Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000321, 05000366, and 07200036 License Nos. DPR-57 and NPF-5
 
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects  
 
Docket Nos. 05000321, 05000366, and 07200036 License Nos. DPR-57 and NPF-5  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000321 and 05000366 and 07200036 License Numbers: DPR-57 and NPF-5 Report Numbers: 05000321/2020004, 05000366/2020004 and 07200036/2020003 Enterprise Identifier: I-2020-004-0043 and I-2020-003-0076 Licensee: Southern Nuclear Operating Co., Inc.
Docket Numbers:
05000321 and 05000366 and 07200036  
 
License Numbers:
DPR-57 and NPF-5  
 
Report Numbers:
05000321/2020004, 05000366/2020004 and 07200036/2020003  
 
Enterprise Identifier: I-2020-004-0043 and I-2020-003-0076  
 
Licensee:
Southern Nuclear Operating Co., Inc.  
 
Facility:
Edwin I. Hatch Nuclear Plant
 
Location:
Baxley, GA
 
Inspection Dates:
October 01, 2020 to December 31, 2020
 
Inspectors:
B. Caballero, Senior Operations Engineer


Facility: Edwin I. Hatch Nuclear Plant Location: Baxley, GA Inspection Dates: October 01, 2020 to December 31, 2020 Inspectors: B. Caballero, Senior Operations Engineer C. Dykes, Senior Health Physicist C. Fontana, Emergency Preparedness Inspector J. Hickman, Resident Inspector M. Kennard, Sr. Operations Engineer D. Lanyi, Senior Operations Engineer N. Peterka, Fuel Facility Inspector W. Pursley, Health Physicist A. Rosebrook, Senior Reactor Analyst S. Sanchez, Senior Emergency Preparedness Inspector S. Sandal, Senior Reactor Analyst R. Smith, Senior Resident Inspector N. Staples, Senior Project Engineer J. Walker, Emergency Response Inspector Approved By: Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure
C. Dykes, Senior Health Physicist  
 
C. Fontana, Emergency Preparedness Inspector  
 
J. Hickman, Resident Inspector  
 
M. Kennard, Sr. Operations Engineer  
 
D. Lanyi, Senior Operations Engineer  
 
N. Peterka, Fuel Facility Inspector  
 
W. Pursley, Health Physicist  
 
A. Rosebrook, Senior Reactor Analyst  
 
S. Sanchez, Senior Emergency Preparedness Inspector  
 
S. Sandal, Senior Reactor Analyst  
 
R. Smith, Senior Resident Inspector  
 
N. Staples, Senior Project Engineer  
 
J. Walker, Emergency Response Inspector  
 
Approved By:
Alan J. Blamey, Chief
Reactor Projects Branch 2
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
Line 46: Line 102:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 64: Line 119:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
===Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of below freezing temperatures for the following systems on December 1, 2020:
: (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of below freezing temperatures for the following systems on December 1, 2020:  
1. Plant Service Water.
 
2. Residual Heat Removal Service Water.
 
3. Emergency Diesel Generators.


===1. Plant Service Water.===
===2. Residual Heat Removal Service Water.===
===3. Emergency Diesel Generators.===
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather during a Tornado Watch on April 23, 2020.
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather during a Tornado Watch on April 23, 2020.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (2 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
Line 86: Line 136:


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 95: Line 144:
: (3) Unit 1 Railroad Airlock, Drawing A-43966 Sheet 41 on December 18, 2020.
: (3) Unit 1 Railroad Airlock, Drawing A-43966 Sheet 41 on December 18, 2020.


Fire Brigade Drill Performance Sample (IP Section 03.02) ===
Fire Brigade Drill Performance Sample (IP Section 03.02)===
{{IP sample|IP=IP 43965|count=1}}
{{IP sample|IP=IP 43965|count=1}}
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on October 14, 2020.
: (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on October 14, 2020.


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==
===Cable Degradation (IP Section 03.02) (1 Sample)===
===Cable Degradation (IP Section 03.02) (1 Sample)===
The inspectors evaluated cable submergence protection in:
The inspectors evaluated cable submergence protection in:
Line 106: Line 154:


==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
===Requalification Examination Results (IP Section 03.03) (1 Sample)===
On November 12, 2020, the licensee completed the annual requalification operating test, which is required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. On November 20, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP
On November 12, 2020, the licensee completed the annual requalification operating test, which is required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. On November 20, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP  


===71111.11.
===71111.11.
Line 114: Line 161:


==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Requalification Program (IP Section 03.04)===
{{IP sample|IP=IP 71111.11|count=1}}
: (1) Biennial Requalification Written Examinations
The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered in December 2019.
Annual Requalification Operating Tests
The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.
Administration of an Annual Requalification Operating Test


Licensed Operator Requalification Program (IP Section 03.04) ===
The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.
{{IP sample|IP=IP 71111.11|count=1}}
 
: (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered in December 2019.
Requalification Examination Security
 
The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.
 
Remedial Training and Re-examinations


Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.
The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.


Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.
Operator License Conditions


Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.
The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.


Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
Control Room Simulator


Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.


Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.
Problem Identification and Resolution


Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.
The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 2 sequence exchange, deep control rod exercises and scram time testing on October 17, 2020.
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 2 sequence exchange, deep control rod exercises and scram time testing on October 17, 2020.
Line 142: Line 203:


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
Line 149: Line 209:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
Line 157: Line 216:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 166: Line 224:


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:


===Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)===
(1)34SO-E51-001-2, RCIC Pump Discharge Line Venting, Version 28.2, following Unit 2 RCIC system outage on October 7, 2020.
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
 
: (1) 34SO-E51-001-2, RCIC Pump Discharge Line Venting, Version 28.2, following Unit 2 RCIC system outage on October 7, 2020.
(2)52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.16, following the liner replacement on 1B EDG on October 22, 2020.
: (2) 52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.16, following the liner replacement on 1B EDG on October 22, 2020.
: (3) Work Order (WO) SNC814149 1C Residuals Heat Removal Service Water (RHRSW)
: (3) Work Order (WO) SNC814149 1C Residuals Heat Removal Service Water (RHRSW)
Pump Functional Test following the internal inspection of check-valve 1E11F005C on October 28, 2020.
Pump Functional Test following the internal inspection of check-valve 1E11F005C on October 28, 2020.
: (4) Work Orders SNC631596 and SNC929660 for 2B Reactor Protection System (RPS)one-year preventive maintenance including inspections, lubrication and functional testing and calibration of the power monitoring breakers, on November 10, 2020.
: (4) Work Orders SNC631596 and SNC929660 for 2B Reactor Protection System (RPS)one-year preventive maintenance including inspections, lubrication and functional testing and calibration of the power monitoring breakers, on November 10, 2020.
: (5) Work Orders SNC1063991 and SNC1092799 for 1D Residual Heat Removal Service Water pump and check valve replacement functional testing on November 23, 2020.
: (5) Work Orders SNC1063991 and SNC1092799 for 1D Residual Heat Removal Service Water pump and check valve replacement functional testing on November 23, 2020.
: (6) 52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.19, following the liner replacement on 1C EDG on December 9, 2020.
 
: (7) 34SV-R43-006-1, Diesel Generator 1C Semi-annual Test, Version 15.1, following the liner replacement on 1C EDG on December 10, 2020.
(6)52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.19, following the liner replacement on 1C EDG on December 9, 2020.
 
(7)34SV-R43-006-1, Diesel Generator 1C Semi-annual Test, Version 15.1, following the liner replacement on 1C EDG on December 10, 2020.
 
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:  
The inspectors evaluated the following surveillance tests:


===Surveillance Tests (other) (IP Section 03.01)===
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}
: (1) RCIC 2-E51-F012 Motor Operated Valve Acceptance Testing, Work Order
: (1) RCIC 2-E51-F012 Motor Operated Valve Acceptance Testing, Work Order SNC842422 on October 6, 2020.


===SNC842422 on October 6, 2020.
===Inservice Testing (IP Section 03.01) (1 Sample)===
Inservice Testing (IP Section 03.01) (1 Sample)===
(1)34SV-E51-002-1, RCIC Pump Operability, Version 28.8 (IST, Operating Pressure Test) on October 2, 2020.
: (1) 34SV-E51-002-1, RCIC Pump Operability, Version 28.8 (IST, Operating Pressure


===Test) on October 2, 2020.
===FLEX Testing (IP Section 03.02) (1 Sample)===
FLEX Testing (IP Section 03.02) (1 Sample)===
: (1) Work Order SNC947907, FLEX PM: FLEX Pump Hose Trailer Hose Inspection & Refold, on December 8, 2020.
: (1) Work Order SNC947907, FLEX PM: FLEX Pump Hose Trailer Hose Inspection &
Refold, on December 8, 2020.


==71114.02 - Alert and Notification System Testing==
==71114.02 - Alert and Notification System Testing==
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
===Inspection Review (IP Section 02.01-02.04) (1 Sample)===
: (1) The inspectors evaluated the maintenance and testing of the alert and notification           system during the week of November 2, 2020.
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system during the week of November 2, 2020.


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
===Inspection Review (IP Section 02.01-02.02) (1 Sample)===
: (1) The inspectors evaluated the readiness of the Emergency Response Organization           during the week of November 2, 2020.
: (1) The inspectors evaluated the readiness of the Emergency Response Organization during the week of November 2, 2020.


==71114.04 - Emergency Action Level and Emergency Plan Changes==
==71114.04 - Emergency Action Level and Emergency Plan Changes==
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
===Inspection Review (IP Section 02.01-02.03) (1 Sample)===
: (1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of November 2, 2020. This evaluation does not constitute NRC approval.
: (1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of November 2, 2020. This evaluation does not constitute NRC approval.


==71114.05 - Maintenance of Emergency Preparedness==
==71114.05 - Maintenance of Emergency Preparedness==
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)===
: (1) The inspectors evaluated the maintenance of the emergency preparedness program           during the week of November 2, 2020.
: (1) The inspectors evaluated the maintenance of the emergency preparedness program during the week of November 2, 2020.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
: (1) Emergency Preparedness Drill 20EX06, Seismic event with a loss of all offsite and onsite AC Power on October 28,
: (1) Emergency Preparedness Drill 20EX06, Seismic event with a loss of all offsite and onsite AC Power on October 28,


==RADIATION SAFETY==
==RADIATION SAFETY==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
===Walkdowns and Observations (IP Section 03.01) (4 Samples)===
===Walkdowns and Observations (IP Section 03.01) (4 Samples)===
The inspectors evaluated the following radioactive effluent systems during walkdowns:
The inspectors evaluated the following radioactive effluent systems during walkdowns:
Line 236: Line 287:


===Dose Calculations (IP Section 03.03) (2 Samples)===
===Dose Calculations (IP Section 03.03) (2 Samples)===
The inspectors evaluated the following dose calculations:
The inspectors evaluated the following dose calculations:  
: (1) 64CH-RPT-006-0 Liquid Effluents Discharge Permit WSTA-1 L-20191225-624-B, 12/24/2019.
 
(1)64CH-RPT-006-0 Liquid Effluents Discharge Permit WSTA-1 L-20191225-624-B, 12/24/2019.


64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20191219-606-C, Y22-N008A, 12/20/2019.
64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20191219-606-C, Y22-N008A, 12/20/2019.
Line 244: Line 296:


64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20181213-373-C, Y22-N008A, 12/20/2018.
64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20181213-373-C, Y22-N008A, 12/20/2018.
: (2) 64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181211-200-C, 12/13/2018.
 
(2)64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181211-200-C, 12/13/2018.


64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181218-204-C, 12/19/2018.
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181218-204-C, 12/19/2018.
Line 252: Line 305:
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191217-202-C, 12/28/2019.
64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191217-202-C, 12/28/2019.


Abnormal Discharges (IP Section 03.04)
Abnormal Discharges (IP Section 03.04)  
 
There were no abnormal discharges during the period covered by the inspection which began in May 1, 2018.
There were no abnormal discharges during the period covered by the inspection which began in May 1, 2018.


==71124.07 - Radiological Environmental Monitoring Program==
==71124.07 - Radiological Environmental Monitoring Program==
===Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)===
===Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)===
: (1) The inspectors evaluated environmental monitoring equipment and observed           collection of environmental samples.
: (1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.


===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
===Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the implementation of the licensees radiological           environmental monitoring program.
: (1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.


===GPI Implementation (IP Section 03.03) (1 Sample)===
===GPI Implementation (IP Section 03.03) (1 Sample)===
: (1) The inspectors evaluated the licensees implementation of the Groundwater           Protection Initiative program to identify incomplete or discontinued program elements.
: (1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
EP01: Drill/Exercise Performance (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) EP01: Drill & Exercise Performance for the period July 1, 2019, through June 30, 2020.
: (1) EP01: Drill & Exercise Performance for the period July 1, 2019, through June 30, 2020.


===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
===EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
: (1) EP02: Emergency Response Organization Drill Participation for the period July 1,           2019, through June 30, 2020.
: (1) EP02: Emergency Response Organization Drill Participation for the period July 1, 2019, through June 30, 2020.


===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
: (1) EP03: Alert & Notification System Reliability for the period July 1, 2019, through June           30, 2020.
: (1) EP03: Alert & Notification System Reliability for the period July 1, 2019, through June 30, 2020.


===MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)===
===MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)===
Line 297: Line 352:


==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in Appendix R Emergency Lighting failures, due to high number of failures through the year that might be indicative of a more significant safety issue.
: (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in Appendix R Emergency Lighting failures, due to high number of failures through the year that might be indicative of a more significant safety issue.


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL  


===41502 - Nuclear Power Plant Simulation Facilities Nuclear Power Plant Simulation Facilities ===
===41502 - Nuclear Power Plant Simulation Facilities Nuclear Power Plant Simulation Facilities===
{{IP sample|IP=IP 41502|count=1}}
{{IP sample|IP=IP 41502|count=1}}
: (1) The inspector completed inspection of the Unit 1 Plant Reference Simulator (PRS)
: (1) The inspector completed inspection of the Unit 1 Plant Reference Simulator (PRS)  
          "B" in accordance with Inspection Procedure (IP) 41502 "Nuclear Power Plant Simulation Facilities.
"B" in accordance with Inspection Procedure (IP) 41502 "Nuclear Power Plant Simulation Facilities.


This inspection reviewed a sample of activities to ensure that Simulator B was being tested in accordance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination and appropriate approved plant procedures.
This inspection reviewed a sample of activities to ensure that Simulator B was being tested in accordance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination and appropriate approved plant procedures.
Line 319: Line 373:
No findings were identified. Results of this inspection were discussed with members of the facility staff on October 28, 2020.
No findings were identified. Results of this inspection were discussed with members of the facility staff on October 28, 2020.


===60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants ===
===60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants===
{{IP sample|IP=IP 60855|count=1}}
{{IP sample|IP=IP 60855|count=1}}
: (1) The inspectors evaluated the licensees activates related to long-term operation and monitoring of their independent spent fuel storage installation on November 6, 2020.
: (1) The inspectors evaluated the licensees activates related to long-term operation and monitoring of their independent spent fuel storage installation on November 6, 2020.


