ML16237A033: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD
                                                REGION IV
ARLINGTON, TX 76011
                                            1600 E LAMAR BLVD
-4511 August 31, 2016
                                        ARLINGTON, TX 76011-4511
Mr. Fadi Diya, Senior Vice President
                                            August 31, 2016
  and Chief Nuclear Officer
Mr. Fadi Diya, Senior Vice President
Union Electric Company
  and Chief Nuclear Officer
P.O. Box 620
Union Electric Company
Fulton, MO 65251 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
P.O. Box 620
(REPORT 05000483/2016005)
Fulton, MO 65251
Dear Mr. Diya: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
SUBJECT:         MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
completed its mid-cycle performance review of Callaway Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June
                (REPORT 05000483/2016005)
30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
Dear Mr. Diya:
  The NRC determined that overall, Callaway Plant
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at  
performance review of Callaway Plant. The NRC reviewed the most recent quarterly
Callaway Plant
performance indicators (PIs) in addition to inspection results and enforcement actions from
during the most recent quarter was within the Licensee Response Column of the  
July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your
NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the
facility during this period and its plans for future inspections at your facility.
NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
The NRC determined that overall, Callaway Plant operated in a manner that preserved public
  The inspections listed during the second half
health and safety and met all cornerstone objectives. The NRC determined the performance at
of the inspection plan are tentative and may be revised at the end
Callaway Plant during the most recent quarter was within the Licensee Response Column of the
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which  
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very
will be sent via separate, non
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the
-publicly available correspondence.
nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline
In response to the accident at Fukushima, the Commission issued Order EA
inspections at your facility.
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
-Design-Basis External Events
inspections performed by resident inspectors are not included in the inspection plan. The
," and Order EA
inspections listed during the second half of the inspection plan are tentative and may be revised
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in  
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff  
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
 
you as soon as possible to discuss changes to the inspection plan should circumstances
F. Diya - 2 - will confirm through inspections the full implementation of the orders mentioned above by performing
warrant any changes. This inspection plan does not include security related inspections, which
Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
will be sent via separate, non-publicly available correspondence.
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the
towards compliance with these Orders, and the information gathered will aid staff in
NRC Public Document Room or from the Publicly Available Records (PARS) component of
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
NRC's Agencywide
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Please contact
me at 817-200-1141 with any questions you have regarding this letter.
Sincerely, /RA/ Nicholas H. Taylor, Chief
Projects Branch B
Division of Reactor Projects Docket No. 50
-483 License No. NPF
-30 Enclosure: 
Callaway Plant Inspection/Activity Plan
 
