IR 05000220/2011010: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES N UCLEAR REGULATORY COMMISSION W | ||
==REGION I== | |||
475 ALLENDALE ROAD KlNG OF PRUSSIA. PA 19406-1415 May 13, ?Att Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station. LLC P.O. Box 63 Lycoming, NY 13093 SUBJECT: NINE MILE POINT NUCLEAR STATION - NRC TEMPORARY INSTRUCTION 25151183 INSPECTION REPORT O5oOO22ot2o11010 AND 0500041 ot2o11o1o | |||
==Dear Mr. Belcher:== | ==Dear Mr. Belcher:== | ||
on April 29,2011, the.U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point Nuclear Station Units t and2, using Temporary Insiruction 2515/183,"Followup to the Fukushima Daiichi Nuclear Station rueioamige Event.;' ine enclosed inspection leport documents the inspection results which were Jiscu6"o on Ap ril Zg, 2011 , with you and other members of your staff | on April 29,2011, the.U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point Nuclear Station Units t and2, using Temporary Insiruction 2515/183, | ||
"Followup to the Fukushima Daiichi Nuclear Station rueioamige Event.;' ine enclosed inspection leport documents the inspection results which were Jiscu6"o on Ap ril Zg, 2011 , with you and other members of your staff. | |||
The objective of this inspection was to promptly assess the capabilities of Nine Mile point Nuclear Station to respond to extraordinary consequences similar to those that have recenly occurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States will be used to evaluate the United States iuclear industry's r-eadiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted. | |||
Any resulting findings or violations will be documented by the NRC in a separate report. You are noi requireo-to respond to this letter. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). | All of the potential issues and observations identified by this inspection are contained in this report' The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report. You are noi requireo-to respond to this letter. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-220, 50-410 License Nos.: DPR-63, NPF-69 Enclosure: | Sincerely, Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-220, 50-410 License Nos.: DPR-63, NPF-69 Enclosure: lnspection Report 050002201201 1 01 0 and 05000 41 01201 1 010 cc Mencl: Distribution via ListServ | ||
lnspection Report 050002201201 1 01 0 and 05000 41 01201 1 010 cc Mencl: Distribution via ListServ | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
lR 0500022012011010 and 0500041012011010; 04106312011 | lR 0500022012011010 and 0500041012011010; 04106312011 -0412912011; Nine Mile Point, | ||
-0412912011; | |||
Nine Mile Point, | |||
Units 1 and2; Temporary Instruction 25151183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. | |||
The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006. | This report covers an announced Temporary Instruction (Tl) inspection. The inspection was conducted by a resident inspector. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006. | ||
=INSPECTION SCOPE= | |||
The intent of the Tl is to provide a broad overview of the industry's preparedness for events that may exceed the current design basis for a plant. The focus of the Tl was on | The intent of the Tl is to provide a broad overview of the industry's preparedness for events that may exceed the current design basis for a plant. The focus of the Tl was on | ||
: (1) assessing the licensee's capability to mitigate consequences from large fires or explosions on site, | : (1) assessing the licensee's capability to mitigate consequences from large fires or explosions on site, | ||
: (2) assessing the licensee's capability to mitigate station blackout (SBO) conditions, | : (2) assessing the licensee's capability to mitigate station blackout (SBO) conditions, | ||
: (3) assessing the licensee's capability to mitigate internal and external flooding events accounted for by the station's design, and | : (3) assessing the licensee's capability to mitigate internal and external flooding events accounted for by the station's design, and | ||
: (4) assessing the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. lf necessary, a more specific followup inspection will be performed at a later date.INSPEGTION RESULTS All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. | : (4) assessing the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. lf necessary, a more specific followup inspection will be performed at a later date. | ||
INSPEGTION RESULTS All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report. | |||
03.01 Assess the licensee's capability to mitigate conditions that result from beyond design basis events, typically bounded by security threats, committed to as part of NRC Security Order Section B.5.b issued February 25, 2002, and severe accident management guidelines and as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh). Use Inspection Procedure (lP) 71111.05T, "Fire Protection (Triennial)," Section 02.03 and 03.03 as a guideline. lf lP 71111.05T was recently performed at the facility the inspector should review the inspection results and findings to identify any other potential areas of inspection. Particular emphasis should be placed on strategies related to the spent fuel pool. The inspection should include, but not be limited to, an assessment of any licensee actions to: | |||
Licensee Action Describe what the licensee did to test or inspect equipment. | |||
a. Verify through test or NMPNS tested portable equipment credited to support Security Order Section 8.5.b or severe inspection that accident mitigation guidelines (SAMG), and verified that preventive maintenance tasks were equipment is available current. Required equipment inventories were walked down and verified. The 8.5.b and SAMG and functional. Active procedures were verified to be current and appropriately staged. | |||
equipment shall be tested and passive equipment shall be Describe inspector actions taken to confirm equipment readiness (e.9., observed a test, reviewed walked down and test results, discussed actions, reviewed records, etc.). | |||
inspected. lt is not expected that permanently installed The inspector verified through walkdowns and document reviews that installed and portable equipment that is tested equipment designed or staged to implement mitigation strategies was operable and procedures under an existing were workable. The types of equipment examined included fire water pumps and piping hose regulatory testing stations; portable pumps, fittings, hoses, adapters, and tools; portable direct currenValternating program be retested. | |||
current power supplies and generators; radios and communications devices; gas bottles and regulators; and, equipment lockers. The inspector also evaluated the staging areas of 8.5.b This review should be equipment in terms of availability and survivability in case of loss of large station areas. The done for a reasonable reviews and walkdowns included equipment credited in emergency operating procedures (EOPs),sample of mitigating SAMGS, and extreme damage mitigating guidelines (EDMG). | |||
strategies/eq uipment. | |||
Documents reviewed are listed in the Attachment to this report. | |||
Discuss general results including corrective actions by licensee. | |||
The licensee did not identify any significant deficiencies. Enhancements and minor deficiencies such as missing labels, fittings, or tools were captured in the corrective action program and promptly corrected. The condition reports (CR) are listed in the supplement of this report. | |||
Based on the reviews conducted, the inspector concluded that the equipment was available and functional. | |||
Describe the licensee's actions to verify that procedures are in place and can be executed (e.g. | |||
Licensee Action walkdowns, demonstrations, tests, etc.) | |||
b. Verify through NMPNS reviewed B.S.b procedures, EDMG and severe accident procedures (SAP) to identify all walkdowns or referenced implementing procedures, including emergency and normal operating procedure demonstration that attachments and damage repair procedures. All of the procedures were walked down by procedures to implement operators and engineers focusing on ability to execute without normal electrical or motive power. | |||
the strategies associated Comments and recommendations were captured in the corrective action program. | |||
with 8.5.b and 10 CFR 50.54(hh) are in place and are executable. | |||
Describe inspector actions and the sample strategies reviewed. Assess whether procedures were Licensees may choose in place and could be used as intended. | |||
The | not to connect or operate permanently installed equipment The inspector reviewed NMPNS walkdown results and walked down several damage repair and during this veriflcation. abnormal procedures involving installation of alternate water sources to the reactor coolant, primary containment, and fire systems; containment venting strategies, and portable power This review should be supplies. The inspector assessed the adequacy and completeness of the procedures, staging done for a reasonable and compatibility of equipment, and the practicality of the operator actions directed by the sample of mitigating procedures. Based on these reviews, the inspector concluded the procedures were in place and strateg ies/eq uipment. | ||
executable. | |||
Documents reviewed are listed in the Attachment to this report. | |||
Discuss general results including corrective actions by licensee. | |||
NMPNS did not identify any deficiencies that could have prevented a procedure from being executed. Minor issues such as labeling deficiencies or incorrectly staged or missing equipment were captured in the corrective action program and corrected. In some cases, alternate and easier means of implementing the guidelines and procedures were identified and adopted. CRs associated with this item are listed in the Attachment to this report. | |||
Based on the reviews conducted, the inspector concluded that the procedures to implement the strategies associated with B.5.b and 10 CFR 50.54(hh) are in place and are executable. | |||
Describe the licensee's actions and conclusions regarding training and qualifications of operators Licensee Action and support staff. | |||
Verify the training and NMPNS reviewed and verified operator training for the commitments made under Security Order qualifications of Section 8.5.b. Operators are trained as emergency response organization (ERO) team members operators and the and on SAMGs and EDMGs. NMPNS also reviewed the ERO job qualification matrix and fire support staff needed to brigade qualification records and verified that allwere current. | |||
implement the procedures and work instructions are current for activities related to Security Order Section Describe inspector actions and the sample strategies reviewed to assess training and B.S.b and severe qualifications of operators and support staff. | |||
accident management guidelines as required by 10 cFR 50.54 (hh). | |||
Documents reviewed are listed in the Attachment to this report | The inspector reviewed initial qualification and periodic re-qualification lesson plans and training records to verify that training for personnel tasked with implementing the B.5.b mitigating strategies, SAMGs, and EDMGs was up to date. The inspector concluded that the B.S.b training provided by NMPNS was appropriate and consistent with industry guidelines. Documents reviewed are listed in the Attachment to this report. | ||
Discuss general results including corrective actions by licensee. | |||
No deficiencies were identified by NMPNS. Based on the reviews conducted, the inspector concluded that the training and qualifications of operators and the support staff needed to implement the procedures and work instructions are current for activities related to Security Order Section 8.5.b and SAMGs as required by 10 CFR 50.54 (hh). | |||
Describe the licensee's actions and conclusions regarding applicable agreements and contracts Licensee Action are in place. | |||
d. Verify that any NMPNS verified that agreements from municipal fire departments and other commitments for applicable agreements various pieces of support equipment required to implement the strategies were in place and and contracts are in current. Additionally, NMPNS reviewed current interface agreements for support and contracts place and are capable of with suppliers and vendors to ensure that they were capable of meeting the conditions needed to meeting the conditions mitigate the consequences of loss of a larger area of the plant. | |||
needed to mitigate the consequences of these events. | |||
For a sample of mitigating strategies involving contracts or agreements with offsite entities, describe inspector actions to confirm agreements and contracts are in place and current (e.9., | |||
This review should be confirm that offsite fire assistance agreement is in place and current). | |||
done for a reasonable sample of mitigating strateg ies/eq uipment. The inspector verified that NMPNS had current letters of agreement with off-site entities to provide assistance in mitiqation strateqies. The inspector verified that equipment with adequate liftinq capacity to facilitate spray cooling into the spent fuel pool (SFP) and/or with capacity to charge the site fire headers for water makeup to the SFP was available. Documents reviewed are listed in the Attachment to this report. | |||
Discuss general results including corrective actions by licensee. | |||
No deficiencies were identified by NMPNS. Based on the reviews conducted, the inspector concluded that the agreements and contracts were in place and were appropriate for the strategies evaluated. | |||
Document the corrective action report number and briefly summarize problems noted by the Licensee Action licensee that have significant potential to prevent the success of any existing mitigating strategy. | |||
The | e. Review any open CRs for items identified by NMPNS are listed in the Attachment of this report. The inspector corrective action determined that none of the CRs describe problems that would have adversely impacted the documents to assess capability to implement mitigating strategies. | ||
problems with mitigating strategy implementation identified by the licensee. Assess the impact of the problem on the mitigating capability and the remaining capability that is not impacted. | |||
03.02 Assess the licensee's capability to mitigate station blackout (SBO) conditions, as required by 10 CFR 50.63, "Loss of All Alternating Current Power," and station design, is functional and valid. Refer to Tl 25151120, "lnspection of lmplementation of Station Blackout Rule Multi-Plant Action ltem A-22" as a guideline. lt is not intended that Tl 25151120 be completely reinspected. | |||
The inspection should include, but not be limited to, an assessment of any licensee actions to: | |||
Describe the licensee's actions to verify the adequacy of equipment needed to mitigate an SBO Licensee Action event. | |||
a. Verify through NMPNS reviewed the SBO engineering evaluations and procedure basis documents and walkdowns and conducted walkdowns of all onsite SBO-related equipment to ensure that it was adequate, inspection that all properly staged, tested, and maintained. Special equipment is stored in designated locations and required materials are inventoried during quarterly audits. Permanent plant equipment is tested in accordance with adequate and properly surveillance procedures. Other equipment described in damage repair procedures was verified to staged, tested, and be functional. | |||
maintained. | |||
Describe inspector actions to verify equipment is available and useable. | |||
NMPNS | The inspectors reviewed the results of NMPNS activities and walked down the SBO procedures and equipment, including the station batteries and switchgear and the emergency diesel generators (EDG). Documents reviewed are listed in the Attachment to this report. | ||
Discuss general results including corrective actions by licensee, No deficiencies were identifled by NMPNS. During its reviews NMPNS identified and implemented procedure enhancements, and verified that time-critical actions could be completed as required. CRs were initiated where appropriate and are listed in the Attachment of this report. | |||
Based on his review of NMPNS activities and independent walkdowns, the inspector concluded that NMPNS's reviews verified that SBO equipment was readv to respond to a SBO condition. | |||
Licensee Action Describe the licensee's actions to verify the capability to mitigate an SBO event. | |||
b. Demonstrate through NMPNS conducted walkdowns of its SBO procedures to verify they could be executed as written. | |||
NMPNS | walkdowns that NMPNS also audited all applicable procedures located in the main control room, the technical procedures for response support center, and the emergency off-site facility. All documents were in place and current. | ||
to an SBO are executable. | |||
Describe inspector actions to assess whether procedures were in place and could be used as intended. | |||
The inspector reviewed NMPNS's actions as documented in response to the industry guidance regarding followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. The inspector independently walked down N1-SOP-33A.2, "Station Blackout," at Unit 1 in the field and on the Unit 1 simulator, and portions of N2-SOP-01, "Station Blackout Procedure," at Unit 2. Documents reviewed are listed in the Attachment to this report. | |||
Discuss general results including corrective actions by licensee. | |||
No deficiencies were identified by NMPNS. Based on his review of NMPNS activities and independent procedure walkdowns, the inspector concluded that the SBO procedures were adequate to respond to a SBO condition. | |||
03.03 Assess the licensee's capability to mitigate internal and external flooding events required by station design. Refer to lP 71111.01, "Adverse Weather Protection," Section 02.04, "Evaluate Readiness to Cope with External Flooding" as a guideline. The inspection should include, but not be limited to, an assessment of any licensee actions to verify through walkdowns and inspections that all required materials and equipment are adequate and properly staged. These walkdowns and inspections shall include verification that accessible doors, barriers, and penetration seals are functional. | |||
Describe the licensee's actions to verify the capability to mitigate existing design basis flooding Licensee Action events. | |||
a. Verify through NMPNS conducted walkdowns and inspections of all required materials and equipment necessary walkdowns and to mitigate an internal or external flood to ensure that they were adequate. NMPNS also inspection that all considered the potential that equipments functions could be lost during a seismic event required materials are appropriate for the site. NMPNS documented the areas inspected, procedures and adequate and properly surveillances/preventive maintenance reviewed, and permanent or portable mitigating equipment staged, tested, and identified in accordance with the industry guidance. | |||
maintained. | |||
Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended. | |||
The inspector | The inspector reviewed NMPNS external and internalflood design documents and independently walked down flood protection features associated with the EDGs and emergency switchgear. The inspector also reviewed the design qualification and installation of a sample of flood seals, and flood-related CRs. Documents reviewed are listed in the Attachment to this report. | ||
Discuss general results including corrective actions by licensee. | |||
The inspector concluded that all required materials are adequate and properly staged, tested, and maintained to respond to an internal or external flood within the NMPNS design basis. | |||
While no operability or significant concerns were identified, NMPNS identified minor building sump and barrier discrepancies and initiated CRs appropriately. The CRs are listed in the Attachment to this report. The inspector reviewed the associated CRs and determined that the licensee's initial 03.04 Assess the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. Assess the licensee's development of any new mitigating strategies for identified vulnerabilities (e.9., entered it in to the corrective action program and any immediate actions taken). As a minimum, the licensee should have performed walkdowns and inspections of important equipment (permanent and temporary) such as storage tanks, plant water intake structures, and fire and flood response equipment; and developed mitigating strategies to cope with the loss of that important function. Use lP 71111.21, "Component Design Basis Inspection," Appendix 3, "Component Walkdown Considerations," as a guideline to assess the thoroughness of the licensee's walkdowns and inspections. | |||
Describe the licensee's actions to assess the potential impact of seismic events on the availability Licensee Action of equipment used in fire and flooding mitigation strategies. | |||
Verify through NMPNS utilized industry guidance to assess the potential impact of seismic events on the walkdowns that all availability of equipment used in fire and flooding mitigation strategies. The guidelines were required materials are established to govern the conduct of walkdowns and inspections of the equipment. NMPNS adequate and properly walked down systems and components and documented the results in an internal report. | |||
staged, tested, and maintained. | |||
=SUPPLEMENTAL | Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended. | ||
INFORMATION= | |||
The inspector reviewed the scope of NMPNS's assessments and the results of its walkdowns. | |||
The inspector also walked down a sample of risk significant areas of the plant to assess beyond design basis seismic and flooding vulnerabilities, including the EDGs, containment spray, station batteries, emergency condensers, reactor core isolation cooling (RCIC) system, and the diesel fire pumps. The inspector also reviewed design basis flooding documents. The inspector determined that the licensee meets the cunent licensing and design bases for 8.5.b, fire protection, and flooding. Documents reviewed are listed in the Attachment to this report. | |||
Discuss general results including corrective actions by licensee. Briefly summarize any new mitigating strategies identified by the licensee as a result of their reviews. | |||
The inspector concluded that NMPNS's reviews were comprehensive. ln reviewing beyond design basis fire or flooding and seismic interactions, NMPNS identified and documented vulnerabilities for additional review and evaluation. The vulnerabilities primarily involved the seismicity of fire suppression systems, and flood detection and building drain systems. CRs were initiated to track further actions. The CRs are listed in the Attachment to this report. | |||
Meetinqs 4OAO Exit Meetinq The inspectors presented the inspection results to Mr. Sam Belcher and other members of NMPNS management at the conclusion of the inspection on April 29,2011. The inspectors asked NMPNS whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified. | |||
A-1 | |||
=SUPPLEMENTAL INFORMATION= | |||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
==LIST OF DOCUMENTS== | Licensee | ||
: [[contact::S. Belcher]], Vice President | |||
: [[contact::F. Payne]], Unit 1 General Supervisor Operations | |||
: [[contact::J. Kaminski]], Director Emergency Preparedness | |||
: [[contact::M. Eron]], General Supervisor System Engineering | |||
==LIST OF DOCUMENTS REVIEWED== | |||
}} | }} | ||
Revision as of 23:42, 12 November 2019
| ML111320448 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/13/2011 |
| From: | Doerflein L Engineering Region 1 Branch 2 |
| To: | Belcher S Nine Mile Point |
| Shared Package | |
| ML111300168 | List: |
| References | |
| IR-11-010 | |
| Download: ML111320448 (23) | |
Text
UNITED STATES N UCLEAR REGULATORY COMMISSION W
REGION I
475 ALLENDALE ROAD KlNG OF PRUSSIA. PA 19406-1415 May 13, ?Att Mr. Sam Belcher Vice President Nine Mile Point Nuclear Station. LLC P.O. Box 63 Lycoming, NY 13093 SUBJECT: NINE MILE POINT NUCLEAR STATION - NRC TEMPORARY INSTRUCTION 25151183 INSPECTION REPORT O5oOO22ot2o11010 AND 0500041 ot2o11o1o
Dear Mr. Belcher:
on April 29,2011, the.U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Nine Mile Point Nuclear Station Units t and2, using Temporary Insiruction 2515/183,
"Followup to the Fukushima Daiichi Nuclear Station rueioamige Event.;' ine enclosed inspection leport documents the inspection results which were Jiscu6"o on Ap ril Zg, 2011 , with you and other members of your staff.
The objective of this inspection was to promptly assess the capabilities of Nine Mile point Nuclear Station to respond to extraordinary consequences similar to those that have recenly occurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States will be used to evaluate the United States iuclear industry's r-eadiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.
All of the potential issues and observations identified by this inspection are contained in this report' The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report. You are noi requireo-to respond to this letter. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-220, 50-410 License Nos.: DPR-63, NPF-69 Enclosure: lnspection Report 050002201201 1 01 0 and 05000 41 01201 1 010 cc Mencl: Distribution via ListServ
SUMMARY OF FINDINGS
lR 0500022012011010 and 0500041012011010; 04106312011 -0412912011; Nine Mile Point,
Units 1 and2; Temporary Instruction 25151183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event.
This report covers an announced Temporary Instruction (Tl) inspection. The inspection was conducted by a resident inspector. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
INSPECTION SCOPE
The intent of the Tl is to provide a broad overview of the industry's preparedness for events that may exceed the current design basis for a plant. The focus of the Tl was on
- (1) assessing the licensee's capability to mitigate consequences from large fires or explosions on site,
- (2) assessing the licensee's capability to mitigate station blackout (SBO) conditions,
- (3) assessing the licensee's capability to mitigate internal and external flooding events accounted for by the station's design, and
- (4) assessing the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. lf necessary, a more specific followup inspection will be performed at a later date.
INSPEGTION RESULTS All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report.
03.01 Assess the licensee's capability to mitigate conditions that result from beyond design basis events, typically bounded by security threats, committed to as part of NRC Security Order Section B.5.b issued February 25, 2002, and severe accident management guidelines and as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh). Use Inspection Procedure (lP) 71111.05T, "Fire Protection (Triennial)," Section 02.03 and 03.03 as a guideline. lf lP 71111.05T was recently performed at the facility the inspector should review the inspection results and findings to identify any other potential areas of inspection. Particular emphasis should be placed on strategies related to the spent fuel pool. The inspection should include, but not be limited to, an assessment of any licensee actions to:
Licensee Action Describe what the licensee did to test or inspect equipment.
a. Verify through test or NMPNS tested portable equipment credited to support Security Order Section 8.5.b or severe inspection that accident mitigation guidelines (SAMG), and verified that preventive maintenance tasks were equipment is available current. Required equipment inventories were walked down and verified. The 8.5.b and SAMG and functional. Active procedures were verified to be current and appropriately staged.
equipment shall be tested and passive equipment shall be Describe inspector actions taken to confirm equipment readiness (e.9., observed a test, reviewed walked down and test results, discussed actions, reviewed records, etc.).
inspected. lt is not expected that permanently installed The inspector verified through walkdowns and document reviews that installed and portable equipment that is tested equipment designed or staged to implement mitigation strategies was operable and procedures under an existing were workable. The types of equipment examined included fire water pumps and piping hose regulatory testing stations; portable pumps, fittings, hoses, adapters, and tools; portable direct currenValternating program be retested.
current power supplies and generators; radios and communications devices; gas bottles and regulators; and, equipment lockers. The inspector also evaluated the staging areas of 8.5.b This review should be equipment in terms of availability and survivability in case of loss of large station areas. The done for a reasonable reviews and walkdowns included equipment credited in emergency operating procedures (EOPs),sample of mitigating SAMGS, and extreme damage mitigating guidelines (EDMG).
strategies/eq uipment.
Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
The licensee did not identify any significant deficiencies. Enhancements and minor deficiencies such as missing labels, fittings, or tools were captured in the corrective action program and promptly corrected. The condition reports (CR) are listed in the supplement of this report.
Based on the reviews conducted, the inspector concluded that the equipment was available and functional.
Describe the licensee's actions to verify that procedures are in place and can be executed (e.g.
Licensee Action walkdowns, demonstrations, tests, etc.)
b. Verify through NMPNS reviewed B.S.b procedures, EDMG and severe accident procedures (SAP) to identify all walkdowns or referenced implementing procedures, including emergency and normal operating procedure demonstration that attachments and damage repair procedures. All of the procedures were walked down by procedures to implement operators and engineers focusing on ability to execute without normal electrical or motive power.
the strategies associated Comments and recommendations were captured in the corrective action program.
with 8.5.b and 10 CFR 50.54(hh) are in place and are executable.
Describe inspector actions and the sample strategies reviewed. Assess whether procedures were Licensees may choose in place and could be used as intended.
not to connect or operate permanently installed equipment The inspector reviewed NMPNS walkdown results and walked down several damage repair and during this veriflcation. abnormal procedures involving installation of alternate water sources to the reactor coolant, primary containment, and fire systems; containment venting strategies, and portable power This review should be supplies. The inspector assessed the adequacy and completeness of the procedures, staging done for a reasonable and compatibility of equipment, and the practicality of the operator actions directed by the sample of mitigating procedures. Based on these reviews, the inspector concluded the procedures were in place and strateg ies/eq uipment.
executable.
Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
NMPNS did not identify any deficiencies that could have prevented a procedure from being executed. Minor issues such as labeling deficiencies or incorrectly staged or missing equipment were captured in the corrective action program and corrected. In some cases, alternate and easier means of implementing the guidelines and procedures were identified and adopted. CRs associated with this item are listed in the Attachment to this report.
Based on the reviews conducted, the inspector concluded that the procedures to implement the strategies associated with B.5.b and 10 CFR 50.54(hh) are in place and are executable.
Describe the licensee's actions and conclusions regarding training and qualifications of operators Licensee Action and support staff.
Verify the training and NMPNS reviewed and verified operator training for the commitments made under Security Order qualifications of Section 8.5.b. Operators are trained as emergency response organization (ERO) team members operators and the and on SAMGs and EDMGs. NMPNS also reviewed the ERO job qualification matrix and fire support staff needed to brigade qualification records and verified that allwere current.
implement the procedures and work instructions are current for activities related to Security Order Section Describe inspector actions and the sample strategies reviewed to assess training and B.S.b and severe qualifications of operators and support staff.
accident management guidelines as required by 10 cFR 50.54 (hh).
The inspector reviewed initial qualification and periodic re-qualification lesson plans and training records to verify that training for personnel tasked with implementing the B.5.b mitigating strategies, SAMGs, and EDMGs was up to date. The inspector concluded that the B.S.b training provided by NMPNS was appropriate and consistent with industry guidelines. Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
No deficiencies were identified by NMPNS. Based on the reviews conducted, the inspector concluded that the training and qualifications of operators and the support staff needed to implement the procedures and work instructions are current for activities related to Security Order Section 8.5.b and SAMGs as required by 10 CFR 50.54 (hh).
Describe the licensee's actions and conclusions regarding applicable agreements and contracts Licensee Action are in place.
d. Verify that any NMPNS verified that agreements from municipal fire departments and other commitments for applicable agreements various pieces of support equipment required to implement the strategies were in place and and contracts are in current. Additionally, NMPNS reviewed current interface agreements for support and contracts place and are capable of with suppliers and vendors to ensure that they were capable of meeting the conditions needed to meeting the conditions mitigate the consequences of loss of a larger area of the plant.
needed to mitigate the consequences of these events.
For a sample of mitigating strategies involving contracts or agreements with offsite entities, describe inspector actions to confirm agreements and contracts are in place and current (e.9.,
This review should be confirm that offsite fire assistance agreement is in place and current).
done for a reasonable sample of mitigating strateg ies/eq uipment. The inspector verified that NMPNS had current letters of agreement with off-site entities to provide assistance in mitiqation strateqies. The inspector verified that equipment with adequate liftinq capacity to facilitate spray cooling into the spent fuel pool (SFP) and/or with capacity to charge the site fire headers for water makeup to the SFP was available. Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
No deficiencies were identified by NMPNS. Based on the reviews conducted, the inspector concluded that the agreements and contracts were in place and were appropriate for the strategies evaluated.
Document the corrective action report number and briefly summarize problems noted by the Licensee Action licensee that have significant potential to prevent the success of any existing mitigating strategy.
e. Review any open CRs for items identified by NMPNS are listed in the Attachment of this report. The inspector corrective action determined that none of the CRs describe problems that would have adversely impacted the documents to assess capability to implement mitigating strategies.
problems with mitigating strategy implementation identified by the licensee. Assess the impact of the problem on the mitigating capability and the remaining capability that is not impacted.
03.02 Assess the licensee's capability to mitigate station blackout (SBO) conditions, as required by 10 CFR 50.63, "Loss of All Alternating Current Power," and station design, is functional and valid. Refer to Tl 25151120, "lnspection of lmplementation of Station Blackout Rule Multi-Plant Action ltem A-22" as a guideline. lt is not intended that Tl 25151120 be completely reinspected.
The inspection should include, but not be limited to, an assessment of any licensee actions to:
Describe the licensee's actions to verify the adequacy of equipment needed to mitigate an SBO Licensee Action event.
a. Verify through NMPNS reviewed the SBO engineering evaluations and procedure basis documents and walkdowns and conducted walkdowns of all onsite SBO-related equipment to ensure that it was adequate, inspection that all properly staged, tested, and maintained. Special equipment is stored in designated locations and required materials are inventoried during quarterly audits. Permanent plant equipment is tested in accordance with adequate and properly surveillance procedures. Other equipment described in damage repair procedures was verified to staged, tested, and be functional.
maintained.
Describe inspector actions to verify equipment is available and useable.
The inspectors reviewed the results of NMPNS activities and walked down the SBO procedures and equipment, including the station batteries and switchgear and the emergency diesel generators (EDG). Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee, No deficiencies were identifled by NMPNS. During its reviews NMPNS identified and implemented procedure enhancements, and verified that time-critical actions could be completed as required. CRs were initiated where appropriate and are listed in the Attachment of this report.
Based on his review of NMPNS activities and independent walkdowns, the inspector concluded that NMPNS's reviews verified that SBO equipment was readv to respond to a SBO condition.
Licensee Action Describe the licensee's actions to verify the capability to mitigate an SBO event.
b. Demonstrate through NMPNS conducted walkdowns of its SBO procedures to verify they could be executed as written.
walkdowns that NMPNS also audited all applicable procedures located in the main control room, the technical procedures for response support center, and the emergency off-site facility. All documents were in place and current.
to an SBO are executable.
Describe inspector actions to assess whether procedures were in place and could be used as intended.
The inspector reviewed NMPNS's actions as documented in response to the industry guidance regarding followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event. The inspector independently walked down N1-SOP-33A.2, "Station Blackout," at Unit 1 in the field and on the Unit 1 simulator, and portions of N2-SOP-01, "Station Blackout Procedure," at Unit 2. Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
No deficiencies were identified by NMPNS. Based on his review of NMPNS activities and independent procedure walkdowns, the inspector concluded that the SBO procedures were adequate to respond to a SBO condition.
03.03 Assess the licensee's capability to mitigate internal and external flooding events required by station design. Refer to lP 71111.01, "Adverse Weather Protection," Section 02.04, "Evaluate Readiness to Cope with External Flooding" as a guideline. The inspection should include, but not be limited to, an assessment of any licensee actions to verify through walkdowns and inspections that all required materials and equipment are adequate and properly staged. These walkdowns and inspections shall include verification that accessible doors, barriers, and penetration seals are functional.
Describe the licensee's actions to verify the capability to mitigate existing design basis flooding Licensee Action events.
a. Verify through NMPNS conducted walkdowns and inspections of all required materials and equipment necessary walkdowns and to mitigate an internal or external flood to ensure that they were adequate. NMPNS also inspection that all considered the potential that equipments functions could be lost during a seismic event required materials are appropriate for the site. NMPNS documented the areas inspected, procedures and adequate and properly surveillances/preventive maintenance reviewed, and permanent or portable mitigating equipment staged, tested, and identified in accordance with the industry guidance.
maintained.
Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended.
The inspector reviewed NMPNS external and internalflood design documents and independently walked down flood protection features associated with the EDGs and emergency switchgear. The inspector also reviewed the design qualification and installation of a sample of flood seals, and flood-related CRs. Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee.
The inspector concluded that all required materials are adequate and properly staged, tested, and maintained to respond to an internal or external flood within the NMPNS design basis.
While no operability or significant concerns were identified, NMPNS identified minor building sump and barrier discrepancies and initiated CRs appropriately. The CRs are listed in the Attachment to this report. The inspector reviewed the associated CRs and determined that the licensee's initial 03.04 Assess the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. Assess the licensee's development of any new mitigating strategies for identified vulnerabilities (e.9., entered it in to the corrective action program and any immediate actions taken). As a minimum, the licensee should have performed walkdowns and inspections of important equipment (permanent and temporary) such as storage tanks, plant water intake structures, and fire and flood response equipment; and developed mitigating strategies to cope with the loss of that important function. Use lP 71111.21, "Component Design Basis Inspection," Appendix 3, "Component Walkdown Considerations," as a guideline to assess the thoroughness of the licensee's walkdowns and inspections.
Describe the licensee's actions to assess the potential impact of seismic events on the availability Licensee Action of equipment used in fire and flooding mitigation strategies.
Verify through NMPNS utilized industry guidance to assess the potential impact of seismic events on the walkdowns that all availability of equipment used in fire and flooding mitigation strategies. The guidelines were required materials are established to govern the conduct of walkdowns and inspections of the equipment. NMPNS adequate and properly walked down systems and components and documented the results in an internal report.
staged, tested, and maintained.
Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended.
The inspector reviewed the scope of NMPNS's assessments and the results of its walkdowns.
The inspector also walked down a sample of risk significant areas of the plant to assess beyond design basis seismic and flooding vulnerabilities, including the EDGs, containment spray, station batteries, emergency condensers, reactor core isolation cooling (RCIC) system, and the diesel fire pumps. The inspector also reviewed design basis flooding documents. The inspector determined that the licensee meets the cunent licensing and design bases for 8.5.b, fire protection, and flooding. Documents reviewed are listed in the Attachment to this report.
Discuss general results including corrective actions by licensee. Briefly summarize any new mitigating strategies identified by the licensee as a result of their reviews.
The inspector concluded that NMPNS's reviews were comprehensive. ln reviewing beyond design basis fire or flooding and seismic interactions, NMPNS identified and documented vulnerabilities for additional review and evaluation. The vulnerabilities primarily involved the seismicity of fire suppression systems, and flood detection and building drain systems. CRs were initiated to track further actions. The CRs are listed in the Attachment to this report.
Meetinqs 4OAO Exit Meetinq The inspectors presented the inspection results to Mr. Sam Belcher and other members of NMPNS management at the conclusion of the inspection on April 29,2011. The inspectors asked NMPNS whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
A-1
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- S. Belcher, Vice President
- F. Payne, Unit 1 General Supervisor Operations
- J. Kaminski, Director Emergency Preparedness
- M. Eron, General Supervisor System Engineering