===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders ===
===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders  
 
Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders===
{{IP sample|IP=IP 92702|count=1}}
{{IP sample|IP=IP 92702|count=1}}
: (1) On November 20, 2019, as a result of Alternative Dispute Resolution the NRC issued Confirmatory Order (CO) EA-18-130 and EA-18-171 (ML19249B552). The CO was the result of an apparent violation of 10 CFR 53.5, Employee Protection at Vogtle Units 3 & 4 which contained actions for the Farley, Hatch and Vogtle Units 1 & 2 nuclear plants. During the week of November 30,2020, the inspectors reviewed corrective actions for this CO. Because the CO was fleet wide for the Southern Nuclear Company, the corrective actions reviewed by the inspectors included a review of corrective actions for the Hatch, Farley, and Vogtle Units 1 through 4 nuclear plants. The details can be found in inspection report 0500025/20200012, 0500026/2020012; 11/30/2020 through 12/11/2020; Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, CO Follow-Up and SCWE inspection report.
: (1) On November 20, 2019, as a result of Alternative Dispute Resolution the NRC issued Confirmatory Order (CO) EA-18-130 and EA-18-171 (ML19249B552). The CO was the result of an apparent violation of 10 CFR 53.5, Employee Protection at Vogtle Units 3 & 4 which contained actions for the Farley, Hatch and Vogtle Units 1 & 2 nuclear plants. During the week of November 30,2020, the inspectors reviewed corrective actions for this CO. Because the CO was fleet wide for the Southern Nuclear Company, the corrective actions reviewed by the inspectors included a review of corrective actions for the Hatch, Farley, and Vogtle Units 1 through 4 nuclear plants. The details can be found in inspection report 0500025/20200012, 0500026/2020012; 11/30/2020 through 12/11/2020; Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, CO Follow-Up and SCWE inspection report.
Line 339: Line 395:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type         Designation                       Description or Title               Revision or
Inspection
Procedure                                                                                      Date
Procedure
41502     Miscellaneous NMP-TR-422-004 Att 20 Section 3.4 Core Performance Testing - NMP-    1/22/2019
Type
Criticality                      TR-422-004 Att 20 Section 3.4
Designation
Description or Title
Revision or
Date
41502
Miscellaneous
NMP-TR-422-004 Att 20 Section 3.4
Criticality
Criticality
Test 503-1                       Loss of Coolant - Outside Primary   2/10/2020
Core Performance Testing - NMP-
TR-422-004 Att 20 Section 3.4
Criticality
1/22/2019
Test 503-1
Loss of Coolant - Outside Primary
Containment
Containment
Test 505-2                       Loss of Coolant - Small Reactor     2/14/2019
2/10/2020
Test 505-2
Loss of Coolant - Small Reactor
Coolant Breaks including
Coolant Breaks including
Demonstration of Saturation
Demonstration of Saturation
Condition
Condition
Test 505-2                       Loss of Coolant - Small Reactor     2/14/2019
2/14/2019
Test 505-2
Loss of Coolant - Small Reactor
Coolant Breaks including
Coolant Breaks including
Demonstration of Saturation
Demonstration of Saturation
Condition
Condition
Test 521-0                       Loss of Protective System Channel   2/14/2019
2/14/2019
Test 522-1                       Control Rod Failure including Stuck 2/10/2020
Test 521-0
Loss of Protective System Channel
2/14/2019
Test 522-1
Control Rod Failure including Stuck
Rods, Drifting Rods, Rod Drops,
Rods, Drifting Rods, Rod Drops,
and Misaligned Rods
and Misaligned Rods
Test 527-0                       Failure in Automatic Control       2/10/2020
2/10/2020
Test 527-0
Failure in Automatic Control
Systems that Affect Reactivity and
Systems that Affect Reactivity and
Core Heat Removal
Core Heat Removal
Test 604-0                       Reactor Trip Followed by Recovery   2/15/2019
2/10/2020
Test 604-0
Reactor Trip Followed by Recovery
to Rated Power
to Rated Power
Test 707-0                       Transient Performance - Maximum     2/3/2020
2/15/2019
Test 707-0
Transient Performance - Maximum
Power Ramp Recirc Down to
Power Ramp Recirc Down to
Approximately 75% and Back up to
Approximately 75% and Back up to
100%
100%
Test 708-2                       Transient Performance - Maximum     2/12/2019
2/3/2020
Test 708-2
Transient Performance - Maximum
Size Reactor Coolant System
Size Reactor Coolant System
Rupture Combined with a Loss of
Rupture Combined with a Loss of
Off-Site Power
Off-Site Power
Test: 615-1                       SS Performance 35% Power           2/12/2019
2/12/2019
Test: 704-0                       Transient Performance -             2/6/2019
Test: 615-1
Inspection Type       Designation       Description or Title               Revision or
SS Performance 35% Power
Procedure                                                                    Date
2/12/2019
Test: 704-0
Transient Performance -
2/6/2019  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Simultaneous Trip of all
Simultaneous Trip of all
Recirculation Pumps
Recirculation Pumps
60855.1   Engineering TE 1053015       Dry Cask Storage - 10 CFR 72.212   22
60855.1
Evaluations                  Report - Revision for 2020 UFLO
Engineering
Radiation                     Plant Hatch Radiological           04/28/2020
Evaluations
Surveys                      Information Survey # 179999 ISFSI
TE 1053015
Plant Hatch Radiological            04/28/2020
Dry Cask Storage - 10 CFR 72.212
Report - Revision for 2020 UFLO
Radiation
Surveys
Plant Hatch Radiological
Information Survey # 179999 ISFSI
04/28/2020
Plant Hatch Radiological
Information Survey # 180018 ISFSI
Information Survey # 180018 ISFSI
71111.01   Procedures 34AB-Y22-002-0   Naturally Occurring Phenomena       19.1
04/28/2020
NMP-OS-017       Attachment 1, Severe Weather       2.0
71111.01
Procedures
34AB-Y22-002-0
Naturally Occurring Phenomena
19.1
NMP-OS-017
1, Severe Weather
Preparation Checklist Maintenance
Preparation Checklist Maintenance
Section for 4/23/2020
Section for 4/23/2020
NMP-OS-017       Attachment 2, Severe Weather       2.0
2.0
NMP-OS-017
2, Severe Weather
Preparation Checklist Chemistry for
Preparation Checklist Chemistry for
4/23/2020
4/23/2020
NMP-OS-017       Attachment 3, Severe Weather       2.0
2.0
NMP-OS-017
3, Severe Weather
Preparation Checklist Operations
Preparation Checklist Operations
for 4/23/2020
for 4/23/2020
NMP-OS-017       Attachment 4, Severe Weather       2.0
2.0
NMP-OS-017
4, Severe Weather
Checklist Technology Organization
Checklist Technology Organization
for 4/23/3030
for 4/23/3030
NMP-OS-017       Attachment 5, Severe Weather       2.0
2.0
NMP-OS-017
5, Severe Weather
Preparation Checklist Security for
Preparation Checklist Security for
4/23/2020
4/23/2020
NMP-OS-017       Attachment 6, Severe Weather       2.0
2.0
NMP-OS-017
6, Severe Weather
Preparation Checklist Supply Chain
Preparation Checklist Supply Chain
for 4/23/2020
for 4/23/2020
NMP-OS-017       Attachment 7, Severe Weather       2.0
2.0
NMP-OS-017
7, Severe Weather
Preparation Checklist Emergency
Preparation Checklist Emergency
Preparedness for 4/23/2020
Preparedness for 4/23/2020
NMP-OS-017       Severe Weather                     3.0
2.0
71111.04   Drawings   H-13350           Unit 1 Master Single Line Diagram   30.0
NMP-OS-017
H-13350           Unit 1 Master Single Line Diagram   30.0
Severe Weather
Procedures 34SO-R22-001-1   4160 VAC System                     25.3
3.0
Inspection Type         Designation                               Description or Title               Revision or
71111.04
Procedure                                                                                            Date
Drawings
34SO-R43-001-1                           Diesel Generator Standby AC       29.3
H-13350
Unit 1 Master Single Line Diagram
30.0
H-13350
Unit 1 Master Single Line Diagram
30.0
Procedures
34SO-R22-001-1
4160 VAC System
25.3  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
34SO-R43-001-1
Diesel Generator Standby AC
System
System
34SV-SUV-013-1                           Breaker Alignment Checks           10.4
29.3
71111.05   Fire Plans   Drawing A-43965 Sheets 115, 118, and 119. Unit 2 Standby Gas and HVAC,       2
34SV-SUV-013-1
Miscellaneous                                           Fire Protection Fire Hazards       36.0
Breaker Alignment Checks
10.4
71111.05
Fire Plans
Drawing A-43965 Sheets 115, 118, and 119.
Unit 2 Standby Gas and HVAC,
Miscellaneous
Fire Protection Fire Hazards
Analysis (FHA)
Analysis (FHA)
NMP-TR-425-F01                           Fire Drill Scenario Development   10/13/2020
36.0
NMP-TR-425-F01
Fire Drill Scenario Development
and Approval Sheet for fire in
and Approval Sheet for fire in
drywell
drywell
Procedures   NMP-TR-425                               Fire Drill Program                 9.0
10/13/2020
NMP-TR-425-F14                           Fire Drill Package                 1.1
Procedures
71111.06   Procedures   52PM-Y46-001-0                           Inground Pullbox Debris           10.0
NMP-TR-425
Fire Drill Program
9.0
NMP-TR-425-F14
Fire Drill Package
1.1
71111.06
Procedures
2PM-Y46-001-0
Inground Pullbox Debris
Removal/Inspection
Removal/Inspection
71111.11B Miscellaneous H-LTC-SE-00314                           314 NRC 2                         Ver 1.0
10.0
19-7A RO                                 2019 RO Written Exam               12/15/2019
71111.11B
19-7A SRO                                 2019 SRO Written Exam             12/15/2019
Miscellaneous
H-LCT-SE-00302                           302 Pilot 2                       Rev 0.1
H-LTC-SE-00314
H-LT-JP-C11-010155                       Vent the Scram Header             Ver 16.5
314 NRC 2
H-LT-JP-C82-01013A                       Perform Plant Operations in       Ver 1.0
Ver 1.0
19-7A RO
2019 RO Written Exam
2/15/2019
19-7A SRO
2019 SRO Written Exam
2/15/2019
H-LCT-SE-00302
2 Pilot 2
Rev 0.1
H-LT-JP-C11-010155
Vent the Scram Header
Ver 16.5
H-LT-JP-C82-01013A
Perform Plant Operations in
Support of a Remote Plant
Support of a Remote Plant
Shutdown (Alternate Path)
Shutdown (Alternate Path)
H-lT-JP-E41-00515A                       Establish Reactor Cooldown with     Ver 0.1
Ver 1.0
H-lT-JP-E41-00515A
Establish Reactor Cooldown with
HPCI (Alternate Path)
HPCI (Alternate Path)
H-LT-JP-EAL-25068                         FG1 Emergency Classification -     Ver 3.1
Ver 0.1
H-LT-JP-EAL-25068
FG1 Emergency Classification -
Complete NMP-EP-141-F01
Complete NMP-EP-141-F01
H-LT-JP-EAL-25208                         Determine PARS (SRO only)         Ver 10.1
Ver 3.1
H-LT-JP-N33-01702B                       Perform TC-1, Seal Steam Failure   Ver 0.1
H-LT-JP-EAL-25208
                                                                  (Alternate Path)
Determine PARS (SRO only)
H-LT-JP-R42-02744                         Place the 125/250 VDC Station     Ver 19.3
Ver 10.1
H-LT-JP-N33-01702B
Perform TC-1, Seal Steam Failure  
(Alternate Path)
Ver 0.1
H-LT-JP-R42-02744
Place the 125/250 VDC Station
Service Battery Charger in Service
Service Battery Charger in Service
H-LT-JP-SUV-10022                         Conduct of Operations, 34SV-SUV-   Ver 2.2
Ver 19.3
H-LT-JP-SUV-10022
Conduct of Operations, 34SV-SUV-
019-1 Average Drywell
019-1 Average Drywell
Temperature Surveillance
Temperature Surveillance
H-LT-JP-T48-01362A                       Fast Vent the Drywell (Alternate   Ver 0.5
Ver 2.2
Inspection Type         Designation                                 Description or Title               Revision or
H-LT-JP-T48-01362A
Procedure                                                                                                Date
Fast Vent the Drywell (Alternate
Ver 0.5  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Path)
Path)
H-LTC-SE-00341                               341 Pilot 1                         Ver 1.0
H-LTC-SE-00341
H-LTC-SE-00342                               314 NRC 1                           Ver 0.1
341 Pilot 1
NDE Reports   H-LT-JP-R43-02824A                           Locally Start U2 EDG with Air Start Ver 1.6
Ver 1.0
H-LTC-SE-00342
314 NRC 1
Ver 0.1
NDE Reports
H-LT-JP-R43-02824A
Locally Start U2 EDG with Air Start
and Energ Bus (Alternate Path)
and Energ Bus (Alternate Path)
71111.11Q Corrective     CR10746882, 10746887, 10746968,
Ver 1.6
Action       10747001
71111.11Q Corrective
Action
Documents
Documents
Miscellaneous H-LTC-SE-00306                               Station Service Air Compressor Trip 1.0
CR10746882, 10746887, 10746968,
                                                                      , Recirculation Pump Trip , Reactor
10747001
 
Miscellaneous
H-LTC-SE-00306
Station Service Air Compressor Trip  
, Recirculation Pump Trip, Reactor
Feed Pump Turbine High Vibration,
Feed Pump Turbine High Vibration,
Lost of Second Recirculation Pump,
Lost of Second Recirculation Pump,
Line 463: Line 666:
PCBs (Output Breakers) Failed to
PCBs (Output Breakers) Failed to
Auto Open
Auto Open
Procedures   42CC-ERP-011-0                               Control Rod Exchange               15.4
1.0
NMP-OS-001                                   Reactivity Management Program       20.1
Procedures
NMP-OS-007-001                               Conduct of Operations Standards     17.0
2CC-ERP-011-0
Control Rod Exchange
15.4
NMP-OS-001
Reactivity Management Program
20.1
NMP-OS-007-001
Conduct of Operations Standards
and Expectations
and Expectations
NMP-RE-008-F01                               Detailed Reactivity Management     2.1
17.0
NMP-RE-008-F01
Detailed Reactivity Management
Plan (Unit 2 Sequence Exchange)
Plan (Unit 2 Sequence Exchange)
71111.12   Corrective   CAR 277277                                   Root Cause Determination Report     05/27/2020
2.1
Action                                                    for PCIVs 2T28F319 and 2T48F320
71111.12
Documents    CR10737209
Corrective
Miscellaneous Maintenance Rule a(1) Action Plan for 2T23-0
Action
Procedures   34SO-T48-002-2                               Containment Atmospheric Control     29.5
Documents
CAR 277277
Root Cause Determination Report
for PCIVs 2T28F319 and 2T48F320
05/27/2020
CR10737209  
 
Miscellaneous
Maintenance Rule a(1) Action Plan for 2T23-0  
 
Procedures
34SO-T48-002-2
Containment Atmospheric Control
and Dilution System
and Dilution System
2-PM-T48-013-0                             Purge and Vent Valve T-Ring         12.6
29.5
2-PM-T48-013-0
Purge and Vent Valve T-Ring
Replacement
Replacement
MNP-ES-027                                   Maintenance Rule Program           10.2
2.6
Self-                                                     Hatch Living (a)(3) Documentation   08/01/2018-
MNP-ES-027
Assessments                                                Package                            05/01/2020
Maintenance Rule Program
71111.13   Calculations                                               Equipment Out of Service           October 20,
10.2
Inspection Type         Designation       Description or Title               Revision or
Self-
Procedure                                                                      Date
Assessments
Calculations                       2020.
Hatch Living (a)(3) Documentation
Equipment Out of Service           October 7,
Package
Calculations                        2020.
08/01/2018-
Corrective   CR 10746694
05/01/2020
71111.13
Calculations
Equipment Out of Service
October 20,  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
20.
Equipment Out of Service
Calculations
October 7,
20.
Corrective
Action
Action
Documents
Documents
Procedures   NMP-DP-001         Operational Risk Awareness         16.0
CR 10746694
NMP-OS-010-002     Hatch Protected Equipment Logs     11.0
 
71111.15   Corrective   CR 10747548
Procedures
Action        CR10753268
NMP-DP-001
Documents    CR10753270
Operational Risk Awareness
Engineering   TE1077753
16.0
NMP-OS-010-002
Hatch Protected Equipment Logs
11.0
71111.15
Corrective
Action
Documents
CR 10747548  
 
CR10753268  
 
CR10753270  
 
Engineering
Evaluations
Evaluations
Miscellaneous                   Unit 1 Technical Specifications     Amendment
TE1077753
 
Miscellaneous
Unit 1 Technical Specifications
Amendment
294
294
Unit 2 Technical Specifications     Amendment
Unit 2 Technical Specifications
Amendment
239
239
Procedures   34SV-P41-001-1     Plant Service Water Pump           15.2
Procedures
34SV-P41-001-1
Plant Service Water Pump
Operability
Operability
NMP-AD-012         Operability Determinations and     13.3
15.2
NMP-AD-012
Operability Determinations and
Functional Assessments
Functional Assessments
NMP-AD-012-GL04   Mission Times                       1.1
13.3
71111.19   NDE Reports   NMP-ES-024-515     Ultrasonic Gas/Void Examination     10/07/2020
NMP-AD-012-GL04
Mission Times
1.1
71111.19
NDE Reports
NMP-ES-024-515
Ultrasonic Gas/Void Examination
Report for Unit 2 RCIC
Report for Unit 2 RCIC
Procedures   34SO-E51-001-2     RCIC Pump Discharge Line Venting   28.2
10/07/2020
2SV-R43-001-0     Diesel, Alternator, and Accessories 31.16
Procedures
34SO-E51-001-2
RCIC Pump Discharge Line Venting 28.2
2SV-R43-001-0
Diesel, Alternator, and Accessories
Inspection
Inspection
57SV-R43-001-0     Diesel, Alternator, and Accessories 31.19
31.16
57SV-R43-001-0
Diesel, Alternator, and Accessories
Inspection
Inspection
NMP-MA-014         Post Maintenance Testing/Post       2.2
31.19
NMP-MA-014
Post Maintenance Testing/Post
Modification Testing
Modification Testing
NMP-MA-014-001     Maintenance Testing Guidance       5.2
2.2
Work Orders   SNC 814149         Internal inspection of check-valve October 28,
NMP-MA-014-001
1E11F005C                          2020.
Maintenance Testing Guidance
Inspection Type         Designation                       Description or Title             Revision or
5.2
Procedure                                                                                    Date
Work Orders
SNC631596, SNC929660                                                 11/10/2020
SNC 814149
71111.22   Miscellaneous NEI 12-06                         Diverse and Flexible Coping       Revision 4
Internal inspection of check-valve
1E11F005C
October 28,
20.  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC631596, SNC929660
11/10/2020
71111.22
Miscellaneous
NEI 12-06
Diverse and Flexible Coping
Strategies (FLEX) Implementation
Strategies (FLEX) Implementation
Guide
Guide
Procedures   34SV-E51-002-1                     RCIC Pump Operability             28.8
Revision 4
Work Orders   SNC842422                         RCIC 2-E51-F012 Motor Operated   10/06/2020
Procedures
34SV-E51-002-1
RCIC Pump Operability
28.8
Work Orders
SNC842422  
 
RCIC 2-E51-F012 Motor Operated
Valve Acceptance Testing
Valve Acceptance Testing
71114.06   Corrective   CR 10749692
10/06/2020
71114.06
Corrective
Action
Action
Documents
Documents
Miscellaneous                                   Southern Nuclear Operating       1.0
CR 10749692
 
Miscellaneous
Southern Nuclear Operating
Company (SNC) Standard
Company (SNC) Standard
Emergency Plan (SEP)
Emergency Plan (SEP)
SNC Standard Emergency Plan       1.0
1.0
Annex for Hatch Nuclear Plant
SNC Standard Emergency Plan
                                                            (HNP) Units 1 & 2
Annex for Hatch Nuclear Plant  
20EX06                             Emergency Preparedness Drill     10/07/2020
(HNP) Units 1 & 2
1.0
20EX06
Emergency Preparedness Drill
Guide
Guide
Procedures   NMP-EP-141                         Event Classification             1.0
10/07/2020
NMP-EP-142                         Emergency Notification           1.0
Procedures
NMP-EP-143                         Facility Activation,             1.0
NMP-EP-141
71124.06   Calibration   64CH-RCL-006-0                     Interlaboratory Cross-Check;     08/2019
Event Classification
Records                                          Gamma Spec
1.0
Corrective   10559574, 10724533
NMP-EP-142
Emergency Notification
1.0
NMP-EP-143
Facility Activation,
1.0
71124.06
Calibration
Records
64CH-RCL-006-0
Interlaboratory Cross-Check;
Gamma Spec
08/2019
Corrective
Action
Action
Documents
Documents
Miscellaneous Annual Radioactive Effluent Report                                   2018; 2019
10559574, 10724533
Procedures   NMP-EN-002;                       Radiological Groundwater          VERSION
 
NMP-EN-002-GL02                   Protection Program;              9.1, 9.2;
Miscellaneous
Hatch Nuclear Plant Groundwater   Version 1.1
Annual Radioactive Effluent Report
2018; 2019
Procedures
NMP-EN-002;
NMP-EN-002-GL02
Radiological Groundwater
Protection Program;
Hatch Nuclear Plant Groundwater
Monitoring Plan for Radionuclides
Monitoring Plan for Radionuclides
71124.07   Corrective   10616583
VERSION
Action        10697831
9.1, 9.2;
Inspection Type         Designation                                 Description or Title               Revision or
Version 1.1
Procedure                                                                                                Date
71124.07
Documents     10726878
Corrective
Action
10616583
10697831  
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
10726878
10724533
10724533
Miscellaneous                                             Annual Radiological Environmental   2018; 2019
Miscellaneous
Annual Radiological Environmental
Operating Report
Operating Report
71151     Miscellaneous NEI 99-02                                   Regulatory Assessment               Revision 7
2018; 2019
71151
Miscellaneous
NEI 99-02
Regulatory Assessment
Performance Indicator Guideline
Performance Indicator Guideline
Procedures   NMP-AD-029                                 Preparation and Reporting of       Version 1.1
Revision 7
Procedures
NMP-AD-029
Preparation and Reporting of
Regulatory Assessment
Regulatory Assessment
Performance Indicator Data and the
Performance Indicator Data and the
Monthly Operating Report
Monthly Operating Report
71152     Corrective   CR10674923,10674928,10674930,10683597,
Version 1.1
Action        106844712, 10691713, 10692524, 10693660,
71152
Documents    10702308, 10702309, 10702310, 10707157,
Corrective
Action
Documents
CR10674923,10674928,10674930,10683597,
106844712, 10691713, 10692524, 10693660,
10702308, 10702309, 10702310, 10707157,
10707157, 10708283, 10711197, 10714683,
10707157, 10708283, 10711197, 10714683,
10719206, 10721524, 10743478, 10743512,
10719206, 10721524, 10743478, 10743512,
Line 576: Line 936:
10698928, 10698929, 10721527, 10721529,
10698928, 10698929, 10721527, 10721529,
10721530, 10721531, 10732840, 10737206,
10721530, 10721531, 10732840, 10737206,
10743805, 10744770, 10744794, 10745187
10743805, 10744770, 10744794, 10745187  
Engineering   TE1061317, 1062509, 1062593, 1065490,
 
Evaluations  1065491, 1066692, 1068404,
Engineering
Evaluations
TE1061317, 1062509, 1062593, 1065490,
1065491, 1066692, 1068404,
1068405,1068406,1068407, 1068407,
1068405,1068406,1068407, 1068407,
1070192, 1071151
1070192, 1071151  
Fire Plans                                               Edwin I. Hatch Nuclear Plant Unit 1 38.0
 
Fire Plans
Edwin I. Hatch Nuclear Plant Unit 1
and 2 Fire Hazards Analysis,
and 2 Fire Hazards Analysis,
Sections 4.12, 1.9.1, and IV.B5.a/b
Sections 4.12, 1.9.1, and IV.B5.a/b
Miscellaneous FAS 1-20-003, 004, 005, 020, 030, 048, 068,
38.0
069, 070, 075, 079, 080, 081
Miscellaneous
Work Orders   SNC1117152, 1107322
FAS 1-20-003, 004, 005, 020, 030, 048, 068,
069, 070, 075, 079, 080, 081  
 
Work Orders
SNC1117152, 1107322  
 
21
21
}}
}}

Latest revision as of 11:09, 29 November 2024

Integrated Inspection Report 05000321/2020004 and 05000366/2020004 and Independent Spent Fuel Storage Installation Report 07200036/2020003
ML21041A073
Person / Time
Site: Hatch, 07200036  Southern Nuclear icon.png
Issue date: 02/10/2021
From: Alan Blamey
Division Reactor Projects II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2020003, IR 2020004
Download: ML21041A073 (23)


Text

February 10, 2021

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000321/2020004 AND 05000366/2020004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200036/2020003

Dear Ms. Gayheart:

On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant. On January 25, 2021, the NRC inspectors discussed the results of this inspection with Johnny Weissinger and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 05000321, 05000366, and 07200036 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000321 and 05000366 and 07200036

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2020004, 05000366/2020004 and 07200036/2020003

Enterprise Identifier: I-2020-004-0043 and I-2020-003-0076

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Edwin I. Hatch Nuclear Plant

Location:

Baxley, GA

Inspection Dates:

October 01, 2020 to December 31, 2020

Inspectors:

B. Caballero, Senior Operations Engineer

C. Dykes, Senior Health Physicist

C. Fontana, Emergency Preparedness Inspector

J. Hickman, Resident Inspector

M. Kennard, Sr. Operations Engineer

D. Lanyi, Senior Operations Engineer

N. Peterka, Fuel Facility Inspector

W. Pursley, Health Physicist

A. Rosebrook, Senior Reactor Analyst

S. Sanchez, Senior Emergency Preparedness Inspector

S. Sandal, Senior Reactor Analyst

R. Smith, Senior Resident Inspector

N. Staples, Senior Project Engineer

J. Walker, Emergency Response Inspector

Approved By:

Alan J. Blamey, Chief

Reactor Projects Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Edwin I. Hatch Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at 100 percent rated thermal power (RTP). On October 30, 2020, the unit was down powered to 50 percent RTP due to removing the 1A Circulating Water Pump (CWP) from service due to motor bearing issue. On October 30, 2020, the unit increased in power to 63 percent RTP until repairs were completed to the 1A CWP. On November 6, 2020, the unit was returned to 100 percent RTP. On December 19, 2020, the unit was down powered to 90 percent RTP for turbine bypass valve testing. On December 19, 2020, the unit was returned to 100 percent RTP and operated there for the remainder of the inspection period.

Unit 2 began the inspection period at 100 percent RTP. On October 17, 2020, the unit was down powered to 70 percent RTP for sequence exchange and quarterly turbine testing. On October 18, 2020, the unit was returned to 98 percent RTP due to issues with computer hard drive associated with feedwater uncertainty recapture. On October 24, 2020, the unit was returned to 100 percent RTP after issues with the computer hard drive were resolved. On November 2, 2020, the unit was down powered to 88.5 percent RTP for a rod pattern adjustment and on November 2, 2020, it was return to 100 percent RTP. On November 12, 2020, the unit was down powered to 82.5 percent RTP for a rod pattern adjustment and on November 12, 2020, it was return to 100 percent RTP. On November 22, 2020, the unit was down powered to 87.5 percent RTP for a rod pattern adjustment and on November 22, 2020, it was return to 100 percent RTP. On December 5, 2020, the unit down powered to 70 percent RTP for turbine valve testing and on December 5, 2020, the unit was returned to 100 percent RTP. On December 9, 2020, the unit reached maximum core flow and began the coast down in power for the 2021, spring refueling outage.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of below freezing temperatures for the following systems on December 1, 2020:

1. Plant Service Water.

2. Residual Heat Removal Service Water.

3. Emergency Diesel Generators.

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather during a Tornado Watch on April 23, 2020.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Alignment of the 1E, 1F, and 1G switchgear during the 1B Emergency Diesel Generator (EDG) outage, using 34SO-R22-00-1, 4160 VAC System Attachment 1, 34SO-R43-001-1, Diesel Generator Standby AC System Attachment 2, and 34SV-SUV-013-1, Breaker Alignment Checks Attachments 2 and 3, on October 19 and 21, 2020.
(2) Alignment of Unit 2 Residual Heat Removal (RHR) System following the 2B RHR maintenance outage, 34SO-E11-010-2, Residual Heat Removal System, Version 44.2 on December 21 and 23, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2 Standby Gas and Heating Ventilation Air Conditioning (HVAC), Drawing A-

===43965 Sheets 115, 118, and 119 on October 9, 2020.

(2) Unit 1 and Unit 2 Intake Structure, Drawing A-43966 Sheet 027 on November 24, 2020.
(3) Unit 1 Railroad Airlock, Drawing A-43966 Sheet 41 on December 18, 2020.

Fire Brigade Drill Performance Sample (IP Section 03.02)===

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on October 14, 2020.

71111.06 - Flood Protection Measures

Cable Degradation (IP Section 03.02) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Safety related cable vaults PB1-DO, and PB1-DP,

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

On November 12, 2020, the licensee completed the annual requalification operating test, which is required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. On November 20, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP

===71111.11.

(1) On November 20, 2020, the inspector reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating test administration completed on November 12, 2020.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04)===

(1) Biennial Requalification Written Examinations

The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered in December 2019.

Annual Requalification Operating Tests

The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test

The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security

The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations

The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions

The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator

The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution

The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 2 sequence exchange, deep control rod exercises and scram time testing on October 17, 2020.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated License Operator Requalification Program (LORP) Scenario H-LTC-SE-00306, "Station Service Air Compressor Trip, Recirculation Pump Trip, Reactor Feed Pump Turbine High Vibration, Lost of Second Recirculation Pump, Anticipated Transient Without a Scram (ATWS), and Generator Output Breakers Failed to Auto Open," for two teams during annual simulator evaluations on October 28, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Review of the Hatch Living a(3) Documentation Package with emphasis on Primary Containment penetration failure on January 4, 2020.
(2) Unit 1 and Unit 2 Emergency Diesel Generator Fuel Oil Transfer System water intrusion issues on November 20, 2020.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2 elevated risk due to the Reactor Core Isolation Cooling (RCIC) System Outage on October 7, 2020.
(2) Unit 1 and Unit 2 elevated risk due to the liner replacement on 1B EDG on October 20, 2020.
(3) Unit 1 elevated risk due to the liner replacement on 1C Emergency Diesel Generator on December 3, 2020.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 water intrusion into terminal box of 'B' fuel oil transfer pump on 1B EDG on October 14, 2020.
(2) Unit 1 'B' Plant Service Water (PSW) Pump inoperable due to low In-Service Test (IST) differential pressure ratio on October 30, 2020.
(3) Unit 1 'B' Reactor Protection System (RPS) output breaker 52-3B failure to trip during function testing on November 12, 2020.
(4) Unit 1 'A' Plant Service Water pump differential pressure (DP) in the required action range on November 12, 2020.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1)34SO-E51-001-2, RCIC Pump Discharge Line Venting, Version 28.2, following Unit 2 RCIC system outage on October 7, 2020.

(2)52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.16, following the liner replacement on 1B EDG on October 22, 2020.

(3) Work Order (WO) SNC814149 1C Residuals Heat Removal Service Water (RHRSW)

Pump Functional Test following the internal inspection of check-valve 1E11F005C on October 28, 2020.

(4) Work Orders SNC631596 and SNC929660 for 2B Reactor Protection System (RPS)one-year preventive maintenance including inspections, lubrication and functional testing and calibration of the power monitoring breakers, on November 10, 2020.
(5) Work Orders SNC1063991 and SNC1092799 for 1D Residual Heat Removal Service Water pump and check valve replacement functional testing on November 23, 2020.

(6)52SV-R43-001-0, Diesel, Alternator, and Accessories Inspection, Version 31.19, following the liner replacement on 1C EDG on December 9, 2020.

(7)34SV-R43-006-1, Diesel Generator 1C Semi-annual Test, Version 15.1, following the liner replacement on 1C EDG on December 10, 2020.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) RCIC 2-E51-F012 Motor Operated Valve Acceptance Testing, Work Order SNC842422 on October 6, 2020.

Inservice Testing (IP Section 03.01) (1 Sample)

(1)34SV-E51-002-1, RCIC Pump Operability, Version 28.8 (IST, Operating Pressure Test) on October 2, 2020.

FLEX Testing (IP Section 03.02) (1 Sample)

(1) Work Order SNC947907, FLEX PM: FLEX Pump Hose Trailer Hose Inspection & Refold, on December 8, 2020.

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system during the week of November 2, 2020.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Response Organization during the week of November 2, 2020.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of November 2, 2020. This evaluation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program during the week of November 2, 2020.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Emergency Preparedness Drill 20EX06, Seismic event with a loss of all offsite and onsite AC Power on October 28,

RADIATION SAFETY

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Unit 1 Reactor building ventilation stack monitor.
(2) Plant Main Stack Radiation Monitors.
(3) Liquid Radwaste Monitor.
(4) Unit 2 Reactor building ventilation stack monitor.

Sampling and Analysis (IP Section 03.02) (3 Samples)

(1) Inspectors evaluated compensatory sampling on the Unit 2 Reactor building ventilation stack monitor.
(2) Inspectors evaluated effluent particulate and iodine sampling on the main plant stack monitor.
(3) Inspectors evaluated tritium sampling methodology on the Unit 2 Reactor building ventilation stack monitor.

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1)64CH-RPT-006-0 Liquid Effluents Discharge Permit WSTA-1 L-20191225-624-B, 12/24/2019.

64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20191219-606-C, Y22-N008A, 12/20/2019.

64CH-RPT-006-0 Liquid Effluents Discharge Permit L-2018213-372-C, Y22-N008A, 12/14/2018.

64CH-RPT-006-0 Liquid Effluents Discharge Permit L-20181213-373-C, Y22-N008A, 12/20/2018.

(2)64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181211-200-C, 12/13/2018.

64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20181218-204-C, 12/19/2018.

64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191210-198-C, 12/12/2019.

64CH-RPT-007-0 GASEOUS EFFLUENTS: DISCHARGE PERMIT PARTICULATE, IODINE AND NOBLE GAS SAMPLE INFORMATION, G-20191217-202-C, 12/28/2019.

Abnormal Discharges (IP Section 03.04)

There were no abnormal discharges during the period covered by the inspection which began in May 1, 2018.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) EP01: Drill & Exercise Performance for the period July 1, 2019, through June 30, 2020.

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) EP02: Emergency Response Organization Drill Participation for the period July 1, 2019, through June 30, 2020.

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) EP03: Alert & Notification System Reliability for the period July 1, 2019, through June 30, 2020.

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)

(1) Unit 1 (October 1, 2019 to September 30, 2020).
(2) Unit 2 (October 1, 2019 to September 30, 2020).

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2019 to September 30, 2020).
(2) Unit 2 (July 1, 2019 to September 30, 2020).

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2019 to September 30, 2020).
(2) Unit 2 (October 1, 2019 to September 30, 2020).

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) Unit 1 January 1, 2019 through October 31, 2020.

Unit 2 January 1, 2019 through October 31, 2020.

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in Appendix R Emergency Lighting failures, due to high number of failures through the year that might be indicative of a more significant safety issue.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

41502 - Nuclear Power Plant Simulation Facilities Nuclear Power Plant Simulation Facilities

(1) The inspector completed inspection of the Unit 1 Plant Reference Simulator (PRS)

"B" in accordance with Inspection Procedure (IP) 41502 "Nuclear Power Plant Simulation Facilities.

This inspection reviewed a sample of activities to ensure that Simulator B was being tested in accordance with ANSI/ANS-3.5-2009, Nuclear Power Plant Simulators for Use in Operator Training and Examination and appropriate approved plant procedures.

The inspectors reviewed testing to verify that the simulator utilizes models relating to nuclear and thermal-hydraulic characteristics replicating the most recent core load from cold shutdown to rated power plant conditions. Additionally, six transient tests, two steady state tests, five malfunction tests, and one core performance test. Additionally, inspectors reviewed a sample of simulator discrepancies to ensure that they were dispositioned in accordance with appropriate approved plant procedures.

Finally, this inspection reviewed simulator physical fidelity with its reference unit to ensure that PRS "B" was sufficiently designed to allow the performance of evolution's prescribed by 10 CFR 55.45 and 55.59.

The inspector reviewed simulator operation during performance of two Initial License Training (ILT) simulator scenarios using IP 41502 criteria for evaluation of plant-reference simulators under 10 CFR 55.46(c) and (d).

No findings were identified. Results of this inspection were discussed with members of the facility staff on October 28, 2020.

60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants

(1) The inspectors evaluated the licensees activates related to long-term operation and monitoring of their independent spent fuel storage installation on November 6, 2020.

===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders

Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders===

(1) On November 20, 2019, as a result of Alternative Dispute Resolution the NRC issued Confirmatory Order (CO) EA-18-130 and EA-18-171 (ML19249B552). The CO was the result of an apparent violation of 10 CFR 53.5, Employee Protection at Vogtle Units 3 & 4 which contained actions for the Farley, Hatch and Vogtle Units 1 & 2 nuclear plants. During the week of November 30,2020, the inspectors reviewed corrective actions for this CO. Because the CO was fleet wide for the Southern Nuclear Company, the corrective actions reviewed by the inspectors included a review of corrective actions for the Hatch, Farley, and Vogtle Units 1 through 4 nuclear plants. The details can be found in inspection report 0500025/20200012, 0500026/2020012; 11/30/2020 through 12/11/2020; Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, CO Follow-Up and SCWE inspection report.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 25, 2021, the inspectors presented the integrated inspection results to Johnny Weissinger and other members of the licensee staff.
  • On October 29, 2020, the inspectors presented the Licensed Operator Requalification and Simulator B inspection results to Johnny Weissinger and other members of the licensee staff.
  • On November 6, 2020, the inspectors presented the Emergency Preparedness Program inspection results to Sonny Dean and other members of the licensee staff.
  • On December 8, 2020, the inspectors presented the RP Baseline Inspection Exit inspection results to Sonny Dean and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

41502

Miscellaneous

NMP-TR-422-004 Att 20 Section 3.4

Criticality

Core Performance Testing - NMP-

TR-422-004 Att 20 Section 3.4

Criticality

1/22/2019

Test 503-1

Loss of Coolant - Outside Primary

Containment

2/10/2020

Test 505-2

Loss of Coolant - Small Reactor

Coolant Breaks including

Demonstration of Saturation

Condition

2/14/2019

Test 505-2

Loss of Coolant - Small Reactor

Coolant Breaks including

Demonstration of Saturation

Condition

2/14/2019

Test 521-0

Loss of Protective System Channel

2/14/2019

Test 522-1

Control Rod Failure including Stuck

Rods, Drifting Rods, Rod Drops,

and Misaligned Rods

2/10/2020

Test 527-0

Failure in Automatic Control

Systems that Affect Reactivity and

Core Heat Removal

2/10/2020

Test 604-0

Reactor Trip Followed by Recovery

to Rated Power

2/15/2019

Test 707-0

Transient Performance - Maximum

Power Ramp Recirc Down to

Approximately 75% and Back up to

100%

2/3/2020

Test 708-2

Transient Performance - Maximum

Size Reactor Coolant System

Rupture Combined with a Loss of

Off-Site Power

2/12/2019

Test: 615-1

SS Performance 35% Power

2/12/2019

Test: 704-0

Transient Performance -

2/6/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Simultaneous Trip of all

Recirculation Pumps

60855.1

Engineering

Evaluations

TE 1053015

Dry Cask Storage - 10 CFR 72.212

Report - Revision for 2020 UFLO

Radiation

Surveys

Plant Hatch Radiological

Information Survey # 179999 ISFSI

04/28/2020

Plant Hatch Radiological

Information Survey # 180018 ISFSI

04/28/2020

71111.01

Procedures

34AB-Y22-002-0

Naturally Occurring Phenomena

19.1

NMP-OS-017

1, Severe Weather

Preparation Checklist Maintenance

Section for 4/23/2020

2.0

NMP-OS-017

2, Severe Weather

Preparation Checklist Chemistry for

4/23/2020

2.0

NMP-OS-017

3, Severe Weather

Preparation Checklist Operations

for 4/23/2020

2.0

NMP-OS-017

4, Severe Weather

Checklist Technology Organization

for 4/23/3030

2.0

NMP-OS-017

5, Severe Weather

Preparation Checklist Security for

4/23/2020

2.0

NMP-OS-017

6, Severe Weather

Preparation Checklist Supply Chain

for 4/23/2020

2.0

NMP-OS-017

7, Severe Weather

Preparation Checklist Emergency

Preparedness for 4/23/2020

2.0

NMP-OS-017

Severe Weather

3.0

71111.04

Drawings

H-13350

Unit 1 Master Single Line Diagram

30.0

H-13350

Unit 1 Master Single Line Diagram

30.0

Procedures

34SO-R22-001-1

4160 VAC System

25.3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

34SO-R43-001-1

Diesel Generator Standby AC

System

29.3

34SV-SUV-013-1

Breaker Alignment Checks

10.4

71111.05

Fire Plans

Drawing A-43965 Sheets 115, 118, and 119.

Unit 2 Standby Gas and HVAC,

Miscellaneous

Fire Protection Fire Hazards

Analysis (FHA)

36.0

NMP-TR-425-F01

Fire Drill Scenario Development

and Approval Sheet for fire in

drywell

10/13/2020

Procedures

NMP-TR-425

Fire Drill Program

9.0

NMP-TR-425-F14

Fire Drill Package

1.1

71111.06

Procedures

2PM-Y46-001-0

Inground Pullbox Debris

Removal/Inspection

10.0

71111.11B

Miscellaneous

H-LTC-SE-00314

314 NRC 2

Ver 1.0

19-7A RO

2019 RO Written Exam

2/15/2019

19-7A SRO

2019 SRO Written Exam

2/15/2019

H-LCT-SE-00302

2 Pilot 2

Rev 0.1

H-LT-JP-C11-010155

Vent the Scram Header

Ver 16.5

H-LT-JP-C82-01013A

Perform Plant Operations in

Support of a Remote Plant

Shutdown (Alternate Path)

Ver 1.0

H-lT-JP-E41-00515A

Establish Reactor Cooldown with

HPCI (Alternate Path)

Ver 0.1

H-LT-JP-EAL-25068

FG1 Emergency Classification -

Complete NMP-EP-141-F01

Ver 3.1

H-LT-JP-EAL-25208

Determine PARS (SRO only)

Ver 10.1

H-LT-JP-N33-01702B

Perform TC-1, Seal Steam Failure

(Alternate Path)

Ver 0.1

H-LT-JP-R42-02744

Place the 125/250 VDC Station

Service Battery Charger in Service

Ver 19.3

H-LT-JP-SUV-10022

Conduct of Operations, 34SV-SUV-

019-1 Average Drywell

Temperature Surveillance

Ver 2.2

H-LT-JP-T48-01362A

Fast Vent the Drywell (Alternate

Ver 0.5

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Path)

H-LTC-SE-00341

341 Pilot 1

Ver 1.0

H-LTC-SE-00342

314 NRC 1

Ver 0.1

NDE Reports

H-LT-JP-R43-02824A

Locally Start U2 EDG with Air Start

and Energ Bus (Alternate Path)

Ver 1.6

71111.11Q Corrective

Action

Documents

CR10746882, 10746887, 10746968,

10747001

Miscellaneous

H-LTC-SE-00306

Station Service Air Compressor Trip

, Recirculation Pump Trip, Reactor

Feed Pump Turbine High Vibration,

Lost of Second Recirculation Pump,

Anticipated Transient Without a

Scram (ATWS), and Generator

PCBs (Output Breakers) Failed to

Auto Open

1.0

Procedures

2CC-ERP-011-0

Control Rod Exchange

15.4

NMP-OS-001

Reactivity Management Program

20.1

NMP-OS-007-001

Conduct of Operations Standards

and Expectations

17.0

NMP-RE-008-F01

Detailed Reactivity Management

Plan (Unit 2 Sequence Exchange)

2.1

71111.12

Corrective

Action

Documents

CAR 277277

Root Cause Determination Report

for PCIVs 2T28F319 and 2T48F320

05/27/2020

CR10737209

Miscellaneous

Maintenance Rule a(1) Action Plan for 2T23-0

Procedures

34SO-T48-002-2

Containment Atmospheric Control

and Dilution System

29.5

2-PM-T48-013-0

Purge and Vent Valve T-Ring

Replacement

2.6

MNP-ES-027

Maintenance Rule Program

10.2

Self-

Assessments

Hatch Living (a)(3) Documentation

Package

08/01/2018-

05/01/2020

71111.13

Calculations

Equipment Out of Service

October 20,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Calculations

20.

Equipment Out of Service

Calculations

October 7,

20.

Corrective

Action

Documents

CR 10746694

Procedures

NMP-DP-001

Operational Risk Awareness

16.0

NMP-OS-010-002

Hatch Protected Equipment Logs

11.0

71111.15

Corrective

Action

Documents

CR 10747548

CR10753268

CR10753270

Engineering

Evaluations

TE1077753

Miscellaneous

Unit 1 Technical Specifications

Amendment

294

Unit 2 Technical Specifications

Amendment

239

Procedures

34SV-P41-001-1

Plant Service Water Pump

Operability

15.2

NMP-AD-012

Operability Determinations and

Functional Assessments

13.3

NMP-AD-012-GL04

Mission Times

1.1

71111.19

NDE Reports

NMP-ES-024-515

Ultrasonic Gas/Void Examination

Report for Unit 2 RCIC

10/07/2020

Procedures

34SO-E51-001-2

RCIC Pump Discharge Line Venting 28.2

2SV-R43-001-0

Diesel, Alternator, and Accessories

Inspection

31.16

57SV-R43-001-0

Diesel, Alternator, and Accessories

Inspection

31.19

NMP-MA-014

Post Maintenance Testing/Post

Modification Testing

2.2

NMP-MA-014-001

Maintenance Testing Guidance

5.2

Work Orders

SNC 814149

Internal inspection of check-valve

1E11F005C

October 28,

20.

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SNC631596, SNC929660

11/10/2020

71111.22

Miscellaneous

NEI 12-06

Diverse and Flexible Coping

Strategies (FLEX) Implementation

Guide

Revision 4

Procedures

34SV-E51-002-1

RCIC Pump Operability

28.8

Work Orders

SNC842422

RCIC 2-E51-F012 Motor Operated

Valve Acceptance Testing

10/06/2020

71114.06

Corrective

Action

Documents

CR 10749692

Miscellaneous

Southern Nuclear Operating

Company (SNC) Standard

Emergency Plan (SEP)

1.0

SNC Standard Emergency Plan

Annex for Hatch Nuclear Plant

(HNP) Units 1 & 2

1.0

20EX06

Emergency Preparedness Drill

Guide

10/07/2020

Procedures

NMP-EP-141

Event Classification

1.0

NMP-EP-142

Emergency Notification

1.0

NMP-EP-143

Facility Activation,

1.0

71124.06

Calibration

Records

64CH-RCL-006-0

Interlaboratory Cross-Check;

Gamma Spec

08/2019

Corrective

Action

Documents

10559574, 10724533

Miscellaneous

Annual Radioactive Effluent Report

2018; 2019

Procedures

NMP-EN-002;

NMP-EN-002-GL02

Radiological Groundwater

Protection Program;

Hatch Nuclear Plant Groundwater

Monitoring Plan for Radionuclides

VERSION

9.1, 9.2;

Version 1.1

71124.07

Corrective

Action

10616583

10697831

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

10726878

10724533

Miscellaneous

Annual Radiological Environmental

Operating Report

2018; 2019

71151

Miscellaneous

NEI 99-02

Regulatory Assessment

Performance Indicator Guideline

Revision 7

Procedures

NMP-AD-029

Preparation and Reporting of

Regulatory Assessment

Performance Indicator Data and the

Monthly Operating Report

Version 1.1

71152

Corrective

Action

Documents

CR10674923,10674928,10674930,10683597,

106844712, 10691713, 10692524, 10693660,

10702308, 10702309, 10702310, 10707157,

10707157, 10708283, 10711197, 10714683,

10719206, 10721524, 10743478, 10743512,

10743517, 10743783, 10743785, 10743797,

10743800, 10743801, 10744767, 10744769,

10744792, 10745209, 10745211, 10745214,

10747562, 10683988, 10687821, 10698864,

10698867, 10698868, 10698871, 10698926,

10698928, 10698929, 10721527, 10721529,

10721530, 10721531, 10732840, 10737206,

10743805, 10744770, 10744794, 10745187

Engineering

Evaluations

TE1061317, 1062509, 1062593, 1065490,

1065491, 1066692, 1068404,

1068405,1068406,1068407, 1068407,

1070192, 1071151

Fire Plans

Edwin I. Hatch Nuclear Plant Unit 1

and 2 Fire Hazards Analysis,

Sections 4.12, 1.9.1, and IV.B5.a/b

38.0

Miscellaneous

FAS 1-20-003, 004, 005, 020, 030, 048, 068,

069, 070, 075, 079, 080, 081

Work Orders

SNC1117152, 1107322

21