{{#Wiki_filter:Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources
{{#Wiki_filter:Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-1 of 12 USNRC HRTD
: 1. DIESEL GENERATORS AS                           3. Why diesel engines are used as the EMERGENCY POWER SOURCES                               prime movers for emergency power generators instead of alternative Learning Objectives                                         engine designs.
: 1.
The predominant means of supplying onsite             4. An overview of the regulations, codes, emergency (standby) electrical power for                   guides, and standards that establish nuclear power plants (NPPs) is emergency                    the design basis for these emergency diesel generators (EDGs). Therefore, diesel                 power systems.
DIESEL GENERATORS AS EMERGENCY POWER SOURCES Learning Objectives The predominant means of supplying onsite emergency (standby) electrical power for nuclear power plants (NPPs) is emergency diesel generators (EDGs). Therefore, diesel generator sets are the specific focus of this NRC training course. Upon completing this lesson students will understand the fundamental criteria used in selection of emergency diesel generators for onsite electric power supplies at NPP's. That will include an overview of the primary federal regulations, regulatory guides, codes, and industry standards applicable to these essential safety systems.
generator sets are the specific focus of this NRC training course. Upon completing this             5. How the above documents are lesson students will understand the                         translated    into    the    licensee's fundamental criteria used in selection of                   application and design for a nuclear emergency diesel generators for onsite                     power station.
In addition, this lesson will conclude with a summary overview of the EDG and its associated systems and components, as well as remarks on how they interface with site facilities. For the EDG to be capable of performing its design basis function, all of its on-skid and off-skid support systems and components must also meet their own design basis functional requirements.
electric power supplies at NPP's. That will include an overview of the primary federal           6. The major components of a diesel regulations, regulatory guides, codes, and                 generator system, as well as some industry standards applicable to these                     considerations involving site facilities essential safety systems.                                  that support EDG operation.
The primary objective of this lesson is to set the stage for later Chapters by giving students a fundamental understanding of:
In addition, this lesson will conclude with a         NOTE: Many participants in this course will summary overview of the EDG and its                   already be very familiar with the regulatory associated systems and components, as                 criteria applicable to EDGs. However, the well as remarks on how they interface with           NRC requires such documentation to be site facilities. For the EDG to be capable of         part of the course because some attendees performing its design basis function, all of its     may be relatively new on the job. Even on-skid and off-skid support systems and             those with considerable experience may components must also meet their own                   benefit from a brief review of the underlying design basis functional requirements.                 documentation. This Chapter provides an overview of the fundamental requirements The primary objective of this lesson is to set       relevant to EDGs in nuclear service. For the stage for later Chapters by giving               both new and experienced staff it can serve students a fundamental understanding of:             as a convenient reference.
: 1.
: 1. The basic regulatory requirements             1.1    Regulatory Basis for Redundant, establishing the need for redundant                   Independent Power Systems power systems (onsite and offsite) for operating nuclear power plants.                 Federal regulations applicable to nuclear power plants and, hence, onsite emergency
The basic regulatory requirements establishing the need for redundant power systems (onsite and offsite) for operating nuclear power plants.
: 2. Three      fundamental    performance          power supplies, originate in Title 10, Part 50 requirements that emergency diesel              of the Code of Federal Regulations (10 CFR generators (EDGs) must meet.                    50). This document is the successor to the Rev 3/16                                      1-1 of 12                              USNRC HRTD
: 2.
Three fundamental performance requirements that emergency diesel generators (EDGs) must meet.
: 3.
Why diesel engines are used as the prime movers for emergency power generators instead of alternative engine designs.
: 4.
An overview of the regulations, codes, guides, and standards that establish the design basis for these emergency power systems.
: 5.
How the above documents are translated into the licensee's application and design for a nuclear power station.
: 6.
The major components of a diesel generator system, as well as some considerations involving site facilities that support EDG operation.
NOTE: Many participants in this course will already be very familiar with the regulatory criteria applicable to EDGs. However, the NRC requires such documentation to be part of the course because some attendees may be relatively new on the job. Even those with considerable experience may benefit from a brief review of the underlying documentation. This Chapter provides an overview of the fundamental requirements relevant to EDGs in nuclear service. For both new and experienced staff it can serve as a convenient reference.
1.1 Regulatory Basis for Redundant, Independent Power Systems Federal regulations applicable to nuclear power plants and, hence, onsite emergency power supplies, originate in Title 10, Part 50 of the Code of Federal Regulations (10 CFR 50). This document is the successor to the  


Emergency Diesel Generator                         Diesel Generators as Emergency Power Sources Atomic Energy Commission (AEC) General             accident but is considered a precursor to Design Criteria of 10 July 1967, to which           possible core damage and, therefore, is part many early Nuclear Power Plants, meaning           of various postulated accident scenarios.
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-2 of 12 USNRC HRTD Atomic Energy Commission (AEC) General Design Criteria of 10 July 1967, to which many early Nuclear Power Plants, meaning those starting construction prior to 1972, were licensed. Supporting regulatory guides, codes, and industry standards used to implement these federal regulations are briefly described in this Chapter.
those starting construction prior to 1972, were licensed.         Supporting regulatory       Independence is the absence of shared guides, codes, and industry standards used         components that could result in the to implement these federal regulations are         simultaneous failure of both units. That briefly described in this Chapter.                 includes physical and electrical separation, such that a transformer or cable tray fire, for One of the most important nuclear power             example, would not impact operation of the plant safety requirements is for redundant,         other emergency diesel generator.
One of the most important nuclear power plant safety requirements is for redundant, and independent, power systems. This is contained in 10 CFR 50 Appendix A, General Design Criterion (GDC) 17, which specifically requires both off-site and onsite power systems "to permit functioning of structures,
and independent, power systems. This is contained in 10 CFR 50 Appendix A,                 Redundancy is required to achieve the General Design Criterion (GDC) 17, which           desired operational reliability, and also to specifically requires both off-site and onsite     accommodate "down time" for testing and power systems "to permit functioning of             maintenance. This means a dual EDG structures, systems, and components                 installation, where the required power is important to safety."                               available with either unit out of service.
: systems, and components important to safety."
GDC 17 further states that onsite electric         Testability is somewhat self-explanatory.
GDC 17 further states that onsite electric power supplies, including the distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.
power supplies, including the distribution         EDG testing is discussed in Chapter 11.
This requires emergency power systems to be designed such that failure of one will not adversely impact the other (more about that later). Each electric power source must be capable of providing the capacity and capability to assure that:
system, shall have sufficient independence, redundancy, and testability to perform their       1.2 Regulatory Guide (RG) 1.9 and the safety functions assuming a single failure.               Three Fundamental Performance This requires emergency power systems to                 Requirements for EDGs be designed such that failure of one will not adversely impact the other (more about that         Regulatory Guide 1.9, Rev 4 (March 2007) later). Each electric power source must be          is "Application and Testing of Safety-capable of providing the capacity and              Related Diesel Generators in Nuclear Power capability to assure that:                          Plants" (new title for this edition) and evolved from AEC Safety Guide 9. A copy
: 1. "Fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded" for any anticipated occurrences, and
: 1. "Fuel design limits and design conditions        of RG 1.9, Rev 4 is included in this Manual of the reactor coolant pressure boundary        as Appendix B. It covers three fundamental are not exceeded" for any anticipated          performance requirements every EDG must occurrences, and                                meet to perform its design function per referenced Standards. They are as follows:
: 2. The "core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents."
: 2. The "core is cooled and containment integrity and other vital functions are      1. The unit must be able to "...start and maintained in the event of postulated              accelerate a number of large motor loads accidents."                                        in rapid succession while maintaining voltage and frequency within acceptable Loss of Offsite Power (a LOOP) is not an                limits...."
Loss of Offsite Power (a LOOP) is not an accident but is considered a precursor to possible core damage and, therefore, is part of various postulated accident scenarios.
Rev 3/16                                    1-2 of 12                                USNRC HRTD
Independence is the absence of shared components that could result in the simultaneous failure of both units. That includes physical and electrical separation, such that a transformer or cable tray fire, for example, would not impact operation of the other emergency diesel generator.
Redundancy is required to achieve the desired operational reliability, and also to accommodate "down time" for testing and maintenance. This means a dual EDG installation, where the required power is available with either unit out of service.
Testability is somewhat self-explanatory.
EDG testing is discussed in Chapter 11.
1.2 Regulatory Guide (RG) 1.9 and the Three Fundamental Performance Requirements for EDGs Regulatory Guide 1.9, Rev 4 (March 2007) is "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants" (new title for this edition) and evolved from AEC Safety Guide 9. A copy of RG 1.9, Rev 4 is included in this Manual as Appendix B. It covers three fundamental performance requirements every EDG must meet to perform its design function per referenced Standards. They are as follows:
: 1. The unit must be able to "...start and accelerate a number of large motor loads in rapid succession while maintaining voltage and frequency within acceptable limits...."  


Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-3 of 12 USNRC HRTD
: 2. The unit must also be able to "...provide         requirement set for the onsite emergency power promptly to engineered safety             power source to be ready to accept loads features if a loss of offsite power and an       following loss of offsite power. So, two accident occur during the same time             fundamental questions asked in the period...."                                     selection of the emergency onsite power source are:
: 2. The unit must also be able to "...provide power promptly to engineered safety features if a loss of offsite power and an accident occur during the same time period...."
: 3. The unit must "...supply power continuously to the equipment needed to         1. Based on the plant-specific accident maintain the plant in a safe condition...."         analysis, how fast must electrical power be restored to support Emergency Core A later chapter will cover the challenge of              Cooling System (ECCS) operation to complying with the first of these three                  prevent core damage (i.e., to keep from performance requirements (EDG loading).                  exceeding peak fuel clad temperature)?
: 3. The unit must  
Item (2) immediately above introduces the                Stated another way, how soon must the requirement to cope with two events                      emergency electrical source be running (failures / accidents) that occur either                with breaker closed, ready to accept the simultaneously or with one following the                required step loads? By analysis, many other. Finally, please note Item (3) has no              of the reactor designs required power to endurance time. "Continuously" is open-                  be available within 15 to 30 seconds ended and effectively means "until normal                after receiving a start signal. Although power is restored" (however long it takes).              this time included the inherent delay for protective circuits to sense the loss of 1.3 Why DIESEL Generators?                              power and initiate a start signal to the emergency power source, the bulk of it There is no requirement that emergency                  represented the start-up time necessary diesel generators must be used for onsite                to spin up the generator, energize its electric power supplies at nuclear power                field, and get it switched on line.
"...supply power continuously to the equipment needed to maintain the plant in a safe condition...."
plants. Hence, a natural question could be, why have diesel generators been selected            To assure an acceptable margin of safety, as the predominant means of supplying this          the accident analysis for many reactor power? Some other potential prime movers            designs assumed emergency generator that could have been selected are:                  power would be available within 10 seconds.
A later chapter will cover the challenge of complying with the first of these three performance requirements (EDG loading).
NOTE: In some plants where nuclear fuel
Item (2) immediately above introduces the requirement to cope with two events (failures / accidents) that occur either simultaneously or with one following the other. Finally, please note Item (3) has no endurance time. "Continuously" is open-ended and effectively means "until normal power is restored" (however long it takes).
* Gasoline / Gaseous Fuel Engines                  upgrades have been implemented and new
1.3 Why DIESEL Generators?
* Gas Turbine Engines                              core damage accident analysis calculations
There is no requirement that emergency diesel generators must be used for onsite electric power supplies at nuclear power plants. Hence, a natural question could be, why have diesel generators been selected as the predominant means of supplying this power? Some other potential prime movers that could have been selected are:
* Hydro-electric generation                        performed, they have frequently supported
* Gasoline/Gaseous Fuel Engines
* Steam-driven turbine generator                  a corresponding increase in the delay time
* Gas Turbine Engines
* Possible hybrid arrangement of stored            for emergency generator availability.
* Hydro-electric generation
energy and a slower-response system.            However, it was not unusual to have the containment integrity support systems (e.g.
* Steam-driven turbine generator
The answer to why diesel generators can            Containment Spray System) become the usually be found by looking at the time              new limiting consideration.
* Possible hybrid arrangement of stored energy and a slower-response system.
Rev 3/16                                      1-3 of 12                                USNRC HRTD
The answer to why diesel generators can usually be found by looking at the time requirement set for the onsite emergency power source to be ready to accept loads following loss of offsite power. So, two fundamental questions asked in the selection of the emergency onsite power source are:
: 1. Based on the plant-specific accident analysis, how fast must electrical power be restored to support Emergency Core Cooling System (ECCS) operation to prevent core damage (i.e., to keep from exceeding peak fuel clad temperature)?
Stated another way, how soon must the emergency electrical source be running with breaker closed, ready to accept the required step loads? By analysis, many of the reactor designs required power to be available within 15 to 30 seconds after receiving a start signal. Although this time included the inherent delay for protective circuits to sense the loss of power and initiate a start signal to the emergency power source, the bulk of it represented the start-up time necessary to spin up the generator, energize its field, and get it switched on line.
To assure an acceptable margin of safety, the accident analysis for many reactor designs assumed emergency generator power would be available within 10 seconds.
NOTE: In some plants where nuclear fuel upgrades have been implemented and new core damage accident analysis calculations performed, they have frequently supported a corresponding increase in the delay time for emergency generator availability.
However, it was not unusual to have the containment integrity support systems (e.g.
Containment Spray System) become the new limiting consideration.  


Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-4 of 12 USNRC HRTD
: 2. Once the accident analysis has set the             Criterion 38: Reliability and Testability of time limitations on restoration of power to     Engineered Safety Features.                  All vital safety equipment, the only                 engineered safety features shall be remaining question is what power                designed to provide high functional reliability supplies are readily available that could        and ready testability. In determining the reliably supply the needed power within          suitability of a facility for proposed site, the those time limitations?                          degree of reliance upon the acceptance of the inherent and engineered safety afforded With the exception of large gas engines,              by the system, including the engineered which have other onsite energy availability          safety features, will be influenced by the and safety concerns, none of the sources              known and the demonstrated performance listed above could reliably match the                capability and reliability of the systems, and required response time and output power as            by the extent to which the operability of such well as diesel generators could. To use a            systems can be tested and inspected where football analogy, they have the muscle to do          appropriate during the life of the plant.
: 2. Once the accident analysis has set the time limitations on restoration of power to vital safety equipment, the only remaining question is what power supplies are readily available that could reliably supply the needed power within those time limitations?
the job and the speed to get there in time.
With the exception of large gas engines, which have other onsite energy availability and safety concerns, none of the sources listed above could reliably match the required response time and output power as well as diesel generators could. To use a football analogy, they have the muscle to do the job and the speed to get there in time.
Furthermore, diesel generators were readily          Criterion 39: Emergency Power for available and their proven reliability had            Engineered Safety Features. Alternate already gained them acceptance as                    power systems shall be provided and emergency power supplies under the Naval              designed with adequate independency Reactors program.                                    (independence), redundancy, capacity, and testability to permit the functioning required Therefore, although other factors such as            of the engineered safety features. As a site location and engine type familiarity had        minimum, the onsite power system and the some influence, the answers to the two                offsite   power       system     shall   each, questions above ultimately decided the                independently, provide this capacity question of what type of generators to use            assuming a failure of a single active for NPP applications. Fundamentally, the              component in each power system.
Furthermore, diesel generators were readily available and their proven reliability had already gained them acceptance as emergency power supplies under the Naval Reactors program.
decision became what diesel generators will best fill our emergency power needs?"            Criterion 48: Testing of Operational Sequence of Emergency Core Cooling 1.4 An Overview of EDG Regulations,                  Systems. A capability shall be provided to Guides, Codes, and Standards                  test under conditions as close to design as practical the full operational sequence that 1.4.1 Early Plants Licensed under AEC                would bring the emergency core cooling General Design Criteria (i.e., those        systems into action, including the transfer to starting construction before 1972)          alternate power sources.
Therefore, although other factors such as site location and engine type familiarity had some influence, the answers to the two questions above ultimately decided the question of what type of generators to use for NPP applications. Fundamentally, the decision became what diesel generators will best fill our emergency power needs?"
The primary design criteria applicable from          Even the casual reader will note the close early AEC regulatory requirements...those            similarity between Criterions 38, 39, 48 and still being the GDC of record at many older          parts of 10 CFR 50 Appendix A, GDC 17.
1.4 An Overview of EDG Regulations, Guides, Codes, and Standards 1.4.1 Early Plants Licensed under AEC General Design Criteria (i.e., those starting construction before 1972)
nuclear power plantsare as follows:
The primary design criteria applicable from early AEC regulatory requirements...those still being the GDC of record at many older nuclear power plantsare as follows:
Rev 3/16                                      1-4 of 12                                USNRC HRTD
Criterion 38: Reliability and Testability of Engineered Safety Features.
All engineered safety features shall be designed to provide high functional reliability and ready testability. In determining the suitability of a facility for proposed site, the degree of reliance upon the acceptance of the inherent and engineered safety afforded by the system, including the engineered safety features, will be influenced by the known and the demonstrated performance capability and reliability of the systems, and by the extent to which the operability of such systems can be tested and inspected where appropriate during the life of the plant.
Criterion 39: Emergency Power for Engineered Safety Features. Alternate power systems shall be provided and designed with adequate independency (independence), redundancy, capacity, and testability to permit the functioning required of the engineered safety features. As a minimum, the onsite power system and the offsite power system shall
: each, independently, provide this capacity assuming a failure of a single active component in each power system.
Criterion 48: Testing of Operational Sequence of Emergency Core Cooling Systems. A capability shall be provided to test under conditions as close to design as practical the full operational sequence that would bring the emergency core cooling systems into action, including the transfer to alternate power sources.
Even the casual reader will note the close similarity between Criterions 38, 39, 48 and parts of 10 CFR 50 Appendix A, GDC 17.  


Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources The AEC had other GDC's which formed the             periodically (1) the operability and functional basis for those currently appearing in 10           performance of the components of the CFR 50 Appendix A. Likewise, AEC Safety             systems, such as onsite power sources, Guides that were used to interpret and               relays, switches, and buses, and (2) the implement those early design criteria               operability of the systems as a whole and, became the foundation for current NRC               under conditions as close to design as Regulatory Guides. Some early NPP's have             practical, the full operation sequence that voluntarily adopted portions of current             brings the systems into operation, including requirements applicable to EDGs, such as             operation of applicable portions of the IEEE 387 (discussed later). Therefore, no           protection system, and the transfer of power further time will be spent on early criteria.        among the nuclear power unit, the offsite power system, and the onsite power system.
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-5 of 12 USNRC HRTD The AEC had other GDC's which formed the basis for those currently appearing in 10 CFR 50 Appendix A. Likewise, AEC Safety Guides that were used to interpret and implement those early design criteria became the foundation for current NRC Regulatory Guides. Some early NPP's have voluntarily adopted portions of current requirements applicable to EDGs, such as IEEE 387 (discussed later). Therefore, no further time will be spent on early criteria.
1.4.2 Plants Licensed by NRC using the GDC of 10 CFR 50 Appendix A                 Criterion 33, 34, 35, 38, 41, and 44:
1.4.2 Plants Licensed by NRC using the GDC of 10 CFR 50 Appendix A (construction began 1972 or later)
(construction began 1972 or later)           Establish the criteria for specific safety systems to be able to perform their required As explained in Section 1.1, the 10 CFR 50           functions even assuming a Loss of Offsite Appendix A General Design Criteria are the           Power (LOOP) and a single failure of a successor documents to AEC GDC's.                   source of onsite power (e.g. one EDG Train Those listed below provide primary design           or Division).
As explained in Section 1.1, the 10 CFR 50 Appendix A General Design Criteria are the successor documents to AEC GDC's.
criteria for EDGs. Some others that have relevant secondary criteria such as for the         1.4.3 "Top Level" NRC Regulations that physical plant design will not be described         Pertain to NPP Licensing, Construction, (e.g., GDC 2, 4, 5, and 50).                         Commissioning, and Operation:
Those listed below provide primary design criteria for EDGs. Some others that have relevant secondary criteria such as for the physical plant design will not be described (e.g., GDC 2, 4, 5, and 50).
Criterion 17: "Electrical Power Systems"
Criterion 17: "Electrical Power Systems" To recap the previous discussions on page 1-2, GDC 17 states the fundamental safety mission for on-site (and off-site) electrical systems, as well as the key attributes of independence, redundancy, and testability.
* 10 CFR 50.10  License required.
Criterion 18: "Inspection and Testing of Electrical Power Systems" Electric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the offsite power system, and the onsite power system.
To recap the previous discussions on page 1-2, GDC 17 states the fundamental safety
Criterion 33, 34, 35, 38, 41, and 44:
* 10 CFR 50.23  Construction permits. A mission for on-site (and off-site) electrical           permit for the construction of a systems, as well as the key attributes of               production or utilization facility will be independence, redundancy, and testability.              issued prior to the issuance of a license if the application is otherwise acceptable, Criterion 18: "Inspection and Testing of                and will be converted upon due Electrical Power Systems" Electric power                completion       of   the   facility and systems important to safety shall be                    Commission action into a license as designed to permit appropriate periodic                  provided in 50.56 of this part.
Establish the criteria for specific safety systems to be able to perform their required functions even assuming a Loss of Offsite Power (LOOP) and a single failure of a source of onsite power (e.g. one EDG Train or Division).
inspection and testing of important areas and features, such as wiring, insulation,
1.4.3 "Top Level" NRC Regulations that Pertain to NPP Licensing, Construction, Commissioning, and Operation:
* 10 CFR 50.34 - Details the contents of connections, and switchboards, to assess                applications; technical information. For the continuity of the systems and the                    purposes of this course, the following condition of their components. The systems              excerpts from this document are of shall be designed with a capability to test              particular significance to EDG selection:
* 10 CFR 50.10 License required.
Rev 3/16                                      1-5 of 12                                USNRC HRTD
* 10 CFR 50.23 Construction permits. A permit for the construction of a
production or utilization facility will be issued prior to the issuance of a license if the application is otherwise acceptable, and will be converted upon due completion of the facility and Commission action into a license as provided in 50.56 of this part.
* 10 CFR 50.34 - Details the contents of applications; technical information. For purposes of this course, the following excerpts from this document are of particular significance to EDG selection:  


Emergency Diesel Generator                         Diesel Generators as Emergency Power Sources
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-6 of 12 USNRC HRTD
  "(a) Preliminary safety analysis report.
"(a) Preliminary safety analysis report.
* 10 CFR 50.36 - This document covers Each application for a construction                 technical specifications intended to permit shall include a preliminary safety           define safety system limiting conditions analysis report. (3) The preliminary               for operation that may prevent design design of the facility including:                  and license safety function. More about this topic appears later in the Chapter, (i) The principal design criteria for the          under Regulatory Guides 1.93, 1.156.
Each application for a construction permit shall include a preliminary safety analysis report. (3) The preliminary design of the facility including:
facility. Appendix A, General Design Criteria for Nuclear Power Plants,
(i) The principal design criteria for the facility. Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have previously been issued by the Commission and provides guidance to applicants for construction permits in establishing principal design criteria for other types of nuclear power units; (ii) The design bases and the relation of the design bases to the principal design criteria; (iii)
* 10 CFR 50.54 Conditions of licenses.
Information relative to materials of construction, general arrangement, and approximate dimensions, sufficient to provide reasonable assurance that the final design will conform to the design bases with adequate margin for safety..."
establishes minimum requirements for the principal design criteria for water-
"(b) Final safety analysis report. Each application for a license to operate a facility shall include a final safety analysis report. The final safety analysis report shall include information that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures,
* 10 CFR 50.55a Codes and standards.
: systems, and components and of the facility as a whole"
cooled nuclear power plants similar in              "Each operating license for a boiling or design and location to plants for which            pressurized water-cooled nuclear power construction permits have previously                facility is subject to the conditions in been issued by the Commission and                  paragraphs (f)* and (g)* of this section provides guidance to applicants for                and each construction permit for a construction permits in establishing                utilization facility is subject to the principal design criteria for other types of        following conditions in addition to those nuclear power units;                                specified in §50.55:
* 10 CFR 50.36 - This document covers technical specifications intended to define safety system limiting conditions for operation that may prevent design and license safety function. More about this topic appears later in the Chapter, under Regulatory Guides 1.93, 1.156.
(ii) The design bases and the relation of          "(a)(1) Structures, systems, and the design bases to the principal design            components         must   be     designed, criteria;                                          fabricated, erected, constructed, tested, and inspected to quality standards (iii) Information relative to materials of commensurate with the importance of construction, general arrangement, and the safety function to be performed."
* 10 CFR 50.54 Conditions of licenses.
approximate dimensions, sufficient to provide reasonable assurance that the final design will conform to the design
* 10 CFR 50.55a Codes and standards.  
* NOTE: Items (f) and (g) above refer to bases with adequate margin for                      In-service inspection requirements.
"Each operating license for a boiling or pressurized water-cooled nuclear power facility is subject to the conditions in paragraphs (f)* and (g)* of this section and each construction permit for a utilization facility is subject to the following conditions in addition to those specified in §50.55:  
safety..."
"(a)(1)
* 10 CFR 50.56 Conversion of
Structures,
  "(b) Final safety analysis report. Each            construction permit to license; or application for a license to operate a              amendment of license. Upon completion facility shall include a final safety              of the construction or alteration of a analysis report. The final safety analysis          facility, in compliance with the terms and report shall include information that              conditions of the construction permit and describes the facility, presents the                subject to any necessary testing of the design bases and the limits on its                  facility for health or safety purposes, the operation, and presents a safety analysis          Commission will, in the absence of good of the structures, systems, and                    cause shown to the contrary issue a components and of the facility as a                license of the class for which the whole"                                            construction permit was issued or an Rev 3/16                                    1-6 of 12                                USNRC HRTD
: systems, and components must be
: designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed."
* NOTE: Items (f) and (g) above refer to In-service inspection requirements.
* 10 CFR 50.56 Conversion of construction permit to license; or amendment of license. Upon completion of the construction or alteration of a facility, in compliance with the terms and conditions of the construction permit and subject to any necessary testing of the facility for health or safety purposes, the Commission will, in the absence of good cause shown to the contrary issue a license of the class for which the construction permit was issued or an  


Emergency Diesel Generator                         Diesel Generators as Emergency Power Sources appropriate amendment of the license,
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-7 of 12 USNRC HRTD appropriate amendment of the license, as the case may be.
* Regulatory Guide 1.6 - "Independence as the case may be.                              Between Redundant Standby (Onsite)
* 10 CFR 50.57 Issuance of operating license.
Power Sources and Between Their
* 10 CFR 50.63 Loss of All Alternating Current Power (Station Blackout). This is an additional source of functional regulatory requirements involving Emergency Diesel Generators. Target EDG reliability is used to determine station blackout coping capability.
* 10 CFR 50.57  Issuance of operating              Distribution Systems," (Formerly Safety license.                                          Guide 6). Each power supply (e.g. EDG) shall have the "...capability of performing
* 10 CFR 50 Appendix A, General Design Criteria. - This was previously discussed in this Chapter. See Sections 1.1, 1.4.2, etc.
* 10 CFR 50.63  Loss of All Alternating            as a redundant unit of a standby power Current Power (Station Blackout). This            supply." Therefore, mechanically and is an additional source of functional            electrically, the Emergency Diesel regulatory      requirements    involving        Generator must be able to operate Emergency Diesel Generators. Target              during and after any design basis event EDG reliability is used to determine              without support from a preferred power station blackout coping capability.              source.
1.5 Implementation of These Criteria into Site-Specific System Design 1.5.1 Overview of Primary Regulatory Guides and Referenced Standards Used to Implement Design Criteria For early nuclear plants licensed under AEC General Design Criteria the applicable design requirements were implemented via the AEC's Safety Guides. With transition of the criteria to 10 CFR 50, Appendix A, the NRC's Regulatory Guides (RG's) became the means to implement requirements into NPP design.
* 10 CFR 50 Appendix A, General
Under both of these regimes, codes and standards developed by industry groups or national organizations (e.g., ANSI, IEEE, NFPA, etc.) were incorporated into the regulations. This training course provides just an overview of the more important documents relevant to EDGs.
* Regulatory Guide 1.9 - "Selection, Design Criteria. - This was previously            Design, Qualification, and Testing of discussed in this Chapter. See Sections          Emergency Diesel Generator Units Used 1.1, 1.4.2, etc.                                  as Class 1E Onsite Electric Power Systems at Nuclear Power Plants,"
* Regulatory Guide 1.6 - "Independence Between Redundant Standby (Onsite)
1.5 Implementation of These Criteria                  (formerly AEC Safety Guide 9). RG 1.9, into Site-Specific System Design              Rev 4 (March, 2007) was introduced in 1.2 of this Chapter and discusses three 1.5.1 Overview of Primary Regulatory                  fundamental performance requirements Guides and Referenced Standards              for EDGs. It incorporates portions of Used to Implement Design Criteria            GDC 17 Electric Power Systems, and GDC 18 Inspection and Testing of For early nuclear plants licensed under AEC          Electrical Power Systems. RG 1.9 also General Design Criteria the applicable                references these IEEE documents:
Power Sources and Between Their Distribution Systems," (Formerly Safety Guide 6). Each power supply (e.g. EDG) shall have the "...capability of performing as a redundant unit of a standby power supply." Therefore, mechanically and electrically, the Emergency Diesel Generator must be able to operate during and after any design basis event without support from a preferred power source.
design requirements were implemented via the AEC's Safety Guides. With transition of
* Regulatory Guide 1.9 - "Selection, Design, Qualification, and Testing of Emergency Diesel Generator Units Used as Class 1E Onsite Electric Power Systems at Nuclear Power Plants,"
* IEEE 308 - "Standard Criteria for Class the criteria to 10 CFR 50, Appendix A, the            1E Power Systems for Nuclear Power NRC's Regulatory Guides (RG's) became                Generating Stations."         In practice, the means to implement requirements into              Section     6.2.4,   "Standby       Power NPP design.                                          Supplies," of the IEEE 308 standard is implemented through IEEE 387.
(formerly AEC Safety Guide 9). RG 1.9, Rev 4 (March, 2007) was introduced in 1.2 of this Chapter and discusses three fundamental performance requirements for EDGs. It incorporates portions of GDC 17 Electric Power Systems, and GDC 18 Inspection and Testing of Electrical Power Systems. RG 1.9 also references these IEEE documents:
Under both of these regimes, codes and standards developed by industry groups or
* IEEE 308 - "Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations." In practice, Section 6.2.4, "Standby Power Supplies," of the IEEE 308 standard is implemented through IEEE 387.
* IEEE 387 (1972, 1977, 1984, 1995) -
* IEEE 387 (1972, 1977, 1984, 1995) -  
national organizations (e.g., ANSI, IEEE,            "IEEE Standard Criteria for Diesel-NFPA, etc.) were incorporated into the                Generator Units Applied as Standby regulations. This training course provides            Power Supplies for Nuclear Power just an overview of the more important                Generating Stations."         The parent documents relevant to EDGs.                          standard to IEEE 387-1995 (and 1984) is Rev 3/16                                    1-7 of 12                              USNRC HRTD
"IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations." The parent standard to IEEE 387-1995 (and 1984) is  


Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources IEEE Standard 308-1980. IEEE 387
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-8 of 12 USNRC HRTD IEEE Standard 308-1980. IEEE 387 expands on IEEE 308, Section 6.2.4, "Standby Power Supplies" with respect to application of diesel generator units.
* Regulatory Guide 1.32 - "Criteria for expands on IEEE 308, Section 6.2.4,                 Safety-Related Electric Power Systems "Standby Power Supplies" with respect               for Nuclear Power Plants." RG 1.32 to application of diesel generator units.            seeks to implement compliance with portions of the following document:
This standard provides many amplifying and supplemental details, in conjunction with Regulatory Guide 1.9, regarding the design, testing, and qualification of Emergency Diesel Generators used in nuclear applications. Not all plants are committed to use IEEE 387, especially those licensed prior to 1972. IEEE 387 also endorses several other codes and standards including the Diesel Engine Manufacturers Association (DEMA) guide Standard Practices for Low and Medium Speed Stationary Diesel and Gas Engines, last revised in 1972. DEMA is no longer an active association but its guidelines are still relevant to the design criteria applied to EDGs installed at most US nuclear power plants. Post-1977 versions of the IEEE 387 standard also outline criteria for initial EDG first unit qualification tests for NPP service.
This standard provides many amplifying and supplemental details, in conjunction
These will be discussed in Chapter 11.
NOTE: IEEE 387-1995 gives the design basis for nuclear service EDGs as 4000 starts and 6000 operating hours, over a specified service life of 40 years. Such intermittent duty is very different from typical commercial service! This course will point out the profound impact that has on EDG maintenance and testing, as well as some design implications. A copy of IEEE 387-1995 is Appendix 3.
* IEEE 323 - "Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations."
* Regulatory Guide 1.32 - "Criteria for Safety-Related Electric Power Systems for Nuclear Power Plants." RG 1.32 seeks to implement compliance with portions of the following document:
* GDC 17 - Electric Power Systems.
* GDC 17 - Electric Power Systems.
with Regulatory Guide 1.9, regarding the design, testing, and qualification of
* IEEE 308 - "Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations." Invoked by RG 1.32, this Standard specifies capabilities of a Standby Power Supply (e.g. EDG) to serve as an independent / redundant unit (or Train or Division) of power.
* IEEE 308 - "Standard Criteria for Class Emergency Diesel Generators used in                  1E Power Systems for Nuclear Power nuclear applications. Not all plants are            Generating Stations." Invoked by RG committed to use IEEE 387, especially                1.32, this Standard specifies capabilities those licensed prior to 1972. IEEE 387              of a Standby Power Supply (e.g. EDG) to also endorses several other codes and                serve as an independent / redundant unit standards including the Diesel Engine                (or Train or Division) of power.
* Regulatory Guide 1.75 - "Physical Independence of Electric Systems."
Manufacturers Association (DEMA) guide Standard Practices for Low and Medium
Deals more with the physical than functional independence or separation between classes and Trains or Divisions.
* Regulatory Guide 1.75 - "Physical Speed Stationary Diesel and Gas                      Independence of Electric Systems."
The criteria are intended to ensure adequate independence through physical separation and barriers to assure continued function under all postulated plant events. RG 1.75 also invokes the following Standards:
Engines, last revised in 1972. DEMA is              Deals more with the physical than no longer an active association but its              functional independence or separation guidelines are still relevant to the design          between classes and Trains or Divisions.
* IEEE 384 - "Standard Criteria for Independence of Class 1E Equipment and Circuits.
criteria applied to EDGs installed at most          The criteria are intended to ensure US nuclear power plants. Post-1977                  adequate       independence     through versions of the IEEE 387 standard also              physical separation and barriers to outline criteria for initial EDG first unit        assure continued function under all qualification tests for NPP service.                postulated plant events. RG 1.75 also These will be discussed in Chapter 11.              invokes the following Standards:
Regulatory Guide 1.93 - "Availability of Electric Power Sources." RG 1.93 provides guidance for the application of 10 CFR 50.36 (above), particularly section 50.36(c)(2), "Limiting Conditions for Operation," (LCO) when less than the number of power supplies required by GDC 17 are available.
NOTE: IEEE 387-1995 gives the design
Regulatory Guide 1.108 - "Periodic  
* IEEE 384 - "Standard Criteria for basis for nuclear service EDGs as 4000              Independence of Class 1E Equipment starts and 6000 operating hours, over a              and Circuits.
specified service life of 40 years. Such intermittent duty is very different from          Regulatory Guide 1.93 - "Availability of typical commercial service! This course              Electric Power Sources."         RG 1.93 will point out the profound impact that              provides guidance for the application of has on EDG maintenance and testing, as              10 CFR 50.36 (above), particularly well as some design implications. A                  section 50.36(c)(2), "Limiting Conditions copy of IEEE 387-1995 is Appendix 3.                for Operation," (LCO) when less than the number of power supplies required by
* IEEE 323 - "Standard for Qualifying                  GDC 17 are available.
Class 1E Equipment for Nuclear Power Generating Stations."                              Regulatory Guide 1.108 - "Periodic Rev 3/16                                      1-8 of 12                              USNRC HRTD


Emergency Diesel Generator                           Diesel Generators as Emergency Power Sources Testing of Diesel Generator Units Used         1.5.2    Licensee's Implementation of EDG as Onsite Electric Power Systems at                       System Design Criteria Nuclear Power Plants." (Withdrawn.
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-9 of 12 USNRC HRTD Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants." (Withdrawn.
See 58 FR 41813, 5 August 1993.                   It should be evident the criteria for design Superseded by Regulatory Guide 1.9,               have evolved and what is applicable to a Revision 3).                                     specific plant depends to a large extent on the time frame in which it was constructed NOTE: Some of the early design plants             and licensed. Licensees take whatever previously committed to Regulatory               documents are applicable at the time their Guide 1.108 only adopted portions of             project moves forward, including the proper Regulatory Guide 1.9.                            revision dates, and implement them into their plant-specific design and operations.
See 58 FR 41813, 5 August 1993.
Regulatory Guide 1.137 - "Fuel-Oil                 The resulting EDG documents include:
Superseded by Regulatory Guide 1.9, Revision 3).
Systems         for       Standby     Diesel System drawings and isometrics Generators." RG 1.137 also seeks to implement compliance with portions of             System specifications GDC 17, Electric Power Systems                     Equipment specification (above), and it endorses the following             Purchase specifications standard for regulatory compliance.               Installation and Test Criteria ANSI N195 / ANS 59.51 - "Fuel Oil                 The design criteria which were applied to the Systems        for      Emergency      Diesel    plant are typically listed or referenced in the Generators."                                      licensee       design     and       equipment specifications and the Final safety Analysis Regulatory Guide 1.155 - "Station                  Report / Updated Final Safety Analysis Blackout."        This Guide seeks to            Report (FSAR / UFSAR).
NOTE: Some of the early design plants previously committed to Regulatory Guide 1.108 only adopted portions of Regulatory Guide 1.9.
implement compliance with all of:
Regulatory Guide 1.137 - "Fuel-Oil Systems for Standby Diesel Generators." RG 1.137 also seeks to implement compliance with portions of GDC 17, Electric Power Systems (above), and it endorses the following standard for regulatory compliance.
ANSI N195 / ANS 59.51 - "Fuel Oil Systems for Emergency Diesel Generators."
Regulatory Guide 1.155 - "Station Blackout." This Guide seeks to implement compliance with all of:
10 CFR 50.63, "Loss of all Alternating Current Power."The specified station blackout duration shall be based on the following factors:
"(i) The redundancy of the onsite emergency ac power sources; (ii) The reliability of the onsite emergency ac power sources;"
RG 1.155 also invokes NUMARC 8700:
Guidlines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors.
1.5.2 Licensee's Implementation of EDG System Design Criteria It should be evident the criteria for design have evolved and what is applicable to a specific plant depends to a large extent on the time frame in which it was constructed and licensed. Licensees take whatever documents are applicable at the time their project moves forward, including the proper revision dates, and implement them into their plant-specific design and operations.
The resulting EDG documents include:
System drawings and isometrics System specifications Equipment specification Purchase specifications Installation and Test Criteria The design criteria which were applied to the plant are typically listed or referenced in the licensee design and equipment specifications and the Final safety Analysis Report / Updated Final Safety Analysis Report (FSAR / UFSAR).
Highlights of Licensee FSAR / UFSAR:
Highlights of Licensee FSAR / UFSAR:
10 CFR 50.63, "Loss of all Alternating Current Power."The specified station              FSAR / UFSAR Chapter 1, Plant blackout duration shall be based on the              (Design)
FSAR / UFSAR Chapter 1,
Plant (Design)  


== Description:==
==
Typically following factors:                                    outlines the design criteria applicable to the plant design, construction, and
Description:==
  "(i) The redundancy of the onsite                    operation. NOTE: Subsequent updates emergency ac power sources;                          of regulatory criteria may be difficult, or (ii) The reliability of the onsite emergency          impractical, for a licensee to back-fit.
Typically outlines the design criteria applicable to the plant design, construction, and operation. NOTE: Subsequent updates of regulatory criteria may be difficult, or impractical, for a licensee to back-fit.
ac power sources;"
The licensees Final Safety Analysis Report or Updated Final Safety Analysis Report (FSAR/ UFSAR) will document the regulatory requirements followed in their licensing process.  
The licensees Final Safety Analysis RG 1.155 also invokes NUMARC 8700:                    Report or Updated Final Safety Analysis Guidlines and Technical Bases for                    Report (FSAR/ UFSAR) will document NUMARC Initiatives Addressing Station                the regulatory requirements followed in Blackout at Light Water Reactors.                    their licensing process.
Rev 3/16                                      1-9 of 12                                USNRC HRTD


Emergency Diesel Generator                         Diesel Generators as Emergency Power Sources FSAR / UFSAR Chapter 8, Section                   Additional limiting requirements for the 8.3(4), Onsite Emergency (AC) Power             availability of Emergency Power supplies Systems: The bulk of the plant-specific         are contained within the Technical design criteria applied by the licensee to     Specifications for the supported safety the EDGs is typically included here.           systems. These Technical Specs typically identify the plant mode and required number FSAR / UFSAR Chapter 9, Plant                     of available Trains or Divisions of that safety Auxiliary Systems: Typically includes           system. Reg Guide 1.93 (see previous) design criteria for many of the major           should be referenced to assist with EDG support systems such as Fuel Oil,           determining NPP implementation and Jacket Water, Lube oil, and Starting Air.       compliance with Electric Power Technical Specification LCOs, including Emergency All licensees were required to develop plant       Diesel Generators.
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-10 of 12 USNRC HRTD FSAR / UFSAR Chapter 8, Section 8.3(4), Onsite Emergency (AC) Power Systems: The bulk of the plant-specific design criteria applied by the licensee to the EDGs is typically included here.
Technical Specifications that prescribe plant Limiting Conditions of Operation (LCOs) for         FSAR/USFAR Chapter 14, Accident required safety systems. As outlined in 10               (Safety) Analysis: The following CFR 50.36, "The technical specifications               constitute a few of the generic plant will be derived from the analyses and                   design basis events or accidents where evaluation included in the safety analysis               Emergency Diesel generators are report, and amendments thereto, submitted               required to mitigate the resulting effects:
FSAR / UFSAR Chapter 9,
pursuant to 50.34. (c) Technical specifications will include items in the                 Loss of Coolant Accident (LOCA) with following categories:                                    LOOP: Safety Injection Actuation (SIAS) due to large or small break Loss of (1) Safety limits, limiting safety system                Coolant Accident, with a concurrent or settings, and limiting control settings.                subsequent Loss of Offsite (preferred)
Plant Auxiliary Systems: Typically includes design criteria for many of the major EDG support systems such as Fuel Oil, Jacket Water, Lube oil, and Starting Air.
(i)(A) Safety limits for nuclear reactors are            Power (LOCA / LOOP or SI / LOOP).
All licensees were required to develop plant Technical Specifications that prescribe plant Limiting Conditions of Operation (LCOs) for required safety systems. As outlined in 10 CFR 50.36, "The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to 50.34.
limits upon important process variables that are found to be necessary to reasonably                  NOTE:   Many plants were originally protect the integrity of certain of the physical        designed for a LOCA with a concurrent barriers that guard against the uncontrolled            LOOP in such a manner that other release of radioactivity. If any safety limit            scenarios may not have been is exceeded, the reactor must be shut                    adequately addressed. Be aware of down."                                                  associated issues contained within IN 93-17 and TI 2515 / 176 regarding LOCA The following are key typical Technical                  with a subsequent LOOP, and LOOP Specifications which apply to EDGs:                      with subsequent LOCA.
(c)
Loss of Offsite Power (LOOP): Loss of 3 / 4.8: Electrical Power Systems normal and preferred electric power to 3 / 4.8.1: AC Sources - Operating station auxiliaries.
Technical specifications will include items in the following categories:
3 / 4 .8.2: AC Sources - Shutdown NOTE: Cases have been identified Rev 3/16                                      1-10 of 12                              USNRC HRTD
(1) Safety limits, limiting safety system settings, and limiting control settings.
(i)(A) Safety limits for nuclear reactors are limits upon important process variables that are found to be necessary to reasonably protect the integrity of certain of the physical barriers that guard against the uncontrolled release of radioactivity. If any safety limit is exceeded, the reactor must be shut down."
The following are key typical Technical Specifications which apply to EDGs:
3 / 4.8: Electrical Power Systems 3 / 4.8.1: AC Sources - Operating 3 / 4.8.2: AC Sources - Shutdown Additional limiting requirements for the availability of Emergency Power supplies are contained within the Technical Specifications for the supported safety systems. These Technical Specs typically identify the plant mode and required number of available Trains or Divisions of that safety system. Reg Guide 1.93 (see previous) should be referenced to assist with determining NPP implementation and compliance with Electric Power Technical Specification LCOs, including Emergency Diesel Generators.
FSAR/USFAR Chapter 14, Accident (Safety)
Analysis:
The following constitute a few of the generic plant design basis events or accidents where Emergency Diesel generators are required to mitigate the resulting effects:
Loss of Coolant Accident (LOCA) with LOOP: Safety Injection Actuation (SIAS) due to large or small break Loss of Coolant Accident, with a concurrent or subsequent Loss of Offsite (preferred)
Power (LOCA / LOOP or SI / LOOP).
NOTE: Many plants were originally designed for a LOCA with a concurrent LOOP in such a manner that other scenarios may not have been adequately addressed. Be aware of associated issues contained within IN 93-17 and TI 2515/176 regarding LOCA with a subsequent LOOP, and LOOP with subsequent LOCA.
Loss of Offsite Power (LOOP): Loss of normal and preferred electric power to station auxiliaries.
NOTE: Cases have been identified  


Emergency Diesel Generator                         Diesel Generators as Emergency Power Sources where actual monitoring for loss of offsite     Generator: Serving as the interconnected power was not being performed at the           emergency electrical source, the generator 4KV class 1E buses. Then it would be           follows (responds to) the electrical load possible for the 1E bus to lose power or       demands placed on the ESF bus. Major become disconnected from the offsite           components of generators are:
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-11 of 12 USNRC HRTD where actual monitoring for loss of offsite power was not being performed at the 4KV class 1E buses. Then it would be possible for the 1E bus to lose power or become disconnected from the offsite (preferred) source with no automatic initiation of the EDG to restore power.
(preferred) source with no automatic initiation of the EDG to restore power.
High Energy Line Break (HELB): Steam or feedwater system piping failure with Loss of Offsite Power (LOOP).
NOTE: Issues have been identified where at least one of the Emergency Diesel Generators could be adversely impacted by the postulated HELB and was not previously protected against it.
The preferred plant power source is always the normal offsite power supply, as defined in Regulatory Guide 1.9 and associated standards, including IEEE 308-1980, "Criteria for Class 1E Power Systems for Nuclear Power Generating Stations."
1.5.3 EDG Component Selection Each emergency diesel generator is one of the most unique and complex "support systems" found within a nuclear power plant.
The EDG is itself an independent miniature power plant serving critical safety equipment within the much larger facility.
Figure 1-1 "Diesel Generator Systems" (next page) is from RG 1.9 and illustrates an EDG system, including most of its support systems. The selection of EDGs to serve as independent, redundant, power sources for nuclear power plant emergency systems involves evaluation of the following major components, support systems, and circuits:
Generator: Serving as the interconnected emergency electrical source, the generator follows (responds to) the electrical load demands placed on the ESF bus. Major components of generators are:
* Generator housing and stator
* Generator housing and stator
* Generator rotor and exciter High Energy Line Break (HELB): Steam
* Generator rotor and exciter
* Voltage Regulator or feedwater system piping failure with
* Voltage Regulator
* EDG emergency trip controls and relays Loss of Offsite Power (LOOP).
* EDG emergency trip controls and relays Diesel Engine: Most of the diesel engines installed at current nuclear power plants were selected using guidance of the Diesel Engine Manufacturers Association (DEMA).
NOTE:    Issues have been identified          Diesel Engine: Most of the diesel engines where at least one of the Emergency            installed at current nuclear power plants Diesel Generators could be adversely            were selected using guidance of the Diesel impacted by the postulated HELB and            Engine Manufacturers Association (DEMA).
Their "Standard Practices for Low and Medium Speed Diesel and Gas Engines, DEMA-1972, was the 6th edition of this standard, which has not been actively updated since.
was not previously protected against it.        Their "Standard Practices for Low and Medium Speed Diesel and Gas Engines, The preferred plant power source is always          DEMA-1972, was the 6th edition of this the normal offsite power supply, as defined        standard, which has not been actively in Regulatory Guide 1.9 and associated              updated since.
As the prime mover, the diesel engine follows (responds to) both the steady state and transient load demands applied to the generator. Its major components and systems are:
standards, including IEEE 308-1980, "Criteria for Class 1E Power Systems for            As the prime mover, the diesel engine Nuclear Power Generating Stations."                follows (responds to) both the steady state and transient load demands applied to the 1.5.3 EDG Component Selection                      generator.     Its major components and systems are:
* Governor
Each emergency diesel generator is one of
* Starting System (air or electric)
* Governor the most unique and complex "support
* Fuel Oil Delivery System
* Starting System (air or electric) systems" found within a nuclear power plant.
* Combustion Air Intake
The EDG is itself an independent miniature
* Fuel Oil Delivery System power plant serving critical safety equipment
* Combustion Air Intake within the much larger facility.
* Exhaust System
* Exhaust System
* Lubrication System Figure 1-1 "Diesel Generator Systems" (next page) is from RG 1.9 and illustrates an
* Lubrication System
* Cooling (Jacket Water) System EDG system, including most of its support
* Cooling (Jacket Water) System
* Crankcase Ventilation systems. The selection of EDGs to serve as
* Crankcase Ventilation
* EDG start logic controls and relays independent, redundant, power sources for
* EDG start logic controls and relays
* Emergency run controls and Relays nuclear power plant emergency systems involves evaluation of the following major components, support systems, and circuits:
* Emergency run controls and Relays  
Rev 3/16                                      1-11 of 12                              USNRC HRTD


Emergency Diesel Generator         Diesel Generators as Emergency Power Sources Figure 1-1 Diesel Generator Systems Rev 3/16                     1-12 of 12                           USNRC HRTD}}
Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-12 of 12 USNRC HRTD Figure 1-1 Diesel Generator Systems}}

Latest revision as of 15:12, 19 December 2024

Training Material for E-111 Emergency Diesel Generator Course, Chapter 1 (7-18), Diesel Generator as Emergency Power Sources
ML20043F652
Person / Time
Issue date: 02/12/2020
From:
Office of the Chief Human Capital Officer, Woodard Corp
To:
Gary Callaway
Shared Package
ML20043F634 List:
References
Download: ML20043F652 (12)


Text

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-1 of 12 USNRC HRTD

1.

DIESEL GENERATORS AS EMERGENCY POWER SOURCES Learning Objectives The predominant means of supplying onsite emergency (standby) electrical power for nuclear power plants (NPPs) is emergency diesel generators (EDGs). Therefore, diesel generator sets are the specific focus of this NRC training course. Upon completing this lesson students will understand the fundamental criteria used in selection of emergency diesel generators for onsite electric power supplies at NPP's. That will include an overview of the primary federal regulations, regulatory guides, codes, and industry standards applicable to these essential safety systems.

In addition, this lesson will conclude with a summary overview of the EDG and its associated systems and components, as well as remarks on how they interface with site facilities. For the EDG to be capable of performing its design basis function, all of its on-skid and off-skid support systems and components must also meet their own design basis functional requirements.

The primary objective of this lesson is to set the stage for later Chapters by giving students a fundamental understanding of:

1.

The basic regulatory requirements establishing the need for redundant power systems (onsite and offsite) for operating nuclear power plants.

2.

Three fundamental performance requirements that emergency diesel generators (EDGs) must meet.

3.

Why diesel engines are used as the prime movers for emergency power generators instead of alternative engine designs.

4.

An overview of the regulations, codes, guides, and standards that establish the design basis for these emergency power systems.

5.

How the above documents are translated into the licensee's application and design for a nuclear power station.

6.

The major components of a diesel generator system, as well as some considerations involving site facilities that support EDG operation.

NOTE: Many participants in this course will already be very familiar with the regulatory criteria applicable to EDGs. However, the NRC requires such documentation to be part of the course because some attendees may be relatively new on the job. Even those with considerable experience may benefit from a brief review of the underlying documentation. This Chapter provides an overview of the fundamental requirements relevant to EDGs in nuclear service. For both new and experienced staff it can serve as a convenient reference.

1.1 Regulatory Basis for Redundant, Independent Power Systems Federal regulations applicable to nuclear power plants and, hence, onsite emergency power supplies, originate in Title 10, Part 50 of the Code of Federal Regulations (10 CFR 50). This document is the successor to the

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-2 of 12 USNRC HRTD Atomic Energy Commission (AEC) General Design Criteria of 10 July 1967, to which many early Nuclear Power Plants, meaning those starting construction prior to 1972, were licensed. Supporting regulatory guides, codes, and industry standards used to implement these federal regulations are briefly described in this Chapter.

One of the most important nuclear power plant safety requirements is for redundant, and independent, power systems. This is contained in 10 CFR 50 Appendix A, General Design Criterion (GDC) 17, which specifically requires both off-site and onsite power systems "to permit functioning of structures,

systems, and components important to safety."

GDC 17 further states that onsite electric power supplies, including the distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.

This requires emergency power systems to be designed such that failure of one will not adversely impact the other (more about that later). Each electric power source must be capable of providing the capacity and capability to assure that:

1. "Fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded" for any anticipated occurrences, and
2. The "core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents."

Loss of Offsite Power (a LOOP) is not an accident but is considered a precursor to possible core damage and, therefore, is part of various postulated accident scenarios.

Independence is the absence of shared components that could result in the simultaneous failure of both units. That includes physical and electrical separation, such that a transformer or cable tray fire, for example, would not impact operation of the other emergency diesel generator.

Redundancy is required to achieve the desired operational reliability, and also to accommodate "down time" for testing and maintenance. This means a dual EDG installation, where the required power is available with either unit out of service.

Testability is somewhat self-explanatory.

EDG testing is discussed in Chapter 11.

1.2 Regulatory Guide (RG) 1.9 and the Three Fundamental Performance Requirements for EDGs Regulatory Guide 1.9, Rev 4 (March 2007) is "Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants" (new title for this edition) and evolved from AEC Safety Guide 9. A copy of RG 1.9, Rev 4 is included in this Manual as Appendix B. It covers three fundamental performance requirements every EDG must meet to perform its design function per referenced Standards. They are as follows:

1. The unit must be able to "...start and accelerate a number of large motor loads in rapid succession while maintaining voltage and frequency within acceptable limits...."

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-3 of 12 USNRC HRTD

2. The unit must also be able to "...provide power promptly to engineered safety features if a loss of offsite power and an accident occur during the same time period...."
3. The unit must

"...supply power continuously to the equipment needed to maintain the plant in a safe condition...."

A later chapter will cover the challenge of complying with the first of these three performance requirements (EDG loading).

Item (2) immediately above introduces the requirement to cope with two events (failures / accidents) that occur either simultaneously or with one following the other. Finally, please note Item (3) has no endurance time. "Continuously" is open-ended and effectively means "until normal power is restored" (however long it takes).

1.3 Why DIESEL Generators?

There is no requirement that emergency diesel generators must be used for onsite electric power supplies at nuclear power plants. Hence, a natural question could be, why have diesel generators been selected as the predominant means of supplying this power? Some other potential prime movers that could have been selected are:

  • Gasoline/Gaseous Fuel Engines
  • Gas Turbine Engines
  • Hydro-electric generation
  • Steam-driven turbine generator
  • Possible hybrid arrangement of stored energy and a slower-response system.