Page 1 of 2
08/30/2016
09:32:44 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteCallawayInspection / Activity Plan
07/01/2016
-06/30/2018BASELINE-PLANT MODS
1 1 IP A dverse Weather (Site/Imminent)7111101-Imminent
01/01/2016
12/31/2016
EB1-07T-CWY HEAT SINK PERFORMANCE
1 1 IP Heat Sink Performance7111107T 09/26/2016
09/30/2016
RS 24-RADIATION SAFETY
3 1 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016
1 IP Occupational Dose Assessment71124.0411/07/201611/11/2016
EP-1-EP PERFORMANCE INDICATORS
1 1 IP Drill/Exercise Performance71151-EP0111/14/201611/18/2016
1 IP ERO Readiness71151-EP0211/14/201611/18/2016
1 IP A lert & Notification System Reliability71151-EP0311/14/201611/18/2016
EP-2-BIENNIAL EP PROGRAM INSPECTION
1 1 IP A lert and Notification System Testing711140211/14/201611/18/2016
1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016
1 IP Emergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016
ISFSI-ROUTINE INSPECTION (ONE WEEK IN MONTH)
1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1 02/01/2017
02/28/2017EXAM-INIT EXAM 4 1 INITIAL EXAM CALLAWAY (09/2017)
X02591 08/14/2017
08/18/2017
1 INITIAL EXAM CALLAWAY (09/2017)
X0259109/11/2017
09/15/2017
RS 5678-RS TEAM 5 1 IP Radiation Monitoring Instrumentation71124.05 02/27/2017
03/03/2017
1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/27/2017
03/03/2017
1 IP Radiological Environmental Monitoring Program71124.07 02/27/2017
03/03/2017
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/27/2017
03/03/2017
EP-2-BIENNIAL EP EXERCISE INSPECTION
4 1 IP Exercise Evaluation7111401 04/24/2017
04/28/2017
1 IP Emergency Action Level and Emergency Plan Changes7111404 04/24/2017
04/28/2017
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
1 1 IP Drill/Exercise Performance71151-EP01
04/24/2017
04/28/2017
1 IP ERO Readiness71151-EP02
04/24/2017
04/28/2017
1 IP A lert & Notification System Reliability71151-EP03
04/24/2017
04/28/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
08/30/2016
09:32:44 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteCallawayInspection / Activity Plan
07/01/2016
-06/30/2018
BRQ-BIENNIAL REQUAL INSPECTION
3 1 IP Licensed Operator Requalification Program7111111B 06/12/2017
06/16/2017
EB1-21M-CWY COMPONENT DESIGN BASES INSPECTION
6 1 IP Component Design Bases Inspection (Teams)7111121M 07/31/2017
09/01/2017
RS 12 PI-RADIATION SAFETY
3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017
10/20/2017
1 IP Occupational ALARA Planning and Controls71124.02 10/16/2017
10/20/2017
1 IP Occupational Exposure Control Effectiveness71151-OR01
10/16/2017
10/20/2017
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
10/16/2017
10/20/201771111.08-INSERVICE INSPECTION RFO22
1 1 IP Inservice Inspection Activities - PWR7111108P 10/16/2017
10/27/2017
EP-1-EP PROGRAM INSPECTION
1 1 IP A lert and Notification System Testing7111402 04/23/2018
04/27/2018
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 04/23/2018
04/27/2018
1 IP Emergency Action Level and Emergency Plan Changes7111404 04/23/2018
04/27/2018
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 04/23/2018
04/27/2018
1 IP Drill/Exercise Performance71151-EP01
04/23/2018
04/27/2018
1 IP ERO Readiness71151-EP02
04/23/2018
04/27/2018
1 IP A lert & Notification System Reliability71151-EP03
04/23/2018
04/27/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.


  ML16237A03
F. Diya                                            -2-
SUNSI Review
will confirm through inspections the full implementation of the orders mentioned above by
  By:   ADAMS  Yes   No  Publicly Available
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
   Non-Publicly Available
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV
Communication/Staffing/Multi-Unit Dose Assessment Plans.
SPE:DRP/B D: DRS D: DRP C: DRP/B  NAME DProulx AVegel TWPruett NTaylor  SIGNATURE /RA/ /RA Jeff Clark for/
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
/RA/ /RA/  DATE 8/22/16 8/22/16 8/23/16 8/23/16  
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016         SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
  (REPORT 05000483/2016005)
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
  DISTRIBUTION
to conduct quarterly assessment meetings and communicate changes in the assessment of
: Regional Administrator (Kriss.Kennedy@nrc.gov)  
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
Deputy Regional Administrator (Scott.Morris@nrc.gov)  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
DRP Director (Troy.Pruett@nrc.gov)  
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
NRC Public Document Room or from the Publicly Available Records (PARS) component of
DRS Director (Anton.Vegel@nrc.gov)  
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
DRS Deputy Director (Jeff.Clark@nrc.gov)
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
  Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Electronic Reading Room).
Resident Inspector (Michael.Langelier@nrc.gov)
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
                                                    Sincerely,
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
                                                    /RA/
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
                                                    Nicholas H. Taylor, Chief
Administrative Assistant (Dawn.Yancey@nrc.gov
                                                    Projects Branch B
) Public Affairs Officer (Victor.Dricks@nrc.gov)  
                                                    Division of Reactor Projects
Project Manager (John.Klos@nrc.gov)  
Docket No. 50-483
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
License No. NPF-30
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Enclosure:
ACES (R4Enforcement.Resource@nrc.gov)
Callaway Plant Inspection/Activity Plan
Regional Counsel (Karla.Fuller@nrc.gov)
 
Technical Support Assistant (Loretta.Williams@nrc.gov)
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                        CWY
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Page 1 of 2                                                                                      Callaway
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
08/30/2016    09:32:44                                                                Inspection / Activity Plan
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
Report 22
RIV RSLO (Bill.Maier@nrc.gov)
                                                                                        07/01/2016 - 06/30/2018
Director, DIRS, NRR (Chris.Miller@nrc.gov)
  Unit          Planned Dates                                                                                                                                        No. of Staff
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Number          Start        End      Inspection Activity                                                                Title                                      on Site
Director, DORL, NRR (Anne.Boland@nrc.gov)
                                        BASELINE      - PLANT MODS                                                                                                          1
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
1          01/01/2016      12/31/2016    IP 7111101-Imminent      Adverse Weather (Site/Imminent)
Director, NSIR (Brian.Holian@nrc.gov)
                                        EB1-07T        - CWY HEAT SINK PERFORMANCE                                                                                          1
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
1          09/26/2016      09/30/2016    IP 7111107T              Heat Sink Performance
DRP Branch Chiefs (R4DRPBC@nrc.gov)
                                        RS 24          - RADIATION SAFETY                                                                                                    3
DRS Branch Chiefs (R4DRSBC@nrc.gov)
1          11/07/2016      11/11/2016    IP 71124.02              Occupational ALARA Planning and Controls
ROPreports.Resource@nrc.gov
1          11/07/2016      11/11/2016    IP 71124.04              Occupational Dose Assessment
ROPassessment.Resource@nrc.gov
                                        EP-1          - EP PERFORMANCE INDICATORS                                                                                          1
1          11/14/2016      11/18/2016    IP 71151-EP01            Drill/Exercise Performance
1          11/14/2016      11/18/2016    IP 71151-EP02            ERO Readiness
1          11/14/2016      11/18/2016    IP 71151-EP03            Alert & Notification System Reliability
                                        EP-2          - BIENNIAL EP PROGRAM INSPECTION                                                                                      1
1          11/14/2016      11/18/2016    IP 7111402              Alert and Notification System Testing
1          11/14/2016      11/18/2016    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          11/14/2016      11/18/2016    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          11/14/2016      11/18/2016    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        ISFSI          - ROUTINE INSPECTION (ONE WEEK IN MONTH)                                                                              1
1          02/01/2017      02/28/2017    IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                        EXAM          - INIT EXAM                                                                                                          4
1          08/14/2017      08/18/2017        X02591                INITIAL EXAM CALLAWAY (09/2017)
1          09/11/2017      09/15/2017        X02591                INITIAL EXAM CALLAWAY (09/2017)
                                        RS 5678        - RS TEAM                                                                                                            5
1          02/27/2017      03/03/2017    IP 71124.05              Radiation Monitoring Instrumentation
1          02/27/2017      03/03/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
1          02/27/2017      03/03/2017    IP 71124.07              Radiological Environmental Monitoring Program
1          02/27/2017      03/03/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                                    4
1          04/24/2017      04/28/2017    IP 7111401              Exercise Evaluation
1          04/24/2017      04/28/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3           - EP PERFORMANCE INDICATOR VERIFICATION                                                                              1
  1          04/24/2017      04/28/2017    IP 71151-EP01            Drill/Exercise Performance
1          04/24/2017      04/28/2017    IP 71151-EP02            ERO Readiness
  1          04/24/2017      04/28/2017    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                                              Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information    CWY
Page 2 of 2                                                                                      Callaway
08/30/2016    09:32:44                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
   Unit          Planned Dates                                                                                                                  No. of Staff
Number          Start        End        Inspection Activity                                                                Title                on Site
                                        BRQ            - BIENNIAL REQUAL INSPECTION                                                                    3
1          06/12/2017      06/16/2017    IP 7111111B              Licensed Operator Requalification Program
                                        EB1-21M        - CWY COMPONENT DESIGN BASES INSPECTION                                                          6
1          07/31/2017      09/01/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                        RS 12 PI      - RADIATION SAFETY                                                                              3
1          10/16/2017      10/20/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          10/16/2017      10/20/2017    IP 71124.02              Occupational ALARA Planning and Controls
1          10/16/2017      10/20/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          10/16/2017      10/20/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        71111.08      - INSERVICE INSPECTION RFO22                                                                    1
1          10/16/2017      10/27/2017    IP 7111108P              Inservice Inspection Activities - PWR
                                        EP-1          - EP PROGRAM INSPECTION                                                                          1
1          04/23/2018      04/27/2018    IP 7111402              Alert and Notification System Testing
1          04/23/2018      04/27/2018    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          04/23/2018      04/27/2018    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          04/23/2018      04/27/2018    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
1          04/23/2018      04/27/2018    IP 71151-EP01            Drill/Exercise Performance
1          04/23/2018      04/27/2018    IP 71151-EP02            ERO Readiness
1          04/23/2018      04/27/2018    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
 
