| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
| author name = Taylor N H
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Diya F
| addressee name = Diya F
Line 9: Line 9:
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = Taylor N H
| contact person = Taylor N
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| document type = Inspection Plan, Inspection Report, Letter
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000483/2016005]]
See also: [[see also::IR 05000483/2016005]]


=Text=
=Text=

Revision as of 23:14, 19 June 2019

Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005)
ML16237A033
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Diya F
Union Electric Co
Taylor N
References
IR 2016005
Download: ML16237A033 (6)


See also: IR 05000483/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E LAMAR BLVD

ARLINGTON, TX 76011

-4511 August 31, 2016

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

Dear Mr. Diya: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)

completed its mid-cycle performance review of Callaway Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June

30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Callaway Plant

operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at

Callaway Plant

during the most recent quarter was within the Licensee Response Column of the

NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the

NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the second half

of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non

-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

," and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

F. Diya - 2 - will confirm through inspections the full implementation of the orders mentioned above by performing

Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Please contact

me at 817-200-1141 with any questions you have regarding this letter.

Sincerely, /RA/ Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects Docket No. 50

-483 License No. NPF

-30 Enclosure:

Callaway Plant Inspection/Activity Plan

Page 1 of 2

08/30/2016

09:32:44 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteCallawayInspection / Activity Plan

07/01/2016

-06/30/2018BASELINE-PLANT MODS

1 1 IP A dverse Weather (Site/Imminent)7111101-Imminent

01/01/2016

12/31/2016

EB1-07T-CWY HEAT SINK PERFORMANCE

1 1 IP Heat Sink Performance7111107T 09/26/2016

09/30/2016

RS 24-RADIATION SAFETY

3 1 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016

1 IP Occupational Dose Assessment71124.0411/07/201611/11/2016

EP-1-EP PERFORMANCE INDICATORS

1 1 IP Drill/Exercise Performance71151-EP0111/14/201611/18/2016

1 IP ERO Readiness71151-EP0211/14/201611/18/2016

1 IP A lert & Notification System Reliability71151-EP0311/14/201611/18/2016

EP-2-BIENNIAL EP PROGRAM INSPECTION

1 1 IP A lert and Notification System Testing711140211/14/201611/18/2016

1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016

1 IP Emergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016

1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016

ISFSI-ROUTINE INSPECTION (ONE WEEK IN MONTH)

1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1 02/01/2017

02/28/2017EXAM-INIT EXAM 4 1 INITIAL EXAM CALLAWAY (09/2017)

X02591 08/14/2017

08/18/2017

1 INITIAL EXAM CALLAWAY (09/2017)

X0259109/11/2017

09/15/2017

RS 5678-RS TEAM 5 1 IP Radiation Monitoring Instrumentation71124.05 02/27/2017

03/03/2017

1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/27/2017

03/03/2017

1 IP Radiological Environmental Monitoring Program71124.07 02/27/2017

03/03/2017

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/27/2017

03/03/2017

EP-2-BIENNIAL EP EXERCISE INSPECTION

4 1 IP Exercise Evaluation7111401 04/24/2017

04/28/2017

1 IP Emergency Action Level and Emergency Plan Changes7111404 04/24/2017

04/28/2017

EP-3-EP PERFORMANCE INDICATOR VERIFICATION

1 1 IP Drill/Exercise Performance71151-EP01

04/24/2017

04/28/2017

1 IP ERO Readiness71151-EP02

04/24/2017

04/28/2017

1 IP A lert & Notification System Reliability71151-EP03

04/24/2017

04/28/2017

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 2 of 2

08/30/2016

09:32:44 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteCallawayInspection / Activity Plan

07/01/2016

-06/30/2018

BRQ-BIENNIAL REQUAL INSPECTION

3 1 IP Licensed Operator Requalification Program7111111B 06/12/2017

06/16/2017

EB1-21M-CWY COMPONENT DESIGN BASES INSPECTION

6 1 IP Component Design Bases Inspection (Teams)7111121M 07/31/2017

09/01/2017

RS 12 PI-RADIATION SAFETY

3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017

10/20/2017

1 IP Occupational ALARA Planning and Controls71124.02 10/16/2017

10/20/2017

1 IP Occupational Exposure Control Effectiveness71151-OR01

10/16/2017

10/20/2017

1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01

10/16/2017

10/20/201771111.08-INSERVICE INSPECTION RFO22

1 1 IP Inservice Inspection Activities - PWR7111108P 10/16/2017

10/27/2017

EP-1-EP PROGRAM INSPECTION

1 1 IP A lert and Notification System Testing7111402 04/23/2018

04/27/2018

1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 04/23/2018

04/27/2018

1 IP Emergency Action Level and Emergency Plan Changes7111404 04/23/2018

04/27/2018

1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 04/23/2018

04/27/2018

1 IP Drill/Exercise Performance71151-EP01

04/23/2018

04/27/2018

1 IP ERO Readiness71151-EP02

04/23/2018

04/27/2018

1 IP A lert & Notification System Reliability71151-EP03

04/23/2018

04/27/2018

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

ML16237A03

3 SUNSI Review

By: ADAMS Yes No Publicly Available

Non-Publicly Available

Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV

SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/

/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/23/16

Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT

(REPORT 05000483/2016005)

DISTRIBUTION

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Dawn.Yancey@nrc.gov

) Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov