September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - NINE MILE POINT NUCLEAR STATION (REPORTS 05000220/2008001 AND 05000410/2008001)
Dear Mr. Polson:
On August 6, 2008, the NRC staff completed its performance review of Nine Mile Point Nuclear Station for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
While plant performance for the most recent quarter was within the Licensee Response column of the Action Matrix, Nine Mile Point Unit 1 was within the Regulatory Response column of the Action Matrix during the first two quarters of the assessment cycle, based on one finding of low to moderate safety significance (White) identified in January 2007. The White finding involved your Licensed Operator Requalification Training Program for Unit 1. Specifically, the annual dynamic simulator examination integrity was unintentionally compromised at Unit 1 for 2005 and 2006. The NRC has completed a supplemental inspection in accordance with inspection procedure 95001. The results of that inspection were provided in NRC Supplemental Inspection Report 05000220/2007007. As a result of that review, this finding was closed and no longer considered for plant assessment purposes, effective January 1, 2008.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting a license renewal commitments inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA Original Signed By:/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects
Docket Nos. 50-220, 50-410 License Nos. DPR-63, NPF-69
Enclosure: Nine Mile Point Nuclear Station Inspection/ Activity Plan
cc w/ encl:
M. Wallace, Vice - Chairman, Constellation Energy H. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Energy Group, LLC M. Wetterhahn, Esquire, Winston & Strawn T. Syrell, Director, Licensing, Nine Mile Point Nuclear Station P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba P. Church, Oswego County Administator T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. Evans, LIPA G. Detter, Manager, Corp Nuclear Safety and Security, Constellation Energy C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board
Nine Mile Point Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/29/2008 11:41:47 Report 22
10/6EXAM
- U1 INITIAL OPERATOR LICENSING EXAM Not Applicable FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM 09/15/2008 09/19/2008
U01690 Not Applicable FY09 - NINE MILE POINT 1 INITIAL OPERATOR EXAM 10/06/2008 10/17/2008
U01690
- EP PROGRAM INSPECTION EP Baseline Inspection Alert and Notification System Testing 07/14/2008 07/18/2008 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 07/14/2008 07/18/2008 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 07/14/2008 07/18/2008 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 07/14/2008 07/18/2008 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 07/14/2008 07/18/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 07/14/2008 07/18/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 07/14/2008 07/18/2008 1, 2 71151-EP03 IP
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 07/28/2008 08/01/2008 1, 2 2515/171 IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 08/11/2008 08/15/2008 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 08/11/2008 08/15/2008 1, 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 08/11/2008 08/15/2008 1, 2 7112103 IP
7111111B
- L.O.REQUAL.PROG.(FOCUS U1)+P/F RVW Baseline Inspections Licensed Operator Requalification Program 11/17/2008 11/21/2008 1, 2 7111111B IP
7111121
- CDBI Baseline Inspections Component Design Bases Inspection 10/06/2008 10/10/2008 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 10/20/2008 10/24/2008 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 10/27/2008 10/31/2008 1, 2 7111121 IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 11/17/2008 11/21/2008 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 11/17/2008 11/21/2008 1, 2 7112102 IP Baseline Inspections Occupational Exposure Control Effectiveness 11/17/2008 11/21/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 11/17/2008 11/21/2008 1, 2 71151-PR01 IP
TI 176
- TI 176 Generic Safety Inspectio Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 12/01/2008 12/05/2008 1, 2 2515/176 IP
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 12/08/2008 12/12/2008 1, 2 7112202 IP
7112201
- PUB RAD SAFETY - RETS Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/09/2009 02/13/2009 1, 2 7112201 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Nine Mile Point Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/29/2008 11:41:47 Report 22
7111108G
- U1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 03/23/2009 03/27/2009
7111108G IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 03/23/2009 03/27/2009
7112101 IP Baseline Inspections ALARA Planning and Controls 03/23/2009 03/27/2009
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 03/23/2009 03/27/2009
7112103 IP
71003
- LR COMMITMENTS INSP - OUTAGE License Renewal Inspec Post-Approval Site Inspection for License Renewal 03/30/2009 04/03/2009
71003 IP
8/24 EXM
- U2 INITIAL OPERATOR LICENSING EXAM Not Applicable FY09 - NINE MILE POINT 2 INITIAL OPERATOR EXAM 07/27/2009 07/30/2009
U01698 Not Applicable FY09 - NINE MILE POINT 2 INITIAL OPERATOR EXAM 08/24/2009 09/04/2009
U01698
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
06/01/2009 06/05/2009 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]
06/15/2009 06/19/2009 1, 2 7111105T IP
71003
- LR COMMITMENTS INSP - NON-OUTAGE License Renewal Inspec Post-Approval Site Inspection for License Renewal 06/08/2009 06/12/2009
71003 IP License Renewal Inspec Post-Approval Site Inspection for License Renewal 06/22/2009 06/26/2009
71003 IP
71121
- OCC RAD SAFETY Baseline Inspections ALARA Planning and Controls 07/06/2009 07/10/2009 1, 2 7112102 IP Baseline Inspections ALARA Planning and Controls 07/06/2009 07/10/2009 1, 2 7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 07/06/2009 07/10/2009 1, 2 7112103 IP
TI 173
- GROUNDWATER TI Generic Safety Inspectio Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 08/24/2009 08/28/2009 1, 2 2515/173 IP
EP EXER
- EP EXERCISE INSPECTION EP Baseline Inspection Exercise Evaluation 09/13/2009 09/19/2009 1, 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 09/13/2009 09/19/2009 1, 2 7111404 IP Baseline Inspections Performance Indicator Verification 09/13/2009 09/19/2009 1, 2 71151 IP
7111111B
- BIENNIAL REQUAL INSP(U2) W P/F RESULTS Baseline Inspections Licensed Operator Requalification Program 11/30/2009 12/04/2009 1, 2 7111111B IP
- PI&R BIENNIAL TEAM Baseline Inspections Identification and Resolution of Problems 10/05/2009 10/09/2009 1, 2 71152B IP Baseline Inspections Identification and Resolution of Problems 10/19/2009 10/23/2009 1, 2 71152B IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 11/02/2009 11/06/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 11/02/2009 11/06/2009 1, 2 7112102 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Nine Mile Point Inspection / Activity Plan 07/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/29/2008 11:41:47 Report 22
71121
- OCC RAD SAFETY Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 11/02/2009 11/06/2009 1, 2 7112103 IP Baseline Inspections Performance Indicator Verification 11/02/2009 11/06/2009 1, 2 71151 IP
7111111B
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009
7111111B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.