  ML16237A033
  SUNSI Review            ADAMS                  Publicly Available       Non-Sensitive Keyword:
   By:                        Yes  No            Non-Publicly Available  Sensitive     NRC-002
  OFFICE: RIV   SPE:DRP/B   D: DRS               D: DRP       C: DRP/B
   NAME         DProulx     AVegel               TWPruett     NTaylor
   SIGNATURE     /RA/         /RA Jeff Clark for/   /RA/         /RA/
   DATE         8/22/16     8/22/16               8/23/16       8/23/16
                                       
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
                (REPORT 05000483/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Revision as of 14:50, 30 October 2019

Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
ML16237A033
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Union Electric Co
Taylor N
References
IR 2016005
Download: ML16237A033 (6)


See also: IR 05000483/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

Dear Mr. Diya:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Callaway Plant. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Callaway Plant operated in a manner that preserved public

health and safety and met all cornerstone objectives. The NRC determined the performance at

Callaway Plant during the most recent quarter was within the Licensee Response Column of the

NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very

low (i.e., Green) safety significance, and all PIs indicated that your performance was within the

nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline

inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

F. Diya -2-

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects

Docket No. 50-483

License No. NPF-30

Enclosure:

Callaway Plant Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY

Page 1 of 2 Callaway

08/30/2016 09:32:44 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

BASELINE - PLANT MODS 1

1 01/01/2016 12/31/2016 IP 7111101-Imminent Adverse Weather (Site/Imminent)

EB1-07T - CWY HEAT SINK PERFORMANCE 1

1 09/26/2016 09/30/2016 IP 7111107T Heat Sink Performance

RS 24 - RADIATION SAFETY 3

1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment

EP-1 - EP PERFORMANCE INDICATORS 1

1 11/14/2016 11/18/2016 IP 71151-EP01 Drill/Exercise Performance

1 11/14/2016 11/18/2016 IP 71151-EP02 ERO Readiness

1 11/14/2016 11/18/2016 IP 71151-EP03 Alert & Notification System Reliability

EP-2 - BIENNIAL EP PROGRAM INSPECTION 1

1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing

1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

ISFSI - ROUTINE INSPECTION (ONE WEEK IN MONTH) 1

1 02/01/2017 02/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

EXAM - INIT EXAM 4

1 08/14/2017 08/18/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)

1 09/11/2017 09/15/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)

RS 5678 - RS TEAM 5

1 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation

1 02/27/2017 03/03/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

1 02/27/2017 03/03/2017 IP 71124.07 Radiological Environmental Monitoring Program

1 02/27/2017 03/03/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation

1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 04/24/2017 04/28/2017 IP 71151-EP01 Drill/Exercise Performance

1 04/24/2017 04/28/2017 IP 71151-EP02 ERO Readiness

1 04/24/2017 04/28/2017 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY

Page 2 of 2 Callaway

08/30/2016 09:32:44 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

BRQ - BIENNIAL REQUAL INSPECTION 3

1 06/12/2017 06/16/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - CWY COMPONENT DESIGN BASES INSPECTION 6

1 07/31/2017 09/01/2017 IP 7111121M Component Design Bases Inspection (Teams)

RS 12 PI - RADIATION SAFETY 3

1 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls

1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

71111.08 - INSERVICE INSPECTION RFO22 1

1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR

EP-1 - EP PROGRAM INSPECTION 1

1 04/23/2018 04/27/2018 IP 7111402 Alert and Notification System Testing

1 04/23/2018 04/27/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 04/23/2018 04/27/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 04/23/2018 04/27/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

1 04/23/2018 04/27/2018 IP 71151-EP01 Drill/Exercise Performance

1 04/23/2018 04/27/2018 IP 71151-EP02 ERO Readiness

1 04/23/2018 04/27/2018 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A033

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: Yes No Non-Publicly Available Sensitive NRC-002

OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B

NAME DProulx AVegel TWPruett NTaylor

SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/

DATE 8/22/16 8/22/16 8/23/16 8/23/16

Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov