{{#Wiki_filter:71111.01 Revision History
{{#Wiki_filter:U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Revision History Date of Revision      Description of Revision 11/30/2017            IP 71111.01, Adverse Weather Protection, has been revised to add additional ultimate heat sink considerations to summer readiness sample, and improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
09/04/2015            IP 71111.01, "Adverse Weather Protection," has been revised to incorporate Fukushima Lessons Learned and Fukushima flooding inspection insights.
Incorporated the following feedback form: 71111.01-2130.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    1                2                1                  4 NCV Green                                    6                2                4                12 NCVIV Green                                  0                1                0                  1 NCVIV N/A                                    1                0                0                  1 Total                                        8                5                5                18 9/11/2018 2:22:01 PM                                                                                                                                              Page 1 of 276


Date of Revision
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  6        0    2    3    0          6          1            4          1          0              0          0          0 Region 2                  5        0    2    3    0          5          2            3          0          0              0          0          0 Region 3                  2        0    0    1    0          2          1            1          0          0              0          0          0 Region 4                  8        0    2    6    0          8          5            2          1          0              0          0          0 1 Unit Sites              9        0    1    8    0          9          3            5          1          0              0          0          0 2 Unit Sites              11        0    4    5    0          11          6            4          1          0              0          0          0 3 Unit Sites              1        0    1    0    0          1          0            1          0          0              0          0          0 BWR                        7        0    2    4    0          7          2            5          0          0              0          0          0 PWR                      14        0    4    9    0          14          7            5          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        21        0    6  13    0          21          9          10          2          0              0          0          0 Percentage of All    100%        0% 29%  62%    0%      100%          43%        48%        10%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                      Page 2 of 276


Description of Revision
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  6.1        4.5        2.2          4.3        Region 1                  6.1        4.5        2.2          4.3 Region 2                  0.0        3.1        3.9          2.5        Region 2                  0.0        3.1        3.9          2.5 Region 3                  2.1        2.3        0.0          1.6        Region 3                  2.1        2.3        0.0          1.6 Region 4                  11.5        0.0        2.1          4.1        Region 4                  11.5        0.0        2.1          4.1 1 Unit Sites              4.2        4.1        2.6          3.6        1 Unit Sites              4.2        4.1        2.6          3.6 2 Unit Sites              4.4        1.8        1.8          2.7        2 Unit Sites              4.4        1.8        1.8          2.7 3 Unit Sites              0.0        0.0        5.7          3.2        3 Unit Sites              0.0        0.0        5.7          3.2 BWR                        4.4        2.6        1.3          2.7        BWR                        4.4        2.6        1.3          2.7 PWR                        4.0        2.7        3.0          3.2        PWR                        4.0        2.7        3.0          3.2 Total All Regions          4.2        2.6        2.4          3.0        Total All Regions          4.2        2.6        2.4          3.0 71111.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 3 of 276


11/30/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            490      91          5.4        5.4    441          91          5.4        4.8      461        91        5.4          5.1 Region 2            615      92          5.1        6.7    648        101          5.6        6.4      775        94        5.2          8.2 Region 3            472      76          4.8        6.2    437          78          4.9        5.6      367        68        4.3          5.4 Region 4            347      60          4.6        5.8    375          56          4.3        6.7      487        54        4.2          9.0 1 Unit Sites        420      78          4.9        5.4    455          80          5.0        5.7      482        78        4.9          6.2 2 Unit Sites      1287      206          5.3        6.2    1233        208          5.3        5.9    1314      191        4.9          6.9 3 Unit Sites        216      35          4.4        6.2    213          38          4.8        5.6      296        38        4.8          7.8 BWR                680      120          5.0        5.7    775        126          5.3        6.1      746      114        4.8          6.5 PWR                1243      199          5.2        6.2    1126        200          5.3        5.6    1345      193        5.1          7.0 Total All          1923      319          5.2        6.0    1900        326          5.3        5.8    2091      307        5.0          6.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 4 of 276


IP 71111.01,
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1392    273        5.6        5.1 Region 2          2038    287        5.5        7.1 Region 3          1276    222        4.8        5.7 Region 4          1209    170        4.6        7.1 1 Unit Sites      1356    236        5.1        5.7 2 Unit Sites      3834    605        5.3        6.3 3 Unit Sites        725    111        5.0        6.5 BWR                2200    360        5.1        6.1 PWR                3714    592        5.2        6.3 Total All          5914    952        5.2        6.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 5 of 276


Adverse Weather Protection,
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total AV Green                                  0    1          0              1 FIN Green                                  2    0          0              2 NCV Green                                  7    6          7            20 NOV N/A                                    1    0          0              1 Total                                    10    7          7            24 9/11/2018 2:22:01 PM                                                                  Page 6 of 276


has been revised to add additional ultimate heat sink considerations to summer readiness sample, and improved
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    1    3    0          3          1            3          0          0              0          0          0 Region 2                  3        0    1    1    0          2          0            3          0          0              0          0          0 Region 3                  3        0    2    1    0          2          0            2          1          0              0          0          0 Region 4                  14        0    2    6    0          13          0          11          2          0              0          0          0 1 Unit Sites              14        0    5    5    0          12          1          11          1          0              0          0          0 2 Unit Sites              9        0    1    6    0          7          0            7          2          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                      13        0    5    4    0          11          1          10          1          0              0          0          0 PWR                      11        0    1    7    0          9          0            9          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        24        0    6  11    0          20          1          19          3          0              0          0          0 Percentage of All    100%        0% 25%  46%    0%        83%          4%        79%        13%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                      Page 7 of 276


plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.6        0.0        1.2          1.6        Region 1                  2.4        0.0        1.2          1.2 Region 2                  1.1        2.1        1.0          1.4        Region 2                  1.1        1.1        1.0          1.1 Region 3                  1.3        2.8        0.0          1.4        Region 3                  1.3        1.4        0.0          0.9 Region 4                  8.2        3.8        6.8          6.2        Region 4                  6.3        2.5        6.8          5.1 1 Unit Sites              6.0        3.0        1.5          3.5        1 Unit Sites              4.0        2.3        1.5          2.6 2 Unit Sites              1.2        1.1        2.8          1.7        2 Unit Sites              1.2        0.0        2.8          1.3 3 Unit Sites              5.9        5.1        0.0          3.4        3 Unit Sites              5.9        5.1        0.0          3.4 BWR                        5.9        3.1        1.5          3.6        BWR                        4.0        2.4        1.5          2.6 PWR                        1.6        1.5        2.5          1.9        PWR                        1.6        0.5        2.5          1.5 Total All Regions          3.4        2.1        2.1          2.5        Total All Regions          2.6        1.2        2.1          2.0 71111.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 8 of 276


09/04/2015
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            830      233        13.7        3.6    817        232        13.6        3.5      842      231        13.6          3.6 Region 2            896      234        13.0        3.8    952        227        12.6        4.2    1001      246        13.7          4.1 Region 3            757      195        12.2        3.9    723        199        12.4        3.6      740      188        11.8          3.9 Region 4            636      149        11.5        4.3    785        161        12.4        4.9      733      157        12.1          4.7 1 Unit Sites        732      199        12.4        3.7    829        207        12.9        4.0      849      197        12.3          4.3 2 Unit Sites      2020      510        13.1        4.0    2044        506        13.0        4.0    2030      519        13.3          3.9 3 Unit Sites        367      102        12.8        3.6    403        106        13.3        3.8      437      106        13.3          4.1 BWR                1263      313        13.0        4.0    1272        321        13.4        4.0    1294      308        12.8          4.2 PWR                1857      498        13.1        3.7    2004        498        13.1        4.0    2022      514        13.5          3.9 Total All          3119      811        13.3        3.8    3276        819        13.4        4.0    3316      822        13.5          4.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 9 of 276


IP 71111.01, "Adverse Weather Protection," has been revised to incorporate Fukushima Lessons Learned and Fukushima flooding inspection insights. 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          2488    696        14.2        3.6 Region 2          2849    707        13.6        4.0 Region 3          2220    582        12.7        3.8 Region 4          2154    467        12.6        4.6 1 Unit Sites      2410    603        13.1        4.0 2 Unit Sites      6094    1535        13.3        4.0 3 Unit Sites      1207    314        14.3        3.8 BWR                3828    942        13.3        4.1 PWR                5883    1510        13.4        3.9 Total All          9711    2452        13.4        4.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 10 of 276


Incorporated the following feedback form:  71111.01-2130.
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2017  3 Year Total FIN Green                                  0    1            1 NCV Green                                  2    5            7 Total                                      2    6            8 9/11/2018 2:22:01 PM                                                                    Page 11 of 276


2015 2016 2017 3 Year Total
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3       0    1    2    0          2          0            2          1          0              0          0          0 Region 2                  2        0    1    1    0          2          0            2          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  3        0    0    2    0          2          0            3          0          0              0          0          0 1 Unit Sites              2        0    0    2    0          1          0            2          0          0              0          0          0 2 Unit Sites              5        0    2    2    0          4          0            4          1          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                      5        0    0    5    0          3          0            5          0          0              0          0          0 PWR                      3        0    2    0    0          3          0            2          1          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        8        0    2    5    0          6          0            7          1          0              0          0          0 Percentage of All    100%        0% 25%  63%    0%        75%          0%        88%        13%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 12 of 276


FIN Green 1
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                   0.0        0.0        7.8          2.7        Region 1                   0.0        0.0        5.2          1.8 Region 2                  3.0        0.0        2.8          2.1        Region 2                  3.0        0.0        2.8          2.1 Region 3                  2.5        0.0        0.0          0.9        Region 3                  2.5        0.0        0.0          0.9 Region 4                  3.1        0.0        5.3          3.1        Region 4                   0.0        0.0        5.3          2.1 1 Unit Sites              1.8        0.0        1.6          1.2        1 Unit Sites              0.0        0.0        1.6          0.6 2 Unit Sites              1.3        0.0        6.1          2.6         2 Unit Sites              1.3        0.0        4.9          2.2 3 Unit Sites              15.4        0.0        0.0          6.3        3 Unit Sites              15.4        0.0        0.0          6.3 BWR                        3.6        0.0        5.6          3.1        BWR                        1.8        0.0        3.7          1.9 PWR                        1.2        0.0        3.1          1.6        PWR                        1.2        0.0        3.1          1.6 Total All Regions          2.1        0.0        4.0          2.2        Total All Regions          1.4         0.0        3.3          1.7 71111.04S Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 13 of 276
2 1
4 NCV Green 6
2 4
12 NCVIV Green


0 1
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            383      36          2.1        10.6    356          34          2.0       10.5    386        36        2.1         10.7 Region 2            329      35          1.9        9.4    257          36          2.1        7.1    363        34        1.9        10.7 Region 3            394      30          1.9        13.1    334          30          1.9        11.1    376        31        1.9        12.1 Region 4            318      25          1.9        12.7    272          24          1.8        11.3    378        24        1.8        15.8 1 Unit Sites        353      30          1.9        11.8    308          30          1.9        10.3    419        30        1.9        14.0 2 Unit Sites        852      79          2.0        10.8    777          78          2.0        10.0    913        78        2.0        11.7 3 Unit Sites        219      17          2.1        12.9    133          16          2.3        8.3    173        17        2.1         10.1 BWR                556      47          2.0        11.8    501          48          2.0        10.4    534        48        2.0         11.1 PWR                868      79          2.1        11.0     717          76          2.1         9.4    970        77        2.0        12.6 Total All          1424      126          2.1        11.3    1218        124          2.1        9.8   1504      125        2.0        12.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 14 of 276
0 1
NCVIV N/A 1
0 0
1 Total 8
5 5
18 Summary of PIM Findings


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1125    106        2.2        10.6 Region 2            949    105        2.1        9.0 Region 3          1104      91        2.0        12.1 Region 4            968      73        2.0        13.3 1 Unit Sites      1079      90        2.0        12.0 2 Unit Sites      2542    235        2.0        10.8 3 Unit Sites        525      50        2.4        10.5 BWR                1591    143        2.0        11.1 PWR                2555    232        2.1        11.0 Total All          4146    375        2.1        11.1 Regions 9/11/2018 2:22:01 PM                                                                     Page 15 of 276


Page 1 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  2    1          3              6 Total                                      2    1          3              6 9/11/2018 2:22:01 PM                                                                  Page 16 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    2    0    0          2          0            2          0          0              0          0          0 Region 2                  2        0    0    2    0          2          0            2          0          0              0          0          0 Region 3                  2        0    0    2    0          2          1            1          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              5        0    2    3    0          5          1            4          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                      2        0    1    1    0          2          0            2          0          0              0          0          0 PWR                      4        0    1    3    0          4          1            3          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        0    2    4    0          6          1            5          0          0              0          0          0 Percentage of All    100%        0% 33%  67%    0%      100%          17%        83%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 17 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0      21.2          7.2        Region 1                  0.0        0.0        21.2          7.2 Region 2                  11.2        0.0      10.1          6.9        Region 2                  11.2        0.0        10.1          6.9 Region 3                  14.1      11.0      13.5          12.7        Region 3                  14.1        11.0        0.0          8.5 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        7.8          2.7        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              9.4        5.3      10.2          8.4        2 Unit Sites              9.4        5.3        10.2          8.4 3 Unit Sites              0.0        0.0      80.0          31.3        3 Unit Sites              0.0        0.0        80.0        31.3 BWR                        0.0        0.0      21.9          6.3        BWR                        0.0        0.0        21.9          6.3 PWR                        9.3        4.6        8.2          7.3        PWR                        9.3        4.6        4.1          5.9 Total All Regions          6.2        3.0      11.9          7.0        Total All Regions          6.2        3.0        8.9          6.0 71111.05A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 18 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            103      18          1.1        5.7      81        17          1.1        4.8        95      19          1.2          5.0 Region 2            89      21          1.2        4.2    103          23          1.4        4.5        99      19          1.1          5.2 Region 3            71      16          1.1        4.4      91        16          1.0        5.7        74      16          1.0          4.6 Region 4            61      14          1.1        4.3      62        13          1.0        4.8        69      12          0.9          5.7 1 Unit Sites        67      17          1.1        3.9      72        15          1.0        4.8        78      16          1.0          4.9 2 Unit Sites        222      43          1.1        5.2    236          46          1.2        5.1      214        42          1.1          5.1 3 Unit Sites        35        9          1.3        3.9      29          8          1.1        3.6        44        8          1.0          5.5 BWR                108      26          1.2        4.1    117          24          1.1        4.9        91      25          1.1          3.7 PWR                216      43          1.1        5.0    220          45          1.2        4.9      245        41          1.1          6.0 Total All          323      69          1.2        4.7    337          69          1.2        4.9      337        66          1.1          5.1 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 19 of 276


71111.01 All Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            278      54        1.2        5.2 Region 2            291      63        1.3        4.6 Region 3            236      48        1.1        4.9 Region 4            192      39        1.1        4.9 1 Unit Sites        216      48        1.1        4.5 2 Unit Sites        672    131        1.2        5.1 3 Unit Sites        108      25        1.3        4.3 BWR                316      75        1.1        4.2 PWR                681    129        1.2        5.3 Total All           996    204        1.2        4.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 20 of 276
> Green or
> SL-IV PIR HP SCWE Inspector


Identified
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total AV Pending                                0    2          0              2 FIN Green                                  0    0          1              1 NCV Green                                17    14        10            41 NCVIV Green                                0    2          0              2 VIO N/A                                    2    0          0              2 Total                                    19    18        11            48 9/11/2018 2:22:01 PM                                                                  Page 21 of 276


Initiating  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating     Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  5        0    1    4    0          5          2          3          0          0              0          0          0 Region 2                  22        2    4  12    0          19          6          14          0          0              0          0          0 Region 3                  16        0    3  11    0          13          5          11          0          0              0          0          0 Region 4                  5        0    1    4    0          5          1          4          0          0              0          0          0 1 Unit Sites              12        0    3    8    0          11          2          10          0          0              0          0          0 2 Unit Sites              35        2    6  22    0          30          11          22          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          1          0          0          0              0          0          0 BWR                      14        0    3    9    0          13          4          10          0          0              0          0          0 PWR                      34        2    6  22    0          29          10          22          0          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        48        2    9  31    0          42          14          32          0          0              0          0          0 Percentage of All    100%        4% 19%  65%    0%        88%          29%        67%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 22 of 276


Events Mitigating
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  5.4        3.5        0.0          3.0        Region 1                  5.4        3.5        0.0          3.0 Region 2                  8.1      16.7      13.0          12.8        Region 2                  6.5        13.9        9.9        10.3 Region 3                  13.7        9.7        7.1          10.1        Region 3                  11.8        7.8        5.3          8.2 Region 4                  5.7        3.5        2.1          3.8        Region 4                  5.7        3.5        2.1          3.8 1 Unit Sites              8.0        6.7        2.2          5.6        1 Unit Sites              6.9        6.7        2.2          5.2 2 Unit Sites              9.2      11.2        9.4          10.0        2 Unit Sites              8.3        8.8        6.9          8.0 3 Unit Sites              0.0        4.2        0.0          1.9        3 Unit Sites              0.0        4.2        0.0          1.9 BWR                        8.7        4.6        3.4          5.5        BWR                        7.5        4.6        2.3          4.7 PWR                        7.8      11.2        7.4          8.9        PWR                        7.1        9.3        5.9          7.5 Total All Regions          8.1        8.8        5.8          7.6        Total All Regions          7.2        7.6        4.5          6.5 71111.05Q Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 23 of 276


Systems Barrier Integrity Emergency
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            560      339        19.9        1.7    571        325        19.1        1.8      557      334        19.6          1.7 Region 2            620      365        20.3        1.7    719        358        19.9        2.0      607      324        18.0          1.9 Region 3            510      284        17.8        1.8    515        296        18.5        1.7      567      292        18.3          1.9 Region 4            524      218        16.8        2.4    570        220        16.9        2.6      484      223        17.2          2.2 1 Unit Sites        541      292        18.3        1.9    511        296        18.5        1.7      575      296        18.5          1.9 2 Unit Sites      1368      770        19.7        1.8    1462        755        19.4        1.9    1359      733        18.8          1.9 3 Unit Sites        305      144        18.0        2.1    401        148        18.5        2.7      280      144        18.0          1.9 BWR                801      446        18.6        1.8    862        453        18.9        1.9      865      450        18.8          1.9 PWR                1413      760        20.0        1.9    1512        746        19.6        2.0    1349      723        19.0          1.9 Total All          2214    1206        19.8        1.8    2374        1199        19.7        2.0    2214    1173        19.2          1.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 24 of 276


Preparedness
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1688    998        20.4        1.7 Region 2          1945    1047        20.1        1.9 Region 3          1591    872        19.0        1.8 Region 4          1577    661        17.9        2.4 1 Unit Sites      1627    884        19.2        1.8 2 Unit Sites      4189    2258        19.6        1.9 3 Unit Sites        986    436        19.8        2.3 BWR                2528    1349        19.0        1.9 PWR                4274    2229        19.7        1.9 Total All          6802    3578        19.6        1.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 25 of 276


Occupational
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  0    1          0              1 NCV Green                                24    12        18            54 NCVIV Green                                1    0          0              1 NCVIV N/A                                  1    0          1              2 Total                                    26    13        19            58 9/11/2018 2:22:01 PM                                                                  Page 26 of 276


Radiation  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation     Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  10        0    1    4    0          10          0          10          0          0              0          0          0 Region 2                  15        0    1    3    0          15          1          12          0          0              0          0          0 Region 3                  15        0    0    6    0          15          1          13          0          0              0          0          1 Region 4                  18        0    2    3    0          18          1          17          0          0              0          0          0 1 Unit Sites              29        0    3  10    0          29          1          27          0          0              0          0          1 2 Unit Sites              26        0    1    6    0          26          1          23          0          0              0          0          0 3 Unit Sites              3        0    0    0    0          3          1            2          0          0              0          0          0 BWR                      26        0    2    6    0          26          1          25          0          0              0          0          0 PWR                      32        0    2  10    0          32          2          27          0          0              0          0          1 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        58        0    4  16    0          58          3          52          0          0              0          0          1 Percentage of All    100%        0%  7%  28%    0%      100%            5%        90%          0%          0%            0%        0%          2%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 27 of 276


Safety Public Radiation
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.9        1.9        2.3          2.1        Region 1                  1.9        1.6        1.2          1.5 Region 2                  3.9        4.2        1.7          3.7        Region 2                  4.4        3.0        1.7          3.6 Region 3                  4.4        3.8        3.8          4.0        Region 3                  3.4        3.8        3.8          3.7 Region 4                  5.0      10.7        5.0          5.5        Region 4                  5.2        7.1        4.7          5.2 1 Unit Sites              4.7        6.7        3.8          4.7        1 Unit Sites              4.2        6.8        3.0          4.0 2 Unit Sites              3.3        1.4        3.1          2.8        2 Unit Sites              3.3        1.4        2.6          2.5 3 Unit Sites              3.9      16.5        0.0          7.9        3 Unit Sites              3.9        16.5        0.0          6.3 BWR                        4.0        5.1        3.2          3.9        BWR                        2.7        4.2        3.0          3.2 PWR                        3.7        2.2        3.8          3.5        PWR                        4.0        2.2        2.5          3.1 Total All Regions          3.8        3.6        3.5          3.6        Total All Regions          3.6        3.0        2.8          3.2 71111.05T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 28 of 276


Safety Security Region 1 6
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1           1559      60          8.6       26.0   1258          60        12.0         21.0   1709        98        14.0         17.4 Region 2           1811      51          7.3       35.5     658          0           0.0         0.0     596        23        4.6        25.9 Region 3           885      16          3.2       55.3    783          18          3.0       43.5    1302        28        4.7        46.5 Region 4            765      28          7.0       27.3    280          8          4.0        35.0   1073        48        9.6        22.4 1 Unit Sites        971      30          6.0       32.4    144          6          3.0       23.9    1334        54        7.7        24.7 2 Unit Sites      3535      111          7.9        31.8    2050          42          3.8        48.8    2632      113        9.4        23.3 3 Unit Sites        515      14          4.7        36.8    786          38          9.5        20.7    714        30        10.0         23.8 BWR                1486      55          7.9        27.0   1184          30          5.0       39.5    2311        84        8.4         27.5 PWR                3534      100          7.1        35.3    1795          56          5.6       32.1    2369      113        10.3        21.0 Total All          5020      155          7.8       32.4    2979          86          5.7        34.6    4680      197        9.9        23.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 29 of 276
0 2
3 0
6 1
4 1
0 0
0 0
Region 2 5
0 2
3 0
5 2
3 0
0 0
0 0
Region 3 2
0 0
1 0
2 1
1 0
0 0
0 0
Region 4 8
0 2
6 0
8 5
2 1
0 0
0 0
1 Unit Sites


9 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4526    218        12.8        20.8 Region 2          3065      74        4.9       41.4 Region 3          2971      62        4.1       47.9 Region 4          2118      84        9.3       25.2 1 Unit Sites      2449      90        7.5       27.2 2 Unit Sites       8216    266        7.6        30.9 3 Unit Sites      2014      82      10.3        24.6 BWR                4981    169        7.7        29.5 PWR                7699    269        7.9        28.6 Total All        12679    438        8.0        28.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 30 of 276
1 8
0 9
3 5
1 0
0 0
0 2 Unit Sites


11 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  5     6         1           12 NOV N/A                                    0     3          0             3 Total                                      5    9          1            15 9/11/2018 2:22:01 PM                                                                  Page 31 of 276
4 5
0 11 6
4 1
0 0
0 0
3 Unit Sites


1 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
1 0
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  5        0    1    2    0          5          1            2          0          0              0          0          0 Region 3                  3        0    0    1    0          3          0            3          0          0              0          0          0 Region 4                  4        0    0    1     0           4          0            3          0          0              0          0          0 1 Unit Sites              2        0    0    1    0          2          0            2          0          0              0          0          0 2 Unit Sites              9        0    1    2    0          9          1            5          0          0              0          0          0 3 Unit Sites              1       0   0    1    0           1         0           1           0           0             0         0         0 BWR                       2        0    1    0    0           2         0           2           0           0             0         0         0 PWR                       10        0    0    4    0         10          1            6          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        12        0    1    4     0          12          1            8          0          0              0          0          0 Percentage of All    100%        0%  8%  33%    0%      100%            8%        67%          0%          0%            0%        0%          0%
0 1
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 32 of 276
0 1
0 0
0 0
0 BWR 7
0 2
4 0
7 2
5 0
0 0
0 0
PWR 14 0
4 9
0 14 7
5 2
0 0
0 0
Findings Associated


SIT/AIT 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0       0.0         0.0 Region 2                  0.0       4.1        1.3          3.0         Region 2                  0.0         3.8        1.3          2.7 Region 3                  5.7        3.4        0.0           4.7        Region 3                  5.7        3.4        0.0          4.7 Region 4                  0.0        4.4        0.0          3.7        Region 4                  0.0        2.8        0.0          2.3 1 Unit Sites              3.2        3.1        0.0          2.6        1 Unit Sites              3.2        1.6        0.0          2.0 2 Unit Sites              0.0        4.0        1.9          3.4        2 Unit Sites              0.0        3.3        1.9          2.8 3 Unit Sites              0.0        4.2        0.0          4.2        3 Unit Sites              0.0        4.2        0.0          4.2 BWR                        2.8        3.9        3.6          3.5        BWR                        2.8        1.9        3.6          2.6 PWR                        2.7        3.9        0.0          3.2        PWR                        2.7        3.3        0.0          2.7 Total All Regions          2.7        3.9        1.3          3.3        Total All Regions         2.7        3.0        1.3          2.7 71111.05XT Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 33 of 276
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions


21 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            110        5          2.5        22.0     229          12          6.0        19.0        0        0          0.0          0.0 Region 2              0        0          0.0        0.0    1050          30          5.0        35.0    780        16          4.0        48.7 Region 3            348      15          5.0        23.2    296          9          3.0       32.9       0        0          0.0          0.0 Region 4            274      10         5.0        27.4    1060          36          9.0        29.4        0        0          0.0          0.0 1 Unit Sites        622      25          6.3        24.9    643          20          6.7        32.1    257        4          2.0         64.2 2 Unit Sites        110        6          3.0       18.3    1520          53          6.6        28.7    523        12          4.0         43.6 3 Unit Sites          0       0          0.0        0.0    472          14          4.7        33.7        0        0          0.0          0.0 BWR                362      13          4.3        27.8    514          16          5.3        32.1    279        8          4.0        34.9 PWR                370      18          6.0        20.5    2121          71          7.1        29.9    501        8          2.7        62.6 Total All          731      31          6.2        23.6    2634          87          7.3        30.3    780        16          4.0        48.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 34 of 276
6 13 0
21 9
10 2
0 0
0 0
Percentage of All


Findings 100%
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            338      17        5.7        19.9 Region 2          1830      47        5.2        38.9 Region 3            644      24        4.8        26.8 Region 4          1333      46        9.2        29.0 1 Unit Sites      1521      49        7.0       31.0 2 Unit Sites      2153      71        6.5        30.3 3 Unit Sites        472      14        4.7        33.7 BWR                1155      37        5.3        31.2 PWR                2991      97        6.5        30.8 Total All          4145    134        6.4        30.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 35 of 276
0%
29%
62%
0%
100%
43%
48%
10%
0%
0%
0%
0%
PIM Findings Breakdown


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Revision History Date of Revision      Description of Revision 11/25/2015            IP 71111.06, "Flood Protection Measures," has been revised to address feedback forms 71111.06-1768 and 71111.06-1863, and expand on guidance related to inspection of cable routing areas susceptible to flooding or where cables may be exposed to moisture form condensation or wetting.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    5                1                  0                6 NCV Green                                    4                6                  3              13 Total                                        9                7                  3              19 9/11/2018 2:22:01 PM                                                                                                                                       Page 36 of 276


Page 2 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    1    1    0          4          0            4          0          0              0          0          0 Region 2                  6        0    0    4    0          5          0            6          0          0              0          0          0 Region 3                  5        0    1    4    0          4          0            5          0          0              0          0          0 Region 4                  4        0    1    2    0          4          0            3          1          0              0          0          0 1 Unit Sites              10        0    2    7    0          9          0            9          1          0              0          0          0 2 Unit Sites              8        0    1    4    0          7          0            8          0          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                        7        0    1    5    0          7          0            7          0          0              0          0          0 PWR                      12        0    2    6    0          10          0          11          1          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        19        0    3  11    0          17          0          18          1          0              0          0          0 Percentage of All    100%        0% 16%  58%    0%        89%          0%        95%          5%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 37 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  10.1        3.5        0.0          4.8        Region 1                  10.1        3.5        0.0          4.8 Region 2                  9.1        3.6        6.3          6.5        Region 2                  6.1        3.6        6.3          5.4 Region 3                  3.9      11.3        0.0          5.7        Region 3                  3.9        6.3        0.0          3.5 Region 4                  7.2        4.1        3.5          4.9        Region 4                  7.2        4.1        3.5          4.9 1 Unit Sites              13.4        5.5        2.1          6.8        1 Unit Sites              11.1        3.9        2.1          5.6 2 Unit Sites              4.6        7.0        1.7          4.5        2 Unit Sites              4.6        5.2        1.7          3.9 3 Unit Sites              0.0        0.0      14.2          5.8        3 Unit Sites              0.0        0.0        14.2          5.8 BWR                        6.9        6.3        2.3          5.2        BWR                        6.9        4.5        2.3          4.6 PWR                        8.3        5.9        2.9          5.7        PWR                        6.9        4.4        2.9          4.8 Total All Regions          7.8        6.1        2.7          5.5        Total All Regions          6.9        4.5        2.7          4.7 71111.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 38 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            298      52          3.1        5.7    283          45          2.6        6.3      249        45        2.6          5.5 Region 2            328      52          2.9        6.3    276          54          3.0        5.1      320        53        2.9          6.0 Region 3            257      46          2.9        5.6    318          39          2.4        8.2      270        41        2.6          6.6 Region 4            278      42          3.2        6.6    243          32          2.5        7.6      289        37        2.8          7.8 1 Unit Sites        227      47          2.9        4.8    353          41          2.6        8.6      326        43        2.7          7.6 2 Unit Sites        773      121          3.1        6.4    660        108          2.8        6.1      647      109        2.8          5.9 3 Unit Sites        161      24          3.0        6.7    108          21          2.6        5.2      155        24        3.0          6.5 BWR                436      71          3.0        6.1    440          64          2.7        6.9      442        65        2.7          6.8 PWR                725      121          3.2        6.0    680        106          2.8        6.4      685      111        2.9          6.2 Total All          1161      192          3.1        6.0    1120        170          2.8        6.6    1128      176        2.9          6.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 39 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            831    142        2.9        5.8 Region 2            924    159        3.1        5.8 Region 3            845    126        2.7        6.7 Region 4            809    111        3.0        7.3 1 Unit Sites        905    131        2.8        6.9 2 Unit Sites      2079    338        2.9        6.2 3 Unit Sites        425      69        3.1        6.2 BWR                1318    200        2.8        6.6 PWR                2090    338        3.0        6.2 Total All          3408    538        2.9        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 40 of 276


71111.01 Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.07, "Heat Sink Performance," has been revised to incorporate aging management programs per ROP Feedback Form 71111.07-2059 (ADAMS ML16160A006). ROP Feedback Form 71111.07-2185 (ADAMS ML16160A008) was considered but rejected. Revised text to clarify inspection requirements versus guidance (should and shall), to address recommendations from OIG 16-A-12 audit.
Summary of PIM Findings 2015              2016            2017    3 Year Total NCV Green                                  2                  1              1                4 Total                                      2                  1              1                4 9/11/2018 2:22:01 PM                                                                                                                                    Page 41 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
Findings /  
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            1          1          0              0          0          0 Region 4                  2        0    0    1    0          2          0            2          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 2 Unit Sites              3        0    0    1    0          3          0            2          1          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      4        0    0    2    0          4          0            3          1          0              0          0          0 Findings                 0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        4        0    0    2    0          4          0            3          1          0              0          0          0 Percentage of All    100%        0%  0%  50%    0%      100%            0%        75%        25%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 42 of 276


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs   1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)     (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  16.0        0.0        0.0          6.4        Region 3                  8.0        0.0        0.0          3.2 Region 4                  0.0      10.0        6.7          6.2        Region 4                  0.0        10.0        6.7          6.2 1 Unit Sites              0.0        4.6        0.0          1.7        1 Unit Sites              0.0        4.6        0.0          1.7 2 Unit Sites              7.3        0.0        4.0          4.0        2 Unit Sites              3.7        0.0        4.0          2.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        6.9        3.6        3.2          4.5        PWR                        3.4        3.6        3.2          3.4 Total All Regions          4.1        2.2        2.0          2.8        Total All Regions          2.1        2.2        2.0          2.1 71111.07A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 43 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1           161      34          2.0        4.7    136          30          1.8        4.5     132        32          1.9          4.1 Region 2           123      23          1.3        5.4     119          24          1.3       5.0     121        23          1.3          5.3 Region 3            125      18          1.1        6.9      97        16          1.1        6.1        91      17          1.1         5.4 Region 4            76      14          1.1        5.4    100          17          1.3       5.9     149        17          1.3          8.7 1 Unit Sites        123      22          1.4        5.6    127          22          1.4        5.8      117        21          1.3         5.6 2 Unit Sites        300      56          1.4        5.4    278          55          1.5        5.1      293        56          1.4          5.2 3 Unit Sites        63      11          1.4        5.7      47        10          1.3       4.7        82      12          1.5          6.8 BWR                195      34          1.4        5.7    175          32          1.3        5.5      175        36          1.5          4.9 PWR                291      55          1.4         5.3    277          55          1.5       5.0     317        53          1.4          6.0 Total All          485      89          1.5        5.5    452          87          1.5        5.2      492        89          1.5          5.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 44 of 276
/1000 hrs Region 1 6.1 4.5 2.2 4.3 Region 2 0.0 3.1 3.9 2.5 Region 3 2.1 2.3 0.0 1.6 Region 4 11.5 0.0 2.1 4.1 1 Unit Sites


4.2 4.1 2.6 3.6 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            428      96        2.0        4.5 Region 2            364      70        1.3        5.2 Region 3            313      51        1.2        6.1 Region 4            324      48        1.3         6.8 1 Unit Sites        366      65        1.4        5.6 2 Unit Sites       871    167        1.5        5.2 3 Unit Sites        192      33        1.5        5.8 BWR                545    102        1.4        5.3 PWR                884    163        1.5        5.4 Total All          1429    265        1.5        5.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 45 of 276


4.4 1.8 1.8 2.7 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  2    2          2              6 NOV Green                                  0    0          1             1 Total                                      2    2         3              7 9/11/2018 2:22:01 PM                                                                  Page 46 of 276


0.0 0.0 5.7 3.2 BWR 4.4 2.6 1.3 2.7 PWR 4.0 2.7 3.0 3.2 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0         0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0         0         0 Region 3                  5       0    1    2     0          5          0            5          0          0              0          0          0 Region 4                 2        0    0    2    0          2          0            2          0          0              0          0          0 1 Unit Sites              4       0    1   2     0          4          0            4           0          0              0          0          0 2 Unit Sites              3        0    0   2     0          3          0            3          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      5        0    0   3     0          5          0            5          0          0              0          0          0 PWR                      2        0    1    1    0          2          0            2           0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions         7        0    1    4    0          7          0            7          0          0              0          0          0 Percentage of All    100%        0% 14%  57%    0%      100%            0%        100%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 47 of 276


4.2 2.6 2.4 3.0 Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  4.0        0.0        0.0          1.6        Region 2                  4.0        0.0        0.0          1.6 Region 3                  3.2        3.0        4.9          3.7        Region 3                  2.0        3.0        4.9          3.3 Region 4                  0.0        5.7      11.4          6.7        Region 4                  0.0        5.7        5.7          4.4 1 Unit Sites              0.0        4.7        5.3          3.6        1 Unit Sites              0.0        4.7        5.3          3.6 2 Unit Sites              4.1        0.0        3.9          2.8        2 Unit Sites              3.4        0.0        1.9          1.8 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        3.2        5.8        3.0          3.9        BWR                        2.1        5.8        3.0          3.4 PWR                        2.0        0.0        5.4          2.4        PWR                        2.0        0.0        3.6         1.8 Total All Regions          2.7        2.1        4.5          3.0         Total All Regions          2.0        2.1        3.4          2.5 71111.07T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 48 of 276


Hours Inspector Identified Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours   Samples Normalized Samples                                      Samples                                    Samples Region 1            154      17          3.4        9.1    229          26          3.3        8.8    158        13          2.2        12.1 Region 2            249      32          4.6        7.8    227          25          3.6        9.1    146        20          4.0          7.3 Region 3            491      20          2.5        24.6    329          17          2.4        19.4    411        13          2.2        31.6 Region 4            99      14          2.8        7.0    176          19          3.2        9.3    176        14          2.8        12.5 1 Unit Sites        284      22          3.1        12.9    211          20          3.3        10.5    310        14          2.3        22.2 2 Unit Sites        463      46          3.8        10.1    680          61          3.4        11.1    501        40          3.1        12.5 3 Unit Sites        246      15          3.0        16.4      70          6          2.0        11.7      78        6          3.0        13.0 BWR                484      31          3.1        15.6    342          33          3.3        10.4    334        21          3.0        15.9 PWR                509      52          4.0        9.8    618          54          3.4        11.4    555        39          3.0        14.2 Total All          993      83          3.8        12.0    960          87          3.5        11.0    890        60          3.2        14.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 49 of 276


Hours Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1            540      56        3.3        9.6 Region 2            622      77        4.5        8.1 Region 3          1231      50        2.6        24.6 Region 4            450      47        3.4        9.6 1 Unit Sites        805      56        3.3        14.4 2 Unit Sites      1644    147        3.6        11.2 3 Unit Sites        394      27        3.4        14.6 BWR                1160      85        3.3        13.6 PWR                1683    145        3.5        11.6 Total All          2843    230        3.5        12.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 50 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  4    4          1              9 VIO N/A                                    0    1          0              1 Total                                      4    5          1            10 9/11/2018 2:22:01 PM                                                                  Page 51 of 276
Findings /  


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
Findings /  
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          0          0            0          1          0              0          0          0 Region 2                  2        1    0    1    0          2          1            0          0          0              0          0          0 Region 3                  7        0    2    5    0          7          3            3          1          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              5        0    1    4    0          4          1            2          2          0              0          0          0 2 Unit Sites              5        1    1    3    0          5          3            1          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      10        1    2    7    0          9          4            3          2          0              0          0          0 PWR                        0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                   0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        10        1    2    7    0          9          4            3          2          0              0          0          0 Percentage of All    100%      10%  20%  70%    0%        90%          40%        30%        20%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 52 of 276


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs   1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)     /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                   3.2        0.0        3.8          2.4        Region 1                  0.0        0.0        3.8          1.2 Region 2                  0.0      26.9        0.0          11.5         Region 2                   0.0        26.9        0.0        11.5 Region 3                  12.3        7.2       3.4           7.3         Region 3                  12.3        4.2       3.4          6.4 Region 4                  0.0        0.0        0.0          0.0         Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              5.9        6.2        3.5          5.4        1 Unit Sites              3.0        3.3        3.5          3.2 2 Unit Sites              5.7      12.3        2.4          6.4        2 Unit Sites              5.7        12.3       2.4          6.4 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0       0.0          0.0 BWR                        5.5        8.0        2.7          5.6        BWR                        4.1         7.2        2.7          4.6 Total All Regions          5.5       8.0       2.7          5.6        Total All Regions          4.1         7.2        2.7          4.6 71111.08G Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 53 of 276
/1000 hrs Region 1 6.1 4.5 2.2 4.3 Region 2 0.0 3.1 3.9 2.5 Region 3 2.1 2.3 0.0 1.6 Region 4 11.5 0.0 2.1 4.1 1 Unit Sites


4.2 4.1 2.6 3.6 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            316        6          0.9        52.6    239          5          0.7        47.8    266        9          1.3        29.5 Region 2            102        3          0.8        34.0    149          3          0.8        49.5      96        3          0.8        32.0 Region 3            244        7          1.0        34.8    236          5          0.8        47.1    298        7          0.9        42.5 Region 4             62        2          0.7        31.0      75          2          0.7        37.3      75        2         0.7        37.5 1 Unit Sites        101        3          1.0        33.6     174          3           0.6       57.8    145        5          1.0        29.1 2 Unit Sites       507      12          0.9        42.3    380          9          0.9        42.2    451        11          0.9        41.0 3 Unit Sites        116        3          0.8        38.5    144          3          0.8        48.0    138        5          1.3        27.6 BWR                723      18          1.0        40.2    697          15          0.9        46.5    734        21          1.1        35.0 PWR                  0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 Total All          723      18          1.0        40.2    697          15          0.9        46.5    734        21          1.1        35.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 54 of 276


4.4 1.8 1.8 2.7 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            820      20        1.1        41.0 Region 2            347        9        0.9        38.5 Region 3            777      19        1.0        40.9 Region 4           212        6        0.9        35.3 1 Unit Sites        420      11        1.0        38.1 2 Unit Sites      1338      32        1.0        41.8 3 Unit Sites       397      11        1.1        36.1 BWR                2155      54        1.0        39.9 PWR                  0        0        0.0        0.0 Total All          2155      54        1.0        39.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 55 of 276


0.0 0.0 5.7 3.2 BWR 4.4 2.6 1.3 2.7 PWR 4.0 2.7 3.0 3.2 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  3    0         0             3 NCV Green                                15    3         6           24 NCVIV Green                                1     0         0             1 Total                                    19    3         6            28 9/11/2018 2:22:01 PM                                                                  Page 56 of 276


4.2 2.6 2.4 3.0 71111.01 Hours & Samples Reported
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    1    0    0          1          0            0          1          0              0          0          0 Region 2                   5        0    2   0    0          5          0            0          5          0              0          0          0 Region 3                  7        0    0    6     0          7          3            3          1          0              0          0          0 Region 4                  9        0    2   5    0          7          4           5          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 2 Unit Sites              20        0    5  10    0          18          7            7          6          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            0          1          0              0          0          0 BWR                        0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      22        0    5  11    0          20          7            8          7          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        22        0    5  11    0          20          7            8          7          0              0          0          0 Percentage of All    100%        0% 23%  50%    0%        91%          32%        36%        32%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 57 of 276


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        6.7        1.6          2.4        Region 1                  0.0        4.5        1.6          1.8 Region 2                  1.9        2.0        1.1          1.7        Region 2                  1.9        2.0        1.1          1.7 Region 3                  9.9        3.2        0.0          4.0        Region 3                  9.4        3.2        0.0          3.6 Region 4                  6.3        0.0        5.7          4.2        Region 4                  3.8        0.0        5.7          3.3 1 Unit Sites              2.8        0.0        0.0          1.2        1 Unit Sites              2.8        0.0        0.0          1.2 2 Unit Sites              5.1        3.1        2.7          3.7        2 Unit Sites              3.9        2.6        2.7          3.1 3 Unit Sites              0.0        2.9        0.0          1.3        3 Unit Sites              0.0        2.9        0.0          1.3 PWR                        4.3        2.6        2.0          3.0        PWR                        3.4        2.2        2.0          2.5 Total All Regions          4.3        2.6        2.0          3.0        Total All Regions          3.4        2.2        2.0          2.5 71111.08P Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                     Page 58 of 276


Page 3 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            589      10          1.1        58.9    445          6          1.0        74.1    625        11          1.2        56.8 Region 2          1063      17          1.1        62.5    983          12          1.0        81.9    881        18          1.3        48.9 Region 3            534        7          1.0        76.2    624          7          1.0        89.2    771        9          1.3        85.7 Region 4            794      11          1.4        72.1    656          9          1.3        72.8    700        10          1.3        70.0 1 Unit Sites        442        6          0.9        73.7    304          4          1.0        75.9    456        7          1.0        65.1 2 Unit Sites      2219      33          1.3        67.2    1812          24          1.1        75.5    2098        34          1.4        61.7 3 Unit Sites        318        6          1.2        52.9    592          6          1.2        98.7    422        7          1.4        60.2 BWR                  0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 PWR                2979      45          1.3        66.2    2708          34          1.2        79.6    2976        48          1.4        62.0 Total All          2979      45          1.3        66.2    2708          34          1.2        79.6    2976        48          1.4        62.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 59 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1658      27        1.2        61.4 Region 2          2926      47        1.2        62.3 Region 3          1929      23        1.2        83.9 Region 4          2149      30        1.4        71.6 1 Unit Sites      1202      17        1.1        70.7 2 Unit Sites      6129      91        1.3        67.3 3 Unit Sites      1331      19        1.5        70.1 BWR                  0        0        0.0        0.0 PWR                8662    127        1.3        68.2 Total All          8662    127        1.3        68.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 60 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Revision History Date of Revision      Description of Revision Summary of PIM Findings 2016  3 Year Total FIN Green                                  1            1 NCV Green                                  1            1 Total                                      2            2 9/11/2018 2:22:01 PM                                                                          Page 61 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          0          0            1          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  1        0    0    0    0          1          0            1          0          0              0          0          0 1 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 2 Unit Sites              1        0    0    1    0          0          0            1          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    0    1    0          0          0            1          0          0              0          0          0 PWR                      1        0    0    0    0          1          0            1          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        2        0    0    1    0          1          0            2          0          0              0          0          0 Percentage of All    100%        0%  0%  50%    0%        50%          0%        100%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 62 of 276


Calendar Year 2015
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                 Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0      71.4        0.0          19.2        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0    111.1        0.0          43.5        Region 4                  0.0      111.1        0.0        43.5 1 Unit Sites              0.0      62.5        0.0          13.3        1 Unit Sites              0.0        62.5        0.0        13.3 2 Unit Sites              0.0      40.8        0.0          14.4        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0      43.5        0.0          18.8        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0      55.6        0.0          9.6        PWR                        0.0        55.6        0.0          9.6 Total All Regions          0.0      48.8        0.0          12.7        Total All Regions          0.0        24.4        0.0          6.3 71111.11A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 63 of 276


Calendar Year 2016
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                           Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1              1        9          4.5        0.1      14        14          1.3        1.0        37      20          4.0          1.9 Region 2            17      17          1.2        1.0        9        18          1.6        0.5        24      16          0.9          1.5 Region 3            17      15          1.7        1.1        9        15          1.9        0.6        6      15          1.9          0.4 Region 4              9        6          1.5        1.5        9          8          1.1        1.1        5        6          1.2          0.8 1 Unit Sites          8      11          2.2        0.7        6        12          1.7        0.5        8      13          1.6          0.6 2 Unit Sites        26      30          1.7        0.9      34        37          1.4        0.9        63      35          1.5          1.8 3 Unit Sites        11        6          1.2        1.9        2          6          2.0        0.3        2        9          3.0          0.3 BWR                  18      16          1.6        1.1      23        20          1.3        1.2        13      22          1.8          0.6 PWR                  27      31          1.8        0.9      18        35          1.8        0.5        60      35          1.6          1.7 Total All            44      47          1.8        0.9      41        55          1.6        0.7        72      57          1.7          1.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 64 of 276


Calendar Year 2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            52      43        2.7        1.2 Region 2            51      51        1.2        1.0 Region 3            32      45        2.0        0.7 Region 4            23      20        1.4        1.2 1 Unit Sites        21      36        2.0        0.6 2 Unit Sites        122    102        1.5        1.2 3 Unit Sites        15      21        2.3        0.7 BWR                  53      58        1.6        0.9 PWR                104    101        1.8        1.0 Total All          158    159        1.7        1.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 65 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  7    0          0              7 NCV Green                                  0    2          3              5 NCVIV Green                                1    1          0              2 NCVIV N/A                                  0    0          1              1 NCVIV No Performance                      0    0          2              2 Deficiency Total                                      8    3          6            17 9/11/2018 2:22:01 PM                                                                  Page 66 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3        0    0    3    0          2          0            3          0          0              0          0          0 Region 2                  7        0    0    4    0          7          0            6          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  6        0    0    3    0          5          0            6          0          0              0          0          0 1 Unit Sites              5        0    0    3    0          4          0            4          0          0              0          0          0 2 Unit Sites              10        0    0    6    0          9          0          10          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                        2        0    0    2    0          1          0            2          0          0              0          0          0 PWR                      14        0    0    8    0          13          0          13          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        16        0    0  10    0          14          0          15          0          0              0          0          0 Percentage of All    100%        0%  0%  63%    0%        88%          0%        94%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 67 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.9        1.7        1.0          1.1        Region 1                  0.0        1.7        1.0          0.8 Region 2                  3.6        1.0        4.2          2.8        Region 2                  3.1        1.0        4.2          2.6 Region 3                  0.0        0.0        1.2          0.5        Region 3                  0.0        0.0        0.0          0.0 Region 4                  4.3        1.9        2.4          2.9        Region 4                  2.9        1.9        1.4          2.0 1 Unit Sites              2.3        1.2        1.6          1.8        1 Unit Sites              1.5        1.2        1.6          1.5 2 Unit Sites              2.3        1.1        2.1          1.9        2 Unit Sites              1.5        1.1        1.1          1.2 3 Unit Sites              0.0        0.0        5.8          2.8        3 Unit Sites              0.0        0.0        5.8          2.8 BWR                        0.8        1.0        0.9          0.9        BWR                        0.0        1.0        0.0          0.3 PWR                        3.0        1.2        2.7          2.4        PWR                        2.2        1.2        2.4          2.0 Total All Regions          2.2        1.1        2.1          1.9        Total All Regions          1.4        1.1        1.5          1.4 71111.11B Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 68 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1086      14          0.9        77.6    591          7          0.9        84.4    958        15        1.1        63.9 Region 2            980      10          1.1        98.0    990          10          0.9        99.0    719        9        1.0        79.9 Region 3            693        8          0.6        86.7    563          6          0.9        93.8    852        21        2.1        40.6 Region 4            700        8          1.0        87.5    537          7          1.2        76.6    733        10        1.1        73.3 1 Unit Sites        877      10          0.8        87.7    459          6          1.0        76.5    875        19        1.7        46.1 2 Unit Sites      2268      25          1.0        90.7    1873          19          1.0        98.6    1976        32        1.3        61.8 3 Unit Sites        315        5          0.8        63.0    348          5          1.0        69.7    410        4        0.7      102.6 BWR                1236      14          0.9        88.3    1045          10          0.9      104.5    1156        27        1.8        42.8 PWR                2223      26          0.9        85.5    1636          20          1.1        81.8    2106        28        1.1        75.2 Total All          3459      40          1.0        86.5    2680          30          1.0        89.3    3262        55        1.4        59.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 69 of 276


Reported Hours Reported Samples Average Normalized  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1          2635      36        1.0        73.2 Region 2          2689      29        1.1        92.7 Region 3          2108      35        1.3        60.2 Region 4          1969      25        1.2        78.8 1 Unit Sites      2211      35        1.3        63.2 2 Unit Sites      6117      76        1.1        80.5 3 Unit Sites      1074      14        0.9        76.7 BWR                3437      51        1.3        67.4 PWR                5964      74        1.0        80.6 Total All          9401    125        1.1        75.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 70 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016  3 Year Total NCV Green                                  2    3            5 Total                                      2    3            5 9/11/2018 2:22:01 PM                                                                    Page 71 of 276


Region 1 490 91 5.4 5.4 441 91 5.4 4.8 461 91 5.4 5.1 Region 2 615 92 5.1 6.7 648 101 5.6 6.4 775 94 5.2 8.2 Region 3 472 76 4.8 6.2 437 78 4.9 5.6 367 68 4.3 5.4 Region 4 347 60 4.6 5.8 375 56 4.3 6.7 487 54 4.2 9.0 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            1           0          0              0          0          0 Region 2                 2        0    0    1    0          1         0            2           0          0              0          0          0 Region 3                 1        0    0    0    0          0          1            0          0          0              0          0          0 Region 4                 1        0    0    1    0          1          0            1          0          0              0          0          0 1 Unit Sites              3       0    0    2    0          2          1            2          0          0              0          0          0 2 Unit Sites              1        0    0    1    0          1          0           1           0          0              0          0          0 3 Unit Sites             1        0    0    0    0          0          0            1          0          0              0          0          0 BWR                      3        0    0    1    0          1          1            2          0          0              0          0          0 PWR                      2        0    0    2    0          2          0            2          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    0    3    0          3          1            4          0          0              0          0          0 Percentage of All    100%        0%  0%  60%    0%        60%          20%        80%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 72 of 276


420 78 4.9 5.4 455 80 5.0 5.7 482 78 4.9 6.2 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        1.6        0.0          0.5         Region 1                  0.0        1.6        0.0          0.5 Region 2                  1.7        1.6        0.0          1.0        Region 2                  0.0         1.6        0.0          0.5 Region 3                  2.0        3.8        1.7           2.5        Region 3                  2.0        0.0        0.0          0.6 Region 4                   2.0        0.0        0.0          0.6        Region 4                  2.0        0.0        0.0          0.6 1 Unit Sites              2.5        3.5        1.1          2.3        1 Unit Sites              2.5        1.2        0.0          1.1 2 Unit Sites              0.0        0.8        0.0          0.2         2 Unit Sites               0.0        0.8        0.0          0.2 3 Unit Sites              10.1        0.0        0.0          3.1        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        3.6        1.1        1.1          1.8        BWR                        2.4        0.0        0.0          0.7 PWR                        0.0        2.1        0.0          0.7        PWR                        0.0        1.4        0.0          0.5 Total All Regions          1.4        1.7        0.4          1.1        Total All Regions          0.9        0.9        0.0          0.6 71111.11Q Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 73 of 276


1287 206 5.3 6.2 1233 208 5.3 5.9 1314 191 4.9 6.9 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            636      156          9.2        4.1    637        155          9.1        4.1      638      154        9.1          4.1 Region 2            588      167          9.3        3.5     631        163          9.1        3.9      727      168        9.3          4.3 Region 3            494      124          7.8        4.0    532        123          7.7        4.3      601      128        8.0          4.7 Region 4            497      108          8.3         4.6     517        108          8.3        4.8      542      110        8.5         4.9 1 Unit Sites        508      129          8.1        3.9    540        132          8.3        4.1      574      132        8.3          4.3 2 Unit Sites      1398      349          8.9        4.0    1442        344          8.8        4.2    1604      356        9.1          4.5 3 Unit Sites        309      77          9.6        4.0    336          73          9.1        4.6      329        72        9.0          4.6 BWR                845      197          8.2        4.3    914        199          8.3        4.6      950      200        8.3          4.7 PWR                1371      358          9.4        3.8    1404        350          9.2        4.0    1557      360        9.5          4.3 Total All          2215      555          9.1        4.0    2318        549          9.0        4.2    2507      560        9.2          4.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 74 of 276


216 35 4.4 6.2 213 38 4.8 5.6 296 38 4.8 7.8 BWR 680 120 5.0 5.7 775 126 5.3 6.1 746 114 4.8 6.5 PWR 1243 199 5.2 6.2 1126 200 5.3 5.6 1345 193 5.1 7.0 Total All
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1911    465        9.5        4.1 Region 2          1945    498        9.6         3.9 Region 3          1627    375        8.2         4.3 Region 4          1556    326        8.8        4.8 1 Unit Sites      1621    393        8.5         4.1 2 Unit Sites      4445    1049        9.1        4.2 3 Unit Sites        974    222        10.1         4.4 BWR                2708    596        8.4        4.5 PWR               4332    1068        9.5         4.1 Total All          7039    1664        9.1         4.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 75 of 276


Regions 1923 319 5.2 6.0 1900 326 5.3 5.8 2091 307 5.0 6.8 9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  3    7          4            14 NCV Green                                38    32        18            88 NCVIV N/A                                  0    1          0             1 Total                                    41    40        22            103 9/11/2018 2:22:01 PM                                                                 Page 76 of 276


Page 4 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  27        0  11  12    0          16          2          17          5          0              0          3          0 Region 2                  23        0    5  13    0          10          7          15          1          0              0          0          0 Region 3                  25        0    8  11    0          12          4          18          2          0              0          0          0 Region 4                  29        0    7  16    0          20          5          21          3          0              0          0          0 1 Unit Sites              47        0  14  21    0          26          7          31          5          0              0          3          0 2 Unit Sites              54        0  16  29    0          31          10          38          6          0              0          0          0 3 Unit Sites              3        0    1    2    0          1          1          2          0          0              0          0          0 BWR                      38        0  12  19    0          25          5          23          6          0              0          3          0 PWR                      66        0  19  33    0          33          13          48          5          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        104        0  31  52    0          58          18          71        11            0              0          3          0 Percentage of All    100%        0% 30%  50%    0%        56%          17%        68%        11%            0%            0%        3%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 77 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  8.1        9.6        5.3          7.7        Region 1                  4.1        5.4        3.1          4.2 Region 2                  9.3        6.9        1.5          5.9        Region 2                  3.1        3.9        0.8          2.6 Region 3                  9.8        7.5        5.7          7.7        Region 3                  4.9        3.6        1.6          3.4 Region 4                  8.9        8.0        7.2          8.0        Region 4                  6.3        6.2        4.5          5.7 1 Unit Sites              9.9        8.2        7.2          8.4        1 Unit Sites              4.8        4.3        3.1          4.1 2 Unit Sites              9.3        8.5        3.2          6.9        2 Unit Sites              4.6        5.3        2.1          4.0 3 Unit Sites              0.0        0.0        6.3          1.6        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        5.7        8.6        7.0          7.2        BWR                        3.4        5.1        3.8          4.1 PWR                      11.1        7.6        3.6          7.4        PWR                        5.1        4.4        1.6          3.7 Total All Regions          9.1        8.0        4.8          7.3        Total All Regions          4.5        4.7        2.4          3.9 71111.12 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 78 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1232      144          8.5        8.6    1299        146          8.6        8.9    1295      145        8.5          8.9 Region 2          1287      151          8.4        8.5    1298        153          8.5        8.5    1302      150        8.3          8.7 Region 3          1221      124          7.8        9.8    1393        133          8.3        10.5    1224      129        8.1          9.5 Region 4            952      98          7.5        9.7    1122        102          7.8        11.0    1106      100        7.7        11.1 1 Unit Sites      1161      127          7.9        9.1    1371        132          8.3        10.4    1247      127        7.9          9.8 2 Unit Sites      2950      328          8.4        9.0    3155        339          8.7        9.3    3216      335        8.6          9.6 3 Unit Sites        581      62          7.8        9.4    587          63          7.9        9.3    463        62        7.8          7.5 BWR                1761      195          8.1        9.0    1959        210          8.8        9.3    1833      200        8.3          9.2 PWR                2931      322          8.5        9.1    3153        324          8.5        9.7    3093      324        8.5          9.5 Total All          4692      517          8.5        9.1    5112        534          8.8        9.6    4926      524        8.6          9.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 79 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3826    435        8.9        8.8 Region 2          3887    454        8.7        8.6 Region 3          3838    386        8.4        9.9 Region 4          3180    300        8.1        10.6 1 Unit Sites      3779    386        8.4        9.8 2 Unit Sites      9321    1002        8.7        9.3 3 Unit Sites      1631    187        8.5        8.7 BWR                5553    605        8.5        9.2 PWR                9177    970        8.6        9.5 Total All        14730    1575        8.6        9.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 80 of 276


3 Year Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Revision History Date of Revision      Description of Revision 12/20/2017            IP 71111.13, Maintenance Risk Assessments and Emergent Work Control, has been revised to add inspection of RICT times and risk management actions.
These are a subset of maintenance activities and are included in the samples. This change includes information to facilitate inspection of RICT and PRA functionality. In addition, this revision streamlines IP formatting.
02/03/2016            IP 71111.13, "Maintenance Risk Assessments and Emergent Work Control," has been revised o update references to Revision 3 to RG 1.160 and Revision 4A to NUMARC 93-01, which were recently issued. IP 71111.13 has been revised to update references to the new revision numbers. Changes made in accordance with ROP Enhancement Project (see ML14017A381)
Summary of PIM Findings 2015                2016              2017      3 Year Total FIN Green                                      1                  0                2              3 NCV Green                                    18                  24              11              53 Total                                        19                  24              13              56 9/11/2018 2:22:01 PM                                                                                                                                                  Page 81 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  14        0    1  13    0          11          3          9          2          0              0          0          0 Region 2                  10        0    0  10    0          8          2          8          0          0              0          0          0 Region 3                  12        0    1    9    0          6          2          7          3          0              0          0          0 Region 4                  20        0    2  17    0          17          3          13          3          0              1          0          0 1 Unit Sites              25        0    2  22    0          19          5          15          4          0              1          0          0 2 Unit Sites              29        0    2  25    0          21          5          20          4          0              0          0          0 3 Unit Sites              2        0    0    2    0          2          0          2          0          0              0          0          0 BWR                      25        0    1  24    0          19          2          17          5          0              1          0          0 PWR                      31        0    3  25    0          23          8          20          3          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        56        0    4  49    0          42          10          37          8          0              1          0          0 Percentage of All    100%        0%  7%  88%    0%        75%          18%        66%        14%            0%            2%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 82 of 276


Region 1 1392 273 5.6 5.1 Region 2 2038 287 5.5 7.1 Region 3 1276 222 4.8 5.7 Region 4 1209 170 4.6 7.1 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                   0.7        5.9        3.8          3.5        Region 1                  0.7        4.6       2.4          2.5 Region 2                  2.1       3.9        1.5          2.5        Region 2                   1.4        3.1        1.5          2.0 Region 3                  5.5       4.7       0.0          3.5        Region 3                  3.3        1.6        0.0          1.6 Region 4                  8.9        4.5        4.6          5.7         Region 4                   7.7        3.6        3.8          4.8 1 Unit Sites              4.8        4.3        2.3          3.8        1 Unit Sites              3.9        2.4       1.9          2.7 2 Unit Sites              3.1        5.6       2.5          3.7         2 Unit Sites              1.9        4.2        1.8          2.6 3 Unit Sites              4.0        0.0        4.1           2.8        3 Unit Sites               4.0        0.0        4.1          2.8 BWR                        5.5        5.1        2.1          4.2        BWR                        3.3        3.6        1.6          2.9 PWR                        2.9        4.6        2.7          3.4        PWR                        2.6        3.0        2.2          2.6 Total All Regions          3.9        4.8        2.5          3.7        Total All Regions          2.9        3.2        2.0          2.7 71111.13 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 83 of 276


1356 236 5.1 5.7 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1344      322        18.9        4.2    1317        322        18.9        4.1    1268      320        18.8          4.0 Region 2          1416      320        17.8        4.4    1270        292        16.2        4.3    1364      314        17.4          4.3 Region 3          1228      260        16.3        4.7    1251        260        16.3        4.8    1181      243        15.2          4.9 Region 4            904      204        15.7        4.4    1102        208        16.0        5.3    1305      213        16.4          6.1 1 Unit Sites      1212      275        17.2        4.4    1297        284        17.8        4.6    1343      267        16.7          5.0 2 Unit Sites      3066      690        17.7        4.4    3057        657        16.8        4.7    3235      690        17.7          4.7 3 Unit Sites       614      141        17.6        4.4    586        141        17.6        4.2      540      133        16.6          4.1 BWR                1797      415        17.3        4.3    1922        423        17.6        4.5    1878      413        17.2          4.5 PWR                3096      691        18.2        4.5    3018        659        17.3        4.6    3239      677        17.8          4.8 Total All          4892    1106        18.1        4.4    4941        1082        17.7        4.6    5118    1090        17.9          4.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 84 of 276


3834 605 5.3 6.3 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3930    964        19.7        4.1 Region 2          4050    926        17.8        4.4 Region 3           3660    763        16.6         4.8 Region 4          3311    625        16.9        5.3 1 Unit Sites      3852    826        18.0        4.7 2 Unit Sites      9359    2037        17.7        4.6 3 Unit Sites       1740    415        18.9        4.2 BWR                5597    1251        17.6        4.5 PWR                9353    2027        17.9        4.6 Total All        14950    3278        17.9        4.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 85 of 276


725 111 5.0 6.5 BWR 2200 360 5.1 6.1 PWR 3714 592 5.2 6.3 Total All
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Revision History Date of Revision      Description of Revision 12/22/2016            IP 71111.15, "Operability Determinations and Functionality Assessments," has been revised to address use of mandatory and discretionary language concerns and recommendations found in OIG Audit OIG-16-A-12. The requirement to inspect at least one sample associated with OWA has been deleted.
Summary of PIM Findings 2015              2016            2017      3 Year Total FIN Green                                  4                1                  1               6 NCV Green                                65                47                49              161 NCV N/A                                    0                1                  0              1 NCVIV Green                                0                0                  1              1 NCVIV Minor Performance                    0                0                  1              1 Deficiency NCVIV N/A                                  4                5                 2              11 NCVIV No Performance                        0                0                  1              1 Deficiency NOV N/A                                    1                1                  0              2 NOV White                                  0                1                  2               3 VIO Green                                  0                1                  0              1 VIO N/A                                    1                0                  0              1 VIO White                                  0                1                  0              1 Total                                     75                58                57              190 9/11/2018 2:22:01 PM                                                                                                                                            Page 86 of 276


Regions 5914 952 5.2 6.2 9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  50        1  12  30    0          40          2          34        14            0              0          0          0 Region 2                  42        1  10  24    0          37          1          29          6          1              0          1          0 Region 3                  64        3    9  37    0          50          4          48          7          0              0          0          0 Region 4                  34        0    4  23    0          26          0          26          5          2              1          0          0 1 Unit Sites              82        4  16  47    0          68          5           57        12            2              0          0          0 2 Unit Sites              95        1  16  61    0          75          1          70        18            1              1          1          0 3 Unit Sites              13        0    3    6     0          10          1          10          2          0              0          0          0 BWR                      95        3  20  56    0          74          5          67        18            1              0          0          0 PWR                      95        2  15  58    0          79          2          70        14            2              1          1          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        190        5  35  114    0        153          7          137        32            3              1          1          0 Percentage of All    100%        3% 18%  60%    0%        81%          4%        72%        17%            2%            1%        1%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                     Page 87 of 276


Page 5 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  13.4        7.3        5.5          8.6        Region 1                  11.0        5.5        3.6          6.6 Region 2                  6.3        6.7        6.9          6.6        Region 2                  5.5        4.4        5.2          5.0 Region 3                  9.9      11.4      11.5          11.0        Region 3                  7.5        7.3        7.0          7.3 Region 4                  8.9        4.8        8.2          7.3        Region 4                  7.1        3.4        5.4          5.3 1 Unit Sites              12.4      10.0        7.5          10.0        1 Unit Sites              9.9        7.1        5.1          7.4 2 Unit Sites              7.8        6.6        8.4          7.6        2 Unit Sites              6.6        4.4        5.4          5.4 3 Unit Sites              6.1        6.5        8.0          6.8        3 Unit Sites              5.0        3.6        4.4          4.3 BWR                      12.2      10.3        9.9          10.8        BWR                        9.7        7.6        5.6          7.6 PWR                        7.8        6.2        6.9          7.0        PWR                        6.5        3.8        5.1          5.1 Total All Regions          9.4        7.8        8.0          8.4        Total All Regions          7.7        5.3        5.3          6.1 71111.15 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 88 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1905      350        20.6        5.4    2187        332        19.5        6.6    1956      340        20.0          5.8 Region 2          2376      367        20.4        6.5    2257        364        20.2        6.2    2124      356        19.8          6.0 Region 3          1856      294        18.4        6.3    2056        292        18.3        7.0    1870      293        18.3          6.4 Region 4          1403      232        17.8        6.0    1465        233        17.9        6.3    1652      233        17.9          7.1 1 Unit Sites      1660      271        16.9        6.1    1726        273        17.1        6.3    1712      269        16.8          6.4 2 Unit Sites      4674      801        20.5        5.8    5069        776        19.9        6.5    4909      780        20.0          6.3 3 Unit Sites      1206      171        21.4        7.0    1169        172        21.5        6.8      980      173        21.6          5.7 BWR                2797      461        19.2        6.1    3017        457        19.0        6.6    2862      457        19.0          6.3 PWR                4743      782        20.6        6.1    4948        764        20.1        6.5    4739      765        20.1          6.2 Total All          7539    1243        20.4        6.1    7964        1221        20.0        6.5    7601    1222        20.0          6.2 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 89 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          6047    1022        20.9        5.9 Region 2          6756    1087        20.9        6.2 Region 3          5781    879        19.1        6.6 Region 4          4520    698        18.9        6.5 1 Unit Sites      5098    813        17.7        6.3 2 Unit Sites      14652    2357        20.5        6.2 3 Unit Sites      3354    516        23.5        6.5 BWR                8675    1375        19.4        6.3 PWR              14429    2311        20.5        6.2 Total All        23104    3686        20.1        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 90 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.17T, "Evaluations of Changes, Tests, and Experiments," has been revised to: 1) address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515), and 2) relocate inspection of permanent plant modifications to IP 71111.21M, "Component Design Bases Inspection (Teams).
11/13/2015            IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                      3                1                0                4 NCV Green                                    17                13                4              34 NCVIV Green                                    5              10                1              16 NCVIV N/A                                      2                1                0                3 NCVIV No Performance                            0                0                1                1 Deficiency Total                                        27                25                6              58 9/11/2018 2:22:01 PM                                                                                                                                              Page 91 of 276


71111.04 Revision History
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  5        0    1    2    0          5          1            2          2          0              0          0          0 Region 2                  22        0    4  12    0          22          0          19          1          0              0          0          0 Region 3                  19        0    3    7    0          18          3          13          3          0              0          0          0 Region 4                  11        0    3    2    0          11          1            8          1          0              0          0          0 1 Unit Sites              25        0    4    9    0          25          4          15          6          0              0          0          0 2 Unit Sites              27        0    7  10    0          26          1          22          1          0              0          0          0 3 Unit Sites              5        0    0    4    0          5          0            5          0          0              0          0          0 BWR                      30        0    6  11    0          29          3          22          5          0              0          0          0 PWR                      27        0    5  12    0          27          2          20          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        57        0  11  23    0          56          5          42          7          0              0          0          0 Percentage of All    100%        0% 19%  40%    0%        98%          9%        74%        12%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 92 of 276


Date of Revision
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.9        1.3        0.0          1.8        Region 1                  3.9        1.3        0.0          1.8 Region 2                  5.9        6.0        7.1          6.1        Region 2                  5.6        5.2        5.4          5.4 Region 3                  9.7        9.2        3.3          8.0        Region 3                  8.7        7.2        1.6          6.5 Region 4                  4.1        9.6        2.5          5.9        Region 4                  4.1        5.5        2.5          4.3 1 Unit Sites              6.1        7.2        0.0          6.0        1 Unit Sites              6.1        5.1        0.0          5.1 2 Unit Sites              5.8        4.7        4.4          5.1        2 Unit Sites              5.5        3.8        2.8          4.1 3 Unit Sites              9.0        3.3        5.5          6.1        3 Unit Sites              6.0        3.3        5.5          4.9 BWR                        8.4        9.2        0.0          7.8        BWR                        7.8        6.3        0.0          6.2 PWR                        5.0        2.8        4.8          4.2        PWR                        4.4        2.8        3.3          3.5 Total All Regions          6.1        5.7        3.7          5.5        Total All Regions          5.8        4.4        2.5          4.6 71111.17T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 93 of 276


Description of Revision
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            768      146        24.3        5.3    1537        273        34.1        5.6      454      132        22.0          3.4 Region 2          1605      190        23.8        8.4    1344        169        24.1        8.0      556        95        15.8          5.9 Region 3          1033      165        27.5        6.3    978        175        29.2        5.6      607      125        20.8          4.9 Region 4            739      155        31.0        4.8    731        163        32.6        4.5      406      109        21.8          3.7 1 Unit Sites      1172      209        29.9        5.6    1310        254        31.8        5.2      190        57        19.0          3.3 2 Unit Sites      2440      407        31.3        6.0    2503        441        33.9        5.7    1584      352        23.5          4.5 3 Unit Sites        533      40        10.0        13.3    777          85        21.3        9.1      249        52        13.0          4.8 BWR                1657      286        28.6        5.8    2065        364        33.1        5.7      501      113        18.8          4.4 PWR                2488      370        28.5        6.7    2525        416        32.0        6.1    1522      348        23.2          4.4 Total All          4145      656        29.8        6.3    4590        780        33.9        5.9    2023      461        23.1          4.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 94 of 276


2015 2016 2017 3 Year Total
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          2759    551        30.6        5.0 Region 2          3505    454        23.9        7.7 Region 3          2617    465        29.1        5.6 Region 4          1876    427        32.8        4.4 1 Unit Sites      2672    520        32.5        5.1 2 Unit Sites      6527    1200        30.8        5.4 3 Unit Sites      1558    177        17.7        8.8 BWR                4223    763        29.3        5.5 PWR                6535    1134        28.4        5.8 Total All        10757    1897        29.2        5.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 95 of 276


AV Green 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Revision History Date of Revision      Description of Revision 11/17/2016            IP 71111.18, "Plant Modifications," has been revised to: 1) Provide oversight of licensee commitments to consider Severe Accident Management Guidelines (SAMGs) within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. Additional background information can be found in SRM SECY-15-0065 (ML15239A767) and a February 23, 2016, letter from the NRC to NEI (ML16032A029). The February 23, 2016, letter, which also references the SRM, is added to the References section. (2) Address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515). (3) Closed feedback form 71111.18-2212.
1 0
11/13/2015            IP 71111.18, "Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.
1 FIN Green 2
Summary of PIM Findings 2015              2016            2017    3 Year Total FIN Green                                     4                1                1                  6 NCV Green                                     9                3                4                16 NCVIV Green                                  6               4                0                10 NCVIV N/A                                    2                0                1                  3 NOV N/A                                       0                0                1                  1 VIO Green                                    0               0                 1                  1 Total                                       21                8                8                37 9/11/2018 2:22:01 PM                                                                                                                                                    Page 96 of 276
0 0
2 NCV Green 7
6 7
20 NOV N/A 1
0 0
1 Total 10 7
7 24 Summary of PIM Findings


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  6        0    1    4    0          6          0            5          1          0              0          0          0 Region 2                  7        0    0    5    0          5          1            3          2          0              0          0          0 Region 3                  16        0    2    8    0          15          3            5          6          0              0          0          0 Region 4                  8        0    0    6    0          7          2            5          0          0              0          0          0 1 Unit Sites              17        0    3    8    0          15          4            7          4          0              0          0          0 2 Unit Sites              18        0    0  14    0          16          1          11          5          0              0          0          0 3 Unit Sites              2        0    0    1    0          2          1            0          0          0              0          0          0 BWR                      18        0    2  10    0          17          3            7          6          0              0          0          0 PWR                      19        0    1  13    0          16          3          11          3          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        37        0    3  23    0          33          6          18          9          0              0          0          0 Percentage of All    100%        0%  8%  62%    0%        89%          16%        49%        24%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                     Page 97 of 276


Page 6 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  4.8        6.1        1.6          4.2        Region 1                  4.8        6.1        0.0          3.7 Region 2                  6.7        0.0        5.7          4.7        Region 2                  5.3        0.0        3.8          3.5 Region 3                  16.2        7.5        5.6          10.1        Region 3                  13.0        7.5        3.7          8.4 Region 4                  12.0        1.8        3.9          5.4        Region 4                  9.6        1.8        3.9          4.7 1 Unit Sites              12.8        3.9        2.1          6.3        1 Unit Sites              10.1        3.9        2.1          5.3 2 Unit Sites              7.9        4.8        6.2          6.4        2 Unit Sites              6.6        4.8        3.6          5.1 3 Unit Sites              7.3        7.1        0.0          5.4        3 Unit Sites              7.3        7.1        0.0          5.4 BWR                      12.6        6.1        3.4          7.4        BWR                      10.5        6.1        3.4          6.8 PWR                        8.2        3.5        4.6          5.5        PWR                        6.5        3.5        2.3          4.2 Total All Regions          9.9        4.5        4.1          6.3        Total All Regions          8.0        4.5        2.7          5.2 71111.18 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 98 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            630      86          5.1        7.3    654          90          5.3        7.3    606        89        5.2          6.8 Region 2            752      80          4.4        9.4    416          65          3.6        6.4    526        67        3.7          7.9 Region 3            694      65          4.1        10.7    796          59          3.7        13.5    540        60        3.8          9.0 Region 4            417      54          4.2        7.7    560          51          3.9        11.0    515        49        3.8        10.5 1 Unit Sites        662      68          4.3        9.7    726          72          4.5        10.1    677        67        4.2        10.1 2 Unit Sites      1539      185          4.7        8.3    1380        158          4.1        8.7    1239      162        4.2          7.6 3 Unit Sites        292      32          4.0        9.1    320          35          4.4        9.1    272        36        4.5          7.5 BWR                949      110          4.6        8.6    983        105          4.4        9.4    883      107        4.5          8.3 PWR                1543      175          4.6        8.8    1443        160          4.2        9.0    1304      158        4.2          8.3 Total All          2492      285          4.7        8.7    2426        265          4.3        9.2    2187      265        4.3          8.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 99 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1890    265        5.4        7.1 Region 2          1694    212        4.1        8.0 Region 3          2030    184        4.0        11.0 Region 4          1491    154        4.2        9.7 1 Unit Sites      2064    207        4.5        10.0 2 Unit Sites      4158    505        4.4        8.2 3 Unit Sites        883    103        4.7        8.6 BWR                2815    322        4.5        8.7 PWR                4290    493        4.4        8.7 Total All          7105    815        4.5        8.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 100 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  1    1          0              2 NCV Green                                14    6          8            28 Total                                    15    7          8            30 9/11/2018 2:22:01 PM                                                                  Page 101 of 276


71111.04 All Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 PIM Findings Breakdown All   > Green PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                   Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
> Green or
                            > SL-IV                                                                                 Safety      Safety Region 1                  7        0    2    4    0          6          0            4          3          0              0          0          0 Region 2                  7        0    2    5    0          6          1            4          2          0              0          0          0 Region 3                  5        0    1    4    0          3          1            4          0          0              0          0          0 Region 4                  11        0    0    8    0          6          1          10          0          0              0          0          0 1 Unit Sites              12        0    0  11    0          7          2            8          2          0              0          0          0 2 Unit Sites              15        0    5    8    0          12          0          12          3          0              0          0          0 3 Unit Sites              3        0    0    2    0          2          1            2          0          0              0          0          0 BWR                      15        0    3  10    0          10          3            9          3          0              0          0          0 PWR                      15        0    2  11    0          11          0          13          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        30        0    5  21    0          21          3          22          5          0              0          0          0 Percentage of All    100%        0% 17%  70%    0%        70%          10%        73%        17%            0%            0%          0%        0%
> SL-IV PIR HP SCWE Inspector
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 102 of 276


Identified
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.5        1.3        0.7          1.5        Region 1                  1.9        1.3        0.7          1.3 Region 2                  2.5        2.3        0.7          1.8        Region 2                  1.3        2.3        0.7          1.4 Region 3                  3.1        0.0        2.3          1.8        Region 3                  1.6        0.0        0.8          0.8 Region 4                  4.3        2.3        3.0          3.1        Region 4                  3.2        0.8        1.5          1.7 1 Unit Sites              3.3        1.3        2.2          2.3        1 Unit Sites              1.9        0.9        0.9          1.2 2 Unit Sites              2.7        1.4        1.0          1.7        2 Unit Sites              1.7        1.0        1.0          1.2 3 Unit Sites              3.6        3.7        3.5          3.6        3 Unit Sites              3.6        3.7        0.0          2.4 BWR                        5.1        2.3        0.5          2.6        BWR                        2.6        1.8        0.5          1.6 PWR                        1.8        0.9        2.3          1.7        PWR                        1.5        0.6        1.2          1.1 Total All Regions          3.0        1.5        1.6          2.0        Total All Regions          1.9        1.1        0.9          1.3 71111.19 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 103 of 276


Initiating
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1570      401        23.6        3.9    1541        397        23.4        3.9    1532      395        23.2          3.9 Region 2          1567      388        21.6        4.0    1323        366        20.3        3.6    1418      372        20.7          3.8 Region 3          1287      318        19.9        4.0    1247        329        20.6        3.8    1290      331        20.7          3.9 Region 4            928      245        18.8        3.8    1293        251        19.3        5.1    1328      256        19.7          5.2 1 Unit Sites      1199      333        20.8        3.6    1288        348        21.8        3.7    1418      337        21.1          4.2 2 Unit Sites      3465      854        21.9        4.1    3461        831        21.3        4.2    3468      850        21.8          4.1 3 Unit Sites        688      165        20.6        4.2    654        164        20.5        4.0      682      167        20.9          4.1 BWR                1935      523        21.8        3.7    2198        532        22.2        4.1    2102      525        21.9          4.0 PWR                3417      829        21.8        4.1    3205        811        21.3        4.0    3466      829        21.8          4.2 Total All          5352    1352        22.2        4.0    5403        1343        22.0        4.0    5568    1354        22.2          4.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 104 of 276


Events Mitigating
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4642    1193        24.3        3.9 Region 2          4307    1126        21.7        3.8 Region 3          3824    978        21.3        3.9 Region 4          3549    752        20.3        4.7 1 Unit Sites      3906    1018        22.1        3.8 2 Unit Sites      10393    2535        22.0        4.1 3 Unit Sites      2024    496        22.5        4.1 BWR                6234    1580        22.3        3.9 PWR              10089    2469        21.8        4.1 Total All        16322    4049        22.1        4.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 105 of 276


Systems Barrier Integrity Emergency
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Revision History Date of Revision      Description of Revision 11/30/2017            IP 71111.20, Refueling and Other Outage Activities, has been revised to add guidance to review calculations for reactor pressure vessel water inventory control. Improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
01/27/2015            IP 71111.20, "Refueling and Other Outage Activities," has been revised to group existing fatigue assessment guidance into a new, separate section, and to add IP 71111.11 as acceptable guidance to observe start-up activities in the control room, based on the 2014 ROP Enhancement Project feedback.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    0                1                1                  2 NCV Green                                  11                15                10                36 NCVIV N/A                                    0                0                1                  1 Total                                      11                16                12                39 9/11/2018 2:22:01 PM                                                                                                                                              Page 106 of 276


Preparedness
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  8        0    2    4    0          6          1          5          2          0              0          0          0 Region 2                  7        0    1    5    0          6          0          2          4          0              0          0          0 Region 3                  17        0    0  15    0          7          8          4          5          0              0          0          0 Region 4                  7        0    0    5    0          5          3          1          3          0              0          0          0 1 Unit Sites              11        0    1    8    0          5          6          2          2          0              0          0          0 2 Unit Sites              28        0    2  21    0          19          6          10        12            0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0          0          0          0              0          0          0 BWR                      11        0    0  10    0          5          5          5          1          0              0          0          0 PWR                      28        0    3  19    0          19          7          7        13            0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        39        0    3  29    0          24          12          12        14            0              0          0          0 Percentage of All    100%        0%  8%  74%    0%        62%          31%        31%        36%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 107 of 276


Occupational
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.6        1.1        2.2          1.6        Region 1                  1.1        1.1        1.1          1.1 Region 2                  1.3        1.2        2.0          1.5        Region 2                  0.9        1.2        1.6          1.2 Region 3                  2.9        5.4        1.8          3.4        Region 3                  0.5        2.1        0.6          1.0 Region 4                  1.7        1.6        2.5          2.0        Region 4                  0.9        1.6        1.7          1.4 1 Unit Sites              2.0        1.5        1.8          1.7        1 Unit Sites              1.0        0.0        1.0          0.7 2 Unit Sites              2.0        3.3        2.4          2.5        2 Unit Sites              0.8        2.5        1.4          1.5 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        2.2        1.4        1.4          1.7        BWR                        0.9        0.4        0.9          0.7 PWR                        1.8        3.2        2.4          2.4        PWR                        0.8        2.3        1.3          1.4 Total All Regions          1.9        2.5        2.1          2.1        Total All Regions          0.8        1.5        1.2          1.2 71111.20 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 108 of 276


Radiation
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1896      33          2.1        57.4    1772          30          1.9        59.1    1846        29        1.9        63.6 Region 2          2233      45          2.5        49.6    1663          27          1.7        61.6    1916        38        2.2        50.4 Region 3          1909      33          2.2        57.8    1443          21          1.5        68.7    1679        23        1.5        73.0 Region 4          1159      21          1.8        55.2    1224          25          1.9        49.0    1189        25        2.3        47.5 1 Unit Sites      1222      22          1.6        55.5    1193          20          1.7        59.6    1228        18        1.5        68.2 2 Unit Sites      5142      93          2.4        55.3    3977          66          1.7        60.3    4439        81        2.2        54.8 3 Unit Sites        833      17          2.1        49.0    933          17          2.1        54.9    963        16        2.0        60.2 BWR                2222      44          2.1        50.5    2659          47          2.0        56.6    2133        42        2.0        50.8 PWR                4975      88          2.3        56.5    3444          56          1.6        61.5    4496        73        2.1        61.6 Total All          7197      132          2.3        54.5    6102        103          1.8        59.2    6629      115        2.1        57.6 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 109 of 276


Safety Public Radiation
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          5513      92        2.0        59.9 Region 2          5812    110        2.2        52.8 Region 3          5031      77        1.8        65.3 Region 4          3572      71        2.1        50.3 1 Unit Sites      3642      60        1.7        60.7 2 Unit Sites      13557    240        2.2        56.5 3 Unit Sites      2729      50        2.3        54.6 BWR                7014    133        2.1        52.7 PWR              12915    217        2.0        59.5 Total All        19928    350        2.1        56.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 110 of 276


Safety Security Region 1 4
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.21M, "Design Bases Assurance Inspection (Teams)," has been revised to inspection procedure to address internal and external comments from conducting the eight CDBI pilot inspections and also to address FFs -1989; -2072; and -2172.
0 1
11/24/2015            IP 71111.21M, "Component Design Bases Inspection (Teams)," has been revised after the regional comment period and reissued after incorporating regional comments.
3 0
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                  0                 2                0                 2 NCV Green                                  11                14                41              66 NCVIV N/A                                  0                 1                 3                 4 NOV Green                                  0                 0                 1                 1 Total                                      11                17                45              73 9/11/2018 2:22:01 PM                                                                                                                                          Page 111 of 276
3 1
3 0
0 0
0 0
Region 2 3
0 1
1 0
2 0
3 0
0 0
0 0
Region 3 3
0 2
1 0
2 0
2 1
0 0
0 0
Region 4 14 0
2 6
0 13 0
11 2
0 0
0 0
1 Unit Sites


14 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
5 5
                            > SL-IV                                                                                Safety      Safety Region 1                  8        0    1    1    0          8          0            8          0          0              0          0          0 Region 2                  24        0    3    3    0          24          2          17          4          0              0          0          0 Region 3                  16        0    1    2    0          16          1          14           1          0              0          0          0 Region 4                  25        0    2  11    0          24          1          21          1          0              0          0          0 1 Unit Sites              27        0    1  10    0          26          0          23          2          0              0          0          0 2 Unit Sites              43        0    5   6    0          43          4          35          3          0              0          0          0 3 Unit Sites              3        0   1    1     0          3          0            2          1           0              0          0          0 BWR                      18        0    2    8    0          17          0          15          2          0              0          0          0 PWR                      55        0    5    9    0          55          4          45          4          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        73        0    7  17    0          72          4          60          6          0              0          0          0 Percentage of All    100%        0% 10%  23%    0%        99%          5%        82%          8%          0%            0%          0%        0%
0 12 1
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 112 of 276
11 1
0 0
0 0
2 Unit Sites


9 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                800.0        0.0        3.3          4.0        Region 1                800.0        0.0        3.4          4.2 Region 2                  44.4      76.9       4.2          6.1        Region 2                  44.4        51.3        4.6          7.0 Region 3                  0.0        0.0       4.8          7.1         Region 3                  0.0        0.0        4.7          5.4 Region 4                  0.0      12.2        4.4          6.0         Region 4                  0.0        7.8        6.0         6.6 1 Unit Sites              0.0        3.1        4.4          4.3        1 Unit Sites              0.0        3.1        5.3          5.1 2 Unit Sites          3600.0        13.7       4.0          7.4        2 Unit Sites            2000.0         9.0       3.9          6.4 3 Unit Sites              44.4        0.0       3.3          10.8        3 Unit Sites             44.4        0.0        3.3          6.1 BWR                      44.4        1.6        4.1          4.3        BWR                      44.4        1.6        4.5          4.2 PWR                    3600.0        18.8        4.3          6.7        PWR                    2000.0        15.1        4.7          7.1 Total All Regions      171.4        11.4        4.2          5.9        Total All Regions        240.0        7.2        4.6          5.8 71111.21M Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 113 of 276
1 6
0 7
0 7
2 0
0 0
0 3 Unit Sites


1 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1             3      14          7.0         0.2    197          15          7.5        13.1    1476      142        23.7        10.4 Region 2            23      16          8.0         1.4      78        34        17.0         2.3    1744      249        35.6          7.0 Region 3              0       0         0.0         0.0     317          13           6.5       24.4    1713        75        9.4         22.8 Region 4              0        0          0.0         0.0    515          31        10.3        16.6    1164      103        20.6        11.3 1 Unit Sites          0        0          0.0        0.0    197          15          7.5        13.1   1855      170        21.3        10.9 2 Unit Sites          3      27        13.5        0.1    593          65        16.3          9.1   3701      336        24.0         11.0 3 Unit Sites        23      16          8.0         1.4    317          13          6.5        24.4    541        63        21.0         8.6 BWR                  23      16          8.0        1.4    642          43        10.8        14.9    2468      167        16.7        14.8 PWR                   3      27        13.5        0.1     465          50        16.7          9.3    3630      402        28.7         9.0 Total All            25      43        14.3        0.6    1107          93        15.5        11.9   6098      569        24.7        10.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 114 of 276
0 0
0 1
0 1
0 0
0 0
0 BWR 13 0
5 4
0 11 1
10 1
0 0
0 0
PWR 11 0
1 7
0 9
0 9
2 0
0 0
0 Findings Associated


SIT/AIT 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1676    171        21.4        9.8 Region 2          1844    299        33.2        6.2 Region 3          2030    101        11.2        20.1 Region 4          1679    134        19.1        12.5 1 Unit Sites      2052    185        20.6        11.1 2 Unit Sites      4297    428        23.8        10.0 3 Unit Sites        881      92      18.4        9.6 BWR                3132    226        15.1        13.9 PWR                4097    479        26.6        8.6 Total All         7229    705        22.0        10.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 115 of 276
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions


24 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.21N, "Design Bases Assurance Inspection (Programs)," has been revised to include lessons learned from the pilot EQ inspections and FF 71111.21-1965 and 71111.21-2120 02/17/2016            IP 71111.21N, "Component Design Bases Inspection (Programs)," has been issued as a pilot inspection procedure. Researched commitments for the last four years and found none.
6 11 0
Summary of PIM Findings 2016            2017    3 Year Total FIN Green                                  1              0                 1 NCV Green                                  4            17                21 Total                                      5            17                22 9/11/2018 2:22:01 PM                                                                                                                                          Page 116 of 276
20 1
19 3
0 0
0 0
Percentage of All


Findings 100%
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings     or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
0%
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    1    0          2          0            1          1          0              0          0          0 Region 2                  12        0    0    3    0          12          0          11          0          1              0          0          0 Region 3                  6        0    0    1    0          6          0            6          0          0              0          0          0 Region 4                  2        0    0    2    0          2          0            1          0          1              0          0          0 1 Unit Sites              7        0    0    2    0          7          0            6          0          1              0          0          0 2 Unit Sites              14        0    0    5    0          14          0          12          1          1              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                        8        0    0    2    0          8          0            7          1          0              0          0          0 PWR                      14        0    0    5    0          14          0          12          0          2              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        22        0    0    7    0          22          0          19          1          2              0          0          0 Percentage of All    100%         0% 0% 32%   0%     100%           0%         86%         5%           9%           0%         0%         0%
25%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 117 of 276
46%
0%
83%
4%
79%
13%
0%
0%
0%
0%
PIM Findings Breakdown


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        2.3          2.2        Region 1                  0.0        0.0        2.3          2.2 Region 2                  0.0      19.3        4.4          5.0        Region 2                  0.0        14.5        3.6          4.4 Region 3                  0.0        4.6        4.3          4.4        Region 3                  0.0        4.6        3.0          3.4 Region 4                  0.0        0.0        2.9          2.3        Region 4                  0.0        0.0        2.9          2.3 1 Unit Sites              0.0        0.0        2.5          2.4        1 Unit Sites              0.0        0.0        1.9          1.8 2 Unit Sites              0.0        9.5        6.2          6.5        2 Unit Sites              0.0        5.7        3.9          4.1 3 Unit Sites              0.0        9.8        0.0          9.8        3 Unit Sites              0.0        9.8        0.0          9.8 BWR                        0.0        6.6        3.5          3.8        BWR                        0.0        6.6        1.9          2.7 PWR                        0.0        9.6        4.3          4.6        PWR                        0.0        4.1        3.8          3.9 Total All Regions          0.0        8.1        4.1          4.3        Total All Regions          0.0        5.5        3.1          3.4 71111.21N Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                     Page 118 of 276


Page 7 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours  Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            0        0          0.0        0.0      34          8          4.0        4.3    869        72        14.4        12.1 Region 2            0        0          0.0        0.0    138          14          4.7        9.8    1688      136        19.4        12.4 Region 3            0        0          0.0        0.0    219          15          5.0        14.6    674        25        6.3        27.0 Region 4            0        0          0.0        0.0    157          16          5.3        9.8    698        39        7.8        17.9 1 Unit Sites        0        0          0.0        0.0      34          8          4.0        4.3    1146        68        11.3        16.8 2 Unit Sites        0        0          0.0        0.0    300          29          5.8        10.3    2554      186        15.5        13.7 3 Unit Sites        0        0          0.0        0.0    213          16          5.3        13.3    229        18        9.0        12.7 BWR                  0        0          0.0        0.0    305          33          6.6        9.2    1579        99        12.4        15.9 PWR                  0        0          0.0        0.0    242          20          5.0        12.1    2350      173        15.7        13.6 Total All            0        0          0.0        0.0    547          53          6.6        10.3    3929      272        15.1        14.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 119 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            903      89      14.8        10.1 Region 2          1826    150        16.7        12.2 Region 3            893      40        6.7        22.3 Region 4            855      55        7.9        15.5 1 Unit Sites      1180      76      10.9        15.5 2 Unit Sites      2854    224        14.0        12.7 3 Unit Sites        442      34        8.5        13.0 BWR                1884    132        10.2        14.3 PWR                2592    202        13.5        12.8 Total All          4476    334        12.4        13.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 120 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Revision History Date of Revision      Description of Revision 06/15/2015            IP 71111.22, "Surveillance Testing," has been revised to incorporate feedback associated with the 2014 ROP Enhancement Project.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    1                1                0                2 NCV Green                                  13              12                13              38 NCVIV N/A                                    0                1                0                1 Total                                      14              14                13              41 9/11/2018 2:22:01 PM                                                                                                                                  Page 121 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  9        0    2    5    0          7          0            7          2          0              0          0          0 Region 2                  10        0    0    9    0          6          1            8          0          0              0          0          0 Region 3                  10        0    1    7    0          5          0            4          6          0              0          0          0 Region 4                  11        0    2    7    0          9          0            9          2          0              0          0          0 1 Unit Sites              16        0    2  10    0          10          0            9          7          0              0          0          0 2 Unit Sites              22        0    3  16    0          15          1          17          3          0              0          0          0 3 Unit Sites              2        0    0    2    0          2          0            2          0          0              0          0          0 BWR                      21        0    2  15    0          14          0          13          8          0              0          0          0 PWR                      19        0    3  13    0          13          1          15          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        40        0    5  28    0          27          1          28        10            0              0          0          0 Percentage of All    100%        0% 13%  70%    0%        68%          3%        70%        25%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 122 of 276


71111.04 Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.6        2.1        1.3          2.0        Region 1                  2.0        2.1        0.7          1.6 Region 2                  2.1        2.9        3.3          2.8        Region 2                  1.4        2.2        2.0          1.9 Region 3                  2.3        3.4        2.5          2.8        Region 3                  0.8        2.8        0.8          1.5 Region 4                  4.0        2.6        3.0          3.2        Region 4                  4.0        2.6        1.5          2.6 1 Unit Sites              1.5        2.8        3.1          2.5        1 Unit Sites              1.0        2.3        1.3          1.5 2 Unit Sites              3.8        2.7        2.0          2.8        2 Unit Sites              2.7        2.3        1.0          2.0 3 Unit Sites              0.0        4.1        3.3          2.6        3 Unit Sites              0.0        4.1        3.3          2.6 BWR                        3.0        4.2        2.9          3.4        BWR                        2.0        3.3        1.5          2.3 PWR                        2.5        1.8        2.3          2.2        PWR                        1.9        1.8        1.1          1.6 Total All Regions          2.7        2.8        2.5          2.7        Total All Regions          1.9        2.4        1.3          1.9 71111.22 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 123 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1526      349        20.5        4.4    1412        326        19.2        4.3    1532      325        19.1          4.7 Region 2          1414      354        19.7        4.0    1358        341        18.9        4.0    1497      334        18.6          4.5 Region 3          1278      290        18.1        4.4    1454        286        17.9        5.1    1207      268        16.8          4.5 Region 4            998      236        18.2        4.2    1157        211        16.2        5.5    1332      220        16.9          6.1 1 Unit Sites      1257      302        18.9        4.2    1323        300        18.8        4.4    1489      278        17.4          5.4 2 Unit Sites      3278      773        19.8        4.2    3433        706        18.1        4.9    3438      720        18.5          4.8 3 Unit Sites        681      154        19.3        4.4    625        158        19.8        4.0      641      149        18.6          4.3 BWR                1981      462        19.3        4.3    2133        460        19.2        4.6    2036      427        17.8          4.8 PWR                3235      767        20.2        4.2    3248        704        18.5        4.6    3532      720        18.9          4.9 Total All          5216    1229        20.1        4.2    5381        1164        19.1        4.6    5568    1147        18.8          4.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 124 of 276
Findings /  


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4470    1000       20.4        4.5 Region 2          4269    1029        19.8        4.1 Region 3          3939    844        18.3        4.7 Region 4          3487    667        18.0        5.2 1 Unit Sites      4069    880        19.1        4.6 2 Unit Sites      10149    2199        19.1        4.6 3 Unit Sites      1946    461        21.0        4.2 BWR                6150    1349        19.0        4.6 PWR              10015    2191        19.4        4.6 Total All        16165    3540        19.3        4.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 125 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.01, "Exercise Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2017    3 Year Total NCV Green                                  1                 1 Total                                      1                 1 9/11/2018 2:22:01 PM                                                                                                                                  Page 126 of 276
/1000 hrs Region 1 3.6 0.0 1.2 1.6 Region 2 1.1 2.1 1.0 1.4 Region 3 1.3 2.8 0.0 1.4 Region 4 8.2 3.8 6.8 6.2 1 Unit Sites


6.0 3.0 1.5 3.5 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0     0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                 0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  1        0    1    0    0          1          0            0          0          1              0          0          0 1 Unit Sites              1        0    1    0    0          1          0            0          0           1             0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites             0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      1        0    1    0    0          1          0            0          0          1              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        1        0    1    0    0          1          0            0          0          1              0          0          0 Percentage of All    100%        0% 100%  0%    0%      100%            0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 127 of 276


1.2 1.1 2.8 1.7 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                   0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                   0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        4.0          4.0        Region 4                  0.0        0.0        4.0          4.0 1 Unit Sites              0.0        0.0        1.1          0.6        1 Unit Sites              0.0        0.0        1.1          0.6 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites               0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.7          0.3        PWR                        0.0        0.0        0.7          0.3 Total All Regions          0.0        0.0        0.5          0.2        Total All Regions          0.0        0.0        0.5          0.2 71114.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 128 of 276


5.9 5.1 0.0 3.4 BWR 5.9 3.1 1.5 3.6 PWR 1.6 1.5 2.5 1.9 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            227        2          0.5       113.5    526          9           0.9        58.4    326        7        0.9        46.5 Region 2            196        3          0.8        65.3    691          8          0.9        86.3    856        9        0.9        95.1 Region 3            201        2          0.7      100.4    631          8          0.9        78.8    626        7        0.9        89.5 Region 4             0        0          0.0        0.0        0          0          0.0        0.0    251        6        1.5         41.8 1 Unit Sites        222        3         0.8        73.9    234          4          1.0        58.4    732        11        1.1        66.6 2 Unit Sites        299        3         0.6        99.6   1353          23          1.2        58.8    1149        15        1.0        76.6 3 Unit Sites        103        1         0.5       103.3    261          4          0.8        65.3    178        3        0.8        59.3 BWR                221        3          0.8        73.5    756          13          1.2       58.1    603        10        1.0        60.3 PWR                403        4          0.7      100.8    1092          18          1.1        60.6    1456        19        1.1         76.6 Total All           624        7          0.8        89.1    1847          31          1.2        59.6    2059        29        1.1        71.0 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 129 of 276


3.4 2.1 2.1 2.5 Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1079      18        0.9        59.9 Region 2          1742      20        1.0        87.1 Region 3           1458      17        0.9        85.8 Region 4           251      12        3.0        20.9 1 Unit Sites      1188      18        1.1        66.0 2 Unit Sites      2800      41        1.1        68.3 3 Unit Sites        542        8        0.9        67.8 BWR                1579      26        1.1        60.7 PWR                2951      41        1.1        72.0 Total All          4530      67        1.1       67.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 130 of 276


Hours Inspector Identified Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.02, "Alert and Notification System Testing," has been revised to address technical, guidance and editorial changes. Closed feedback form71114-1925.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                            Page 131 of 276


Hours Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        0        0    0    0    0          0          0            0          0          0              0          0          0 Percentage of All    100%        0%  0%  0%    0%          0%          0%          0%          0%          0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 132 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                 (2015)     (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.0          0.0        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.0        0.0        0.0          0.0        Total All Regions          0.0        0.0        0.0          0.0 71114.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 133 of 276
Findings /  


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                           Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            12        9          4.5        1.3        0          0          0.0        0.0        20        9          1.8          2.2 Region 2            70        8          1.1        8.7      61          9          1.0        6.7        71        8          0.9          8.8 Region 3              8        8          4.0        1.0      44        11          1.4        4.0        37        8          1.1          4.6 Region 4              0        0          0.0        0.0        0          0          0.0        0.0        18        7          1.2          2.5 1 Unit Sites          0        0          0.0        0.0      27        12          2.0        2.3        13        4          1.0          3.3 2 Unit Sites        82      23          2.9        3.6      60        16          1.8        3.7      112        24          1.3          4.7 3 Unit Sites          8        4          2.0        2.0      18          4          1.3        4.4        20        4          1.0          5.0 BWR                  8      13          6.5        0.6      26        10          2.0        2.6        52      14          1.3          3.7 PWR                  82      18          2.3        4.5      78        22          1.8        3.6        93      18          1.3          5.2 Total All            90      31          3.4        2.9    105          32          2.0        3.3      145        32          1.3          4.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 134 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1             32      25        4.2         1.3 Region 2           201      25        1.1         8.0 Region 3             89      27        1.8        3.3 Region 4             18      18        3.0         1.0 1 Unit Sites        40      20        2.2        2.0 2 Unit Sites        254      63        1.9         4.0 3 Unit Sites        46      12        1.7        3.8 BWR                  86      37        2.2        2.3 PWR                253      58        1.8         4.4 Total All          339      95        1.9        3.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 135 of 276
/1000 hrs Region 1 2.4 0.0 1.2 1.2 Region 2 1.1 1.1 1.0 1.1 Region 3 1.3 1.4 0.0 0.9 Region 4 6.3 2.5 6.8 5.1 1 Unit Sites


4.0 2.3 1.5 2.6 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.03, "Emergency Preparedness Organization Staffing and Augmentation System," has been revised to address editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2015            2016    3 Year Total NCV Green                                  1              2                 3 Total                                      1               2                 3 9/11/2018 2:22:01 PM                                                                                                                                        Page 136 of 276


1.2 0.0 2.8 1.3 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1       0    0    1    0          1          0            0          0          1              0          0          0 Region 2                 1        0    1    0    0          1          0            0          0          1              0          0          0 Region 3                  1        0    0    1    0          0          0            0          0          1              0          0          0 Region 4                  0        0   0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            0          0          1              0          0          0 2 Unit Sites              2        0    1    1    0          1         0            0          0          2              0          0          0 3 Unit Sites             0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      3        0    1    2    0          2          0            0          0          3              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    1    2    0          2          0            0          0          3              0          0          0 Percentage of All    100%        0% 33%  67%    0%        67%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 137 of 276


5.9 5.1 0.0 3.4 BWR 4.0 2.4 1.5 2.6 PWR 1.6 0.5 2.5 1.5 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          25.0        Region 1                  0.0        0.0        0.0        25.0 Region 2                  0.0      10.7        0.0          3.9        Region 2                  0.0        10.7        0.0          3.9 Region 3                100.0        0.0        0.0           7.9        Region 3                   0.0        0.0        0.0          0.0 Region 4                   0.0        0.0        0.0          0.0        Region 4                   0.0        0.0        0.0          0.0 1 Unit Sites              0.0      17.2       0.0          8.9        1 Unit Sites              0.0        17.2        0.0          8.9 2 Unit Sites              11.6      10.9        0.0          6.6         2 Unit Sites              0.0        10.9        0.0          3.3 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                       10.6       16.5        0.0          9.0        PWR                        0.0        16.5       0.0          6.0 Total All Regions          9.6      12.6        0.0          6.8        Total All Regions         0.0        12.6        0.0          4.5 71114.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 138 of 276


2.6 1.2 2.1 2.0 71111.04 Hours & Samples Reported
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            12        9          4.5        1.3        0          0          0.0        0.0      28        9          1.8          3.1 Region 2             82        8          1.0        10.3      94          8          0.9        11.7      83        8          0.9        10.4 Region 3            10        8          4.0        1.3      65        11          1.4        5.9      51        8          1.1          6.4 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      19        7          1.2         2.7 1 Unit Sites          0        0          0.0        0.0      43        12          2.0        3.6      17        4          1.0          4.3 2 Unit Sites        96      23          2.6        4.2      92        15          1.7        6.1    132        24          1.3          5.5 3 Unit Sites          8        4          2.0         2.0      24          4          1.3        6.0      32        4          1.0          8.0 BWR                  10      13          6.5        0.8      38        10          2.0        3.8      65      14          1.3          4.6 PWR                  94      18          2.0        5.2    121          21          1.8        5.8    116        18          1.3          6.5 Total All          104      31          3.1        3.4    159          31          1.9        5.1    181        32          1.3          5.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 139 of 276


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            40      25        4.2        1.6 Region 2            259      24        1.0        10.8 Region 3            126      27        1.8        4.7 Region 4            19      18        3.0        1.0 1 Unit Sites        61      20        2.2        3.0 2 Unit Sites        319      62        1.8        5.1 3 Unit Sites        64      12        1.7        5.3 BWR                112      37        2.2        3.0 PWR                332      57        1.7        5.8 Total All          444      94        1.9        4.7 Regions 9/11/2018 2:22:01 PM                                                                     Page 140 of 276


Page 8 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.04, "Emergency Action Level and Emergency Plan Changes," has been revised to address editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015            2016    3 Year Total NCV Green                                  2                2              4 NCVIV Green                                1                0              1 NCVIV N/A                                  1                0              1 VIO White                                  0                1              1 Total                                      4                3              7 9/11/2018 2:22:01 PM                                                                                                                                      Page 141 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        1    0    2    0          1          0            0          0          2              0          0          0 Region 2                  2        0    0    1    0          2          0            0          0          2              0          0          0 Region 3                  1        0    0    0    0          1          0            0          0          1              0          0          0 Region 4                  1        0    0    1    0          1          0            0          0          1              0          0          0 1 Unit Sites              3        1    0    3    0          2          0            0          0          3              0          0          0 2 Unit Sites              3        0    0    1    0          3          0            0          0          3              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    0    1    0          1          0            0          0          1              0          0          0 PWR                      5        1    0    3    0          4          0            0          0          5              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        1    0    4    0          5          0            0          0          6              0          0          0 Percentage of All    100%      17%  0%  67%    0%        83%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 142 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  10.1        5.2        0.0          5.3        Region 1                  0.0        5.2        0.0          2.7 Region 2                  3.8        4.2        0.0          2.7        Region 2                  3.8        4.2        0.0          2.7 Region 3                  9.0        0.0        0.0          3.4        Region 3                  4.5        0.0        0.0          1.7 Region 4                  0.0        0.0        0.0          32.5        Region 4                  0.0        0.0        0.0        32.5 1 Unit Sites              4.6        9.9        0.0          5.1        1 Unit Sites              0.0        9.9        0.0          3.4 2 Unit Sites              8.8        2.6        0.0          3.8        2 Unit Sites              5.9        2.6        0.0          2.8 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        5.2        4.3        0.0          3.2        BWR                        0.0        4.3        0.0          1.6 PWR                        7.7        5.1        0.0          4.5        PWR                        5.1        5.1        0.0          3.6 Total All Regions          6.9        4.8        0.0          4.0        Total All Regions          3.4        4.8        0.0          2.9 71114.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 143 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            100      22          1.3        4.5    194          17          1.0        11.4      81      15          1.3          5.4 Region 2            260      17          1.0        15.3    236          17          1.0        13.9    243        17          0.9        14.3 Region 3            223      15          1.0        14.8    194          20          1.3        9.7    173        14          0.9        12.3 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      31      25          3.6          1.2 1 Unit Sites        183      34          2.8        5.4    140          20          1.8        7.0    124        26          2.0          4.8 2 Unit Sites        357      74          2.5        4.8    372          57          1.8        6.5    339        34          1.1        10.0 3 Unit Sites        42      12          1.7        3.5    112          9          1.3        12.4      64      11          1.6          5.8 BWR                191      40          2.2        4.8    231          27          1.4        8.5    202        25          1.3          8.1 PWR                391      80          2.7        4.9    393          59          2.0        6.7    325        46          1.4          7.1 Total All          582      120          2.6        4.8    624          86          1.8        7.3    527        71          1.4          7.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 144 of 276


Calendar Year 2015
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            374      54        1.2        6.9 Region 2            739      51        1.0        14.5 Region 3            589      49        1.1        12.0 Region 4            31    123        17.6        0.3 1 Unit Sites        447      80        2.4        5.6 2 Unit Sites      1068    165        1.8        6.5 3 Unit Sites        218      32        1.7        6.8 BWR                624      92        1.7        6.8 PWR                1109    185        2.1        6.0 Total All          1733    277        1.9        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 145 of 276


Calendar Year 2016
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.05, "Maintenance of Emergency Preparedness," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015            2016            2017    3 Year Total NCV Green                                  3              4                3              10 Total                                      3              4                3              10 9/11/2018 2:22:01 PM                                                                                                                                        Page 146 of 276


Calendar Year 2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency    Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0            0              0          0          0 Region 2                  3        0    0    3    0          3          0            0          0            3              0          0          0 Region 3                  2        0    0    2    0          1          0            0          0            2              0          0          0 Region 4                  5        0    2    3    0          5          0            0          0            5              0          0          0 1 Unit Sites              5        0    2    3    0          5          0            0          0            5              0          0          0 2 Unit Sites              3        0    0    3    0          2          0            0          0            3              0          0          0 3 Unit Sites              2        0    0    2    0          2          0            0          0            2              0          0          0 BWR                        5        0    2    3    0          5          0            0          0            5              0          0          0 PWR                        5        0    0    5    0          4          0            0          0            5              0          0          0 Findings                  0        0    0    0    0          0          0            0          0            0              0          0          0 Associated SIT/AIT Total All Regions        10        0    2    8    0          9          0            0          0          10              0          0          0 Percentage of All    100%        0% 20%  80%    0%        90%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 147 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  10.3        6.7      10.5          8.8        Region 2                  10.3        6.7        10.5          8.8 Region 3                  71.4        0.0      10.6          10.2        Region 3                  71.4        0.0        0.0          5.1 Region 4                  0.0        0.0      15.0          59.9        Region 4                  0.0        0.0        15.0        59.9 1 Unit Sites            142.9        10.6      11.2          20.2        1 Unit Sites            142.9        10.6        11.2        20.2 2 Unit Sites              0.0        7.7      10.3          7.0        2 Unit Sites              0.0        7.7        5.1          4.7 3 Unit Sites              95.2      76.9        0.0          53.3        3 Unit Sites              95.2        76.9        0.0        53.3 BWR                    142.9        20.2        7.7          20.6        BWR                      142.9        20.2        7.7        20.6 PWR                        8.7      10.6      11.9          10.6        PWR                        8.7        10.6        6.0          8.5 Total All Regions        23.2      12.6      10.1          13.5        Total All Regions        23.2        12.6        6.7        12.0 71114.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 148 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            18      10          5.0        1.8        0          0          0.0        0.0      42        9          1.8          4.7 Region 2            98        8          1.0        12.2    150          9          1.0        16.6      95        8          0.9        11.9 Region 3            14        8          4.0        1.8      88        11          1.4        8.0      94        8          1.1        11.8 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      67        6          1.0        11.1 1 Unit Sites          0        0          0.0        0.0      77        12          2.0        6.4      41        4          1.0        10.3 2 Unit Sites        119      23          2.6        5.2    129          17          1.9        7.6    216        23          1.3          9.4 3 Unit Sites        11        4          2.0        2.6      32          4          1.3        8.0      41        4          1.0        10.3 BWR                  14      13          6.5        1.1      50        10          2.0        5.0    130        14          1.3          9.3 PWR                116      19          2.1        6.1    188          23          1.9        8.2    168        17          1.2          9.9 Total All          130      32          3.2        4.0    238          33          2.1        7.2    298        31          1.3          9.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 149 of 276


Reported Hours Reported Samples Average Normalized  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1            60      26        4.3        2.3 Region 2            342      25        1.0        13.7 Region 3            196      27        1.8        7.3 Region 4            67      18        3.0        3.7 1 Unit Sites        118      21        2.3        5.6 2 Unit Sites        464      63        1.9        7.4 3 Unit Sites        84      12        1.7        7.0 BWR                194      37        2.2        5.2 PWR                471      59        1.7        8.0 Total All          665      96        1.9        6.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 150 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.06, "Drill Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015              2016              2017    3 Year Total NCV Green                                    1                3                1                5 NCVIV N/A                                    0                0                1                1 Total                                        1                3                2                6 9/11/2018 2:22:01 PM                                                                                                                                Page 151 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    3    1    0          4          0            0          0          4              0          0          0 Region 2                  1        0    1    0    0          1          0            0          0          1              0          0          0 Region 3                  1        0    0    1    0          1          0            0          0          1              0          0          0 Region 4                  1        0    0    0    0          1          0            0          0          0              0          0          0 1 Unit Sites              3        0    0    2    0          3          0            0          0          2              0          0          0 2 Unit Sites              3        0    3    0    0          3          0            0          0          3              0          0          0 3 Unit Sites              1        0    1    0    0          1          0            0          0          1              0          0          0 BWR                      3        0    2    1    0          3          0            0          0          3              0          0          0 PWR                      4        0    2    1    0          4          0            0          0          3              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    4    2    0          7          0            0          0          6              0          0          0 Percentage of All    100%        0% 57%  29%    0%      100%            0%          0%          0%          86%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 152 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  8.0        3.7        4.6          5.4        Region 1                  8.0        3.7        4.6          5.4 Region 2                  0.0        3.0        0.0          1.0        Region 2                  0.0        3.0        0.0          1.0 Region 3                  3.6        3.2        0.0          2.2        Region 3                  3.6        3.2        0.0          2.2 Region 4                  0.0        0.0        4.1          1.4        Region 4                  0.0        0.0        4.1          1.4 1 Unit Sites              2.2        1.9        4.3          2.8        1 Unit Sites              2.2        1.9        4.3          2.8 2 Unit Sites              3.6        1.7        0.0          1.7        2 Unit Sites              3.6        1.7        0.0          1.7 3 Unit Sites              0.0      21.5        0.0          6.4        3 Unit Sites              0.0        21.5        0.0          6.4 BWR                        4.9        6.6        0.0          3.9        BWR                        4.9        6.6        0.0          3.9 PWR                        1.5        0.0        2.7          1.4        PWR                        1.5        0.0        2.7          1.4 Total All Regions          2.8        2.6        1.8          2.4        Total All Regions          2.8        2.6        1.8          2.4 71114.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 153 of 276


Region 1 830 233 13.7 3.6 817 232 13.6 3.5 842 231 13.6 3.6 Region 2 896 234 13.0 3.8 952 227 12.6 4.2 1001 246 13.7 4.1 Region 3 757 195 12.2 3.9 723 199 12.4 3.6 740 188 11.8 3.9 Region 4 636 149 11.5 4.3 785 161 12.4 4.9 733 157 12.1 4.7 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1           250      49          2.9        5.1    269          49          2.9        5.5      220        49        2.9          4.5 Region 2            314      56          3.1        5.6     338          54          3.0        6.3      355        58        3.2         6.1 Region 3           277      45          2.8         6.2    311          47          2.9        6.6      325        47        2.9          6.9 Region 4           228      37          2.8        6.2     243          36          2.8        6.7     242        40        3.1          6.0 1 Unit Sites        303      46          2.9        6.6    319          47          2.9        6.8      296        46        2.9          6.4 2 Unit Sites        661      120          3.1         5.5    725        117          3.0        6.2     721      121        3.1          6.0 3 Unit Sites        105      21          2.6         5.0    117          22          2.8       5.3      125        27        3.4          4.6 BWR                409      70          2.9         5.8    458          72          3.0        6.4     409        79        3.3          5.2 PWR                660      117          3.1        5.6    702        114          3.0        6.2      733       115        3.0          6.4 Total All          1068      187          3.1         5.7   1160        186          3.0        6.2    1142      194        3.2          5.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 154 of 276


732 199 12.4 3.7 829 207 12.9 4.0 849 197 12.3 4.3 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            739    147        3.0        5.0 Region 2          1007    168        3.2        6.0 Region 3            913    139        3.0        6.6 Region 4           712    113        3.1        6.3 1 Unit Sites        917    139        3.0        6.6 2 Unit Sites      2107    358        3.1        5.9 3 Unit Sites        346      70        3.2        4.9 BWR                1276    221        3.1        5.8 PWR                2094    346        3.1        6.1 Total All          3370    567        3.1        5.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 155 of 276


2020 510 13.1 4.0 2044 506 13.0 4.0 2030 519 13.3 3.9 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.07, "Exercise Evaluation - Hostile Action (HA) Event," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015    3 Year Total NCV Green                                  1                  1 Total                                      1                  1 9/11/2018 2:22:01 PM                                                                                                                                            Page 156 of 276


367 102 12.8 3.6 403 106 13.3 3.8 437 106 13.3 4.1 BWR 1263 313 13.0 4.0 1272 321 13.4 4.0 1294 308 12.8 4.2 PWR 1857 498 13.1 3.7 2004 498 13.1 4.0 2022 514 13.5 3.9 Total All  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                 0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                 1        0    1    0    0          1          0            0          0          1              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              1        0    1    0    0          1          0            0          0          1             0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                       0        0    0    0    0          0          0            0          0          0              0         0         0 PWR                       1        0    1    0    0          1         0            0          0          1             0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        1        0    1    0    0          1          0            0          0          1              0          0          0 Percentage of All    100%        0% 100%  0%    0%      100%            0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 157 of 276


Regions 3119 811 13.3 3.8 3276 819 13.4 4.0 3316 822 13.5 4.0 9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Findings per 1000 Inspection                Inspector Identified Findings per 1000 Inspection Hours                                      Hours Findings /  3 Year                          Findings /    3 Year 1000 hrs  Findings                          1000 hrs    Findings (2015)    /1000 hrs                          (2015)      /1000 hrs Region 1                  0.0          0.0 Region 1                    0.0            0.0 Region 2                  0.0          0.0 Region 2                    0.0            0.0 Region 3                   0.0          0.0 Region 3                   0.0            0.0 Region 4                   0.0          0.0 Region 4                   0.0            0.0 1 Unit Sites              0.0          0.0 1 Unit Sites                0.0            0.0 2 Unit Sites              1.6          1.6 2 Unit Sites                1.6            1.6 3 Unit Sites              0.0          0.0 3 Unit Sites                0.0            0.0 BWR                        0.0          0.0 BWR                        0.0            0.0 PWR                        1.3          1.3 PWR                        1.3            1.3 Total All Regions          0.8          0.8 Total All Regions          0.8            0.8 71114.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                         Page 158 of 276


Page 9 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            237        5          1.0        47.4        0          0          0.0        0.0        0        0          0.0          0.0 Region 2            485        6          0.9        80.8        0          0          0.0        0.0        0        0          0.0          0.0 Region 3            477        5          0.8        95.3        0          0          0.0        0.0        0        0          0.0          0.0 Region 4              0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 1 Unit Sites        398        8          1.3        49.7        0          0          0.0        0.0        0        0          0.0          0.0 2 Unit Sites        705      12          1.2        58.8        0          0          0.0        0.0        0        0          0.0          0.0 3 Unit Sites        96        2          1.0        48.0        0          0          0.0        0.0        0        0          0.0          0.0 BWR                437        7          1.0        62.4        0          0          0.0        0.0        0        0          0.0          0.0 PWR                762      15          1.5        50.8        0          0          0.0        0.0        0        0          0.0          0.0 Total All          1199      22          1.4        54.5        0          0          0.0        0.0        0        0          0.0          0.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 159 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            237        5        1.0        47.4 Region 2            485        6        0.9        80.8 Region 3            477        5        0.8        95.3 Region 4              0        0        0.0        0.0 1 Unit Sites        398        8        1.3        49.7 2 Unit Sites        705      12        1.2        58.8 3 Unit Sites        96        2        1.0        48.0 BWR                437        7        0.9        62.4 PWR                762      15        1.4        50.8 Total All          1199      22        1.2        54.5 Regions 9/11/2018 2:22:01 PM                                                                      Page 160 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.08, "Exercise Evaluation - Scenario Review," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                          Page 161 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        0        0    0    0    0          0          0            0          0          0              0          0          0 Percentage of All    100%        0%  0%  0%    0%          0%          0%          0%          0%          0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 162 of 276


3 Year Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.0          0.0        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.0        0.0        0.0          0.0        Total All Regions          0.0        0.0        0.0          0.0 71114.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 163 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            32        7          1.2        4.6      55          9          1.1        6.1      34        7          1.8          4.9 Region 2            63        9          1.0        7.0    102          8          0.9        12.7      97        9          1.1        10.8 Region 3            54        7          1.0        7.7      44          8          1.1        5.4      36        7          1.0          5.1 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      40        6          1.5          6.6 1 Unit Sites        39      11          1.4        3.5      15          4          1.3        3.6      66      11          1.2          6.0 2 Unit Sites        94      15          1.4        6.2    148          23          1.4        6.4    106        15          1.5          7.1 3 Unit Sites        16        3          1.0        5.4      38          4          0.8        9.5      35        3          1.0        11.7 BWR                  53      10          1.1        5.3      64        13          1.3        4.9      72      10          1.3          7.2 PWR                  96      19          1.6        5.0    137          18          1.4        7.6    135        19          1.5          7.1 Total All          149      29          1.5        5.1    200          31          1.4        6.5    207        29          1.5          7.1 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 164 of 276


Region 1 2488 696 14.2 3.6 Region 2 2849 707 13.6 4.0 Region 3 2220 582 12.7 3.8 Region 4 2154 467 12.6 4.6 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1           121      23        1.4        5.3 Region 2           262      26        1.1        10.1 Region 3           133      22        1.2        6.1 Region 4             40      18        4.5        2.2 1 Unit Sites       119      26        1.4        4.6 2 Unit Sites       347      53        1.5        6.6 3 Unit Sites         89      10        1.1        8.9 BWR                 188      33        1.3         5.7 PWR                367      56        1.5        6.6 Total All           556      89        1.4         6.2 Regions 9/11/2018 2:22:01 PM                                                                     Page 165 of 276
 
2410 603 13.1 4.0 2 Unit Sites
 
6094 1535 13.3 4.0 3 Unit Sites
 
1207 314 14.3 3.8 BWR 3828 942 13.3 4.1 PWR 5883 1510 13.4 3.9 Total All  
 
Regions 9711 2452 13.4 4.0 9/11/2018 2:22:01 PM
 
Page 10 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.04S Revision History
 
Date of Revision
 
Description of Revision
 
2015 2017 3 Year Total
 
FIN Green 0
1 1
NCV Green 2
5 7
Total 2
6 8
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 11 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.04S All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 3
0 1
2 0
2 0
2 1
0 0
0 0
Region 2 2
0 1
1 0
2 0
2 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 3
0 0
2 0
2 0
3 0
0 0
0 0
1 Unit Sites
 
2 0
0 2
0 1
0 2
0 0
0 0
0 2 Unit Sites
 
5 0
2 2
0 4
0 4
1 0
0 0
0 3 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 BWR 5
0 0
5 0
3 0
5 0
0 0
0 0
PWR 3
0 2
0 0
3 0
2 1
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
8 0
2 5
0 6
0 7
1 0
0 0
0 Percentage of All
 
Findings 100%
0%
25%
63%
0%
75%
0%
88%
13%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 12 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.04S Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 7.8 2.7 Region 2 3.0 0.0 2.8 2.1 Region 3 2.5 0.0 0.0 0.9 Region 4 3.1 0.0 5.3 3.1 1 Unit Sites
 
1.8 0.0 1.6 1.2 2 Unit Sites
 
1.3 0.0 6.1 2.6 3 Unit Sites
 
15.4 0.0 0.0 6.3 BWR 3.6 0.0 5.6 3.1 PWR 1.2 0.0 3.1 1.6 Total All Regions
 
2.1 0.0 4.0 2.2 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 5.2 1.8 Region 2 3.0 0.0 2.8 2.1 Region 3 2.5 0.0 0.0 0.9 Region 4 0.0 0.0 5.3 2.1 1 Unit Sites
 
0.0 0.0 1.6 0.6 2 Unit Sites
 
1.3 0.0 4.9 2.2 3 Unit Sites
 
15.4 0.0 0.0 6.3 BWR 1.8 0.0 3.7 1.9 PWR 1.2 0.0 3.1 1.6 Total All Regions
 
1.4 0.0 3.3 1.7 71111.04S Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 13 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 383 36 2.1 10.6 356 34 2.0 10.5 386 36 2.1 10.7 Region 2 329 35 1.9 9.4 257 36 2.1 7.1 363 34 1.9 10.7 Region 3 394 30 1.9 13.1 334 30 1.9 11.1 376 31 1.9 12.1 Region 4 318 25 1.9 12.7 272 24 1.8 11.3 378 24 1.8 15.8 1 Unit Sites
 
353 30 1.9 11.8 308 30 1.9 10.3 419 30 1.9 14.0 2 Unit Sites
 
852 79 2.0 10.8 777 78 2.0 10.0 913 78 2.0 11.7 3 Unit Sites
 
219 17 2.1 12.9 133 16 2.3 8.3 173 17 2.1 10.1 BWR 556 47 2.0 11.8 501 48 2.0 10.4 534 48 2.0 11.1 PWR 868 79 2.1 11.0 717 76 2.1 9.4 970 77 2.0 12.6 Total All
 
Regions 1424 126 2.1 11.3 1218 124 2.1 9.8 1504 125 2.0 12.0 9/11/2018 2:22:01 PM
 
Page 14 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1125 106 2.2 10.6 Region 2 949 105 2.1 9.0 Region 3 1104 91 2.0 12.1 Region 4 968 73 2.0 13.3 1 Unit Sites
 
1079 90 2.0 12.0 2 Unit Sites
 
2542 235 2.0 10.8 3 Unit Sites
 
525 50 2.4 10.5 BWR 1591 143 2.0 11.1 PWR 2555 232 2.1 11.0 Total All
 
Regions 4146 375 2.1 11.1 9/11/2018 2:22:01 PM
 
Page 15 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05A Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
NCV Green 2
1 3
6 Total 2
1 3
6 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 16 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05A All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 2
0 2
0 0
2 0
2 0
0 0
0 0
Region 2 2
0 0
2 0
2 0
2 0
0 0
0 0
Region 3 2
0 0
2 0
2 1
1 0
0 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 2 Unit Sites
 
5 0
2 3
0 5
1 4
0 0
0 0
0 3 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 BWR 2
0 1
1 0
2 0
2 0
0 0
0 0
PWR 4
0 1
3 0
4 1
3 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
6 0
2 4
0 6
1 5
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
33%
67%
0%
100%
17%
83%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 17 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05A Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 21.2 7.2 Region 2 11.2 0.0 10.1 6.9 Region 3 14.1 11.0 13.5 12.7 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 7.8 2.7 2 Unit Sites
 
9.4 5.3 10.2 8.4 3 Unit Sites
 
0.0 0.0 80.0 31.3 BWR 0.0 0.0 21.9 6.3 PWR 9.3 4.6 8.2 7.3 Total All Regions
 
6.2 3.0 11.9 7.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 21.2 7.2 Region 2 11.2 0.0 10.1 6.9 Region 3 14.1 11.0 0.0 8.5 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
9.4 5.3 10.2 8.4 3 Unit Sites
 
0.0 0.0 80.0 31.3 BWR 0.0 0.0 21.9 6.3 PWR 9.3 4.6 4.1 5.9 Total All Regions
 
6.2 3.0 8.9 6.0 71111.05A Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 18 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 103 18 1.1 5.7 81 17 1.1 4.8 95 19 1.2 5.0 Region 2 89 21 1.2 4.2 103 23 1.4 4.5 99 19 1.1 5.2 Region 3 71 16 1.1 4.4 91 16 1.0 5.7 74 16 1.0 4.6 Region 4 61 14 1.1 4.3 62 13 1.0 4.8 69 12 0.9 5.7 1 Unit Sites
 
67 17 1.1 3.9 72 15 1.0 4.8 78 16 1.0 4.9 2 Unit Sites
 
222 43 1.1 5.2 236 46 1.2 5.1 214 42 1.1 5.1 3 Unit Sites
 
35 9
1.3 3.9 29 8
1.1 3.6 44 8
1.0 5.5 BWR 108 26 1.2 4.1 117 24 1.1 4.9 91 25 1.1 3.7 PWR 216 43 1.1 5.0 220 45 1.2 4.9 245 41 1.1 6.0 Total All
 
Regions 323 69 1.2 4.7 337 69 1.2 4.9 337 66 1.1 5.1 9/11/2018 2:22:01 PM
 
Page 19 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 278 54 1.2 5.2 Region 2 291 63 1.3 4.6 Region 3 236 48 1.1 4.9 Region 4 192 39 1.1 4.9 1 Unit Sites
 
216 48 1.1 4.5 2 Unit Sites
 
672 131 1.2 5.1 3 Unit Sites
 
108 25 1.3 4.3 BWR 316 75 1.1 4.2 PWR 681 129 1.2 5.3 Total All
 
Regions 996 204 1.2 4.9 9/11/2018 2:22:01 PM
 
Page 20 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05Q Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
AV Pending
 
0 2
0 2
FIN Green 0
0 1
1 NCV Green 17 14 10 41 NCVIV Green
 
0 2
0 2
VIO N/A 2
0 0
2 Total 19 18 11 48 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 21 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05Q All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 5
0 1
4 0
5 2
3 0
0 0
0 0
Region 2 22 2
4 12 0
19 6
14 0
0 0
0 0
Region 3 16 0
3 11 0
13 5
11 0
0 0
0 0
Region 4 5
0 1
4 0
5 1
4 0
0 0
0 0
1 Unit Sites
 
12 0
3 8
0 11 2
10 0
0 0
0 0
2 Unit Sites
 
35 2
6 22 0
30 11 22 0
0 0
0 0
3 Unit Sites
 
1 0
0 1
0 1
1 0
0 0
0 0
0 BWR 14 0
3 9
0 13 4
10 0
0 0
0 0
PWR 34 2
6 22 0
29 10 22 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
48 2
9 31 0
42 14 32 0
0 0
0 0
Percentage of All
 
Findings 100%
4%
19%
65%
0%
88%
29%
67%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 22 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05Q Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 5.4 3.5 0.0 3.0 Region 2 8.1 16.7 13.0 12.8 Region 3 13.7 9.7 7.1 10.1 Region 4 5.7 3.5 2.1 3.8 1 Unit Sites
 
8.0 6.7 2.2 5.6 2 Unit Sites
 
9.2 11.2 9.4 10.0 3 Unit Sites
 
0.0 4.2 0.0 1.9 BWR 8.7 4.6 3.4 5.5 PWR 7.8 11.2 7.4 8.9 Total All Regions
 
8.1 8.8 5.8 7.6 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 5.4 3.5 0.0 3.0 Region 2 6.5 13.9 9.9 10.3 Region 3 11.8 7.8 5.3 8.2 Region 4 5.7 3.5 2.1 3.8 1 Unit Sites
 
6.9 6.7 2.2 5.2 2 Unit Sites
 
8.3 8.8 6.9 8.0 3 Unit Sites
 
0.0 4.2 0.0 1.9 BWR 7.5 4.6 2.3 4.7 PWR 7.1 9.3 5.9 7.5 Total All Regions
 
7.2 7.6 4.5 6.5 71111.05Q Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 23 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 560 339 19.9 1.7 571 325 19.1 1.8 557 334 19.6 1.7 Region 2 620 365 20.3 1.7 719 358 19.9 2.0 607 324 18.0 1.9 Region 3 510 284 17.8 1.8 515 296 18.5 1.7 567 292 18.3 1.9 Region 4 524 218 16.8 2.4 570 220 16.9 2.6 484 223 17.2 2.2 1 Unit Sites
 
541 292 18.3 1.9 511 296 18.5 1.7 575 296 18.5 1.9 2 Unit Sites
 
1368 770 19.7 1.8 1462 755 19.4 1.9 1359 733 18.8 1.9 3 Unit Sites
 
305 144 18.0 2.1 401 148 18.5 2.7 280 144 18.0 1.9 BWR 801 446 18.6 1.8 862 453 18.9 1.9 865 450 18.8 1.9 PWR 1413 760 20.0 1.9 1512 746 19.6 2.0 1349 723 19.0 1.9 Total All
 
Regions 2214 1206 19.8 1.8 2374 1199 19.7 2.0 2214 1173 19.2 1.9 9/11/2018 2:22:01 PM
 
Page 24 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1688 998 20.4 1.7 Region 2 1945 1047 20.1 1.9 Region 3 1591 872 19.0 1.8 Region 4 1577 661 17.9 2.4 1 Unit Sites
 
1627 884 19.2 1.8 2 Unit Sites
 
4189 2258 19.6 1.9 3 Unit Sites
 
986 436 19.8 2.3 BWR 2528 1349 19.0 1.9 PWR 4274 2229 19.7 1.9 Total All
 
Regions 6802 3578 19.6 1.9 9/11/2018 2:22:01 PM
 
Page 25 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05T Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
FIN Green 0
1 0
1 NCV Green 24 12 18 54 NCVIV Green
 
1 0
0 1
NCVIV N/A 1
0 1
2 Total 26 13 19 58 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 26 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05T All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 10 0
1 4
0 10 0
10 0
0 0
0 0
Region 2 15 0
1 3
0 15 1
12 0
0 0
0 0
Region 3 15 0
0 6
0 15 1
13 0
0 0
0 1
Region 4 18 0
2 3
0 18 1
17 0
0 0
0 0
1 Unit Sites
 
29 0
3 10 0
29 1
27 0
0 0
0 1
2 Unit Sites
 
26 0
1 6
0 26 1
23 0
0 0
0 0
3 Unit Sites
 
3 0
0 0
0 3
1 2
0 0
0 0
0 BWR 26 0
2 6
0 26 1
25 0
0 0
0 0
PWR 32 0
2 10 0
32 2
27 0
0 0
0 1
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
58 0
4 16 0
58 3
52 0
0 0
0 1
Percentage of All
 
Findings 100%
0%
7%
28%
0%
100%
5%
90%
0%
0%
0%
0%
2%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 27 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05T Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.9 1.9 2.3 2.1 Region 2 3.9 4.2 1.7 3.7 Region 3 4.4 3.8 3.8 4.0 Region 4 5.0 10.7 5.0 5.5 1 Unit Sites
 
4.7 6.7 3.8 4.7 2 Unit Sites
 
3.3 1.4 3.1 2.8 3 Unit Sites
 
3.9 16.5 0.0 7.9 BWR 4.0 5.1 3.2 3.9 PWR 3.7 2.2 3.8 3.5 Total All Regions
 
3.8 3.6 3.5 3.6 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.9 1.6 1.2 1.5 Region 2 4.4 3.0 1.7 3.6 Region 3 3.4 3.8 3.8 3.7 Region 4 5.2 7.1 4.7 5.2 1 Unit Sites
 
4.2 6.8 3.0 4.0 2 Unit Sites
 
3.3 1.4 2.6 2.5 3 Unit Sites
 
3.9 16.5 0.0 6.3 BWR 2.7 4.2 3.0 3.2 PWR 4.0 2.2 2.5 3.1 Total All Regions
 
3.6 3.0 2.8 3.2 71111.05T Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 28 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1559 60 8.6 26.0 1258 60 12.0 21.0 1709 98 14.0 17.4 Region 2 1811 51 7.3 35.5 658 0
0.0 0.0 596 23 4.6 25.9 Region 3 885 16 3.2 55.3 783 18 3.0 43.5 1302 28 4.7 46.5 Region 4 765 28 7.0 27.3 280 8
4.0 35.0 1073 48 9.6 22.4 1 Unit Sites
 
971 30 6.0 32.4 144 6
3.0 23.9 1334 54 7.7 24.7 2 Unit Sites
 
3535 111 7.9 31.8 2050 42 3.8 48.8 2632 113 9.4 23.3 3 Unit Sites
 
515 14 4.7 36.8 786 38 9.5 20.7 714 30 10.0 23.8 BWR 1486 55 7.9 27.0 1184 30 5.0 39.5 2311 84 8.4 27.5 PWR 3534 100 7.1 35.3 1795 56 5.6 32.1 2369 113 10.3 21.0 Total All
 
Regions 5020 155 7.8 32.4 2979 86 5.7 34.6 4680 197 9.9 23.8 9/11/2018 2:22:01 PM
 
Page 29 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 4526 218 12.8 20.8 Region 2 3065 74 4.9 41.4 Region 3 2971 62 4.1 47.9 Region 4 2118 84 9.3 25.2 1 Unit Sites
 
2449 90 7.5 27.2 2 Unit Sites
 
8216 266 7.6 30.9 3 Unit Sites
 
2014 82 10.3 24.6 BWR 4981 169 7.7 29.5 PWR 7699 269 7.9 28.6 Total All
 
Regions 12679 438 8.0 28.9 9/11/2018 2:22:01 PM
 
Page 30 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05XT
 
Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
NCV Green 5
6 1
12 NOV N/A 0
3 0
3 Total 5
9 1
15 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 31 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05XT
 
All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 5
0 1
2 0
5 1
2 0
0 0
0 0
Region 3 3
0 0
1 0
3 0
3 0
0 0
0 0
Region 4 4
0 0
1 0
4 0
3 0
0 0
0 0
1 Unit Sites
 
2 0
0 1
0 2
0 2
0 0
0 0
0 2 Unit Sites
 
9 0
1 2
0 9
1 5
0 0
0 0
0 3 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 BWR 2
0 1
0 0
2 0
2 0
0 0
0 0
PWR 10 0
0 4
0 10 1
6 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
12 0
1 4
0 12 1
8 0
0 0
0 0
Percentage of All
 
Findings 100%
0%
8%
33%
0%
100%
8%
67%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 32 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.05XT
 
Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 4.1 1.3 3.0 Region 3 5.7 3.4 0.0 4.7 Region 4 0.0 4.4 0.0 3.7 1 Unit Sites
 
3.2 3.1 0.0 2.6 2 Unit Sites
 
0.0 4.0 1.9 3.4 3 Unit Sites
 
0.0 4.2 0.0 4.2 BWR 2.8 3.9 3.6 3.5 PWR 2.7 3.9 0.0 3.2 Total All Regions
 
2.7 3.9 1.3 3.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 3.8 1.3 2.7 Region 3 5.7 3.4 0.0 4.7 Region 4 0.0 2.8 0.0 2.3 1 Unit Sites
 
3.2 1.6 0.0 2.0 2 Unit Sites
 
0.0 3.3 1.9 2.8 3 Unit Sites
 
0.0 4.2 0.0 4.2 BWR 2.8 1.9 3.6 2.6 PWR 2.7 3.3 0.0 2.7 Total All Regions
 
2.7 3.0 1.3 2.7 71111.05XT
 
Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 33 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 110 5
2.5 22.0 229 12 6.0 19.0 0
0 0.0 0.0 Region 2 0
0 0.0 0.0 1050 30 5.0 35.0 780 16 4.0 48.7 Region 3 348 15 5.0 23.2 296 9
3.0 32.9 0
0 0.0 0.0 Region 4 274 10 5.0 27.4 1060 36 9.0 29.4 0
0 0.0 0.0 1 Unit Sites
 
622 25 6.3 24.9 643 20 6.7 32.1 257 4
2.0 64.2 2 Unit Sites
 
110 6
3.0 18.3 1520 53 6.6 28.7 523 12 4.0 43.6 3 Unit Sites
 
0 0
0.0 0.0 472 14 4.7 33.7 0
0 0.0 0.0 BWR 362 13 4.3 27.8 514 16 5.3 32.1 279 8
4.0 34.9 PWR 370 18 6.0 20.5 2121 71 7.1 29.9 501 8
2.7 62.6 Total All
 
Regions 731 31 6.2 23.6 2634 87 7.3 30.3 780 16 4.0 48.7 9/11/2018 2:22:01 PM
 
Page 34 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 338 17 5.7 19.9 Region 2 1830 47 5.2 38.9 Region 3 644 24 4.8 26.8 Region 4 1333 46 9.2 29.0 1 Unit Sites
 
1521 49 7.0 31.0 2 Unit Sites
 
2153 71 6.5 30.3 3 Unit Sites
 
472 14 4.7 33.7 BWR 1155 37 5.3 31.2 PWR 2991 97 6.5 30.8 Total All
 
Regions 4145 134 6.4 30.9 9/11/2018 2:22:01 PM
 
Page 35 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.06 Revision History
 
Date of Revision
 
Description of Revision
 
11/25/2015
 
IP 71111.06, "Flood Protection Measures," has been revised to address feedback forms 71111.06-1768 and 71111.06-1863, and expand on guidance related
 
to inspection of cable routing areas susceptible to flooding or where cables may be exposed to moisture form condensation or wetting.
 
2015 2016 2017 3 Year Total
 
FIN Green 5
1 0
6 NCV Green 4
6 3
13 Total 9
7 3
19 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 36 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.06 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 4
0 1
1 0
4 0
4 0
0 0
0 0
Region 2 6
0 0
4 0
5 0
6 0
0 0
0 0
Region 3 5
0 1
4 0
4 0
5 0
0 0
0 0
Region 4 4
0 1
2 0
4 0
3 1
0 0
0 0
1 Unit Sites
 
10 0
2 7
0 9
0 9
1 0
0 0
0 2 Unit Sites
 
8 0
1 4
0 7
0 8
0 0
0 0
0 3 Unit Sites
 
1 0
0 0
0 1
0 1
0 0
0 0
0 BWR 7
0 1
5 0
7 0
7 0
0 0
0 0
PWR 12 0
2 6
0 10 0
11 1
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
19 0
3 11 0
17 0
18 1
0 0
0 0
Percentage of All
 
Findings 100%
0%
16%
58%
0%
89%
0%
95%
5%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 37 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.06 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 10.1 3.5 0.0 4.8 Region 2 9.1 3.6 6.3 6.5 Region 3 3.9 11.3 0.0 5.7 Region 4 7.2 4.1 3.5 4.9 1 Unit Sites
 
13.4 5.5 2.1 6.8 2 Unit Sites
 
4.6 7.0 1.7 4.5 3 Unit Sites
 
0.0 0.0 14.2 5.8 BWR 6.9 6.3 2.3 5.2 PWR 8.3 5.9 2.9 5.7 Total All Regions
 
7.8 6.1 2.7 5.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 10.1 3.5 0.0 4.8 Region 2 6.1 3.6 6.3 5.4 Region 3 3.9 6.3 0.0 3.5 Region 4 7.2 4.1 3.5 4.9 1 Unit Sites
 
11.1 3.9 2.1 5.6 2 Unit Sites
 
4.6 5.2 1.7 3.9 3 Unit Sites
 
0.0 0.0 14.2 5.8 BWR 6.9 4.5 2.3 4.6 PWR 6.9 4.4 2.9 4.8 Total All Regions
 
6.9 4.5 2.7 4.7 71111.06 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 38 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 298 52 3.1 5.7 283 45 2.6 6.3 249 45 2.6 5.5 Region 2 328 52 2.9 6.3 276 54 3.0 5.1 320 53 2.9 6.0 Region 3 257 46 2.9 5.6 318 39 2.4 8.2 270 41 2.6 6.6 Region 4 278 42 3.2 6.6 243 32 2.5 7.6 289 37 2.8 7.8 1 Unit Sites
 
227 47 2.9 4.8 353 41 2.6 8.6 326 43 2.7 7.6 2 Unit Sites
 
773 121 3.1 6.4 660 108 2.8 6.1 647 109 2.8 5.9 3 Unit Sites
 
161 24 3.0 6.7 108 21 2.6 5.2 155 24 3.0 6.5 BWR 436 71 3.0 6.1 440 64 2.7 6.9 442 65 2.7 6.8 PWR 725 121 3.2 6.0 680 106 2.8 6.4 685 111 2.9 6.2 Total All
 
Regions 1161 192 3.1 6.0 1120 170 2.8 6.6 1128 176 2.9 6.4 9/11/2018 2:22:01 PM
 
Page 39 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 831 142 2.9 5.8 Region 2 924 159 3.1 5.8 Region 3 845 126 2.7 6.7 Region 4 809 111 3.0 7.3 1 Unit Sites
 
905 131 2.8 6.9 2 Unit Sites
 
2079 338 2.9 6.2 3 Unit Sites
 
425 69 3.1 6.2 BWR 1318 200 2.8 6.6 PWR 2090 338 3.0 6.2 Total All
 
Regions 3408 538 2.9 6.3 9/11/2018 2:22:01 PM
 
Page 40 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07A Revision History
 
Date of Revision
 
Description of Revision
 
12/08/2016
 
IP 71111.07, "Heat Sink Performance," has been revised to incorporate aging management programs per ROP Feedback Form 71111.07-2059 (ADAMS
 
ML16160A006). ROP Feedback Form 71111.07-2185 (ADAMS ML16160A008) was considered but rejected. Revised text to clarify inspection requirements
 
versus guidance (should and shall), to address recommendations from OIG 16-A-12 audit.
 
2015 2016 2017 3 Year Total
 
NCV Green 2
1 1
4 Total 2
1 1
4 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 41 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07A All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 2
0 0
1 0
2 0
1 1
0 0
0 0
Region 4 2
0 0
1 0
2 0
2 0
0 0
0 0
1 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 2 Unit Sites
 
3 0
0 1
0 3
0 2
1 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 4
0 0
2 0
4 0
3 1
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
4 0
0 2
0 4
0 3
1 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
50%
0%
100%
0%
75%
25%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 42 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07A Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 16.0 0.0 0.0 6.4 Region 4 0.0 10.0 6.7 6.2 1 Unit Sites
 
0.0 4.6 0.0 1.7 2 Unit Sites
 
7.3 0.0 4.0 4.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 6.9 3.6 3.2 4.5 Total All Regions
 
4.1 2.2 2.0 2.8 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 8.0 0.0 0.0 3.2 Region 4 0.0 10.0 6.7 6.2 1 Unit Sites
 
0.0 4.6 0.0 1.7 2 Unit Sites
 
3.7 0.0 4.0 2.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 3.4 3.6 3.2 3.4 Total All Regions
 
2.1 2.2 2.0 2.1 71111.07A Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 43 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 161 34 2.0 4.7 136 30 1.8 4.5 132 32 1.9 4.1 Region 2 123 23 1.3 5.4 119 24 1.3 5.0 121 23 1.3 5.3 Region 3 125 18 1.1 6.9 97 16 1.1 6.1 91 17 1.1 5.4 Region 4 76 14 1.1 5.4 100 17 1.3 5.9 149 17 1.3 8.7 1 Unit Sites
 
123 22 1.4 5.6 127 22 1.4 5.8 117 21 1.3 5.6 2 Unit Sites
 
300 56 1.4 5.4 278 55 1.5 5.1 293 56 1.4 5.2 3 Unit Sites
 
63 11 1.4 5.7 47 10 1.3 4.7 82 12 1.5 6.8 BWR 195 34 1.4 5.7 175 32 1.3 5.5 175 36 1.5 4.9 PWR 291 55 1.4 5.3 277 55 1.5 5.0 317 53 1.4 6.0 Total All
 
Regions 485 89 1.5 5.5 452 87 1.5 5.2 492 89 1.5 5.5 9/11/2018 2:22:01 PM
 
Page 44 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 428 96 2.0 4.5 Region 2 364 70 1.3 5.2 Region 3 313 51 1.2 6.1 Region 4 324 48 1.3 6.8 1 Unit Sites
 
366 65 1.4 5.6 2 Unit Sites
 
871 167 1.5 5.2 3 Unit Sites
 
192 33 1.5 5.8 BWR 545 102 1.4 5.3 PWR 884 163 1.5 5.4 Total All
 
Regions 1429 265 1.5 5.4 9/11/2018 2:22:01 PM
 
Page 45 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07T Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
NCV Green 2
2 2
6 NOV Green 0
0 1
1 Total 2
2 3
7 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 46 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07T All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 5
0 1
2 0
5 0
5 0
0 0
0 0
Region 4 2
0 0
2 0
2 0
2 0
0 0
0 0
1 Unit Sites
 
4 0
1 2
0 4
0 4
0 0
0 0
0 2 Unit Sites
 
3 0
0 2
0 3
0 3
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 5
0 0
3 0
5 0
5 0
0 0
0 0
PWR 2
0 1
1 0
2 0
2 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
7 0
1 4
0 7
0 7
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
14%
57%
0%
100%
0%
100%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 47 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.07T Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 4.0 0.0 0.0 1.6 Region 3 3.2 3.0 4.9 3.7 Region 4 0.0 5.7 11.4 6.7 1 Unit Sites
 
0.0 4.7 5.3 3.6 2 Unit Sites
 
4.1 0.0 3.9 2.8 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 3.2 5.8 3.0 3.9 PWR 2.0 0.0 5.4 2.4 Total All Regions
 
2.7 2.1 4.5 3.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 4.0 0.0 0.0 1.6 Region 3 2.0 3.0 4.9 3.3 Region 4 0.0 5.7 5.7 4.4 1 Unit Sites
 
0.0 4.7 5.3 3.6 2 Unit Sites
 
3.4 0.0 1.9 1.8 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 2.1 5.8 3.0 3.4 PWR 2.0 0.0 3.6 1.8 Total All Regions
 
2.0 2.1 3.4 2.5 71111.07T Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 48 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 154 17 3.4 9.1 229 26 3.3 8.8 158 13 2.2 12.1 Region 2 249 32 4.6 7.8 227 25 3.6 9.1 146 20 4.0 7.3 Region 3 491 20 2.5 24.6 329 17 2.4 19.4 411 13 2.2 31.6 Region 4 99 14 2.8 7.0 176 19 3.2 9.3 176 14 2.8 12.5 1 Unit Sites
 
284 22 3.1 12.9 211 20 3.3 10.5 310 14 2.3 22.2 2 Unit Sites
 
463 46 3.8 10.1 680 61 3.4 11.1 501 40 3.1 12.5 3 Unit Sites
 
246 15 3.0 16.4 70 6
2.0 11.7 78 6
3.0 13.0 BWR 484 31 3.1 15.6 342 33 3.3 10.4 334 21 3.0 15.9 PWR 509 52 4.0 9.8 618 54 3.4 11.4 555 39 3.0 14.2 Total All
 
Regions 993 83 3.8 12.0 960 87 3.5 11.0 890 60 3.2 14.8 9/11/2018 2:22:01 PM
 
Page 49 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 540 56 3.3 9.6 Region 2 622 77 4.5 8.1 Region 3 1231 50 2.6 24.6 Region 4 450 47 3.4 9.6 1 Unit Sites
 
805 56 3.3 14.4 2 Unit Sites
 
1644 147 3.6 11.2 3 Unit Sites
 
394 27 3.4 14.6 BWR 1160 85 3.3 13.6 PWR 1683 145 3.5 11.6 Total All
 
Regions 2843 230 3.5 12.4 9/11/2018 2:22:01 PM
 
Page 50 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08G Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
NCV Green 4
4 1
9 VIO N/A 0
1 0
1 Total 4
5 1
10 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 51 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08G All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
0 0
0 1
0 0
0 0
Region 2 2
1 0
1 0
2 1
0 0
0 0
0 0
Region 3 7
0 2
5 0
7 3
3 1
0 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
5 0
1 4
0 4
1 2
2 0
0 0
0 2 Unit Sites
 
5 1
1 3
0 5
3 1
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 10 1
2 7
0 9
4 3
2 0
0 0
0 PWR 0
0 0
0 0
0 0
0 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
10 1
2 7
0 9
4 3
2 0
0 0
0 Percentage of All
 
Findings 100%
10%
20%
70%
0%
90%
40%
30%
20%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 52 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08G Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 3.2 0.0 3.8 2.4 Region 2 0.0 26.9 0.0 11.5 Region 3 12.3 7.2 3.4 7.3 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
5.9 6.2 3.5 5.4 2 Unit Sites
 
5.7 12.3 2.4 6.4 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 5.5 8.0 2.7 5.6 Total All Regions
 
5.5 8.0 2.7 5.6 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 3.8 1.2 Region 2 0.0 26.9 0.0 11.5 Region 3 12.3 4.2 3.4 6.4 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
3.0 3.3 3.5 3.2 2 Unit Sites
 
5.7 12.3 2.4 6.4 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 4.1 7.2 2.7 4.6 Total All Regions
 
4.1 7.2 2.7 4.6 71111.08G Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 53 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 316 6
0.9 52.6 239 5
0.7 47.8 266 9
1.3 29.5 Region 2 102 3
0.8 34.0 149 3
0.8 49.5 96 3
0.8 32.0 Region 3 244 7
1.0 34.8 236 5
0.8 47.1 298 7
0.9 42.5 Region 4 62 2
0.7 31.0 75 2
0.7 37.3 75 2
0.7 37.5 1 Unit Sites
 
101 3
1.0 33.6 174 3
0.6 57.8 145 5
1.0 29.1 2 Unit Sites
 
507 12 0.9 42.3 380 9
0.9 42.2 451 11 0.9 41.0 3 Unit Sites
 
116 3
0.8 38.5 144 3
0.8 48.0 138 5
1.3 27.6 BWR 723 18 1.0 40.2 697 15 0.9 46.5 734 21 1.1 35.0 PWR 0
0 0.0 0.0 0
0 0.0 0.0 0
0 0.0 0.0 Total All
 
Regions 723 18 1.0 40.2 697 15 0.9 46.5 734 21 1.1 35.0 9/11/2018 2:22:01 PM
 
Page 54 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 820 20 1.1 41.0 Region 2 347 9
0.9 38.5 Region 3 777 19 1.0 40.9 Region 4 212 6
0.9 35.3 1 Unit Sites
 
420 11 1.0 38.1 2 Unit Sites
 
1338 32 1.0 41.8 3 Unit Sites
 
397 11 1.1 36.1 BWR 2155 54 1.0 39.9 PWR 0
0 0.0 0.0 Total All
 
Regions 2155 54 1.0 39.9 9/11/2018 2:22:01 PM
 
Page 55 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08P Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
FIN Green 3
0 0
3 NCV Green 15 3
6 24 NCVIV Green
 
1 0
0 1
Total 19 3
6 28 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 56 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08P All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 1
0 0
1 0
0 1
0 0
0 0
Region 2 5
0 2
0 0
5 0
0 5
0 0
0 0
Region 3 7
0 0
6 0
7 3
3 1
0 0
0 0
Region 4 9
0 2
5 0
7 4
5 0
0 0
0 0
1 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 2 Unit Sites
 
20 0
5 10 0
18 7
7 6
0 0
0 0
3 Unit Sites
 
1 0
0 0
0 1
0 0
1 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 22 0
5 11 0
20 7
8 7
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
22 0
5 11 0
20 7
8 7
0 0
0 0
Percentage of All
 
Findings 100%
0%
23%
50%
0%
91%
32%
36%
32%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 57 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.08P Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 6.7 1.6 2.4 Region 2 1.9 2.0 1.1 1.7 Region 3 9.9 3.2 0.0 4.0 Region 4 6.3 0.0 5.7 4.2 1 Unit Sites
 
2.8 0.0 0.0 1.2 2 Unit Sites
 
5.1 3.1 2.7 3.7 3 Unit Sites
 
0.0 2.9 0.0 1.3 PWR 4.3 2.6 2.0 3.0 Total All Regions
 
4.3 2.6 2.0 3.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 4.5 1.6 1.8 Region 2 1.9 2.0 1.1 1.7 Region 3 9.4 3.2 0.0 3.6 Region 4 3.8 0.0 5.7 3.3 1 Unit Sites
 
2.8 0.0 0.0 1.2 2 Unit Sites
 
3.9 2.6 2.7 3.1 3 Unit Sites
 
0.0 2.9 0.0 1.3 PWR 3.4 2.2 2.0 2.5 Total All Regions
 
3.4 2.2 2.0 2.5 71111.08P Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 58 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 589 10 1.1 58.9 445 6
1.0 74.1 625 11 1.2 56.8 Region 2 1063 17 1.1 62.5 983 12 1.0 81.9 881 18 1.3 48.9 Region 3 534 7
1.0 76.2 624 7
1.0 89.2 771 9
1.3 85.7 Region 4 794 11 1.4 72.1 656 9
1.3 72.8 700 10 1.3 70.0 1 Unit Sites
 
442 6
0.9 73.7 304 4
1.0 75.9 456 7
1.0 65.1 2 Unit Sites
 
2219 33 1.3 67.2 1812 24 1.1 75.5 2098 34 1.4 61.7 3 Unit Sites
 
318 6
1.2 52.9 592 6
1.2 98.7 422 7
1.4 60.2 BWR 0
0 0.0 0.0 0
0 0.0 0.0 0
0 0.0 0.0 PWR 2979 45 1.3 66.2 2708 34 1.2 79.6 2976 48 1.4 62.0 Total All
 
Regions 2979 45 1.3 66.2 2708 34 1.2 79.6 2976 48 1.4 62.0 9/11/2018 2:22:01 PM
 
Page 59 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1658 27 1.2 61.4 Region 2 2926 47 1.2 62.3 Region 3 1929 23 1.2 83.9 Region 4 2149 30 1.4 71.6 1 Unit Sites
 
1202 17 1.1 70.7 2 Unit Sites
 
6129 91 1.3 67.3 3 Unit Sites
 
1331 19 1.5 70.1 BWR 0
0 0.0 0.0 PWR 8662 127 1.3 68.2 Total All
 
Regions 8662 127 1.3 68.2 9/11/2018 2:22:01 PM
 
Page 60 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11A Revision History
 
Date of Revision
 
Description of Revision
 
2016 3 Year Total
 
FIN Green 1
1 NCV Green 1
1 Total 2
2 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 61 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11A All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
0 0
1 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 1
0 0
0 0
1 0
1 0
0 0
0 0
1 Unit Sites
 
1 0
0 0
0 1
0 1
0 0
0 0
0 2 Unit Sites
 
1 0
0 1
0 0
0 1
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 1
0 0
1 0
0 0
1 0
0 0
0 0
PWR 1
0 0
0 0
1 0
1 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
2 0
0 1
0 1
0 2
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
50%
0%
50%
0%
100%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 62 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11A Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 71.4 0.0 19.2 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 111.1 0.0 43.5 1 Unit Sites
 
0.0 62.5 0.0 13.3 2 Unit Sites
 
0.0 40.8 0.0 14.4 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 43.5 0.0 18.8 PWR 0.0 55.6 0.0 9.6 Total All Regions
 
0.0 48.8 0.0 12.7 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 111.1 0.0 43.5 1 Unit Sites
 
0.0 62.5 0.0 13.3 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 55.6 0.0 9.6 Total All Regions
 
0.0 24.4 0.0 6.3 71111.11A Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 63 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1
9 4.5 0.1 14 14 1.3 1.0 37 20 4.0 1.9 Region 2 17 17 1.2 1.0 9
18 1.6 0.5 24 16 0.9 1.5 Region 3 17 15 1.7 1.1 9
15 1.9 0.6 6
15 1.9 0.4 Region 4 9
6 1.5 1.5 9
8 1.1 1.1 5
6 1.2 0.8 1 Unit Sites
 
8 11 2.2 0.7 6
12 1.7 0.5 8
13 1.6 0.6 2 Unit Sites
 
26 30 1.7 0.9 34 37 1.4 0.9 63 35 1.5 1.8 3 Unit Sites
 
11 6
1.2 1.9 2
6 2.0 0.3 2
9 3.0 0.3 BWR 18 16 1.6 1.1 23 20 1.3 1.2 13 22 1.8 0.6 PWR 27 31 1.8 0.9 18 35 1.8 0.5 60 35 1.6 1.7 Total All
 
Regions 44 47 1.8 0.9 41 55 1.6 0.7 72 57 1.7 1.3 9/11/2018 2:22:01 PM
 
Page 64 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 52 43 2.7 1.2 Region 2 51 51 1.2 1.0 Region 3 32 45 2.0 0.7 Region 4 23 20 1.4 1.2 1 Unit Sites
 
21 36 2.0 0.6 2 Unit Sites
 
122 102 1.5 1.2 3 Unit Sites
 
15 21 2.3 0.7 BWR 53 58 1.6 0.9 PWR 104 101 1.8 1.0 Total All
 
Regions 158 159 1.7 1.0 9/11/2018 2:22:01 PM
 
Page 65 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11B Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
FIN Green 7
0 0
7 NCV Green 0
2 3
5 NCVIV Green
 
1 1
0 2
NCVIV N/A 0
0 1
1 NCVIV No Performance
 
Deficiency
 
0 0
2 2
Total 8
3 6
17 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 66 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11B All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 3
0 0
3 0
2 0
3 0
0 0
0 0
Region 2 7
0 0
4 0
7 0
6 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 6
0 0
3 0
5 0
6 0
0 0
0 0
1 Unit Sites
 
5 0
0 3
0 4
0 4
0 0
0 0
0 2 Unit Sites
 
10 0
0 6
0 9
0 10 0
0 0
0 0
3 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 BWR 2
0 0
2 0
1 0
2 0
0 0
0 0
PWR 14 0
0 8
0 13 0
13 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
16 0
0 10 0
14 0
15 0
0 0
0 0
Percentage of All
 
Findings 100%
0%
0%
63%
0%
88%
0%
94%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 67 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11B Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.9 1.7 1.0 1.1 Region 2 3.6 1.0 4.2 2.8 Region 3 0.0 0.0 1.2 0.5 Region 4 4.3 1.9 2.4 2.9 1 Unit Sites
 
2.3 1.2 1.6 1.8 2 Unit Sites
 
2.3 1.1 2.1 1.9 3 Unit Sites
 
0.0 0.0 5.8 2.8 BWR 0.8 1.0 0.9 0.9 PWR 3.0 1.2 2.7 2.4 Total All Regions
 
2.2 1.1 2.1 1.9 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 1.7 1.0 0.8 Region 2 3.1 1.0 4.2 2.6 Region 3 0.0 0.0 0.0 0.0 Region 4 2.9 1.9 1.4 2.0 1 Unit Sites
 
1.5 1.2 1.6 1.5 2 Unit Sites
 
1.5 1.1 1.1 1.2 3 Unit Sites
 
0.0 0.0 5.8 2.8 BWR 0.0 1.0 0.0 0.3 PWR 2.2 1.2 2.4 2.0 Total All Regions
 
1.4 1.1 1.5 1.4 71111.11B Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 68 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1086 14 0.9 77.6 591 7
0.9 84.4 958 15 1.1 63.9 Region 2 980 10 1.1 98.0 990 10 0.9 99.0 719 9
1.0 79.9 Region 3 693 8
0.6 86.7 563 6
0.9 93.8 852 21 2.1 40.6 Region 4 700 8
1.0 87.5 537 7
1.2 76.6 733 10 1.1 73.3 1 Unit Sites
 
877 10 0.8 87.7 459 6
1.0 76.5 875 19 1.7 46.1 2 Unit Sites
 
2268 25 1.0 90.7 1873 19 1.0 98.6 1976 32 1.3 61.8 3 Unit Sites
 
315 5
0.8 63.0 348 5
1.0 69.7 410 4
0.7 102.6 BWR 1236 14 0.9 88.3 1045 10 0.9 104.5 1156 27 1.8 42.8 PWR 2223 26 0.9 85.5 1636 20 1.1 81.8 2106 28 1.1 75.2 Total All
 
Regions 3459 40 1.0 86.5 2680 30 1.0 89.3 3262 55 1.4 59.3 9/11/2018 2:22:01 PM
 
Page 69 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 2635 36 1.0 73.2 Region 2 2689 29 1.1 92.7 Region 3 2108 35 1.3 60.2 Region 4 1969 25 1.2 78.8 1 Unit Sites
 
2211 35 1.3 63.2 2 Unit Sites
 
6117 76 1.1 80.5 3 Unit Sites
 
1074 14 0.9 76.7 BWR 3437 51 1.3 67.4 PWR 5964 74 1.0 80.6 Total All
 
Regions 9401 125 1.1 75.2 9/11/2018 2:22:01 PM
 
Page 70 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11Q Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 3 Year Total
 
NCV Green 2
3 5
Total 2
3 5
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 71 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11Q All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
1 0
1 0
0 0
0 0
Region 2 2
0 0
1 0
1 0
2 0
0 0
0 0
Region 3 1
0 0
0 0
0 1
0 0
0 0
0 0
Region 4 1
0 0
1 0
1 0
1 0
0 0
0 0
1 Unit Sites
 
3 0
0 2
0 2
1 2
0 0
0 0
0 2 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 3 Unit Sites
 
1 0
0 0
0 0
0 1
0 0
0 0
0 BWR 3
0 0
1 0
1 1
2 0
0 0
0 0
PWR 2
0 0
2 0
2 0
2 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
5 0
0 3
0 3
1 4
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
60%
0%
60%
20%
80%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 72 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.11Q Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 1.6 0.0 0.5 Region 2 1.7 1.6 0.0 1.0 Region 3 2.0 3.8 1.7 2.5 Region 4 2.0 0.0 0.0 0.6 1 Unit Sites
 
2.5 3.5 1.1 2.3 2 Unit Sites
 
0.0 0.8 0.0 0.2 3 Unit Sites
 
10.1 0.0 0.0 3.1 BWR 3.6 1.1 1.1 1.8 PWR 0.0 2.1 0.0 0.7 Total All Regions
 
1.4 1.7 0.4 1.1 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 1.6 0.0 0.5 Region 2 0.0 1.6 0.0 0.5 Region 3 2.0 0.0 0.0 0.6 Region 4 2.0 0.0 0.0 0.6 1 Unit Sites
 
2.5 1.2 0.0 1.1 2 Unit Sites
 
0.0 0.8 0.0 0.2 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 2.4 0.0 0.0 0.7 PWR 0.0 1.4 0.0 0.5 Total All Regions
 
0.9 0.9 0.0 0.6 71111.11Q Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 73 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 636 156 9.2 4.1 637 155 9.1 4.1 638 154 9.1 4.1 Region 2 588 167 9.3 3.5 631 163 9.1 3.9 727 168 9.3 4.3 Region 3 494 124 7.8 4.0 532 123 7.7 4.3 601 128 8.0 4.7 Region 4 497 108 8.3 4.6 517 108 8.3 4.8 542 110 8.5 4.9 1 Unit Sites
 
508 129 8.1 3.9 540 132 8.3 4.1 574 132 8.3 4.3 2 Unit Sites
 
1398 349 8.9 4.0 1442 344 8.8 4.2 1604 356 9.1 4.5 3 Unit Sites
 
309 77 9.6 4.0 336 73 9.1 4.6 329 72 9.0 4.6 BWR 845 197 8.2 4.3 914 199 8.3 4.6 950 200 8.3 4.7 PWR 1371 358 9.4 3.8 1404 350 9.2 4.0 1557 360 9.5 4.3 Total All
 
Regions 2215 555 9.1 4.0 2318 549 9.0 4.2 2507 560 9.2 4.5 9/11/2018 2:22:01 PM
 
Page 74 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1911 465 9.5 4.1 Region 2 1945 498 9.6 3.9 Region 3 1627 375 8.2 4.3 Region 4 1556 326 8.8 4.8 1 Unit Sites
 
1621 393 8.5 4.1 2 Unit Sites
 
4445 1049 9.1 4.2 3 Unit Sites
 
974 222 10.1 4.4 BWR 2708 596 8.4 4.5 PWR 4332 1068 9.5 4.1 Total All
 
Regions 7039 1664 9.1 4.2 9/11/2018 2:22:01 PM
 
Page 75 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.12 Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
FIN Green 3
7 4
14 NCV Green 38 32 18 88 NCVIV N/A 0
1 0
1 Total 41 40 22 103 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 76 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.12 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 27 0
11 12 0
16 2
17 5
0 0
3 0
Region 2 23 0
5 13 0
10 7
15 1
0 0
0 0
Region 3 25 0
8 11 0
12 4
18 2
0 0
0 0
Region 4 29 0
7 16 0
20 5
21 3
0 0
0 0
1 Unit Sites
 
47 0
14 21 0
26 7
31 5
0 0
3 0
2 Unit Sites
 
54 0
16 29 0
31 10 38 6
0 0
0 0
3 Unit Sites
 
3 0
1 2
0 1
1 2
0 0
0 0
0 BWR 38 0
12 19 0
25 5
23 6
0 0
3 0
PWR 66 0
19 33 0
33 13 48 5
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
104 0
31 52 0
58 18 71 11 0
0 3
0 Percentage of All
 
Findings 100%
0%
30%
50%
0%
56%
17%
68%
11%
0%
0%
3%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 77 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.12 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 8.1 9.6 5.3 7.7 Region 2 9.3 6.9 1.5 5.9 Region 3 9.8 7.5 5.7 7.7 Region 4 8.9 8.0 7.2 8.0 1 Unit Sites
 
9.9 8.2 7.2 8.4 2 Unit Sites
 
9.3 8.5 3.2 6.9 3 Unit Sites
 
0.0 0.0 6.3 1.6 BWR 5.7 8.6 7.0 7.2 PWR 11.1 7.6 3.6 7.4 Total All Regions
 
9.1 8.0 4.8 7.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 4.1 5.4 3.1 4.2 Region 2 3.1 3.9 0.8 2.6 Region 3 4.9 3.6 1.6 3.4 Region 4 6.3 6.2 4.5 5.7 1 Unit Sites
 
4.8 4.3 3.1 4.1 2 Unit Sites
 
4.6 5.3 2.1 4.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 3.4 5.1 3.8 4.1 PWR 5.1 4.4 1.6 3.7 Total All Regions
 
4.5 4.7 2.4 3.9 71111.12 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 78 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1232 144 8.5 8.6 1299 146 8.6 8.9 1295 145 8.5 8.9 Region 2 1287 151 8.4 8.5 1298 153 8.5 8.5 1302 150 8.3 8.7 Region 3 1221 124 7.8 9.8 1393 133 8.3 10.5 1224 129 8.1 9.5 Region 4 952 98 7.5 9.7 1122 102 7.8 11.0 1106 100 7.7 11.1 1 Unit Sites
 
1161 127 7.9 9.1 1371 132 8.3 10.4 1247 127 7.9 9.8 2 Unit Sites
 
2950 328 8.4 9.0 3155 339 8.7 9.3 3216 335 8.6 9.6 3 Unit Sites
 
581 62 7.8 9.4 587 63 7.9 9.3 463 62 7.8 7.5 BWR 1761 195 8.1 9.0 1959 210 8.8 9.3 1833 200 8.3 9.2 PWR 2931 322 8.5 9.1 3153 324 8.5 9.7 3093 324 8.5 9.5 Total All
 
Regions 4692 517 8.5 9.1 5112 534 8.8 9.6 4926 524 8.6 9.4 9/11/2018 2:22:01 PM
 
Page 79 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 3826 435 8.9 8.8 Region 2 3887 454 8.7 8.6 Region 3 3838 386 8.4 9.9 Region 4 3180 300 8.1 10.6 1 Unit Sites
 
3779 386 8.4 9.8 2 Unit Sites
 
9321 1002 8.7 9.3 3 Unit Sites
 
1631 187 8.5 8.7 BWR 5553 605 8.5 9.2 PWR 9177 970 8.6 9.5 Total All
 
Regions 14730 1575 8.6 9.4 9/11/2018 2:22:01 PM
 
Page 80 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.13 Revision History
 
Date of Revision
 
Description of Revision
 
12/20/2017
 
IP 71111.13,
 
Maintenance Risk Assessments and Emergent Work Control,
 
has been revised to add inspection of RICT times and risk management actions. 
 
These are a subset of maintenance activities and are included in the samples. This change includes information to facilitate inspection of RICT and PRA
 
functionality. In addition, this revision streamlines IP formatting.
 
02/03/2016
 
IP 71111.13, "Maintenance Risk Assessments and Emergent Work Control," has been revised o update references to Revision 3 to RG 1.160 and Revision 4A
 
to NUMARC 93-01, which were recently issued. IP 71111.13 has been revised to update references to the new revision numbers. Changes made in
 
accordance with ROP Enhancement Project (see ML14017A381)
 
2015 2016 2017 3 Year Total
 
FIN Green 1
0 2
3 NCV Green 18 24 11 53 Total 19 24 13 56 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 81 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.13 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 14 0
1 13 0
11 3
9 2
0 0
0 0
Region 2 10 0
0 10 0
8 2
8 0
0 0
0 0
Region 3 12 0
1 9
0 6
2 7
3 0
0 0
0 Region 4 20 0
2 17 0
17 3
13 3
0 1
0 0
1 Unit Sites
 
25 0
2 22 0
19 5
15 4
0 1
0 0
2 Unit Sites
 
29 0
2 25 0
21 5
20 4
0 0
0 0
3 Unit Sites
 
2 0
0 2
0 2
0 2
0 0
0 0
0 BWR 25 0
1 24 0
19 2
17 5
0 1
0 0
PWR 31 0
3 25 0
23 8
20 3
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
56 0
4 49 0
42 10 37 8
0 1
0 0
Percentage of All
 
Findings 100%
0%
7%
88%
0%
75%
18%
66%
14%
0%
2%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 82 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.13 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.7 5.9 3.8 3.5 Region 2 2.1 3.9 1.5 2.5 Region 3 5.5 4.7 0.0 3.5 Region 4 8.9 4.5 4.6 5.7 1 Unit Sites
 
4.8 4.3 2.3 3.8 2 Unit Sites
 
3.1 5.6 2.5 3.7 3 Unit Sites
 
4.0 0.0 4.1 2.8 BWR 5.5 5.1 2.1 4.2 PWR 2.9 4.6 2.7 3.4 Total All Regions
 
3.9 4.8 2.5 3.7 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.7 4.6 2.4 2.5 Region 2 1.4 3.1 1.5 2.0 Region 3 3.3 1.6 0.0 1.6 Region 4 7.7 3.6 3.8 4.8 1 Unit Sites
 
3.9 2.4 1.9 2.7 2 Unit Sites
 
1.9 4.2 1.8 2.6 3 Unit Sites
 
4.0 0.0 4.1 2.8 BWR 3.3 3.6 1.6 2.9 PWR 2.6 3.0 2.2 2.6 Total All Regions
 
2.9 3.2 2.0 2.7 71111.13 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 83 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1344 322 18.9 4.2 1317 322 18.9 4.1 1268 320 18.8 4.0 Region 2 1416 320 17.8 4.4 1270 292 16.2 4.3 1364 314 17.4 4.3 Region 3 1228 260 16.3 4.7 1251 260 16.3 4.8 1181 243 15.2 4.9 Region 4 904 204 15.7 4.4 1102 208 16.0 5.3 1305 213 16.4 6.1 1 Unit Sites
 
1212 275 17.2 4.4 1297 284 17.8 4.6 1343 267 16.7 5.0 2 Unit Sites
 
3066 690 17.7 4.4 3057 657 16.8 4.7 3235 690 17.7 4.7 3 Unit Sites
 
614 141 17.6 4.4 586 141 17.6 4.2 540 133 16.6 4.1 BWR 1797 415 17.3 4.3 1922 423 17.6 4.5 1878 413 17.2 4.5 PWR 3096 691 18.2 4.5 3018 659 17.3 4.6 3239 677 17.8 4.8 Total All
 
Regions 4892 1106 18.1 4.4 4941 1082 17.7 4.6 5118 1090 17.9 4.7 9/11/2018 2:22:01 PM
 
Page 84 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 3930 964 19.7 4.1 Region 2 4050 926 17.8 4.4 Region 3 3660 763 16.6 4.8 Region 4 3311 625 16.9 5.3 1 Unit Sites
 
3852 826 18.0 4.7 2 Unit Sites
 
9359 2037 17.7 4.6 3 Unit Sites
 
1740 415 18.9 4.2 BWR 5597 1251 17.6 4.5 PWR 9353 2027 17.9 4.6 Total All
 
Regions 14950 3278 17.9 4.6 9/11/2018 2:22:01 PM
 
Page 85 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.15 Revision History
 
Date of Revision
 
Description of Revision
 
12/22/2016
 
IP 71111.15, "Operability Determinations and Functionality Assessments," has been revised to address use of mandatory and discretionary language
 
concerns and recommendations found in OIG Audit OIG-16-A-12. The requirement to inspect at least one sample associated with OWA has been deleted.
 
2015 2016 2017 3 Year Total
 
FIN Green 4
1 1
6 NCV Green 65 47 49 161 NCV N/A 0
1 0
1 NCVIV Green
 
0 0
1 1
NCVIV Minor Performance
 
Deficiency
 
0 0
1 1
NCVIV N/A 4
5 2
11 NCVIV No Performance
 
Deficiency
 
0 0
1 1
NOV N/A 1
1 0
2 NOV White 0
1 2
3 VIO Green 0
1 0
1 VIO N/A 1
0 0
1 VIO White 0
1 0
1 Total 75 58 57 190 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 86 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.15 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 50 1
12 30 0
40 2
34 14 0
0 0
0 Region 2 42 1
10 24 0
37 1
29 6
1 0
1 0
Region 3 64 3
9 37 0
50 4
48 7
0 0
0 0
Region 4 34 0
4 23 0
26 0
26 5
2 1
0 0
1 Unit Sites
 
82 4
16 47 0
68 5
57 12 2
0 0
0 2 Unit Sites
 
95 1
16 61 0
75 1
70 18 1
1 1
0 3 Unit Sites
 
13 0
3 6
0 10 1
10 2
0 0
0 0
BWR 95 3
20 56 0
74 5
67 18 1
0 0
0 PWR 95 2
15 58 0
79 2
70 14 2
1 1
0 Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
190 5
35 114 0
153 7
137 32 3
1 1
0 Percentage of All
 
Findings 100%
3%
18%
60%
0%
81%
4%
72%
17%
2%
1%
1%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 87 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.15 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 13.4 7.3 5.5 8.6 Region 2 6.3 6.7 6.9 6.6 Region 3 9.9 11.4 11.5 11.0 Region 4 8.9 4.8 8.2 7.3 1 Unit Sites
 
12.4 10.0 7.5 10.0 2 Unit Sites
 
7.8 6.6 8.4 7.6 3 Unit Sites
 
6.1 6.5 8.0 6.8 BWR 12.2 10.3 9.9 10.8 PWR 7.8 6.2 6.9 7.0 Total All Regions
 
9.4 7.8 8.0 8.4 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 11.0 5.5 3.6 6.6 Region 2 5.5 4.4 5.2 5.0 Region 3 7.5 7.3 7.0 7.3 Region 4 7.1 3.4 5.4 5.3 1 Unit Sites
 
9.9 7.1 5.1 7.4 2 Unit Sites
 
6.6 4.4 5.4 5.4 3 Unit Sites
 
5.0 3.6 4.4 4.3 BWR 9.7 7.6 5.6 7.6 PWR 6.5 3.8 5.1 5.1 Total All Regions
 
7.7 5.3 5.3 6.1 71111.15 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 88 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1905 350 20.6 5.4 2187 332 19.5 6.6 1956 340 20.0 5.8 Region 2 2376 367 20.4 6.5 2257 364 20.2 6.2 2124 356 19.8 6.0 Region 3 1856 294 18.4 6.3 2056 292 18.3 7.0 1870 293 18.3 6.4 Region 4 1403 232 17.8 6.0 1465 233 17.9 6.3 1652 233 17.9 7.1 1 Unit Sites
 
1660 271 16.9 6.1 1726 273 17.1 6.3 1712 269 16.8 6.4 2 Unit Sites
 
4674 801 20.5 5.8 5069 776 19.9 6.5 4909 780 20.0 6.3 3 Unit Sites
 
1206 171 21.4 7.0 1169 172 21.5 6.8 980 173 21.6 5.7 BWR 2797 461 19.2 6.1 3017 457 19.0 6.6 2862 457 19.0 6.3 PWR 4743 782 20.6 6.1 4948 764 20.1 6.5 4739 765 20.1 6.2 Total All
 
Regions 7539 1243 20.4 6.1 7964 1221 20.0 6.5 7601 1222 20.0 6.2 9/11/2018 2:22:01 PM
 
Page 89 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 6047 1022 20.9 5.9 Region 2 6756 1087 20.9 6.2 Region 3 5781 879 19.1 6.6 Region 4 4520 698 18.9 6.5 1 Unit Sites
 
5098 813 17.7 6.3 2 Unit Sites
 
14652 2357 20.5 6.2 3 Unit Sites
 
3354 516 23.5 6.5 BWR 8675 1375 19.4 6.3 PWR 14429 2311 20.5 6.2 Total All
 
Regions 23104 3686 20.1 6.3 9/11/2018 2:22:01 PM
 
Page 90 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.17T Revision History
 
Date of Revision
 
Description of Revision
 
12/08/2016
 
IP 71111.17T, "Evaluations of Changes, Tests, and Experiments," has been revised to: 1) address use of mandatory and discretionary language concerns and
 
recommendations found in OIG-16-A-12 (ML16097A515), and 2) relocate inspection of permanent plant modifications to IP 71111.21M, "Component Design
 
Bases Inspection (Teams).
 
11/13/2015
 
IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications," has been revised to ensure security related issues
 
identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program
 
associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been
 
reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.
 
2015 2016 2017 3 Year Total
 
FIN Green 3
1 0
4 NCV Green 17 13 4
34 NCVIV Green
 
5 10 1
16 NCVIV N/A 2
1 0
3 NCVIV No Performance
 
Deficiency
 
0 0
1 1
Total 27 25 6
58 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 91 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.17T All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 5
0 1
2 0
5 1
2 2
0 0
0 0
Region 2 22 0
4 12 0
22 0
19 1
0 0
0 0
Region 3 19 0
3 7
0 18 3
13 3
0 0
0 0
Region 4 11 0
3 2
0 11 1
8 1
0 0
0 0
1 Unit Sites
 
25 0
4 9
0 25 4
15 6
0 0
0 0
2 Unit Sites
 
27 0
7 10 0
26 1
22 1
0 0
0 0
3 Unit Sites
 
5 0
0 4
0 5
0 5
0 0
0 0
0 BWR 30 0
6 11 0
29 3
22 5
0 0
0 0
PWR 27 0
5 12 0
27 2
20 2
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
57 0
11 23 0
56 5
42 7
0 0
0 0
Percentage of All
 
Findings 100%
0%
19%
40%
0%
98%
9%
74%
12%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 92 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.17T Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 3.9 1.3 0.0 1.8 Region 2 5.9 6.0 7.1 6.1 Region 3 9.7 9.2 3.3 8.0 Region 4 4.1 9.6 2.5 5.9 1 Unit Sites
 
6.1 7.2 0.0 6.0 2 Unit Sites
 
5.8 4.7 4.4 5.1 3 Unit Sites
 
9.0 3.3 5.5 6.1 BWR 8.4 9.2 0.0 7.8 PWR 5.0 2.8 4.8 4.2 Total All Regions
 
6.1 5.7 3.7 5.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 3.9 1.3 0.0 1.8 Region 2 5.6 5.2 5.4 5.4 Region 3 8.7 7.2 1.6 6.5 Region 4 4.1 5.5 2.5 4.3 1 Unit Sites
 
6.1 5.1 0.0 5.1 2 Unit Sites
 
5.5 3.8 2.8 4.1 3 Unit Sites
 
6.0 3.3 5.5 4.9 BWR 7.8 6.3 0.0 6.2 PWR 4.4 2.8 3.3 3.5 Total All Regions
 
5.8 4.4 2.5 4.6 71111.17T Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 93 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 768 146 24.3 5.3 1537 273 34.1 5.6 454 132 22.0 3.4 Region 2 1605 190 23.8 8.4 1344 169 24.1 8.0 556 95 15.8 5.9 Region 3 1033 165 27.5 6.3 978 175 29.2 5.6 607 125 20.8 4.9 Region 4 739 155 31.0 4.8 731 163 32.6 4.5 406 109 21.8 3.7 1 Unit Sites
 
1172 209 29.9 5.6 1310 254 31.8 5.2 190 57 19.0 3.3 2 Unit Sites
 
2440 407 31.3 6.0 2503 441 33.9 5.7 1584 352 23.5 4.5 3 Unit Sites
 
533 40 10.0 13.3 777 85 21.3 9.1 249 52 13.0 4.8 BWR 1657 286 28.6 5.8 2065 364 33.1 5.7 501 113 18.8 4.4 PWR 2488 370 28.5 6.7 2525 416 32.0 6.1 1522 348 23.2 4.4 Total All
 
Regions 4145 656 29.8 6.3 4590 780 33.9 5.9 2023 461 23.1 4.4 9/11/2018 2:22:01 PM
 
Page 94 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 2759 551 30.6 5.0 Region 2 3505 454 23.9 7.7 Region 3 2617 465 29.1 5.6 Region 4 1876 427 32.8 4.4 1 Unit Sites
 
2672 520 32.5 5.1 2 Unit Sites
 
6527 1200 30.8 5.4 3 Unit Sites
 
1558 177 17.7 8.8 BWR 4223 763 29.3 5.5 PWR 6535 1134 28.4 5.8 Total All
 
Regions 10757 1897 29.2 5.7 9/11/2018 2:22:01 PM
 
Page 95 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.18 Revision History
 
Date of Revision
 
Description of Revision
 
11/17/2016
 
IP 71111.18, "Plant Modifications," has been revised to:  1) Provide oversight of licensee commitments to consider Severe Accident Management Guidelines (SAMGs) within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. Additional background
 
information can be found in SRM SECY-15-0065 (ML15239A767) and a February 23, 2016, letter from the NRC to NEI (ML16032A029). The February 23, 2016, letter, which also references the SRM, is added to the References section.  (2) Address use of mandatory and discretionary language concerns and
 
recommendations found in OIG-16-A-12 (ML16097A515).  (3) Closed feedback form 71111.18-2212.
 
11/13/2015
 
IP 71111.18, "Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the
 
security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure
 
that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-
 
2145.
2015 2016 2017 3 Year Total
 
FIN Green 4
1 1
6 NCV Green 9
3 4
16 NCVIV Green
 
6 4
0 10 NCVIV N/A 2
0 1
3 NOV N/A 0
0 1
1 VIO Green 0
0 1
1 Total 21 8
8 37 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 96 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.18 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 6
0 1
4 0
6 0
5 1
0 0
0 0
Region 2 7
0 0
5 0
5 1
3 2
0 0
0 0
Region 3 16 0
2 8
0 15 3
5 6
0 0
0 0
Region 4 8
0 0
6 0
7 2
5 0
0 0
0 0
1 Unit Sites
 
17 0
3 8
0 15 4
7 4
0 0
0 0
2 Unit Sites
 
18 0
0 14 0
16 1
11 5
0 0
0 0
3 Unit Sites
 
2 0
0 1
0 2
1 0
0 0
0 0
0 BWR 18 0
2 10 0
17 3
7 6
0 0
0 0
PWR 19 0
1 13 0
16 3
11 3
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
37 0
3 23 0
33 6
18 9
0 0
0 0
Percentage of All
 
Findings 100%
0%
8%
62%
0%
89%
16%
49%
24%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 97 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.18 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 4.8 6.1 1.6 4.2 Region 2 6.7 0.0 5.7 4.7 Region 3 16.2 7.5 5.6 10.1 Region 4 12.0 1.8 3.9 5.4 1 Unit Sites
 
12.8 3.9 2.1 6.3 2 Unit Sites
 
7.9 4.8 6.2 6.4 3 Unit Sites
 
7.3 7.1 0.0 5.4 BWR 12.6 6.1 3.4 7.4 PWR 8.2 3.5 4.6 5.5 Total All Regions
 
9.9 4.5 4.1 6.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 4.8 6.1 0.0 3.7 Region 2 5.3 0.0 3.8 3.5 Region 3 13.0 7.5 3.7 8.4 Region 4 9.6 1.8 3.9 4.7 1 Unit Sites
 
10.1 3.9 2.1 5.3 2 Unit Sites
 
6.6 4.8 3.6 5.1 3 Unit Sites
 
7.3 7.1 0.0 5.4 BWR 10.5 6.1 3.4 6.8 PWR 6.5 3.5 2.3 4.2 Total All Regions
 
8.0 4.5 2.7 5.2 71111.18 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 98 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 630 86 5.1 7.3 654 90 5.3 7.3 606 89 5.2 6.8 Region 2 752 80 4.4 9.4 416 65 3.6 6.4 526 67 3.7 7.9 Region 3 694 65 4.1 10.7 796 59 3.7 13.5 540 60 3.8 9.0 Region 4 417 54 4.2 7.7 560 51 3.9 11.0 515 49 3.8 10.5 1 Unit Sites
 
662 68 4.3 9.7 726 72 4.5 10.1 677 67 4.2 10.1 2 Unit Sites
 
1539 185 4.7 8.3 1380 158 4.1 8.7 1239 162 4.2 7.6 3 Unit Sites
 
292 32 4.0 9.1 320 35 4.4 9.1 272 36 4.5 7.5 BWR 949 110 4.6 8.6 983 105 4.4 9.4 883 107 4.5 8.3 PWR 1543 175 4.6 8.8 1443 160 4.2 9.0 1304 158 4.2 8.3 Total All
 
Regions 2492 285 4.7 8.7 2426 265 4.3 9.2 2187 265 4.3 8.3 9/11/2018 2:22:01 PM
 
Page 99 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1890 265 5.4 7.1 Region 2 1694 212 4.1 8.0 Region 3 2030 184 4.0 11.0 Region 4 1491 154 4.2 9.7 1 Unit Sites
 
2064 207 4.5 10.0 2 Unit Sites
 
4158 505 4.4 8.2 3 Unit Sites
 
883 103 4.7 8.6 BWR 2815 322 4.5 8.7 PWR 4290 493 4.4 8.7 Total All
 
Regions 7105 815 4.5 8.7 9/11/2018 2:22:01 PM
 
Page 100 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.19 Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 2017 3 Year Total
 
FIN Green 1
1 0
2 NCV Green 14 6
8 28 Total 15 7
8 30 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 101 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.19 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 7
0 2
4 0
6 0
4 3
0 0
0 0
Region 2 7
0 2
5 0
6 1
4 2
0 0
0 0
Region 3 5
0 1
4 0
3 1
4 0
0 0
0 0
Region 4 11 0
0 8
0 6
1 10 0
0 0
0 0
1 Unit Sites
 
12 0
0 11 0
7 2
8 2
0 0
0 0
2 Unit Sites
 
15 0
5 8
0 12 0
12 3
0 0
0 0
3 Unit Sites
 
3 0
0 2
0 2
1 2
0 0
0 0
0 BWR 15 0
3 10 0
10 3
9 3
0 0
0 0
PWR 15 0
2 11 0
11 0
13 2
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
30 0
5 21 0
21 3
22 5
0 0
0 0
Percentage of All
 
Findings 100%
0%
17%
70%
0%
70%
10%
73%
17%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 102 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.19 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.5 1.3 0.7 1.5 Region 2 2.5 2.3 0.7 1.8 Region 3 3.1 0.0 2.3 1.8 Region 4 4.3 2.3 3.0 3.1 1 Unit Sites
 
3.3 1.3 2.2 2.3 2 Unit Sites
 
2.7 1.4 1.0 1.7 3 Unit Sites
 
3.6 3.7 3.5 3.6 BWR 5.1 2.3 0.5 2.6 PWR 1.8 0.9 2.3 1.7 Total All Regions
 
3.0 1.5 1.6 2.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.9 1.3 0.7 1.3 Region 2 1.3 2.3 0.7 1.4 Region 3 1.6 0.0 0.8 0.8 Region 4 3.2 0.8 1.5 1.7 1 Unit Sites
 
1.9 0.9 0.9 1.2 2 Unit Sites
 
1.7 1.0 1.0 1.2 3 Unit Sites
 
3.6 3.7 0.0 2.4 BWR 2.6 1.8 0.5 1.6 PWR 1.5 0.6 1.2 1.1 Total All Regions
 
1.9 1.1 0.9 1.3 71111.19 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 103 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1570 401 23.6 3.9 1541 397 23.4 3.9 1532 395 23.2 3.9 Region 2 1567 388 21.6 4.0 1323 366 20.3 3.6 1418 372 20.7 3.8 Region 3 1287 318 19.9 4.0 1247 329 20.6 3.8 1290 331 20.7 3.9 Region 4 928 245 18.8 3.8 1293 251 19.3 5.1 1328 256 19.7 5.2 1 Unit Sites
 
1199 333 20.8 3.6 1288 348 21.8 3.7 1418 337 21.1 4.2 2 Unit Sites
 
3465 854 21.9 4.1 3461 831 21.3 4.2 3468 850 21.8 4.1 3 Unit Sites
 
688 165 20.6 4.2 654 164 20.5 4.0 682 167 20.9 4.1 BWR 1935 523 21.8 3.7 2198 532 22.2 4.1 2102 525 21.9 4.0 PWR 3417 829 21.8 4.1 3205 811 21.3 4.0 3466 829 21.8 4.2 Total All
 
Regions 5352 1352 22.2 4.0 5403 1343 22.0 4.0 5568 1354 22.2 4.1 9/11/2018 2:22:01 PM
 
Page 104 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 4642 1193 24.3 3.9 Region 2 4307 1126 21.7 3.8 Region 3 3824 978 21.3 3.9 Region 4 3549 752 20.3 4.7 1 Unit Sites
 
3906 1018 22.1 3.8 2 Unit Sites
 
10393 2535 22.0 4.1 3 Unit Sites
 
2024 496 22.5 4.1 BWR 6234 1580 22.3 3.9 PWR 10089 2469 21.8 4.1 Total All
 
Regions 16322 4049 22.1 4.0 9/11/2018 2:22:01 PM
 
Page 105 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.20 Revision History
 
Date of Revision
 
Description of Revision
 
11/30/2017
 
IP 71111.20,
 
Refueling and Other Outage Activities,
 
has been revised to add guidance to review calculations for reactor pressure vessel water inventory
 
control. Improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
 
01/27/2015
 
IP 71111.20, "Refueling and Other Outage Activities," has been revised to group existing fatigue assessment guidance into a new, separate section, and to
 
add IP 71111.11 as acceptable guidance to observe start-up activities in the control room, based on the 2014 ROP Enhancement Project feedback.
 
2015 2016 2017 3 Year Total
 
FIN Green 0
1 1
2 NCV Green 11 15 10 36 NCVIV N/A 0
0 1
1 Total 11 16 12 39 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 106 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.20 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 8
0 2
4 0
6 1
5 2
0 0
0 0
Region 2 7
0 1
5 0
6 0
2 4
0 0
0 0
Region 3 17 0
0 15 0
7 8
4 5
0 0
0 0
Region 4 7
0 0
5 0
5 3
1 3
0 0
0 0
1 Unit Sites
 
11 0
1 8
0 5
6 2
2 0
0 0
0 2 Unit Sites
 
28 0
2 21 0
19 6
10 12 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 11 0
0 10 0
5 5
5 1
0 0
0 0
PWR 28 0
3 19 0
19 7
7 13 0
0 0
0 Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
39 0
3 29 0
24 12 12 14 0
0 0
0 Percentage of All
 
Findings 100%
0%
8%
74%
0%
62%
31%
31%
36%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 107 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.20 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.6 1.1 2.2 1.6 Region 2 1.3 1.2 2.0 1.5 Region 3 2.9 5.4 1.8 3.4 Region 4 1.7 1.6 2.5 2.0 1 Unit Sites
 
2.0 1.5 1.8 1.7 2 Unit Sites
 
2.0 3.3 2.4 2.5 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 2.2 1.4 1.4 1.7 PWR 1.8 3.2 2.4 2.4 Total All Regions
 
1.9 2.5 2.1 2.1 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.1 1.1 1.1 1.1 Region 2 0.9 1.2 1.6 1.2 Region 3 0.5 2.1 0.6 1.0 Region 4 0.9 1.6 1.7 1.4 1 Unit Sites
 
1.0 0.0 1.0 0.7 2 Unit Sites
 
0.8 2.5 1.4 1.5 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.9 0.4 0.9 0.7 PWR 0.8 2.3 1.3 1.4 Total All Regions
 
0.8 1.5 1.2 1.2 71111.20 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 108 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1896 33 2.1 57.4 1772 30 1.9 59.1 1846 29 1.9 63.6 Region 2 2233 45 2.5 49.6 1663 27 1.7 61.6 1916 38 2.2 50.4 Region 3 1909 33 2.2 57.8 1443 21 1.5 68.7 1679 23 1.5 73.0 Region 4 1159 21 1.8 55.2 1224 25 1.9 49.0 1189 25 2.3 47.5 1 Unit Sites
 
1222 22 1.6 55.5 1193 20 1.7 59.6 1228 18 1.5 68.2 2 Unit Sites
 
5142 93 2.4 55.3 3977 66 1.7 60.3 4439 81 2.2 54.8 3 Unit Sites
 
833 17 2.1 49.0 933 17 2.1 54.9 963 16 2.0 60.2 BWR 2222 44 2.1 50.5 2659 47 2.0 56.6 2133 42 2.0 50.8 PWR 4975 88 2.3 56.5 3444 56 1.6 61.5 4496 73 2.1 61.6 Total All
 
Regions 7197 132 2.3 54.5 6102 103 1.8 59.2 6629 115 2.1 57.6 9/11/2018 2:22:01 PM
 
Page 109 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 5513 92 2.0 59.9 Region 2 5812 110 2.2 52.8 Region 3 5031 77 1.8 65.3 Region 4 3572 71 2.1 50.3 1 Unit Sites
 
3642 60 1.7 60.7 2 Unit Sites
 
13557 240 2.2 56.5 3 Unit Sites
 
2729 50 2.3 54.6 BWR 7014 133 2.1 52.7 PWR 12915 217 2.0 59.5 Total All
 
Regions 19928 350 2.1 56.9 9/11/2018 2:22:01 PM
 
Page 110 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21M Revision History
 
Date of Revision
 
Description of Revision
 
12/08/2016
 
IP 71111.21M, "Design Bases Assurance Inspection (Teams)," has been revised to inspection procedure to address internal and external comments from
 
conducting the eight CDBI pilot inspections and also to address FFs -1989; -2072; and -2172.
 
11/24/2015
 
IP 71111.21M, "Component Design Bases Inspection (Teams)," has been revised after the regional comment period and reissued after incorporating regional
 
comments.
2015 2016 2017 3 Year Total
 
FIN Green 0
2 0
2 NCV Green 11 14 41 66 NCVIV N/A 0
1 3
4 NOV Green 0
0 1
1 Total 11 17 45 73 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 111 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21M All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 8
0 1
1 0
8 0
8 0
0 0
0 0
Region 2 24 0
3 3
0 24 2
17 4
0 0
0 0
Region 3 16 0
1 2
0 16 1
14 1
0 0
0 0
Region 4 25 0
2 11 0
24 1
21 1
0 0
0 0
1 Unit Sites
 
27 0
1 10 0
26 0
23 2
0 0
0 0
2 Unit Sites
 
43 0
5 6
0 43 4
35 3
0 0
0 0
3 Unit Sites
 
3 0
1 1
0 3
0 2
1 0
0 0
0 BWR 18 0
2 8
0 17 0
15 2
0 0
0 0
PWR 55 0
5 9
0 55 4
45 4
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
73 0
7 17 0
72 4
60 6
0 0
0 0
Percentage of All
 
Findings 100%
0%
10%
23%
0%
99%
5%
82%
8%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 112 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21M Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 800.0 0.0 3.3 4.0 Region 2 44.4 76.9 4.2 6.1 Region 3 0.0 0.0 4.8 7.1 Region 4 0.0 12.2 4.4 6.0 1 Unit Sites
 
0.0 3.1 4.4 4.3 2 Unit Sites
 
3600.0 13.7 4.0 7.4 3 Unit Sites
 
44.4 0.0 3.3 10.8 BWR 44.4 1.6 4.1 4.3 PWR 3600.0 18.8 4.3 6.7 Total All Regions
 
171.4 11.4 4.2 5.9 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 800.0 0.0 3.4 4.2 Region 2 44.4 51.3 4.6 7.0 Region 3 0.0 0.0 4.7 5.4 Region 4 0.0 7.8 6.0 6.6 1 Unit Sites
 
0.0 3.1 5.3 5.1 2 Unit Sites
 
2000.0 9.0 3.9 6.4 3 Unit Sites
 
44.4 0.0 3.3 6.1 BWR 44.4 1.6 4.5 4.2 PWR 2000.0 15.1 4.7 7.1 Total All Regions
 
240.0 7.2 4.6 5.8 71111.21M Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 113 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 3
14 7.0 0.2 197 15 7.5 13.1 1476 142 23.7 10.4 Region 2 23 16 8.0 1.4 78 34 17.0 2.3 1744 249 35.6 7.0 Region 3 0
0 0.0 0.0 317 13 6.5 24.4 1713 75 9.4 22.8 Region 4 0
0 0.0 0.0 515 31 10.3 16.6 1164 103 20.6 11.3 1 Unit Sites
 
0 0
0.0 0.0 197 15 7.5 13.1 1855 170 21.3 10.9 2 Unit Sites
 
3 27 13.5 0.1 593 65 16.3 9.1 3701 336 24.0 11.0 3 Unit Sites
 
23 16 8.0 1.4 317 13 6.5 24.4 541 63 21.0 8.6 BWR 23 16 8.0 1.4 642 43 10.8 14.9 2468 167 16.7 14.8 PWR 3
27 13.5 0.1 465 50 16.7 9.3 3630 402 28.7 9.0 Total All
 
Regions 25 43 14.3 0.6 1107 93 15.5 11.9 6098 569 24.7 10.7 9/11/2018 2:22:01 PM
 
Page 114 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1676 171 21.4 9.8 Region 2 1844 299 33.2 6.2 Region 3 2030 101 11.2 20.1 Region 4 1679 134 19.1 12.5 1 Unit Sites
 
2052 185 20.6 11.1 2 Unit Sites
 
4297 428 23.8 10.0 3 Unit Sites
 
881 92 18.4 9.6 BWR 3132 226 15.1 13.9 PWR 4097 479 26.6 8.6 Total All
 
Regions 7229 705 22.0 10.3 9/11/2018 2:22:01 PM
 
Page 115 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21N Revision History
 
Date of Revision
 
Description of Revision
 
12/08/2016
 
IP 71111.21N, "Design Bases Assurance Inspection (Programs)," has been revised to include lessons learned from the pilot EQ inspections and FF 71111.21-
 
1965 and 71111.21-2120
 
02/17/2016
 
IP 71111.21N, "Component Design Bases Inspection (Programs)," has been issued as a pilot inspection procedure. Researched commitments for the last four
 
years and found none.
 
2016 2017 3 Year Total
 
FIN Green 1
0 1
NCV Green 4
17 21 Total 5
17 22 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 116 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21N All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 2
0 0
1 0
2 0
1 1
0 0
0 0
Region 2 12 0
0 3
0 12 0
11 0
1 0
0 0
Region 3 6
0 0
1 0
6 0
6 0
0 0
0 0
Region 4 2
0 0
2 0
2 0
1 0
1 0
0 0
1 Unit Sites
 
7 0
0 2
0 7
0 6
0 1
0 0
0 2 Unit Sites
 
14 0
0 5
0 14 0
12 1
1 0
0 0
3 Unit Sites
 
1 0
0 0
0 1
0 1
0 0
0 0
0 BWR 8
0 0
2 0
8 0
7 1
0 0
0 0
PWR 14 0
0 5
0 14 0
12 0
2 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
22 0
0 7
0 22 0
19 1
2 0
0 0
Percentage of All
 
Findings 100%
0%
0%
32%
0%
100%
0%
86%
5%
9%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 117 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.21N Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 2.3 2.2 Region 2 0.0 19.3 4.4 5.0 Region 3 0.0 4.6 4.3 4.4 Region 4 0.0 0.0 2.9 2.3 1 Unit Sites
 
0.0 0.0 2.5 2.4 2 Unit Sites
 
0.0 9.5 6.2 6.5 3 Unit Sites
 
0.0 9.8 0.0 9.8 BWR 0.0 6.6 3.5 3.8 PWR 0.0 9.6 4.3 4.6 Total All Regions
 
0.0 8.1 4.1 4.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 2.3 2.2 Region 2 0.0 14.5 3.6 4.4 Region 3 0.0 4.6 3.0 3.4 Region 4 0.0 0.0 2.9 2.3 1 Unit Sites
 
0.0 0.0 1.9 1.8 2 Unit Sites
 
0.0 5.7 3.9 4.1 3 Unit Sites
 
0.0 9.8 0.0 9.8 BWR 0.0 6.6 1.9 2.7 PWR 0.0 4.1 3.8 3.9 Total All Regions
 
0.0 5.5 3.1 3.4 71111.21N Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 118 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 0
0 0.0 0.0 34 8
4.0 4.3 869 72 14.4 12.1 Region 2 0
0 0.0 0.0 138 14 4.7 9.8 1688 136 19.4 12.4 Region 3 0
0 0.0 0.0 219 15 5.0 14.6 674 25 6.3 27.0 Region 4 0
0 0.0 0.0 157 16 5.3 9.8 698 39 7.8 17.9 1 Unit Sites
 
0 0
0.0 0.0 34 8
4.0 4.3 1146 68 11.3 16.8 2 Unit Sites
 
0 0
0.0 0.0 300 29 5.8 10.3 2554 186 15.5 13.7 3 Unit Sites
 
0 0
0.0 0.0 213 16 5.3 13.3 229 18 9.0 12.7 BWR 0
0 0.0 0.0 305 33 6.6 9.2 1579 99 12.4 15.9 PWR 0
0 0.0 0.0 242 20 5.0 12.1 2350 173 15.7 13.6 Total All
 
Regions 0
0 0.0 0.0 547 53 6.6 10.3 3929 272 15.1 14.4 9/11/2018 2:22:01 PM
 
Page 119 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 903 89 14.8 10.1 Region 2 1826 150 16.7 12.2 Region 3 893 40 6.7 22.3 Region 4 855 55 7.9 15.5 1 Unit Sites
 
1180 76 10.9 15.5 2 Unit Sites
 
2854 224 14.0 12.7 3 Unit Sites
 
442 34 8.5 13.0 BWR 1884 132 10.2 14.3 PWR 2592 202 13.5 12.8 Total All
 
Regions 4476 334 12.4 13.4 9/11/2018 2:22:01 PM
 
Page 120 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.22 Revision History
 
Date of Revision
 
Description of Revision
 
06/15/2015
 
IP 71111.22, "Surveillance Testing," has been revised to incorporate feedback associated with the 2014 ROP Enhancement Project.
 
2015 2016 2017 3 Year Total
 
FIN Green 1
1 0
2 NCV Green 13 12 13 38 NCVIV N/A 0
1 0
1 Total 14 14 13 41 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 121 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.22 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 9
0 2
5 0
7 0
7 2
0 0
0 0
Region 2 10 0
0 9
0 6
1 8
0 0
0 0
0 Region 3 10 0
1 7
0 5
0 4
6 0
0 0
0 Region 4 11 0
2 7
0 9
0 9
2 0
0 0
0 1 Unit Sites
 
16 0
2 10 0
10 0
9 7
0 0
0 0
2 Unit Sites
 
22 0
3 16 0
15 1
17 3
0 0
0 0
3 Unit Sites
 
2 0
0 2
0 2
0 2
0 0
0 0
0 BWR 21 0
2 15 0
14 0
13 8
0 0
0 0
PWR 19 0
3 13 0
13 1
15 2
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
40 0
5 28 0
27 1
28 10 0
0 0
0 Percentage of All
 
Findings 100%
0%
13%
70%
0%
68%
3%
70%
25%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 122 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71111.22 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.6 2.1 1.3 2.0 Region 2 2.1 2.9 3.3 2.8 Region 3 2.3 3.4 2.5 2.8 Region 4 4.0 2.6 3.0 3.2 1 Unit Sites
 
1.5 2.8 3.1 2.5 2 Unit Sites
 
3.8 2.7 2.0 2.8 3 Unit Sites
 
0.0 4.1 3.3 2.6 BWR 3.0 4.2 2.9 3.4 PWR 2.5 1.8 2.3 2.2 Total All Regions
 
2.7 2.8 2.5 2.7 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.0 2.1 0.7 1.6 Region 2 1.4 2.2 2.0 1.9 Region 3 0.8 2.8 0.8 1.5 Region 4 4.0 2.6 1.5 2.6 1 Unit Sites
 
1.0 2.3 1.3 1.5 2 Unit Sites
 
2.7 2.3 1.0 2.0 3 Unit Sites
 
0.0 4.1 3.3 2.6 BWR 2.0 3.3 1.5 2.3 PWR 1.9 1.8 1.1 1.6 Total All Regions
 
1.9 2.4 1.3 1.9 71111.22 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 123 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1526 349 20.5 4.4 1412 326 19.2 4.3 1532 325 19.1 4.7 Region 2 1414 354 19.7 4.0 1358 341 18.9 4.0 1497 334 18.6 4.5 Region 3 1278 290 18.1 4.4 1454 286 17.9 5.1 1207 268 16.8 4.5 Region 4 998 236 18.2 4.2 1157 211 16.2 5.5 1332 220 16.9 6.1 1 Unit Sites
 
1257 302 18.9 4.2 1323 300 18.8 4.4 1489 278 17.4 5.4 2 Unit Sites
 
3278 773 19.8 4.2 3433 706 18.1 4.9 3438 720 18.5 4.8 3 Unit Sites
 
681 154 19.3 4.4 625 158 19.8 4.0 641 149 18.6 4.3 BWR 1981 462 19.3 4.3 2133 460 19.2 4.6 2036 427 17.8 4.8 PWR 3235 767 20.2 4.2 3248 704 18.5 4.6 3532 720 18.9 4.9 Total All
 
Regions 5216 1229 20.1 4.2 5381 1164 19.1 4.6 5568 1147 18.8 4.9 9/11/2018 2:22:01 PM
 
Page 124 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 4470 1000 20.4 4.5 Region 2 4269 1029 19.8 4.1 Region 3 3939 844 18.3 4.7 Region 4 3487 667 18.0 5.2 1 Unit Sites
 
4069 880 19.1 4.6 2 Unit Sites
 
10149 2199 19.1 4.6 3 Unit Sites
 
1946 461 21.0 4.2 BWR 6150 1349 19.0 4.6 PWR 10015 2191 19.4 4.6 Total All
 
Regions 16165 3540 19.3 4.6 9/11/2018 2:22:01 PM
 
Page 125 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.01 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.01, "Exercise Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925
 
2017 3 Year Total
 
NCV Green 1
1 Total 1
1 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 126 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.01 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 1
0 1
0 0
1 0
0 0
1 0
0 0
1 Unit Sites
 
1 0
1 0
0 1
0 0
0 1
0 0
0 2 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 1
0 1
0 0
1 0
0 0
1 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
1 0
1 0
0 1
0 0
0 1
0 0
0 Percentage of All
 
Findings 100%
0%
100%
0%
0%
100%
0%
0%
0%
100%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 127 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.01 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 4.0 4.0 1 Unit Sites
 
0.0 0.0 1.1 0.6 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.7 0.3 Total All Regions
 
0.0 0.0 0.5 0.2 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 4.0 4.0 1 Unit Sites
 
0.0 0.0 1.1 0.6 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.7 0.3 Total All Regions
 
0.0 0.0 0.5 0.2 71114.01 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 128 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 227 2
0.5 113.5 526 9
0.9 58.4 326 7
0.9 46.5 Region 2 196 3
0.8 65.3 691 8
0.9 86.3 856 9
0.9 95.1 Region 3 201 2
0.7 100.4 631 8
0.9 78.8 626 7
0.9 89.5 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 251 6
1.5 41.8 1 Unit Sites
 
222 3
0.8 73.9 234 4
1.0 58.4 732 11 1.1 66.6 2 Unit Sites
 
299 3
0.6 99.6 1353 23 1.2 58.8 1149 15 1.0 76.6 3 Unit Sites
 
103 1
0.5 103.3 261 4
0.8 65.3 178 3
0.8 59.3 BWR 221 3
0.8 73.5 756 13 1.2 58.1 603 10 1.0 60.3 PWR 403 4
0.7 100.8 1092 18 1.1 60.6 1456 19 1.1 76.6 Total All
 
Regions 624 7
0.8 89.1 1847 31 1.2 59.6 2059 29 1.1 71.0 9/11/2018 2:22:01 PM
 
Page 129 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1079 18 0.9 59.9 Region 2 1742 20 1.0 87.1 Region 3 1458 17 0.9 85.8 Region 4 251 12 3.0 20.9 1 Unit Sites
 
1188 18 1.1 66.0 2 Unit Sites
 
2800 41 1.1 68.3 3 Unit Sites
 
542 8
0.9 67.8 BWR 1579 26 1.1 60.7 PWR 2951 41 1.1 72.0 Total All
 
Regions 4530 67 1.1 67.6 9/11/2018 2:22:01 PM
 
Page 130 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.02 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.02, "Alert and Notification System Testing," has been revised to address technical, guidance and editorial changes. Closed feedback form71114-
 
1925.
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 131 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.02 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 2 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 0
0 0
0 0
0 0
0 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
0 0
0 0
0 0
0 0
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 132 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.02 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions
 
0.0 0.0 0.0 0.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions
 
0.0 0.0 0.0 0.0 71114.02 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 133 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 12 9
4.5 1.3 0
0 0.0 0.0 20 9
1.8 2.2 Region 2 70 8
1.1 8.7 61 9
1.0 6.7 71 8
0.9 8.8 Region 3 8
8 4.0 1.0 44 11 1.4 4.0 37 8
1.1 4.6 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 18 7
1.2 2.5 1 Unit Sites
 
0 0
0.0 0.0 27 12 2.0 2.3 13 4
1.0 3.3 2 Unit Sites
 
82 23 2.9 3.6 60 16 1.8 3.7 112 24 1.3 4.7 3 Unit Sites
 
8 4
2.0 2.0 18 4
1.3 4.4 20 4
1.0 5.0 BWR 8
13 6.5 0.6 26 10 2.0 2.6 52 14 1.3 3.7 PWR 82 18 2.3 4.5 78 22 1.8 3.6 93 18 1.3 5.2 Total All
 
Regions 90 31 3.4 2.9 105 32 2.0 3.3 145 32 1.3 4.5 9/11/2018 2:22:01 PM
 
Page 134 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 32 25 4.2 1.3 Region 2 201 25 1.1 8.0 Region 3 89 27 1.8 3.3 Region 4 18 18 3.0 1.0 1 Unit Sites
 
40 20 2.2 2.0 2 Unit Sites
 
254 63 1.9 4.0 3 Unit Sites
 
46 12 1.7 3.8 BWR 86 37 2.2 2.3 PWR 253 58 1.8 4.4 Total All
 
Regions 339 95 1.9 3.6 9/11/2018 2:22:01 PM
 
Page 135 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.03 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.03, "Emergency Preparedness Organization Staffing and Augmentation System," has been revised to address editorial changes. Closed feedback
 
form 71114-1925
 
2015 2016 3 Year Total
 
NCV Green 1
2 3
Total 1
2 3
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 136 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.03 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
1 0
0 0
1 0
0 0
Region 2 1
0 1
0 0
1 0
0 0
1 0
0 0
Region 3 1
0 0
1 0
0 0
0 0
1 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
1 0
0 1
0 1
0 0
0 1
0 0
0 2 Unit Sites
 
2 0
1 1
0 1
0 0
0 2
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 3
0 1
2 0
2 0
0 0
3 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
3 0
1 2
0 2
0 0
0 3
0 0
0 Percentage of All
 
Findings 100%
0%
33%
67%
0%
67%
0%
0%
0%
100%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 137 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.03 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 25.0 Region 2 0.0 10.7 0.0 3.9 Region 3 100.0 0.0 0.0 7.9 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 17.2 0.0 8.9 2 Unit Sites
 
11.6 10.9 0.0 6.6 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 10.6 16.5 0.0 9.0 Total All Regions
 
9.6 12.6 0.0 6.8 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 25.0 Region 2 0.0 10.7 0.0 3.9 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 17.2 0.0 8.9 2 Unit Sites
 
0.0 10.9 0.0 3.3 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 16.5 0.0 6.0 Total All Regions
 
0.0 12.6 0.0 4.5 71114.03 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 138 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 12 9
4.5 1.3 0
0 0.0 0.0 28 9
1.8 3.1 Region 2 82 8
1.0 10.3 94 8
0.9 11.7 83 8
0.9 10.4 Region 3 10 8
4.0 1.3 65 11 1.4 5.9 51 8
1.1 6.4 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 19 7
1.2 2.7 1 Unit Sites
 
0 0
0.0 0.0 43 12 2.0 3.6 17 4
1.0 4.3 2 Unit Sites
 
96 23 2.6 4.2 92 15 1.7 6.1 132 24 1.3 5.5 3 Unit Sites
 
8 4
2.0 2.0 24 4
1.3 6.0 32 4
1.0 8.0 BWR 10 13 6.5 0.8 38 10 2.0 3.8 65 14 1.3 4.6 PWR 94 18 2.0 5.2 121 21 1.8 5.8 116 18 1.3 6.5 Total All
 
Regions 104 31 3.1 3.4 159 31 1.9 5.1 181 32 1.3 5.6 9/11/2018 2:22:01 PM
 
Page 139 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 40 25 4.2 1.6 Region 2 259 24 1.0 10.8 Region 3 126 27 1.8 4.7 Region 4 19 18 3.0 1.0 1 Unit Sites
 
61 20 2.2 3.0 2 Unit Sites
 
319 62 1.8 5.1 3 Unit Sites
 
64 12 1.7 5.3 BWR 112 37 2.2 3.0 PWR 332 57 1.7 5.8 Total All
 
Regions 444 94 1.9 4.7 9/11/2018 2:22:01 PM
 
Page 140 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.04 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.04, "Emergency Action Level and Emergency Plan Changes," has been revised to address editorial changes. Closed feedback form 71114-1925.
 
2015 2016 3 Year Total
 
NCV Green 2
2 4
NCVIV Green
 
1 0
1 NCVIV N/A 1
0 1
VIO White 0
1 1
Total 4
3 7
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 141 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.04 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 2
1 0
2 0
1 0
0 0
2 0
0 0
Region 2 2
0 0
1 0
2 0
0 0
2 0
0 0
Region 3 1
0 0
0 0
1 0
0 0
1 0
0 0
Region 4 1
0 0
1 0
1 0
0 0
1 0
0 0
1 Unit Sites
 
3 1
0 3
0 2
0 0
0 3
0 0
0 2 Unit Sites
 
3 0
0 1
0 3
0 0
0 3
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 1
0 0
1 0
1 0
0 0
1 0
0 0
PWR 5
1 0
3 0
4 0
0 0
5 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
6 1
0 4
0 5
0 0
0 6
0 0
0 Percentage of All
 
Findings 100%
17%
0%
67%
0%
83%
0%
0%
0%
100%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 142 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.04 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 10.1 5.2 0.0 5.3 Region 2 3.8 4.2 0.0 2.7 Region 3 9.0 0.0 0.0 3.4 Region 4 0.0 0.0 0.0 32.5 1 Unit Sites
 
4.6 9.9 0.0 5.1 2 Unit Sites
 
8.8 2.6 0.0 3.8 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 5.2 4.3 0.0 3.2 PWR 7.7 5.1 0.0 4.5 Total All Regions
 
6.9 4.8 0.0 4.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 5.2 0.0 2.7 Region 2 3.8 4.2 0.0 2.7 Region 3 4.5 0.0 0.0 1.7 Region 4 0.0 0.0 0.0 32.5 1 Unit Sites
 
0.0 9.9 0.0 3.4 2 Unit Sites
 
5.9 2.6 0.0 2.8 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 4.3 0.0 1.6 PWR 5.1 5.1 0.0 3.6 Total All Regions
 
3.4 4.8 0.0 2.9 71114.04 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 143 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 100 22 1.3 4.5 194 17 1.0 11.4 81 15 1.3 5.4 Region 2 260 17 1.0 15.3 236 17 1.0 13.9 243 17 0.9 14.3 Region 3 223 15 1.0 14.8 194 20 1.3 9.7 173 14 0.9 12.3 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 31 25 3.6 1.2 1 Unit Sites
 
183 34 2.8 5.4 140 20 1.8 7.0 124 26 2.0 4.8 2 Unit Sites
 
357 74 2.5 4.8 372 57 1.8 6.5 339 34 1.1 10.0 3 Unit Sites
 
42 12 1.7 3.5 112 9
1.3 12.4 64 11 1.6 5.8 BWR 191 40 2.2 4.8 231 27 1.4 8.5 202 25 1.3 8.1 PWR 391 80 2.7 4.9 393 59 2.0 6.7 325 46 1.4 7.1 Total All
 
Regions 582 120 2.6 4.8 624 86 1.8 7.3 527 71 1.4 7.4 9/11/2018 2:22:01 PM
 
Page 144 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 374 54 1.2 6.9 Region 2 739 51 1.0 14.5 Region 3 589 49 1.1 12.0 Region 4 31 123 17.6 0.3 1 Unit Sites
 
447 80 2.4 5.6 2 Unit Sites
 
1068 165 1.8 6.5 3 Unit Sites
 
218 32 1.7 6.8 BWR 624 92 1.7 6.8 PWR 1109 185 2.1 6.0 Total All
 
Regions 1733 277 1.9 6.3 9/11/2018 2:22:01 PM
 
Page 145 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.05 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.05, "Maintenance of Emergency Preparedness," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
 
2015 2016 2017 3 Year Total
 
NCV Green 3
4 3
10 Total 3
4 3
10 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 146 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.05 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 3
0 0
3 0
3 0
0 0
3 0
0 0
Region 3 2
0 0
2 0
1 0
0 0
2 0
0 0
Region 4 5
0 2
3 0
5 0
0 0
5 0
0 0
1 Unit Sites
 
5 0
2 3
0 5
0 0
0 5
0 0
0 2 Unit Sites
 
3 0
0 3
0 2
0 0
0 3
0 0
0 3 Unit Sites
 
2 0
0 2
0 2
0 0
0 2
0 0
0 BWR 5
0 2
3 0
5 0
0 0
5 0
0 0
PWR 5
0 0
5 0
4 0
0 0
5 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
10 0
2 8
0 9
0 0
0 10 0
0 0
Percentage of All
 
Findings 100%
0%
20%
80%
0%
90%
0%
0%
0%
100%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 147 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.05 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 10.3 6.7 10.5 8.8 Region 3 71.4 0.0 10.6 10.2 Region 4 0.0 0.0 15.0 59.9 1 Unit Sites
 
142.9 10.6 11.2 20.2 2 Unit Sites
 
0.0 7.7 10.3 7.0 3 Unit Sites
 
95.2 76.9 0.0 53.3 BWR 142.9 20.2 7.7 20.6 PWR 8.7 10.6 11.9 10.6 Total All Regions
 
23.2 12.6 10.1 13.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 10.3 6.7 10.5 8.8 Region 3 71.4 0.0 0.0 5.1 Region 4 0.0 0.0 15.0 59.9 1 Unit Sites
 
142.9 10.6 11.2 20.2 2 Unit Sites
 
0.0 7.7 5.1 4.7 3 Unit Sites
 
95.2 76.9 0.0 53.3 BWR 142.9 20.2 7.7 20.6 PWR 8.7 10.6 6.0 8.5 Total All Regions
 
23.2 12.6 6.7 12.0 71114.05 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 148 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 18 10 5.0 1.8 0
0 0.0 0.0 42 9
1.8 4.7 Region 2 98 8
1.0 12.2 150 9
1.0 16.6 95 8
0.9 11.9 Region 3 14 8
4.0 1.8 88 11 1.4 8.0 94 8
1.1 11.8 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 67 6
1.0 11.1 1 Unit Sites
 
0 0
0.0 0.0 77 12 2.0 6.4 41 4
1.0 10.3 2 Unit Sites
 
119 23 2.6 5.2 129 17 1.9 7.6 216 23 1.3 9.4 3 Unit Sites
 
11 4
2.0 2.6 32 4
1.3 8.0 41 4
1.0 10.3 BWR 14 13 6.5 1.1 50 10 2.0 5.0 130 14 1.3 9.3 PWR 116 19 2.1 6.1 188 23 1.9 8.2 168 17 1.2 9.9 Total All
 
Regions 130 32 3.2 4.0 238 33 2.1 7.2 298 31 1.3 9.6 9/11/2018 2:22:01 PM
 
Page 149 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 60 26 4.3 2.3 Region 2 342 25 1.0 13.7 Region 3 196 27 1.8 7.3 Region 4 67 18 3.0 3.7 1 Unit Sites
 
118 21 2.3 5.6 2 Unit Sites
 
464 63 1.9 7.4 3 Unit Sites
 
84 12 1.7 7.0 BWR 194 37 2.2 5.2 PWR 471 59 1.7 8.0 Total All
 
Regions 665 96 1.9 6.9 9/11/2018 2:22:01 PM
 
Page 150 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.06 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.06, "Drill Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
 
2015 2016 2017 3 Year Total
 
NCV Green 1
3 1
5 NCVIV N/A 0
0 1
1 Total 1
3 2
6 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 151 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.06 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 4
0 3
1 0
4 0
0 0
4 0
0 0
Region 2 1
0 1
0 0
1 0
0 0
1 0
0 0
Region 3 1
0 0
1 0
1 0
0 0
1 0
0 0
Region 4 1
0 0
0 0
1 0
0 0
0 0
0 0
1 Unit Sites
 
3 0
0 2
0 3
0 0
0 2
0 0
0 2 Unit Sites
 
3 0
3 0
0 3
0 0
0 3
0 0
0 3 Unit Sites
 
1 0
1 0
0 1
0 0
0 1
0 0
0 BWR 3
0 2
1 0
3 0
0 0
3 0
0 0
PWR 4
0 2
1 0
4 0
0 0
3 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
7 0
4 2
0 7
0 0
0 6
0 0
0 Percentage of All
 
Findings 100%
0%
57%
29%
0%
100%
0%
0%
0%
86%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 152 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.06 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 8.0 3.7 4.6 5.4 Region 2 0.0 3.0 0.0 1.0 Region 3 3.6 3.2 0.0 2.2 Region 4 0.0 0.0 4.1 1.4 1 Unit Sites
 
2.2 1.9 4.3 2.8 2 Unit Sites
 
3.6 1.7 0.0 1.7 3 Unit Sites
 
0.0 21.5 0.0 6.4 BWR 4.9 6.6 0.0 3.9 PWR 1.5 0.0 2.7 1.4 Total All Regions
 
2.8 2.6 1.8 2.4 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 8.0 3.7 4.6 5.4 Region 2 0.0 3.0 0.0 1.0 Region 3 3.6 3.2 0.0 2.2 Region 4 0.0 0.0 4.1 1.4 1 Unit Sites
 
2.2 1.9 4.3 2.8 2 Unit Sites
 
3.6 1.7 0.0 1.7 3 Unit Sites
 
0.0 21.5 0.0 6.4 BWR 4.9 6.6 0.0 3.9 PWR 1.5 0.0 2.7 1.4 Total All Regions
 
2.8 2.6 1.8 2.4 71114.06 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 153 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 250 49 2.9 5.1 269 49 2.9 5.5 220 49 2.9 4.5 Region 2 314 56 3.1 5.6 338 54 3.0 6.3 355 58 3.2 6.1 Region 3 277 45 2.8 6.2 311 47 2.9 6.6 325 47 2.9 6.9 Region 4 228 37 2.8 6.2 243 36 2.8 6.7 242 40 3.1 6.0 1 Unit Sites
 
303 46 2.9 6.6 319 47 2.9 6.8 296 46 2.9 6.4 2 Unit Sites
 
661 120 3.1 5.5 725 117 3.0 6.2 721 121 3.1 6.0 3 Unit Sites
 
105 21 2.6 5.0 117 22 2.8 5.3 125 27 3.4 4.6 BWR 409 70 2.9 5.8 458 72 3.0 6.4 409 79 3.3 5.2 PWR 660 117 3.1 5.6 702 114 3.0 6.2 733 115 3.0 6.4 Total All
 
Regions 1068 187 3.1 5.7 1160 186 3.0 6.2 1142 194 3.2 5.9 9/11/2018 2:22:01 PM
 
Page 154 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 739 147 3.0 5.0 Region 2 1007 168 3.2 6.0 Region 3 913 139 3.0 6.6 Region 4 712 113 3.1 6.3 1 Unit Sites
 
917 139 3.0 6.6 2 Unit Sites
 
2107 358 3.1 5.9 3 Unit Sites
 
346 70 3.2 4.9 BWR 1276 221 3.1 5.8 PWR 2094 346 3.1 6.1 Total All
 
Regions 3370 567 3.1 5.9 9/11/2018 2:22:01 PM
 
Page 155 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.07 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.07, "Exercise Evaluation - Hostile Action (HA) Event," has been revised to address guidance and editorial changes. Closed feedback form 71114-
 
1925.
2015 3 Year Total
 
NCV Green 1
1 Total 1
1 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 156 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.07 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 1
0 1
0 0
1 0
0 0
1 0
0 0
1 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 2 Unit Sites
 
1 0
1 0
0 1
0 0
0 1
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 1
0 1
0 0
1 0
0 0
1 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
1 0
1 0
0 1
0 0
0 1
0 0
0 Percentage of All
 
Findings 100%
0%
100%
0%
0%
100%
0%
0%
0%
100%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 157 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.07 Findings /
 
1000 hrs (2015) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 Region 2 0.0 0.0 Region 3 0.0 0.0 Region 4 0.0 0.0 1 Unit Sites
 
0.0 0.0 2 Unit Sites
 
1.6 1.6 3 Unit Sites
 
0.0 0.0 BWR 0.0 0.0 PWR 1.3 1.3 Total All Regions
 
0.8 0.8 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 Region 2 0.0 0.0 Region 3 0.0 0.0 Region 4 0.0 0.0 1 Unit Sites
 
0.0 0.0 2 Unit Sites
 
1.6 1.6 3 Unit Sites
 
0.0 0.0 BWR 0.0 0.0 PWR 1.3 1.3 Total All Regions
 
0.8 0.8 71114.07 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 158 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 237 5
1.0 47.4 0
0 0.0 0.0 0
0 0.0 0.0 Region 2 485 6
0.9 80.8 0
0 0.0 0.0 0
0 0.0 0.0 Region 3 477 5
0.8 95.3 0
0 0.0 0.0 0
0 0.0 0.0 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 0
0 0.0 0.0 1 Unit Sites
 
398 8
1.3 49.7 0
0 0.0 0.0 0
0 0.0 0.0 2 Unit Sites
 
705 12 1.2 58.8 0
0 0.0 0.0 0
0 0.0 0.0 3 Unit Sites
 
96 2
1.0 48.0 0
0 0.0 0.0 0
0 0.0 0.0 BWR 437 7
1.0 62.4 0
0 0.0 0.0 0
0 0.0 0.0 PWR 762 15 1.5 50.8 0
0 0.0 0.0 0
0 0.0 0.0 Total All
 
Regions 1199 22 1.4 54.5 0
0 0.0 0.0 0
0 0.0 0.0 9/11/2018 2:22:01 PM
 
Page 159 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 237 5
1.0 47.4 Region 2 485 6
0.9 80.8 Region 3 477 5
0.8 95.3 Region 4 0
0 0.0 0.0 1 Unit Sites
 
398 8
1.3 49.7 2 Unit Sites
 
705 12 1.2 58.8 3 Unit Sites
 
96 2
1.0 48.0 BWR 437 7
0.9 62.4 PWR 762 15 1.4 50.8 Total All
 
Regions 1199 22 1.2 54.5 9/11/2018 2:22:01 PM
 
Page 160 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.08 Revision History
 
Date of Revision
 
Description of Revision
 
07/21/2016
 
IP 71114.08, "Exercise Evaluation - Scenario Review," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
 
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 161 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.08 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 2 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 0
0 0
0 0
0 0
0 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
0 0
0 0
0 0
0 0
0 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 162 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71114.08 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions
 
0.0 0.0 0.0 0.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions
 
0.0 0.0 0.0 0.0 71114.08 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 163 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 32 7
1.2 4.6 55 9
1.1 6.1 34 7
1.8 4.9 Region 2 63 9
1.0 7.0 102 8
0.9 12.7 97 9
1.1 10.8 Region 3 54 7
1.0 7.7 44 8
1.1 5.4 36 7
1.0 5.1 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 40 6
1.5 6.6 1 Unit Sites
 
39 11 1.4 3.5 15 4
1.3 3.6 66 11 1.2 6.0 2 Unit Sites
 
94 15 1.4 6.2 148 23 1.4 6.4 106 15 1.5 7.1 3 Unit Sites
 
16 3
1.0 5.4 38 4
0.8 9.5 35 3
1.0 11.7 BWR 53 10 1.1 5.3 64 13 1.3 4.9 72 10 1.3 7.2 PWR 96 19 1.6 5.0 137 18 1.4 7.6 135 19 1.5 7.1 Total All
 
Regions 149 29 1.5 5.1 200 31 1.4 6.5 207 29 1.5 7.1 9/11/2018 2:22:01 PM
 
Page 164 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 121 23 1.4 5.3 Region 2 262 26 1.1 10.1 Region 3 133 22 1.2 6.1 Region 4 40 18 4.5 2.2 1 Unit Sites
 
119 26 1.4 4.6 2 Unit Sites
 
347 53 1.5 6.6 3 Unit Sites
 
89 10 1.1 8.9 BWR 188 33 1.3 5.7 PWR 367 56 1.5 6.6 Total All
 
Regions 556 89 1.4 6.2 9/11/2018 2:22:01 PM
 
Page 165 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.01 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.01,
 
Radiological Hazard Assessment and Exposure Controls,
 
has been revised as a major editorial revision.
 
02/19/2016
 
IP 71124.01, "Radiological Hazard Assessment and Exposure Controls," has been revised based on the 2013 ROP Enhancement project. The revision
 
clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted. 


U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.01, Radiological Hazard Assessment and Exposure Controls, has been revised as a major editorial revision.
02/19/2016            IP 71124.01, "Radiological Hazard Assessment and Exposure Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.
Incorporated feedback forms 71124.01-1636 and 71124.01-2132<br><br>
Incorporated feedback forms 71124.01-1636 and 71124.01-2132<br><br>
Summary of PIM Findings 2015              2016          2017      3 Year Total NCV Green                                      11              15              7                33 Total                                          11              15              7                33 9/11/2018 2:22:01 PM                                                                                                                                            Page 166 of 276


2015 2016 2017 3 Year Total
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
 
                            > SL-IV                                                                                Safety      Safety Region 1                  10        0    1    9    0          4          0            0          0          0            10          0          0 Region 2                  11        0    0  10    0          8          0            0          0          0            11          0          0 Region 3                  6        0    1    5    0          1          0            0          0          0              6          0          0 Region 4                  6        0    1    5    0          3         0            0          0          0              6          0          0 1 Unit Sites              8        0    0    8    0          3          0            0          0          0              8          0          0 2 Unit Sites              20        0    3  16    0          9          0            0          0          0            20          0          0 3 Unit Sites              5        0    0    5    0          4          0            0          0          0              5          0          0 BWR                      21        0    2  19    0          13          0            0          0          0            21          0          0 PWR                      12        0    1  10    0          3          0            0          0          0            12          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        33       0    3  29    0          16          0            0          0          0            33           0          0 Percentage of All    100%        0%  9%  88%    0%        48%          0%          0%          0%          0%        100%          0%        0%
NCV Green 11 15 7
Findings 9/11/2018 2:22:01 PM                                                                                                                   Page 167 of 276
33 Total 11 15 7
33 Summary of PIM Findings
 
9/11/2018 2:22:01 PM


Page 166 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  8.2      10.3        1.7          6.5        Region 1                  5.5        1.8        0.0          2.0 Region 2                  6.5        6.3        4.6          5.8        Region 2                  3.3        4.7        4.6          4.2 Region 3                  4.5        5.5        1.8          3.9        Region 3                  2.3        0.0        0.0          0.6 Region 4                  4.7        5.3        4.7          4.9        Region 4                  4.7        0.0        2.3          2.4 1 Unit Sites              1.3        5.0        3.7          3.4        1 Unit Sites              1.3        1.3        1.2          1.3 2 Unit Sites              10.5        6.4        1.6          5.7        2 Unit Sites              6.3        0.8        0.8          2.3 3 Unit Sites              0.0      35.3      16.0          15.5        3 Unit Sites              0.0        23.5        16.0        12.4 BWR                      13.4      10.3        5.9          9.4        BWR                      10.0        4.0        3.5          5.4 PWR                        2.4        5.1        1.5          3.0        PWR                        0.8        0.7        0.7          0.8 Total All Regions          6.0        7.0        3.2          5.3        Total All Regions          3.8        1.9        1.8          2.4 71124.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 168 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            364      16          1.0        22.8    567        115          6.8        4.9      584      115        6.8          5.1 Region 2            612      17          0.9        36.0    636        121          6.7        5.3      646      120        6.7          5.4 Region 3            441      15          0.9        29.4    543        105          6.6        5.2      558      105        6.6          5.3 Region 4            425      12          0.9        35.4    378          84          7.0        4.5      428        84        6.5          5.1 1 Unit Sites        492      15          0.9        32.8    486        106          6.6        4.6      502      107        6.7          4.7 2 Unit Sites      1127      38          1.0        29.7    1409        270          7.1        5.2    1411      268        6.9          5.3 3 Unit Sites        223        7          1.0        31.8    229          49          6.1        4.7      303        49        6.1          6.2 BWR                599      23          1.0        26.0    757        168          7.3        4.5      852      162        6.8          5.3 PWR                1243      37          1.0        33.6    1367        257          6.8        5.3    1364      262        6.9          5.2 Total All          1841      60          1.0        30.7    2123        425          7.1        5.0    2216      424        7.0          5.2 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 169 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1515    246        5.1        6.2 Region 2          1894    258        5.0        7.3 Region 3          1541    225        4.9        6.9 Region 4          1230    180        5.0        6.8 1 Unit Sites      1479    228        5.0        6.5 2 Unit Sites      3946    576        5.1        6.9 3 Unit Sites        755    105        5.0        7.2 BWR                2207    353        5.1        6.3 PWR                3973    556        4.9        7.1 Total All          6180    909        5.0        6.8 Regions 9/11/2018 2:22:01 PM                                                                      Page 170 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.02, Occupational ALARA Planning and Controls, has been revised as a major editorial revision.
03/02/2016            IP 71124.02, "Occupational ALARA Planning and Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted. Incorporated feedback forms 71124.02-1762 Summary of PIM Findings 2015            2016            2017      3 Year Total FIN Green                                    1              1                1                3 NCV Green                                    0              1                0                1 Total                                        1              2                1                4 9/11/2018 2:22:01 PM                                                                                                                                          Page 171 of 276


71124.01 All Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 PIM Findings Breakdown All   > Green PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                   Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
> Green or
                            > SL-IV                                                                                 Safety      Safety Region 1                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 4                  2        0    1    1    0          2          0            0          0          0              2          0          0 1 Unit Sites              3        0    1    2    0          2          0            0          0          0              3          0          0 2 Unit Sites              1        0    0    1    0          0          0            0          0          0              1          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    1    2    0          2          0            0          0          0              3          0          0 PWR                      1        0    0    1    0          0          0            0          0          0              1          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        4        0    1    3    0          2          0            0          0          0              4          0          0 Percentage of All    100%        0% 25%  75%    0%        50%          0%          0%          0%          0%        100%          0%        0%
> SL-IV PIR HP SCWE Inspector
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 172 of 276


Identified
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        3.2        0.0          1.1        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        2.5          0.9        Region 3                  0.0        0.0        0.0          0.0 Region 4                  3.5        2.8        0.0          2.2        Region 4                  3.5        2.8        0.0          2.2 1 Unit Sites              2.5        2.1        1.6          2.0        1 Unit Sites              2.5        2.1        0.0          1.3 2 Unit Sites              0.0        1.1        0.0          0.4        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        2.5        2.2        1.4          1.9        BWR                        2.5        2.2        0.0          1.3 PWR                        0.0        1.1        0.0          0.4        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.8        1.5        0.7          1.0        Total All Regions          0.8        0.7        0.0          0.5 71124.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 173 of 276


Initiating
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            230      11          0.8        20.9    308          42          2.8        7.3    387        61        3.8          6.3 Region 2            367        9          0.9        40.7    340          40          4.4        8.5    408        45        4.5          9.1 Region 3            319      14          0.9        22.8    374          32          2.9        11.7    404        47        3.4          8.6 Region 4            284      12          1.0        23.6    352          30          2.3        11.7    266        38        3.8          7.0 1 Unit Sites        285      12          0.9        23.8    278          26          2.6        10.7    375        53        3.8          7.1 2 Unit Sites        723      27          0.9        26.8    929        101          3.3        9.2    864      113        4.2          7.6 3 Unit Sites        191        7          1.0        27.3    167          17          2.8        9.8    225        25        3.1          9.0 BWR                400      19          1.0        21.1    448          48          2.8        9.3    703        82        3.7          8.6 PWR                798      27          0.9        29.6    926          96          3.3        9.6    761      109        4.2          7.0 Total All          1199      46          1.0        26.1    1374        144          3.2        9.5    1464      191        4.1          7.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 174 of 276


Events Mitigating
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            924    114        2.7        8.1 Region 2          1114      94        3.5        11.9 Region 3          1097      93        2.4        11.8 Region 4            901      80        2.4        11.3 1 Unit Sites        938      91        2.6        10.3 2 Unit Sites      2516    241        2.8        10.4 3 Unit Sites        583      49        2.6        11.9 BWR                1551    149        2.6        10.4 PWR                2485    232        2.8        10.7 Total All          4036    381        2.7        10.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 175 of 276


Systems Barrier Integrity Emergency
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.03, In-Plant Airborne Radioactivity Control and Mitigation, has been revised as a major editorial revision.
02/24/2016            IP 71124.03, "In-Plant Airborne Radioactivity Control and Mitigation," has been revised in response to the 2013 ROP Enhancement project. The revisions clarify the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how the samples are counted.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                      4                4                1                  9 Total                                          4                4                1                  9 9/11/2018 2:22:01 PM                                                                                                                                            Page 176 of 276


Preparedness
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  7        0    1    5    0          5          0            0          0          0              7          0          0 Region 4                  2        0    0    2    0          2          0            0          0          0              2          0          0 1 Unit Sites              4        0    1    2    0          3          0            0          0          0              4          0          0 2 Unit Sites              3        0    0    3    0          2          0            0          0          0              3          0          0 3 Unit Sites              2        0    0    2    0          2          0            0          0          0              2          0          0 BWR                      6        0    1    4    0          5          0            0          0          0              6          0          0 PWR                      3        0    0    3    0          2          0            0          0          0              3          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    1    7    0          7          0            0          0          0              9          0          0 Percentage of All    100%        0% 11%  78%    0%        78%          0%          0%          0%          0%        100%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 177 of 276


Occupational
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  31.4      14.4      18.3          21.3        Region 3                  15.7        14.4        18.3        16.0 Region 4                  0.0      10.2        0.0          3.0        Region 4                  0.0        10.2        0.0          3.0 1 Unit Sites              16.0        0.0        9.3          8.0        1 Unit Sites              10.6        0.0        9.3          6.4 2 Unit Sites              3.4        6.1        0.0          3.2        2 Unit Sites              0.0        6.1        0.0          2.1 3 Unit Sites              0.0      62.5        0.0          11.4        3 Unit Sites              0.0        62.5        0.0        11.4 BWR                      16.4      12.1        7.3          11.2        BWR                      11.0        12.1        7.3          9.6 PWR                        3.1        2.5        0.0          1.9        PWR                        0.0        2.5        0.0          1.0 Total All Regions          7.9        5.3        3.4          5.4        Total All Regions          3.9        5.3        3.4          4.2 71124.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 178 of 276


Radiation
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            125      13          1.0        9.6    205          34          2.4        6.0      154        30          2.1          5.1 Region 2            167        9          0.9        18.5    128          32          3.6        4.0      180        36          3.6          5.0 Region 3            128        9          1.1        14.2    139          32          2.7        4.4      109        29          3.2          3.8 Region 4            91        5          1.0        18.2      98        20          3.3        4.9      144        28          3.5          5.1 1 Unit Sites        139        9          1.0        15.4    129          25          2.5        5.2      162        35          3.2          4.6 2 Unit Sites        306      21          1.0        14.5    362          78          3.1        4.6      353        74          3.1          4.8 3 Unit Sites        66        6          1.2        10.9      79        15          3.0        5.2        71      14          2.8          5.1 BWR                183      18          1.1        10.1    166          36          2.4        4.6      275        56          2.9          4.9 PWR                327      18          1.0        18.2    404          82          3.4        4.9      312        67          3.4          4.7 Total All          510      36          1.1        14.2    570        118          3.1        4.8      586      123          3.2          4.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 179 of 276


Safety Public Radiation
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            483      77        2.0        6.3 Region 2            474      77        2.9        6.2 Region 3            376      70        2.6        5.4 Region 4            333      53        3.1        6.3 1 Unit Sites        430      69        2.5        6.2 2 Unit Sites      1021    173        2.5        5.9 3 Unit Sites        215      35        2.7        6.2 BWR                623    110        2.2        5.7 PWR                1043    167        2.7        6.2 Total All          1665    277        2.5        6.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 180 of 276


Safety Security Region 1 10 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.04, Occupational Dose Assessment, has been revised as a major editorial revision.
1 9
02/19/2016            IP 71124.04, "Occupational Dose Assessment," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.<br><br>
0 4
Summary of PIM Findings 2015            2016      3 Year Total NCV Green                                  1               1               2 NCVIV N/A                                  1               0               1 Total                                      2                1               3 9/11/2018 2:22:01 PM                                                                                                                                        Page 181 of 276
0 0
0 0
10 0
0 Region 2 11 0
0 10 0
8 0
0 0
0 11 0
0 Region 3 6
0 1
5 0
1 0
0 0
0 6
0 0
Region 4 6
0 1
5 0
3 0
0 0
0 6
0 0
1 Unit Sites


8 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
0 8
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0             0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0         0 Region 3                 2        0    0    1    0          2          0            0          0          0              2          0          0 Region 4                  1        0    0    1    0          0          0            0          0          0              1          0          0 1 Unit Sites              1        0    0    0    0          1          0           0           0           0             1          0         0 2 Unit Sites             1        0    0    1    0          1          0            0          0          0              1          0          0 3 Unit Sites              1        0    0    1    0          0          0            0          0          0              1          0          0 BWR                      1        0    0    0    0          1          0            0          0          0              1          0          0 PWR                      2        0    0    2    0          1          0            0          0          0              2          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    0    2    0          2          0            0          0          0              3          0          0 Percentage of All    100%        0%  0%  67%    0%        67%          0%          0%          0%          0%        100%          0%        0%
0 3
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 182 of 276
0 0
0 0
8 0
0 2 Unit Sites


20 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0         0.0 Region 3                  24.0        0.0        0.0          5.5        Region 3                 24.0        0.0        0.0          5.5 Region 4                  0.0        6.6        0.0           3.2        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              6.5        0.0        0.0          1.7        1 Unit Sites              6.5        0.0        0.0          1.7 2 Unit Sites              3.3        0.0        0.0          1.2        2 Unit Sites              3.3        0.0        0.0         1.2 3 Unit Sites              0.0       41.7        0.0           9.3        3 Unit Sites               0.0        0.0        0.0          0.0 BWR                        8.3        0.0        0.0          2.0        BWR                        8.3        0.0        0.0          2.0 PWR                        2.7        2.1        0.0          1.9        PWR                        2.7        0.0        0.0          1.0 Total All Regions          4.1        1.4        0.0          1.9        Total All Regions          4.1        0.0        0.0          1.3 71124.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 183 of 276
3 16 0
9 0
0 0
0 20 0
0 3 Unit Sites


5 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            149      14          1.0       10.6    209          62          4.4        3.4        52      31          3.9          1.7 Region 2            139        9          0.9        15.4    170          40          4.4        4.2      165        46          5.1          3.6 Region 3            84      10          1.1        8.4    163          39          3.3        4.2      116        37          4.6          3.1 Region 4           115        5          0.8        23.0     152          35          4.4        4.3        50      35        11.7          1.4 1 Unit Sites        118      11          1.1        10.7    152          39          3.9        3.9      131        38          4.2          3.5 2 Unit Sites        320      23          1.0       13.9    450        112          4.3        4.0     196      100          6.7          2.0 3 Unit Sites        49        4          1.0       12.2      92        25          4.2        3.7        55      11          3.7          5.0 BWR                121      17          1.1        7.1    207          63          3.9        3.3      185        59          4.5          3.1 PWR                365      21         1.0       17.4    487        113          4.5        4.3     198        90          6.9          2.2 Total All          486      38          1.1        12.8    694        176          4.4        3.9      382      149          6.0         2.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 184 of 276
0 5
0 4
0 0
0 0
5 0
0 BWR 21 0
2 19 0
13 0
0 0
0 21 0
0 PWR 12 0
1 10 0
3 0
0 0
0 12 0
0 Findings Associated


SIT/AIT 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            410    107        3.1        3.8 Region 2            473      95        3.7        5.0 Region 3            362      86        3.2        4.2 Region 4            317      75        5.0         4.2 1 Unit Sites        400      88        3.3        4.5 2 Unit Sites        966    235        3.7        4.1 3 Unit Sites        195      40        3.6        4.9 BWR                513    139        3.2        3.7 PWR                1049    224        3.8        4.7 Total All         1562    363        3.6        4.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 185 of 276
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions


33 0
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.05, Radiation Monitoring Instrumentation, has been revised as a major editorial revision.
3 29 0
04/01/2016            IP 71124.05, "Radiation Monitoring Instrumentation," has been revised in response to the 2013 ROP Enhancement Project. The revision changes how inspection samples are counted.
16 0
Summary of PIM Findings 2015              2017    3 Year Total NCV Green                                  4                  0               4 VIO Green                                  0                 1                1 Total                                      4                  1                5 9/11/2018 2:22:01 PM                                                                                                                                          Page 186 of 276
0 0
0 33 0
0 Percentage of All


Findings 100%
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
0%
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            0          0          0              1          1          0 Region 4                  3        0    2    1    0          3          0            0          0          0              1          2          0 1 Unit Sites              3        0    2    1    0          3          0            0          0          0              1          2          0 2 Unit Sites              2        0    0    1    0          2          0            0          0          0              1          1          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    2    1    0          3          0            0          0          0              1          2          0 PWR                      2        0    0    1    0          2          0            0          0          0              1          1          0 Findings                 0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    2    2    0          5          0            0          0          0              2          3          0 Percentage of All    100%       0% 40% 40%   0%     100%           0%         0%         0%           0%           40%       60%         0%
9%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 187 of 276
88%
0%
48%
0%
0%
0%
0%
100%
0%
0%
PIM Findings Breakdown


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  9.7      10.1        0.0          4.2        Region 3                  9.7        10.1        0.0          4.2 Region 4                  6.9        0.0        5.2          4.5        Region 4                  6.9        0.0        5.2          4.5 1 Unit Sites              6.5        0.0        2.1          3.2        1 Unit Sites              6.5        0.0        2.1          3.2 2 Unit Sites              2.5        1.8        0.0          1.3        2 Unit Sites              2.5        1.8        0.0          1.3 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.4        0.0        1.9          3.6        BWR                        8.4        0.0        1.9          3.6 PWR                        1.6        1.6        0.0          1.1        PWR                        1.6        1.6        0.0          1.1 Total All Regions          4.1        1.2        0.9          2.1        Total All Regions          4.1        1.2        0.9          2.1 71124.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                     Page 188 of 276


Page 167 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            152      11          1.1        13.8    304          30          2.5        10.1    242        23        2.3        10.5 Region 2            318        9          0.9        35.3    269          24          2.7        11.2    241        27        3.4          8.9 Region 3            205        9          1.0        22.8      99          9          2.3        11.0    402        36        2.8        11.2 Region 4            291        7          0.9        41.6    188          13          2.2        14.5    192        21        2.6          9.1 1 Unit Sites        270      10          0.9        27.0    141          12          2.4        11.7    359        33        2.8        10.9 2 Unit Sites        566      21          1.1        27.0    658          58          2.6        11.3    564        56        2.8        10.1 3 Unit Sites        131        5          1.0        26.1      61          6          2.0        10.2    154        18        3.0          8.6 BWR                358      16          1.1        22.4    221          23          2.6        9.6    520        48        2.7        10.8 PWR                608      20          1.0        30.4    639          53          2.7        12.0    557        59        3.1          9.4 Total All          966      36          1.1        26.8    860          76          2.7        11.3    1077      107        3.0        10.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 189 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            698      64        2.1        10.9 Region 2            827      60        2.4        13.8 Region 3            707      54        2.3        13.1 Region 4            671      41        2.1        16.4 1 Unit Sites        769      55        2.1        14.0 2 Unit Sites      1788    135        2.3        13.2 3 Unit Sites        346      29        2.4        11.9 BWR                1099      87        2.1        12.6 PWR                1803    132        2.3        13.7 Total All          2902    219        2.2        13.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 190 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.06, Radioactive Gaseous and Liquid Effluent Treatment, has been revised as a major editorial revision.
04/01/2016            IP 71124.06, "Radioactive Gaseous and Liquid Effluent Treatment," has been revised in response to the 2013 ROP Enhancement Project. The revision changed how inspection samples are counted, and moved the sections on ground water inspections from 71124.06 to 71124.07. It also incorporates effluent monitoring instrumentation from 71124.05 into 71124.06.
Summary of PIM Findings 2015              2016            2017    3 Year Total FIN Green                                  0                0                1                1 NCV Green                                  1                1                2                4 NOV White                                  0                0                1                1 Total                                      1                1                4                6 9/11/2018 2:22:01 PM                                                                                                                                          Page 191 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  5        1    0    4    0          5          0            0          0          1              1          3          0 Region 4                  1        0    1    0    0          1          0            0          0          0              0          1          0 1 Unit Sites              5        1    1    3    0          5          0            0          0          1              1          3          0 2 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          1          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        1    1    1    0          3          0            0          0          1              0          2          0 PWR                      3        0    0    3    0          3          0            0          0          0              1          2          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        1    1    4    0          6          0            0          0          1              1          4          0 Percentage of All    100%      17%  17%  67%    0%      100%            0%          0%          0%          17%          17%        67%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 192 of 276


71124.01 Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  3.1        6.1      12.5          7.4        Region 3                  3.1        6.1        9.4          6.2 Region 4                  0.0        0.0        4.1          1.5        Region 4                  0.0        0.0        4.1          1.5 1 Unit Sites              1.9        4.5        7.2          4.6        1 Unit Sites              1.9        4.5        5.4          3.9 2 Unit Sites              0.0        0.0        1.9          0.7        2 Unit Sites              0.0        0.0        1.9          0.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        2.9        4.6          2.6        BWR                        0.0        2.9        4.6          2.6 PWR                        1.7        0.0        4.3          2.2        PWR                        1.7        0.0        2.9          1.7 Total All Regions          1.0        1.1        4.4          2.4        Total All Regions          1.0        1.1        3.5          2.0 71124.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 193 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            136        8          1.1        17.0    267          45          5.0        5.9      305        54        5.4          5.6 Region 2            242        8          0.9        30.3    288          51          5.1        5.6      258        48        5.3          5.4 Region 3            323      10          0.9        32.3    164          34          5.7        4.8      321        57        5.7          5.6 Region 4            253        7          0.9        36.1    158          25          4.2        6.3      245        42        5.3          5.8 1 Unit Sites        329      10          0.9        32.9    149          28          4.7        5.3      341        62        5.6          5.5 2 Unit Sites        534      18          0.9        29.7    619        109          5.5        5.7      655      115        5.8          5.7 3 Unit Sites        91        5          1.3        18.2    109          18          4.5        6.1      134        24        4.8          5.6 BWR                368      13          1.0        28.3    344          67          6.1        5.1      433        73        5.6          5.9 PWR                586      20          1.0        29.3    533          88          4.9        6.1      696      128        5.8          5.4 Total All          954      33          1.0        28.9    877        155          5.5        5.7    1129      201        5.9          5.6 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 194 of 276
Findings /  


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            708    107        4.5        6.6 Region 2            788    107        4.1        7.4 Region 3            808    101        4.0        8.0 Region 4            656      74        3.7        8.9 1 Unit Sites        818    100        3.8        8.2 2 Unit Sites      1808    242        4.2        7.5 3 Unit Sites        334      47        4.3        7.1 BWR                1145    153        4.3        7.5 PWR                1815    236        4.0        7.7 Total All          2960    389        4.1        7.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 195 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.07, Radiological Environmental Monitoring Program, has been revised as a major editorial revision.
/1000 hrs Region 1 8.2 10.3 1.7 6.5 Region 2 6.5 6.3 4.6 5.8 Region 3 4.5 5.5 1.8 3.9 Region 4 4.7 5.3 4.7 4.9 1 Unit Sites
04/01/2016            IP 71124.07, "Radiological Environmental Monitoring Program," has been revised in response to the 2013 ROP Enhancement Project. This revised procedure includes groundwater monitoring inspection requirements transferred from IP 71124.06, and changed the way samples are counted.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                  3                 1                2                6 NOV N/A                                    1                0                0                1 Total                                      4                 1                 2                7 9/11/2018 2:22:01 PM                                                                                                                                        Page 196 of 276


1.3 5.0 3.7 3.4 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1       0    0    0    0          1          0            0          0          0              0          1          0 Region 2                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 3                  2        0    1    1    0          2          0            0          0          0              0          2          0 Region 4                  3        0    0    2    0          3          0            0          0          0              0          3          0 1 Unit Sites              3       0    0    2    0           3         0            0          0          0              0          3         0 2 Unit Sites              4       0    1    2     0          3          0            0          0          0              1          3          0 3 Unit Sites             0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    0    2    0          3          0            0          0          0              0          3          0 PWR                      4        0    1    2    0          3          0            0          0          0              1          3          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    1    4    0          6          0            0          0          0              1          6          0 Percentage of All    100%        0% 14%  57%    0%        86%          0%          0%          0%          0%          14%        86%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 197 of 276


10.5 6.4 1.6 5.7 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.6        0.0        0.0          1.2        Region 1                  2.6        0.0        0.0          1.2 Region 2                  0.0        4.2        0.0          1.5         Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        8.4      13.6           7.9        Region 3                  0.0        4.2        9.1         4.7 Region 4                  12.8        0.0        0.0          5.3        Region 4                  10.1        0.0        0.0          3.7 1 Unit Sites              6.3        4.0        2.4          4.3        1 Unit Sites              4.5         0.0        0.0          1.8 2 Unit Sites              2.0        4.2        3.9          3.4        2 Unit Sites              2.0        2.1        3.9          2.7 3 Unit Sites               0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        6.5        3.9        2.5          4.5        BWR                        4.7        0.0        0.0          1.8 PWR                        1.8        3.9        3.6          3.1        PWR                        1.8        1.9        3.6          2.5 Total All Regions          3.9        3.9        3.1          3.6        Total All Regions          3.1        1.3        2.1          2.2 71124.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 198 of 276


0.0 35.3 16.0 15.5 BWR 13.4 10.3 5.9 9.4 PWR 2.4 5.1 1.5 3.0 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            387      13          0.9        29.8    172          17          2.8        10.1    307        33          3.0         9.3 Region 2            220        8          0.9        27.5    240          25          2.5        9.6    219        24          2.7          9.1 Region 3           176        7          0.9        25.1    239          24          2.7        10.0    220        22          2.8        10.0 Region 4            198        7          0.9        28.2    119          10          2.0        11.9    218        24          2.7          9.1 1 Unit Sites        248        9          0.9        27.6    199          19          2.4        10.4     235        24          2.7          9.8 2 Unit Sites        630      22          1.0        28.6    449          45          2.8        10.0    631        70          3.0          9.0 3 Unit Sites        103        4         0.8        25.6    122          12          2.4       10.1       99        9          2.3        10.9 BWR                429      15          0.9        28.6    253          28          2.8        9.0    405        42          2.8          9.6 PWR                552      20          1.0        27.6    516          48          2.7        10.8    559        61          3.1          9.2 Total All           980      35          1.0        28.0    769          76          2.8        10.1    964      103          3.0          9.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 199 of 276


6.0 7.0 3.2 5.3 Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            866      63        2.2        13.7 Region 2            679      57        2.2        11.9 Region 3            635      53        2.3        12.0 Region 4            534      41        2.1        13.0 1 Unit Sites        681      52        2.1        13.1 2 Unit Sites      1710    137        2.3        12.5 3 Unit Sites        323      25        2.1        12.9 BWR                1087      85        2.1        12.8 PWR                1627    129        2.2        12.6 Total All          2714    214        2.2       12.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 200 of 276


Hours Inspector Identified Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.08, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation, has been revised as a major editorial revision.
01/26/2016            IP 71124.08, "Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation," has been revised in response to the 2013 ROP Enhancement Project. This major revision clarifies the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.
Summary of PIM Findings 2015            2016              2017      3 Year Total NCV Green                                  4                3                2                  9 NCVIV N/A                                  1                0                0                  1 Total                                      5                3                2                10 9/11/2018 2:22:01 PM                                                                                                                                            Page 201 of 276


Hours Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3        0    3    0    0          3          0            0          0          0              1          2          0 Region 2                  1        0    0    1    0          1          0            0          0          0              0          1          0 Region 3                  2        0    0    2    0          0          0            0          0          0              0          2          0 Region 4                  4        0    0    3    0          2          0            0          0          0              0          3          0 1 Unit Sites              8        0    3    4    0          5          0            0          0          0              1          6          0 2 Unit Sites              1        0    0    1    0          0          0            0          0          0              0          1          0 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          1          0 BWR                        8        0    3    4    0          5          0            0          0          0              1          6          0 PWR                        2        0    0    2    0          1          0            0          0          0              0          2          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        10        0    3    6    0          6          0            0          0          0              1          8          0 Percentage of All    100%        0% 30%  60%    0%        60%          0%          0%          0%          0%          10%        80%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 202 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                 (2015)     (2016)      (2017)  /1000 hrs Region 1                  6.5        3.6        0.0          3.4        Region 1                  6.5        3.6        0.0          3.4 Region 2                  0.0        4.0        0.0          1.4        Region 2                  0.0        4.0        0.0          1.4 Region 3                  0.0        9.3        2.5          2.6        Region 3                  0.0        0.0        0.0          0.0 Region 4                  13.6        0.0        4.4          7.4        Region 4                  7.8        0.0        0.0          3.1 1 Unit Sites              11.8        3.3        4.1          6.9        1 Unit Sites              8.4        3.3        0.0          3.9 2 Unit Sites              0.0        2.3        0.0          0.6        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0      19.2        0.0          8.3        3 Unit Sites              0.0        19.2        0.0          8.3 BWR                      11.6        6.7        4.2          7.4        BWR                        7.6        6.7        0.0          4.3 PWR                        1.5        2.0        0.0          1.1        PWR                        1.5        0.0        0.0          0.5 Total All Regions          5.5        3.8        1.7          3.6        Total All Regions          3.8        2.5        0.0          2.0 71124.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 203 of 276
Findings /  


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                         Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            310        8          0.9        38.8    281          48          4.8        5.9      292        48        5.3          6.1 Region 2            219        8          1.0        27.4    251          56          5.6        4.5      224        48        5.3          4.7 Region 3            269        8          0.9        33.6    108          18          4.5        6.0      403        72        5.5          5.6 Region 4            257        8          1.0        32.2    160          30          5.0        5.3      225        42        5.3          5.4 1 Unit Sites        254        7          0.9        36.3    269          48          4.8        5.6      223        42        5.3          5.3 2 Unit Sites        619      20          1.1        31.0    478          91          5.7        5.2      740      138        5.8          5.4 3 Unit Sites        182        5          0.8        36.4      52        13          4.3        4.0      181        30        5.0          6.0 BWR                396      11          0.9        36.0    299          56          5.1        5.3      482        84        5.6          5.7 PWR                659      21          1.1        31.4    500          96          5.6        5.2      662      126        5.7          5.3 Total All          1055      32          1.0        33.0    799        152          5.6        5.3    1144      210        5.8          5.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 204 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1           883    104        4.0        8.5 Region 2            694    112        4.5         6.2 Region 3            779      98        4.1         7.9 Region 4            642      80        4.0        8.0 1 Unit Sites        746      97        4.0         7.7 2 Unit Sites      1837    249        4.4         7.4 3 Unit Sites        415      48        3.7        8.6 BWR                1176    151        4.1        7.8 PWR                1821    243        4.2        7.5 Total All          2998    394        4.2         7.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 205 of 276
/1000 hrs Region 1 5.5 1.8 0.0 2.0 Region 2 3.3 4.7 4.6 4.2 Region 3 2.3 0.0 0.0 0.6 Region 4 4.7 0.0 2.3 2.4 1 Unit Sites


1.3 1.3 1.2 1.3 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.01, "Access Authorization," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.01, "Access Authorization," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2017      3 Year Total NCV Green                                    6                3                9 Total                                        6                3               9 9/11/2018 2:22:01 PM                                                                                                                                              Page 206 of 276


6.3 0.8 0.8 2.3 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  1        0    0    1    0          0          0            0          0          0              0          0          1 Region 3                 4        0    0   0    0          3          0            0          0          0              0          0          0 Region 4                  4        0    1    2    0          4          0            0          0          0              0          0          2 1 Unit Sites              3        0    0   2     0          3         0            0          0          0              0          0          1 2 Unit Sites              6        0    1    1    0          4          0            0          0          0              0          0          2 3 Unit Sites             0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      4        0    0    0    0          3          0            0          0          0              0          0          0 PWR                      5        0    1    3    0          4          0            0          0          0              0          0          3 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    1    3    0          7          0            0          0          0              0          0          3 Percentage of All    100%        0% 11%  33%    0%        78%          0%          0%          0%          0%            0%          0%      33%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 207 of 276


0.0 23.5 16.0 12.4 BWR 10.0 4.0 3.5 5.4 PWR 0.8 0.7 0.7 0.8 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        4.8          2.5         Region 2                  0.0         0.0        0.0          0.0 Region 3                  9.6        0.0        0.0          9.6        Region 3                  7.2        0.0        0.0          7.2 Region 4                  4.9        0.0        5.1          5.0         Region 4                   4.9        0.0        5.1          5.0 1 Unit Sites              3.5       0.0        2.9          3.1        1 Unit Sites              3.5        0.0        2.9          3.1 2 Unit Sites              7.2        0.0        5.7          5.9        2 Unit Sites              5.4         0.0        2.9          3.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.4        0.0        0.0          5.2        BWR                        6.3        0.0        0.0          3.9 PWR                       2.9        0.0       5.5          3.7         PWR                        2.9        0.0        3.7         2.9 Total All Regions          5.1        0.0       3.9          4.2        Total All Regions         4.3        0.0        2.6          3.3 71130.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 208 of 276


3.8 1.9 1.8 2.4 71124.01 Hours & Samples Reported
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            234        8          0.9        29.2    116          4          0.8        28.9    172        7          0.9        24.5 Region 2            113        6          0.9        18.8      73          4          0.8        18.3    210        8          1.0        26.2 Region 3            417      15          0.9        27.8        0          0          0.0        0.0        0        0          0.0          0.0 Region 4            407      12          0.9        33.9        0          0          0.0        0.0    393        12          1.0        32.7 1 Unit Sites        330      11          0.9        30.0      26          1          0.5        25.5    212        6          1.0        35.3 2 Unit Sites        747      27          1.0        27.7    113          5          0.8       22.6    464        18          1.0        25.8 3 Unit Sites        94        3          0.8        31.3      50          2          0.7        25.0      98        3          0.8        32.7 BWR                479      17          0.9       28.2      62          2          0.7        31.0    231        9          0.9        25.7 PWR                692      24          1.0        28.8     127          6          0.9        21.1    543        18          1.1        30.2 Total All          1171      41          1.0        28.6    189          8          0.9        23.6    774        27          1.0        28.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 209 of 276


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            521      19        1.0        27.4 Region 2            396      18        1.0        22.0 Region 3            417      15        0.9        27.8 Region 4            800      24        1.0        33.3 1 Unit Sites        568      18        1.0        31.5 2 Unit Sites      1324      50        1.0        26.5 3 Unit Sites        242        8        0.9        30.3 BWR                772      28        0.9        27.6 PWR                1361      48        1.0        28.4 Total All          2134      76        1.0        28.1 Regions 9/11/2018 2:22:01 PM                                                                     Page 210 of 276


Page 168 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.02, "Access Control," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.02, "Access Control," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015            2016              2017    3 Year Total FIN Green                                    0                0                6                6 NCV Green                                    9                16                8              33 Total                                        9                16              14                39 9/11/2018 2:22:01 PM                                                                                                                                              Page 211 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  17        0    1  15    0          14          0            0          0          0              0          0        14 Region 2                  4        0    0    4    0          4          0            0          0          0              0          0          3 Region 3                  4        0    0    4    0          3          0            0          0          0              0          0          4 Region 4                  14        0    2  11    0          13          0            0          0          0              0          0          9 1 Unit Sites              22        0    3  18    0          19          0            0          0          0              0          0        17 2 Unit Sites              16        0    0  15    0          14          0            0          0          0              0          0        12 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          0          1 BWR                      18        0    2  15    0          15          0            0          0          0              0          0        12 PWR                      21        0    1  19    0          19          0            0          0          0              0          0        18 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        39        0    3  34    0          34          0            0          0          0              0          0        30 Percentage of All    100%        0%  8%  87%    0%        87%          0%          0%          0%          0%            0%          0%      77%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 212 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  7.9      11.2      15.0          11.9        Region 1                  5.3        5.2        8.9          6.6 Region 2                  2.5        8.0        0.0          3.3        Region 2                  2.5        8.0        0.0          3.3 Region 3                  0.0        5.5        7.6          4.4        Region 3                  0.0        5.5        2.7          2.7 Region 4                  15.0      16.9      12.1          14.9        Region 4                  11.6        12.3        9.1        11.2 1 Unit Sites              7.4      14.7      12.6          11.6        1 Unit Sites              5.0        8.5        7.2          6.9 2 Unit Sites              5.6        7.6        6.2          6.5        2 Unit Sites              4.2        7.6        2.4          4.7 3 Unit Sites              0.0        0.0      15.6          4.3        3 Unit Sites              0.0        0.0        15.6          4.3 BWR                        9.3      11.1        9.6          10.0        BWR                        7.0        5.6        3.5          5.3 PWR                        3.6        9.8        8.7          7.5        PWR                        2.4        8.7        5.6          5.7 Total All Regions          6.1      10.4        9.0          8.5        Total All Regions          4.3        7.6        4.8          5.6 71130.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 213 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            381      16          0.9        23.8    384          16          0.9        24.0    450        16        0.9        28.1 Region 2            399      17          1.0        23.5    374          17          0.9        22.0    421        19        1.2        22.2 Region 3            368      15          0.9        24.5    367          15          0.9        24.5    377        15        0.9        25.1 Region 4            258      12          1.0        21.5    326          12          0.9        27.1    220        12        1.1        18.3 1 Unit Sites        384      15          0.9        25.6    387          15          0.9        25.8    355        16        1.1        22.2 2 Unit Sites        845      38          1.0        22.2    885          38          1.0        23.3    919        39        1.1        23.6 3 Unit Sites        176        7          0.9        25.2    179          7          0.9        25.5    193        7        1.0        27.6 BWR                573      23          1.0        24.9    535          23          1.0        23.3    577        24        1.0        24.0 PWR                833      37          1.0        22.5    915          37          1.0        24.7    890        38        1.1        23.4 Total All          1405      60          1.0        23.4    1450          60          1.0        24.2    1467        62        1.1        23.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 214 of 276


Calendar Year 2015
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1214      48        1.0        25.3 Region 2          1195      53        1.1        22.5 Region 3          1111      45        1.0        24.7 Region 4            804      36        1.1        22.3 1 Unit Sites      1126      46        1.0        24.5 2 Unit Sites      2650    115        1.0        23.0 3 Unit Sites        548      21        1.0        26.1 BWR                1685      70        1.0        24.1 PWR                2638    112        1.0        23.6 Total All          4323    182        1.0        23.8 Regions 9/11/2018 2:22:01 PM                                                                      Page 215 of 276


Calendar Year 2016
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Revision History Date of Revision      Description of Revision 12/22/2016            IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to remove Addendum 5, and change the resource estimate hours from 435 to 393.
04/20/2015            IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015          2016              2017      3 Year Total NCV Green                                  27              20                9                56 Total                                      27              20                9                56 9/11/2018 2:22:01 PM                                                                                                                                            Page 216 of 276


Calendar Year 2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  13        0    2    6    0          13          0            0          0          0              0          0          6 Region 2                  8        0    2    3    0          8          0            0          0          0              0          0          4 Region 3                  16        0    2  11    0          15          0            0          0          0              0          0        11 Region 4                  17        0    4    7    0          17          0            0          0          0              0          0          6 1 Unit Sites              17        0    4    8    0          16          0            0          0          0              0          0          7 2 Unit Sites              35        0    5  19    0          35          0            0          0          0              0          0        18 3 Unit Sites              2        0    1    0    0          2          0            0          0          0              0          0          2 BWR                      22        0    5    8    0          21          0            0          0          0              0          0          7 PWR                      32        0    5  19    0          32          0            0          0          0              0          0        20 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        54        0  10  27    0          53          0            0          0          0              0          0        27 Percentage of All    100%        0% 19%  50%    0%        98%          0%          0%          0%          0%            0%          0%      50%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 217 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.0        2.7        0.7          1.8        Region 1                  1.6        2.6        0.4          1.3 Region 2                  1.5        1.3        0.5          1.2        Region 2                  1.1        1.3        0.5          0.9 Region 3                  2.5        2.3        2.7          2.5        Region 3                  2.4        2.3        1.6          2.1 Region 4                  2.4        2.6        1.5          2.4        Region 4                  1.6        2.6        1.5          2.0 1 Unit Sites              2.0        2.0        1.4          1.8        1 Unit Sites              1.4        2.0        0.9          1.3 2 Unit Sites              2.1        2.2        1.2          2.0        2 Unit Sites              1.8        2.0        0.7          1.7 3 Unit Sites              0.0        2.4        0.0          1.6        3 Unit Sites              0.0        2.4        0.0          1.6 BWR                        2.3        1.7        1.2          2.0        BWR                        2.0        1.7        0.5          1.5 PWR                        1.9        2.4        1.2          1.9        PWR                        1.3        2.2        0.9          1.5 Total All Regions          2.1        2.2        1.2          1.9        Total All Regions          1.6        2.1        0.8          1.5 71130.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 218 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1932        5          0.8      386.3    1164          6          1.5      194.0    2357        18        2.0      130.9 Region 2          1815        5          0.8      362.9    2330          12          1.7      194.1    2185        14        2.0      156.0 Region 3          1693        5          0.8      338.6    2189          12          1.7      182.4    1257        8        1.6      157.2 Region 4          1895        6          0.9      315.8    1535          8          1.6      191.9    670        5        1.7      134.0 1 Unit Sites      1644        5          0.8      328.8    355          2          1.0      177.4    2914        20        2.0      145.7 2 Unit Sites      5328      15          0.9      355.2    5667          30          1.9      188.9    2333        19        2.1      122.8 3 Unit Sites        362        1          0.5      362.0    1195          6          1.5      199.2    1222        6        1.5      203.6 BWR                3579      10          0.9      357.9    2317          12          1.7      193.1    2050        15        1.9      136.6 PWR                3755      11          0.9      341.3    4900          26          1.9      188.5    4419        30        2.1      147.3 Total All          7334      21          1.0      349.2    7217          38          1.9      189.9    6469        45        2.1      143.8 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 219 of 276


Reported Hours Reported Samples Average Normalized  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1          5453      29        1.7      188.0 Region 2          6329      31        1.7      204.1 Region 3          5139      25        1.6      205.6 Region 4          4100      19        1.5      215.8 1 Unit Sites      4913      27        1.7      182.0 2 Unit Sites      13328      64        1.6      208.3 3 Unit Sites      2779      13        1.6      213.8 BWR                7946      37        1.5      214.8 PWR              13074      67        1.7      195.1 Total All        21020    104        1.7      202.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 220 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.04, "Equipment Performance, Testing and Maintenance," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/27/2015            IP 71130.04, "Equipment Performance, Testing and Maintenance, has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                  7                10                7                24 NOV N/A                                    1                  0                0                  1 Total                                      8                10                7                25 9/11/2018 2:22:01 PM                                                                                                                                            Page 221 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  18        0    3  10    0          18          0            0          0          0              0          0        12 Region 2                  2        0    0    2    0          2          0            0          0          0              0          0          2 Region 3                  2        0    0    2    0          2          0            0          0          0              0          0          1 Region 4                  3        0    0    2    0          3          0            0          0          0              0          0          2 1 Unit Sites              11        0    1    7    0          11          0            0          0          0              0          0          6 2 Unit Sites              14        0    2    9    0          14          0            0          0          0              0          0        11 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      13        0    1    9    0          13          0            0          0          0              0          0          8 PWR                      12        0    2    7    0          12          0            0          0          0              0          0          9 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        25        0    3  16    0          25          0            0          0          0              0          0        17 Percentage of All    100%        0% 12%  64%    0%      100%            0%          0%          0%          0%            0%          0%      68%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 222 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  11.2      15.1      14.9          13.5        Region 1                  9.0        12.1        12.2        11.1 Region 2                  0.0        0.0        7.7          2.4        Region 2                  0.0        0.0        7.7          2.4 Region 3                  1.2        2.6        0.0          1.8        Region 3                  1.2        2.6        0.0          1.8 Region 4                  0.0        4.2        0.0          6.3        Region 4                  0.0        4.2        0.0          6.3 1 Unit Sites              7.5        5.6      10.5          6.8        1 Unit Sites              5.6        4.5        6.8          5.1 2 Unit Sites              3.2        5.7      12.3          5.8        2 Unit Sites              2.3        4.9        11.2          4.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        6.3        7.3      12.3          7.5        BWR                        4.5        6.2        9.9          6.0 PWR                        3.7        4.0      11.4          5.0        PWR                        2.7        3.3        9.9          4.0 Total All Regions          5.0        5.3      11.7          6.1        Total All Regions          3.6        4.5        9.9          4.8 71130.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 223 of 276


Region 1 364 16 1.0 22.8 567 115 6.8 4.9 584 115 6.8 5.1 Region 2 612 17 0.9 36.0 636 121 6.7 5.3 646 120 6.7 5.4 Region 3 441 15 0.9 29.4 543 105 6.6 5.2 558 105 6.6 5.3 Region 4 425 12 0.9 35.4 378 84 7.0 4.5 428 84 6.5 5.1 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1           334        6          0.9        55.6     415          10          0.9        41.5    246        6         0.9        40.9 Region 2           229        6          0.9       38.1    345          10          0.9        34.5    260        7         0.9        37.2 Region 3           841      15         0.9       56.1    783          15          0.9        52.2       0        0          0.0          0.0 Region 4             0        0          0.0        0.0    475          12           1.0        39.6        0        0          0.0          0.0 1 Unit Sites        375        8          0.9       46.9    488          12          1.0        40.7    115        3          0.8        38.4 2 Unit Sites        828      16          0.9        51.8    1312          30          1.0        43.7     307        8          0.9        38.4 3 Unit Sites        200        3          0.8        66.8    217          5           0.8        43.3      83        2          0.7        41.6 BWR                661      12          0.9        55.1    806          18          1.0        44.8    202        5         0.8        40.5 PWR                743      15          0.9        49.5    1211          29          1.0        41.8    304        8          0.9        37.9 Total All          1404      27          1.0        52.0    2017          47          1.0        42.9    506        13          0.9        38.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 224 of 276


492 15 0.9 32.8 486 106 6.6 4.6 502 107 6.7 4.7 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported   Average   Hrs/Sample Hours   Samples Normalized Samples Region 1           994       22       1.0       45.2 Region 2           833       23       1.0       36.2 Region 3           1624       30       1.0       54.1 Region 4           475       12       1.0       39.6 1 Unit Sites       979       23       1.0       42.5 2 Unit Sites       2447       54       1.0       45.3 3 Unit Sites       500       10       0.9       50.0 BWR               1669       35       1.0       47.7 PWR               2257       52       1.0       43.4 Total All         3926       87       1.0       45.1 Regions 9/11/2018 2:22:01 PM                                                                     Page 225 of 276
 
1127 38 1.0 29.7 1409 270 7.1 5.2 1411 268 6.9 5.3 3 Unit Sites
 
223 7
1.0 31.8 229 49 6.1 4.7 303 49 6.1 6.2 BWR 599 23 1.0 26.0 757 168 7.3 4.5 852 162 6.8 5.3 PWR 1243 37 1.0 33.6 1367 257 6.8 5.3 1364 262 6.9 5.2 Total All
 
Regions 1841 60 1.0 30.7 2123 425 7.1 5.0 2216 424 7.0 5.2 9/11/2018 2:22:01 PM
 
Page 169 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1515 246 5.1 6.2 Region 2 1894 258 5.0 7.3 Region 3 1541 225 4.9 6.9 Region 4 1230 180 5.0 6.8 1 Unit Sites
 
1479 228 5.0 6.5 2 Unit Sites
 
3946 576 5.1 6.9 3 Unit Sites
 
755 105 5.0 7.2 BWR 2207 353 5.1 6.3 PWR 3973 556 4.9 7.1 Total All
 
Regions 6180 909 5.0 6.8 9/11/2018 2:22:01 PM
 
Page 170 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.02 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.02,
 
Occupational ALARA Planning and Controls,
 
has been revised as a major editorial revision.
 
03/02/2016
 
IP 71124.02, "Occupational ALARA Planning and Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the
 
existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted. Incorporated feedback
 
forms 71124.02-1762
 
2015 2016 2017 3 Year Total
 
FIN Green 1
1 1
3 NCV Green 0
1 0
1 Total 1
2 1
4 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 171 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.02 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
0 0
0 0
0 1
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 1
0 0
1 0
0 0
0 0
0 1
0 0
Region 4 2
0 1
1 0
2 0
0 0
0 2
0 0
1 Unit Sites
 
3 0
1 2
0 2
0 0
0 0
3 0
0 2 Unit Sites
 
1 0
0 1
0 0
0 0
0 0
1 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 3
0 1
2 0
2 0
0 0
0 3
0 0
PWR 1
0 0
1 0
0 0
0 0
0 1
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
4 0
1 3
0 2
0 0
0 0
4 0
0 Percentage of All
 
Findings 100%
0%
25%
75%
0%
50%
0%
0%
0%
0%
100%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 172 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.02 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 3.2 0.0 1.1 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 2.5 0.9 Region 4 3.5 2.8 0.0 2.2 1 Unit Sites
 
2.5 2.1 1.6 2.0 2 Unit Sites
 
0.0 1.1 0.0 0.4 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 2.5 2.2 1.4 1.9 PWR 0.0 1.1 0.0 0.4 Total All Regions
 
0.8 1.5 0.7 1.0 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 3.5 2.8 0.0 2.2 1 Unit Sites
 
2.5 2.1 0.0 1.3 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 2.5 2.2 0.0 1.3 PWR 0.0 0.0 0.0 0.0 Total All Regions
 
0.8 0.7 0.0 0.5 71124.02 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 173 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 230 11 0.8 20.9 308 42 2.8 7.3 387 61 3.8 6.3 Region 2 367 9
0.9 40.7 340 40 4.4 8.5 408 45 4.5 9.1 Region 3 319 14 0.9 22.8 374 32 2.9 11.7 404 47 3.4 8.6 Region 4 284 12 1.0 23.6 352 30 2.3 11.7 266 38 3.8 7.0 1 Unit Sites
 
285 12 0.9 23.8 278 26 2.6 10.7 375 53 3.8 7.1 2 Unit Sites
 
723 27 0.9 26.8 929 101 3.3 9.2 864 113 4.2 7.6 3 Unit Sites
 
191 7
1.0 27.3 167 17 2.8 9.8 225 25 3.1 9.0 BWR 400 19 1.0 21.1 448 48 2.8 9.3 703 82 3.7 8.6 PWR 798 27 0.9 29.6 926 96 3.3 9.6 761 109 4.2 7.0 Total All
 
Regions 1199 46 1.0 26.1 1374 144 3.2 9.5 1464 191 4.1 7.7 9/11/2018 2:22:01 PM
 
Page 174 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 924 114 2.7 8.1 Region 2 1114 94 3.5 11.9 Region 3 1097 93 2.4 11.8 Region 4 901 80 2.4 11.3 1 Unit Sites
 
938 91 2.6 10.3 2 Unit Sites
 
2516 241 2.8 10.4 3 Unit Sites
 
583 49 2.6 11.9 BWR 1551 149 2.6 10.4 PWR 2485 232 2.8 10.7 Total All
 
Regions 4036 381 2.7 10.6 9/11/2018 2:22:01 PM
 
Page 175 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.03 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.03,
 
In-Plant Airborne Radioactivity Control and Mitigation,
 
has been revised as a major editorial revision.
 
02/24/2016
 
IP 71124.03, "In-Plant Airborne Radioactivity Control and Mitigation," has been revised in response to the 2013 ROP Enhancement project. The revisions
 
clarify the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how the samples are counted.
 
2015 2016 2017 3 Year Total
 
NCV Green 4
4 1
9 Total 4
4 1
9 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 176 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.03 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 7
0 1
5 0
5 0
0 0
0 7
0 0
Region 4 2
0 0
2 0
2 0
0 0
0 2
0 0
1 Unit Sites
 
4 0
1 2
0 3
0 0
0 0
4 0
0 2 Unit Sites
 
3 0
0 3
0 2
0 0
0 0
3 0
0 3 Unit Sites
 
2 0
0 2
0 2
0 0
0 0
2 0
0 BWR 6
0 1
4 0
5 0
0 0
0 6
0 0
PWR 3
0 0
3 0
2 0
0 0
0 3
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
9 0
1 7
0 7
0 0
0 0
9 0
0 Percentage of All
 
Findings 100%
0%
11%
78%
0%
78%
0%
0%
0%
0%
100%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 177 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.03 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 31.4 14.4 18.3 21.3 Region 4 0.0 10.2 0.0 3.0 1 Unit Sites
 
16.0 0.0 9.3 8.0 2 Unit Sites
 
3.4 6.1 0.0 3.2 3 Unit Sites
 
0.0 62.5 0.0 11.4 BWR 16.4 12.1 7.3 11.2 PWR 3.1 2.5 0.0 1.9 Total All Regions
 
7.9 5.3 3.4 5.4 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 15.7 14.4 18.3 16.0 Region 4 0.0 10.2 0.0 3.0 1 Unit Sites
 
10.6 0.0 9.3 6.4 2 Unit Sites
 
0.0 6.1 0.0 2.1 3 Unit Sites
 
0.0 62.5 0.0 11.4 BWR 11.0 12.1 7.3 9.6 PWR 0.0 2.5 0.0 1.0 Total All Regions
 
3.9 5.3 3.4 4.2 71124.03 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 178 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 125 13 1.0 9.6 205 34 2.4 6.0 154 30 2.1 5.1 Region 2 167 9
0.9 18.5 128 32 3.6 4.0 180 36 3.6 5.0 Region 3 128 9
1.1 14.2 139 32 2.7 4.4 109 29 3.2 3.8 Region 4 91 5
1.0 18.2 98 20 3.3 4.9 144 28 3.5 5.1 1 Unit Sites
 
139 9
1.0 15.4 129 25 2.5 5.2 162 35 3.2 4.6 2 Unit Sites
 
306 21 1.0 14.5 362 78 3.1 4.6 353 74 3.1 4.8 3 Unit Sites
 
66 6
1.2 10.9 79 15 3.0 5.2 71 14 2.8 5.1 BWR 183 18 1.1 10.1 166 36 2.4 4.6 275 56 2.9 4.9 PWR 327 18 1.0 18.2 404 82 3.4 4.9 312 67 3.4 4.7 Total All
 
Regions 510 36 1.1 14.2 570 118 3.1 4.8 586 123 3.2 4.8 9/11/2018 2:22:01 PM
 
Page 179 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 483 77 2.0 6.3 Region 2 474 77 2.9 6.2 Region 3 376 70 2.6 5.4 Region 4 333 53 3.1 6.3 1 Unit Sites
 
430 69 2.5 6.2 2 Unit Sites
 
1021 173 2.5 5.9 3 Unit Sites
 
215 35 2.7 6.2 BWR 623 110 2.2 5.7 PWR 1043 167 2.7 6.2 Total All
 
Regions 1665 277 2.5 6.0 9/11/2018 2:22:01 PM
 
Page 180 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.04 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.04,
 
Occupational Dose Assessment,
 
has been revised as a major editorial revision.
 
02/19/2016
 
IP 71124.04, "Occupational Dose Assessment," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection
 
requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.<br><br>
 
2015 2016 3 Year Total
 
NCV Green 1
1 2
NCVIV N/A 1
0 1
Total 2
1 3
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 181 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.04 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 2
0 0
1 0
2 0
0 0
0 2
0 0
Region 4 1
0 0
1 0
0 0
0 0
0 1
0 0
1 Unit Sites
 
1 0
0 0
0 1
0 0
0 0
1 0
0 2 Unit Sites
 
1 0
0 1
0 1
0 0
0 0
1 0
0 3 Unit Sites
 
1 0
0 1
0 0
0 0
0 0
1 0
0 BWR 1
0 0
0 0
1 0
0 0
0 1
0 0
PWR 2
0 0
2 0
1 0
0 0
0 2
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
3 0
0 2
0 2
0 0
0 0
3 0
0 Percentage of All
 
Findings 100%
0%
0%
67%
0%
67%
0%
0%
0%
0%
100%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 182 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.04 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 24.0 0.0 0.0 5.5 Region 4 0.0 6.6 0.0 3.2 1 Unit Sites
 
6.5 0.0 0.0 1.7 2 Unit Sites
 
3.3 0.0 0.0 1.2 3 Unit Sites
 
0.0 41.7 0.0 9.3 BWR 8.3 0.0 0.0 2.0 PWR 2.7 2.1 0.0 1.9 Total All Regions
 
4.1 1.4 0.0 1.9 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 24.0 0.0 0.0 5.5 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
6.5 0.0 0.0 1.7 2 Unit Sites
 
3.3 0.0 0.0 1.2 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.3 0.0 0.0 2.0 PWR 2.7 0.0 0.0 1.0 Total All Regions
 
4.1 0.0 0.0 1.3 71124.04 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 183 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 149 14 1.0 10.6 209 62 4.4 3.4 52 31 3.9 1.7 Region 2 139 9
0.9 15.4 170 40 4.4 4.2 165 46 5.1 3.6 Region 3 84 10 1.1 8.4 163 39 3.3 4.2 116 37 4.6 3.1 Region 4 115 5
0.8 23.0 152 35 4.4 4.3 50 35 11.7 1.4 1 Unit Sites
 
118 11 1.1 10.7 152 39 3.9 3.9 131 38 4.2 3.5 2 Unit Sites
 
320 23 1.0 13.9 450 112 4.3 4.0 196 100 6.7 2.0 3 Unit Sites
 
49 4
1.0 12.2 92 25 4.2 3.7 55 11 3.7 5.0 BWR 121 17 1.1 7.1 207 63 3.9 3.3 185 59 4.5 3.1 PWR 365 21 1.0 17.4 487 113 4.5 4.3 198 90 6.9 2.2 Total All
 
Regions 486 38 1.1 12.8 694 176 4.4 3.9 382 149 6.0 2.6 9/11/2018 2:22:01 PM
 
Page 184 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 410 107 3.1 3.8 Region 2 473 95 3.7 5.0 Region 3 362 86 3.2 4.2 Region 4 317 75 5.0 4.2 1 Unit Sites
 
400 88 3.3 4.5 2 Unit Sites
 
966 235 3.7 4.1 3 Unit Sites
 
195 40 3.6 4.9 BWR 513 139 3.2 3.7 PWR 1049 224 3.8 4.7 Total All
 
Regions 1562 363 3.6 4.3 9/11/2018 2:22:01 PM
 
Page 185 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.05 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.05,
 
Radiation Monitoring Instrumentation,
 
has been revised as a major editorial revision.
 
04/01/2016
 
IP 71124.05, "Radiation Monitoring Instrumentation," has been revised in response to the 2013 ROP Enhancement Project. The revision changes how
 
inspection samples are counted.
 
2015 2017 3 Year Total
 
NCV Green 4
0 4
VIO Green 0
1 1
Total 4
1 5
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 186 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.05 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 2
0 0
1 0
2 0
0 0
0 1
1 0
Region 4 3
0 2
1 0
3 0
0 0
0 1
2 0
1 Unit Sites
 
3 0
2 1
0 3
0 0
0 0
1 2
0 2 Unit Sites
 
2 0
0 1
0 2
0 0
0 0
1 1
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 3
0 2
1 0
3 0
0 0
0 1
2 0
PWR 2
0 0
1 0
2 0
0 0
0 1
1 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
5 0
2 2
0 5
0 0
0 0
2 3
0 Percentage of All
 
Findings 100%
0%
40%
40%
0%
100%
0%
0%
0%
0%
40%
60%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 187 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.05 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 9.7 10.1 0.0 4.2 Region 4 6.9 0.0 5.2 4.5 1 Unit Sites
 
6.5 0.0 2.1 3.2 2 Unit Sites
 
2.5 1.8 0.0 1.3 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.4 0.0 1.9 3.6 PWR 1.6 1.6 0.0 1.1 Total All Regions
 
4.1 1.2 0.9 2.1 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 9.7 10.1 0.0 4.2 Region 4 6.9 0.0 5.2 4.5 1 Unit Sites
 
6.5 0.0 2.1 3.2 2 Unit Sites
 
2.5 1.8 0.0 1.3 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.4 0.0 1.9 3.6 PWR 1.6 1.6 0.0 1.1 Total All Regions
 
4.1 1.2 0.9 2.1 71124.05 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 188 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized  
 
Samples Hrs/Sample
 
Region 1 152 11 1.1 13.8 304 30 2.5 10.1 242 23 2.3 10.5 Region 2 318 9
0.9 35.3 269 24 2.7 11.2 241 27 3.4 8.9 Region 3 205 9
1.0 22.8 99 9
2.3 11.0 402 36 2.8 11.2 Region 4 291 7
0.9 41.6 188 13 2.2 14.5 192 21 2.6 9.1 1 Unit Sites
 
270 10 0.9 27.0 141 12 2.4 11.7 359 33 2.8 10.9 2 Unit Sites
 
566 21 1.1 27.0 658 58 2.6 11.3 564 56 2.8 10.1 3 Unit Sites
 
131 5
1.0 26.1 61 6
2.0 10.2 154 18 3.0 8.6 BWR 358 16 1.1 22.4 221 23 2.6 9.6 520 48 2.7 10.8 PWR 608 20 1.0 30.4 639 53 2.7 12.0 557 59 3.1 9.4 Total All
 
Regions 966 36 1.1 26.8 860 76 2.7 11.3 1077 107 3.0 10.1 9/11/2018 2:22:01 PM
 
Page 189 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 698 64 2.1 10.9 Region 2 827 60 2.4 13.8 Region 3 707 54 2.3 13.1 Region 4 671 41 2.1 16.4 1 Unit Sites
 
769 55 2.1 14.0 2 Unit Sites
 
1788 135 2.3 13.2 3 Unit Sites
 
346 29 2.4 11.9 BWR 1099 87 2.1 12.6 PWR 1803 132 2.3 13.7 Total All
 
Regions 2902 219 2.2 13.3 9/11/2018 2:22:01 PM
 
Page 190 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.06 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.06,
 
Radioactive Gaseous and Liquid Effluent Treatment,
 
has been revised as a major editorial revision.
 
04/01/2016
 
IP 71124.06, "Radioactive Gaseous and Liquid Effluent Treatment," has been revised in response to the 2013 ROP Enhancement Project. The revision
 
changed how inspection samples are counted, and moved the sections on ground water inspections from 71124.06 to 71124.07. It also incorporates effluent
 
monitoring instrumentation from 71124.05 into 71124.06.
 
2015 2016 2017 3 Year Total
 
FIN Green 0
0 1
1 NCV Green 1
1 2
4 NOV White 0
0 1
1 Total 1
1 4
6 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 191 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.06 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 5
1 0
4 0
5 0
0 0
1 1
3 0
Region 4 1
0 1
0 0
1 0
0 0
0 0
1 0
1 Unit Sites
 
5 1
1 3
0 5
0 0
0 1
1 3
0 2 Unit Sites
 
1 0
0 1
0 1
0 0
0 0
0 1
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 3
1 1
1 0
3 0
0 0
1 0
2 0
PWR 3
0 0
3 0
3 0
0 0
0 1
2 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
6 1
1 4
0 6
0 0
0 1
1 4
0 Percentage of All
 
Findings 100%
17%
17%
67%
0%
100%
0%
0%
0%
17%
17%
67%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 192 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.06 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 3.1 6.1 12.5 7.4 Region 4 0.0 0.0 4.1 1.5 1 Unit Sites
 
1.9 4.5 7.2 4.6 2 Unit Sites
 
0.0 0.0 1.9 0.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 2.9 4.6 2.6 PWR 1.7 0.0 4.3 2.2 Total All Regions
 
1.0 1.1 4.4 2.4 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 3.1 6.1 9.4 6.2 Region 4 0.0 0.0 4.1 1.5 1 Unit Sites
 
1.9 4.5 5.4 3.9 2 Unit Sites
 
0.0 0.0 1.9 0.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 2.9 4.6 2.6 PWR 1.7 0.0 2.9 1.7 Total All Regions
 
1.0 1.1 3.5 2.0 71124.06 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 193 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 136 8
1.1 17.0 267 45 5.0 5.9 305 54 5.4 5.6 Region 2 242 8
0.9 30.3 288 51 5.1 5.6 258 48 5.3 5.4 Region 3 323 10 0.9 32.3 164 34 5.7 4.8 321 57 5.7 5.6 Region 4 253 7
0.9 36.1 158 25 4.2 6.3 245 42 5.3 5.8 1 Unit Sites
 
329 10 0.9 32.9 149 28 4.7 5.3 341 62 5.6 5.5 2 Unit Sites
 
534 18 0.9 29.7 619 109 5.5 5.7 655 115 5.8 5.7 3 Unit Sites
 
91 5
1.3 18.2 109 18 4.5 6.1 134 24 4.8 5.6 BWR 368 13 1.0 28.3 344 67 6.1 5.1 433 73 5.6 5.9 PWR 586 20 1.0 29.3 533 88 4.9 6.1 696 128 5.8 5.4 Total All
 
Regions 954 33 1.0 28.9 877 155 5.5 5.7 1129 201 5.9 5.6 9/11/2018 2:22:01 PM
 
Page 194 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 708 107 4.5 6.6 Region 2 788 107 4.1 7.4 Region 3 808 101 4.0 8.0 Region 4 656 74 3.7 8.9 1 Unit Sites
 
818 100 3.8 8.2 2 Unit Sites
 
1808 242 4.2 7.5 3 Unit Sites
 
334 47 4.3 7.1 BWR 1145 153 4.3 7.5 PWR 1815 236 4.0 7.7 Total All
 
Regions 2960 389 4.1 7.6 9/11/2018 2:22:01 PM
 
Page 195 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.07 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.07,
 
Radiological Environmental Monitoring Program,
 
has been revised as a major editorial revision.
 
04/01/2016
 
IP 71124.07, "Radiological Environmental Monitoring Program," has been revised in response to the 2013 ROP Enhancement Project. This revised procedure
 
includes groundwater monitoring inspection requirements transferred from IP 71124.06, and changed the way samples are counted.
 
2015 2016 2017 3 Year Total
 
NCV Green 3
1 2
6 NOV N/A 1
0 0
1 Total 4
1 2
7 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 196 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.07 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
0 0
1 0
0 0
0 0
1 0
Region 2 1
0 0
1 0
0 0
0 0
0 1
0 0
Region 3 2
0 1
1 0
2 0
0 0
0 0
2 0
Region 4 3
0 0
2 0
3 0
0 0
0 0
3 0
1 Unit Sites
 
3 0
0 2
0 3
0 0
0 0
0 3
0 2 Unit Sites
 
4 0
1 2
0 3
0 0
0 0
1 3
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 3
0 0
2 0
3 0
0 0
0 0
3 0
PWR 4
0 1
2 0
3 0
0 0
0 1
3 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
7 0
1 4
0 6
0 0
0 0
1 6
0 Percentage of All
 
Findings 100%
0%
14%
57%
0%
86%
0%
0%
0%
0%
14%
86%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 197 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.07 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.6 0.0 0.0 1.2 Region 2 0.0 4.2 0.0 1.5 Region 3 0.0 8.4 13.6 7.9 Region 4 12.8 0.0 0.0 5.3 1 Unit Sites
 
6.3 4.0 2.4 4.3 2 Unit Sites
 
2.0 4.2 3.9 3.4 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 6.5 3.9 2.5 4.5 PWR 1.8 3.9 3.6 3.1 Total All Regions
 
3.9 3.9 3.1 3.6 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.6 0.0 0.0 1.2 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 4.2 9.1 4.7 Region 4 10.1 0.0 0.0 3.7 1 Unit Sites
 
4.5 0.0 0.0 1.8 2 Unit Sites
 
2.0 2.1 3.9 2.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 4.7 0.0 0.0 1.8 PWR 1.8 1.9 3.6 2.5 Total All Regions
 
3.1 1.3 2.1 2.2 71124.07 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 198 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 387 13 0.9 29.8 172 17 2.8 10.1 307 33 3.0 9.3 Region 2 220 8
0.9 27.5 240 25 2.5 9.6 219 24 2.7 9.1 Region 3 176 7
0.9 25.1 239 24 2.7 10.0 220 22 2.8 10.0 Region 4 198 7
0.9 28.2 119 10 2.0 11.9 218 24 2.7 9.1 1 Unit Sites
 
248 9
0.9 27.6 199 19 2.4 10.4 235 24 2.7 9.8 2 Unit Sites
 
630 22 1.0 28.6 449 45 2.8 10.0 631 70 3.0 9.0 3 Unit Sites
 
103 4
0.8 25.6 122 12 2.4 10.1 99 9
2.3 10.9 BWR 429 15 0.9 28.6 253 28 2.8 9.0 405 42 2.8 9.6 PWR 552 20 1.0 27.6 516 48 2.7 10.8 559 61 3.1 9.2 Total All
 
Regions 980 35 1.0 28.0 769 76 2.8 10.1 964 103 3.0 9.4 9/11/2018 2:22:01 PM
 
Page 199 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 866 63 2.2 13.7 Region 2 679 57 2.2 11.9 Region 3 635 53 2.3 12.0 Region 4 534 41 2.1 13.0 1 Unit Sites
 
681 52 2.1 13.1 2 Unit Sites
 
1710 137 2.3 12.5 3 Unit Sites
 
323 25 2.1 12.9 BWR 1087 85 2.1 12.8 PWR 1627 129 2.2 12.6 Total All
 
Regions 2714 214 2.2 12.7 9/11/2018 2:22:01 PM
 
Page 200 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.08 Revision History
 
Date of Revision
 
Description of Revision
 
12/21/2017
 
IP 71124.08,
 
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation,
 
has been revised as a major editorial
 
revision.
01/26/2016
 
IP 71124.08, "Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation," has been revised in response to the 2013
 
ROP Enhancement Project. This major revision clarifies the existing inspection requirements and enhanced the inspection guidance section. The revision
 
also changed how samples are counted.
 
2015 2016 2017 3 Year Total
 
NCV Green 4
3 2
9 NCVIV N/A 1
0 0
1 Total 5
3 2
10 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 201 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.08 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 3
0 3
0 0
3 0
0 0
0 1
2 0
Region 2 1
0 0
1 0
1 0
0 0
0 0
1 0
Region 3 2
0 0
2 0
0 0
0 0
0 0
2 0
Region 4 4
0 0
3 0
2 0
0 0
0 0
3 0
1 Unit Sites
 
8 0
3 4
0 5
0 0
0 0
1 6
0 2 Unit Sites
 
1 0
0 1
0 0
0 0
0 0
0 1
0 3 Unit Sites
 
1 0
0 1
0 1
0 0
0 0
0 1
0 BWR 8
0 3
4 0
5 0
0 0
0 1
6 0
PWR 2
0 0
2 0
1 0
0 0
0 0
2 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
10 0
3 6
0 6
0 0
0 0
1 8
0 Percentage of All
 
Findings 100%
0%
30%
60%
0%
60%
0%
0%
0%
0%
10%
80%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 202 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71124.08 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 6.5 3.6 0.0 3.4 Region 2 0.0 4.0 0.0 1.4 Region 3 0.0 9.3 2.5 2.6 Region 4 13.6 0.0 4.4 7.4 1 Unit Sites
 
11.8 3.3 4.1 6.9 2 Unit Sites
 
0.0 2.3 0.0 0.6 3 Unit Sites
 
0.0 19.2 0.0 8.3 BWR 11.6 6.7 4.2 7.4 PWR 1.5 2.0 0.0 1.1 Total All Regions
 
5.5 3.8 1.7 3.6 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 6.5 3.6 0.0 3.4 Region 2 0.0 4.0 0.0 1.4 Region 3 0.0 0.0 0.0 0.0 Region 4 7.8 0.0 0.0 3.1 1 Unit Sites
 
8.4 3.3 0.0 3.9 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 19.2 0.0 8.3 BWR 7.6 6.7 0.0 4.3 PWR 1.5 0.0 0.0 0.5 Total All Regions
 
3.8 2.5 0.0 2.0 71124.08 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 203 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 310 8
0.9 38.8 281 48 4.8 5.9 292 48 5.3 6.1 Region 2 219 8
1.0 27.4 251 56 5.6 4.5 224 48 5.3 4.7 Region 3 269 8
0.9 33.6 108 18 4.5 6.0 403 72 5.5 5.6 Region 4 257 8
1.0 32.2 160 30 5.0 5.3 225 42 5.3 5.4 1 Unit Sites
 
254 7
0.9 36.3 269 48 4.8 5.6 223 42 5.3 5.3 2 Unit Sites
 
619 20 1.1 31.0 478 91 5.7 5.2 740 138 5.8 5.4 3 Unit Sites
 
182 5
0.8 36.4 52 13 4.3 4.0 181 30 5.0 6.0 BWR 396 11 0.9 36.0 299 56 5.1 5.3 482 84 5.6 5.7 PWR 659 21 1.1 31.4 500 96 5.6 5.2 662 126 5.7 5.3 Total All
 
Regions 1055 32 1.0 33.0 799 152 5.6 5.3 1144 210 5.8 5.4 9/11/2018 2:22:01 PM
 
Page 204 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 883 104 4.0 8.5 Region 2 694 112 4.5 6.2 Region 3 779 98 4.1 7.9 Region 4 642 80 4.0 8.0 1 Unit Sites
 
746 97 4.0 7.7 2 Unit Sites
 
1837 249 4.4 7.4 3 Unit Sites
 
415 48 3.7 8.6 BWR 1176 151 4.1 7.8 PWR 1821 243 4.2 7.5 Total All
 
Regions 2998 394 4.2 7.6 9/11/2018 2:22:01 PM
 
Page 205 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.01 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.01, "Access Authorization," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target
 
range for completion of this procedure as well as make minor administrative changes.
 
04/20/2015
 
IP 71130.01, "Access Authorization," has been revised to address the program applicability and minor administrative changes.
 
2015 2017 3 Year Total
 
NCV Green 6
3 9
Total 6
3 9
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 206 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.01 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 1
0 0
1 0
0 0
0 0
0 0
0 1
Region 3 4
0 0
0 0
3 0
0 0
0 0
0 0
Region 4 4
0 1
2 0
4 0
0 0
0 0
0 2
1 Unit Sites
 
3 0
0 2
0 3
0 0
0 0
0 0
1 2 Unit Sites
 
6 0
1 1
0 4
0 0
0 0
0 0
2 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 4
0 0
0 0
3 0
0 0
0 0
0 0
PWR 5
0 1
3 0
4 0
0 0
0 0
0 3
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
9 0
1 3
0 7
0 0
0 0
0 0
3 Percentage of All
 
Findings 100%
0%
11%
33%
0%
78%
0%
0%
0%
0%
0%
0%
33%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 207 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.01 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 4.8 2.5 Region 3 9.6 0.0 0.0 9.6 Region 4 4.9 0.0 5.1 5.0 1 Unit Sites
 
3.5 0.0 2.9 3.1 2 Unit Sites
 
7.2 0.0 5.7 5.9 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.4 0.0 0.0 5.2 PWR 2.9 0.0 5.5 3.7 Total All Regions
 
5.1 0.0 3.9 4.2 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 7.2 0.0 0.0 7.2 Region 4 4.9 0.0 5.1 5.0 1 Unit Sites
 
3.5 0.0 2.9 3.1 2 Unit Sites
 
5.4 0.0 2.9 3.9 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 6.3 0.0 0.0 3.9 PWR 2.9 0.0 3.7 2.9 Total All Regions
 
4.3 0.0 2.6 3.3 71130.01 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 208 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 234 8
0.9 29.2 116 4
0.8 28.9 172 7
0.9 24.5 Region 2 113 6
0.9 18.8 73 4
0.8 18.3 210 8
1.0 26.2 Region 3 417 15 0.9 27.8 0
0 0.0 0.0 0
0 0.0 0.0 Region 4 407 12 0.9 33.9 0
0 0.0 0.0 393 12 1.0 32.7 1 Unit Sites
 
330 11 0.9 30.0 26 1
0.5 25.5 212 6
1.0 35.3 2 Unit Sites
 
747 27 1.0 27.7 113 5
0.8 22.6 464 18 1.0 25.8 3 Unit Sites
 
94 3
0.8 31.3 50 2
0.7 25.0 98 3
0.8 32.7 BWR 479 17 0.9 28.2 62 2
0.7 31.0 231 9
0.9 25.7 PWR 692 24 1.0 28.8 127 6
0.9 21.1 543 18 1.1 30.2 Total All
 
Regions 1171 41 1.0 28.6 189 8
0.9 23.6 774 27 1.0 28.7 9/11/2018 2:22:01 PM
 
Page 209 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 521 19 1.0 27.4 Region 2 396 18 1.0 22.0 Region 3 417 15 0.9 27.8 Region 4 800 24 1.0 33.3 1 Unit Sites
 
568 18 1.0 31.5 2 Unit Sites
 
1324 50 1.0 26.5 3 Unit Sites
 
242 8
0.9 30.3 BWR 772 28 0.9 27.6 PWR 1361 48 1.0 28.4 Total All
 
Regions 2134 76 1.0 28.1 9/11/2018 2:22:01 PM
 
Page 210 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.02 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.02, "Access Control," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range
 
for completion of this procedure as well as make minor administrative changes.
 
04/20/2015
 
IP 71130.02, "Access Control," has been revised to address the program applicability and minor administrative changes.
 
2015 2016 2017 3 Year Total
 
FIN Green 0
0 6
6 NCV Green 9
16 8
33 Total 9
16 14 39 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 211 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.02 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 17 0
1 15 0
14 0
0 0
0 0
0 14 Region 2 4
0 0
4 0
4 0
0 0
0 0
0 3
Region 3 4
0 0
4 0
3 0
0 0
0 0
0 4
Region 4 14 0
2 11 0
13 0
0 0
0 0
0 9
1 Unit Sites
 
22 0
3 18 0
19 0
0 0
0 0
0 17 2 Unit Sites
 
16 0
0 15 0
14 0
0 0
0 0
0 12 3 Unit Sites
 
1 0
0 1
0 1
0 0
0 0
0 0
1 BWR 18 0
2 15 0
15 0
0 0
0 0
0 12 PWR 21 0
1 19 0
19 0
0 0
0 0
0 18 Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
39 0
3 34 0
34 0
0 0
0 0
0 30 Percentage of All
 
Findings 100%
0%
8%
87%
0%
87%
0%
0%
0%
0%
0%
0%
77%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 212 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.02 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 7.9 11.2 15.0 11.9 Region 2 2.5 8.0 0.0 3.3 Region 3 0.0 5.5 7.6 4.4 Region 4 15.0 16.9 12.1 14.9 1 Unit Sites
 
7.4 14.7 12.6 11.6 2 Unit Sites
 
5.6 7.6 6.2 6.5 3 Unit Sites
 
0.0 0.0 15.6 4.3 BWR 9.3 11.1 9.6 10.0 PWR 3.6 9.8 8.7 7.5 Total All Regions
 
6.1 10.4 9.0 8.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 5.3 5.2 8.9 6.6 Region 2 2.5 8.0 0.0 3.3 Region 3 0.0 5.5 2.7 2.7 Region 4 11.6 12.3 9.1 11.2 1 Unit Sites
 
5.0 8.5 7.2 6.9 2 Unit Sites
 
4.2 7.6 2.4 4.7 3 Unit Sites
 
0.0 0.0 15.6 4.3 BWR 7.0 5.6 3.5 5.3 PWR 2.4 8.7 5.6 5.7 Total All Regions
 
4.3 7.6 4.8 5.6 71130.02 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 213 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 381 16 0.9 23.8 384 16 0.9 24.0 450 16 0.9 28.1 Region 2 399 17 1.0 23.5 374 17 0.9 22.0 421 19 1.2 22.2 Region 3 368 15 0.9 24.5 367 15 0.9 24.5 377 15 0.9 25.1 Region 4 258 12 1.0 21.5 326 12 0.9 27.1 220 12 1.1 18.3 1 Unit Sites
 
384 15 0.9 25.6 387 15 0.9 25.8 355 16 1.1 22.2 2 Unit Sites
 
845 38 1.0 22.2 885 38 1.0 23.3 919 39 1.1 23.6 3 Unit Sites
 
176 7
0.9 25.2 179 7
0.9 25.5 193 7
1.0 27.6 BWR 573 23 1.0 24.9 535 23 1.0 23.3 577 24 1.0 24.0 PWR 833 37 1.0 22.5 915 37 1.0 24.7 890 38 1.1 23.4 Total All
 
Regions 1405 60 1.0 23.4 1450 60 1.0 24.2 1467 62 1.1 23.7 9/11/2018 2:22:01 PM
 
Page 214 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1214 48 1.0 25.3 Region 2 1195 53 1.1 22.5 Region 3 1111 45 1.0 24.7 Region 4 804 36 1.1 22.3 1 Unit Sites
 
1126 46 1.0 24.5 2 Unit Sites
 
2650 115 1.0 23.0 3 Unit Sites
 
548 21 1.0 26.1 BWR 1685 70 1.0 24.1 PWR 2638 112 1.0 23.6 Total All
 
Regions 4323 182 1.0 23.8 9/11/2018 2:22:01 PM
 
Page 215 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.03 Revision History
 
Date of Revision
 
Description of Revision
 
12/22/2016
 
IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to remove Addendum 5, and change the resource estimate hours from 435
 
to 393.
04/20/2015
 
IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to address the program applicability and minor administrative changes.
 
2015 2016 2017 3 Year Total
 
NCV Green 27 20 9
56 Total 27 20 9
56 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 216 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.03 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 13 0
2 6
0 13 0
0 0
0 0
0 6
Region 2 8
0 2
3 0
8 0
0 0
0 0
0 4
Region 3 16 0
2 11 0
15 0
0 0
0 0
0 11 Region 4 17 0
4 7
0 17 0
0 0
0 0
0 6
1 Unit Sites
 
17 0
4 8
0 16 0
0 0
0 0
0 7
2 Unit Sites
 
35 0
5 19 0
35 0
0 0
0 0
0 18 3 Unit Sites
 
2 0
1 0
0 2
0 0
0 0
0 0
2 BWR 22 0
5 8
0 21 0
0 0
0 0
0 7
PWR 32 0
5 19 0
32 0
0 0
0 0
0 20 Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
54 0
10 27 0
53 0
0 0
0 0
0 27 Percentage of All
 
Findings 100%
0%
19%
50%
0%
98%
0%
0%
0%
0%
0%
0%
50%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 217 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.03 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 2.0 2.7 0.7 1.8 Region 2 1.5 1.3 0.5 1.2 Region 3 2.5 2.3 2.7 2.5 Region 4 2.4 2.6 1.5 2.4 1 Unit Sites
 
2.0 2.0 1.4 1.8 2 Unit Sites
 
2.1 2.2 1.2 2.0 3 Unit Sites
 
0.0 2.4 0.0 1.6 BWR 2.3 1.7 1.2 2.0 PWR 1.9 2.4 1.2 1.9 Total All Regions
 
2.1 2.2 1.2 1.9 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.6 2.6 0.4 1.3 Region 2 1.1 1.3 0.5 0.9 Region 3 2.4 2.3 1.6 2.1 Region 4 1.6 2.6 1.5 2.0 1 Unit Sites
 
1.4 2.0 0.9 1.3 2 Unit Sites
 
1.8 2.0 0.7 1.7 3 Unit Sites
 
0.0 2.4 0.0 1.6 BWR 2.0 1.7 0.5 1.5 PWR 1.3 2.2 0.9 1.5 Total All Regions
 
1.6 2.1 0.8 1.5 71130.03 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 218 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1932 5
0.8 386.3 1164 6
1.5 194.0 2357 18 2.0 130.9 Region 2 1815 5
0.8 362.9 2330 12 1.7 194.1 2185 14 2.0 156.0 Region 3 1693 5
0.8 338.6 2189 12 1.7 182.4 1257 8
1.6 157.2 Region 4 1895 6
0.9 315.8 1535 8
1.6 191.9 670 5
1.7 134.0 1 Unit Sites
 
1644 5
0.8 328.8 355 2
1.0 177.4 2914 20 2.0 145.7 2 Unit Sites
 
5328 15 0.9 355.2 5667 30 1.9 188.9 2333 19 2.1 122.8 3 Unit Sites
 
362 1
0.5 362.0 1195 6
1.5 199.2 1222 6
1.5 203.6 BWR 3579 10 0.9 357.9 2317 12 1.7 193.1 2050 15 1.9 136.6 PWR 3755 11 0.9 341.3 4900 26 1.9 188.5 4419 30 2.1 147.3 Total All
 
Regions 7334 21 1.0 349.2 7217 38 1.9 189.9 6469 45 2.1 143.8 9/11/2018 2:22:01 PM
 
Page 219 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 5453 29 1.7 188.0 Region 2 6329 31 1.7 204.1 Region 3 5139 25 1.6 205.6 Region 4 4100 19 1.5 215.8 1 Unit Sites
 
4913 27 1.7 182.0 2 Unit Sites
 
13328 64 1.6 208.3 3 Unit Sites
 
2779 13 1.6 213.8 BWR 7946 37 1.5 214.8 PWR 13074 67 1.7 195.1 Total All
 
Regions 21020 104 1.7 202.1 9/11/2018 2:22:01 PM
 
Page 220 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.04 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.04, "Equipment Performance, Testing and Maintenance," has been revised to adjust the resource estimate to reflect the nominal number of
 
inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
 
04/27/2015
 
IP 71130.04, "Equipment Performance, Testing and Maintenance, has been revised to address the program applicability and minor administrative changes.
 
2015 2016 2017 3 Year Total
 
NCV Green 7
10 7
24 NOV N/A 1
0 0
1 Total 8
10 7
25 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 221 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.04 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 18 0
3 10 0
18 0
0 0
0 0
0 12 Region 2 2
0 0
2 0
2 0
0 0
0 0
0 2
Region 3 2
0 0
2 0
2 0
0 0
0 0
0 1
Region 4 3
0 0
2 0
3 0
0 0
0 0
0 2
1 Unit Sites
 
11 0
1 7
0 11 0
0 0
0 0
0 6
2 Unit Sites
 
14 0
2 9
0 14 0
0 0
0 0
0 11 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 13 0
1 9
0 13 0
0 0
0 0
0 8
PWR 12 0
2 7
0 12 0
0 0
0 0
0 9
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
25 0
3 16 0
25 0
0 0
0 0
0 17 Percentage of All
 
Findings 100%
0%
12%
64%
0%
100%
0%
0%
0%
0%
0%
0%
68%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 222 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.04 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 11.2 15.1 14.9 13.5 Region 2 0.0 0.0 7.7 2.4 Region 3 1.2 2.6 0.0 1.8 Region 4 0.0 4.2 0.0 6.3 1 Unit Sites
 
7.5 5.6 10.5 6.8 2 Unit Sites
 
3.2 5.7 12.3 5.8 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 6.3 7.3 12.3 7.5 PWR 3.7 4.0 11.4 5.0 Total All Regions
 
5.0 5.3 11.7 6.1 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 9.0 12.1 12.2 11.1 Region 2 0.0 0.0 7.7 2.4 Region 3 1.2 2.6 0.0 1.8 Region 4 0.0 4.2 0.0 6.3 1 Unit Sites
 
5.6 4.5 6.8 5.1 2 Unit Sites
 
2.3 4.9 11.2 4.9 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 4.5 6.2 9.9 6.0 PWR 2.7 3.3 9.9 4.0 Total All Regions
 
3.6 4.5 9.9 4.8 71130.04 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 223 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 334 6
0.9 55.6 415 10 0.9 41.5 246 6
0.9 40.9 Region 2 229 6
0.9 38.1 345 10 0.9 34.5 260 7
0.9 37.2 Region 3 841 15 0.9 56.1 783 15 0.9 52.2 0
0 0.0 0.0 Region 4 0
0 0.0 0.0 475 12 1.0 39.6 0
0 0.0 0.0 1 Unit Sites
 
375 8
0.9 46.9 488 12 1.0 40.7 115 3
0.8 38.4 2 Unit Sites
 
828 16 0.9 51.8 1312 30 1.0 43.7 307 8
0.9 38.4 3 Unit Sites
 
200 3
0.8 66.8 217 5
0.8 43.3 83 2
0.7 41.6 BWR 661 12 0.9 55.1 806 18 1.0 44.8 202 5
0.8 40.5 PWR 743 15 0.9 49.5 1211 29 1.0 41.8 304 8
0.9 37.9 Total All
 
Regions 1404 27 1.0 52.0 2017 47 1.0 42.9 506 13 0.9 38.9 9/11/2018 2:22:01 PM
 
Page 224 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 994 22 1.0 45.2 Region 2 833 23 1.0 36.2 Region 3 1624 30 1.0 54.1 Region 4 475 12 1.0 39.6 1 Unit Sites
 
979 23 1.0 42.5 2 Unit Sites
 
2447 54 1.0 45.3 3 Unit Sites
 
500 10 0.9 50.0 BWR 1669 35 1.0 47.7 PWR 2257 52 1.0 43.4 Total All  
 
Regions 3926 87 1.0 45.1 9/11/2018 2:22:01 PM
 
Page 225 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.05 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to adjust the resource estimate to reflect the nominal
 
number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
 
04/27/2015
 
IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to address program applicability. Additionally, inspection requirement 05-02.07.f (the verification of target sets) was removed as it was redundant to the inspection activity being inspected in IP 71130.14. 


U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/27/2015            IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to address program applicability. Additionally, inspection requirement 05-02.07.f (the verification of target sets) was removed as it was redundant to the inspection activity being inspected in IP 71130.14.
Procedure completion and resource estimate were changed due to deletion of this inspection requirement. Minor administrative edits were made.
Procedure completion and resource estimate were changed due to deletion of this inspection requirement. Minor administrative edits were made.
Summary of PIM Findings 2015              2016                2017      3 Year Total NCV Green                                    6                13                    5              24 NCVIV Green                                  0                0                    1              1 NCVIV N/A                                    0                1                    0              1 Total                                        6                14                    6              26 9/11/2018 2:22:01 PM                                                                                                                                                  Page 226 of 276


2015 2016 2017 3 Year Total
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 PIM Findings Breakdown All    > Green PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
 
                            > SL-IV                                                                                Safety      Safety Region 1                   5        0    1   2    0          5          0            0          0          0              0          0          5 Region 2                  4        0    0    4    0          4          0            0          0          0              0         0         1 Region 3                  5        0    1    4    0          4          0            0          0          0              0          0          5 Region 4                  12        0    5    5    0          12          0            0          0          0              0          0          9 1 Unit Sites              14       0    5    7    0          13          0            0          0          0              0          0        11 2 Unit Sites              11       0    2   7    0          11          0            0          0          0              0          0          9 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          0          0 BWR                        9        0    1    7    0          8          0            0          0          0              0          0          5 PWR                      17        0    6    8    0          17          0            0          0          0              0          0        15 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        26        0   7  15    0         25          0           0           0           0             0         0         20 Percentage of All    100%        0% 27%  58%    0%        96%          0%          0%          0%          0%            0%          0%      77%
NCV Green 6
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 227 of 276
13 5
24 NCVIV Green
 
0 0
1 1
NCVIV N/A 0
1 0
1 Total 6
14 6
26 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 226 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.05 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 5
0 1
2 0
5 0
0 0
0 0
0 5
Region 2 4
0 0
4 0
4 0
0 0
0 0
0 1
Region 3 5
0 1
4 0
4 0
0 0
0 0
0 5
Region 4 12 0
5 5
0 12 0
0 0
0 0
0 9
1 Unit Sites
 
14 0
5 7
0 13 0
0 0
0 0
0 11 2 Unit Sites
 
11 0
2 7
0 11 0
0 0
0 0
0 9
3 Unit Sites
 
1 0
0 1
0 1
0 0
0 0
0 0
0 BWR 9
0 1
7 0
8 0
0 0
0 0
0 5
PWR 17 0
6 8
0 17 0
0 0
0 0
0 15 Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
26 0
7 15 0
25 0
0 0
0 0
0 20 Percentage of All
 
Findings 100%
0%
27%
58%
0%
96%
0%
0%
0%
0%
0%
0%
77%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 227 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.05 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 4.5 1.6 2.7 Region 2 2.7 2.9 3.5 2.9 Region 3 0.0 9.4 4.4 5.7 Region 4 5.7 9.6 9.5 8.2 1 Unit Sites
 
4.1 7.8 2.9 5.5 2 Unit Sites
 
1.9 5.0 4.1 3.6 3 Unit Sites
 
3.7 0.0 5.8 4.6 BWR 7.3 4.3 2.4 4.3 PWR 1.3 8.2 4.7 4.6 Total All Regions
 
2.9 6.6 3.8 4.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 4.1 1.6 2.3 Region 2 2.7 2.9 1.8 2.4 Region 3 0.0 3.8 3.3 3.2 Region 4 2.5 7.6 9.5 6.0 1 Unit Sites
 
1.7 4.8 2.9 3.3 2 Unit Sites
 
1.9 4.4 2.6 2.9 3 Unit Sites
 
3.7 0.0 5.8 4.6 BWR 4.9 2.6 2.4 3.0 PWR 1.3 6.3 3.3 3.3 Total All Regions
 
2.1 4.6 3.0 3.2 71130.05 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 228 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 342 6
1.5 57.0 736 16 1.8 46.0 642 12 1.7 53.5 Region 2 1132 20 1.8 56.6 344 8
1.6 43.0 567 14 1.8 40.5 Region 3 61 2
0.7 30.5 260 6
1.2 43.3 614 21 1.8 29.2 Region 4 393 12 1.5 32.8 395 12 1.7 32.9 210 6
1.5 35.0 1 Unit Sites
 
521 12 1.5 43.4 531 12 1.5 44.3 315 8
1.6 39.3 2 Unit Sites
 
1140 22 1.7 51.8 982 26 1.9 37.8 1371 37 1.9 37.0 3 Unit Sites
 
268 6
1.5 44.6 222 4
1.3 55.4 347 8
1.6 43.4 BWR 411 9
1.3 45.6 784 17 1.7 46.1 820 23 1.8 35.7 PWR 1518 31 1.8 49.0 951 25 1.8 38.0 1213 30 1.9 40.4 Total All
 
Regions 1928 40 1.7 48.2 1735 42 1.8 41.3 2033 53 1.9 38.3 9/11/2018 2:22:01 PM
 
Page 229 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1720 34 1.9 50.6 Region 2 2043 42 1.9 48.6 Region 3 935 29 1.6 32.2 Region 4 998 30 1.8 33.3 1 Unit Sites
 
1366 32 1.7 42.7 2 Unit Sites
 
3493 85 1.9 41.1 3 Unit Sites
 
836 18 1.8 46.5 BWR 2015 49 1.7 41.1 PWR 3681 86 1.9 42.8 Total All
 
Regions 5695 135 1.8 42.2 9/11/2018 2:22:01 PM
 
Page 230 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.06 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.06, "Protection of Safeguards Information," has been revised to adjust the resource estimate to reflect the nominal number of inspection
 
requirements as the target range for completion of this procedure as well as make minor administrative changes.
 
04/20/2015
 
IP 71130.06, "Protection of Safeguards Information," has been revised to address the program applicability and minor administrative changes.
 
2017 3 Year Total
 
NOV White 1
1 Total 1
1 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 231 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.06 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 1
1 0
0 0
1 0
0 0
0 0
0 1
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 0
0 0
0 0
0 0
0 0
0 0
0 0
1 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 2 Unit Sites
 
1 1
0 0
0 1
0 0
0 0
0 0
1 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 0
0 0
0 0
0 0
0 0
0 0
0 0
PWR 1
1 0
0 0
1 0
0 0
0 0
0 1
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
1 1
0 0
0 1
0 0
0 0
0 0
1 Percentage of All
 
Findings 100%
100%
0%
0%
0%
100%
0%
0%
0%
0%
0%
0%
100%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 232 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.06 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 10.2 5.4 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 7.3 2.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 6.9 2.2 Total All Regions
 
0.0 0.0 4.7 1.4 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 10.2 5.4 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites
 
0.0 0.0 0.0 0.0 2 Unit Sites
 
0.0 0.0 7.3 2.7 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 6.9 2.2 Total All Regions
 
0.0 0.0 4.7 1.4 71130.06 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 233 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 71 8
0.9 8.9 28 4
0.8 6.9 29 7
0.9 4.1 Region 2 59 6
0.9 9.9 26 4
1.0 6.6 98 8
0.9 12.3 Region 3 0
0 0.0 0.0 107 15 0.9 7.2 0
0 0.0 0.0 Region 4 191 12 0.9 15.9 13 0
0.0 0.0 87 12 1.0 7.3 1 Unit Sites
 
75 6
0.9 12.5 61 6
0.8 10.2 26 6
0.9 4.3 2 Unit Sites
 
230 18 0.9 12.8 103 14 0.9 7.4 171 18 1.0 9.5 3 Unit Sites
 
17 2
0.7 8.5 10 3
1.0 3.3 17 3
0.8 5.5 BWR 120 9
0.9 13.3 72 10 0.9 7.2 68 9
0.9 7.6 PWR 202 17 0.9 11.9 103 13 0.9 7.9 146 18 1.0 8.1 Total All
 
Regions 322 26 1.0 12.4 174 23 1.0 7.6 214 27 1.0 7.9 9/11/2018 2:22:01 PM
 
Page 234 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 127 19 1.0 6.7 Region 2 184 18 1.0 10.2 Region 3 107 15 0.9 7.2 Region 4 291 24 1.0 12.1 1 Unit Sites
 
162 18 0.9 9.0 2 Unit Sites
 
504 50 1.0 10.1 3 Unit Sites
 
44 8
1.0 5.4 BWR 260 28 0.9 9.3 PWR 450 48 1.0 9.4 Total All
 
Regions 709 76 1.0 9.3 9/11/2018 2:22:01 PM
 
Page 235 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.07 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.07, "Security Training," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target
 
range for completion of this procedure as well as make minor administrative changes.
 
04/27/2015
 
IP 71130.07, "Security Training," has been revised to address program applicability. Additionally, inspection requirements for Firearms Preemptive Authority, section 07-02.14.a,b,c. Procedure completion and resource estimate were changed to reflect new requirements. Minor administrative edits were made.
 
2016 2017 3 Year Total
 
NCV Green 3
1 4
Total 3
1 4
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 236 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.07 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
1 0
0 0
0 0
0 1
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 1
0 1
0 0
1 0
0 0
0 0
0 1
Region 4 1
0 0
1 0
1 0
0 0
0 0
0 1
1 Unit Sites
 
3 0
1 2
0 3
0 0
0 0
0 0
3 2 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 1
0 1
0 0
1 0
0 0
0 0
0 1
PWR 2
0 0
2 0
2 0
0 0
0 0
0 2
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
3 0
1 2
0 3
0 0
0 0
0 0
3 Percentage of All
 
Findings 100%
0%
33%
67%
0%
100%
0%
0%
0%
0%
0%
0%
100%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 237 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.07 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 3.2 0.0 1.4 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 4.5 2.1 Region 4 0.0 2.7 0.0 2.7 1 Unit Sites
 
0.0 5.5 3.2 2.9 2 Unit Sites
 
0.0 0.0 1.8 0.6 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 4.8 1.8 PWR 0.0 2.9 0.0 1.3 Total All Regions
 
0.0 2.1 2.3 1.5 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 3.2 0.0 1.4 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 2.2 1.0 Region 4 0.0 2.7 0.0 2.7 1 Unit Sites
 
0.0 5.5 3.2 2.9 2 Unit Sites
 
0.0 0.0 0.0 0.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 0.0 2.4 0.9 PWR 0.0 2.9 0.0 1.3 Total All Regions
 
0.0 2.1 1.2 1.1 71130.07 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 238 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 194 6
0.9 32.3 311 11 1.1 28.3 189 6
0.9 31.5 Region 2 145 6
1.0 24.1 260 10 0.9 26.0 224 7
0.9 31.9 Region 3 516 15 0.9 34.4 0
0 0.0 0.0 448 15 0.9 29.9 Region 4 0
0 0.0 0.0 371 12 1.0 30.9 4
0 0.0 0.0 1 Unit Sites
 
254 8
0.9 31.7 198 7
1.0 28.3 232 8
0.9 29.0 2 Unit Sites
 
481 16 1.0 30.1 611 22 1.0 27.8 531 17 0.9 31.3 3 Unit Sites
 
120 3
0.8 39.9 132 4
0.8 33.0 102 3
0.8 33.8 BWR 411 12 0.9 34.3 262 10 1.1 26.2 414 13 0.9 31.8 PWR 443 15 1.0 29.5 680 23 1.0 29.6 451 15 0.9 30.1 Total All
 
Regions 854 27 1.0 31.6 941 33 1.1 28.5 865 28 0.9 30.9 9/11/2018 2:22:01 PM
 
Page 239 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 694 23 1.0 30.2 Region 2 628 23 1.0 27.3 Region 3 964 30 1.0 32.1 Region 4 375 12 0.9 31.3 1 Unit Sites
 
684 23 1.0 29.7 2 Unit Sites
 
1623 55 1.0 29.5 3 Unit Sites
 
353 10 0.9 35.3 BWR 1086 35 1.0 31.0 PWR 1574 53 1.0 29.7 Total All
 
Regions 2660 88 1.0 30.2 9/11/2018 2:22:01 PM
 
Page 240 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.08 Revision History
 
Date of Revision
 
Description of Revision
 
09/30/2016
 
IP 71130.08, "Fitness-for-Duty (FFD) Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as
 
the target range for completion of this procedure as well as make minor administrative changes.
 
05/21/2015
 
IP 71130.08, "Fitness-for-Duty Program," has been revised to address language clarification for 10 CFR 26.139(d) and (e) requirements found in section 02.10
 
c.3. of this IP; program applicability and minor administrative changes.
 
2015 2016 2017 3 Year Total
 
FIN Green 2
0 0
2 NCV Green 0
0 5
5 NCVIV N/A 0
0 1
1 VIO N/A 0
1 0
1 Total 2
1 6
9 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 241 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.08 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 2
0 0
2 0
2 0
0 0
0 0
0 0
Region 2 1
0 0
0 0
1 0
0 0
0 0
0 1
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 6
0 5
0 0
6 0
0 0
0 0
0 6
1 Unit Sites
 
3 0
1 1
0 3
0 0
0 0
0 0
2 2 Unit Sites
 
6 0
4 1
0 6
0 0
0 0
0 0
5 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 2
0 1
1 0
2 0
0 0
0 0
0 1
PWR 7
0 4
1 0
7 0
0 0
0 0
0 6
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
9 0
5 2
0 9
0 0
0 0
0 0
7 Percentage of All
 
Findings 100%
0%
56%
22%
0%
100%
0%
0%
0%
0%
0%
0%
78%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 242 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.08 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 9.2 0.0 0.0 3.9 Region 2 0.0 20.8 0.0 3.3 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 15.1 15.1 1 Unit Sites
 
8.3 0.0 7.8 7.3 2 Unit Sites
 
4.7 7.7 6.2 6.0 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.2 0.0 2.7 3.6 PWR 4.7 9.2 8.5 7.8 Total All Regions
 
6.0 5.5 6.5 6.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 9.2 0.0 0.0 3.9 Region 2 0.0 20.8 0.0 3.3 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 13.4 13.4 1 Unit Sites
 
8.3 0.0 7.8 7.3 2 Unit Sites
 
4.7 7.7 2.1 3.6 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 8.2 0.0 2.7 3.6 PWR 4.7 9.2 5.5 5.8 Total All Regions
 
6.0 5.5 4.4 4.9 71130.08 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 243 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 218 8
0.9 27.3 133 4
0.8 33.1 162 7
0.9 23.1 Region 2 116 6
0.9 19.3 48 4
0.8 12.0 140 8
1.0 17.4 Region 3 0
0 0.0 0.0 0
0 0.0 0.0 309 15 0.9 20.6 Region 4 0
0 0.0 0.0 0
0 0.0 0.0 298 12 1.1 24.8 1 Unit Sites
 
43 2
0.7 21.6 26 1
0.5 25.5 222 11 1.2 20.1 2 Unit Sites
 
259 11 0.9 23.5 109 5
0.8 21.8 598 27 1.0 22.1 3 Unit Sites
 
32 1
0.5 32.0 46 2
0.7 23.0 89 4
0.8 22.3 BWR 122 5
0.8 24.5 72 2
0.7 36.0 367 17 0.9 21.6 PWR 212 9
0.9 23.6 109 6
0.9 18.1 542 25 1.1 21.7 Total All
 
Regions 334 14 0.9 23.9 181 8
0.9 22.6 909 42 1.1 21.6 9/11/2018 2:22:01 PM
 
Page 244 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 513 19 1.0 27.0 Region 2 304 18 1.0 16.9 Region 3 309 15 0.9 20.6 Region 4 298 12 1.1 24.8 1 Unit Sites
 
290 14 1.2 20.7 2 Unit Sites
 
966 43 1.0 22.5 3 Unit Sites
 
167 7
0.9 23.9 BWR 561 24 0.9 23.4 PWR 863 40 1.0 21.6 Total All
 
Regions 1423 64 1.0 22.2 9/11/2018 2:22:01 PM
 
Page 245 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.11 Revision History
 
Date of Revision
 
Description of Revision
 
2015 2016 3 Year Total
 
NCV Green 1
5 6
NCVIV N/A 1
0 1
Total 2
5 7
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 246 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.11 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 1
0 0
1 0
1 0
0 0
0 0
0 1
Region 2 2
0 1
0 0
2 0
0 0
0 0
0 0
Region 3 2
0 0
1 0
2 0
0 0
0 0
0 2
Region 4 2
0 0
1 0
1 0
0 0
0 0
0 2
1 Unit Sites
 
4 0
0 2
0 3
0 0
0 0
0 0
3 2 Unit Sites
 
3 0
1 1
0 3
0 0
0 0
0 0
2 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 2
0 0
2 0
1 0
0 0
0 0
0 2
PWR 5
0 1
1 0
5 0
0 0
0 0
0 3
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
7 0
1 3
0 6
0 0
0 0
0 0
5 Percentage of All
 
Findings 100%
0%
14%
43%
0%
86%
0%
0%
0%
0%
0%
0%
71%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 247 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.11 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 6.0 0.0 2.6 Region 2 24.0 0.0 0.0 9.0 Region 3 0.0 20.4 0.0 9.8 Region 4 0.0 25.0 0.0 12.2 1 Unit Sites
 
6.3 14.5 0.0 9.0 2 Unit Sites
 
6.6 12.7 0.0 6.2 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 9.0 0.0 4.8 PWR 10.4 16.2 0.0 8.9 Total All Regions
 
6.4 12.3 0.0 7.2 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 6.0 0.0 2.6 Region 2 24.0 0.0 0.0 9.0 Region 3 0.0 20.4 0.0 9.8 Region 4 0.0 12.5 0.0 6.1 1 Unit Sites
 
6.3 9.7 0.0 6.7 2 Unit Sites
 
6.6 12.7 0.0 6.2 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 0.0 4.5 0.0 2.4 PWR 10.4 16.2 0.0 8.9 Total All Regions
 
6.4 9.9 0.0 6.2 71130.11 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 248 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 122 75 15.0 1.6 166 105 17.5 1.6 97 75 15.0 1.3 Region 2 83 105 13.1 0.8 62 74 12.3 0.8 78 90 12.9 0.9 Region 3 57 75 15.0 0.8 98 90 15.0 1.1 49 60 12.0 0.8 Region 4 48 30 10.0 1.6 80 75 12.5 1.1 36 60 12.0 0.6 1 Unit Sites
 
112 105 15.0 1.1 58 60 12.0 1.0 80 60 12.0 1.3 2 Unit Sites
 
198 180 15.0 1.1 282 224 16.0 1.3 126 180 15.0 0.7 3 Unit Sites
 
0 0
0.0 0.0 67 60 15.0 1.1 54 45 11.3 1.2 BWR 119 90 12.9 1.3 221 164 16.4 1.3 76 90 12.9 0.8 PWR 192 195 16.3 1.0 185 180 15.0 1.0 183 195 15.0 0.9 Total All
 
Regions 310 285 15.8 1.1 406 344 16.4 1.2 259 285 15.0 0.9 9/11/2018 2:22:01 PM
 
Page 249 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 384 255 18.2 1.5 Region 2 223 269 14.2 0.8 Region 3 205 225 16.1 0.9 Region 4 164 165 13.8 1.0 1 Unit Sites
 
250 225 15.0 1.1 2 Unit Sites
 
606 584 16.2 1.0 3 Unit Sites
 
120 105 15.0 1.1 BWR 416 344 15.0 1.2 PWR 559 570 15.8 1.0 Total All
 
Regions 975 914 15.8 1.1 9/11/2018 2:22:01 PM
 
Page 250 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.14 Revision History
 
Date of Revision
 
Description of Revision
 
09/12/2017
 
IP 71130.14, "Review of Power Reactor Target Sets," has been revised to add background and guidance on target sets related to cyber critical digital assets.
 
09/30/2016
 
IP 71130.14, "Review of Power Reactor Target Sets," has been revised to adjust the resource estimate to reflect the nominal number of inspection
 
requirements as the target range for completion of this procedure as well as make minor administrative changes.
 
04/20/2015
 
IP 71130.14, "Review of Reactor Target Sets," has been revised to address the program applicability and minor administrative changes.
 
2015 2016 3 Year Total
 
NCV Green 5
10 15 Total 5
10 15 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 251 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.14 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 2 7
0 0
6 0
7 0
0 0
0 0
0 2
Region 3 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 4 8
0 2
6 0
8 0
0 0
0 0
0 8
1 Unit Sites
 
9 0
2 7
0 9
0 0
0 0
0 0
7 2 Unit Sites
 
4 0
0 3
0 4
0 0
0 0
0 0
2 3 Unit Sites
 
2 0
0 2
0 2
0 0
0 0
0 0
1 BWR 8
0 2
5 0
8 0
0 0
0 0
0 6
PWR 7
0 0
7 0
7 0
0 0
0 0
0 4
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
15 0
2 12 0
15 0
0 0
0 0
0 10 Percentage of All
 
Findings 100%
0%
13%
80%
0%
100%
0%
0%
0%
0%
0%
0%
67%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 252 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71130.14 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 18.7 15.9 0.0 13.5 Region 3 0.0 0.0 28.2 6.6 Region 4 57.1 27.5 0.0 30.7 1 Unit Sites
 
10.4 23.2 11.5 17.2 2 Unit Sites
 
23.6 10.0 0.0 12.9 3 Unit Sites
 
23.8 44.4 0.0 31.0 BWR 12.2 24.1 14.2 18.7 PWR 21.5 14.5 0.0 14.1 Total All Regions
 
18.4 19.0 4.0 15.8 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 2 18.7 15.9 0.0 13.5 Region 3 0.0 0.0 0.0 0.0 Region 4 33.9 25.6 0.0 23.6 1 Unit Sites
 
10.4 19.4 0.0 12.4 2 Unit Sites
 
14.0 10.0 0.0 8.7 3 Unit Sites
 
23.8 44.4 0.0 31.0 BWR 12.2 19.7 0.0 12.9 PWR 14.0 14.5 0.0 10.8 Total All Regions
 
13.4 16.3 0.0 11.5 71130.14 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 253 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 70 55 9.2 1.3 72 88 9.8 0.8 61 6
0.9 10.1 Region 2 268 79 8.8 3.4 126 83 10.4 1.5 125 24 3.4 5.2 Region 3 81 66 11.0 1.2 36 44 8.8 0.8 36 6
1.0 5.9 Region 4 30 16 5.3 1.8 195 111 11.1 1.8 30 0
0.0 0.0 1 Unit Sites
 
92 42 8.4 2.2 117 99 9.9 1.2 67 4
0.7 16.8 2 Unit Sites
 
293 153 10.2 1.9 268 184 11.5 1.5 171 31 2.4 5.5 3 Unit Sites
 
63 21 7.0 3.0 45 43 8.6 1.0 13 1
0.5 12.5 BWR 164 72 9.0 2.3 153 109 10.9 1.4 71 8
0.9 8.8 PWR 285 144 10.3 2.0 277 217 10.9 1.3 180 28 2.5 6.4 Total All
 
Regions 449 216 10.3 2.1 429 326 11.2 1.3 251 36 1.9 7.0 9/11/2018 2:22:01 PM
 
Page 254 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 203 149 7.5 1.4 Region 2 519 186 8.5 2.8 Region 3 153 116 7.7 1.3 Region 4 255 127 9.8 2.0 1 Unit Sites
 
276 145 7.6 1.9 2 Unit Sites
 
733 368 8.8 2.0 3 Unit Sites
 
120 65 8.1 1.8 BWR 387 189 7.3 2.0 PWR 742 389 8.8 1.9 Total All
 
Regions 1128 578 8.4 2.0 9/11/2018 2:22:01 PM
 
Page 255 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71151 Revision History
 
Date of Revision
 
Description of Revision
 
05/03/2017
 
IP 71151, "Performance Indicator Verification," has been revised to correct typographical errors. No other changes were made.
 
12/08/2016
 
IP 71151, "Performance Indicator Verification," has been revised to reduce the annual resource estimate by half, per Commission direction in SRM SECY 009, and clarifications for requirements made per OIG Audit 16-A-12  and the inspection report initiative.
 
2015 2016 3 Year Total
 
FIN Green 1
0 1
NCV Green 1
1 2
NCVIV N/A 0
1 1
NOV N/A 1
0 1
Total 3
2 5
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 256 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71151 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 2
0 0
1 0
1 0
0 1
0 0
0 0
Region 2 0
0 0
0 0
0 0
0 0
0 0
0 0
Region 3 2
0 0
1 0
1 1
1 0
0 0
0 0
Region 4 1
0 0
0 0
1 1
0 0
0 0
0 0
1 Unit Sites
 
1 0
0 0
0 0
1 0
0 0
0 0
0 2 Unit Sites
 
4 0
0 2
0 3
1 1
1 0
0 0
0 3 Unit Sites
 
0 0
0 0
0 0
0 0
0 0
0 0
0 BWR 2
0 0
1 0
0 1
0 1
0 0
0 0
PWR 3
0 0
1 0
3 1
1 0
0 0
0 0
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
5 0
0 2
0 3
2 1
1 0
0 0
0 Percentage of All
 
Findings 100%
0%
0%
40%
0%
60%
40%
20%
20%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 257 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71151 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.8 1.5 2.2 1.8 Region 2 0.0 0.0 0.0 0.0 Region 3 4.5 1.4 0.0 2.1 Region 4 1.8 0.0 2.2 1.3 1 Unit Sites
 
1.0 1.0 2.5 1.4 2 Unit Sites
 
2.7 0.6 0.0 1.1 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 1.9 1.0 2.4 1.7 PWR 1.9 0.6 0.0 0.9 Total All Regions
 
1.9 0.7 0.9 1.2 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 0.0 1.5 0.0 0.6 Region 2 0.0 0.0 0.0 0.0 Region 3 4.5 0.0 0.0 1.6 Region 4 1.8 0.0 0.0 0.6 1 Unit Sites
 
1.0 0.0 0.0 0.4 2 Unit Sites
 
2.0 0.6 0.0 0.9 3 Unit Sites
 
0.0 0.0 0.0 0.0 BWR 1.0 0.0 0.0 0.3 PWR 1.9 0.6 0.0 0.9 Total All Regions
 
1.5 0.4 0.0 0.7 71151 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 258 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 552 374 22.0 1.5 672 368 21.6 1.8 464 371 21.8 1.3 Region 2 820 455 25.3 1.8 854 454 25.2 1.9 778 458 25.4 1.7 Region 3 672 343 21.4 2.0 727 357 22.3 2.0 514 344 21.5 1.5 Region 4 560 270 20.8 2.1 528 272 20.9 1.9 459 284 21.8 1.6 1 Unit Sites
 
556 255 15.9 2.2 665 255 15.9 2.6 442 258 16.1 1.7 2 Unit Sites
 
1749 958 24.6 1.8 1736 964 24.7 1.8 1498 969 24.8 1.5 3 Unit Sites
 
299 229 28.6 1.3 380 232 29.0 1.6 275 230 28.8 1.2 BWR 1036 512 21.3 2.0 1035 514 21.4 2.0 833 516 21.5 1.6 PWR 1567 930 24.5 1.7 1746 937 24.7 1.9 1381 941 24.8 1.5 Total All
 
Regions 2603 1442 23.6 1.8 2781 1451 23.8 1.9 2214 1457 23.9 1.5 9/11/2018 2:22:01 PM
 
Page 259 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 1688 1113 22.7 1.5 Region 2 2452 1367 26.3 1.8 Region 3 1912 1044 22.7 1.8 Region 4 1546 826 22.3 1.9 1 Unit Sites
 
1663 768 16.7 2.2 2 Unit Sites
 
4982 2891 25.1 1.7 3 Unit Sites
 
953 691 31.4 1.4 BWR 2904 1542 21.7 1.9 PWR 4694 2808 24.8 1.7 Total All
 
Regions 7598 4350 23.8 1.7 9/11/2018 2:22:01 PM
 
Page 260 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152 Revision History
 
Date of Revision
 
Description of Revision
 
02/26/2015
 
IP 71152, "Problem Identification and Resolution," has been revised to relocate Operator Work-around inspection requirement to IP 71111.15; enhanced
 
alignment of 71152-01 INSPECTION OBJECTIVES with IMC 0308 Att. 2 Fig. 37; enhanced IP organization; aligned language to updated IMC 0310
 
nomenclature; enhanced communications with the NRC Vendor Inspection Center of Expertise for vendor or supplier deficiencies; updated references to
 
external IP's and IMC's and eliminated reference to retired RIS 2005-20; eliminated use of undefined terminology; and enhanced integration of OpE Smart
 
Samples into inspection sample population. This revision addresses, or partially addressed, FBF's 71152-1787, -1836, -1946, -1964, -2012, -2013, and -2022.
 
Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 261 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
2015 2016 2017 3 Year Total
 
AV N/A 0
0 2
2 AV Preliminary White
 
0 0
1 1
AV White 0
1 0
1 FIN Green 8
12 10 30 NCV Green 68 60 64 192 NCV N/A 0
2 0
2 NCVIV Green
 
4 1
0 5
NCVIV N/A 3
3 2
8 NOV Green 0
0 1
1 NOV N/A 1
1 0
2 NOV White 0
0 3
3 VIO Green 2
2 0
4 VIO N/A 3
1 0
4 VIO White 1
1 0
2 Total 90 84 83 257 9/11/2018 2:22:01 PM
 
Page 262 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 61 3
25 26 0
42 7
28 9
3 1
1 11 Region 2 51 0
12 26 0
42 6
32 4
0 0
0 0
Region 3 79 3
20 31 0
51 15 53 3
1 1
0 2
Region 4 64 2
8 37 1
37 19 38 4
1 0
1 0
1 Unit Sites
 
109 7
33 50 1
73 24 58 12 0
1 0
8 2 Unit Sites
 
136 1
30 65 0
92 21 87 8
5 1
2 5
3 Unit Sites
 
10 0
2 5
0 7
2 6
0 0
0 0
0 BWR 108 5
32 53 0
65 22 58 12 1
1 0
8 PWR 147 3
33 67 1
107 25 93 8
4 1
2 5
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
255 8
65 120 1
172 47 151 20 5
2 2
13 Percentage of All
 
Findings 100%
3%
25%
47%
0%
67%
18%
59%
8%
2%
1%
1%
5%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 263 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152 Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 3.1 3.4 3.0 3.2 Region 2 3.4 3.8 3.3 3.5 Region 3 6.6 4.5 6.1 5.7 Region 4 6.3 5.5 5.9 5.9 1 Unit Sites
 
5.1 4.8 4.9 4.9 2 Unit Sites
 
4.4 3.8 4.4 4.2 3 Unit Sites
 
2.7 2.8 1.4 2.3 BWR 4.7 4.8 4.6 4.7 PWR 4.4 3.7 4.2 4.1 Total All Regions
 
4.5 4.1 4.3 4.3 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 1.9 2.8 1.4 2.1 Region 2 2.6 3.2 2.0 2.6 Region 3 3.2 2.7 2.6 2.8 Region 4 3.1 3.0 3.2 3.1 1 Unit Sites
 
2.8 3.5 2.6 3.0 2 Unit Sites
 
2.6 2.6 2.0 2.4 3 Unit Sites
 
2.1 2.8 0.7 1.9 BWR 2.3 3.2 2.7 2.8 PWR 2.8 2.7 1.8 2.4 Total All Regions
 
2.6 2.9 2.2 2.6 71152 Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 264 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 6370 138 8.1 46.2 7383 137 8.1 53.9 6564 144 8.5 45.6 Region 2 5736 132 7.3 43.5 5322 119 6.6 44.7 5449 136 7.6 40.1 Region 3 4388 104 6.5 42.2 4905 107 6.7 45.8 4632 104 6.5 44.5 Region 4 3518 86 6.6 40.9 3654 94 7.2 38.9 3702 88 6.8 42.1 1 Unit Sites
 
4607 114 7.1 40.4 4696 110 6.9 42.7 4684 119 7.4 39.4 2 Unit Sites
 
11801 287 7.4 41.1 12923 290 7.4 44.6 12322 296 7.6 41.6 3 Unit Sites
 
3604 59 7.4 61.1 3644 57 7.1 63.9 3342 57 7.1 58.6 BWR 7684 178 7.4 43.2 8403 182 7.6 46.2 7817 187 7.8 41.8 PWR 12328 282 7.4 43.7 12860 275 7.2 46.8 12531 285 7.5 44.0 Total All
 
Regions 20012 460 7.5 43.5 21263 457 7.5 46.5 20347 472 7.7 43.1 9/11/2018 2:22:01 PM
 
Page 265 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 20316 419 8.6 48.5 Region 2 16507 387 7.4 42.7 Region 3 13925 315 6.8 44.2 Region 4 10874 268 7.2 40.6 1 Unit Sites
 
13987 343 7.5 40.8 2 Unit Sites
 
37045 873 7.6 42.4 3 Unit Sites
 
10590 173 7.9 61.2 BWR 23904 547 7.7 43.7 PWR 37718 842 7.5 44.8 Total All
 
Regions 61622 1389 7.6 44.4 9/11/2018 2:22:01 PM
 
Page 266 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152B Revision History
 
Date of Revision
 
Description of Revision
 
02/26/2015
 
For the biennial portion of IP 71152. Separate sample sizes/hours, etc.
 
2015 2016 2017 3 Year Total
 
AV N/A 0
0 1
1 FIN Green 5
2 3
10 FIN N/A 4
0 0
4 NCV Green 41 21 20 82 NCVIV Green
 
0 1
1 2
NCVIV N/A 3
0 3
6 NOV N/A 1
0 0
1 NOVIV Green
 
0 0
1 1
VIO Green 3
0 0
3 VIO N/A 0
1 0
1 Total 57 25 29 111 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 267 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152B All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 32 0
16 9
0 27 5
14 4
2 0
0 1
Region 2 17 0
5 2
0 17 0
9 0
1 0
0 0
Region 3 18 0
10 4
0 17 1
13 3
0 0
0 1
Region 4 42 0
14 21 0
38 5
30 2
0 1
0 2
1 Unit Sites
 
55 0
26 17 0
51 6
33 4
3 1
0 1
2 Unit Sites
 
53 0
19 18 0
47 5
32 5
0 0
0 3
3 Unit Sites
 
1 0
0 1
0 1
0 1
0 0
0 0
0 BWR 59 0
27 19 0
54 8
35 6
2 1
0 2
PWR 50 0
18 17 0
45 3
31 3
1 0
0 2
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
109 0
45 36 0
99 11 66 9
3 1
0 4
Percentage of All
 
Findings 100%
0%
41%
33%
0%
91%
10%
61%
8%
3%
1%
0%
4%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 268 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71152B Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 4.5 2.5 1.9 3.1 Region 2 1.6 2.8 1.8 2.1 Region 3 2.9 2.9 2.8 2.8 Region 4 3.8 2.6 3.4 3.4 1 Unit Sites
 
4.5 2.3 2.8 3.3 2 Unit Sites
 
2.7 3.0 2.4 2.7 3 Unit Sites
 
0.0 1.8 0.0 0.9 BWR 4.1 2.7 2.8 3.3 PWR 2.7 2.7 2.2 2.6 Total All Regions
 
3.4 2.7 2.6 2.9 Findings per 1000 Inspection
 
Hours Inspector Identified Findings per 1000 Inspection
 
Hours Findings /
 
1000 hrs (2015)
Findings /
 
1000 hrs (2016)
Findings /
 
1000 hrs (2017) 3 Year Findings
/1000 hrs Region 1 3.9 1.7 0.8 2.1 Region 2 1.2 2.4 1.2 1.6 Region 3 2.5 2.4 2.7 2.5 Region 4 3.8 1.1 3.3 2.7 1 Unit Sites
 
4.3 1.8 2.3 2.7 2 Unit Sites
 
2.0 2.0 1.6 1.9 3 Unit Sites
 
0.0 1.8 0.0 0.9 BWR 3.7 2.3 2.0 2.7 PWR 1.9 1.8 1.7 1.8 Total All Regions
 
2.7 1.9 1.8 2.2 71152B Hours & Samples Reported
 
9/11/2018 2:22:01 PM
 
Page 269 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
Calendar Year 2015
 
Calendar Year 2016
 
Calendar Year 2017
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 2040 15 1.7 136.0 1733 15 1.9 115.6 2464 18 1.8 136.9 Region 2 2458 18 1.8 136.6 2079 16 1.8 129.9 2410 18 1.8 133.9 Region 3 2021 10 1.0 202.1 1668 7
0.9 238.3 2254 10 1.0 225.4 Region 4 1565 11 1.6 142.3 1777 12 1.5 148.1 1538 12 1.7 128.1 1 Unit Sites
 
1119 7
1.2 159.8 2356 16 1.6 147.2 1717 9
1.1 190.8 2 Unit Sites
 
6248 41 1.6 152.4 3791 27 1.6 140.4 6168 43 1.8 143.4 3 Unit Sites
 
717 6
1.5 119.5 1110 7
1.4 158.6 780 6
1.5 130.0 BWR 3798 24 1.5 158.2 1760 12 1.5 146.6 4542 30 1.8 151.4 PWR 4286 30 1.7 142.9 5497 38 1.7 144.7 4123 28 1.6 147.3 Total All
 
Regions 8084 54 1.6 149.7 7257 50 1.7 145.1 8665 58 1.7 149.4 9/11/2018 2:22:01 PM
 
Page 270 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
3 Year Reported Hours Reported Samples Average Normalized
 
Samples Hrs/Sample
 
Region 1 6237 48 1.9 129.9 Region 2 6947 52 1.9 133.6 Region 3 5942 27 1.0 220.1 Region 4 4879 35 1.8 139.4 1 Unit Sites
 
5191 32 1.5 162.2 2 Unit Sites
 
16207 111 1.7 146.0 3 Unit Sites
 
2608 19 1.7 137.2 BWR 10099 66 1.7 153.0 PWR 13907 96 1.7 144.9 Total All
 
Regions 24006 162 1.7 148.2 9/11/2018 2:22:01 PM
 
Page 271 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71153 Revision History
 
Date of Revision
 
Description of Revision
 
12/17/2015
 
IP 71153, "Follow-up of Events and Notices of Enforcement Discretion," has been revised to change outdated references.
 
2015 2016 2017 3 Year Total
 
AV N/A 0
0 1
1 AV White 0
1 0
1 EDG N/A 0
0 1
1 FIN Green 15 19 12 46 FIN N/A 0
1 0
1 FIN White 0
1 0
1 NCV Green 49 58 63 170 NCVIV Green
 
1 1
1 3
NCVIV N/A 10 5
3 18 NOV N/A 1
4 2
7 NOV White 0
0 1
1 NOVIV N/A 0
0 1
1 VIO White 2
1 0
3 Total 78 91 85 254 Summary of PIM Findings
 
9/11/2018 2:22:01 PM
 
Page 272 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71153 All Findings
> Green or
> SL-IV PIR HP SCWE Inspector
 
Identified
 
Initiating
 
Events Mitigating
 
Systems Barrier Integrity Emergency
 
Preparedness
 
Occupational
 
Radiation
 
Safety Public Radiation
 
Safety Security Region 1 78 0
9 50 0
34 32 23 15 1
1 1
0 Region 2 69 1
11 35 1
37 20 34 4
0 0
0 0
Region 3 51 3
10 26 0
15 17 23 7
0 0
0 1
Region 4 53 2
4 29 0
22 17 27 6
0 0
0 0
1 Unit Sites
 
112 2
14 64 0
40 38 45 19 0
1 0
0 2 Unit Sites
 
121 4
16 66 1
61 44 50 12 1
0 1
1 3 Unit Sites
 
18 0
4 10 0
7 4
12 1
0 0
0 0
BWR 126 3
16 73 0
47 43 45 24 1
1 1
0 PWR 125 3
18 67 1
61 43 62 8
0 0
0 1
Findings Associated
 
SIT/AIT 0
0 0
0 0
0 0
0 0
0 0
0 0
Total All Regions
 
251 6
34 140 1
108 86 107 32 1
1 1
1 Percentage of All
 
Findings 100%
2%
14%
56%
0%
43%
34%
43%
13%
0%
0%
0%
0%
PIM Findings Breakdown
 
9/11/2018 2:22:01 PM
 
Page 273 of 276
 
IP 28 Inspection Procedure Analysis
 
U.S. Nuclear Regulatory Commission
 
01/01/2015 through 12/31/2017
 
71153 Findings /
 
1000 hrs (2015)
Findings /


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs   1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)     (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        4.5        1.6          2.7        Region 1                  0.0        4.1        1.6          2.3 Region 2                  2.7        2.9        3.5          2.9        Region 2                  2.7        2.9        1.8          2.4 Region 3                  0.0        9.4        4.4          5.7        Region 3                  0.0        3.8        3.3          3.2 Region 4                  5.7        9.6        9.5          8.2        Region 4                  2.5        7.6        9.5          6.0 1 Unit Sites              4.1        7.8        2.9          5.5        1 Unit Sites              1.7        4.8        2.9          3.3 2 Unit Sites              1.9        5.0        4.1          3.6        2 Unit Sites              1.9        4.4        2.6          2.9 3 Unit Sites              3.7        0.0        5.8          4.6        3 Unit Sites              3.7        0.0        5.8          4.6 BWR                        7.3        4.3        2.4          4.3        BWR                        4.9        2.6        2.4          3.0 PWR                        1.3        8.2        4.7          4.6        PWR                        1.3        6.3        3.3          3.3 Total All Regions          2.9        6.6        3.8          4.5        Total All Regions          2.1        4.6        3.0          3.2 71130.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 228 of 276
Findings /  


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1           342        6          1.5        57.0    736          16          1.8        46.0    642        12        1.7        53.5 Region 2           1132      20         1.8        56.6    344          8          1.6        43.0     567        14        1.8        40.5 Region 3            61        2         0.7        30.5     260          6          1.2        43.3    614        21         1.8        29.2 Region 4            393      12          1.5        32.8    395          12          1.7        32.9    210        6        1.5        35.0 1 Unit Sites        521      12          1.5        43.4    531          12          1.5        44.3     315        8        1.6         39.3 2 Unit Sites      1140      22          1.7       51.8    982          26          1.9        37.8    1371        37        1.9        37.0 3 Unit Sites        268        6          1.5       44.6    222          4          1.3       55.4    347        8         1.6        43.4 BWR                411        9          1.3        45.6    784          17          1.7        46.1    820        23        1.8        35.7 PWR                1518      31          1.8        49.0    951          25          1.8        38.0    1213        30        1.9        40.4 Total All          1928      40          1.7        48.2    1735          42          1.8       41.3   2033        53        1.9        38.3 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 229 of 276
/1000 hrs Region 1 20.2 20.0 9.4 14.7 Region 2 11.5 21.3 22.3 17.6 Region 3 19.7 21.5 18.3 19.8 Region 4 20.1 15.3 26.8 20.3 1 Unit Sites


19.2 19.5 12.9 16.1 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1720      34        1.9        50.6 Region 2          2043      42        1.9       48.6 Region 3            935      29        1.6        32.2 Region 4            998      30        1.8        33.3 1 Unit Sites      1366      32        1.7        42.7 2 Unit Sites      3493      85        1.9        41.1 3 Unit Sites       836      18        1.8        46.5 BWR                2015      49        1.7        41.1 PWR                3681      86        1.9        42.8 Total All          5695    135        1.8        42.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 230 of 276


17.1 18.9 19.4 18.3 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.06, "Protection of Safeguards Information," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.06, "Protection of Safeguards Information," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2017      3 Year Total NOV White                                    1                1 Total                                        1                1 9/11/2018 2:22:01 PM                                                                                                                                                Page 231 of 276


11.0 29.6 34.3 20.6 BWR 19.9 21.3 14.1 17.3 PWR 15.3 18.7 19.8 17.6 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  1        1    0    0    0          1          0            0          0          0              0          0          1 Region 3                 0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              1        1    0    0    0          1          0            0          0          0              0          0          1 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                       1        1    0    0    0          1          0            0          0          0              0          0          1 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions         1        1    0    0    0          1          0            0          0          0              0          0          1 Percentage of All    100%    100%  0%  0%    0%      100%            0%          0%          0%          0%            0%          0%      100%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 232 of 276


17.0 19.8 15.8 17.5 Findings per 1000 Inspection  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0      10.2          5.4        Region 2                  0.0        0.0        10.2          5.4 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        7.3          2.7        2 Unit Sites              0.0        0.0        7.3          2.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        6.9          2.2        PWR                        0.0        0.0        6.9          2.2 Total All Regions          0.0        0.0        4.7          1.4        Total All Regions          0.0        0.0        4.7          1.4 71130.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 233 of 276


Hours Inspector Identified Findings per 1000 Inspection
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours   Samples Normalized Samples                                      Samples                                    Samples Region 1            71        8          0.9        8.9      28          4          0.8        6.9      29        7          0.9          4.1 Region 2            59        6          0.9        9.9      26          4          1.0        6.6      98        8          0.9        12.3 Region 3              0        0          0.0        0.0    107          15          0.9        7.2        0        0          0.0          0.0 Region 4            191      12          0.9        15.9      13          0          0.0        0.0      87      12          1.0          7.3 1 Unit Sites        75        6          0.9        12.5      61          6          0.8        10.2      26        6          0.9          4.3 2 Unit Sites        230      18          0.9        12.8    103          14          0.9        7.4    171        18          1.0          9.5 3 Unit Sites        17        2          0.7        8.5      10          3          1.0        3.3      17        3          0.8          5.5 BWR                120        9          0.9        13.3      72        10          0.9        7.2      68        9          0.9          7.6 PWR                202      17          0.9        11.9    103          13          0.9        7.9    146        18          1.0          8.1 Total All          322      26          1.0        12.4    174          23          1.0        7.6    214        27          1.0          7.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 234 of 276


Hours Findings /  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1            127      19        1.0        6.7 Region 2            184      18        1.0        10.2 Region 3            107      15        0.9        7.2 Region 4            291      24        1.0        12.1 1 Unit Sites        162      18        0.9        9.0 2 Unit Sites        504      50        1.0        10.1 3 Unit Sites        44        8        1.0        5.4 BWR                260      28        0.9        9.3 PWR                450      48        1.0        9.4 Total All          709      76        1.0        9.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 235 of 276


1000 hrs (2015)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.07, "Security Training," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
Findings /  
04/27/2015            IP 71130.07, "Security Training," has been revised to address program applicability. Additionally, inspection requirements for Firearms Preemptive Authority, section 07-02.14.a,b,c. Procedure completion and resource estimate were changed to reflect new requirements. Minor administrative edits were made.
Summary of PIM Findings 2016              2017      3 Year Total NCV Green                                    3                1                4 Total                                        3                1                4 9/11/2018 2:22:01 PM                                                                                                                                                Page 236 of 276


1000 hrs (2016)
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
Findings /  
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            0          0          0              0          0          1 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  1        0    1    0    0          1          0            0          0          0              0          0          1 Region 4                  1        0    0    1    0          1          0            0          0          0              0          0          1 1 Unit Sites              3        0    1    2    0          3          0            0          0          0              0          0          3 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    1    0    0          1          0            0          0          0              0          0          1 PWR                      2        0    0    2    0          2          0            0          0          0              0          0          2 Findings                 0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    1    2    0          3          0            0          0          0              0          0          3 Percentage of All    100%        0% 33%  67%    0%      100%            0%          0%          0%          0%            0%          0%      100%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 237 of 276


1000 hrs (2017) 3 Year Findings
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                 (2015)    (2016)      (2017)   /1000 hrs Region 1                   0.0        3.2        0.0          1.4        Region 1                  0.0        3.2       0.0          1.4 Region 2                   0.0        0.0        0.0          0.0        Region 2                   0.0        0.0        0.0          0.0 Region 3                   0.0        0.0        4.5          2.1        Region 3                   0.0        0.0        2.2          1.0 Region 4                  0.0        2.7        0.0          2.7        Region 4                  0.0        2.7        0.0          2.7 1 Unit Sites              0.0        5.5        3.2          2.9        1 Unit Sites              0.0         5.5       3.2          2.9 2 Unit Sites              0.0        0.0        1.8           0.6        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        4.8           1.8        BWR                        0.0        0.0        2.4         0.9 PWR                        0.0        2.9        0.0          1.3        PWR                        0.0        2.9        0.0          1.3 Total All Regions          0.0        2.1        2.3          1.5         Total All Regions          0.0        2.1        1.2          1.1 71130.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 238 of 276
/1000 hrs Region 1 12.3 6.8 5.2 7.9 Region 2 6.8 12.2 6.3 8.3 Region 3 5.0 5.5 3.8 4.8 Region 4 12.3 8.2 7.5 9.4 1 Unit Sites


7.7 5.5 5.9 6.3 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            194        6          0.9        32.3    311          11          1.1        28.3    189        6          0.9        31.5 Region 2            145        6          1.0        24.1    260          10          0.9        26.0    224        7         0.9        31.9 Region 3            516      15          0.9        34.4        0          0          0.0        0.0    448        15          0.9        29.9 Region 4              0        0          0.0        0.0    371          12          1.0        30.9        4        0          0.0          0.0 1 Unit Sites        254        8          0.9        31.7     198          7          1.0        28.3    232        8          0.9        29.0 2 Unit Sites        481      16          1.0        30.1    611          22          1.0        27.8    531        17          0.9        31.3 3 Unit Sites        120        3          0.8        39.9    132          4          0.8        33.0    102        3          0.8        33.8 BWR                411      12          0.9        34.3    262          10          1.1        26.2    414        13          0.9        31.8 PWR                443      15          1.0        29.5     680          23          1.0        29.6    451        15          0.9        30.1 Total All          854      27          1.0        31.6    941          33          1.1        28.5     865        28          0.9         30.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 239 of 276


9.8 9.3 4.7 8.3 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            694      23        1.0        30.2 Region 2            628      23        1.0        27.3 Region 3            964      30        1.0        32.1 Region 4            375      12        0.9       31.3 1 Unit Sites        684      23        1.0        29.7 2 Unit Sites      1623      55        1.0        29.5 3 Unit Sites       353      10        0.9        35.3 BWR                1086      35        1.0        31.0 PWR                1574      53        1.0        29.7 Total All          2660      88        1.0        30.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 240 of 276


7.6 17.1 10.6 11.0 BWR 8.1 9.5 5.5 7.6 PWR 9.4 7.3 5.8 7.8 Total All Regions
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.08, "Fitness-for-Duty (FFD) Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
05/21/2015            IP 71130.08, "Fitness-for-Duty Program," has been revised to address language clarification for 10 CFR 26.139(d) and (e) requirements found in section 02.10 c.3. of this IP; program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016            2017      3 Year Total FIN Green                                    2                  0                0              2 NCV Green                                    0                  0                5             5 NCVIV N/A                                    0                  0                1              1 VIO N/A                                      0                  1                0              1 Total                                         2                  1                6              9 9/11/2018 2:22:01 PM                                                                                                                                              Page 241 of 276


8.9 8.2 5.6 7.7 71153 Hours & Samples Reported
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    2    0          2         0            0          0          0              0          0          0 Region 2                  1        0    0    0    0          1          0            0          0          0              0          0          1 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  6        0    5   0    0          6          0            0          0          0              0          0          6 1 Unit Sites              3        0    1    1    0          3          0            0          0          0              0          0          2 2 Unit Sites              6        0    4    1    0          6         0            0          0          0              0          0          5 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    1    1    0          2          0            0          0          0              0          0          1 PWR                      7        0    4    1    0          7         0            0          0          0              0          0          6 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    5    2    0          9          0            0          0          0              0          0          7 Percentage of All    100%        0% 56%  22%    0%      100%            0%          0%          0%          0%            0%          0%      78%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 242 of 276


9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  9.2        0.0        0.0          3.9        Region 1                  9.2        0.0        0.0          3.9 Region 2                  0.0      20.8        0.0          3.3        Region 2                  0.0        20.8        0.0          3.3 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0      15.1          15.1        Region 4                  0.0        0.0        13.4        13.4 1 Unit Sites              8.3        0.0        7.8          7.3        1 Unit Sites              8.3        0.0        7.8          7.3 2 Unit Sites              4.7        7.7        6.2          6.0        2 Unit Sites              4.7        7.7        2.1          3.6 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.2        0.0        2.7          3.6        BWR                        8.2        0.0        2.7          3.6 PWR                        4.7        9.2        8.5          7.8        PWR                        4.7        9.2        5.5          5.8 Total All Regions          6.0        5.5        6.5          6.3        Total All Regions          6.0        5.5        4.4          4.9 71130.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                     Page 243 of 276


Page 274 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            218        8          0.9        27.3    133          4          0.8        33.1    162        7          0.9        23.1 Region 2            116        6          0.9        19.3      48          4          0.8        12.0    140        8          1.0        17.4 Region 3              0        0          0.0        0.0        0          0          0.0        0.0    309        15          0.9        20.6 Region 4              0        0          0.0        0.0        0          0          0.0        0.0    298        12          1.1        24.8 1 Unit Sites        43        2          0.7        21.6      26          1          0.5        25.5    222        11          1.2        20.1 2 Unit Sites        259      11          0.9        23.5    109          5          0.8        21.8    598        27          1.0        22.1 3 Unit Sites        32        1          0.5        32.0      46          2          0.7        23.0      89        4          0.8        22.3 BWR                122        5          0.8        24.5      72          2          0.7        36.0    367        17          0.9        21.6 PWR                212        9          0.9        23.6    109          6          0.9        18.1    542        25          1.1        21.7 Total All          334      14          0.9        23.9    181          8          0.9        22.6    909        42          1.1        21.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 244 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            513      19        1.0        27.0 Region 2            304      18        1.0        16.9 Region 3            309      15        0.9        20.6 Region 4            298      12        1.1        24.8 1 Unit Sites        290      14        1.2        20.7 2 Unit Sites        966      43        1.0        22.5 3 Unit Sites        167        7        0.9        23.9 BWR                561      24        0.9        23.4 PWR                863      40        1.0        21.6 Total All          1423      64        1.0        22.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 245 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016  3 Year Total NCV Green                                  1    5            6 NCVIV N/A                                  1    0            1 Total                                      2    5            7 9/11/2018 2:22:01 PM                                                                    Page 246 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            0          0          0              0          0          1 Region 2                  2        0    1    0    0          2          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            0          0          0              0          0          2 Region 4                  2        0    0    1    0          1          0            0          0          0              0          0          2 1 Unit Sites              4        0    0    2    0          3          0            0          0          0              0          0          3 2 Unit Sites              3        0    1    1    0          3          0            0          0          0              0          0          2 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    0    2    0          1          0            0          0          0              0          0          2 PWR                      5        0    1    1    0          5          0            0          0          0              0          0          3 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    1    3    0          6          0            0          0          0              0          0          5 Percentage of All    100%        0% 14%  43%    0%        86%          0%          0%          0%          0%            0%          0%      71%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 247 of 276


Calendar Year 2015
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                 Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        6.0        0.0          2.6        Region 1                  0.0        6.0        0.0          2.6 Region 2                  24.0        0.0        0.0          9.0        Region 2                  24.0        0.0        0.0          9.0 Region 3                  0.0      20.4        0.0          9.8        Region 3                  0.0        20.4        0.0          9.8 Region 4                  0.0      25.0        0.0          12.2        Region 4                  0.0        12.5        0.0          6.1 1 Unit Sites              6.3      14.5        0.0          9.0        1 Unit Sites              6.3        9.7        0.0          6.7 2 Unit Sites              6.6      12.7        0.0          6.2        2 Unit Sites              6.6        12.7        0.0          6.2 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        9.0        0.0          4.8        BWR                        0.0        4.5        0.0          2.4 PWR                      10.4      16.2        0.0          8.9        PWR                      10.4        16.2        0.0          8.9 Total All Regions          6.4      12.3        0.0          7.2        Total All Regions          6.4        9.9        0.0          6.2 71130.11 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 248 of 276


Calendar Year 2016
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                           Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            122      75        15.0        1.6    166        105        17.5        1.6        97      75        15.0          1.3 Region 2            83      105        13.1        0.8      62        74        12.3        0.8        78      90        12.9          0.9 Region 3            57      75        15.0        0.8      98        90        15.0        1.1        49      60        12.0          0.8 Region 4            48      30        10.0        1.6      80        75        12.5        1.1        36      60        12.0          0.6 1 Unit Sites        112      105        15.0        1.1      58        60        12.0        1.0        80      60        12.0          1.3 2 Unit Sites        198      180        15.0        1.1    282        224        16.0        1.3      126      180        15.0          0.7 3 Unit Sites          0        0          0.0        0.0      67        60        15.0        1.1        54      45        11.3          1.2 BWR                119      90        12.9        1.3    221        164        16.4        1.3        76      90        12.9          0.8 PWR                192      195        16.3        1.0    185        180        15.0        1.0      183      195        15.0          0.9 Total All          310      285        15.8        1.1    406        344        16.4        1.2      259      285        15.0          0.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 249 of 276


Calendar Year 2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            384    255        18.2        1.5 Region 2            223    269        14.2        0.8 Region 3            205    225        16.1        0.9 Region 4            164    165        13.8        1.0 1 Unit Sites        250    225        15.0        1.1 2 Unit Sites        606    584        16.2        1.0 3 Unit Sites        120    105        15.0        1.1 BWR                416    344        15.0        1.2 PWR                559    570        15.8        1.0 Total All          975    914        15.8        1.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 250 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Revision History Date of Revision      Description of Revision 09/12/2017            IP 71130.14, "Review of Power Reactor Target Sets," has been revised to add background and guidance on target sets related to cyber critical digital assets.
09/30/2016            IP 71130.14, "Review of Power Reactor Target Sets," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.14, "Review of Reactor Target Sets," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016    3 Year Total NCV Green                                    5              10                  15 Total                                        5              10                  15 9/11/2018 2:22:01 PM                                                                                                                                            Page 251 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  7        0    0    6    0          7          0            0          0          0              0          0          2 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  8        0    2    6    0          8          0            0          0          0              0          0          8 1 Unit Sites              9        0    2    7    0          9          0            0          0          0              0          0          7 2 Unit Sites              4        0    0    3    0          4          0            0          0          0              0          0          2 3 Unit Sites              2        0    0    2    0          2          0            0          0          0              0          0          1 BWR                        8        0    2    5    0          8          0            0          0          0              0          0          6 PWR                        7        0    0    7    0          7          0            0          0          0              0          0          4 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        15        0    2  12    0          15          0            0          0          0              0          0        10 Percentage of All    100%        0% 13%  80%    0%      100%            0%          0%          0%          0%            0%          0%      67%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 252 of 276


Reported Hours Reported Samples Average Normalized
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  18.7      15.9        0.0          13.5        Region 2                  18.7        15.9        0.0        13.5 Region 3                  0.0        0.0      28.2          6.6        Region 3                  0.0        0.0        0.0          0.0 Region 4                  57.1      27.5        0.0          30.7        Region 4                  33.9        25.6        0.0        23.6 1 Unit Sites              10.4      23.2      11.5          17.2        1 Unit Sites              10.4        19.4        0.0        12.4 2 Unit Sites              23.6      10.0        0.0          12.9        2 Unit Sites              14.0        10.0        0.0          8.7 3 Unit Sites              23.8      44.4        0.0          31.0        3 Unit Sites              23.8        44.4        0.0        31.0 BWR                      12.2      24.1      14.2          18.7        BWR                      12.2        19.7        0.0        12.9 PWR                      21.5      14.5        0.0          14.1        PWR                      14.0        14.5        0.0        10.8 Total All Regions        18.4      19.0        4.0          15.8        Total All Regions        13.4        16.3        0.0        11.5 71130.14 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 253 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            70      55          9.2        1.3      72        88          9.8        0.8        61        6          0.9        10.1 Region 2            268      79          8.8        3.4    126          83        10.4        1.5      125        24          3.4          5.2 Region 3            81      66        11.0        1.2      36        44          8.8        0.8        36        6          1.0          5.9 Region 4            30      16          5.3        1.8    195        111        11.1        1.8        30        0          0.0          0.0 1 Unit Sites        92      42          8.4        2.2    117          99          9.9        1.2        67        4          0.7        16.8 2 Unit Sites        293      153        10.2        1.9    268        184        11.5        1.5      171        31          2.4          5.5 3 Unit Sites        63      21          7.0        3.0      45        43          8.6        1.0        13        1          0.5        12.5 BWR                164      72          9.0        2.3    153        109        10.9        1.4        71        8          0.9          8.8 PWR                285      144        10.3        2.0    277        217        10.9        1.3      180        28          2.5          6.4 Total All          449      216        10.3        2.1    429        326        11.2        1.3      251        36          1.9          7.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 254 of 276


Reported Hours Reported Samples Average Normalized  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1            203    149        7.5        1.4 Region 2            519    186        8.5        2.8 Region 3            153    116        7.7        1.3 Region 4            255    127        9.8        2.0 1 Unit Sites        276    145        7.6        1.9 2 Unit Sites        733    368        8.8        2.0 3 Unit Sites        120      65        8.1        1.8 BWR                387    189        7.3        2.0 PWR                742    389        8.8        1.9 Total All          1128    578        8.4        2.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 255 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Revision History Date of Revision      Description of Revision 05/03/2017            IP 71151, "Performance Indicator Verification," has been revised to correct typographical errors. No other changes were made.
12/08/2016            IP 71151, "Performance Indicator Verification," has been revised to reduce the annual resource estimate by half, per Commission direction in SRM SECY                      009, and clarifications for requirements made per OIG Audit 16-A-12 and the inspection report initiative.
Summary of PIM Findings 2015              2016    3 Year Total FIN Green                                      1                0                1 NCV Green                                      1                1                2 NCVIV N/A                                      0                1                1 NOV N/A                                        1                0                1 Total                                          3                2                5 9/11/2018 2:22:01 PM                                                                                                                                              Page 256 of 276


Region 1 972 133 7.8 7.3 1329 194 12.1 6.9 970 111 6.5 8.7 Region 2 1465 98 5.4 14.9 981 112 6.2 8.8 789 119 6.6 6.6 Region 3 800 122 7.6 6.6 733 125 7.8 5.9 779 115 7.2 6.8 Region 4 813 76 5.8 10.7 852 79 6.1 10.8 665 61 4.7 10.9 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    1    0          1          0            0          1           0              0          0          0 Region 2                 0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                 2       0    0    1    0          1          1            1          0          0              0          0          0 Region 4                 1        0    0    0    0          1          1            0          0          0              0          0          0 1 Unit Sites              1        0    0    0    0          0          1           0          0          0              0          0          0 2 Unit Sites              4       0    0    2    0          3          1            1          1           0              0          0          0 3 Unit Sites             0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    0    1    0          0          1            0          1          0              0          0          0 PWR                      3        0    0    1    0          3          1            1          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    0    2    0          3          2            1          1          0              0          0          0 Percentage of All    100%        0%  0%  40%    0%        60%          40%        20%        20%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 257 of 276


747 91 5.7 8.2 1030 127 8.5 8.1 1076 102 6.4 10.5 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.8        1.5       2.2          1.8         Region 1                  0.0        1.5        0.0          0.6 Region 2                   0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  4.5        1.4        0.0          2.1        Region 3                  4.5         0.0        0.0          1.6 Region 4                  1.8       0.0        2.2          1.3        Region 4                  1.8        0.0        0.0          0.6 1 Unit Sites              1.0        1.0        2.5          1.4        1 Unit Sites              1.0        0.0        0.0          0.4 2 Unit Sites              2.7        0.6        0.0          1.1        2 Unit Sites               2.0        0.6        0.0          0.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        1.9        1.0        2.4          1.7        BWR                        1.0        0.0        0.0          0.3 PWR                        1.9        0.6        0.0          0.9        PWR                        1.9        0.6        0.0          0.9 Total All Regions          1.9        0.7        0.9          1.2        Total All Regions          1.5        0.4        0.0          0.7 71151 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 258 of 276


2552 271 6.9 9.4 2067 307 7.9 6.7 1763 260 6.7 6.8 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            552      374        22.0        1.5    672        368        21.6         1.8      464      371        21.8          1.3 Region 2            820      455        25.3        1.8    854        454        25.2        1.9     778      458        25.4         1.7 Region 3            672      343        21.4        2.0    727        357        22.3        2.0      514      344        21.5          1.5 Region 4            560      270        20.8        2.1    528        272        20.9        1.9      459      284        21.8          1.6 1 Unit Sites        556      255        15.9        2.2    665        255        15.9         2.6     442      258        16.1          1.7 2 Unit Sites      1749      958        24.6         1.8    1736        964        24.7         1.8    1498      969        24.8         1.5 3 Unit Sites       299      229        28.6        1.3    380        232        29.0        1.6      275      230        28.8          1.2 BWR                1036      512        21.3        2.0    1035        514        21.4        2.0      833      516        21.5          1.6 PWR                1567      930        24.5        1.7    1746        937        24.7        1.9    1381      941        24.8          1.5 Total All          2603    1442        23.6        1.8    2781        1451        23.8        1.9    2214    1457        23.9          1.5 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 259 of 276


751 67 8.4 11.2 798 76 9.5 10.5 364 44 5.5 8.3 BWR 1608 206 8.6 7.8 1574 262 10.9 6.0 1828 214 8.9 8.5 PWR 2442 223 5.9 10.9 2321 248 6.7 9.4 1375 192 5.1 7.2 Total All
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1688    1113        22.7        1.5 Region 2          2452    1367        26.3        1.8 Region 3           1912    1044        22.7         1.8 Region 4          1546    826        22.3        1.9 1 Unit Sites      1663    768        16.7        2.2 2 Unit Sites      4982    2891        25.1        1.7 3 Unit Sites        953    691        31.4        1.4 BWR                2904    1542        21.7         1.9 PWR                4694    2808        24.8        1.7 Total All          7598    4350        23.8        1.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 260 of 276


Regions 4049 429 7.0 9.4 3895 510 8.5 7.6 3203 406 6.7 7.9 9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Revision History Date of Revision      Description of Revision 02/26/2015            IP 71152, "Problem Identification and Resolution," has been revised to relocate Operator Work-around inspection requirement to IP 71111.15; enhanced alignment of 71152-01 INSPECTION OBJECTIVES with IMC 0308 Att. 2 Fig. 37; enhanced IP organization; aligned language to updated IMC 0310 nomenclature; enhanced communications with the NRC Vendor Inspection Center of Expertise for vendor or supplier deficiencies; updated references to external IP's and IMC's and eliminated reference to retired RIS 2005-20; eliminated use of undefined terminology; and enhanced integration of OpE Smart Samples into inspection sample population. This revision addresses, or partially addressed, FBF's 71152-1787, -1836, -1946, -1964, -2012, -2013, and -2022.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                               Page 261 of 276


Page 275 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 2015 2016      2017    3 Year Total AV N/A                  0    0          2              2 AV Preliminary White    0    0          1              1 AV White                0    1          0              1 FIN Green              8  12        10            30 NCV Green              68  60        64            192 NCV N/A                0    2          0              2 NCVIV Green            4    1          0              5 NCVIV N/A              3    3          2              8 NOV Green              0    0          1              1 NOV N/A                1    1          0              2 NOV White              0    0          3              3 VIO Green              2    2          0              4 VIO N/A                3    1          0              4 VIO White              1    1          0              2 Total                  90  84        83            257 9/11/2018 2:22:01 PM                                              Page 262 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  61        3  25  26    0          42          7          28          9          3              1          1          11 Region 2                  51        0  12  26    0          42          6          32          4          0              0          0          0 Region 3                  79        3  20  31    0          51          15          53          3          1              1          0          2 Region 4                  64        2    8  37    1          37          19          38          4          1              0          1          0 1 Unit Sites            109        7  33  50    1          73          24          58          12          0              1          0          8 2 Unit Sites            136        1  30  65    0          92          21          87          8          5              1          2          5 3 Unit Sites              10        0    2    5    0          7          2          6          0          0              0          0          0 BWR                      108        5  32  53    0          65          22          58          12          1              1          0          8 PWR                      147        3  33  67    1        107          25          93          8          4              1          2          5 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        255        8  65  120    1        172          47        151          20          5              2          2          13 Percentage of All    100%        3% 25%  47%    0%        67%          18%        59%          8%          2%            1%          1%        5%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 263 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.1        3.4        3.0          3.2        Region 1                  1.9        2.8        1.4          2.1 Region 2                  3.4        3.8        3.3          3.5        Region 2                  2.6        3.2        2.0          2.6 Region 3                  6.6        4.5        6.1          5.7        Region 3                  3.2        2.7        2.6          2.8 Region 4                  6.3        5.5        5.9          5.9        Region 4                  3.1        3.0        3.2          3.1 1 Unit Sites              5.1        4.8        4.9          4.9        1 Unit Sites              2.8        3.5        2.6          3.0 2 Unit Sites              4.4        3.8        4.4          4.2        2 Unit Sites              2.6        2.6        2.0          2.4 3 Unit Sites              2.7        2.8        1.4          2.3        3 Unit Sites              2.1        2.8        0.7          1.9 BWR                        4.7        4.8        4.6          4.7        BWR                        2.3        3.2        2.7          2.8 PWR                        4.4        3.7        4.2          4.1        PWR                        2.8        2.7        1.8          2.4 Total All Regions          4.5        4.1        4.3          4.3        Total All Regions          2.6        2.9        2.2          2.6 71152 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 264 of 276


01/01/2015 through 12/31/2017
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          6370      138          8.1        46.2    7383        137          8.1        53.9    6564      144        8.5        45.6 Region 2          5736      132          7.3        43.5    5322        119          6.6        44.7    5449      136        7.6        40.1 Region 3          4388      104          6.5        42.2    4905        107          6.7        45.8    4632      104        6.5        44.5 Region 4          3518      86          6.6        40.9    3654          94          7.2        38.9    3702        88        6.8        42.1 1 Unit Sites      4607      114          7.1        40.4    4696        110          6.9        42.7    4684      119        7.4        39.4 2 Unit Sites      11801      287          7.4        41.1  12923        290          7.4        44.6  12322      296        7.6        41.6 3 Unit Sites      3604      59          7.4        61.1    3644          57          7.1        63.9    3342        57        7.1        58.6 BWR                7684      178          7.4        43.2    8403        182          7.6        46.2    7817      187        7.8        41.8 PWR              12328      282          7.4        43.7  12860        275          7.2        46.8  12531      285        7.5        44.0 Total All        20012      460          7.5        43.5  21263        457          7.5        46.5  20347      472        7.7        43.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 265 of 276


3 Year Reported Hours Reported Samples Average Normalized  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours   Samples Normalized Samples Region 1          20316    419        8.6        48.5 Region 2          16507    387        7.4        42.7 Region 3          13925    315        6.8        44.2 Region 4          10874    268        7.2        40.6 1 Unit Sites      13987    343        7.5        40.8 2 Unit Sites      37045    873        7.6        42.4 3 Unit Sites      10590    173        7.9        61.2 BWR              23904    547        7.7        43.7 PWR              37718    842        7.5        44.8 Total All        61622    1389        7.6        44.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 266 of 276


Samples Hrs/Sample
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Revision History Date of Revision      Description of Revision 02/26/2015            For the biennial portion of IP 71152. Separate sample sizes/hours, etc.
Summary of PIM Findings 2015              2016            2017    3 Year Total AV N/A                                        0                0                1              1 FIN Green                                    5                2                3              10 FIN N/A                                      4                0                0              4 NCV Green                                    41              21              20              82 NCVIV Green                                  0                1                1              2 NCVIV N/A                                    3                0                3              6 NOV N/A                                      1                0                0              1 NOVIV Green                                  0                0                1              1 VIO Green                                    3                0                0              3 VIO N/A                                      0                1                0              1 Total                                        57              25              29            111 9/11/2018 2:22:01 PM                                                                                      Page 267 of 276


Region 1 3271 438 9.1 7.5 Region 2 3235 329 6.3 9.8 Region 3 2312 362 7.9 6.4 Region 4 2330 216 5.8 10.8 1 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                 32        0  16    9     0          27          5          14          4          2              0          0          1 Region 2                  17        0    5   2     0          17          0          9           0          1              0          0          0 Region 3                 18        0  10    4     0          17          1          13          3          0              0          0          1 Region 4                 42        0  14  21    0          38          5          30          2          0              1          0          2 1 Unit Sites              55        0  26  17    0          51          6          33          4          3              1          0          1 2 Unit Sites              53        0  19  18    0          47          5         32          5          0              0          0          3 3 Unit Sites              1        0    0    1    0          1          0          1          0          0              0          0          0 BWR                      59        0  27  19    0          54          8         35          6          2              1          0          2 PWR                      50        0  18  17    0          45          3          31          3          1              0          0          2 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        109        0  45  36    0          99          11          66          9          3              1          0          4 Percentage of All    100%        0% 41%  33%    0%        91%          10%        61%          8%          3%            1%          0%        4%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 268 of 276


2853 320 7.1 8.9 2 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  4.5        2.5        1.9          3.1        Region 1                  3.9        1.7       0.8          2.1 Region 2                  1.6        2.8        1.8           2.1        Region 2                  1.2        2.4        1.2          1.6 Region 3                  2.9        2.9       2.8          2.8        Region 3                  2.5        2.4        2.7          2.5 Region 4                  3.8        2.6        3.4          3.4        Region 4                  3.8        1.1        3.3          2.7 1 Unit Sites              4.5        2.3        2.8          3.3        1 Unit Sites              4.3        1.8        2.3          2.7 2 Unit Sites              2.7        3.0        2.4          2.7        2 Unit Sites              2.0        2.0        1.6          1.9 3 Unit Sites              0.0        1.8        0.0          0.9        3 Unit Sites               0.0        1.8        0.0          0.9 BWR                        4.1        2.7        2.8          3.3        BWR                        3.7        2.3        2.0          2.7 PWR                        2.7        2.7        2.2          2.6        PWR                        1.9        1.8        1.7          1.8 Total All Regions          3.4        2.7        2.6          2.9        Total All Regions          2.7        1.9        1.8          2.2 71152B Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 269 of 276


6382 838 7.3 7.6 3 Unit Sites
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          2040      15          1.7       136.0    1733          15          1.9      115.6    2464        18        1.8      136.9 Region 2          2458      18          1.8      136.6    2079          16          1.8      129.9    2410        18        1.8      133.9 Region 3           2021      10          1.0      202.1    1668          7           0.9      238.3    2254        10        1.0      225.4 Region 4          1565      11          1.6       142.3   1777          12          1.5      148.1    1538        12        1.7      128.1 1 Unit Sites      1119        7          1.2      159.8    2356          16          1.6      147.2    1717        9        1.1      190.8 2 Unit Sites       6248      41          1.6      152.4    3791          27          1.6      140.4    6168        43        1.8      143.4 3 Unit Sites        717        6          1.5      119.5    1110          7          1.4      158.6    780        6        1.5      130.0 BWR                3798      24          1.5      158.2    1760          12          1.5      146.6    4542        30        1.8      151.4 PWR                4286      30          1.7      142.9    5497          38          1.7      144.7    4123        28        1.6      147.3 Total All          8084      54          1.6      149.7    7257          50          1.7      145.1    8665        58        1.7      149.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 270 of 276


1913 187 8.5 10.2 BWR 5010 682 9.6 7.3 PWR 6137 663 5.9 9.3 Total All  
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          6237      48        1.9      129.9 Region 2          6947      52        1.9      133.6 Region 3          5942      27        1.0      220.1 Region 4          4879      35        1.8       139.4 1 Unit Sites      5191      32        1.5       162.2 2 Unit Sites      16207    111        1.7      146.0 3 Unit Sites      2608      19        1.7      137.2 BWR               10099      66        1.7       153.0 PWR               13907      96        1.7      144.9 Total All         24006    162        1.7      148.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 271 of 276


Regions 11147 1345 7.4 8.3 9/11/2018 2:22:01 PM
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Revision History Date of Revision      Description of Revision 12/17/2015            IP 71153, "Follow-up of Events and Notices of Enforcement Discretion," has been revised to change outdated references.
Summary of PIM Findings 2015              2016            2017    3 Year Total AV N/A                                      0                0                1                  1 AV White                                    0                1                0                  1 EDG N/A                                    0                0                1                  1 FIN Green                                  15              19              12                46 FIN N/A                                    0                1                0                  1 FIN White                                  0                1                0                  1 NCV Green                                  49              58              63                170 NCVIV Green                                1                1                1                  3 NCVIV N/A                                  10                5                3                18 NOV N/A                                    1                4               2                  7 NOV White                                  0                0                1                  1 NOVIV N/A                                  0                0                1                  1 VIO White                                  2                1                0                  3 Total                                      78              91              85                254 9/11/2018 2:22:01 PM                                                                                                                         Page 272 of 276


Page 276 of 276
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  78        0    9  50    0          34          32          23        15            1              1          1          0 Region 2                  69        1  11  35    1          37          20          34          4          0              0          0          0 Region 3                  51        3  10  26    0          15          17          23          7          0              0          0          1 Region 4                  53        2    4  29    0          22          17          27          6          0              0          0          0 1 Unit Sites            112        2  14  64    0          40          38          45        19            0              1          0          0 2 Unit Sites            121        4  16  66    1          61          44          50        12            1              0          1          1 3 Unit Sites              18        0    4  10    0          7          4          12          1          0              0          0          0 BWR                      126        3  16  73    0          47          43          45        24            1              1          1          0 PWR                      125        3  18  67    1          61          43          62          8          0              0          0          1 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        251        6  34  140    1        108          86        107        32            1              1          1          1 Percentage of All    100%        2% 14%  56%    0%        43%          34%        43%        13%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 273 of 276


IP 28 Inspection Procedure Analysis
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  20.2      20.0        9.4          14.7        Region 1                  12.3        6.8        5.2          7.9 Region 2                  11.5      21.3      22.3          17.6        Region 2                  6.8        12.2        6.3          8.3 Region 3                  19.7      21.5      18.3          19.8        Region 3                  5.0        5.5        3.8          4.8 Region 4                  20.1      15.3      26.8          20.3        Region 4                  12.3        8.2        7.5          9.4 1 Unit Sites              19.2      19.5      12.9          16.1        1 Unit Sites              7.7        5.5        5.9          6.3 2 Unit Sites              17.1      18.9      19.4          18.3        2 Unit Sites              9.8        9.3        4.7          8.3 3 Unit Sites              11.0      29.6      34.3          20.6        3 Unit Sites              7.6        17.1        10.6        11.0 BWR                      19.9      21.3      14.1          17.3        BWR                        8.1        9.5        5.5          7.6 PWR                      15.3      18.7      19.8          17.6        PWR                        9.4        7.3        5.8          7.8 Total All Regions        17.0      19.8      15.8          17.5        Total All Regions          8.9        8.2        5.6          7.7 71153 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 274 of 276


U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            972      133          7.8        7.3    1329        194        12.1          6.9    970      111        6.5          8.7 Region 2          1465      98          5.4        14.9    981        112          6.2        8.8    789      119        6.6          6.6 Region 3            800      122          7.6        6.6    733        125          7.8        5.9    779      115        7.2          6.8 Region 4            813      76          5.8        10.7    852          79          6.1        10.8    665        61        4.7        10.9 1 Unit Sites        747      91          5.7        8.2    1030        127          8.5        8.1    1076      102        6.4        10.5 2 Unit Sites      2552      271          6.9        9.4    2067        307          7.9        6.7    1763      260        6.7          6.8 3 Unit Sites        751      67          8.4        11.2    798          76          9.5        10.5    364        44        5.5          8.3 BWR                1608      206          8.6        7.8    1574        262        10.9          6.0    1828      214        8.9          8.5 PWR                2442      223          5.9        10.9    2321        248          6.7        9.4    1375      192        5.1          7.2 Total All          4049      429          7.0        9.4    3895        510          8.5        7.6    3203      406        6.7          7.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 275 of 276


01/01/2015 through 12/31/2017}}
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3271    438        9.1        7.5 Region 2          3235    329        6.3        9.8 Region 3          2312    362        7.9        6.4 Region 4          2330    216        5.8        10.8 1 Unit Sites      2853    320        7.1        8.9 2 Unit Sites      6382    838        7.3        7.6 3 Unit Sites      1913    187        8.5        10.2 BWR                5010    682        9.6        7.3 PWR                6137    663        5.9        9.3 Total All        11147    1345        7.4        8.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 276 of 276}}

Revision as of 08:19, 20 October 2019

2017-2015 IP 28 Inspection Procedure Analysis
ML18351A130
Person / Time
Issue date: 04/24/2019
From: Aron Lewin
NRC/NRR/DIRS/IRIB
To:
Lewin A, 415-2259, NRR/DIRS
References
Download: ML18351A130 (276)


Text

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Revision History Date of Revision Description of Revision 11/30/2017 IP 71111.01, Adverse Weather Protection, has been revised to add additional ultimate heat sink considerations to summer readiness sample, and improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.

09/04/2015 IP 71111.01, "Adverse Weather Protection," has been revised to incorporate Fukushima Lessons Learned and Fukushima flooding inspection insights.

Incorporated the following feedback form: 71111.01-2130.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 1 2 1 4 NCV Green 6 2 4 12 NCVIV Green 0 1 0 1 NCVIV N/A 1 0 0 1 Total 8 5 5 18 9/11/2018 2:22:01 PM Page 1 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 6 0 2 3 0 6 1 4 1 0 0 0 0 Region 2 5 0 2 3 0 5 2 3 0 0 0 0 0 Region 3 2 0 0 1 0 2 1 1 0 0 0 0 0 Region 4 8 0 2 6 0 8 5 2 1 0 0 0 0 1 Unit Sites 9 0 1 8 0 9 3 5 1 0 0 0 0 2 Unit Sites 11 0 4 5 0 11 6 4 1 0 0 0 0 3 Unit Sites 1 0 1 0 0 1 0 1 0 0 0 0 0 BWR 7 0 2 4 0 7 2 5 0 0 0 0 0 PWR 14 0 4 9 0 14 7 5 2 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 21 0 6 13 0 21 9 10 2 0 0 0 0 Percentage of All 100% 0% 29% 62% 0% 100% 43% 48% 10% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 2 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 6.1 4.5 2.2 4.3 Region 1 6.1 4.5 2.2 4.3 Region 2 0.0 3.1 3.9 2.5 Region 2 0.0 3.1 3.9 2.5 Region 3 2.1 2.3 0.0 1.6 Region 3 2.1 2.3 0.0 1.6 Region 4 11.5 0.0 2.1 4.1 Region 4 11.5 0.0 2.1 4.1 1 Unit Sites 4.2 4.1 2.6 3.6 1 Unit Sites 4.2 4.1 2.6 3.6 2 Unit Sites 4.4 1.8 1.8 2.7 2 Unit Sites 4.4 1.8 1.8 2.7 3 Unit Sites 0.0 0.0 5.7 3.2 3 Unit Sites 0.0 0.0 5.7 3.2 BWR 4.4 2.6 1.3 2.7 BWR 4.4 2.6 1.3 2.7 PWR 4.0 2.7 3.0 3.2 PWR 4.0 2.7 3.0 3.2 Total All Regions 4.2 2.6 2.4 3.0 Total All Regions 4.2 2.6 2.4 3.0 71111.01 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 3 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 490 91 5.4 5.4 441 91 5.4 4.8 461 91 5.4 5.1 Region 2 615 92 5.1 6.7 648 101 5.6 6.4 775 94 5.2 8.2 Region 3 472 76 4.8 6.2 437 78 4.9 5.6 367 68 4.3 5.4 Region 4 347 60 4.6 5.8 375 56 4.3 6.7 487 54 4.2 9.0 1 Unit Sites 420 78 4.9 5.4 455 80 5.0 5.7 482 78 4.9 6.2 2 Unit Sites 1287 206 5.3 6.2 1233 208 5.3 5.9 1314 191 4.9 6.9 3 Unit Sites 216 35 4.4 6.2 213 38 4.8 5.6 296 38 4.8 7.8 BWR 680 120 5.0 5.7 775 126 5.3 6.1 746 114 4.8 6.5 PWR 1243 199 5.2 6.2 1126 200 5.3 5.6 1345 193 5.1 7.0 Total All 1923 319 5.2 6.0 1900 326 5.3 5.8 2091 307 5.0 6.8 Regions 9/11/2018 2:22:01 PM Page 4 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1392 273 5.6 5.1 Region 2 2038 287 5.5 7.1 Region 3 1276 222 4.8 5.7 Region 4 1209 170 4.6 7.1 1 Unit Sites 1356 236 5.1 5.7 2 Unit Sites 3834 605 5.3 6.3 3 Unit Sites 725 111 5.0 6.5 BWR 2200 360 5.1 6.1 PWR 3714 592 5.2 6.3 Total All 5914 952 5.2 6.2 Regions 9/11/2018 2:22:01 PM Page 5 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total AV Green 0 1 0 1 FIN Green 2 0 0 2 NCV Green 7 6 7 20 NOV N/A 1 0 0 1 Total 10 7 7 24 9/11/2018 2:22:01 PM Page 6 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 4 0 1 3 0 3 1 3 0 0 0 0 0 Region 2 3 0 1 1 0 2 0 3 0 0 0 0 0 Region 3 3 0 2 1 0 2 0 2 1 0 0 0 0 Region 4 14 0 2 6 0 13 0 11 2 0 0 0 0 1 Unit Sites 14 0 5 5 0 12 1 11 1 0 0 0 0 2 Unit Sites 9 0 1 6 0 7 0 7 2 0 0 0 0 3 Unit Sites 1 0 0 0 0 1 0 1 0 0 0 0 0 BWR 13 0 5 4 0 11 1 10 1 0 0 0 0 PWR 11 0 1 7 0 9 0 9 2 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 24 0 6 11 0 20 1 19 3 0 0 0 0 Percentage of All 100% 0% 25% 46% 0% 83% 4% 79% 13% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 7 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 3.6 0.0 1.2 1.6 Region 1 2.4 0.0 1.2 1.2 Region 2 1.1 2.1 1.0 1.4 Region 2 1.1 1.1 1.0 1.1 Region 3 1.3 2.8 0.0 1.4 Region 3 1.3 1.4 0.0 0.9 Region 4 8.2 3.8 6.8 6.2 Region 4 6.3 2.5 6.8 5.1 1 Unit Sites 6.0 3.0 1.5 3.5 1 Unit Sites 4.0 2.3 1.5 2.6 2 Unit Sites 1.2 1.1 2.8 1.7 2 Unit Sites 1.2 0.0 2.8 1.3 3 Unit Sites 5.9 5.1 0.0 3.4 3 Unit Sites 5.9 5.1 0.0 3.4 BWR 5.9 3.1 1.5 3.6 BWR 4.0 2.4 1.5 2.6 PWR 1.6 1.5 2.5 1.9 PWR 1.6 0.5 2.5 1.5 Total All Regions 3.4 2.1 2.1 2.5 Total All Regions 2.6 1.2 2.1 2.0 71111.04 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 8 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 830 233 13.7 3.6 817 232 13.6 3.5 842 231 13.6 3.6 Region 2 896 234 13.0 3.8 952 227 12.6 4.2 1001 246 13.7 4.1 Region 3 757 195 12.2 3.9 723 199 12.4 3.6 740 188 11.8 3.9 Region 4 636 149 11.5 4.3 785 161 12.4 4.9 733 157 12.1 4.7 1 Unit Sites 732 199 12.4 3.7 829 207 12.9 4.0 849 197 12.3 4.3 2 Unit Sites 2020 510 13.1 4.0 2044 506 13.0 4.0 2030 519 13.3 3.9 3 Unit Sites 367 102 12.8 3.6 403 106 13.3 3.8 437 106 13.3 4.1 BWR 1263 313 13.0 4.0 1272 321 13.4 4.0 1294 308 12.8 4.2 PWR 1857 498 13.1 3.7 2004 498 13.1 4.0 2022 514 13.5 3.9 Total All 3119 811 13.3 3.8 3276 819 13.4 4.0 3316 822 13.5 4.0 Regions 9/11/2018 2:22:01 PM Page 9 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 2488 696 14.2 3.6 Region 2 2849 707 13.6 4.0 Region 3 2220 582 12.7 3.8 Region 4 2154 467 12.6 4.6 1 Unit Sites 2410 603 13.1 4.0 2 Unit Sites 6094 1535 13.3 4.0 3 Unit Sites 1207 314 14.3 3.8 BWR 3828 942 13.3 4.1 PWR 5883 1510 13.4 3.9 Total All 9711 2452 13.4 4.0 Regions 9/11/2018 2:22:01 PM Page 10 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2017 3 Year Total FIN Green 0 1 1 NCV Green 2 5 7 Total 2 6 8 9/11/2018 2:22:01 PM Page 11 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 3 0 1 2 0 2 0 2 1 0 0 0 0 Region 2 2 0 1 1 0 2 0 2 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 3 0 0 2 0 2 0 3 0 0 0 0 0 1 Unit Sites 2 0 0 2 0 1 0 2 0 0 0 0 0 2 Unit Sites 5 0 2 2 0 4 0 4 1 0 0 0 0 3 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 BWR 5 0 0 5 0 3 0 5 0 0 0 0 0 PWR 3 0 2 0 0 3 0 2 1 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 8 0 2 5 0 6 0 7 1 0 0 0 0 Percentage of All 100% 0% 25% 63% 0% 75% 0% 88% 13% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 12 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 7.8 2.7 Region 1 0.0 0.0 5.2 1.8 Region 2 3.0 0.0 2.8 2.1 Region 2 3.0 0.0 2.8 2.1 Region 3 2.5 0.0 0.0 0.9 Region 3 2.5 0.0 0.0 0.9 Region 4 3.1 0.0 5.3 3.1 Region 4 0.0 0.0 5.3 2.1 1 Unit Sites 1.8 0.0 1.6 1.2 1 Unit Sites 0.0 0.0 1.6 0.6 2 Unit Sites 1.3 0.0 6.1 2.6 2 Unit Sites 1.3 0.0 4.9 2.2 3 Unit Sites 15.4 0.0 0.0 6.3 3 Unit Sites 15.4 0.0 0.0 6.3 BWR 3.6 0.0 5.6 3.1 BWR 1.8 0.0 3.7 1.9 PWR 1.2 0.0 3.1 1.6 PWR 1.2 0.0 3.1 1.6 Total All Regions 2.1 0.0 4.0 2.2 Total All Regions 1.4 0.0 3.3 1.7 71111.04S Hours & Samples Reported 9/11/2018 2:22:01 PM Page 13 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 383 36 2.1 10.6 356 34 2.0 10.5 386 36 2.1 10.7 Region 2 329 35 1.9 9.4 257 36 2.1 7.1 363 34 1.9 10.7 Region 3 394 30 1.9 13.1 334 30 1.9 11.1 376 31 1.9 12.1 Region 4 318 25 1.9 12.7 272 24 1.8 11.3 378 24 1.8 15.8 1 Unit Sites 353 30 1.9 11.8 308 30 1.9 10.3 419 30 1.9 14.0 2 Unit Sites 852 79 2.0 10.8 777 78 2.0 10.0 913 78 2.0 11.7 3 Unit Sites 219 17 2.1 12.9 133 16 2.3 8.3 173 17 2.1 10.1 BWR 556 47 2.0 11.8 501 48 2.0 10.4 534 48 2.0 11.1 PWR 868 79 2.1 11.0 717 76 2.1 9.4 970 77 2.0 12.6 Total All 1424 126 2.1 11.3 1218 124 2.1 9.8 1504 125 2.0 12.0 Regions 9/11/2018 2:22:01 PM Page 14 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1125 106 2.2 10.6 Region 2 949 105 2.1 9.0 Region 3 1104 91 2.0 12.1 Region 4 968 73 2.0 13.3 1 Unit Sites 1079 90 2.0 12.0 2 Unit Sites 2542 235 2.0 10.8 3 Unit Sites 525 50 2.4 10.5 BWR 1591 143 2.0 11.1 PWR 2555 232 2.1 11.0 Total All 4146 375 2.1 11.1 Regions 9/11/2018 2:22:01 PM Page 15 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 2 1 3 6 Total 2 1 3 6 9/11/2018 2:22:01 PM Page 16 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 2 0 2 0 0 2 0 2 0 0 0 0 0 Region 2 2 0 0 2 0 2 0 2 0 0 0 0 0 Region 3 2 0 0 2 0 2 1 1 0 0 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Unit Sites 5 0 2 3 0 5 1 4 0 0 0 0 0 3 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 BWR 2 0 1 1 0 2 0 2 0 0 0 0 0 PWR 4 0 1 3 0 4 1 3 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 6 0 2 4 0 6 1 5 0 0 0 0 0 Percentage of All 100% 0% 33% 67% 0% 100% 17% 83% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 17 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 21.2 7.2 Region 1 0.0 0.0 21.2 7.2 Region 2 11.2 0.0 10.1 6.9 Region 2 11.2 0.0 10.1 6.9 Region 3 14.1 11.0 13.5 12.7 Region 3 14.1 11.0 0.0 8.5 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 7.8 2.7 1 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 9.4 5.3 10.2 8.4 2 Unit Sites 9.4 5.3 10.2 8.4 3 Unit Sites 0.0 0.0 80.0 31.3 3 Unit Sites 0.0 0.0 80.0 31.3 BWR 0.0 0.0 21.9 6.3 BWR 0.0 0.0 21.9 6.3 PWR 9.3 4.6 8.2 7.3 PWR 9.3 4.6 4.1 5.9 Total All Regions 6.2 3.0 11.9 7.0 Total All Regions 6.2 3.0 8.9 6.0 71111.05A Hours & Samples Reported 9/11/2018 2:22:01 PM Page 18 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 103 18 1.1 5.7 81 17 1.1 4.8 95 19 1.2 5.0 Region 2 89 21 1.2 4.2 103 23 1.4 4.5 99 19 1.1 5.2 Region 3 71 16 1.1 4.4 91 16 1.0 5.7 74 16 1.0 4.6 Region 4 61 14 1.1 4.3 62 13 1.0 4.8 69 12 0.9 5.7 1 Unit Sites 67 17 1.1 3.9 72 15 1.0 4.8 78 16 1.0 4.9 2 Unit Sites 222 43 1.1 5.2 236 46 1.2 5.1 214 42 1.1 5.1 3 Unit Sites 35 9 1.3 3.9 29 8 1.1 3.6 44 8 1.0 5.5 BWR 108 26 1.2 4.1 117 24 1.1 4.9 91 25 1.1 3.7 PWR 216 43 1.1 5.0 220 45 1.2 4.9 245 41 1.1 6.0 Total All 323 69 1.2 4.7 337 69 1.2 4.9 337 66 1.1 5.1 Regions 9/11/2018 2:22:01 PM Page 19 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 278 54 1.2 5.2 Region 2 291 63 1.3 4.6 Region 3 236 48 1.1 4.9 Region 4 192 39 1.1 4.9 1 Unit Sites 216 48 1.1 4.5 2 Unit Sites 672 131 1.2 5.1 3 Unit Sites 108 25 1.3 4.3 BWR 316 75 1.1 4.2 PWR 681 129 1.2 5.3 Total All 996 204 1.2 4.9 Regions 9/11/2018 2:22:01 PM Page 20 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total AV Pending 0 2 0 2 FIN Green 0 0 1 1 NCV Green 17 14 10 41 NCVIV Green 0 2 0 2 VIO N/A 2 0 0 2 Total 19 18 11 48 9/11/2018 2:22:01 PM Page 21 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 5 0 1 4 0 5 2 3 0 0 0 0 0 Region 2 22 2 4 12 0 19 6 14 0 0 0 0 0 Region 3 16 0 3 11 0 13 5 11 0 0 0 0 0 Region 4 5 0 1 4 0 5 1 4 0 0 0 0 0 1 Unit Sites 12 0 3 8 0 11 2 10 0 0 0 0 0 2 Unit Sites 35 2 6 22 0 30 11 22 0 0 0 0 0 3 Unit Sites 1 0 0 1 0 1 1 0 0 0 0 0 0 BWR 14 0 3 9 0 13 4 10 0 0 0 0 0 PWR 34 2 6 22 0 29 10 22 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 48 2 9 31 0 42 14 32 0 0 0 0 0 Percentage of All 100% 4% 19% 65% 0% 88% 29% 67% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 22 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 5.4 3.5 0.0 3.0 Region 1 5.4 3.5 0.0 3.0 Region 2 8.1 16.7 13.0 12.8 Region 2 6.5 13.9 9.9 10.3 Region 3 13.7 9.7 7.1 10.1 Region 3 11.8 7.8 5.3 8.2 Region 4 5.7 3.5 2.1 3.8 Region 4 5.7 3.5 2.1 3.8 1 Unit Sites 8.0 6.7 2.2 5.6 1 Unit Sites 6.9 6.7 2.2 5.2 2 Unit Sites 9.2 11.2 9.4 10.0 2 Unit Sites 8.3 8.8 6.9 8.0 3 Unit Sites 0.0 4.2 0.0 1.9 3 Unit Sites 0.0 4.2 0.0 1.9 BWR 8.7 4.6 3.4 5.5 BWR 7.5 4.6 2.3 4.7 PWR 7.8 11.2 7.4 8.9 PWR 7.1 9.3 5.9 7.5 Total All Regions 8.1 8.8 5.8 7.6 Total All Regions 7.2 7.6 4.5 6.5 71111.05Q Hours & Samples Reported 9/11/2018 2:22:01 PM Page 23 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 560 339 19.9 1.7 571 325 19.1 1.8 557 334 19.6 1.7 Region 2 620 365 20.3 1.7 719 358 19.9 2.0 607 324 18.0 1.9 Region 3 510 284 17.8 1.8 515 296 18.5 1.7 567 292 18.3 1.9 Region 4 524 218 16.8 2.4 570 220 16.9 2.6 484 223 17.2 2.2 1 Unit Sites 541 292 18.3 1.9 511 296 18.5 1.7 575 296 18.5 1.9 2 Unit Sites 1368 770 19.7 1.8 1462 755 19.4 1.9 1359 733 18.8 1.9 3 Unit Sites 305 144 18.0 2.1 401 148 18.5 2.7 280 144 18.0 1.9 BWR 801 446 18.6 1.8 862 453 18.9 1.9 865 450 18.8 1.9 PWR 1413 760 20.0 1.9 1512 746 19.6 2.0 1349 723 19.0 1.9 Total All 2214 1206 19.8 1.8 2374 1199 19.7 2.0 2214 1173 19.2 1.9 Regions 9/11/2018 2:22:01 PM Page 24 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1688 998 20.4 1.7 Region 2 1945 1047 20.1 1.9 Region 3 1591 872 19.0 1.8 Region 4 1577 661 17.9 2.4 1 Unit Sites 1627 884 19.2 1.8 2 Unit Sites 4189 2258 19.6 1.9 3 Unit Sites 986 436 19.8 2.3 BWR 2528 1349 19.0 1.9 PWR 4274 2229 19.7 1.9 Total All 6802 3578 19.6 1.9 Regions 9/11/2018 2:22:01 PM Page 25 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 0 1 0 1 NCV Green 24 12 18 54 NCVIV Green 1 0 0 1 NCVIV N/A 1 0 1 2 Total 26 13 19 58 9/11/2018 2:22:01 PM Page 26 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 10 0 1 4 0 10 0 10 0 0 0 0 0 Region 2 15 0 1 3 0 15 1 12 0 0 0 0 0 Region 3 15 0 0 6 0 15 1 13 0 0 0 0 1 Region 4 18 0 2 3 0 18 1 17 0 0 0 0 0 1 Unit Sites 29 0 3 10 0 29 1 27 0 0 0 0 1 2 Unit Sites 26 0 1 6 0 26 1 23 0 0 0 0 0 3 Unit Sites 3 0 0 0 0 3 1 2 0 0 0 0 0 BWR 26 0 2 6 0 26 1 25 0 0 0 0 0 PWR 32 0 2 10 0 32 2 27 0 0 0 0 1 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 58 0 4 16 0 58 3 52 0 0 0 0 1 Percentage of All 100% 0% 7% 28% 0% 100% 5% 90% 0% 0% 0% 0% 2%

Findings 9/11/2018 2:22:01 PM Page 27 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 1.9 1.9 2.3 2.1 Region 1 1.9 1.6 1.2 1.5 Region 2 3.9 4.2 1.7 3.7 Region 2 4.4 3.0 1.7 3.6 Region 3 4.4 3.8 3.8 4.0 Region 3 3.4 3.8 3.8 3.7 Region 4 5.0 10.7 5.0 5.5 Region 4 5.2 7.1 4.7 5.2 1 Unit Sites 4.7 6.7 3.8 4.7 1 Unit Sites 4.2 6.8 3.0 4.0 2 Unit Sites 3.3 1.4 3.1 2.8 2 Unit Sites 3.3 1.4 2.6 2.5 3 Unit Sites 3.9 16.5 0.0 7.9 3 Unit Sites 3.9 16.5 0.0 6.3 BWR 4.0 5.1 3.2 3.9 BWR 2.7 4.2 3.0 3.2 PWR 3.7 2.2 3.8 3.5 PWR 4.0 2.2 2.5 3.1 Total All Regions 3.8 3.6 3.5 3.6 Total All Regions 3.6 3.0 2.8 3.2 71111.05T Hours & Samples Reported 9/11/2018 2:22:01 PM Page 28 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1559 60 8.6 26.0 1258 60 12.0 21.0 1709 98 14.0 17.4 Region 2 1811 51 7.3 35.5 658 0 0.0 0.0 596 23 4.6 25.9 Region 3 885 16 3.2 55.3 783 18 3.0 43.5 1302 28 4.7 46.5 Region 4 765 28 7.0 27.3 280 8 4.0 35.0 1073 48 9.6 22.4 1 Unit Sites 971 30 6.0 32.4 144 6 3.0 23.9 1334 54 7.7 24.7 2 Unit Sites 3535 111 7.9 31.8 2050 42 3.8 48.8 2632 113 9.4 23.3 3 Unit Sites 515 14 4.7 36.8 786 38 9.5 20.7 714 30 10.0 23.8 BWR 1486 55 7.9 27.0 1184 30 5.0 39.5 2311 84 8.4 27.5 PWR 3534 100 7.1 35.3 1795 56 5.6 32.1 2369 113 10.3 21.0 Total All 5020 155 7.8 32.4 2979 86 5.7 34.6 4680 197 9.9 23.8 Regions 9/11/2018 2:22:01 PM Page 29 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 4526 218 12.8 20.8 Region 2 3065 74 4.9 41.4 Region 3 2971 62 4.1 47.9 Region 4 2118 84 9.3 25.2 1 Unit Sites 2449 90 7.5 27.2 2 Unit Sites 8216 266 7.6 30.9 3 Unit Sites 2014 82 10.3 24.6 BWR 4981 169 7.7 29.5 PWR 7699 269 7.9 28.6 Total All 12679 438 8.0 28.9 Regions 9/11/2018 2:22:01 PM Page 30 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 5 6 1 12 NOV N/A 0 3 0 3 Total 5 9 1 15 9/11/2018 2:22:01 PM Page 31 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 5 0 1 2 0 5 1 2 0 0 0 0 0 Region 3 3 0 0 1 0 3 0 3 0 0 0 0 0 Region 4 4 0 0 1 0 4 0 3 0 0 0 0 0 1 Unit Sites 2 0 0 1 0 2 0 2 0 0 0 0 0 2 Unit Sites 9 0 1 2 0 9 1 5 0 0 0 0 0 3 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 BWR 2 0 1 0 0 2 0 2 0 0 0 0 0 PWR 10 0 0 4 0 10 1 6 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 12 0 1 4 0 12 1 8 0 0 0 0 0 Percentage of All 100% 0% 8% 33% 0% 100% 8% 67% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 32 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 4.1 1.3 3.0 Region 2 0.0 3.8 1.3 2.7 Region 3 5.7 3.4 0.0 4.7 Region 3 5.7 3.4 0.0 4.7 Region 4 0.0 4.4 0.0 3.7 Region 4 0.0 2.8 0.0 2.3 1 Unit Sites 3.2 3.1 0.0 2.6 1 Unit Sites 3.2 1.6 0.0 2.0 2 Unit Sites 0.0 4.0 1.9 3.4 2 Unit Sites 0.0 3.3 1.9 2.8 3 Unit Sites 0.0 4.2 0.0 4.2 3 Unit Sites 0.0 4.2 0.0 4.2 BWR 2.8 3.9 3.6 3.5 BWR 2.8 1.9 3.6 2.6 PWR 2.7 3.9 0.0 3.2 PWR 2.7 3.3 0.0 2.7 Total All Regions 2.7 3.9 1.3 3.3 Total All Regions 2.7 3.0 1.3 2.7 71111.05XT Hours & Samples Reported 9/11/2018 2:22:01 PM Page 33 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 110 5 2.5 22.0 229 12 6.0 19.0 0 0 0.0 0.0 Region 2 0 0 0.0 0.0 1050 30 5.0 35.0 780 16 4.0 48.7 Region 3 348 15 5.0 23.2 296 9 3.0 32.9 0 0 0.0 0.0 Region 4 274 10 5.0 27.4 1060 36 9.0 29.4 0 0 0.0 0.0 1 Unit Sites 622 25 6.3 24.9 643 20 6.7 32.1 257 4 2.0 64.2 2 Unit Sites 110 6 3.0 18.3 1520 53 6.6 28.7 523 12 4.0 43.6 3 Unit Sites 0 0 0.0 0.0 472 14 4.7 33.7 0 0 0.0 0.0 BWR 362 13 4.3 27.8 514 16 5.3 32.1 279 8 4.0 34.9 PWR 370 18 6.0 20.5 2121 71 7.1 29.9 501 8 2.7 62.6 Total All 731 31 6.2 23.6 2634 87 7.3 30.3 780 16 4.0 48.7 Regions 9/11/2018 2:22:01 PM Page 34 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 338 17 5.7 19.9 Region 2 1830 47 5.2 38.9 Region 3 644 24 4.8 26.8 Region 4 1333 46 9.2 29.0 1 Unit Sites 1521 49 7.0 31.0 2 Unit Sites 2153 71 6.5 30.3 3 Unit Sites 472 14 4.7 33.7 BWR 1155 37 5.3 31.2 PWR 2991 97 6.5 30.8 Total All 4145 134 6.4 30.9 Regions 9/11/2018 2:22:01 PM Page 35 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Revision History Date of Revision Description of Revision 11/25/2015 IP 71111.06, "Flood Protection Measures," has been revised to address feedback forms 71111.06-1768 and 71111.06-1863, and expand on guidance related to inspection of cable routing areas susceptible to flooding or where cables may be exposed to moisture form condensation or wetting.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 5 1 0 6 NCV Green 4 6 3 13 Total 9 7 3 19 9/11/2018 2:22:01 PM Page 36 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 4 0 1 1 0 4 0 4 0 0 0 0 0 Region 2 6 0 0 4 0 5 0 6 0 0 0 0 0 Region 3 5 0 1 4 0 4 0 5 0 0 0 0 0 Region 4 4 0 1 2 0 4 0 3 1 0 0 0 0 1 Unit Sites 10 0 2 7 0 9 0 9 1 0 0 0 0 2 Unit Sites 8 0 1 4 0 7 0 8 0 0 0 0 0 3 Unit Sites 1 0 0 0 0 1 0 1 0 0 0 0 0 BWR 7 0 1 5 0 7 0 7 0 0 0 0 0 PWR 12 0 2 6 0 10 0 11 1 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 19 0 3 11 0 17 0 18 1 0 0 0 0 Percentage of All 100% 0% 16% 58% 0% 89% 0% 95% 5% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 37 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 10.1 3.5 0.0 4.8 Region 1 10.1 3.5 0.0 4.8 Region 2 9.1 3.6 6.3 6.5 Region 2 6.1 3.6 6.3 5.4 Region 3 3.9 11.3 0.0 5.7 Region 3 3.9 6.3 0.0 3.5 Region 4 7.2 4.1 3.5 4.9 Region 4 7.2 4.1 3.5 4.9 1 Unit Sites 13.4 5.5 2.1 6.8 1 Unit Sites 11.1 3.9 2.1 5.6 2 Unit Sites 4.6 7.0 1.7 4.5 2 Unit Sites 4.6 5.2 1.7 3.9 3 Unit Sites 0.0 0.0 14.2 5.8 3 Unit Sites 0.0 0.0 14.2 5.8 BWR 6.9 6.3 2.3 5.2 BWR 6.9 4.5 2.3 4.6 PWR 8.3 5.9 2.9 5.7 PWR 6.9 4.4 2.9 4.8 Total All Regions 7.8 6.1 2.7 5.5 Total All Regions 6.9 4.5 2.7 4.7 71111.06 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 38 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 298 52 3.1 5.7 283 45 2.6 6.3 249 45 2.6 5.5 Region 2 328 52 2.9 6.3 276 54 3.0 5.1 320 53 2.9 6.0 Region 3 257 46 2.9 5.6 318 39 2.4 8.2 270 41 2.6 6.6 Region 4 278 42 3.2 6.6 243 32 2.5 7.6 289 37 2.8 7.8 1 Unit Sites 227 47 2.9 4.8 353 41 2.6 8.6 326 43 2.7 7.6 2 Unit Sites 773 121 3.1 6.4 660 108 2.8 6.1 647 109 2.8 5.9 3 Unit Sites 161 24 3.0 6.7 108 21 2.6 5.2 155 24 3.0 6.5 BWR 436 71 3.0 6.1 440 64 2.7 6.9 442 65 2.7 6.8 PWR 725 121 3.2 6.0 680 106 2.8 6.4 685 111 2.9 6.2 Total All 1161 192 3.1 6.0 1120 170 2.8 6.6 1128 176 2.9 6.4 Regions 9/11/2018 2:22:01 PM Page 39 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 831 142 2.9 5.8 Region 2 924 159 3.1 5.8 Region 3 845 126 2.7 6.7 Region 4 809 111 3.0 7.3 1 Unit Sites 905 131 2.8 6.9 2 Unit Sites 2079 338 2.9 6.2 3 Unit Sites 425 69 3.1 6.2 BWR 1318 200 2.8 6.6 PWR 2090 338 3.0 6.2 Total All 3408 538 2.9 6.3 Regions 9/11/2018 2:22:01 PM Page 40 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Revision History Date of Revision Description of Revision 12/08/2016 IP 71111.07, "Heat Sink Performance," has been revised to incorporate aging management programs per ROP Feedback Form 71111.07-2059 (ADAMS ML16160A006). ROP Feedback Form 71111.07-2185 (ADAMS ML16160A008) was considered but rejected. Revised text to clarify inspection requirements versus guidance (should and shall), to address recommendations from OIG 16-A-12 audit.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 2 1 1 4 Total 2 1 1 4 9/11/2018 2:22:01 PM Page 41 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 2 0 0 1 0 2 0 1 1 0 0 0 0 Region 4 2 0 0 1 0 2 0 2 0 0 0 0 0 1 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 2 Unit Sites 3 0 0 1 0 3 0 2 1 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 4 0 0 2 0 4 0 3 1 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 4 0 0 2 0 4 0 3 1 0 0 0 0 Percentage of All 100% 0% 0% 50% 0% 100% 0% 75% 25% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 42 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 16.0 0.0 0.0 6.4 Region 3 8.0 0.0 0.0 3.2 Region 4 0.0 10.0 6.7 6.2 Region 4 0.0 10.0 6.7 6.2 1 Unit Sites 0.0 4.6 0.0 1.7 1 Unit Sites 0.0 4.6 0.0 1.7 2 Unit Sites 7.3 0.0 4.0 4.0 2 Unit Sites 3.7 0.0 4.0 2.7 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 6.9 3.6 3.2 4.5 PWR 3.4 3.6 3.2 3.4 Total All Regions 4.1 2.2 2.0 2.8 Total All Regions 2.1 2.2 2.0 2.1 71111.07A Hours & Samples Reported 9/11/2018 2:22:01 PM Page 43 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 161 34 2.0 4.7 136 30 1.8 4.5 132 32 1.9 4.1 Region 2 123 23 1.3 5.4 119 24 1.3 5.0 121 23 1.3 5.3 Region 3 125 18 1.1 6.9 97 16 1.1 6.1 91 17 1.1 5.4 Region 4 76 14 1.1 5.4 100 17 1.3 5.9 149 17 1.3 8.7 1 Unit Sites 123 22 1.4 5.6 127 22 1.4 5.8 117 21 1.3 5.6 2 Unit Sites 300 56 1.4 5.4 278 55 1.5 5.1 293 56 1.4 5.2 3 Unit Sites 63 11 1.4 5.7 47 10 1.3 4.7 82 12 1.5 6.8 BWR 195 34 1.4 5.7 175 32 1.3 5.5 175 36 1.5 4.9 PWR 291 55 1.4 5.3 277 55 1.5 5.0 317 53 1.4 6.0 Total All 485 89 1.5 5.5 452 87 1.5 5.2 492 89 1.5 5.5 Regions 9/11/2018 2:22:01 PM Page 44 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 428 96 2.0 4.5 Region 2 364 70 1.3 5.2 Region 3 313 51 1.2 6.1 Region 4 324 48 1.3 6.8 1 Unit Sites 366 65 1.4 5.6 2 Unit Sites 871 167 1.5 5.2 3 Unit Sites 192 33 1.5 5.8 BWR 545 102 1.4 5.3 PWR 884 163 1.5 5.4 Total All 1429 265 1.5 5.4 Regions 9/11/2018 2:22:01 PM Page 45 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 2 2 2 6 NOV Green 0 0 1 1 Total 2 2 3 7 9/11/2018 2:22:01 PM Page 46 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 5 0 1 2 0 5 0 5 0 0 0 0 0 Region 4 2 0 0 2 0 2 0 2 0 0 0 0 0 1 Unit Sites 4 0 1 2 0 4 0 4 0 0 0 0 0 2 Unit Sites 3 0 0 2 0 3 0 3 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 5 0 0 3 0 5 0 5 0 0 0 0 0 PWR 2 0 1 1 0 2 0 2 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 7 0 1 4 0 7 0 7 0 0 0 0 0 Percentage of All 100% 0% 14% 57% 0% 100% 0% 100% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 47 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 4.0 0.0 0.0 1.6 Region 2 4.0 0.0 0.0 1.6 Region 3 3.2 3.0 4.9 3.7 Region 3 2.0 3.0 4.9 3.3 Region 4 0.0 5.7 11.4 6.7 Region 4 0.0 5.7 5.7 4.4 1 Unit Sites 0.0 4.7 5.3 3.6 1 Unit Sites 0.0 4.7 5.3 3.6 2 Unit Sites 4.1 0.0 3.9 2.8 2 Unit Sites 3.4 0.0 1.9 1.8 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 3.2 5.8 3.0 3.9 BWR 2.1 5.8 3.0 3.4 PWR 2.0 0.0 5.4 2.4 PWR 2.0 0.0 3.6 1.8 Total All Regions 2.7 2.1 4.5 3.0 Total All Regions 2.0 2.1 3.4 2.5 71111.07T Hours & Samples Reported 9/11/2018 2:22:01 PM Page 48 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 154 17 3.4 9.1 229 26 3.3 8.8 158 13 2.2 12.1 Region 2 249 32 4.6 7.8 227 25 3.6 9.1 146 20 4.0 7.3 Region 3 491 20 2.5 24.6 329 17 2.4 19.4 411 13 2.2 31.6 Region 4 99 14 2.8 7.0 176 19 3.2 9.3 176 14 2.8 12.5 1 Unit Sites 284 22 3.1 12.9 211 20 3.3 10.5 310 14 2.3 22.2 2 Unit Sites 463 46 3.8 10.1 680 61 3.4 11.1 501 40 3.1 12.5 3 Unit Sites 246 15 3.0 16.4 70 6 2.0 11.7 78 6 3.0 13.0 BWR 484 31 3.1 15.6 342 33 3.3 10.4 334 21 3.0 15.9 PWR 509 52 4.0 9.8 618 54 3.4 11.4 555 39 3.0 14.2 Total All 993 83 3.8 12.0 960 87 3.5 11.0 890 60 3.2 14.8 Regions 9/11/2018 2:22:01 PM Page 49 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 540 56 3.3 9.6 Region 2 622 77 4.5 8.1 Region 3 1231 50 2.6 24.6 Region 4 450 47 3.4 9.6 1 Unit Sites 805 56 3.3 14.4 2 Unit Sites 1644 147 3.6 11.2 3 Unit Sites 394 27 3.4 14.6 BWR 1160 85 3.3 13.6 PWR 1683 145 3.5 11.6 Total All 2843 230 3.5 12.4 Regions 9/11/2018 2:22:01 PM Page 50 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 4 4 1 9 VIO N/A 0 1 0 1 Total 4 5 1 10 9/11/2018 2:22:01 PM Page 51 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 0 0 0 1 0 0 0 0 Region 2 2 1 0 1 0 2 1 0 0 0 0 0 0 Region 3 7 0 2 5 0 7 3 3 1 0 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 5 0 1 4 0 4 1 2 2 0 0 0 0 2 Unit Sites 5 1 1 3 0 5 3 1 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 10 1 2 7 0 9 4 3 2 0 0 0 0 PWR 0 0 0 0 0 0 0 0 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 10 1 2 7 0 9 4 3 2 0 0 0 0 Percentage of All 100% 10% 20% 70% 0% 90% 40% 30% 20% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 52 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 3.2 0.0 3.8 2.4 Region 1 0.0 0.0 3.8 1.2 Region 2 0.0 26.9 0.0 11.5 Region 2 0.0 26.9 0.0 11.5 Region 3 12.3 7.2 3.4 7.3 Region 3 12.3 4.2 3.4 6.4 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 5.9 6.2 3.5 5.4 1 Unit Sites 3.0 3.3 3.5 3.2 2 Unit Sites 5.7 12.3 2.4 6.4 2 Unit Sites 5.7 12.3 2.4 6.4 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 5.5 8.0 2.7 5.6 BWR 4.1 7.2 2.7 4.6 Total All Regions 5.5 8.0 2.7 5.6 Total All Regions 4.1 7.2 2.7 4.6 71111.08G Hours & Samples Reported 9/11/2018 2:22:01 PM Page 53 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 316 6 0.9 52.6 239 5 0.7 47.8 266 9 1.3 29.5 Region 2 102 3 0.8 34.0 149 3 0.8 49.5 96 3 0.8 32.0 Region 3 244 7 1.0 34.8 236 5 0.8 47.1 298 7 0.9 42.5 Region 4 62 2 0.7 31.0 75 2 0.7 37.3 75 2 0.7 37.5 1 Unit Sites 101 3 1.0 33.6 174 3 0.6 57.8 145 5 1.0 29.1 2 Unit Sites 507 12 0.9 42.3 380 9 0.9 42.2 451 11 0.9 41.0 3 Unit Sites 116 3 0.8 38.5 144 3 0.8 48.0 138 5 1.3 27.6 BWR 723 18 1.0 40.2 697 15 0.9 46.5 734 21 1.1 35.0 PWR 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 Total All 723 18 1.0 40.2 697 15 0.9 46.5 734 21 1.1 35.0 Regions 9/11/2018 2:22:01 PM Page 54 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 820 20 1.1 41.0 Region 2 347 9 0.9 38.5 Region 3 777 19 1.0 40.9 Region 4 212 6 0.9 35.3 1 Unit Sites 420 11 1.0 38.1 2 Unit Sites 1338 32 1.0 41.8 3 Unit Sites 397 11 1.1 36.1 BWR 2155 54 1.0 39.9 PWR 0 0 0.0 0.0 Total All 2155 54 1.0 39.9 Regions 9/11/2018 2:22:01 PM Page 55 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 3 0 0 3 NCV Green 15 3 6 24 NCVIV Green 1 0 0 1 Total 19 3 6 28 9/11/2018 2:22:01 PM Page 56 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 1 0 0 1 0 0 1 0 0 0 0 Region 2 5 0 2 0 0 5 0 0 5 0 0 0 0 Region 3 7 0 0 6 0 7 3 3 1 0 0 0 0 Region 4 9 0 2 5 0 7 4 5 0 0 0 0 0 1 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 2 Unit Sites 20 0 5 10 0 18 7 7 6 0 0 0 0 3 Unit Sites 1 0 0 0 0 1 0 0 1 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 22 0 5 11 0 20 7 8 7 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 22 0 5 11 0 20 7 8 7 0 0 0 0 Percentage of All 100% 0% 23% 50% 0% 91% 32% 36% 32% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 57 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 6.7 1.6 2.4 Region 1 0.0 4.5 1.6 1.8 Region 2 1.9 2.0 1.1 1.7 Region 2 1.9 2.0 1.1 1.7 Region 3 9.9 3.2 0.0 4.0 Region 3 9.4 3.2 0.0 3.6 Region 4 6.3 0.0 5.7 4.2 Region 4 3.8 0.0 5.7 3.3 1 Unit Sites 2.8 0.0 0.0 1.2 1 Unit Sites 2.8 0.0 0.0 1.2 2 Unit Sites 5.1 3.1 2.7 3.7 2 Unit Sites 3.9 2.6 2.7 3.1 3 Unit Sites 0.0 2.9 0.0 1.3 3 Unit Sites 0.0 2.9 0.0 1.3 PWR 4.3 2.6 2.0 3.0 PWR 3.4 2.2 2.0 2.5 Total All Regions 4.3 2.6 2.0 3.0 Total All Regions 3.4 2.2 2.0 2.5 71111.08P Hours & Samples Reported 9/11/2018 2:22:01 PM Page 58 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 589 10 1.1 58.9 445 6 1.0 74.1 625 11 1.2 56.8 Region 2 1063 17 1.1 62.5 983 12 1.0 81.9 881 18 1.3 48.9 Region 3 534 7 1.0 76.2 624 7 1.0 89.2 771 9 1.3 85.7 Region 4 794 11 1.4 72.1 656 9 1.3 72.8 700 10 1.3 70.0 1 Unit Sites 442 6 0.9 73.7 304 4 1.0 75.9 456 7 1.0 65.1 2 Unit Sites 2219 33 1.3 67.2 1812 24 1.1 75.5 2098 34 1.4 61.7 3 Unit Sites 318 6 1.2 52.9 592 6 1.2 98.7 422 7 1.4 60.2 BWR 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 PWR 2979 45 1.3 66.2 2708 34 1.2 79.6 2976 48 1.4 62.0 Total All 2979 45 1.3 66.2 2708 34 1.2 79.6 2976 48 1.4 62.0 Regions 9/11/2018 2:22:01 PM Page 59 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1658 27 1.2 61.4 Region 2 2926 47 1.2 62.3 Region 3 1929 23 1.2 83.9 Region 4 2149 30 1.4 71.6 1 Unit Sites 1202 17 1.1 70.7 2 Unit Sites 6129 91 1.3 67.3 3 Unit Sites 1331 19 1.5 70.1 BWR 0 0 0.0 0.0 PWR 8662 127 1.3 68.2 Total All 8662 127 1.3 68.2 Regions 9/11/2018 2:22:01 PM Page 60 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Revision History Date of Revision Description of Revision Summary of PIM Findings 2016 3 Year Total FIN Green 1 1 NCV Green 1 1 Total 2 2 9/11/2018 2:22:01 PM Page 61 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 0 0 1 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 1 0 0 0 0 1 0 1 0 0 0 0 0 1 Unit Sites 1 0 0 0 0 1 0 1 0 0 0 0 0 2 Unit Sites 1 0 0 1 0 0 0 1 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 1 0 0 1 0 0 0 1 0 0 0 0 0 PWR 1 0 0 0 0 1 0 1 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 2 0 0 1 0 1 0 2 0 0 0 0 0 Percentage of All 100% 0% 0% 50% 0% 50% 0% 100% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 62 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 71.4 0.0 19.2 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 111.1 0.0 43.5 Region 4 0.0 111.1 0.0 43.5 1 Unit Sites 0.0 62.5 0.0 13.3 1 Unit Sites 0.0 62.5 0.0 13.3 2 Unit Sites 0.0 40.8 0.0 14.4 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 43.5 0.0 18.8 BWR 0.0 0.0 0.0 0.0 PWR 0.0 55.6 0.0 9.6 PWR 0.0 55.6 0.0 9.6 Total All Regions 0.0 48.8 0.0 12.7 Total All Regions 0.0 24.4 0.0 6.3 71111.11A Hours & Samples Reported 9/11/2018 2:22:01 PM Page 63 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1 9 4.5 0.1 14 14 1.3 1.0 37 20 4.0 1.9 Region 2 17 17 1.2 1.0 9 18 1.6 0.5 24 16 0.9 1.5 Region 3 17 15 1.7 1.1 9 15 1.9 0.6 6 15 1.9 0.4 Region 4 9 6 1.5 1.5 9 8 1.1 1.1 5 6 1.2 0.8 1 Unit Sites 8 11 2.2 0.7 6 12 1.7 0.5 8 13 1.6 0.6 2 Unit Sites 26 30 1.7 0.9 34 37 1.4 0.9 63 35 1.5 1.8 3 Unit Sites 11 6 1.2 1.9 2 6 2.0 0.3 2 9 3.0 0.3 BWR 18 16 1.6 1.1 23 20 1.3 1.2 13 22 1.8 0.6 PWR 27 31 1.8 0.9 18 35 1.8 0.5 60 35 1.6 1.7 Total All 44 47 1.8 0.9 41 55 1.6 0.7 72 57 1.7 1.3 Regions 9/11/2018 2:22:01 PM Page 64 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 52 43 2.7 1.2 Region 2 51 51 1.2 1.0 Region 3 32 45 2.0 0.7 Region 4 23 20 1.4 1.2 1 Unit Sites 21 36 2.0 0.6 2 Unit Sites 122 102 1.5 1.2 3 Unit Sites 15 21 2.3 0.7 BWR 53 58 1.6 0.9 PWR 104 101 1.8 1.0 Total All 158 159 1.7 1.0 Regions 9/11/2018 2:22:01 PM Page 65 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 7 0 0 7 NCV Green 0 2 3 5 NCVIV Green 1 1 0 2 NCVIV N/A 0 0 1 1 NCVIV No Performance 0 0 2 2 Deficiency Total 8 3 6 17 9/11/2018 2:22:01 PM Page 66 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 3 0 0 3 0 2 0 3 0 0 0 0 0 Region 2 7 0 0 4 0 7 0 6 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 6 0 0 3 0 5 0 6 0 0 0 0 0 1 Unit Sites 5 0 0 3 0 4 0 4 0 0 0 0 0 2 Unit Sites 10 0 0 6 0 9 0 10 0 0 0 0 0 3 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 BWR 2 0 0 2 0 1 0 2 0 0 0 0 0 PWR 14 0 0 8 0 13 0 13 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 16 0 0 10 0 14 0 15 0 0 0 0 0 Percentage of All 100% 0% 0% 63% 0% 88% 0% 94% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 67 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.9 1.7 1.0 1.1 Region 1 0.0 1.7 1.0 0.8 Region 2 3.6 1.0 4.2 2.8 Region 2 3.1 1.0 4.2 2.6 Region 3 0.0 0.0 1.2 0.5 Region 3 0.0 0.0 0.0 0.0 Region 4 4.3 1.9 2.4 2.9 Region 4 2.9 1.9 1.4 2.0 1 Unit Sites 2.3 1.2 1.6 1.8 1 Unit Sites 1.5 1.2 1.6 1.5 2 Unit Sites 2.3 1.1 2.1 1.9 2 Unit Sites 1.5 1.1 1.1 1.2 3 Unit Sites 0.0 0.0 5.8 2.8 3 Unit Sites 0.0 0.0 5.8 2.8 BWR 0.8 1.0 0.9 0.9 BWR 0.0 1.0 0.0 0.3 PWR 3.0 1.2 2.7 2.4 PWR 2.2 1.2 2.4 2.0 Total All Regions 2.2 1.1 2.1 1.9 Total All Regions 1.4 1.1 1.5 1.4 71111.11B Hours & Samples Reported 9/11/2018 2:22:01 PM Page 68 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1086 14 0.9 77.6 591 7 0.9 84.4 958 15 1.1 63.9 Region 2 980 10 1.1 98.0 990 10 0.9 99.0 719 9 1.0 79.9 Region 3 693 8 0.6 86.7 563 6 0.9 93.8 852 21 2.1 40.6 Region 4 700 8 1.0 87.5 537 7 1.2 76.6 733 10 1.1 73.3 1 Unit Sites 877 10 0.8 87.7 459 6 1.0 76.5 875 19 1.7 46.1 2 Unit Sites 2268 25 1.0 90.7 1873 19 1.0 98.6 1976 32 1.3 61.8 3 Unit Sites 315 5 0.8 63.0 348 5 1.0 69.7 410 4 0.7 102.6 BWR 1236 14 0.9 88.3 1045 10 0.9 104.5 1156 27 1.8 42.8 PWR 2223 26 0.9 85.5 1636 20 1.1 81.8 2106 28 1.1 75.2 Total All 3459 40 1.0 86.5 2680 30 1.0 89.3 3262 55 1.4 59.3 Regions 9/11/2018 2:22:01 PM Page 69 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 2635 36 1.0 73.2 Region 2 2689 29 1.1 92.7 Region 3 2108 35 1.3 60.2 Region 4 1969 25 1.2 78.8 1 Unit Sites 2211 35 1.3 63.2 2 Unit Sites 6117 76 1.1 80.5 3 Unit Sites 1074 14 0.9 76.7 BWR 3437 51 1.3 67.4 PWR 5964 74 1.0 80.6 Total All 9401 125 1.1 75.2 Regions 9/11/2018 2:22:01 PM Page 70 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 3 Year Total NCV Green 2 3 5 Total 2 3 5 9/11/2018 2:22:01 PM Page 71 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 1 0 1 0 0 0 0 0 Region 2 2 0 0 1 0 1 0 2 0 0 0 0 0 Region 3 1 0 0 0 0 0 1 0 0 0 0 0 0 Region 4 1 0 0 1 0 1 0 1 0 0 0 0 0 1 Unit Sites 3 0 0 2 0 2 1 2 0 0 0 0 0 2 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 3 Unit Sites 1 0 0 0 0 0 0 1 0 0 0 0 0 BWR 3 0 0 1 0 1 1 2 0 0 0 0 0 PWR 2 0 0 2 0 2 0 2 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 5 0 0 3 0 3 1 4 0 0 0 0 0 Percentage of All 100% 0% 0% 60% 0% 60% 20% 80% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 72 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 1.6 0.0 0.5 Region 1 0.0 1.6 0.0 0.5 Region 2 1.7 1.6 0.0 1.0 Region 2 0.0 1.6 0.0 0.5 Region 3 2.0 3.8 1.7 2.5 Region 3 2.0 0.0 0.0 0.6 Region 4 2.0 0.0 0.0 0.6 Region 4 2.0 0.0 0.0 0.6 1 Unit Sites 2.5 3.5 1.1 2.3 1 Unit Sites 2.5 1.2 0.0 1.1 2 Unit Sites 0.0 0.8 0.0 0.2 2 Unit Sites 0.0 0.8 0.0 0.2 3 Unit Sites 10.1 0.0 0.0 3.1 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 3.6 1.1 1.1 1.8 BWR 2.4 0.0 0.0 0.7 PWR 0.0 2.1 0.0 0.7 PWR 0.0 1.4 0.0 0.5 Total All Regions 1.4 1.7 0.4 1.1 Total All Regions 0.9 0.9 0.0 0.6 71111.11Q Hours & Samples Reported 9/11/2018 2:22:01 PM Page 73 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 636 156 9.2 4.1 637 155 9.1 4.1 638 154 9.1 4.1 Region 2 588 167 9.3 3.5 631 163 9.1 3.9 727 168 9.3 4.3 Region 3 494 124 7.8 4.0 532 123 7.7 4.3 601 128 8.0 4.7 Region 4 497 108 8.3 4.6 517 108 8.3 4.8 542 110 8.5 4.9 1 Unit Sites 508 129 8.1 3.9 540 132 8.3 4.1 574 132 8.3 4.3 2 Unit Sites 1398 349 8.9 4.0 1442 344 8.8 4.2 1604 356 9.1 4.5 3 Unit Sites 309 77 9.6 4.0 336 73 9.1 4.6 329 72 9.0 4.6 BWR 845 197 8.2 4.3 914 199 8.3 4.6 950 200 8.3 4.7 PWR 1371 358 9.4 3.8 1404 350 9.2 4.0 1557 360 9.5 4.3 Total All 2215 555 9.1 4.0 2318 549 9.0 4.2 2507 560 9.2 4.5 Regions 9/11/2018 2:22:01 PM Page 74 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1911 465 9.5 4.1 Region 2 1945 498 9.6 3.9 Region 3 1627 375 8.2 4.3 Region 4 1556 326 8.8 4.8 1 Unit Sites 1621 393 8.5 4.1 2 Unit Sites 4445 1049 9.1 4.2 3 Unit Sites 974 222 10.1 4.4 BWR 2708 596 8.4 4.5 PWR 4332 1068 9.5 4.1 Total All 7039 1664 9.1 4.2 Regions 9/11/2018 2:22:01 PM Page 75 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 3 7 4 14 NCV Green 38 32 18 88 NCVIV N/A 0 1 0 1 Total 41 40 22 103 9/11/2018 2:22:01 PM Page 76 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 27 0 11 12 0 16 2 17 5 0 0 3 0 Region 2 23 0 5 13 0 10 7 15 1 0 0 0 0 Region 3 25 0 8 11 0 12 4 18 2 0 0 0 0 Region 4 29 0 7 16 0 20 5 21 3 0 0 0 0 1 Unit Sites 47 0 14 21 0 26 7 31 5 0 0 3 0 2 Unit Sites 54 0 16 29 0 31 10 38 6 0 0 0 0 3 Unit Sites 3 0 1 2 0 1 1 2 0 0 0 0 0 BWR 38 0 12 19 0 25 5 23 6 0 0 3 0 PWR 66 0 19 33 0 33 13 48 5 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 104 0 31 52 0 58 18 71 11 0 0 3 0 Percentage of All 100% 0% 30% 50% 0% 56% 17% 68% 11% 0% 0% 3% 0%

Findings 9/11/2018 2:22:01 PM Page 77 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 8.1 9.6 5.3 7.7 Region 1 4.1 5.4 3.1 4.2 Region 2 9.3 6.9 1.5 5.9 Region 2 3.1 3.9 0.8 2.6 Region 3 9.8 7.5 5.7 7.7 Region 3 4.9 3.6 1.6 3.4 Region 4 8.9 8.0 7.2 8.0 Region 4 6.3 6.2 4.5 5.7 1 Unit Sites 9.9 8.2 7.2 8.4 1 Unit Sites 4.8 4.3 3.1 4.1 2 Unit Sites 9.3 8.5 3.2 6.9 2 Unit Sites 4.6 5.3 2.1 4.0 3 Unit Sites 0.0 0.0 6.3 1.6 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 5.7 8.6 7.0 7.2 BWR 3.4 5.1 3.8 4.1 PWR 11.1 7.6 3.6 7.4 PWR 5.1 4.4 1.6 3.7 Total All Regions 9.1 8.0 4.8 7.3 Total All Regions 4.5 4.7 2.4 3.9 71111.12 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 78 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1232 144 8.5 8.6 1299 146 8.6 8.9 1295 145 8.5 8.9 Region 2 1287 151 8.4 8.5 1298 153 8.5 8.5 1302 150 8.3 8.7 Region 3 1221 124 7.8 9.8 1393 133 8.3 10.5 1224 129 8.1 9.5 Region 4 952 98 7.5 9.7 1122 102 7.8 11.0 1106 100 7.7 11.1 1 Unit Sites 1161 127 7.9 9.1 1371 132 8.3 10.4 1247 127 7.9 9.8 2 Unit Sites 2950 328 8.4 9.0 3155 339 8.7 9.3 3216 335 8.6 9.6 3 Unit Sites 581 62 7.8 9.4 587 63 7.9 9.3 463 62 7.8 7.5 BWR 1761 195 8.1 9.0 1959 210 8.8 9.3 1833 200 8.3 9.2 PWR 2931 322 8.5 9.1 3153 324 8.5 9.7 3093 324 8.5 9.5 Total All 4692 517 8.5 9.1 5112 534 8.8 9.6 4926 524 8.6 9.4 Regions 9/11/2018 2:22:01 PM Page 79 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 3826 435 8.9 8.8 Region 2 3887 454 8.7 8.6 Region 3 3838 386 8.4 9.9 Region 4 3180 300 8.1 10.6 1 Unit Sites 3779 386 8.4 9.8 2 Unit Sites 9321 1002 8.7 9.3 3 Unit Sites 1631 187 8.5 8.7 BWR 5553 605 8.5 9.2 PWR 9177 970 8.6 9.5 Total All 14730 1575 8.6 9.4 Regions 9/11/2018 2:22:01 PM Page 80 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Revision History Date of Revision Description of Revision 12/20/2017 IP 71111.13, Maintenance Risk Assessments and Emergent Work Control, has been revised to add inspection of RICT times and risk management actions.

These are a subset of maintenance activities and are included in the samples. This change includes information to facilitate inspection of RICT and PRA functionality. In addition, this revision streamlines IP formatting.

02/03/2016 IP 71111.13, "Maintenance Risk Assessments and Emergent Work Control," has been revised o update references to Revision 3 to RG 1.160 and Revision 4A to NUMARC 93-01, which were recently issued. IP 71111.13 has been revised to update references to the new revision numbers. Changes made in accordance with ROP Enhancement Project (see ML14017A381)

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 1 0 2 3 NCV Green 18 24 11 53 Total 19 24 13 56 9/11/2018 2:22:01 PM Page 81 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 14 0 1 13 0 11 3 9 2 0 0 0 0 Region 2 10 0 0 10 0 8 2 8 0 0 0 0 0 Region 3 12 0 1 9 0 6 2 7 3 0 0 0 0 Region 4 20 0 2 17 0 17 3 13 3 0 1 0 0 1 Unit Sites 25 0 2 22 0 19 5 15 4 0 1 0 0 2 Unit Sites 29 0 2 25 0 21 5 20 4 0 0 0 0 3 Unit Sites 2 0 0 2 0 2 0 2 0 0 0 0 0 BWR 25 0 1 24 0 19 2 17 5 0 1 0 0 PWR 31 0 3 25 0 23 8 20 3 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 56 0 4 49 0 42 10 37 8 0 1 0 0 Percentage of All 100% 0% 7% 88% 0% 75% 18% 66% 14% 0% 2% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 82 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.7 5.9 3.8 3.5 Region 1 0.7 4.6 2.4 2.5 Region 2 2.1 3.9 1.5 2.5 Region 2 1.4 3.1 1.5 2.0 Region 3 5.5 4.7 0.0 3.5 Region 3 3.3 1.6 0.0 1.6 Region 4 8.9 4.5 4.6 5.7 Region 4 7.7 3.6 3.8 4.8 1 Unit Sites 4.8 4.3 2.3 3.8 1 Unit Sites 3.9 2.4 1.9 2.7 2 Unit Sites 3.1 5.6 2.5 3.7 2 Unit Sites 1.9 4.2 1.8 2.6 3 Unit Sites 4.0 0.0 4.1 2.8 3 Unit Sites 4.0 0.0 4.1 2.8 BWR 5.5 5.1 2.1 4.2 BWR 3.3 3.6 1.6 2.9 PWR 2.9 4.6 2.7 3.4 PWR 2.6 3.0 2.2 2.6 Total All Regions 3.9 4.8 2.5 3.7 Total All Regions 2.9 3.2 2.0 2.7 71111.13 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 83 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1344 322 18.9 4.2 1317 322 18.9 4.1 1268 320 18.8 4.0 Region 2 1416 320 17.8 4.4 1270 292 16.2 4.3 1364 314 17.4 4.3 Region 3 1228 260 16.3 4.7 1251 260 16.3 4.8 1181 243 15.2 4.9 Region 4 904 204 15.7 4.4 1102 208 16.0 5.3 1305 213 16.4 6.1 1 Unit Sites 1212 275 17.2 4.4 1297 284 17.8 4.6 1343 267 16.7 5.0 2 Unit Sites 3066 690 17.7 4.4 3057 657 16.8 4.7 3235 690 17.7 4.7 3 Unit Sites 614 141 17.6 4.4 586 141 17.6 4.2 540 133 16.6 4.1 BWR 1797 415 17.3 4.3 1922 423 17.6 4.5 1878 413 17.2 4.5 PWR 3096 691 18.2 4.5 3018 659 17.3 4.6 3239 677 17.8 4.8 Total All 4892 1106 18.1 4.4 4941 1082 17.7 4.6 5118 1090 17.9 4.7 Regions 9/11/2018 2:22:01 PM Page 84 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 3930 964 19.7 4.1 Region 2 4050 926 17.8 4.4 Region 3 3660 763 16.6 4.8 Region 4 3311 625 16.9 5.3 1 Unit Sites 3852 826 18.0 4.7 2 Unit Sites 9359 2037 17.7 4.6 3 Unit Sites 1740 415 18.9 4.2 BWR 5597 1251 17.6 4.5 PWR 9353 2027 17.9 4.6 Total All 14950 3278 17.9 4.6 Regions 9/11/2018 2:22:01 PM Page 85 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Revision History Date of Revision Description of Revision 12/22/2016 IP 71111.15, "Operability Determinations and Functionality Assessments," has been revised to address use of mandatory and discretionary language concerns and recommendations found in OIG Audit OIG-16-A-12. The requirement to inspect at least one sample associated with OWA has been deleted.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 4 1 1 6 NCV Green 65 47 49 161 NCV N/A 0 1 0 1 NCVIV Green 0 0 1 1 NCVIV Minor Performance 0 0 1 1 Deficiency NCVIV N/A 4 5 2 11 NCVIV No Performance 0 0 1 1 Deficiency NOV N/A 1 1 0 2 NOV White 0 1 2 3 VIO Green 0 1 0 1 VIO N/A 1 0 0 1 VIO White 0 1 0 1 Total 75 58 57 190 9/11/2018 2:22:01 PM Page 86 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 50 1 12 30 0 40 2 34 14 0 0 0 0 Region 2 42 1 10 24 0 37 1 29 6 1 0 1 0 Region 3 64 3 9 37 0 50 4 48 7 0 0 0 0 Region 4 34 0 4 23 0 26 0 26 5 2 1 0 0 1 Unit Sites 82 4 16 47 0 68 5 57 12 2 0 0 0 2 Unit Sites 95 1 16 61 0 75 1 70 18 1 1 1 0 3 Unit Sites 13 0 3 6 0 10 1 10 2 0 0 0 0 BWR 95 3 20 56 0 74 5 67 18 1 0 0 0 PWR 95 2 15 58 0 79 2 70 14 2 1 1 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 190 5 35 114 0 153 7 137 32 3 1 1 0 Percentage of All 100% 3% 18% 60% 0% 81% 4% 72% 17% 2% 1% 1% 0%

Findings 9/11/2018 2:22:01 PM Page 87 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 13.4 7.3 5.5 8.6 Region 1 11.0 5.5 3.6 6.6 Region 2 6.3 6.7 6.9 6.6 Region 2 5.5 4.4 5.2 5.0 Region 3 9.9 11.4 11.5 11.0 Region 3 7.5 7.3 7.0 7.3 Region 4 8.9 4.8 8.2 7.3 Region 4 7.1 3.4 5.4 5.3 1 Unit Sites 12.4 10.0 7.5 10.0 1 Unit Sites 9.9 7.1 5.1 7.4 2 Unit Sites 7.8 6.6 8.4 7.6 2 Unit Sites 6.6 4.4 5.4 5.4 3 Unit Sites 6.1 6.5 8.0 6.8 3 Unit Sites 5.0 3.6 4.4 4.3 BWR 12.2 10.3 9.9 10.8 BWR 9.7 7.6 5.6 7.6 PWR 7.8 6.2 6.9 7.0 PWR 6.5 3.8 5.1 5.1 Total All Regions 9.4 7.8 8.0 8.4 Total All Regions 7.7 5.3 5.3 6.1 71111.15 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 88 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1905 350 20.6 5.4 2187 332 19.5 6.6 1956 340 20.0 5.8 Region 2 2376 367 20.4 6.5 2257 364 20.2 6.2 2124 356 19.8 6.0 Region 3 1856 294 18.4 6.3 2056 292 18.3 7.0 1870 293 18.3 6.4 Region 4 1403 232 17.8 6.0 1465 233 17.9 6.3 1652 233 17.9 7.1 1 Unit Sites 1660 271 16.9 6.1 1726 273 17.1 6.3 1712 269 16.8 6.4 2 Unit Sites 4674 801 20.5 5.8 5069 776 19.9 6.5 4909 780 20.0 6.3 3 Unit Sites 1206 171 21.4 7.0 1169 172 21.5 6.8 980 173 21.6 5.7 BWR 2797 461 19.2 6.1 3017 457 19.0 6.6 2862 457 19.0 6.3 PWR 4743 782 20.6 6.1 4948 764 20.1 6.5 4739 765 20.1 6.2 Total All 7539 1243 20.4 6.1 7964 1221 20.0 6.5 7601 1222 20.0 6.2 Regions 9/11/2018 2:22:01 PM Page 89 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 6047 1022 20.9 5.9 Region 2 6756 1087 20.9 6.2 Region 3 5781 879 19.1 6.6 Region 4 4520 698 18.9 6.5 1 Unit Sites 5098 813 17.7 6.3 2 Unit Sites 14652 2357 20.5 6.2 3 Unit Sites 3354 516 23.5 6.5 BWR 8675 1375 19.4 6.3 PWR 14429 2311 20.5 6.2 Total All 23104 3686 20.1 6.3 Regions 9/11/2018 2:22:01 PM Page 90 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Revision History Date of Revision Description of Revision 12/08/2016 IP 71111.17T, "Evaluations of Changes, Tests, and Experiments," has been revised to: 1) address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515), and 2) relocate inspection of permanent plant modifications to IP 71111.21M, "Component Design Bases Inspection (Teams).

11/13/2015 IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 3 1 0 4 NCV Green 17 13 4 34 NCVIV Green 5 10 1 16 NCVIV N/A 2 1 0 3 NCVIV No Performance 0 0 1 1 Deficiency Total 27 25 6 58 9/11/2018 2:22:01 PM Page 91 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 5 0 1 2 0 5 1 2 2 0 0 0 0 Region 2 22 0 4 12 0 22 0 19 1 0 0 0 0 Region 3 19 0 3 7 0 18 3 13 3 0 0 0 0 Region 4 11 0 3 2 0 11 1 8 1 0 0 0 0 1 Unit Sites 25 0 4 9 0 25 4 15 6 0 0 0 0 2 Unit Sites 27 0 7 10 0 26 1 22 1 0 0 0 0 3 Unit Sites 5 0 0 4 0 5 0 5 0 0 0 0 0 BWR 30 0 6 11 0 29 3 22 5 0 0 0 0 PWR 27 0 5 12 0 27 2 20 2 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 57 0 11 23 0 56 5 42 7 0 0 0 0 Percentage of All 100% 0% 19% 40% 0% 98% 9% 74% 12% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 92 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 3.9 1.3 0.0 1.8 Region 1 3.9 1.3 0.0 1.8 Region 2 5.9 6.0 7.1 6.1 Region 2 5.6 5.2 5.4 5.4 Region 3 9.7 9.2 3.3 8.0 Region 3 8.7 7.2 1.6 6.5 Region 4 4.1 9.6 2.5 5.9 Region 4 4.1 5.5 2.5 4.3 1 Unit Sites 6.1 7.2 0.0 6.0 1 Unit Sites 6.1 5.1 0.0 5.1 2 Unit Sites 5.8 4.7 4.4 5.1 2 Unit Sites 5.5 3.8 2.8 4.1 3 Unit Sites 9.0 3.3 5.5 6.1 3 Unit Sites 6.0 3.3 5.5 4.9 BWR 8.4 9.2 0.0 7.8 BWR 7.8 6.3 0.0 6.2 PWR 5.0 2.8 4.8 4.2 PWR 4.4 2.8 3.3 3.5 Total All Regions 6.1 5.7 3.7 5.5 Total All Regions 5.8 4.4 2.5 4.6 71111.17T Hours & Samples Reported 9/11/2018 2:22:01 PM Page 93 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 768 146 24.3 5.3 1537 273 34.1 5.6 454 132 22.0 3.4 Region 2 1605 190 23.8 8.4 1344 169 24.1 8.0 556 95 15.8 5.9 Region 3 1033 165 27.5 6.3 978 175 29.2 5.6 607 125 20.8 4.9 Region 4 739 155 31.0 4.8 731 163 32.6 4.5 406 109 21.8 3.7 1 Unit Sites 1172 209 29.9 5.6 1310 254 31.8 5.2 190 57 19.0 3.3 2 Unit Sites 2440 407 31.3 6.0 2503 441 33.9 5.7 1584 352 23.5 4.5 3 Unit Sites 533 40 10.0 13.3 777 85 21.3 9.1 249 52 13.0 4.8 BWR 1657 286 28.6 5.8 2065 364 33.1 5.7 501 113 18.8 4.4 PWR 2488 370 28.5 6.7 2525 416 32.0 6.1 1522 348 23.2 4.4 Total All 4145 656 29.8 6.3 4590 780 33.9 5.9 2023 461 23.1 4.4 Regions 9/11/2018 2:22:01 PM Page 94 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 2759 551 30.6 5.0 Region 2 3505 454 23.9 7.7 Region 3 2617 465 29.1 5.6 Region 4 1876 427 32.8 4.4 1 Unit Sites 2672 520 32.5 5.1 2 Unit Sites 6527 1200 30.8 5.4 3 Unit Sites 1558 177 17.7 8.8 BWR 4223 763 29.3 5.5 PWR 6535 1134 28.4 5.8 Total All 10757 1897 29.2 5.7 Regions 9/11/2018 2:22:01 PM Page 95 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Revision History Date of Revision Description of Revision 11/17/2016 IP 71111.18, "Plant Modifications," has been revised to: 1) Provide oversight of licensee commitments to consider Severe Accident Management Guidelines (SAMGs) within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. Additional background information can be found in SRM SECY-15-0065 (ML15239A767) and a February 23, 2016, letter from the NRC to NEI (ML16032A029). The February 23, 2016, letter, which also references the SRM, is added to the References section. (2) Address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515). (3) Closed feedback form 71111.18-2212.

11/13/2015 IP 71111.18, "Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 4 1 1 6 NCV Green 9 3 4 16 NCVIV Green 6 4 0 10 NCVIV N/A 2 0 1 3 NOV N/A 0 0 1 1 VIO Green 0 0 1 1 Total 21 8 8 37 9/11/2018 2:22:01 PM Page 96 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 6 0 1 4 0 6 0 5 1 0 0 0 0 Region 2 7 0 0 5 0 5 1 3 2 0 0 0 0 Region 3 16 0 2 8 0 15 3 5 6 0 0 0 0 Region 4 8 0 0 6 0 7 2 5 0 0 0 0 0 1 Unit Sites 17 0 3 8 0 15 4 7 4 0 0 0 0 2 Unit Sites 18 0 0 14 0 16 1 11 5 0 0 0 0 3 Unit Sites 2 0 0 1 0 2 1 0 0 0 0 0 0 BWR 18 0 2 10 0 17 3 7 6 0 0 0 0 PWR 19 0 1 13 0 16 3 11 3 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 37 0 3 23 0 33 6 18 9 0 0 0 0 Percentage of All 100% 0% 8% 62% 0% 89% 16% 49% 24% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 97 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 4.8 6.1 1.6 4.2 Region 1 4.8 6.1 0.0 3.7 Region 2 6.7 0.0 5.7 4.7 Region 2 5.3 0.0 3.8 3.5 Region 3 16.2 7.5 5.6 10.1 Region 3 13.0 7.5 3.7 8.4 Region 4 12.0 1.8 3.9 5.4 Region 4 9.6 1.8 3.9 4.7 1 Unit Sites 12.8 3.9 2.1 6.3 1 Unit Sites 10.1 3.9 2.1 5.3 2 Unit Sites 7.9 4.8 6.2 6.4 2 Unit Sites 6.6 4.8 3.6 5.1 3 Unit Sites 7.3 7.1 0.0 5.4 3 Unit Sites 7.3 7.1 0.0 5.4 BWR 12.6 6.1 3.4 7.4 BWR 10.5 6.1 3.4 6.8 PWR 8.2 3.5 4.6 5.5 PWR 6.5 3.5 2.3 4.2 Total All Regions 9.9 4.5 4.1 6.3 Total All Regions 8.0 4.5 2.7 5.2 71111.18 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 98 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 630 86 5.1 7.3 654 90 5.3 7.3 606 89 5.2 6.8 Region 2 752 80 4.4 9.4 416 65 3.6 6.4 526 67 3.7 7.9 Region 3 694 65 4.1 10.7 796 59 3.7 13.5 540 60 3.8 9.0 Region 4 417 54 4.2 7.7 560 51 3.9 11.0 515 49 3.8 10.5 1 Unit Sites 662 68 4.3 9.7 726 72 4.5 10.1 677 67 4.2 10.1 2 Unit Sites 1539 185 4.7 8.3 1380 158 4.1 8.7 1239 162 4.2 7.6 3 Unit Sites 292 32 4.0 9.1 320 35 4.4 9.1 272 36 4.5 7.5 BWR 949 110 4.6 8.6 983 105 4.4 9.4 883 107 4.5 8.3 PWR 1543 175 4.6 8.8 1443 160 4.2 9.0 1304 158 4.2 8.3 Total All 2492 285 4.7 8.7 2426 265 4.3 9.2 2187 265 4.3 8.3 Regions 9/11/2018 2:22:01 PM Page 99 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1890 265 5.4 7.1 Region 2 1694 212 4.1 8.0 Region 3 2030 184 4.0 11.0 Region 4 1491 154 4.2 9.7 1 Unit Sites 2064 207 4.5 10.0 2 Unit Sites 4158 505 4.4 8.2 3 Unit Sites 883 103 4.7 8.6 BWR 2815 322 4.5 8.7 PWR 4290 493 4.4 8.7 Total All 7105 815 4.5 8.7 Regions 9/11/2018 2:22:01 PM Page 100 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 1 1 0 2 NCV Green 14 6 8 28 Total 15 7 8 30 9/11/2018 2:22:01 PM Page 101 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 7 0 2 4 0 6 0 4 3 0 0 0 0 Region 2 7 0 2 5 0 6 1 4 2 0 0 0 0 Region 3 5 0 1 4 0 3 1 4 0 0 0 0 0 Region 4 11 0 0 8 0 6 1 10 0 0 0 0 0 1 Unit Sites 12 0 0 11 0 7 2 8 2 0 0 0 0 2 Unit Sites 15 0 5 8 0 12 0 12 3 0 0 0 0 3 Unit Sites 3 0 0 2 0 2 1 2 0 0 0 0 0 BWR 15 0 3 10 0 10 3 9 3 0 0 0 0 PWR 15 0 2 11 0 11 0 13 2 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 30 0 5 21 0 21 3 22 5 0 0 0 0 Percentage of All 100% 0% 17% 70% 0% 70% 10% 73% 17% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 102 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 2.5 1.3 0.7 1.5 Region 1 1.9 1.3 0.7 1.3 Region 2 2.5 2.3 0.7 1.8 Region 2 1.3 2.3 0.7 1.4 Region 3 3.1 0.0 2.3 1.8 Region 3 1.6 0.0 0.8 0.8 Region 4 4.3 2.3 3.0 3.1 Region 4 3.2 0.8 1.5 1.7 1 Unit Sites 3.3 1.3 2.2 2.3 1 Unit Sites 1.9 0.9 0.9 1.2 2 Unit Sites 2.7 1.4 1.0 1.7 2 Unit Sites 1.7 1.0 1.0 1.2 3 Unit Sites 3.6 3.7 3.5 3.6 3 Unit Sites 3.6 3.7 0.0 2.4 BWR 5.1 2.3 0.5 2.6 BWR 2.6 1.8 0.5 1.6 PWR 1.8 0.9 2.3 1.7 PWR 1.5 0.6 1.2 1.1 Total All Regions 3.0 1.5 1.6 2.0 Total All Regions 1.9 1.1 0.9 1.3 71111.19 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 103 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1570 401 23.6 3.9 1541 397 23.4 3.9 1532 395 23.2 3.9 Region 2 1567 388 21.6 4.0 1323 366 20.3 3.6 1418 372 20.7 3.8 Region 3 1287 318 19.9 4.0 1247 329 20.6 3.8 1290 331 20.7 3.9 Region 4 928 245 18.8 3.8 1293 251 19.3 5.1 1328 256 19.7 5.2 1 Unit Sites 1199 333 20.8 3.6 1288 348 21.8 3.7 1418 337 21.1 4.2 2 Unit Sites 3465 854 21.9 4.1 3461 831 21.3 4.2 3468 850 21.8 4.1 3 Unit Sites 688 165 20.6 4.2 654 164 20.5 4.0 682 167 20.9 4.1 BWR 1935 523 21.8 3.7 2198 532 22.2 4.1 2102 525 21.9 4.0 PWR 3417 829 21.8 4.1 3205 811 21.3 4.0 3466 829 21.8 4.2 Total All 5352 1352 22.2 4.0 5403 1343 22.0 4.0 5568 1354 22.2 4.1 Regions 9/11/2018 2:22:01 PM Page 104 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 4642 1193 24.3 3.9 Region 2 4307 1126 21.7 3.8 Region 3 3824 978 21.3 3.9 Region 4 3549 752 20.3 4.7 1 Unit Sites 3906 1018 22.1 3.8 2 Unit Sites 10393 2535 22.0 4.1 3 Unit Sites 2024 496 22.5 4.1 BWR 6234 1580 22.3 3.9 PWR 10089 2469 21.8 4.1 Total All 16322 4049 22.1 4.0 Regions 9/11/2018 2:22:01 PM Page 105 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Revision History Date of Revision Description of Revision 11/30/2017 IP 71111.20, Refueling and Other Outage Activities, has been revised to add guidance to review calculations for reactor pressure vessel water inventory control. Improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.

01/27/2015 IP 71111.20, "Refueling and Other Outage Activities," has been revised to group existing fatigue assessment guidance into a new, separate section, and to add IP 71111.11 as acceptable guidance to observe start-up activities in the control room, based on the 2014 ROP Enhancement Project feedback.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 0 1 1 2 NCV Green 11 15 10 36 NCVIV N/A 0 0 1 1 Total 11 16 12 39 9/11/2018 2:22:01 PM Page 106 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 8 0 2 4 0 6 1 5 2 0 0 0 0 Region 2 7 0 1 5 0 6 0 2 4 0 0 0 0 Region 3 17 0 0 15 0 7 8 4 5 0 0 0 0 Region 4 7 0 0 5 0 5 3 1 3 0 0 0 0 1 Unit Sites 11 0 1 8 0 5 6 2 2 0 0 0 0 2 Unit Sites 28 0 2 21 0 19 6 10 12 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 11 0 0 10 0 5 5 5 1 0 0 0 0 PWR 28 0 3 19 0 19 7 7 13 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 39 0 3 29 0 24 12 12 14 0 0 0 0 Percentage of All 100% 0% 8% 74% 0% 62% 31% 31% 36% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 107 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 1.6 1.1 2.2 1.6 Region 1 1.1 1.1 1.1 1.1 Region 2 1.3 1.2 2.0 1.5 Region 2 0.9 1.2 1.6 1.2 Region 3 2.9 5.4 1.8 3.4 Region 3 0.5 2.1 0.6 1.0 Region 4 1.7 1.6 2.5 2.0 Region 4 0.9 1.6 1.7 1.4 1 Unit Sites 2.0 1.5 1.8 1.7 1 Unit Sites 1.0 0.0 1.0 0.7 2 Unit Sites 2.0 3.3 2.4 2.5 2 Unit Sites 0.8 2.5 1.4 1.5 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 2.2 1.4 1.4 1.7 BWR 0.9 0.4 0.9 0.7 PWR 1.8 3.2 2.4 2.4 PWR 0.8 2.3 1.3 1.4 Total All Regions 1.9 2.5 2.1 2.1 Total All Regions 0.8 1.5 1.2 1.2 71111.20 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 108 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1896 33 2.1 57.4 1772 30 1.9 59.1 1846 29 1.9 63.6 Region 2 2233 45 2.5 49.6 1663 27 1.7 61.6 1916 38 2.2 50.4 Region 3 1909 33 2.2 57.8 1443 21 1.5 68.7 1679 23 1.5 73.0 Region 4 1159 21 1.8 55.2 1224 25 1.9 49.0 1189 25 2.3 47.5 1 Unit Sites 1222 22 1.6 55.5 1193 20 1.7 59.6 1228 18 1.5 68.2 2 Unit Sites 5142 93 2.4 55.3 3977 66 1.7 60.3 4439 81 2.2 54.8 3 Unit Sites 833 17 2.1 49.0 933 17 2.1 54.9 963 16 2.0 60.2 BWR 2222 44 2.1 50.5 2659 47 2.0 56.6 2133 42 2.0 50.8 PWR 4975 88 2.3 56.5 3444 56 1.6 61.5 4496 73 2.1 61.6 Total All 7197 132 2.3 54.5 6102 103 1.8 59.2 6629 115 2.1 57.6 Regions 9/11/2018 2:22:01 PM Page 109 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 5513 92 2.0 59.9 Region 2 5812 110 2.2 52.8 Region 3 5031 77 1.8 65.3 Region 4 3572 71 2.1 50.3 1 Unit Sites 3642 60 1.7 60.7 2 Unit Sites 13557 240 2.2 56.5 3 Unit Sites 2729 50 2.3 54.6 BWR 7014 133 2.1 52.7 PWR 12915 217 2.0 59.5 Total All 19928 350 2.1 56.9 Regions 9/11/2018 2:22:01 PM Page 110 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Revision History Date of Revision Description of Revision 12/08/2016 IP 71111.21M, "Design Bases Assurance Inspection (Teams)," has been revised to inspection procedure to address internal and external comments from conducting the eight CDBI pilot inspections and also to address FFs -1989; -2072; and -2172.

11/24/2015 IP 71111.21M, "Component Design Bases Inspection (Teams)," has been revised after the regional comment period and reissued after incorporating regional comments.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 0 2 0 2 NCV Green 11 14 41 66 NCVIV N/A 0 1 3 4 NOV Green 0 0 1 1 Total 11 17 45 73 9/11/2018 2:22:01 PM Page 111 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 8 0 1 1 0 8 0 8 0 0 0 0 0 Region 2 24 0 3 3 0 24 2 17 4 0 0 0 0 Region 3 16 0 1 2 0 16 1 14 1 0 0 0 0 Region 4 25 0 2 11 0 24 1 21 1 0 0 0 0 1 Unit Sites 27 0 1 10 0 26 0 23 2 0 0 0 0 2 Unit Sites 43 0 5 6 0 43 4 35 3 0 0 0 0 3 Unit Sites 3 0 1 1 0 3 0 2 1 0 0 0 0 BWR 18 0 2 8 0 17 0 15 2 0 0 0 0 PWR 55 0 5 9 0 55 4 45 4 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 73 0 7 17 0 72 4 60 6 0 0 0 0 Percentage of All 100% 0% 10% 23% 0% 99% 5% 82% 8% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 112 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 800.0 0.0 3.3 4.0 Region 1 800.0 0.0 3.4 4.2 Region 2 44.4 76.9 4.2 6.1 Region 2 44.4 51.3 4.6 7.0 Region 3 0.0 0.0 4.8 7.1 Region 3 0.0 0.0 4.7 5.4 Region 4 0.0 12.2 4.4 6.0 Region 4 0.0 7.8 6.0 6.6 1 Unit Sites 0.0 3.1 4.4 4.3 1 Unit Sites 0.0 3.1 5.3 5.1 2 Unit Sites 3600.0 13.7 4.0 7.4 2 Unit Sites 2000.0 9.0 3.9 6.4 3 Unit Sites 44.4 0.0 3.3 10.8 3 Unit Sites 44.4 0.0 3.3 6.1 BWR 44.4 1.6 4.1 4.3 BWR 44.4 1.6 4.5 4.2 PWR 3600.0 18.8 4.3 6.7 PWR 2000.0 15.1 4.7 7.1 Total All Regions 171.4 11.4 4.2 5.9 Total All Regions 240.0 7.2 4.6 5.8 71111.21M Hours & Samples Reported 9/11/2018 2:22:01 PM Page 113 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 3 14 7.0 0.2 197 15 7.5 13.1 1476 142 23.7 10.4 Region 2 23 16 8.0 1.4 78 34 17.0 2.3 1744 249 35.6 7.0 Region 3 0 0 0.0 0.0 317 13 6.5 24.4 1713 75 9.4 22.8 Region 4 0 0 0.0 0.0 515 31 10.3 16.6 1164 103 20.6 11.3 1 Unit Sites 0 0 0.0 0.0 197 15 7.5 13.1 1855 170 21.3 10.9 2 Unit Sites 3 27 13.5 0.1 593 65 16.3 9.1 3701 336 24.0 11.0 3 Unit Sites 23 16 8.0 1.4 317 13 6.5 24.4 541 63 21.0 8.6 BWR 23 16 8.0 1.4 642 43 10.8 14.9 2468 167 16.7 14.8 PWR 3 27 13.5 0.1 465 50 16.7 9.3 3630 402 28.7 9.0 Total All 25 43 14.3 0.6 1107 93 15.5 11.9 6098 569 24.7 10.7 Regions 9/11/2018 2:22:01 PM Page 114 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1676 171 21.4 9.8 Region 2 1844 299 33.2 6.2 Region 3 2030 101 11.2 20.1 Region 4 1679 134 19.1 12.5 1 Unit Sites 2052 185 20.6 11.1 2 Unit Sites 4297 428 23.8 10.0 3 Unit Sites 881 92 18.4 9.6 BWR 3132 226 15.1 13.9 PWR 4097 479 26.6 8.6 Total All 7229 705 22.0 10.3 Regions 9/11/2018 2:22:01 PM Page 115 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Revision History Date of Revision Description of Revision 12/08/2016 IP 71111.21N, "Design Bases Assurance Inspection (Programs)," has been revised to include lessons learned from the pilot EQ inspections and FF 71111.21-1965 and 71111.21-2120 02/17/2016 IP 71111.21N, "Component Design Bases Inspection (Programs)," has been issued as a pilot inspection procedure. Researched commitments for the last four years and found none.

Summary of PIM Findings 2016 2017 3 Year Total FIN Green 1 0 1 NCV Green 4 17 21 Total 5 17 22 9/11/2018 2:22:01 PM Page 116 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 2 0 0 1 0 2 0 1 1 0 0 0 0 Region 2 12 0 0 3 0 12 0 11 0 1 0 0 0 Region 3 6 0 0 1 0 6 0 6 0 0 0 0 0 Region 4 2 0 0 2 0 2 0 1 0 1 0 0 0 1 Unit Sites 7 0 0 2 0 7 0 6 0 1 0 0 0 2 Unit Sites 14 0 0 5 0 14 0 12 1 1 0 0 0 3 Unit Sites 1 0 0 0 0 1 0 1 0 0 0 0 0 BWR 8 0 0 2 0 8 0 7 1 0 0 0 0 PWR 14 0 0 5 0 14 0 12 0 2 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 22 0 0 7 0 22 0 19 1 2 0 0 0 Percentage of All 100% 0% 0% 32% 0% 100% 0% 86% 5% 9% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 117 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 2.3 2.2 Region 1 0.0 0.0 2.3 2.2 Region 2 0.0 19.3 4.4 5.0 Region 2 0.0 14.5 3.6 4.4 Region 3 0.0 4.6 4.3 4.4 Region 3 0.0 4.6 3.0 3.4 Region 4 0.0 0.0 2.9 2.3 Region 4 0.0 0.0 2.9 2.3 1 Unit Sites 0.0 0.0 2.5 2.4 1 Unit Sites 0.0 0.0 1.9 1.8 2 Unit Sites 0.0 9.5 6.2 6.5 2 Unit Sites 0.0 5.7 3.9 4.1 3 Unit Sites 0.0 9.8 0.0 9.8 3 Unit Sites 0.0 9.8 0.0 9.8 BWR 0.0 6.6 3.5 3.8 BWR 0.0 6.6 1.9 2.7 PWR 0.0 9.6 4.3 4.6 PWR 0.0 4.1 3.8 3.9 Total All Regions 0.0 8.1 4.1 4.3 Total All Regions 0.0 5.5 3.1 3.4 71111.21N Hours & Samples Reported 9/11/2018 2:22:01 PM Page 118 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 0 0 0.0 0.0 34 8 4.0 4.3 869 72 14.4 12.1 Region 2 0 0 0.0 0.0 138 14 4.7 9.8 1688 136 19.4 12.4 Region 3 0 0 0.0 0.0 219 15 5.0 14.6 674 25 6.3 27.0 Region 4 0 0 0.0 0.0 157 16 5.3 9.8 698 39 7.8 17.9 1 Unit Sites 0 0 0.0 0.0 34 8 4.0 4.3 1146 68 11.3 16.8 2 Unit Sites 0 0 0.0 0.0 300 29 5.8 10.3 2554 186 15.5 13.7 3 Unit Sites 0 0 0.0 0.0 213 16 5.3 13.3 229 18 9.0 12.7 BWR 0 0 0.0 0.0 305 33 6.6 9.2 1579 99 12.4 15.9 PWR 0 0 0.0 0.0 242 20 5.0 12.1 2350 173 15.7 13.6 Total All 0 0 0.0 0.0 547 53 6.6 10.3 3929 272 15.1 14.4 Regions 9/11/2018 2:22:01 PM Page 119 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 903 89 14.8 10.1 Region 2 1826 150 16.7 12.2 Region 3 893 40 6.7 22.3 Region 4 855 55 7.9 15.5 1 Unit Sites 1180 76 10.9 15.5 2 Unit Sites 2854 224 14.0 12.7 3 Unit Sites 442 34 8.5 13.0 BWR 1884 132 10.2 14.3 PWR 2592 202 13.5 12.8 Total All 4476 334 12.4 13.4 Regions 9/11/2018 2:22:01 PM Page 120 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Revision History Date of Revision Description of Revision 06/15/2015 IP 71111.22, "Surveillance Testing," has been revised to incorporate feedback associated with the 2014 ROP Enhancement Project.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 1 1 0 2 NCV Green 13 12 13 38 NCVIV N/A 0 1 0 1 Total 14 14 13 41 9/11/2018 2:22:01 PM Page 121 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 9 0 2 5 0 7 0 7 2 0 0 0 0 Region 2 10 0 0 9 0 6 1 8 0 0 0 0 0 Region 3 10 0 1 7 0 5 0 4 6 0 0 0 0 Region 4 11 0 2 7 0 9 0 9 2 0 0 0 0 1 Unit Sites 16 0 2 10 0 10 0 9 7 0 0 0 0 2 Unit Sites 22 0 3 16 0 15 1 17 3 0 0 0 0 3 Unit Sites 2 0 0 2 0 2 0 2 0 0 0 0 0 BWR 21 0 2 15 0 14 0 13 8 0 0 0 0 PWR 19 0 3 13 0 13 1 15 2 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 40 0 5 28 0 27 1 28 10 0 0 0 0 Percentage of All 100% 0% 13% 70% 0% 68% 3% 70% 25% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 122 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 2.6 2.1 1.3 2.0 Region 1 2.0 2.1 0.7 1.6 Region 2 2.1 2.9 3.3 2.8 Region 2 1.4 2.2 2.0 1.9 Region 3 2.3 3.4 2.5 2.8 Region 3 0.8 2.8 0.8 1.5 Region 4 4.0 2.6 3.0 3.2 Region 4 4.0 2.6 1.5 2.6 1 Unit Sites 1.5 2.8 3.1 2.5 1 Unit Sites 1.0 2.3 1.3 1.5 2 Unit Sites 3.8 2.7 2.0 2.8 2 Unit Sites 2.7 2.3 1.0 2.0 3 Unit Sites 0.0 4.1 3.3 2.6 3 Unit Sites 0.0 4.1 3.3 2.6 BWR 3.0 4.2 2.9 3.4 BWR 2.0 3.3 1.5 2.3 PWR 2.5 1.8 2.3 2.2 PWR 1.9 1.8 1.1 1.6 Total All Regions 2.7 2.8 2.5 2.7 Total All Regions 1.9 2.4 1.3 1.9 71111.22 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 123 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1526 349 20.5 4.4 1412 326 19.2 4.3 1532 325 19.1 4.7 Region 2 1414 354 19.7 4.0 1358 341 18.9 4.0 1497 334 18.6 4.5 Region 3 1278 290 18.1 4.4 1454 286 17.9 5.1 1207 268 16.8 4.5 Region 4 998 236 18.2 4.2 1157 211 16.2 5.5 1332 220 16.9 6.1 1 Unit Sites 1257 302 18.9 4.2 1323 300 18.8 4.4 1489 278 17.4 5.4 2 Unit Sites 3278 773 19.8 4.2 3433 706 18.1 4.9 3438 720 18.5 4.8 3 Unit Sites 681 154 19.3 4.4 625 158 19.8 4.0 641 149 18.6 4.3 BWR 1981 462 19.3 4.3 2133 460 19.2 4.6 2036 427 17.8 4.8 PWR 3235 767 20.2 4.2 3248 704 18.5 4.6 3532 720 18.9 4.9 Total All 5216 1229 20.1 4.2 5381 1164 19.1 4.6 5568 1147 18.8 4.9 Regions 9/11/2018 2:22:01 PM Page 124 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 4470 1000 20.4 4.5 Region 2 4269 1029 19.8 4.1 Region 3 3939 844 18.3 4.7 Region 4 3487 667 18.0 5.2 1 Unit Sites 4069 880 19.1 4.6 2 Unit Sites 10149 2199 19.1 4.6 3 Unit Sites 1946 461 21.0 4.2 BWR 6150 1349 19.0 4.6 PWR 10015 2191 19.4 4.6 Total All 16165 3540 19.3 4.6 Regions 9/11/2018 2:22:01 PM Page 125 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.01, "Exercise Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2017 3 Year Total NCV Green 1 1 Total 1 1 9/11/2018 2:22:01 PM Page 126 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 1 0 1 0 0 1 0 0 0 1 0 0 0 1 Unit Sites 1 0 1 0 0 1 0 0 0 1 0 0 0 2 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 1 0 1 0 0 1 0 0 0 1 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 1 0 1 0 0 1 0 0 0 1 0 0 0 Percentage of All 100% 0% 100% 0% 0% 100% 0% 0% 0% 100% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 127 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 4.0 4.0 Region 4 0.0 0.0 4.0 4.0 1 Unit Sites 0.0 0.0 1.1 0.6 1 Unit Sites 0.0 0.0 1.1 0.6 2 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.7 0.3 PWR 0.0 0.0 0.7 0.3 Total All Regions 0.0 0.0 0.5 0.2 Total All Regions 0.0 0.0 0.5 0.2 71114.01 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 128 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 227 2 0.5 113.5 526 9 0.9 58.4 326 7 0.9 46.5 Region 2 196 3 0.8 65.3 691 8 0.9 86.3 856 9 0.9 95.1 Region 3 201 2 0.7 100.4 631 8 0.9 78.8 626 7 0.9 89.5 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 251 6 1.5 41.8 1 Unit Sites 222 3 0.8 73.9 234 4 1.0 58.4 732 11 1.1 66.6 2 Unit Sites 299 3 0.6 99.6 1353 23 1.2 58.8 1149 15 1.0 76.6 3 Unit Sites 103 1 0.5 103.3 261 4 0.8 65.3 178 3 0.8 59.3 BWR 221 3 0.8 73.5 756 13 1.2 58.1 603 10 1.0 60.3 PWR 403 4 0.7 100.8 1092 18 1.1 60.6 1456 19 1.1 76.6 Total All 624 7 0.8 89.1 1847 31 1.2 59.6 2059 29 1.1 71.0 Regions 9/11/2018 2:22:01 PM Page 129 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1079 18 0.9 59.9 Region 2 1742 20 1.0 87.1 Region 3 1458 17 0.9 85.8 Region 4 251 12 3.0 20.9 1 Unit Sites 1188 18 1.1 66.0 2 Unit Sites 2800 41 1.1 68.3 3 Unit Sites 542 8 0.9 67.8 BWR 1579 26 1.1 60.7 PWR 2951 41 1.1 72.0 Total All 4530 67 1.1 67.6 Regions 9/11/2018 2:22:01 PM Page 130 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.02, "Alert and Notification System Testing," has been revised to address technical, guidance and editorial changes. Closed feedback form71114-1925.

Summary of PIM Findings 9/11/2018 2:22:01 PM Page 131 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 0 0 0 0 0 0 0 0 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 0 0 0 0 0 0 0 0 0 0 0 0 0 Percentage of All 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 132 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions 0.0 0.0 0.0 0.0 Total All Regions 0.0 0.0 0.0 0.0 71114.02 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 133 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 12 9 4.5 1.3 0 0 0.0 0.0 20 9 1.8 2.2 Region 2 70 8 1.1 8.7 61 9 1.0 6.7 71 8 0.9 8.8 Region 3 8 8 4.0 1.0 44 11 1.4 4.0 37 8 1.1 4.6 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 18 7 1.2 2.5 1 Unit Sites 0 0 0.0 0.0 27 12 2.0 2.3 13 4 1.0 3.3 2 Unit Sites 82 23 2.9 3.6 60 16 1.8 3.7 112 24 1.3 4.7 3 Unit Sites 8 4 2.0 2.0 18 4 1.3 4.4 20 4 1.0 5.0 BWR 8 13 6.5 0.6 26 10 2.0 2.6 52 14 1.3 3.7 PWR 82 18 2.3 4.5 78 22 1.8 3.6 93 18 1.3 5.2 Total All 90 31 3.4 2.9 105 32 2.0 3.3 145 32 1.3 4.5 Regions 9/11/2018 2:22:01 PM Page 134 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 32 25 4.2 1.3 Region 2 201 25 1.1 8.0 Region 3 89 27 1.8 3.3 Region 4 18 18 3.0 1.0 1 Unit Sites 40 20 2.2 2.0 2 Unit Sites 254 63 1.9 4.0 3 Unit Sites 46 12 1.7 3.8 BWR 86 37 2.2 2.3 PWR 253 58 1.8 4.4 Total All 339 95 1.9 3.6 Regions 9/11/2018 2:22:01 PM Page 135 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.03, "Emergency Preparedness Organization Staffing and Augmentation System," has been revised to address editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2015 2016 3 Year Total NCV Green 1 2 3 Total 1 2 3 9/11/2018 2:22:01 PM Page 136 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 1 0 0 0 1 0 0 0 Region 2 1 0 1 0 0 1 0 0 0 1 0 0 0 Region 3 1 0 0 1 0 0 0 0 0 1 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 1 0 0 1 0 1 0 0 0 1 0 0 0 2 Unit Sites 2 0 1 1 0 1 0 0 0 2 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 3 0 1 2 0 2 0 0 0 3 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 3 0 1 2 0 2 0 0 0 3 0 0 0 Percentage of All 100% 0% 33% 67% 0% 67% 0% 0% 0% 100% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 137 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 25.0 Region 1 0.0 0.0 0.0 25.0 Region 2 0.0 10.7 0.0 3.9 Region 2 0.0 10.7 0.0 3.9 Region 3 100.0 0.0 0.0 7.9 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 17.2 0.0 8.9 1 Unit Sites 0.0 17.2 0.0 8.9 2 Unit Sites 11.6 10.9 0.0 6.6 2 Unit Sites 0.0 10.9 0.0 3.3 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 10.6 16.5 0.0 9.0 PWR 0.0 16.5 0.0 6.0 Total All Regions 9.6 12.6 0.0 6.8 Total All Regions 0.0 12.6 0.0 4.5 71114.03 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 138 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 12 9 4.5 1.3 0 0 0.0 0.0 28 9 1.8 3.1 Region 2 82 8 1.0 10.3 94 8 0.9 11.7 83 8 0.9 10.4 Region 3 10 8 4.0 1.3 65 11 1.4 5.9 51 8 1.1 6.4 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 19 7 1.2 2.7 1 Unit Sites 0 0 0.0 0.0 43 12 2.0 3.6 17 4 1.0 4.3 2 Unit Sites 96 23 2.6 4.2 92 15 1.7 6.1 132 24 1.3 5.5 3 Unit Sites 8 4 2.0 2.0 24 4 1.3 6.0 32 4 1.0 8.0 BWR 10 13 6.5 0.8 38 10 2.0 3.8 65 14 1.3 4.6 PWR 94 18 2.0 5.2 121 21 1.8 5.8 116 18 1.3 6.5 Total All 104 31 3.1 3.4 159 31 1.9 5.1 181 32 1.3 5.6 Regions 9/11/2018 2:22:01 PM Page 139 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 40 25 4.2 1.6 Region 2 259 24 1.0 10.8 Region 3 126 27 1.8 4.7 Region 4 19 18 3.0 1.0 1 Unit Sites 61 20 2.2 3.0 2 Unit Sites 319 62 1.8 5.1 3 Unit Sites 64 12 1.7 5.3 BWR 112 37 2.2 3.0 PWR 332 57 1.7 5.8 Total All 444 94 1.9 4.7 Regions 9/11/2018 2:22:01 PM Page 140 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.04, "Emergency Action Level and Emergency Plan Changes," has been revised to address editorial changes. Closed feedback form 71114-1925.

Summary of PIM Findings 2015 2016 3 Year Total NCV Green 2 2 4 NCVIV Green 1 0 1 NCVIV N/A 1 0 1 VIO White 0 1 1 Total 4 3 7 9/11/2018 2:22:01 PM Page 141 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 2 1 0 2 0 1 0 0 0 2 0 0 0 Region 2 2 0 0 1 0 2 0 0 0 2 0 0 0 Region 3 1 0 0 0 0 1 0 0 0 1 0 0 0 Region 4 1 0 0 1 0 1 0 0 0 1 0 0 0 1 Unit Sites 3 1 0 3 0 2 0 0 0 3 0 0 0 2 Unit Sites 3 0 0 1 0 3 0 0 0 3 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 1 0 0 1 0 1 0 0 0 1 0 0 0 PWR 5 1 0 3 0 4 0 0 0 5 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 6 1 0 4 0 5 0 0 0 6 0 0 0 Percentage of All 100% 17% 0% 67% 0% 83% 0% 0% 0% 100% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 142 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 10.1 5.2 0.0 5.3 Region 1 0.0 5.2 0.0 2.7 Region 2 3.8 4.2 0.0 2.7 Region 2 3.8 4.2 0.0 2.7 Region 3 9.0 0.0 0.0 3.4 Region 3 4.5 0.0 0.0 1.7 Region 4 0.0 0.0 0.0 32.5 Region 4 0.0 0.0 0.0 32.5 1 Unit Sites 4.6 9.9 0.0 5.1 1 Unit Sites 0.0 9.9 0.0 3.4 2 Unit Sites 8.8 2.6 0.0 3.8 2 Unit Sites 5.9 2.6 0.0 2.8 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 5.2 4.3 0.0 3.2 BWR 0.0 4.3 0.0 1.6 PWR 7.7 5.1 0.0 4.5 PWR 5.1 5.1 0.0 3.6 Total All Regions 6.9 4.8 0.0 4.0 Total All Regions 3.4 4.8 0.0 2.9 71114.04 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 143 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 100 22 1.3 4.5 194 17 1.0 11.4 81 15 1.3 5.4 Region 2 260 17 1.0 15.3 236 17 1.0 13.9 243 17 0.9 14.3 Region 3 223 15 1.0 14.8 194 20 1.3 9.7 173 14 0.9 12.3 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 31 25 3.6 1.2 1 Unit Sites 183 34 2.8 5.4 140 20 1.8 7.0 124 26 2.0 4.8 2 Unit Sites 357 74 2.5 4.8 372 57 1.8 6.5 339 34 1.1 10.0 3 Unit Sites 42 12 1.7 3.5 112 9 1.3 12.4 64 11 1.6 5.8 BWR 191 40 2.2 4.8 231 27 1.4 8.5 202 25 1.3 8.1 PWR 391 80 2.7 4.9 393 59 2.0 6.7 325 46 1.4 7.1 Total All 582 120 2.6 4.8 624 86 1.8 7.3 527 71 1.4 7.4 Regions 9/11/2018 2:22:01 PM Page 144 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 374 54 1.2 6.9 Region 2 739 51 1.0 14.5 Region 3 589 49 1.1 12.0 Region 4 31 123 17.6 0.3 1 Unit Sites 447 80 2.4 5.6 2 Unit Sites 1068 165 1.8 6.5 3 Unit Sites 218 32 1.7 6.8 BWR 624 92 1.7 6.8 PWR 1109 185 2.1 6.0 Total All 1733 277 1.9 6.3 Regions 9/11/2018 2:22:01 PM Page 145 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.05, "Maintenance of Emergency Preparedness," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 3 4 3 10 Total 3 4 3 10 9/11/2018 2:22:01 PM Page 146 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 3 0 0 3 0 3 0 0 0 3 0 0 0 Region 3 2 0 0 2 0 1 0 0 0 2 0 0 0 Region 4 5 0 2 3 0 5 0 0 0 5 0 0 0 1 Unit Sites 5 0 2 3 0 5 0 0 0 5 0 0 0 2 Unit Sites 3 0 0 3 0 2 0 0 0 3 0 0 0 3 Unit Sites 2 0 0 2 0 2 0 0 0 2 0 0 0 BWR 5 0 2 3 0 5 0 0 0 5 0 0 0 PWR 5 0 0 5 0 4 0 0 0 5 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 10 0 2 8 0 9 0 0 0 10 0 0 0 Percentage of All 100% 0% 20% 80% 0% 90% 0% 0% 0% 100% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 147 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 10.3 6.7 10.5 8.8 Region 2 10.3 6.7 10.5 8.8 Region 3 71.4 0.0 10.6 10.2 Region 3 71.4 0.0 0.0 5.1 Region 4 0.0 0.0 15.0 59.9 Region 4 0.0 0.0 15.0 59.9 1 Unit Sites 142.9 10.6 11.2 20.2 1 Unit Sites 142.9 10.6 11.2 20.2 2 Unit Sites 0.0 7.7 10.3 7.0 2 Unit Sites 0.0 7.7 5.1 4.7 3 Unit Sites 95.2 76.9 0.0 53.3 3 Unit Sites 95.2 76.9 0.0 53.3 BWR 142.9 20.2 7.7 20.6 BWR 142.9 20.2 7.7 20.6 PWR 8.7 10.6 11.9 10.6 PWR 8.7 10.6 6.0 8.5 Total All Regions 23.2 12.6 10.1 13.5 Total All Regions 23.2 12.6 6.7 12.0 71114.05 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 148 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 18 10 5.0 1.8 0 0 0.0 0.0 42 9 1.8 4.7 Region 2 98 8 1.0 12.2 150 9 1.0 16.6 95 8 0.9 11.9 Region 3 14 8 4.0 1.8 88 11 1.4 8.0 94 8 1.1 11.8 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 67 6 1.0 11.1 1 Unit Sites 0 0 0.0 0.0 77 12 2.0 6.4 41 4 1.0 10.3 2 Unit Sites 119 23 2.6 5.2 129 17 1.9 7.6 216 23 1.3 9.4 3 Unit Sites 11 4 2.0 2.6 32 4 1.3 8.0 41 4 1.0 10.3 BWR 14 13 6.5 1.1 50 10 2.0 5.0 130 14 1.3 9.3 PWR 116 19 2.1 6.1 188 23 1.9 8.2 168 17 1.2 9.9 Total All 130 32 3.2 4.0 238 33 2.1 7.2 298 31 1.3 9.6 Regions 9/11/2018 2:22:01 PM Page 149 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 60 26 4.3 2.3 Region 2 342 25 1.0 13.7 Region 3 196 27 1.8 7.3 Region 4 67 18 3.0 3.7 1 Unit Sites 118 21 2.3 5.6 2 Unit Sites 464 63 1.9 7.4 3 Unit Sites 84 12 1.7 7.0 BWR 194 37 2.2 5.2 PWR 471 59 1.7 8.0 Total All 665 96 1.9 6.9 Regions 9/11/2018 2:22:01 PM Page 150 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.06, "Drill Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 1 3 1 5 NCVIV N/A 0 0 1 1 Total 1 3 2 6 9/11/2018 2:22:01 PM Page 151 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 4 0 3 1 0 4 0 0 0 4 0 0 0 Region 2 1 0 1 0 0 1 0 0 0 1 0 0 0 Region 3 1 0 0 1 0 1 0 0 0 1 0 0 0 Region 4 1 0 0 0 0 1 0 0 0 0 0 0 0 1 Unit Sites 3 0 0 2 0 3 0 0 0 2 0 0 0 2 Unit Sites 3 0 3 0 0 3 0 0 0 3 0 0 0 3 Unit Sites 1 0 1 0 0 1 0 0 0 1 0 0 0 BWR 3 0 2 1 0 3 0 0 0 3 0 0 0 PWR 4 0 2 1 0 4 0 0 0 3 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 7 0 4 2 0 7 0 0 0 6 0 0 0 Percentage of All 100% 0% 57% 29% 0% 100% 0% 0% 0% 86% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 152 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 8.0 3.7 4.6 5.4 Region 1 8.0 3.7 4.6 5.4 Region 2 0.0 3.0 0.0 1.0 Region 2 0.0 3.0 0.0 1.0 Region 3 3.6 3.2 0.0 2.2 Region 3 3.6 3.2 0.0 2.2 Region 4 0.0 0.0 4.1 1.4 Region 4 0.0 0.0 4.1 1.4 1 Unit Sites 2.2 1.9 4.3 2.8 1 Unit Sites 2.2 1.9 4.3 2.8 2 Unit Sites 3.6 1.7 0.0 1.7 2 Unit Sites 3.6 1.7 0.0 1.7 3 Unit Sites 0.0 21.5 0.0 6.4 3 Unit Sites 0.0 21.5 0.0 6.4 BWR 4.9 6.6 0.0 3.9 BWR 4.9 6.6 0.0 3.9 PWR 1.5 0.0 2.7 1.4 PWR 1.5 0.0 2.7 1.4 Total All Regions 2.8 2.6 1.8 2.4 Total All Regions 2.8 2.6 1.8 2.4 71114.06 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 153 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 250 49 2.9 5.1 269 49 2.9 5.5 220 49 2.9 4.5 Region 2 314 56 3.1 5.6 338 54 3.0 6.3 355 58 3.2 6.1 Region 3 277 45 2.8 6.2 311 47 2.9 6.6 325 47 2.9 6.9 Region 4 228 37 2.8 6.2 243 36 2.8 6.7 242 40 3.1 6.0 1 Unit Sites 303 46 2.9 6.6 319 47 2.9 6.8 296 46 2.9 6.4 2 Unit Sites 661 120 3.1 5.5 725 117 3.0 6.2 721 121 3.1 6.0 3 Unit Sites 105 21 2.6 5.0 117 22 2.8 5.3 125 27 3.4 4.6 BWR 409 70 2.9 5.8 458 72 3.0 6.4 409 79 3.3 5.2 PWR 660 117 3.1 5.6 702 114 3.0 6.2 733 115 3.0 6.4 Total All 1068 187 3.1 5.7 1160 186 3.0 6.2 1142 194 3.2 5.9 Regions 9/11/2018 2:22:01 PM Page 154 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 739 147 3.0 5.0 Region 2 1007 168 3.2 6.0 Region 3 913 139 3.0 6.6 Region 4 712 113 3.1 6.3 1 Unit Sites 917 139 3.0 6.6 2 Unit Sites 2107 358 3.1 5.9 3 Unit Sites 346 70 3.2 4.9 BWR 1276 221 3.1 5.8 PWR 2094 346 3.1 6.1 Total All 3370 567 3.1 5.9 Regions 9/11/2018 2:22:01 PM Page 155 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.07, "Exercise Evaluation - Hostile Action (HA) Event," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.

Summary of PIM Findings 2015 3 Year Total NCV Green 1 1 Total 1 1 9/11/2018 2:22:01 PM Page 156 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 1 0 1 0 0 1 0 0 0 1 0 0 0 1 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Unit Sites 1 0 1 0 0 1 0 0 0 1 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 1 0 1 0 0 1 0 0 0 1 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 1 0 1 0 0 1 0 0 0 1 0 0 0 Percentage of All 100% 0% 100% 0% 0% 100% 0% 0% 0% 100% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 157 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / 3 Year Findings / 3 Year 1000 hrs Findings 1000 hrs Findings (2015) /1000 hrs (2015) /1000 hrs Region 1 0.0 0.0 Region 1 0.0 0.0 Region 2 0.0 0.0 Region 2 0.0 0.0 Region 3 0.0 0.0 Region 3 0.0 0.0 Region 4 0.0 0.0 Region 4 0.0 0.0 1 Unit Sites 0.0 0.0 1 Unit Sites 0.0 0.0 2 Unit Sites 1.6 1.6 2 Unit Sites 1.6 1.6 3 Unit Sites 0.0 0.0 3 Unit Sites 0.0 0.0 BWR 0.0 0.0 BWR 0.0 0.0 PWR 1.3 1.3 PWR 1.3 1.3 Total All Regions 0.8 0.8 Total All Regions 0.8 0.8 71114.07 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 158 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 237 5 1.0 47.4 0 0 0.0 0.0 0 0 0.0 0.0 Region 2 485 6 0.9 80.8 0 0 0.0 0.0 0 0 0.0 0.0 Region 3 477 5 0.8 95.3 0 0 0.0 0.0 0 0 0.0 0.0 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 1 Unit Sites 398 8 1.3 49.7 0 0 0.0 0.0 0 0 0.0 0.0 2 Unit Sites 705 12 1.2 58.8 0 0 0.0 0.0 0 0 0.0 0.0 3 Unit Sites 96 2 1.0 48.0 0 0 0.0 0.0 0 0 0.0 0.0 BWR 437 7 1.0 62.4 0 0 0.0 0.0 0 0 0.0 0.0 PWR 762 15 1.5 50.8 0 0 0.0 0.0 0 0 0.0 0.0 Total All 1199 22 1.4 54.5 0 0 0.0 0.0 0 0 0.0 0.0 Regions 9/11/2018 2:22:01 PM Page 159 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 237 5 1.0 47.4 Region 2 485 6 0.9 80.8 Region 3 477 5 0.8 95.3 Region 4 0 0 0.0 0.0 1 Unit Sites 398 8 1.3 49.7 2 Unit Sites 705 12 1.2 58.8 3 Unit Sites 96 2 1.0 48.0 BWR 437 7 0.9 62.4 PWR 762 15 1.4 50.8 Total All 1199 22 1.2 54.5 Regions 9/11/2018 2:22:01 PM Page 160 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Revision History Date of Revision Description of Revision 07/21/2016 IP 71114.08, "Exercise Evaluation - Scenario Review," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.

Summary of PIM Findings 9/11/2018 2:22:01 PM Page 161 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 0 0 0 0 0 0 0 0 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 0 0 0 0 0 0 0 0 0 0 0 0 0 Percentage of All 100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 162 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 0.0 0.0 Total All Regions 0.0 0.0 0.0 0.0 Total All Regions 0.0 0.0 0.0 0.0 71114.08 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 163 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 32 7 1.2 4.6 55 9 1.1 6.1 34 7 1.8 4.9 Region 2 63 9 1.0 7.0 102 8 0.9 12.7 97 9 1.1 10.8 Region 3 54 7 1.0 7.7 44 8 1.1 5.4 36 7 1.0 5.1 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 40 6 1.5 6.6 1 Unit Sites 39 11 1.4 3.5 15 4 1.3 3.6 66 11 1.2 6.0 2 Unit Sites 94 15 1.4 6.2 148 23 1.4 6.4 106 15 1.5 7.1 3 Unit Sites 16 3 1.0 5.4 38 4 0.8 9.5 35 3 1.0 11.7 BWR 53 10 1.1 5.3 64 13 1.3 4.9 72 10 1.3 7.2 PWR 96 19 1.6 5.0 137 18 1.4 7.6 135 19 1.5 7.1 Total All 149 29 1.5 5.1 200 31 1.4 6.5 207 29 1.5 7.1 Regions 9/11/2018 2:22:01 PM Page 164 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 121 23 1.4 5.3 Region 2 262 26 1.1 10.1 Region 3 133 22 1.2 6.1 Region 4 40 18 4.5 2.2 1 Unit Sites 119 26 1.4 4.6 2 Unit Sites 347 53 1.5 6.6 3 Unit Sites 89 10 1.1 8.9 BWR 188 33 1.3 5.7 PWR 367 56 1.5 6.6 Total All 556 89 1.4 6.2 Regions 9/11/2018 2:22:01 PM Page 165 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.01, Radiological Hazard Assessment and Exposure Controls, has been revised as a major editorial revision.

02/19/2016 IP 71124.01, "Radiological Hazard Assessment and Exposure Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.

Incorporated feedback forms 71124.01-1636 and 71124.01-2132

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 11 15 7 33 Total 11 15 7 33 9/11/2018 2:22:01 PM Page 166 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 10 0 1 9 0 4 0 0 0 0 10 0 0 Region 2 11 0 0 10 0 8 0 0 0 0 11 0 0 Region 3 6 0 1 5 0 1 0 0 0 0 6 0 0 Region 4 6 0 1 5 0 3 0 0 0 0 6 0 0 1 Unit Sites 8 0 0 8 0 3 0 0 0 0 8 0 0 2 Unit Sites 20 0 3 16 0 9 0 0 0 0 20 0 0 3 Unit Sites 5 0 0 5 0 4 0 0 0 0 5 0 0 BWR 21 0 2 19 0 13 0 0 0 0 21 0 0 PWR 12 0 1 10 0 3 0 0 0 0 12 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 33 0 3 29 0 16 0 0 0 0 33 0 0 Percentage of All 100% 0% 9% 88% 0% 48% 0% 0% 0% 0% 100% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 167 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 8.2 10.3 1.7 6.5 Region 1 5.5 1.8 0.0 2.0 Region 2 6.5 6.3 4.6 5.8 Region 2 3.3 4.7 4.6 4.2 Region 3 4.5 5.5 1.8 3.9 Region 3 2.3 0.0 0.0 0.6 Region 4 4.7 5.3 4.7 4.9 Region 4 4.7 0.0 2.3 2.4 1 Unit Sites 1.3 5.0 3.7 3.4 1 Unit Sites 1.3 1.3 1.2 1.3 2 Unit Sites 10.5 6.4 1.6 5.7 2 Unit Sites 6.3 0.8 0.8 2.3 3 Unit Sites 0.0 35.3 16.0 15.5 3 Unit Sites 0.0 23.5 16.0 12.4 BWR 13.4 10.3 5.9 9.4 BWR 10.0 4.0 3.5 5.4 PWR 2.4 5.1 1.5 3.0 PWR 0.8 0.7 0.7 0.8 Total All Regions 6.0 7.0 3.2 5.3 Total All Regions 3.8 1.9 1.8 2.4 71124.01 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 168 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 364 16 1.0 22.8 567 115 6.8 4.9 584 115 6.8 5.1 Region 2 612 17 0.9 36.0 636 121 6.7 5.3 646 120 6.7 5.4 Region 3 441 15 0.9 29.4 543 105 6.6 5.2 558 105 6.6 5.3 Region 4 425 12 0.9 35.4 378 84 7.0 4.5 428 84 6.5 5.1 1 Unit Sites 492 15 0.9 32.8 486 106 6.6 4.6 502 107 6.7 4.7 2 Unit Sites 1127 38 1.0 29.7 1409 270 7.1 5.2 1411 268 6.9 5.3 3 Unit Sites 223 7 1.0 31.8 229 49 6.1 4.7 303 49 6.1 6.2 BWR 599 23 1.0 26.0 757 168 7.3 4.5 852 162 6.8 5.3 PWR 1243 37 1.0 33.6 1367 257 6.8 5.3 1364 262 6.9 5.2 Total All 1841 60 1.0 30.7 2123 425 7.1 5.0 2216 424 7.0 5.2 Regions 9/11/2018 2:22:01 PM Page 169 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1515 246 5.1 6.2 Region 2 1894 258 5.0 7.3 Region 3 1541 225 4.9 6.9 Region 4 1230 180 5.0 6.8 1 Unit Sites 1479 228 5.0 6.5 2 Unit Sites 3946 576 5.1 6.9 3 Unit Sites 755 105 5.0 7.2 BWR 2207 353 5.1 6.3 PWR 3973 556 4.9 7.1 Total All 6180 909 5.0 6.8 Regions 9/11/2018 2:22:01 PM Page 170 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.02, Occupational ALARA Planning and Controls, has been revised as a major editorial revision.

03/02/2016 IP 71124.02, "Occupational ALARA Planning and Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted. Incorporated feedback forms 71124.02-1762 Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 1 1 1 3 NCV Green 0 1 0 1 Total 1 2 1 4 9/11/2018 2:22:01 PM Page 171 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 0 0 0 0 0 1 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 1 0 0 1 0 0 0 0 0 0 1 0 0 Region 4 2 0 1 1 0 2 0 0 0 0 2 0 0 1 Unit Sites 3 0 1 2 0 2 0 0 0 0 3 0 0 2 Unit Sites 1 0 0 1 0 0 0 0 0 0 1 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 3 0 1 2 0 2 0 0 0 0 3 0 0 PWR 1 0 0 1 0 0 0 0 0 0 1 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 4 0 1 3 0 2 0 0 0 0 4 0 0 Percentage of All 100% 0% 25% 75% 0% 50% 0% 0% 0% 0% 100% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 172 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 3.2 0.0 1.1 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 2.5 0.9 Region 3 0.0 0.0 0.0 0.0 Region 4 3.5 2.8 0.0 2.2 Region 4 3.5 2.8 0.0 2.2 1 Unit Sites 2.5 2.1 1.6 2.0 1 Unit Sites 2.5 2.1 0.0 1.3 2 Unit Sites 0.0 1.1 0.0 0.4 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 2.5 2.2 1.4 1.9 BWR 2.5 2.2 0.0 1.3 PWR 0.0 1.1 0.0 0.4 PWR 0.0 0.0 0.0 0.0 Total All Regions 0.8 1.5 0.7 1.0 Total All Regions 0.8 0.7 0.0 0.5 71124.02 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 173 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 230 11 0.8 20.9 308 42 2.8 7.3 387 61 3.8 6.3 Region 2 367 9 0.9 40.7 340 40 4.4 8.5 408 45 4.5 9.1 Region 3 319 14 0.9 22.8 374 32 2.9 11.7 404 47 3.4 8.6 Region 4 284 12 1.0 23.6 352 30 2.3 11.7 266 38 3.8 7.0 1 Unit Sites 285 12 0.9 23.8 278 26 2.6 10.7 375 53 3.8 7.1 2 Unit Sites 723 27 0.9 26.8 929 101 3.3 9.2 864 113 4.2 7.6 3 Unit Sites 191 7 1.0 27.3 167 17 2.8 9.8 225 25 3.1 9.0 BWR 400 19 1.0 21.1 448 48 2.8 9.3 703 82 3.7 8.6 PWR 798 27 0.9 29.6 926 96 3.3 9.6 761 109 4.2 7.0 Total All 1199 46 1.0 26.1 1374 144 3.2 9.5 1464 191 4.1 7.7 Regions 9/11/2018 2:22:01 PM Page 174 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 924 114 2.7 8.1 Region 2 1114 94 3.5 11.9 Region 3 1097 93 2.4 11.8 Region 4 901 80 2.4 11.3 1 Unit Sites 938 91 2.6 10.3 2 Unit Sites 2516 241 2.8 10.4 3 Unit Sites 583 49 2.6 11.9 BWR 1551 149 2.6 10.4 PWR 2485 232 2.8 10.7 Total All 4036 381 2.7 10.6 Regions 9/11/2018 2:22:01 PM Page 175 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.03, In-Plant Airborne Radioactivity Control and Mitigation, has been revised as a major editorial revision.

02/24/2016 IP 71124.03, "In-Plant Airborne Radioactivity Control and Mitigation," has been revised in response to the 2013 ROP Enhancement project. The revisions clarify the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how the samples are counted.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 4 4 1 9 Total 4 4 1 9 9/11/2018 2:22:01 PM Page 176 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 7 0 1 5 0 5 0 0 0 0 7 0 0 Region 4 2 0 0 2 0 2 0 0 0 0 2 0 0 1 Unit Sites 4 0 1 2 0 3 0 0 0 0 4 0 0 2 Unit Sites 3 0 0 3 0 2 0 0 0 0 3 0 0 3 Unit Sites 2 0 0 2 0 2 0 0 0 0 2 0 0 BWR 6 0 1 4 0 5 0 0 0 0 6 0 0 PWR 3 0 0 3 0 2 0 0 0 0 3 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 9 0 1 7 0 7 0 0 0 0 9 0 0 Percentage of All 100% 0% 11% 78% 0% 78% 0% 0% 0% 0% 100% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 177 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 31.4 14.4 18.3 21.3 Region 3 15.7 14.4 18.3 16.0 Region 4 0.0 10.2 0.0 3.0 Region 4 0.0 10.2 0.0 3.0 1 Unit Sites 16.0 0.0 9.3 8.0 1 Unit Sites 10.6 0.0 9.3 6.4 2 Unit Sites 3.4 6.1 0.0 3.2 2 Unit Sites 0.0 6.1 0.0 2.1 3 Unit Sites 0.0 62.5 0.0 11.4 3 Unit Sites 0.0 62.5 0.0 11.4 BWR 16.4 12.1 7.3 11.2 BWR 11.0 12.1 7.3 9.6 PWR 3.1 2.5 0.0 1.9 PWR 0.0 2.5 0.0 1.0 Total All Regions 7.9 5.3 3.4 5.4 Total All Regions 3.9 5.3 3.4 4.2 71124.03 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 178 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 125 13 1.0 9.6 205 34 2.4 6.0 154 30 2.1 5.1 Region 2 167 9 0.9 18.5 128 32 3.6 4.0 180 36 3.6 5.0 Region 3 128 9 1.1 14.2 139 32 2.7 4.4 109 29 3.2 3.8 Region 4 91 5 1.0 18.2 98 20 3.3 4.9 144 28 3.5 5.1 1 Unit Sites 139 9 1.0 15.4 129 25 2.5 5.2 162 35 3.2 4.6 2 Unit Sites 306 21 1.0 14.5 362 78 3.1 4.6 353 74 3.1 4.8 3 Unit Sites 66 6 1.2 10.9 79 15 3.0 5.2 71 14 2.8 5.1 BWR 183 18 1.1 10.1 166 36 2.4 4.6 275 56 2.9 4.9 PWR 327 18 1.0 18.2 404 82 3.4 4.9 312 67 3.4 4.7 Total All 510 36 1.1 14.2 570 118 3.1 4.8 586 123 3.2 4.8 Regions 9/11/2018 2:22:01 PM Page 179 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 483 77 2.0 6.3 Region 2 474 77 2.9 6.2 Region 3 376 70 2.6 5.4 Region 4 333 53 3.1 6.3 1 Unit Sites 430 69 2.5 6.2 2 Unit Sites 1021 173 2.5 5.9 3 Unit Sites 215 35 2.7 6.2 BWR 623 110 2.2 5.7 PWR 1043 167 2.7 6.2 Total All 1665 277 2.5 6.0 Regions 9/11/2018 2:22:01 PM Page 180 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.04, Occupational Dose Assessment, has been revised as a major editorial revision.

02/19/2016 IP 71124.04, "Occupational Dose Assessment," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.

Summary of PIM Findings 2015 2016 3 Year Total NCV Green 1 1 2 NCVIV N/A 1 0 1 Total 2 1 3 9/11/2018 2:22:01 PM Page 181 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 2 0 0 1 0 2 0 0 0 0 2 0 0 Region 4 1 0 0 1 0 0 0 0 0 0 1 0 0 1 Unit Sites 1 0 0 0 0 1 0 0 0 0 1 0 0 2 Unit Sites 1 0 0 1 0 1 0 0 0 0 1 0 0 3 Unit Sites 1 0 0 1 0 0 0 0 0 0 1 0 0 BWR 1 0 0 0 0 1 0 0 0 0 1 0 0 PWR 2 0 0 2 0 1 0 0 0 0 2 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 3 0 0 2 0 2 0 0 0 0 3 0 0 Percentage of All 100% 0% 0% 67% 0% 67% 0% 0% 0% 0% 100% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 182 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 24.0 0.0 0.0 5.5 Region 3 24.0 0.0 0.0 5.5 Region 4 0.0 6.6 0.0 3.2 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 6.5 0.0 0.0 1.7 1 Unit Sites 6.5 0.0 0.0 1.7 2 Unit Sites 3.3 0.0 0.0 1.2 2 Unit Sites 3.3 0.0 0.0 1.2 3 Unit Sites 0.0 41.7 0.0 9.3 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 8.3 0.0 0.0 2.0 BWR 8.3 0.0 0.0 2.0 PWR 2.7 2.1 0.0 1.9 PWR 2.7 0.0 0.0 1.0 Total All Regions 4.1 1.4 0.0 1.9 Total All Regions 4.1 0.0 0.0 1.3 71124.04 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 183 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 149 14 1.0 10.6 209 62 4.4 3.4 52 31 3.9 1.7 Region 2 139 9 0.9 15.4 170 40 4.4 4.2 165 46 5.1 3.6 Region 3 84 10 1.1 8.4 163 39 3.3 4.2 116 37 4.6 3.1 Region 4 115 5 0.8 23.0 152 35 4.4 4.3 50 35 11.7 1.4 1 Unit Sites 118 11 1.1 10.7 152 39 3.9 3.9 131 38 4.2 3.5 2 Unit Sites 320 23 1.0 13.9 450 112 4.3 4.0 196 100 6.7 2.0 3 Unit Sites 49 4 1.0 12.2 92 25 4.2 3.7 55 11 3.7 5.0 BWR 121 17 1.1 7.1 207 63 3.9 3.3 185 59 4.5 3.1 PWR 365 21 1.0 17.4 487 113 4.5 4.3 198 90 6.9 2.2 Total All 486 38 1.1 12.8 694 176 4.4 3.9 382 149 6.0 2.6 Regions 9/11/2018 2:22:01 PM Page 184 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 410 107 3.1 3.8 Region 2 473 95 3.7 5.0 Region 3 362 86 3.2 4.2 Region 4 317 75 5.0 4.2 1 Unit Sites 400 88 3.3 4.5 2 Unit Sites 966 235 3.7 4.1 3 Unit Sites 195 40 3.6 4.9 BWR 513 139 3.2 3.7 PWR 1049 224 3.8 4.7 Total All 1562 363 3.6 4.3 Regions 9/11/2018 2:22:01 PM Page 185 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.05, Radiation Monitoring Instrumentation, has been revised as a major editorial revision.

04/01/2016 IP 71124.05, "Radiation Monitoring Instrumentation," has been revised in response to the 2013 ROP Enhancement Project. The revision changes how inspection samples are counted.

Summary of PIM Findings 2015 2017 3 Year Total NCV Green 4 0 4 VIO Green 0 1 1 Total 4 1 5 9/11/2018 2:22:01 PM Page 186 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 2 0 0 1 0 2 0 0 0 0 1 1 0 Region 4 3 0 2 1 0 3 0 0 0 0 1 2 0 1 Unit Sites 3 0 2 1 0 3 0 0 0 0 1 2 0 2 Unit Sites 2 0 0 1 0 2 0 0 0 0 1 1 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 3 0 2 1 0 3 0 0 0 0 1 2 0 PWR 2 0 0 1 0 2 0 0 0 0 1 1 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 5 0 2 2 0 5 0 0 0 0 2 3 0 Percentage of All 100% 0% 40% 40% 0% 100% 0% 0% 0% 0% 40% 60% 0%

Findings 9/11/2018 2:22:01 PM Page 187 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 9.7 10.1 0.0 4.2 Region 3 9.7 10.1 0.0 4.2 Region 4 6.9 0.0 5.2 4.5 Region 4 6.9 0.0 5.2 4.5 1 Unit Sites 6.5 0.0 2.1 3.2 1 Unit Sites 6.5 0.0 2.1 3.2 2 Unit Sites 2.5 1.8 0.0 1.3 2 Unit Sites 2.5 1.8 0.0 1.3 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 8.4 0.0 1.9 3.6 BWR 8.4 0.0 1.9 3.6 PWR 1.6 1.6 0.0 1.1 PWR 1.6 1.6 0.0 1.1 Total All Regions 4.1 1.2 0.9 2.1 Total All Regions 4.1 1.2 0.9 2.1 71124.05 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 188 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 152 11 1.1 13.8 304 30 2.5 10.1 242 23 2.3 10.5 Region 2 318 9 0.9 35.3 269 24 2.7 11.2 241 27 3.4 8.9 Region 3 205 9 1.0 22.8 99 9 2.3 11.0 402 36 2.8 11.2 Region 4 291 7 0.9 41.6 188 13 2.2 14.5 192 21 2.6 9.1 1 Unit Sites 270 10 0.9 27.0 141 12 2.4 11.7 359 33 2.8 10.9 2 Unit Sites 566 21 1.1 27.0 658 58 2.6 11.3 564 56 2.8 10.1 3 Unit Sites 131 5 1.0 26.1 61 6 2.0 10.2 154 18 3.0 8.6 BWR 358 16 1.1 22.4 221 23 2.6 9.6 520 48 2.7 10.8 PWR 608 20 1.0 30.4 639 53 2.7 12.0 557 59 3.1 9.4 Total All 966 36 1.1 26.8 860 76 2.7 11.3 1077 107 3.0 10.1 Regions 9/11/2018 2:22:01 PM Page 189 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 698 64 2.1 10.9 Region 2 827 60 2.4 13.8 Region 3 707 54 2.3 13.1 Region 4 671 41 2.1 16.4 1 Unit Sites 769 55 2.1 14.0 2 Unit Sites 1788 135 2.3 13.2 3 Unit Sites 346 29 2.4 11.9 BWR 1099 87 2.1 12.6 PWR 1803 132 2.3 13.7 Total All 2902 219 2.2 13.3 Regions 9/11/2018 2:22:01 PM Page 190 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.06, Radioactive Gaseous and Liquid Effluent Treatment, has been revised as a major editorial revision.

04/01/2016 IP 71124.06, "Radioactive Gaseous and Liquid Effluent Treatment," has been revised in response to the 2013 ROP Enhancement Project. The revision changed how inspection samples are counted, and moved the sections on ground water inspections from 71124.06 to 71124.07. It also incorporates effluent monitoring instrumentation from 71124.05 into 71124.06.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 0 0 1 1 NCV Green 1 1 2 4 NOV White 0 0 1 1 Total 1 1 4 6 9/11/2018 2:22:01 PM Page 191 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 5 1 0 4 0 5 0 0 0 1 1 3 0 Region 4 1 0 1 0 0 1 0 0 0 0 0 1 0 1 Unit Sites 5 1 1 3 0 5 0 0 0 1 1 3 0 2 Unit Sites 1 0 0 1 0 1 0 0 0 0 0 1 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 3 1 1 1 0 3 0 0 0 1 0 2 0 PWR 3 0 0 3 0 3 0 0 0 0 1 2 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 6 1 1 4 0 6 0 0 0 1 1 4 0 Percentage of All 100% 17% 17% 67% 0% 100% 0% 0% 0% 17% 17% 67% 0%

Findings 9/11/2018 2:22:01 PM Page 192 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 3.1 6.1 12.5 7.4 Region 3 3.1 6.1 9.4 6.2 Region 4 0.0 0.0 4.1 1.5 Region 4 0.0 0.0 4.1 1.5 1 Unit Sites 1.9 4.5 7.2 4.6 1 Unit Sites 1.9 4.5 5.4 3.9 2 Unit Sites 0.0 0.0 1.9 0.7 2 Unit Sites 0.0 0.0 1.9 0.7 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 2.9 4.6 2.6 BWR 0.0 2.9 4.6 2.6 PWR 1.7 0.0 4.3 2.2 PWR 1.7 0.0 2.9 1.7 Total All Regions 1.0 1.1 4.4 2.4 Total All Regions 1.0 1.1 3.5 2.0 71124.06 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 193 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 136 8 1.1 17.0 267 45 5.0 5.9 305 54 5.4 5.6 Region 2 242 8 0.9 30.3 288 51 5.1 5.6 258 48 5.3 5.4 Region 3 323 10 0.9 32.3 164 34 5.7 4.8 321 57 5.7 5.6 Region 4 253 7 0.9 36.1 158 25 4.2 6.3 245 42 5.3 5.8 1 Unit Sites 329 10 0.9 32.9 149 28 4.7 5.3 341 62 5.6 5.5 2 Unit Sites 534 18 0.9 29.7 619 109 5.5 5.7 655 115 5.8 5.7 3 Unit Sites 91 5 1.3 18.2 109 18 4.5 6.1 134 24 4.8 5.6 BWR 368 13 1.0 28.3 344 67 6.1 5.1 433 73 5.6 5.9 PWR 586 20 1.0 29.3 533 88 4.9 6.1 696 128 5.8 5.4 Total All 954 33 1.0 28.9 877 155 5.5 5.7 1129 201 5.9 5.6 Regions 9/11/2018 2:22:01 PM Page 194 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 708 107 4.5 6.6 Region 2 788 107 4.1 7.4 Region 3 808 101 4.0 8.0 Region 4 656 74 3.7 8.9 1 Unit Sites 818 100 3.8 8.2 2 Unit Sites 1808 242 4.2 7.5 3 Unit Sites 334 47 4.3 7.1 BWR 1145 153 4.3 7.5 PWR 1815 236 4.0 7.7 Total All 2960 389 4.1 7.6 Regions 9/11/2018 2:22:01 PM Page 195 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.07, Radiological Environmental Monitoring Program, has been revised as a major editorial revision.

04/01/2016 IP 71124.07, "Radiological Environmental Monitoring Program," has been revised in response to the 2013 ROP Enhancement Project. This revised procedure includes groundwater monitoring inspection requirements transferred from IP 71124.06, and changed the way samples are counted.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 3 1 2 6 NOV N/A 1 0 0 1 Total 4 1 2 7 9/11/2018 2:22:01 PM Page 196 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 0 0 1 0 0 0 0 0 1 0 Region 2 1 0 0 1 0 0 0 0 0 0 1 0 0 Region 3 2 0 1 1 0 2 0 0 0 0 0 2 0 Region 4 3 0 0 2 0 3 0 0 0 0 0 3 0 1 Unit Sites 3 0 0 2 0 3 0 0 0 0 0 3 0 2 Unit Sites 4 0 1 2 0 3 0 0 0 0 1 3 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 3 0 0 2 0 3 0 0 0 0 0 3 0 PWR 4 0 1 2 0 3 0 0 0 0 1 3 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 7 0 1 4 0 6 0 0 0 0 1 6 0 Percentage of All 100% 0% 14% 57% 0% 86% 0% 0% 0% 0% 14% 86% 0%

Findings 9/11/2018 2:22:01 PM Page 197 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 2.6 0.0 0.0 1.2 Region 1 2.6 0.0 0.0 1.2 Region 2 0.0 4.2 0.0 1.5 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 8.4 13.6 7.9 Region 3 0.0 4.2 9.1 4.7 Region 4 12.8 0.0 0.0 5.3 Region 4 10.1 0.0 0.0 3.7 1 Unit Sites 6.3 4.0 2.4 4.3 1 Unit Sites 4.5 0.0 0.0 1.8 2 Unit Sites 2.0 4.2 3.9 3.4 2 Unit Sites 2.0 2.1 3.9 2.7 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 6.5 3.9 2.5 4.5 BWR 4.7 0.0 0.0 1.8 PWR 1.8 3.9 3.6 3.1 PWR 1.8 1.9 3.6 2.5 Total All Regions 3.9 3.9 3.1 3.6 Total All Regions 3.1 1.3 2.1 2.2 71124.07 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 198 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 387 13 0.9 29.8 172 17 2.8 10.1 307 33 3.0 9.3 Region 2 220 8 0.9 27.5 240 25 2.5 9.6 219 24 2.7 9.1 Region 3 176 7 0.9 25.1 239 24 2.7 10.0 220 22 2.8 10.0 Region 4 198 7 0.9 28.2 119 10 2.0 11.9 218 24 2.7 9.1 1 Unit Sites 248 9 0.9 27.6 199 19 2.4 10.4 235 24 2.7 9.8 2 Unit Sites 630 22 1.0 28.6 449 45 2.8 10.0 631 70 3.0 9.0 3 Unit Sites 103 4 0.8 25.6 122 12 2.4 10.1 99 9 2.3 10.9 BWR 429 15 0.9 28.6 253 28 2.8 9.0 405 42 2.8 9.6 PWR 552 20 1.0 27.6 516 48 2.7 10.8 559 61 3.1 9.2 Total All 980 35 1.0 28.0 769 76 2.8 10.1 964 103 3.0 9.4 Regions 9/11/2018 2:22:01 PM Page 199 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 866 63 2.2 13.7 Region 2 679 57 2.2 11.9 Region 3 635 53 2.3 12.0 Region 4 534 41 2.1 13.0 1 Unit Sites 681 52 2.1 13.1 2 Unit Sites 1710 137 2.3 12.5 3 Unit Sites 323 25 2.1 12.9 BWR 1087 85 2.1 12.8 PWR 1627 129 2.2 12.6 Total All 2714 214 2.2 12.7 Regions 9/11/2018 2:22:01 PM Page 200 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Revision History Date of Revision Description of Revision 12/21/2017 IP 71124.08, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation, has been revised as a major editorial revision.

01/26/2016 IP 71124.08, "Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation," has been revised in response to the 2013 ROP Enhancement Project. This major revision clarifies the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 4 3 2 9 NCVIV N/A 1 0 0 1 Total 5 3 2 10 9/11/2018 2:22:01 PM Page 201 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 3 0 3 0 0 3 0 0 0 0 1 2 0 Region 2 1 0 0 1 0 1 0 0 0 0 0 1 0 Region 3 2 0 0 2 0 0 0 0 0 0 0 2 0 Region 4 4 0 0 3 0 2 0 0 0 0 0 3 0 1 Unit Sites 8 0 3 4 0 5 0 0 0 0 1 6 0 2 Unit Sites 1 0 0 1 0 0 0 0 0 0 0 1 0 3 Unit Sites 1 0 0 1 0 1 0 0 0 0 0 1 0 BWR 8 0 3 4 0 5 0 0 0 0 1 6 0 PWR 2 0 0 2 0 1 0 0 0 0 0 2 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 10 0 3 6 0 6 0 0 0 0 1 8 0 Percentage of All 100% 0% 30% 60% 0% 60% 0% 0% 0% 0% 10% 80% 0%

Findings 9/11/2018 2:22:01 PM Page 202 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 6.5 3.6 0.0 3.4 Region 1 6.5 3.6 0.0 3.4 Region 2 0.0 4.0 0.0 1.4 Region 2 0.0 4.0 0.0 1.4 Region 3 0.0 9.3 2.5 2.6 Region 3 0.0 0.0 0.0 0.0 Region 4 13.6 0.0 4.4 7.4 Region 4 7.8 0.0 0.0 3.1 1 Unit Sites 11.8 3.3 4.1 6.9 1 Unit Sites 8.4 3.3 0.0 3.9 2 Unit Sites 0.0 2.3 0.0 0.6 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 19.2 0.0 8.3 3 Unit Sites 0.0 19.2 0.0 8.3 BWR 11.6 6.7 4.2 7.4 BWR 7.6 6.7 0.0 4.3 PWR 1.5 2.0 0.0 1.1 PWR 1.5 0.0 0.0 0.5 Total All Regions 5.5 3.8 1.7 3.6 Total All Regions 3.8 2.5 0.0 2.0 71124.08 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 203 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 310 8 0.9 38.8 281 48 4.8 5.9 292 48 5.3 6.1 Region 2 219 8 1.0 27.4 251 56 5.6 4.5 224 48 5.3 4.7 Region 3 269 8 0.9 33.6 108 18 4.5 6.0 403 72 5.5 5.6 Region 4 257 8 1.0 32.2 160 30 5.0 5.3 225 42 5.3 5.4 1 Unit Sites 254 7 0.9 36.3 269 48 4.8 5.6 223 42 5.3 5.3 2 Unit Sites 619 20 1.1 31.0 478 91 5.7 5.2 740 138 5.8 5.4 3 Unit Sites 182 5 0.8 36.4 52 13 4.3 4.0 181 30 5.0 6.0 BWR 396 11 0.9 36.0 299 56 5.1 5.3 482 84 5.6 5.7 PWR 659 21 1.1 31.4 500 96 5.6 5.2 662 126 5.7 5.3 Total All 1055 32 1.0 33.0 799 152 5.6 5.3 1144 210 5.8 5.4 Regions 9/11/2018 2:22:01 PM Page 204 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 883 104 4.0 8.5 Region 2 694 112 4.5 6.2 Region 3 779 98 4.1 7.9 Region 4 642 80 4.0 8.0 1 Unit Sites 746 97 4.0 7.7 2 Unit Sites 1837 249 4.4 7.4 3 Unit Sites 415 48 3.7 8.6 BWR 1176 151 4.1 7.8 PWR 1821 243 4.2 7.5 Total All 2998 394 4.2 7.6 Regions 9/11/2018 2:22:01 PM Page 205 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.01, "Access Authorization," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/20/2015 IP 71130.01, "Access Authorization," has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2015 2017 3 Year Total NCV Green 6 3 9 Total 6 3 9 9/11/2018 2:22:01 PM Page 206 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 1 0 0 1 0 0 0 0 0 0 0 0 1 Region 3 4 0 0 0 0 3 0 0 0 0 0 0 0 Region 4 4 0 1 2 0 4 0 0 0 0 0 0 2 1 Unit Sites 3 0 0 2 0 3 0 0 0 0 0 0 1 2 Unit Sites 6 0 1 1 0 4 0 0 0 0 0 0 2 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 4 0 0 0 0 3 0 0 0 0 0 0 0 PWR 5 0 1 3 0 4 0 0 0 0 0 0 3 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 9 0 1 3 0 7 0 0 0 0 0 0 3 Percentage of All 100% 0% 11% 33% 0% 78% 0% 0% 0% 0% 0% 0% 33%

Findings 9/11/2018 2:22:01 PM Page 207 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 4.8 2.5 Region 2 0.0 0.0 0.0 0.0 Region 3 9.6 0.0 0.0 9.6 Region 3 7.2 0.0 0.0 7.2 Region 4 4.9 0.0 5.1 5.0 Region 4 4.9 0.0 5.1 5.0 1 Unit Sites 3.5 0.0 2.9 3.1 1 Unit Sites 3.5 0.0 2.9 3.1 2 Unit Sites 7.2 0.0 5.7 5.9 2 Unit Sites 5.4 0.0 2.9 3.9 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 8.4 0.0 0.0 5.2 BWR 6.3 0.0 0.0 3.9 PWR 2.9 0.0 5.5 3.7 PWR 2.9 0.0 3.7 2.9 Total All Regions 5.1 0.0 3.9 4.2 Total All Regions 4.3 0.0 2.6 3.3 71130.01 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 208 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 234 8 0.9 29.2 116 4 0.8 28.9 172 7 0.9 24.5 Region 2 113 6 0.9 18.8 73 4 0.8 18.3 210 8 1.0 26.2 Region 3 417 15 0.9 27.8 0 0 0.0 0.0 0 0 0.0 0.0 Region 4 407 12 0.9 33.9 0 0 0.0 0.0 393 12 1.0 32.7 1 Unit Sites 330 11 0.9 30.0 26 1 0.5 25.5 212 6 1.0 35.3 2 Unit Sites 747 27 1.0 27.7 113 5 0.8 22.6 464 18 1.0 25.8 3 Unit Sites 94 3 0.8 31.3 50 2 0.7 25.0 98 3 0.8 32.7 BWR 479 17 0.9 28.2 62 2 0.7 31.0 231 9 0.9 25.7 PWR 692 24 1.0 28.8 127 6 0.9 21.1 543 18 1.1 30.2 Total All 1171 41 1.0 28.6 189 8 0.9 23.6 774 27 1.0 28.7 Regions 9/11/2018 2:22:01 PM Page 209 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 521 19 1.0 27.4 Region 2 396 18 1.0 22.0 Region 3 417 15 0.9 27.8 Region 4 800 24 1.0 33.3 1 Unit Sites 568 18 1.0 31.5 2 Unit Sites 1324 50 1.0 26.5 3 Unit Sites 242 8 0.9 30.3 BWR 772 28 0.9 27.6 PWR 1361 48 1.0 28.4 Total All 2134 76 1.0 28.1 Regions 9/11/2018 2:22:01 PM Page 210 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.02, "Access Control," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/20/2015 IP 71130.02, "Access Control," has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 0 0 6 6 NCV Green 9 16 8 33 Total 9 16 14 39 9/11/2018 2:22:01 PM Page 211 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 17 0 1 15 0 14 0 0 0 0 0 0 14 Region 2 4 0 0 4 0 4 0 0 0 0 0 0 3 Region 3 4 0 0 4 0 3 0 0 0 0 0 0 4 Region 4 14 0 2 11 0 13 0 0 0 0 0 0 9 1 Unit Sites 22 0 3 18 0 19 0 0 0 0 0 0 17 2 Unit Sites 16 0 0 15 0 14 0 0 0 0 0 0 12 3 Unit Sites 1 0 0 1 0 1 0 0 0 0 0 0 1 BWR 18 0 2 15 0 15 0 0 0 0 0 0 12 PWR 21 0 1 19 0 19 0 0 0 0 0 0 18 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 39 0 3 34 0 34 0 0 0 0 0 0 30 Percentage of All 100% 0% 8% 87% 0% 87% 0% 0% 0% 0% 0% 0% 77%

Findings 9/11/2018 2:22:01 PM Page 212 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 7.9 11.2 15.0 11.9 Region 1 5.3 5.2 8.9 6.6 Region 2 2.5 8.0 0.0 3.3 Region 2 2.5 8.0 0.0 3.3 Region 3 0.0 5.5 7.6 4.4 Region 3 0.0 5.5 2.7 2.7 Region 4 15.0 16.9 12.1 14.9 Region 4 11.6 12.3 9.1 11.2 1 Unit Sites 7.4 14.7 12.6 11.6 1 Unit Sites 5.0 8.5 7.2 6.9 2 Unit Sites 5.6 7.6 6.2 6.5 2 Unit Sites 4.2 7.6 2.4 4.7 3 Unit Sites 0.0 0.0 15.6 4.3 3 Unit Sites 0.0 0.0 15.6 4.3 BWR 9.3 11.1 9.6 10.0 BWR 7.0 5.6 3.5 5.3 PWR 3.6 9.8 8.7 7.5 PWR 2.4 8.7 5.6 5.7 Total All Regions 6.1 10.4 9.0 8.5 Total All Regions 4.3 7.6 4.8 5.6 71130.02 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 213 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 381 16 0.9 23.8 384 16 0.9 24.0 450 16 0.9 28.1 Region 2 399 17 1.0 23.5 374 17 0.9 22.0 421 19 1.2 22.2 Region 3 368 15 0.9 24.5 367 15 0.9 24.5 377 15 0.9 25.1 Region 4 258 12 1.0 21.5 326 12 0.9 27.1 220 12 1.1 18.3 1 Unit Sites 384 15 0.9 25.6 387 15 0.9 25.8 355 16 1.1 22.2 2 Unit Sites 845 38 1.0 22.2 885 38 1.0 23.3 919 39 1.1 23.6 3 Unit Sites 176 7 0.9 25.2 179 7 0.9 25.5 193 7 1.0 27.6 BWR 573 23 1.0 24.9 535 23 1.0 23.3 577 24 1.0 24.0 PWR 833 37 1.0 22.5 915 37 1.0 24.7 890 38 1.1 23.4 Total All 1405 60 1.0 23.4 1450 60 1.0 24.2 1467 62 1.1 23.7 Regions 9/11/2018 2:22:01 PM Page 214 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1214 48 1.0 25.3 Region 2 1195 53 1.1 22.5 Region 3 1111 45 1.0 24.7 Region 4 804 36 1.1 22.3 1 Unit Sites 1126 46 1.0 24.5 2 Unit Sites 2650 115 1.0 23.0 3 Unit Sites 548 21 1.0 26.1 BWR 1685 70 1.0 24.1 PWR 2638 112 1.0 23.6 Total All 4323 182 1.0 23.8 Regions 9/11/2018 2:22:01 PM Page 215 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Revision History Date of Revision Description of Revision 12/22/2016 IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to remove Addendum 5, and change the resource estimate hours from 435 to 393.

04/20/2015 IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 27 20 9 56 Total 27 20 9 56 9/11/2018 2:22:01 PM Page 216 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 13 0 2 6 0 13 0 0 0 0 0 0 6 Region 2 8 0 2 3 0 8 0 0 0 0 0 0 4 Region 3 16 0 2 11 0 15 0 0 0 0 0 0 11 Region 4 17 0 4 7 0 17 0 0 0 0 0 0 6 1 Unit Sites 17 0 4 8 0 16 0 0 0 0 0 0 7 2 Unit Sites 35 0 5 19 0 35 0 0 0 0 0 0 18 3 Unit Sites 2 0 1 0 0 2 0 0 0 0 0 0 2 BWR 22 0 5 8 0 21 0 0 0 0 0 0 7 PWR 32 0 5 19 0 32 0 0 0 0 0 0 20 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 54 0 10 27 0 53 0 0 0 0 0 0 27 Percentage of All 100% 0% 19% 50% 0% 98% 0% 0% 0% 0% 0% 0% 50%

Findings 9/11/2018 2:22:01 PM Page 217 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 2.0 2.7 0.7 1.8 Region 1 1.6 2.6 0.4 1.3 Region 2 1.5 1.3 0.5 1.2 Region 2 1.1 1.3 0.5 0.9 Region 3 2.5 2.3 2.7 2.5 Region 3 2.4 2.3 1.6 2.1 Region 4 2.4 2.6 1.5 2.4 Region 4 1.6 2.6 1.5 2.0 1 Unit Sites 2.0 2.0 1.4 1.8 1 Unit Sites 1.4 2.0 0.9 1.3 2 Unit Sites 2.1 2.2 1.2 2.0 2 Unit Sites 1.8 2.0 0.7 1.7 3 Unit Sites 0.0 2.4 0.0 1.6 3 Unit Sites 0.0 2.4 0.0 1.6 BWR 2.3 1.7 1.2 2.0 BWR 2.0 1.7 0.5 1.5 PWR 1.9 2.4 1.2 1.9 PWR 1.3 2.2 0.9 1.5 Total All Regions 2.1 2.2 1.2 1.9 Total All Regions 1.6 2.1 0.8 1.5 71130.03 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 218 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 1932 5 0.8 386.3 1164 6 1.5 194.0 2357 18 2.0 130.9 Region 2 1815 5 0.8 362.9 2330 12 1.7 194.1 2185 14 2.0 156.0 Region 3 1693 5 0.8 338.6 2189 12 1.7 182.4 1257 8 1.6 157.2 Region 4 1895 6 0.9 315.8 1535 8 1.6 191.9 670 5 1.7 134.0 1 Unit Sites 1644 5 0.8 328.8 355 2 1.0 177.4 2914 20 2.0 145.7 2 Unit Sites 5328 15 0.9 355.2 5667 30 1.9 188.9 2333 19 2.1 122.8 3 Unit Sites 362 1 0.5 362.0 1195 6 1.5 199.2 1222 6 1.5 203.6 BWR 3579 10 0.9 357.9 2317 12 1.7 193.1 2050 15 1.9 136.6 PWR 3755 11 0.9 341.3 4900 26 1.9 188.5 4419 30 2.1 147.3 Total All 7334 21 1.0 349.2 7217 38 1.9 189.9 6469 45 2.1 143.8 Regions 9/11/2018 2:22:01 PM Page 219 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 5453 29 1.7 188.0 Region 2 6329 31 1.7 204.1 Region 3 5139 25 1.6 205.6 Region 4 4100 19 1.5 215.8 1 Unit Sites 4913 27 1.7 182.0 2 Unit Sites 13328 64 1.6 208.3 3 Unit Sites 2779 13 1.6 213.8 BWR 7946 37 1.5 214.8 PWR 13074 67 1.7 195.1 Total All 21020 104 1.7 202.1 Regions 9/11/2018 2:22:01 PM Page 220 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.04, "Equipment Performance, Testing and Maintenance," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/27/2015 IP 71130.04, "Equipment Performance, Testing and Maintenance, has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 7 10 7 24 NOV N/A 1 0 0 1 Total 8 10 7 25 9/11/2018 2:22:01 PM Page 221 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 18 0 3 10 0 18 0 0 0 0 0 0 12 Region 2 2 0 0 2 0 2 0 0 0 0 0 0 2 Region 3 2 0 0 2 0 2 0 0 0 0 0 0 1 Region 4 3 0 0 2 0 3 0 0 0 0 0 0 2 1 Unit Sites 11 0 1 7 0 11 0 0 0 0 0 0 6 2 Unit Sites 14 0 2 9 0 14 0 0 0 0 0 0 11 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 13 0 1 9 0 13 0 0 0 0 0 0 8 PWR 12 0 2 7 0 12 0 0 0 0 0 0 9 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 25 0 3 16 0 25 0 0 0 0 0 0 17 Percentage of All 100% 0% 12% 64% 0% 100% 0% 0% 0% 0% 0% 0% 68%

Findings 9/11/2018 2:22:01 PM Page 222 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 11.2 15.1 14.9 13.5 Region 1 9.0 12.1 12.2 11.1 Region 2 0.0 0.0 7.7 2.4 Region 2 0.0 0.0 7.7 2.4 Region 3 1.2 2.6 0.0 1.8 Region 3 1.2 2.6 0.0 1.8 Region 4 0.0 4.2 0.0 6.3 Region 4 0.0 4.2 0.0 6.3 1 Unit Sites 7.5 5.6 10.5 6.8 1 Unit Sites 5.6 4.5 6.8 5.1 2 Unit Sites 3.2 5.7 12.3 5.8 2 Unit Sites 2.3 4.9 11.2 4.9 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 6.3 7.3 12.3 7.5 BWR 4.5 6.2 9.9 6.0 PWR 3.7 4.0 11.4 5.0 PWR 2.7 3.3 9.9 4.0 Total All Regions 5.0 5.3 11.7 6.1 Total All Regions 3.6 4.5 9.9 4.8 71130.04 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 223 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 334 6 0.9 55.6 415 10 0.9 41.5 246 6 0.9 40.9 Region 2 229 6 0.9 38.1 345 10 0.9 34.5 260 7 0.9 37.2 Region 3 841 15 0.9 56.1 783 15 0.9 52.2 0 0 0.0 0.0 Region 4 0 0 0.0 0.0 475 12 1.0 39.6 0 0 0.0 0.0 1 Unit Sites 375 8 0.9 46.9 488 12 1.0 40.7 115 3 0.8 38.4 2 Unit Sites 828 16 0.9 51.8 1312 30 1.0 43.7 307 8 0.9 38.4 3 Unit Sites 200 3 0.8 66.8 217 5 0.8 43.3 83 2 0.7 41.6 BWR 661 12 0.9 55.1 806 18 1.0 44.8 202 5 0.8 40.5 PWR 743 15 0.9 49.5 1211 29 1.0 41.8 304 8 0.9 37.9 Total All 1404 27 1.0 52.0 2017 47 1.0 42.9 506 13 0.9 38.9 Regions 9/11/2018 2:22:01 PM Page 224 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 994 22 1.0 45.2 Region 2 833 23 1.0 36.2 Region 3 1624 30 1.0 54.1 Region 4 475 12 1.0 39.6 1 Unit Sites 979 23 1.0 42.5 2 Unit Sites 2447 54 1.0 45.3 3 Unit Sites 500 10 0.9 50.0 BWR 1669 35 1.0 47.7 PWR 2257 52 1.0 43.4 Total All 3926 87 1.0 45.1 Regions 9/11/2018 2:22:01 PM Page 225 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/27/2015 IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to address program applicability. Additionally, inspection requirement 05-02.07.f (the verification of target sets) was removed as it was redundant to the inspection activity being inspected in IP 71130.14.

Procedure completion and resource estimate were changed due to deletion of this inspection requirement. Minor administrative edits were made.

Summary of PIM Findings 2015 2016 2017 3 Year Total NCV Green 6 13 5 24 NCVIV Green 0 0 1 1 NCVIV N/A 0 1 0 1 Total 6 14 6 26 9/11/2018 2:22:01 PM Page 226 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 5 0 1 2 0 5 0 0 0 0 0 0 5 Region 2 4 0 0 4 0 4 0 0 0 0 0 0 1 Region 3 5 0 1 4 0 4 0 0 0 0 0 0 5 Region 4 12 0 5 5 0 12 0 0 0 0 0 0 9 1 Unit Sites 14 0 5 7 0 13 0 0 0 0 0 0 11 2 Unit Sites 11 0 2 7 0 11 0 0 0 0 0 0 9 3 Unit Sites 1 0 0 1 0 1 0 0 0 0 0 0 0 BWR 9 0 1 7 0 8 0 0 0 0 0 0 5 PWR 17 0 6 8 0 17 0 0 0 0 0 0 15 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 26 0 7 15 0 25 0 0 0 0 0 0 20 Percentage of All 100% 0% 27% 58% 0% 96% 0% 0% 0% 0% 0% 0% 77%

Findings 9/11/2018 2:22:01 PM Page 227 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 4.5 1.6 2.7 Region 1 0.0 4.1 1.6 2.3 Region 2 2.7 2.9 3.5 2.9 Region 2 2.7 2.9 1.8 2.4 Region 3 0.0 9.4 4.4 5.7 Region 3 0.0 3.8 3.3 3.2 Region 4 5.7 9.6 9.5 8.2 Region 4 2.5 7.6 9.5 6.0 1 Unit Sites 4.1 7.8 2.9 5.5 1 Unit Sites 1.7 4.8 2.9 3.3 2 Unit Sites 1.9 5.0 4.1 3.6 2 Unit Sites 1.9 4.4 2.6 2.9 3 Unit Sites 3.7 0.0 5.8 4.6 3 Unit Sites 3.7 0.0 5.8 4.6 BWR 7.3 4.3 2.4 4.3 BWR 4.9 2.6 2.4 3.0 PWR 1.3 8.2 4.7 4.6 PWR 1.3 6.3 3.3 3.3 Total All Regions 2.9 6.6 3.8 4.5 Total All Regions 2.1 4.6 3.0 3.2 71130.05 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 228 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 342 6 1.5 57.0 736 16 1.8 46.0 642 12 1.7 53.5 Region 2 1132 20 1.8 56.6 344 8 1.6 43.0 567 14 1.8 40.5 Region 3 61 2 0.7 30.5 260 6 1.2 43.3 614 21 1.8 29.2 Region 4 393 12 1.5 32.8 395 12 1.7 32.9 210 6 1.5 35.0 1 Unit Sites 521 12 1.5 43.4 531 12 1.5 44.3 315 8 1.6 39.3 2 Unit Sites 1140 22 1.7 51.8 982 26 1.9 37.8 1371 37 1.9 37.0 3 Unit Sites 268 6 1.5 44.6 222 4 1.3 55.4 347 8 1.6 43.4 BWR 411 9 1.3 45.6 784 17 1.7 46.1 820 23 1.8 35.7 PWR 1518 31 1.8 49.0 951 25 1.8 38.0 1213 30 1.9 40.4 Total All 1928 40 1.7 48.2 1735 42 1.8 41.3 2033 53 1.9 38.3 Regions 9/11/2018 2:22:01 PM Page 229 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1720 34 1.9 50.6 Region 2 2043 42 1.9 48.6 Region 3 935 29 1.6 32.2 Region 4 998 30 1.8 33.3 1 Unit Sites 1366 32 1.7 42.7 2 Unit Sites 3493 85 1.9 41.1 3 Unit Sites 836 18 1.8 46.5 BWR 2015 49 1.7 41.1 PWR 3681 86 1.9 42.8 Total All 5695 135 1.8 42.2 Regions 9/11/2018 2:22:01 PM Page 230 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.06, "Protection of Safeguards Information," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/20/2015 IP 71130.06, "Protection of Safeguards Information," has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2017 3 Year Total NOV White 1 1 Total 1 1 9/11/2018 2:22:01 PM Page 231 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 1 1 0 0 0 1 0 0 0 0 0 0 1 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Unit Sites 1 1 0 0 0 1 0 0 0 0 0 0 1 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 0 0 0 0 0 0 0 0 0 0 0 0 0 PWR 1 1 0 0 0 1 0 0 0 0 0 0 1 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 1 1 0 0 0 1 0 0 0 0 0 0 1 Percentage of All 100% 100% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 100%

Findings 9/11/2018 2:22:01 PM Page 232 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 10.2 5.4 Region 2 0.0 0.0 10.2 5.4 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 1 Unit Sites 0.0 0.0 0.0 0.0 2 Unit Sites 0.0 0.0 7.3 2.7 2 Unit Sites 0.0 0.0 7.3 2.7 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 BWR 0.0 0.0 0.0 0.0 PWR 0.0 0.0 6.9 2.2 PWR 0.0 0.0 6.9 2.2 Total All Regions 0.0 0.0 4.7 1.4 Total All Regions 0.0 0.0 4.7 1.4 71130.06 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 233 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 71 8 0.9 8.9 28 4 0.8 6.9 29 7 0.9 4.1 Region 2 59 6 0.9 9.9 26 4 1.0 6.6 98 8 0.9 12.3 Region 3 0 0 0.0 0.0 107 15 0.9 7.2 0 0 0.0 0.0 Region 4 191 12 0.9 15.9 13 0 0.0 0.0 87 12 1.0 7.3 1 Unit Sites 75 6 0.9 12.5 61 6 0.8 10.2 26 6 0.9 4.3 2 Unit Sites 230 18 0.9 12.8 103 14 0.9 7.4 171 18 1.0 9.5 3 Unit Sites 17 2 0.7 8.5 10 3 1.0 3.3 17 3 0.8 5.5 BWR 120 9 0.9 13.3 72 10 0.9 7.2 68 9 0.9 7.6 PWR 202 17 0.9 11.9 103 13 0.9 7.9 146 18 1.0 8.1 Total All 322 26 1.0 12.4 174 23 1.0 7.6 214 27 1.0 7.9 Regions 9/11/2018 2:22:01 PM Page 234 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 127 19 1.0 6.7 Region 2 184 18 1.0 10.2 Region 3 107 15 0.9 7.2 Region 4 291 24 1.0 12.1 1 Unit Sites 162 18 0.9 9.0 2 Unit Sites 504 50 1.0 10.1 3 Unit Sites 44 8 1.0 5.4 BWR 260 28 0.9 9.3 PWR 450 48 1.0 9.4 Total All 709 76 1.0 9.3 Regions 9/11/2018 2:22:01 PM Page 235 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.07, "Security Training," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/27/2015 IP 71130.07, "Security Training," has been revised to address program applicability. Additionally, inspection requirements for Firearms Preemptive Authority, section 07-02.14.a,b,c. Procedure completion and resource estimate were changed to reflect new requirements. Minor administrative edits were made.

Summary of PIM Findings 2016 2017 3 Year Total NCV Green 3 1 4 Total 3 1 4 9/11/2018 2:22:01 PM Page 236 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 1 0 0 0 0 0 0 1 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 1 0 1 0 0 1 0 0 0 0 0 0 1 Region 4 1 0 0 1 0 1 0 0 0 0 0 0 1 1 Unit Sites 3 0 1 2 0 3 0 0 0 0 0 0 3 2 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 1 0 1 0 0 1 0 0 0 0 0 0 1 PWR 2 0 0 2 0 2 0 0 0 0 0 0 2 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 3 0 1 2 0 3 0 0 0 0 0 0 3 Percentage of All 100% 0% 33% 67% 0% 100% 0% 0% 0% 0% 0% 0% 100%

Findings 9/11/2018 2:22:01 PM Page 237 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 3.2 0.0 1.4 Region 1 0.0 3.2 0.0 1.4 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 4.5 2.1 Region 3 0.0 0.0 2.2 1.0 Region 4 0.0 2.7 0.0 2.7 Region 4 0.0 2.7 0.0 2.7 1 Unit Sites 0.0 5.5 3.2 2.9 1 Unit Sites 0.0 5.5 3.2 2.9 2 Unit Sites 0.0 0.0 1.8 0.6 2 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 0.0 4.8 1.8 BWR 0.0 0.0 2.4 0.9 PWR 0.0 2.9 0.0 1.3 PWR 0.0 2.9 0.0 1.3 Total All Regions 0.0 2.1 2.3 1.5 Total All Regions 0.0 2.1 1.2 1.1 71130.07 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 238 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 194 6 0.9 32.3 311 11 1.1 28.3 189 6 0.9 31.5 Region 2 145 6 1.0 24.1 260 10 0.9 26.0 224 7 0.9 31.9 Region 3 516 15 0.9 34.4 0 0 0.0 0.0 448 15 0.9 29.9 Region 4 0 0 0.0 0.0 371 12 1.0 30.9 4 0 0.0 0.0 1 Unit Sites 254 8 0.9 31.7 198 7 1.0 28.3 232 8 0.9 29.0 2 Unit Sites 481 16 1.0 30.1 611 22 1.0 27.8 531 17 0.9 31.3 3 Unit Sites 120 3 0.8 39.9 132 4 0.8 33.0 102 3 0.8 33.8 BWR 411 12 0.9 34.3 262 10 1.1 26.2 414 13 0.9 31.8 PWR 443 15 1.0 29.5 680 23 1.0 29.6 451 15 0.9 30.1 Total All 854 27 1.0 31.6 941 33 1.1 28.5 865 28 0.9 30.9 Regions 9/11/2018 2:22:01 PM Page 239 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 694 23 1.0 30.2 Region 2 628 23 1.0 27.3 Region 3 964 30 1.0 32.1 Region 4 375 12 0.9 31.3 1 Unit Sites 684 23 1.0 29.7 2 Unit Sites 1623 55 1.0 29.5 3 Unit Sites 353 10 0.9 35.3 BWR 1086 35 1.0 31.0 PWR 1574 53 1.0 29.7 Total All 2660 88 1.0 30.2 Regions 9/11/2018 2:22:01 PM Page 240 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Revision History Date of Revision Description of Revision 09/30/2016 IP 71130.08, "Fitness-for-Duty (FFD) Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

05/21/2015 IP 71130.08, "Fitness-for-Duty Program," has been revised to address language clarification for 10 CFR 26.139(d) and (e) requirements found in section 02.10 c.3. of this IP; program applicability and minor administrative changes.

Summary of PIM Findings 2015 2016 2017 3 Year Total FIN Green 2 0 0 2 NCV Green 0 0 5 5 NCVIV N/A 0 0 1 1 VIO N/A 0 1 0 1 Total 2 1 6 9 9/11/2018 2:22:01 PM Page 241 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 2 0 0 2 0 2 0 0 0 0 0 0 0 Region 2 1 0 0 0 0 1 0 0 0 0 0 0 1 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 6 0 5 0 0 6 0 0 0 0 0 0 6 1 Unit Sites 3 0 1 1 0 3 0 0 0 0 0 0 2 2 Unit Sites 6 0 4 1 0 6 0 0 0 0 0 0 5 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 2 0 1 1 0 2 0 0 0 0 0 0 1 PWR 7 0 4 1 0 7 0 0 0 0 0 0 6 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 9 0 5 2 0 9 0 0 0 0 0 0 7 Percentage of All 100% 0% 56% 22% 0% 100% 0% 0% 0% 0% 0% 0% 78%

Findings 9/11/2018 2:22:01 PM Page 242 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 9.2 0.0 0.0 3.9 Region 1 9.2 0.0 0.0 3.9 Region 2 0.0 20.8 0.0 3.3 Region 2 0.0 20.8 0.0 3.3 Region 3 0.0 0.0 0.0 0.0 Region 3 0.0 0.0 0.0 0.0 Region 4 0.0 0.0 15.1 15.1 Region 4 0.0 0.0 13.4 13.4 1 Unit Sites 8.3 0.0 7.8 7.3 1 Unit Sites 8.3 0.0 7.8 7.3 2 Unit Sites 4.7 7.7 6.2 6.0 2 Unit Sites 4.7 7.7 2.1 3.6 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 8.2 0.0 2.7 3.6 BWR 8.2 0.0 2.7 3.6 PWR 4.7 9.2 8.5 7.8 PWR 4.7 9.2 5.5 5.8 Total All Regions 6.0 5.5 6.5 6.3 Total All Regions 6.0 5.5 4.4 4.9 71130.08 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 243 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 218 8 0.9 27.3 133 4 0.8 33.1 162 7 0.9 23.1 Region 2 116 6 0.9 19.3 48 4 0.8 12.0 140 8 1.0 17.4 Region 3 0 0 0.0 0.0 0 0 0.0 0.0 309 15 0.9 20.6 Region 4 0 0 0.0 0.0 0 0 0.0 0.0 298 12 1.1 24.8 1 Unit Sites 43 2 0.7 21.6 26 1 0.5 25.5 222 11 1.2 20.1 2 Unit Sites 259 11 0.9 23.5 109 5 0.8 21.8 598 27 1.0 22.1 3 Unit Sites 32 1 0.5 32.0 46 2 0.7 23.0 89 4 0.8 22.3 BWR 122 5 0.8 24.5 72 2 0.7 36.0 367 17 0.9 21.6 PWR 212 9 0.9 23.6 109 6 0.9 18.1 542 25 1.1 21.7 Total All 334 14 0.9 23.9 181 8 0.9 22.6 909 42 1.1 21.6 Regions 9/11/2018 2:22:01 PM Page 244 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 513 19 1.0 27.0 Region 2 304 18 1.0 16.9 Region 3 309 15 0.9 20.6 Region 4 298 12 1.1 24.8 1 Unit Sites 290 14 1.2 20.7 2 Unit Sites 966 43 1.0 22.5 3 Unit Sites 167 7 0.9 23.9 BWR 561 24 0.9 23.4 PWR 863 40 1.0 21.6 Total All 1423 64 1.0 22.2 Regions 9/11/2018 2:22:01 PM Page 245 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Revision History Date of Revision Description of Revision Summary of PIM Findings 2015 2016 3 Year Total NCV Green 1 5 6 NCVIV N/A 1 0 1 Total 2 5 7 9/11/2018 2:22:01 PM Page 246 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 1 0 0 1 0 1 0 0 0 0 0 0 1 Region 2 2 0 1 0 0 2 0 0 0 0 0 0 0 Region 3 2 0 0 1 0 2 0 0 0 0 0 0 2 Region 4 2 0 0 1 0 1 0 0 0 0 0 0 2 1 Unit Sites 4 0 0 2 0 3 0 0 0 0 0 0 3 2 Unit Sites 3 0 1 1 0 3 0 0 0 0 0 0 2 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 2 0 0 2 0 1 0 0 0 0 0 0 2 PWR 5 0 1 1 0 5 0 0 0 0 0 0 3 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 7 0 1 3 0 6 0 0 0 0 0 0 5 Percentage of All 100% 0% 14% 43% 0% 86% 0% 0% 0% 0% 0% 0% 71%

Findings 9/11/2018 2:22:01 PM Page 247 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 6.0 0.0 2.6 Region 1 0.0 6.0 0.0 2.6 Region 2 24.0 0.0 0.0 9.0 Region 2 24.0 0.0 0.0 9.0 Region 3 0.0 20.4 0.0 9.8 Region 3 0.0 20.4 0.0 9.8 Region 4 0.0 25.0 0.0 12.2 Region 4 0.0 12.5 0.0 6.1 1 Unit Sites 6.3 14.5 0.0 9.0 1 Unit Sites 6.3 9.7 0.0 6.7 2 Unit Sites 6.6 12.7 0.0 6.2 2 Unit Sites 6.6 12.7 0.0 6.2 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 0.0 9.0 0.0 4.8 BWR 0.0 4.5 0.0 2.4 PWR 10.4 16.2 0.0 8.9 PWR 10.4 16.2 0.0 8.9 Total All Regions 6.4 12.3 0.0 7.2 Total All Regions 6.4 9.9 0.0 6.2 71130.11 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 248 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 122 75 15.0 1.6 166 105 17.5 1.6 97 75 15.0 1.3 Region 2 83 105 13.1 0.8 62 74 12.3 0.8 78 90 12.9 0.9 Region 3 57 75 15.0 0.8 98 90 15.0 1.1 49 60 12.0 0.8 Region 4 48 30 10.0 1.6 80 75 12.5 1.1 36 60 12.0 0.6 1 Unit Sites 112 105 15.0 1.1 58 60 12.0 1.0 80 60 12.0 1.3 2 Unit Sites 198 180 15.0 1.1 282 224 16.0 1.3 126 180 15.0 0.7 3 Unit Sites 0 0 0.0 0.0 67 60 15.0 1.1 54 45 11.3 1.2 BWR 119 90 12.9 1.3 221 164 16.4 1.3 76 90 12.9 0.8 PWR 192 195 16.3 1.0 185 180 15.0 1.0 183 195 15.0 0.9 Total All 310 285 15.8 1.1 406 344 16.4 1.2 259 285 15.0 0.9 Regions 9/11/2018 2:22:01 PM Page 249 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 384 255 18.2 1.5 Region 2 223 269 14.2 0.8 Region 3 205 225 16.1 0.9 Region 4 164 165 13.8 1.0 1 Unit Sites 250 225 15.0 1.1 2 Unit Sites 606 584 16.2 1.0 3 Unit Sites 120 105 15.0 1.1 BWR 416 344 15.0 1.2 PWR 559 570 15.8 1.0 Total All 975 914 15.8 1.1 Regions 9/11/2018 2:22:01 PM Page 250 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Revision History Date of Revision Description of Revision 09/12/2017 IP 71130.14, "Review of Power Reactor Target Sets," has been revised to add background and guidance on target sets related to cyber critical digital assets.

09/30/2016 IP 71130.14, "Review of Power Reactor Target Sets," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.

04/20/2015 IP 71130.14, "Review of Reactor Target Sets," has been revised to address the program applicability and minor administrative changes.

Summary of PIM Findings 2015 2016 3 Year Total NCV Green 5 10 15 Total 5 10 15 9/11/2018 2:22:01 PM Page 251 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 2 7 0 0 6 0 7 0 0 0 0 0 0 2 Region 3 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 4 8 0 2 6 0 8 0 0 0 0 0 0 8 1 Unit Sites 9 0 2 7 0 9 0 0 0 0 0 0 7 2 Unit Sites 4 0 0 3 0 4 0 0 0 0 0 0 2 3 Unit Sites 2 0 0 2 0 2 0 0 0 0 0 0 1 BWR 8 0 2 5 0 8 0 0 0 0 0 0 6 PWR 7 0 0 7 0 7 0 0 0 0 0 0 4 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 15 0 2 12 0 15 0 0 0 0 0 0 10 Percentage of All 100% 0% 13% 80% 0% 100% 0% 0% 0% 0% 0% 0% 67%

Findings 9/11/2018 2:22:01 PM Page 252 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 0.0 0.0 0.0 0.0 Region 1 0.0 0.0 0.0 0.0 Region 2 18.7 15.9 0.0 13.5 Region 2 18.7 15.9 0.0 13.5 Region 3 0.0 0.0 28.2 6.6 Region 3 0.0 0.0 0.0 0.0 Region 4 57.1 27.5 0.0 30.7 Region 4 33.9 25.6 0.0 23.6 1 Unit Sites 10.4 23.2 11.5 17.2 1 Unit Sites 10.4 19.4 0.0 12.4 2 Unit Sites 23.6 10.0 0.0 12.9 2 Unit Sites 14.0 10.0 0.0 8.7 3 Unit Sites 23.8 44.4 0.0 31.0 3 Unit Sites 23.8 44.4 0.0 31.0 BWR 12.2 24.1 14.2 18.7 BWR 12.2 19.7 0.0 12.9 PWR 21.5 14.5 0.0 14.1 PWR 14.0 14.5 0.0 10.8 Total All Regions 18.4 19.0 4.0 15.8 Total All Regions 13.4 16.3 0.0 11.5 71130.14 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 253 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 70 55 9.2 1.3 72 88 9.8 0.8 61 6 0.9 10.1 Region 2 268 79 8.8 3.4 126 83 10.4 1.5 125 24 3.4 5.2 Region 3 81 66 11.0 1.2 36 44 8.8 0.8 36 6 1.0 5.9 Region 4 30 16 5.3 1.8 195 111 11.1 1.8 30 0 0.0 0.0 1 Unit Sites 92 42 8.4 2.2 117 99 9.9 1.2 67 4 0.7 16.8 2 Unit Sites 293 153 10.2 1.9 268 184 11.5 1.5 171 31 2.4 5.5 3 Unit Sites 63 21 7.0 3.0 45 43 8.6 1.0 13 1 0.5 12.5 BWR 164 72 9.0 2.3 153 109 10.9 1.4 71 8 0.9 8.8 PWR 285 144 10.3 2.0 277 217 10.9 1.3 180 28 2.5 6.4 Total All 449 216 10.3 2.1 429 326 11.2 1.3 251 36 1.9 7.0 Regions 9/11/2018 2:22:01 PM Page 254 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 203 149 7.5 1.4 Region 2 519 186 8.5 2.8 Region 3 153 116 7.7 1.3 Region 4 255 127 9.8 2.0 1 Unit Sites 276 145 7.6 1.9 2 Unit Sites 733 368 8.8 2.0 3 Unit Sites 120 65 8.1 1.8 BWR 387 189 7.3 2.0 PWR 742 389 8.8 1.9 Total All 1128 578 8.4 2.0 Regions 9/11/2018 2:22:01 PM Page 255 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Revision History Date of Revision Description of Revision 05/03/2017 IP 71151, "Performance Indicator Verification," has been revised to correct typographical errors. No other changes were made.

12/08/2016 IP 71151, "Performance Indicator Verification," has been revised to reduce the annual resource estimate by half, per Commission direction in SRM SECY 009, and clarifications for requirements made per OIG Audit 16-A-12 and the inspection report initiative.

Summary of PIM Findings 2015 2016 3 Year Total FIN Green 1 0 1 NCV Green 1 1 2 NCVIV N/A 0 1 1 NOV N/A 1 0 1 Total 3 2 5 9/11/2018 2:22:01 PM Page 256 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 2 0 0 1 0 1 0 0 1 0 0 0 0 Region 2 0 0 0 0 0 0 0 0 0 0 0 0 0 Region 3 2 0 0 1 0 1 1 1 0 0 0 0 0 Region 4 1 0 0 0 0 1 1 0 0 0 0 0 0 1 Unit Sites 1 0 0 0 0 0 1 0 0 0 0 0 0 2 Unit Sites 4 0 0 2 0 3 1 1 1 0 0 0 0 3 Unit Sites 0 0 0 0 0 0 0 0 0 0 0 0 0 BWR 2 0 0 1 0 0 1 0 1 0 0 0 0 PWR 3 0 0 1 0 3 1 1 0 0 0 0 0 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 5 0 0 2 0 3 2 1 1 0 0 0 0 Percentage of All 100% 0% 0% 40% 0% 60% 40% 20% 20% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 257 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 1.8 1.5 2.2 1.8 Region 1 0.0 1.5 0.0 0.6 Region 2 0.0 0.0 0.0 0.0 Region 2 0.0 0.0 0.0 0.0 Region 3 4.5 1.4 0.0 2.1 Region 3 4.5 0.0 0.0 1.6 Region 4 1.8 0.0 2.2 1.3 Region 4 1.8 0.0 0.0 0.6 1 Unit Sites 1.0 1.0 2.5 1.4 1 Unit Sites 1.0 0.0 0.0 0.4 2 Unit Sites 2.7 0.6 0.0 1.1 2 Unit Sites 2.0 0.6 0.0 0.9 3 Unit Sites 0.0 0.0 0.0 0.0 3 Unit Sites 0.0 0.0 0.0 0.0 BWR 1.9 1.0 2.4 1.7 BWR 1.0 0.0 0.0 0.3 PWR 1.9 0.6 0.0 0.9 PWR 1.9 0.6 0.0 0.9 Total All Regions 1.9 0.7 0.9 1.2 Total All Regions 1.5 0.4 0.0 0.7 71151 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 258 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 552 374 22.0 1.5 672 368 21.6 1.8 464 371 21.8 1.3 Region 2 820 455 25.3 1.8 854 454 25.2 1.9 778 458 25.4 1.7 Region 3 672 343 21.4 2.0 727 357 22.3 2.0 514 344 21.5 1.5 Region 4 560 270 20.8 2.1 528 272 20.9 1.9 459 284 21.8 1.6 1 Unit Sites 556 255 15.9 2.2 665 255 15.9 2.6 442 258 16.1 1.7 2 Unit Sites 1749 958 24.6 1.8 1736 964 24.7 1.8 1498 969 24.8 1.5 3 Unit Sites 299 229 28.6 1.3 380 232 29.0 1.6 275 230 28.8 1.2 BWR 1036 512 21.3 2.0 1035 514 21.4 2.0 833 516 21.5 1.6 PWR 1567 930 24.5 1.7 1746 937 24.7 1.9 1381 941 24.8 1.5 Total All 2603 1442 23.6 1.8 2781 1451 23.8 1.9 2214 1457 23.9 1.5 Regions 9/11/2018 2:22:01 PM Page 259 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 1688 1113 22.7 1.5 Region 2 2452 1367 26.3 1.8 Region 3 1912 1044 22.7 1.8 Region 4 1546 826 22.3 1.9 1 Unit Sites 1663 768 16.7 2.2 2 Unit Sites 4982 2891 25.1 1.7 3 Unit Sites 953 691 31.4 1.4 BWR 2904 1542 21.7 1.9 PWR 4694 2808 24.8 1.7 Total All 7598 4350 23.8 1.7 Regions 9/11/2018 2:22:01 PM Page 260 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Revision History Date of Revision Description of Revision 02/26/2015 IP 71152, "Problem Identification and Resolution," has been revised to relocate Operator Work-around inspection requirement to IP 71111.15; enhanced alignment of 71152-01 INSPECTION OBJECTIVES with IMC 0308 Att. 2 Fig. 37; enhanced IP organization; aligned language to updated IMC 0310 nomenclature; enhanced communications with the NRC Vendor Inspection Center of Expertise for vendor or supplier deficiencies; updated references to external IP's and IMC's and eliminated reference to retired RIS 2005-20; eliminated use of undefined terminology; and enhanced integration of OpE Smart Samples into inspection sample population. This revision addresses, or partially addressed, FBF's 71152-1787, -1836, -1946, -1964, -2012, -2013, and -2022.

Summary of PIM Findings 9/11/2018 2:22:01 PM Page 261 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 2015 2016 2017 3 Year Total AV N/A 0 0 2 2 AV Preliminary White 0 0 1 1 AV White 0 1 0 1 FIN Green 8 12 10 30 NCV Green 68 60 64 192 NCV N/A 0 2 0 2 NCVIV Green 4 1 0 5 NCVIV N/A 3 3 2 8 NOV Green 0 0 1 1 NOV N/A 1 1 0 2 NOV White 0 0 3 3 VIO Green 2 2 0 4 VIO N/A 3 1 0 4 VIO White 1 1 0 2 Total 90 84 83 257 9/11/2018 2:22:01 PM Page 262 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 61 3 25 26 0 42 7 28 9 3 1 1 11 Region 2 51 0 12 26 0 42 6 32 4 0 0 0 0 Region 3 79 3 20 31 0 51 15 53 3 1 1 0 2 Region 4 64 2 8 37 1 37 19 38 4 1 0 1 0 1 Unit Sites 109 7 33 50 1 73 24 58 12 0 1 0 8 2 Unit Sites 136 1 30 65 0 92 21 87 8 5 1 2 5 3 Unit Sites 10 0 2 5 0 7 2 6 0 0 0 0 0 BWR 108 5 32 53 0 65 22 58 12 1 1 0 8 PWR 147 3 33 67 1 107 25 93 8 4 1 2 5 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 255 8 65 120 1 172 47 151 20 5 2 2 13 Percentage of All 100% 3% 25% 47% 0% 67% 18% 59% 8% 2% 1% 1% 5%

Findings 9/11/2018 2:22:01 PM Page 263 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 3.1 3.4 3.0 3.2 Region 1 1.9 2.8 1.4 2.1 Region 2 3.4 3.8 3.3 3.5 Region 2 2.6 3.2 2.0 2.6 Region 3 6.6 4.5 6.1 5.7 Region 3 3.2 2.7 2.6 2.8 Region 4 6.3 5.5 5.9 5.9 Region 4 3.1 3.0 3.2 3.1 1 Unit Sites 5.1 4.8 4.9 4.9 1 Unit Sites 2.8 3.5 2.6 3.0 2 Unit Sites 4.4 3.8 4.4 4.2 2 Unit Sites 2.6 2.6 2.0 2.4 3 Unit Sites 2.7 2.8 1.4 2.3 3 Unit Sites 2.1 2.8 0.7 1.9 BWR 4.7 4.8 4.6 4.7 BWR 2.3 3.2 2.7 2.8 PWR 4.4 3.7 4.2 4.1 PWR 2.8 2.7 1.8 2.4 Total All Regions 4.5 4.1 4.3 4.3 Total All Regions 2.6 2.9 2.2 2.6 71152 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 264 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 6370 138 8.1 46.2 7383 137 8.1 53.9 6564 144 8.5 45.6 Region 2 5736 132 7.3 43.5 5322 119 6.6 44.7 5449 136 7.6 40.1 Region 3 4388 104 6.5 42.2 4905 107 6.7 45.8 4632 104 6.5 44.5 Region 4 3518 86 6.6 40.9 3654 94 7.2 38.9 3702 88 6.8 42.1 1 Unit Sites 4607 114 7.1 40.4 4696 110 6.9 42.7 4684 119 7.4 39.4 2 Unit Sites 11801 287 7.4 41.1 12923 290 7.4 44.6 12322 296 7.6 41.6 3 Unit Sites 3604 59 7.4 61.1 3644 57 7.1 63.9 3342 57 7.1 58.6 BWR 7684 178 7.4 43.2 8403 182 7.6 46.2 7817 187 7.8 41.8 PWR 12328 282 7.4 43.7 12860 275 7.2 46.8 12531 285 7.5 44.0 Total All 20012 460 7.5 43.5 21263 457 7.5 46.5 20347 472 7.7 43.1 Regions 9/11/2018 2:22:01 PM Page 265 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 20316 419 8.6 48.5 Region 2 16507 387 7.4 42.7 Region 3 13925 315 6.8 44.2 Region 4 10874 268 7.2 40.6 1 Unit Sites 13987 343 7.5 40.8 2 Unit Sites 37045 873 7.6 42.4 3 Unit Sites 10590 173 7.9 61.2 BWR 23904 547 7.7 43.7 PWR 37718 842 7.5 44.8 Total All 61622 1389 7.6 44.4 Regions 9/11/2018 2:22:01 PM Page 266 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Revision History Date of Revision Description of Revision 02/26/2015 For the biennial portion of IP 71152. Separate sample sizes/hours, etc.

Summary of PIM Findings 2015 2016 2017 3 Year Total AV N/A 0 0 1 1 FIN Green 5 2 3 10 FIN N/A 4 0 0 4 NCV Green 41 21 20 82 NCVIV Green 0 1 1 2 NCVIV N/A 3 0 3 6 NOV N/A 1 0 0 1 NOVIV Green 0 0 1 1 VIO Green 3 0 0 3 VIO N/A 0 1 0 1 Total 57 25 29 111 9/11/2018 2:22:01 PM Page 267 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 32 0 16 9 0 27 5 14 4 2 0 0 1 Region 2 17 0 5 2 0 17 0 9 0 1 0 0 0 Region 3 18 0 10 4 0 17 1 13 3 0 0 0 1 Region 4 42 0 14 21 0 38 5 30 2 0 1 0 2 1 Unit Sites 55 0 26 17 0 51 6 33 4 3 1 0 1 2 Unit Sites 53 0 19 18 0 47 5 32 5 0 0 0 3 3 Unit Sites 1 0 0 1 0 1 0 1 0 0 0 0 0 BWR 59 0 27 19 0 54 8 35 6 2 1 0 2 PWR 50 0 18 17 0 45 3 31 3 1 0 0 2 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 109 0 45 36 0 99 11 66 9 3 1 0 4 Percentage of All 100% 0% 41% 33% 0% 91% 10% 61% 8% 3% 1% 0% 4%

Findings 9/11/2018 2:22:01 PM Page 268 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 4.5 2.5 1.9 3.1 Region 1 3.9 1.7 0.8 2.1 Region 2 1.6 2.8 1.8 2.1 Region 2 1.2 2.4 1.2 1.6 Region 3 2.9 2.9 2.8 2.8 Region 3 2.5 2.4 2.7 2.5 Region 4 3.8 2.6 3.4 3.4 Region 4 3.8 1.1 3.3 2.7 1 Unit Sites 4.5 2.3 2.8 3.3 1 Unit Sites 4.3 1.8 2.3 2.7 2 Unit Sites 2.7 3.0 2.4 2.7 2 Unit Sites 2.0 2.0 1.6 1.9 3 Unit Sites 0.0 1.8 0.0 0.9 3 Unit Sites 0.0 1.8 0.0 0.9 BWR 4.1 2.7 2.8 3.3 BWR 3.7 2.3 2.0 2.7 PWR 2.7 2.7 2.2 2.6 PWR 1.9 1.8 1.7 1.8 Total All Regions 3.4 2.7 2.6 2.9 Total All Regions 2.7 1.9 1.8 2.2 71152B Hours & Samples Reported 9/11/2018 2:22:01 PM Page 269 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 2040 15 1.7 136.0 1733 15 1.9 115.6 2464 18 1.8 136.9 Region 2 2458 18 1.8 136.6 2079 16 1.8 129.9 2410 18 1.8 133.9 Region 3 2021 10 1.0 202.1 1668 7 0.9 238.3 2254 10 1.0 225.4 Region 4 1565 11 1.6 142.3 1777 12 1.5 148.1 1538 12 1.7 128.1 1 Unit Sites 1119 7 1.2 159.8 2356 16 1.6 147.2 1717 9 1.1 190.8 2 Unit Sites 6248 41 1.6 152.4 3791 27 1.6 140.4 6168 43 1.8 143.4 3 Unit Sites 717 6 1.5 119.5 1110 7 1.4 158.6 780 6 1.5 130.0 BWR 3798 24 1.5 158.2 1760 12 1.5 146.6 4542 30 1.8 151.4 PWR 4286 30 1.7 142.9 5497 38 1.7 144.7 4123 28 1.6 147.3 Total All 8084 54 1.6 149.7 7257 50 1.7 145.1 8665 58 1.7 149.4 Regions 9/11/2018 2:22:01 PM Page 270 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 6237 48 1.9 129.9 Region 2 6947 52 1.9 133.6 Region 3 5942 27 1.0 220.1 Region 4 4879 35 1.8 139.4 1 Unit Sites 5191 32 1.5 162.2 2 Unit Sites 16207 111 1.7 146.0 3 Unit Sites 2608 19 1.7 137.2 BWR 10099 66 1.7 153.0 PWR 13907 96 1.7 144.9 Total All 24006 162 1.7 148.2 Regions 9/11/2018 2:22:01 PM Page 271 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Revision History Date of Revision Description of Revision 12/17/2015 IP 71153, "Follow-up of Events and Notices of Enforcement Discretion," has been revised to change outdated references.

Summary of PIM Findings 2015 2016 2017 3 Year Total AV N/A 0 0 1 1 AV White 0 1 0 1 EDG N/A 0 0 1 1 FIN Green 15 19 12 46 FIN N/A 0 1 0 1 FIN White 0 1 0 1 NCV Green 49 58 63 170 NCVIV Green 1 1 1 3 NCVIV N/A 10 5 3 18 NOV N/A 1 4 2 7 NOV White 0 0 1 1 NOVIV N/A 0 0 1 1 VIO White 2 1 0 3 Total 78 91 85 254 9/11/2018 2:22:01 PM Page 272 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 PIM Findings Breakdown All > Green PIR HP SCWE Inspector Initiating Mitigating Barrier Emergency Occupational Public Security Findings or Identified Events Systems Integrity Preparedness Radiation Radiation

> SL-IV Safety Safety Region 1 78 0 9 50 0 34 32 23 15 1 1 1 0 Region 2 69 1 11 35 1 37 20 34 4 0 0 0 0 Region 3 51 3 10 26 0 15 17 23 7 0 0 0 1 Region 4 53 2 4 29 0 22 17 27 6 0 0 0 0 1 Unit Sites 112 2 14 64 0 40 38 45 19 0 1 0 0 2 Unit Sites 121 4 16 66 1 61 44 50 12 1 0 1 1 3 Unit Sites 18 0 4 10 0 7 4 12 1 0 0 0 0 BWR 126 3 16 73 0 47 43 45 24 1 1 1 0 PWR 125 3 18 67 1 61 43 62 8 0 0 0 1 Findings 0 0 0 0 0 0 0 0 0 0 0 0 0 Associated SIT/AIT Total All Regions 251 6 34 140 1 108 86 107 32 1 1 1 1 Percentage of All 100% 2% 14% 56% 0% 43% 34% 43% 13% 0% 0% 0% 0%

Findings 9/11/2018 2:22:01 PM Page 273 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Findings per 1000 Inspection Inspector Identified Findings per 1000 Inspection Hours Hours Findings / Findings / Findings / 3 Year Findings / Findings / Findings / 3 Year 1000 hrs 1000 hrs 1000 hrs Findings 1000 hrs 1000 hrs 1000 hrs Findings (2015) (2016) (2017) /1000 hrs (2015) (2016) (2017) /1000 hrs Region 1 20.2 20.0 9.4 14.7 Region 1 12.3 6.8 5.2 7.9 Region 2 11.5 21.3 22.3 17.6 Region 2 6.8 12.2 6.3 8.3 Region 3 19.7 21.5 18.3 19.8 Region 3 5.0 5.5 3.8 4.8 Region 4 20.1 15.3 26.8 20.3 Region 4 12.3 8.2 7.5 9.4 1 Unit Sites 19.2 19.5 12.9 16.1 1 Unit Sites 7.7 5.5 5.9 6.3 2 Unit Sites 17.1 18.9 19.4 18.3 2 Unit Sites 9.8 9.3 4.7 8.3 3 Unit Sites 11.0 29.6 34.3 20.6 3 Unit Sites 7.6 17.1 10.6 11.0 BWR 19.9 21.3 14.1 17.3 BWR 8.1 9.5 5.5 7.6 PWR 15.3 18.7 19.8 17.6 PWR 9.4 7.3 5.8 7.8 Total All Regions 17.0 19.8 15.8 17.5 Total All Regions 8.9 8.2 5.6 7.7 71153 Hours & Samples Reported 9/11/2018 2:22:01 PM Page 274 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015 Calendar Year 2016 Calendar Year 2017 Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Reported Reported Average Hrs/Sample Hours Samples Normalized Hours Samples Normalized Hours Samples Normalized Samples Samples Samples Region 1 972 133 7.8 7.3 1329 194 12.1 6.9 970 111 6.5 8.7 Region 2 1465 98 5.4 14.9 981 112 6.2 8.8 789 119 6.6 6.6 Region 3 800 122 7.6 6.6 733 125 7.8 5.9 779 115 7.2 6.8 Region 4 813 76 5.8 10.7 852 79 6.1 10.8 665 61 4.7 10.9 1 Unit Sites 747 91 5.7 8.2 1030 127 8.5 8.1 1076 102 6.4 10.5 2 Unit Sites 2552 271 6.9 9.4 2067 307 7.9 6.7 1763 260 6.7 6.8 3 Unit Sites 751 67 8.4 11.2 798 76 9.5 10.5 364 44 5.5 8.3 BWR 1608 206 8.6 7.8 1574 262 10.9 6.0 1828 214 8.9 8.5 PWR 2442 223 5.9 10.9 2321 248 6.7 9.4 1375 192 5.1 7.2 Total All 4049 429 7.0 9.4 3895 510 8.5 7.6 3203 406 6.7 7.9 Regions 9/11/2018 2:22:01 PM Page 275 of 276

U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported Average Hrs/Sample Hours Samples Normalized Samples Region 1 3271 438 9.1 7.5 Region 2 3235 329 6.3 9.8 Region 3 2312 362 7.9 6.4 Region 4 2330 216 5.8 10.8 1 Unit Sites 2853 320 7.1 8.9 2 Unit Sites 6382 838 7.3 7.6 3 Unit Sites 1913 187 8.5 10.2 BWR 5010 682 9.6 7.3 PWR 6137 663 5.9 9.3 Total All 11147 1345 7.4 8.3 Regions 9/11/2018 2:22:01 PM Page 276 of 276