IR 05000445/2020005: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 1, 2020 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 37: | Line 37: | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at (817) 200-1141 with any questions you have regarding this letter | Please contact me at (817) 200-1141 with any questions you have regarding this letter | ||
Sincerely, | Sincerely, Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89 Enclosure: | ||
Inspection Plan cc w/ encl: Distribution via LISTSERV | |||
/RA/ | /RA/ | ||
ML20240A295 | ML20240A295 | ||
SUNSI Review | |||
Non-Sensitive Sensitive | |||
IP 22 Inspection Activity Plan Report Comanche Peak 07/01/2020 - 06/30/2022 Unit | Publicly Available | ||
Transportation Design Bases Assurance (Team) 21M - Comanche Peak | |||
Security FFD .08 | Non-Publicly Available | ||
EP Exercise and PI Inspection - CP | |||
OFFICE PE:DRP/B BC:DRP/B | |||
NAME JFMelfi NOKeefe | |||
DATE 08/25/2020 08/25/2020 | |||
Comanche Peak 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count CP 2020 WRITTEN RETAKE EXAM | |||
1 10/13/2019 07/11/2020 EXRT 000491 RETAKE (EXRT) | |||
Fire Protection Inspection - CP | |||
1, 2 06/22/2020 07/04/2020 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) | |||
Comanche Peak 1, 2 - Powered Operated Valve Inspection | |||
1, 2 08/10/2020 08/14/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 08/24/2020 08/28/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Security Access Control.02 | |||
1, 2 08/24/2020 08/28/2020 IP 71130.02 000734 Access Control 1, 2 08/24/2020 08/28/2020 IP 71130.09 001656 Security Plan Changes 1, 2 08/24/2020 08/28/2020 IP 71151 001338 Performance Indicator Verification TI 2515/194 - CP | |||
1, 2 09/21/2020 09/25/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) | |||
CPSES 2020 BRQ | |||
1, 2 09/27/2020 10/03/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Program Inspection | |||
1, 2 10/05/2020 10/09/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/05/2020 10/09/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/05/2020 10/09/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/05/2020 10/09/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/05/2020 10/09/2020 IP 71151 001397 Performance Indicator Verification RS13PI Radiation Safety | |||
1, 2 11/02/2020 11/06/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/02/2020 11/06/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 8/27/2020 8:12:33 AM Page 1 of 3 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
IP 22 Inspection Activity Plan Report | |||
Comanche Peak 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count RS8 | |||
1, 2 11/02/2020 11/06/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & | |||
Transportation Design Bases Assurance (Team) 21M - Comanche Peak | |||
1, 2 02/08/2021 02/26/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | |||
Security FFD.08 | |||
1, 2 02/22/2021 02/26/2021 IP 71130.08 000740 Fitness For Duty Program Comanche Peak ISFSI Loading Inspection (1 week in March | |||
1 03/01/2021 03/31/2021 IP 60855 001001 Operation Of An ISFSI | |||
03/01/2021 03/31/2021 IP 60857 001004 Review of 10 CFR 72.48 Evaluations In-Office EP Exercise Scenario Review - CP | |||
1, 2 04/07/2021 05/17/2021 IP 71114.08 000723 Exercise Evaluation | |||