The answer to why diesel generators can usually be found by looking at the time requirement set for the onsite emergency power source to be ready to accept loads following loss of offsite power. So, two fundamental questions asked in the selection of the emergency onsite power source are:

1. Based on the plant-specific accident analysis, how fast must electrical power be restored to support Emergency Core Cooling System (ECCS) operation to prevent core damage (i.e., to keep from exceeding peak fuel clad temperature)?

Stated another way, how soon must the emergency electrical source be running with breaker closed, ready to accept the required step loads? By analysis, many of the reactor designs required power to be available within 15 to 30 seconds after receiving a start signal. Although this time included the inherent delay for protective circuits to sense the loss of power and initiate a start signal to the emergency power source, the bulk of it represented the start-up time necessary to spin up the generator, energize its field, and get it switched on line.

To assure an acceptable margin of safety, the accident analysis for many reactor designs assumed emergency generator power would be available within 10 seconds.

NOTE: In some plants where nuclear fuel upgrades have been implemented and new core damage accident analysis calculations performed, they have frequently supported a corresponding increase in the delay time for emergency generator availability.

However, it was not unusual to have the containment integrity support systems (e.g.

Containment Spray System) become the new limiting consideration.

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-4 of 12 USNRC HRTD

2. Once the accident analysis has set the time limitations on restoration of power to vital safety equipment, the only remaining question is what power supplies are readily available that could reliably supply the needed power within those time limitations?

With the exception of large gas engines, which have other onsite energy availability and safety concerns, none of the sources listed above could reliably match the required response time and output power as well as diesel generators could. To use a football analogy, they have the muscle to do the job and the speed to get there in time.

Furthermore, diesel generators were readily available and their proven reliability had already gained them acceptance as emergency power supplies under the Naval Reactors program.

Therefore, although other factors such as site location and engine type familiarity had some influence, the answers to the two questions above ultimately decided the question of what type of generators to use for NPP applications. Fundamentally, the decision became what diesel generators will best fill our emergency power needs?"

1.4 An Overview of EDG Regulations, Guides, Codes, and Standards 1.4.1 Early Plants Licensed under AEC General Design Criteria (i.e., those starting construction before 1972)

The primary design criteria applicable from early AEC regulatory requirements...those still being the GDC of record at many older nuclear power plantsare as follows:

Criterion 38: Reliability and Testability of Engineered Safety Features.

All engineered safety features shall be designed to provide high functional reliability and ready testability. In determining the suitability of a facility for proposed site, the degree of reliance upon the acceptance of the inherent and engineered safety afforded by the system, including the engineered safety features, will be influenced by the known and the demonstrated performance capability and reliability of the systems, and by the extent to which the operability of such systems can be tested and inspected where appropriate during the life of the plant.

Criterion 39: Emergency Power for Engineered Safety Features. Alternate power systems shall be provided and designed with adequate independency (independence), redundancy, capacity, and testability to permit the functioning required of the engineered safety features. As a minimum, the onsite power system and the offsite power system shall

each, independently, provide this capacity assuming a failure of a single active component in each power system.

Criterion 48: Testing of Operational Sequence of Emergency Core Cooling Systems. A capability shall be provided to test under conditions as close to design as practical the full operational sequence that would bring the emergency core cooling systems into action, including the transfer to alternate power sources.

Even the casual reader will note the close similarity between Criterions 38, 39, 48 and parts of 10 CFR 50 Appendix A, GDC 17.

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-5 of 12 USNRC HRTD The AEC had other GDC's which formed the basis for those currently appearing in 10 CFR 50 Appendix A. Likewise, AEC Safety Guides that were used to interpret and implement those early design criteria became the foundation for current NRC Regulatory Guides. Some early NPP's have voluntarily adopted portions of current requirements applicable to EDGs, such as IEEE 387 (discussed later). Therefore, no further time will be spent on early criteria.

1.4.2 Plants Licensed by NRC using the GDC of 10 CFR 50 Appendix A (construction began 1972 or later)

As explained in Section 1.1, the 10 CFR 50 Appendix A General Design Criteria are the successor documents to AEC GDC's.

Those listed below provide primary design criteria for EDGs. Some others that have relevant secondary criteria such as for the physical plant design will not be described (e.g., GDC 2, 4, 5, and 50).

Criterion 17: "Electrical Power Systems" To recap the previous discussions on page 1-2, GDC 17 states the fundamental safety mission for on-site (and off-site) electrical systems, as well as the key attributes of independence, redundancy, and testability.

Criterion 18: "Inspection and Testing of Electrical Power Systems" Electric power systems important to safety shall be designed to permit appropriate periodic inspection and testing of important areas and features, such as wiring, insulation, connections, and switchboards, to assess the continuity of the systems and the condition of their components. The systems shall be designed with a capability to test periodically (1) the operability and functional performance of the components of the systems, such as onsite power sources, relays, switches, and buses, and (2) the operability of the systems as a whole and, under conditions as close to design as practical, the full operation sequence that brings the systems into operation, including operation of applicable portions of the protection system, and the transfer of power among the nuclear power unit, the offsite power system, and the onsite power system.

Criterion 33, 34, 35, 38, 41, and 44:

Establish the criteria for specific safety systems to be able to perform their required functions even assuming a Loss of Offsite Power (LOOP) and a single failure of a source of onsite power (e.g. one EDG Train or Division).

1.4.3 "Top Level" NRC Regulations that Pertain to NPP Licensing, Construction, Commissioning, and Operation:

  • 10 CFR 50.23 Construction permits. A permit for the construction of a

production or utilization facility will be issued prior to the issuance of a license if the application is otherwise acceptable, and will be converted upon due completion of the facility and Commission action into a license as provided in 50.56 of this part.

  • 10 CFR 50.34 - Details the contents of applications; technical information. For purposes of this course, the following excerpts from this document are of particular significance to EDG selection:

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-6 of 12 USNRC HRTD

"(a) Preliminary safety analysis report.

Each application for a construction permit shall include a preliminary safety analysis report. (3) The preliminary design of the facility including:

(i) The principal design criteria for the facility. Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum requirements for the principal design criteria for water-cooled nuclear power plants similar in design and location to plants for which construction permits have previously been issued by the Commission and provides guidance to applicants for construction permits in establishing principal design criteria for other types of nuclear power units; (ii) The design bases and the relation of the design bases to the principal design criteria; (iii)

Information relative to materials of construction, general arrangement, and approximate dimensions, sufficient to provide reasonable assurance that the final design will conform to the design bases with adequate margin for safety..."

"(b) Final safety analysis report. Each application for a license to operate a facility shall include a final safety analysis report. The final safety analysis report shall include information that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures,

systems, and components and of the facility as a whole"
  • 10 CFR 50.36 - This document covers technical specifications intended to define safety system limiting conditions for operation that may prevent design and license safety function. More about this topic appears later in the Chapter, under Regulatory Guides 1.93, 1.156.

"Each operating license for a boiling or pressurized water-cooled nuclear power facility is subject to the conditions in paragraphs (f)* and (g)* of this section and each construction permit for a utilization facility is subject to the following conditions in addition to those specified in §50.55:

"(a)(1)

Structures,

systems, and components must be
designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed."
  • NOTE: Items (f) and (g) above refer to In-service inspection requirements.
  • 10 CFR 50.56 Conversion of construction permit to license; or amendment of license. Upon completion of the construction or alteration of a facility, in compliance with the terms and conditions of the construction permit and subject to any necessary testing of the facility for health or safety purposes, the Commission will, in the absence of good cause shown to the contrary issue a license of the class for which the construction permit was issued or an

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-7 of 12 USNRC HRTD appropriate amendment of the license, as the case may be.

  • 10 CFR 50.63 Loss of All Alternating Current Power (Station Blackout). This is an additional source of functional regulatory requirements involving Emergency Diesel Generators. Target EDG reliability is used to determine station blackout coping capability.
  • 10 CFR 50 Appendix A, General Design Criteria. - This was previously discussed in this Chapter. See Sections 1.1, 1.4.2, etc.

1.5 Implementation of These Criteria into Site-Specific System Design 1.5.1 Overview of Primary Regulatory Guides and Referenced Standards Used to Implement Design Criteria For early nuclear plants licensed under AEC General Design Criteria the applicable design requirements were implemented via the AEC's Safety Guides. With transition of the criteria to 10 CFR 50, Appendix A, the NRC's Regulatory Guides (RG's) became the means to implement requirements into NPP design.

Under both of these regimes, codes and standards developed by industry groups or national organizations (e.g., ANSI, IEEE, NFPA, etc.) were incorporated into the regulations. This training course provides just an overview of the more important documents relevant to EDGs.

Power Sources and Between Their Distribution Systems," (Formerly Safety Guide 6). Each power supply (e.g. EDG) shall have the "...capability of performing as a redundant unit of a standby power supply." Therefore, mechanically and electrically, the Emergency Diesel Generator must be able to operate during and after any design basis event without support from a preferred power source.

(formerly AEC Safety Guide 9). RG 1.9, Rev 4 (March, 2007) was introduced in 1.2 of this Chapter and discusses three fundamental performance requirements for EDGs. It incorporates portions of GDC 17 Electric Power Systems, and GDC 18 Inspection and Testing of Electrical Power Systems. RG 1.9 also references these IEEE documents:

  • IEEE 308 - "Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations." In practice, Section 6.2.4, "Standby Power Supplies," of the IEEE 308 standard is implemented through IEEE 387.

"IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations." The parent standard to IEEE 387-1995 (and 1984) is

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-8 of 12 USNRC HRTD IEEE Standard 308-1980. IEEE 387 expands on IEEE 308, Section 6.2.4, "Standby Power Supplies" with respect to application of diesel generator units.

This standard provides many amplifying and supplemental details, in conjunction with Regulatory Guide 1.9, regarding the design, testing, and qualification of Emergency Diesel Generators used in nuclear applications. Not all plants are committed to use IEEE 387, especially those licensed prior to 1972. IEEE 387 also endorses several other codes and standards including the Diesel Engine Manufacturers Association (DEMA) guide Standard Practices for Low and Medium Speed Stationary Diesel and Gas Engines, last revised in 1972. DEMA is no longer an active association but its guidelines are still relevant to the design criteria applied to EDGs installed at most US nuclear power plants. Post-1977 versions of the IEEE 387 standard also outline criteria for initial EDG first unit qualification tests for NPP service.

These will be discussed in Chapter 11.

NOTE: IEEE 387-1995 gives the design basis for nuclear service EDGs as 4000 starts and 6000 operating hours, over a specified service life of 40 years. Such intermittent duty is very different from typical commercial service! This course will point out the profound impact that has on EDG maintenance and testing, as well as some design implications. A copy of IEEE 387-1995 is Appendix 3.

  • IEEE 323 - "Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations."
  • Regulatory Guide 1.32 - "Criteria for Safety-Related Electric Power Systems for Nuclear Power Plants." RG 1.32 seeks to implement compliance with portions of the following document:
  • GDC 17 - Electric Power Systems.
  • IEEE 308 - "Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations." Invoked by RG 1.32, this Standard specifies capabilities of a Standby Power Supply (e.g. EDG) to serve as an independent / redundant unit (or Train or Division) of power.

Deals more with the physical than functional independence or separation between classes and Trains or Divisions.

The criteria are intended to ensure adequate independence through physical separation and barriers to assure continued function under all postulated plant events. RG 1.75 also invokes the following Standards:

  • IEEE 384 - "Standard Criteria for Independence of Class 1E Equipment and Circuits.

Regulatory Guide 1.93 - "Availability of Electric Power Sources." RG 1.93 provides guidance for the application of 10 CFR 50.36 (above), particularly section 50.36(c)(2), "Limiting Conditions for Operation," (LCO) when less than the number of power supplies required by GDC 17 are available.

Regulatory Guide 1.108 - "Periodic

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-9 of 12 USNRC HRTD Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants." (Withdrawn.

See 58 FR 41813, 5 August 1993.

Superseded by Regulatory Guide 1.9, Revision 3).

NOTE: Some of the early design plants previously committed to Regulatory Guide 1.108 only adopted portions of Regulatory Guide 1.9.

Regulatory Guide 1.137 - "Fuel-Oil Systems for Standby Diesel Generators." RG 1.137 also seeks to implement compliance with portions of GDC 17, Electric Power Systems (above), and it endorses the following standard for regulatory compliance.

ANSI N195 / ANS 59.51 - "Fuel Oil Systems for Emergency Diesel Generators."

Regulatory Guide 1.155 - "Station Blackout." This Guide seeks to implement compliance with all of:

10 CFR 50.63, "Loss of all Alternating Current Power."The specified station blackout duration shall be based on the following factors:

"(i) The redundancy of the onsite emergency ac power sources; (ii) The reliability of the onsite emergency ac power sources;"

RG 1.155 also invokes NUMARC 8700:

Guidlines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors.

1.5.2 Licensee's Implementation of EDG System Design Criteria It should be evident the criteria for design have evolved and what is applicable to a specific plant depends to a large extent on the time frame in which it was constructed and licensed. Licensees take whatever documents are applicable at the time their project moves forward, including the proper revision dates, and implement them into their plant-specific design and operations.

The resulting EDG documents include:

System drawings and isometrics System specifications Equipment specification Purchase specifications Installation and Test Criteria The design criteria which were applied to the plant are typically listed or referenced in the licensee design and equipment specifications and the Final safety Analysis Report / Updated Final Safety Analysis Report (FSAR / UFSAR).

Highlights of Licensee FSAR / UFSAR:

FSAR / UFSAR Chapter 1,

Plant (Design)

==

Description:==

Typically outlines the design criteria applicable to the plant design, construction, and operation. NOTE: Subsequent updates of regulatory criteria may be difficult, or impractical, for a licensee to back-fit.

The licensees Final Safety Analysis Report or Updated Final Safety Analysis Report (FSAR/ UFSAR) will document the regulatory requirements followed in their licensing process.

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-10 of 12 USNRC HRTD FSAR / UFSAR Chapter 8, Section 8.3(4), Onsite Emergency (AC) Power Systems: The bulk of the plant-specific design criteria applied by the licensee to the EDGs is typically included here.

FSAR / UFSAR Chapter 9,

Plant Auxiliary Systems: Typically includes design criteria for many of the major EDG support systems such as Fuel Oil, Jacket Water, Lube oil, and Starting Air.

All licensees were required to develop plant Technical Specifications that prescribe plant Limiting Conditions of Operation (LCOs) for required safety systems. As outlined in 10 CFR 50.36, "The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to 50.34.

(c)

Technical specifications will include items in the following categories:

(1) Safety limits, limiting safety system settings, and limiting control settings.

(i)(A) Safety limits for nuclear reactors are limits upon important process variables that are found to be necessary to reasonably protect the integrity of certain of the physical barriers that guard against the uncontrolled release of radioactivity. If any safety limit is exceeded, the reactor must be shut down."

The following are key typical Technical Specifications which apply to EDGs:

3 / 4.8: Electrical Power Systems 3 / 4.8.1: AC Sources - Operating 3 / 4.8.2: AC Sources - Shutdown Additional limiting requirements for the availability of Emergency Power supplies are contained within the Technical Specifications for the supported safety systems. These Technical Specs typically identify the plant mode and required number of available Trains or Divisions of that safety system. Reg Guide 1.93 (see previous) should be referenced to assist with determining NPP implementation and compliance with Electric Power Technical Specification LCOs, including Emergency Diesel Generators.

FSAR/USFAR Chapter 14, Accident (Safety)

Analysis:

The following constitute a few of the generic plant design basis events or accidents where Emergency Diesel generators are required to mitigate the resulting effects:

Loss of Coolant Accident (LOCA) with LOOP: Safety Injection Actuation (SIAS) due to large or small break Loss of Coolant Accident, with a concurrent or subsequent Loss of Offsite (preferred)

Power (LOCA / LOOP or SI / LOOP).

NOTE: Many plants were originally designed for a LOCA with a concurrent LOOP in such a manner that other scenarios may not have been adequately addressed. Be aware of associated issues contained within IN 93-17 and TI 2515/176 regarding LOCA with a subsequent LOOP, and LOOP with subsequent LOCA.

Loss of Offsite Power (LOOP): Loss of normal and preferred electric power to station auxiliaries.

NOTE: Cases have been identified

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-11 of 12 USNRC HRTD where actual monitoring for loss of offsite power was not being performed at the 4KV class 1E buses. Then it would be possible for the 1E bus to lose power or become disconnected from the offsite (preferred) source with no automatic initiation of the EDG to restore power.

High Energy Line Break (HELB): Steam or feedwater system piping failure with Loss of Offsite Power (LOOP).

NOTE: Issues have been identified where at least one of the Emergency Diesel Generators could be adversely impacted by the postulated HELB and was not previously protected against it.

The preferred plant power source is always the normal offsite power supply, as defined in Regulatory Guide 1.9 and associated standards, including IEEE 308-1980, "Criteria for Class 1E Power Systems for Nuclear Power Generating Stations."

1.5.3 EDG Component Selection Each emergency diesel generator is one of the most unique and complex "support systems" found within a nuclear power plant.

The EDG is itself an independent miniature power plant serving critical safety equipment within the much larger facility.

Figure 1-1 "Diesel Generator Systems" (next page) is from RG 1.9 and illustrates an EDG system, including most of its support systems. The selection of EDGs to serve as independent, redundant, power sources for nuclear power plant emergency systems involves evaluation of the following major components, support systems, and circuits:

Generator: Serving as the interconnected emergency electrical source, the generator follows (responds to) the electrical load demands placed on the ESF bus. Major components of generators are:

  • Voltage Regulator
  • EDG emergency trip controls and relays Diesel Engine: Most of the diesel engines installed at current nuclear power plants were selected using guidance of the Diesel Engine Manufacturers Association (DEMA).

Their "Standard Practices for Low and Medium Speed Diesel and Gas Engines, DEMA-1972, was the 6th edition of this standard, which has not been actively updated since.

As the prime mover, the diesel engine follows (responds to) both the steady state and transient load demands applied to the generator. Its major components and systems are:

  • Governor
  • Starting System (air or electric)
  • Fuel Oil Delivery System
  • Combustion Air Intake
  • Exhaust System
  • Lubrication System
  • Cooling (Jacket Water) System
  • Crankcase Ventilation
  • EDG start logic controls and relays
  • Emergency run controls and Relays

Emergency Diesel Generator Diesel Generators as Emergency Power Sources Rev 3/16 1-12 of 12 USNRC HRTD Figure 1-1 Diesel Generator Systems