dual
BECH-E820<3>; Main Steam Isolation Valve Solenoid Valve
and Position SW. Conn. Diagram
APED-A71-003<11>; Elementary Diagram Nuclear Steam
Supply Shutoff System
APED-A71-003<11A>; Elementary Diagram Nuclear Steam
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Supply Shutoff System
Technical Specification 3.3.3.1; Post Accident Monitoring
Instrumentation (and Bases); Amendment 25
DAEC Operations Logbook; June 13-June 17, 2019
Technical Specification 3.3.3.1; Post Accident Monitoring
Instrument (and Bases); Amendment 25
Drawings
BECH-M144<1>
06/19/2019
BECH-M169 sh.<4>
06/19/2019
Engineering
Changes
Non-Essential Chiller
Work Orders
Work Order 40657678; 'A' Standby Diesel Generator
1G031/CW Replacement
Work Order 40647491; Replace 'A' RHRSW Pump and
Establish IST Reference Values
Corrective Action
Documents
Surveillance Test Procedure 3.3.6.1-06; PCIS Main Steam
Line Isolation Logic System Functional Test
Procedures
Surveillance Test Procedure 3.1.7-04; Standby Liquid
Control Pump Test and Comprehensive Pump Test
STP 3.5.1-10
HPCI System Operability Test and Comprehensive Pump
Test
STP NS520001
HPCI System Leakage Inspection Walkdown
Corrective Action
Documents
CR 02222088
Create Work Order for 2017 Siren Replacements
CR 02239448
Siren 07C (1301) Inoperable for December Monthly Test
CR 02258158
Large Number of Amplifier Failures for April 2018 Monthly
Test
Miscellaneous
Annual Siren Inspection and Maintenance Records
04/01/2017 -
04/01/2019
Monthly Alert Notification System (Siren) Test Results
04/01/2017 -
04/01/2019
FEMA Letter
Duane Arnold Route Alerting Approval Letter
2/17/2012
FEMA Letter
Approval of DAEC Public Information Program Modification
2/04/2019
FEMA REP-10
Design Report
Appendix P
Duane Arnold Energy Center Outdoor Warning System/Alert
and Notification System (ANS) Upgrade Project
01/06/2009
Miscellaneous
Iowa Homeland
Security and
Emergency
Management
Agency Letter
DAEC Siren Control Upgrade Project
05/24/2018
P100002777
ANS Public Information Postcard
01/01/2019
Procedures
EPDM 1013
Emergency Siren (ANS) and Siren Sign Program
GMP-ELEC-34
Whelan High Power Voice and Siren System
GMP-ELEC-34,
Section A
Siren Inspection
GMP-ELEC-34,
Section B
Voice and Siren Testing
GMP-ELEC-34,
Section C
Repair and Troubleshooting
Corrective Action
Documents
CR 02214832
EP Audit - Five ERO Positions are not 3 Deep
CR 02274504
EP Procedures Conflict with Emergency Plan
Miscellaneous
ERO Augmentation Call In Drill Reports
04/01/2017 -
04/01/2019
03/27/2019
ERO Member Training/Qualification Records (sample - 20
records)
05/01/2019
Quarterly ERO Call-In Drill Reports
2nd Quarter
2017 - 1st
Quarter 2019
Procedures
Section H
Emergency Facilities Staffing, Activation and Equipment
Fleet Emergency Response Organization (ERO) Training
Program
EPDM 1009
Emergency Response Organization (ERO) Training and
Qualification Program
EPDM 1016
ERO Augmentation Drill and Testing Program
EPIP 6.1
Drill and Exercise Program
Self-Assessments
DAEC On-Shift Staffing Analysis
Corrective Action
CR 02206959
17TD2SIM -CAQ - Controller Deficiencies
Documents
CR 02207927
Controller Prompting During Tabletop
CR 02215168
State and County Concerns for Emergency Planning
CR 02258889
All Call Phone System Server Issues
CR 02305686
19TD1-CR Event Response Team Pagers did not Activate
CR 2206954
Shift Communicator Identified Incorrect EAL to Simulated Off
Site
PCR 02299716
DAEC Plan "G" - Public Education and Information
RWT 2249730
2018 Emergency Planning Generic RWT
Miscellaneous
KLD TR-993
Duane Arnold Energy Center 2018 Population Update
Analysis
03/08/2018
KLD-TR-910
Duane Arnold Energy Center Development of Evacuation
Time Estimates for Revised EPZ Boundary
03/09/2017
Procedures
Guidelines for Maintaining Emergency Preparedness
EPIP 6.2
Maintenance of Emergency Response Facilities and
Equipment
Self-Assessments
2018 DAEC Onsite Medical Drill After-Action
Report/Improvement Plan
2/04/18
KLD-1071
2019 Population Update Analysis
03/07/2019
NEP#-2017-007
2017 ERO Training Drill #1_Rev 1
07/25/2017
NEP#-2017-014
2017 ERO Training Drill #2_Rev 1
08/10/2017
NEP#-2017-017
2017 Off Year Exercise (OEX) Report
09/29/2017
NEP#-2018-006
2018 Dress Rehearsal (18DR)
04/07/2018
NEP#-2018-008
2018 Exercise (18EX) Final Report
05/21/2018
NEP#-2018-011
2018 Drill (18TD1) Final Report
07/25/2018
PDA 17-004
DAEC Nuclear Assurance Report - Emergency
Preparedness
07/20/2017
PDA 18-007
DAEC Nuclear Assurance Report - Emergency
Preparedness
08/13/2018
Miscellaneous
Duane Arnold Energy Center Training Drill 19TD2
Drill/Exercise Program
NRC Form 361; Reactor Plant Event Notification Worksheet
Note-05; Duane Arnold Energy Center Emergency
Notification
Corrective Action
Increased Contamination Found In Hot Machine Shop
Documents
Procedures
Radiation Worker Instruction and Responsibilities
Radiation
Surveys
PDA-M-
20180822-3
Hot Machine Shop Contamination Survey
08/22/2018
PDA-M-
20180823-1
Main Steam Isolation Valve Piston Contamination Follow Up
08/23/2018
Radiation Work
Permits (RWPs)
18-0051
Routine Work and Inspections
ALARA Plans
18-C1
Scaffolds in Drywell and Balance of Plant
18-EMISC
Electrical work in Drywell and Balance of Plant
18-MB
Main Steam Isolation Valve Inspections and Repairs
18-R1
Refuel Floor Activities
18-S1S2
In Service Inspection and Flow Assisted Corrosion Exams
and Support
Calculations
Radiological
Engineering
Calculation 18-
001-D
Estimating the Committed Effective Dose Equivalent
Exposure to Individual #1 in Main Steam Isolation Valve
Machining Event
08/27/2018
Radiological
Engineering
Calculation 18-
2-D
Estimating Committed Effective Dose Equivalent Exposure
to Individual #2 in Main Steam Isolation Valve Machining
Event
08/27/2018
Radiological
Engineering
Calculation 18-
003-D
Estimating Committed Effective Dose Equivalent Exposure
to Individual #1 in Reactor Head Seal Event
09/21/2018
Radiological
Engineering
Calculation 18-
004-D
Estimating Committed Effective Dose Equivalent Exposure
to Individual #2 in Reactor Head Seal Event
09/21/2018
Calibration
Records
Fastscan Whole Body Counter Quality Assurance Sample
Report
08/23/2018 -
09/20/2018
Fastscan Whole Body Counter Calibration Report
10/03/2017
Procedures
HPP 3104.02
Personnel Contamination Monitoring, Whole Body Counting
and Decontamination
HPP 3109.72
Operation of FastScan Whole Body Counter
Radiation
Surveys
GEL Sample ID
2167001
GEL Laboratories Radiological Certificate of Analysis
11/15/2018
Sample 18-514
Refuel Floor High Contamination Area Gamma Analysis
09/20/2018
71151
Corrective Action
Documents
CR 2246165
Level 1 Assessment - Drill and Exercise Performance
(DEP-PI)
CR 2246166
Potential Trend - DEP-PI Recovery Plan
LIA 2283966
LIA: Review Recent PB DEP-PI Failure
Miscellaneous
NRC Performance Indicator Data; Emergency Preparedness
- Drill/Exercise Performance
1st Quarter
2018 - 4th
Quarter 2018
NRC Performance Indicator Data; Emergency Preparedness
- ERO Readiness
1st Quarter
2018 - 4th
Quarter 2018
NRC Performance Indicator Data; Emergency Preparedness
- Alert and Notification System Reliability
1st Quarter
2018 - 4th
Quarter 2018
NG-001L
NRC PI Data Calculation, Review and Approval, for Second
Quarter 2018 through First Quarter 2019
Procedures
-
EPDM
1010
EP Department Performance Indicators
Corrective Action
Documents
CR 02249054; 'A' & 'B' FLEX Diesel Block Heater
CR 02307659; 'B' FLEX Diesel Generator Major Coolant
Leak
CR 02270741; 'A' FLEX Diesel Engine Block Heater Hose
Failure
CR 02307857; Trend-FLEX 480 VAC Generator
Performance Issues
CR 02273618; 'A' FLEX Diesel Generator Water Hose
Replacement
CR 02273619; 'B' FLEX Diesel Generator Water Hose
Replacement
NS240502A; FLEX 480VAC Diesel Generator 1G101A
Functional Test
NS240502B; FLEX 480VAC Diesel Generator 1G101B
Functional Test
NS240503; FLEX Diesel Generator Monthly Walkdown
NS240506A; FLEX 480VAC Diesel Generator 1G10A Load
Test
NS240506B; FLEX 480VAC Diesel Generator 1G10B Load
Test
ER02307857; Trend-FLEX 480 VAC Generator Performance
Issues
Procedures
MA-AA-100-1011-F03
Work Orders
Work Order 40610900-01; Quality Record
Work Order 40616626-01; Monthly Inspection with ESW
Secured
Corrective Action
Documents
Abnormal Operating Procedure 255.2 Power/Reactivity
Abnormal Change
1C07B Moisture Separator Re-heater Second Stage Drain
Tanks 1T-92A to 1T-92B Pressure Differential High
Operating Shift Logs; May 1, 2019
Operating Shift White Paper on Moisture Separator Drain
Tank High dp
BECH-E108<004A>; Steam and Condensate System
BECH-M104<2>; Feedwater Heaters 1E003A, 4A, 5A, 6A
Miscellaneous
Work Order 40488545-01; 1C80 Repair Leak Issue
MA-AA-100; Conduct of Maintenance
WM-AA-200; Work Management Process Overview
WM-AA-100-1000; Work Activity Risk Management
EN-54012; DAEC Loss of Feed Reactor Trip
Event Notification#54012; Loss of Feed Water Trip
04/20/2019