Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LRO-0056 + (Steam Generator Tube Inspection Report for Refueling Outage 23)
- ML23095A129 + (Steam Generator Tube Inspection Report for Refueling Outage 23)
- ML23095A128 + (Steam Generator Tube Inspection Report for Refueling Outage 23)
- EPID:L-2023-LRO-0034 + (Steam Generator Tube Inspection Report for Refueling Outage 23)
- NL-07-083, Steam Generator Tube Inspection Report for Spring 2007 Refueling Outage + (Steam Generator Tube Inspection Report for Spring 2007 Refueling Outage)
- ML020990363 + (Steam Generator Tube Inspection Report for Surry Power Station Unit 2)
- ML081710334 + (Steam Generator Tube Inspection Report for the Twelfth Refueling Outage)
- CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements + (Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements)
- CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements + (Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements)
- ML040020318 + (Steam Generator Tube Inspection Report, 1 End of Core (EOC) 14)
- ML080510694 + (Steam Generator Tube Inspection Report, Response to Request for Additional Information)
- ML14322A149 + (Steam Generator Tube Inspection Report, End of Cycle 37 Refueling Outage, May 2014)
- ML102980089 + (Steam Generator Tube Inspection Report- Twentieth Refueling Outage (1 R20))
- LR-N18-0054, Steam Generator Tube Inspection Report: Twenty-fifth Refueling Outage (1R25) + (Steam Generator Tube Inspection Report: Twenty-fifth Refueling Outage (1R25))
- ML24324A002 + (Steam Generator Tube Inspection Reports for the Unit 1 Fall 2022 and the Unit 2 Spring 2023 Refueling Outages)
- ML23251A162 + (Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements)
- ML043440065 + (Steam Generator Tube Inspection Reports for the Spring 2004 Outage)
- ML22034A899 + (Steam Generator Tube Inspection Reports in Support of TSTF-577)
- RIS 2009-04, Steam Generator Tube Inspection Requirements + (Steam Generator Tube Inspection Requirements)
- ML040750297 + (Steam Generator Tube Inspection Results)
- ML052380352 + (Steam Generator Tube Inspection Results for the 2003 Outage)
- BW100011, Steam Generator Tube Inspection for Refueling Outage 14 + (Steam Generator Tube Inspection for Refueling Outage 14)
- ML093140728 + (Steam Generator Tube Inspections)
- ML073380143 + (Steam Generator Tube Inspections)
- ML030840642 + (Steam Generator Tube Inspections Response to Request for Additional Information)
- ML17325A125 + (Steam Generator Tube Integrity - Apr 1987:Assessment of Next Operating Interval Length. Related Info Encl,Including Description of Steam Generator Manway Cover Closure Repairs for Mar-Apr 1987 & Westinghouse Nuclear Safety Check List)
- ML021210048 + (Steam Generator Tube Integrity Assessment 2001 Refueling Outage)
- ML041100667 + (Steam Generator Tube Integrity Assessment from the 2003 Refueling Outage)
- ML20148D831 + (Steam Generator Tube Integrity Prog,Monthly Rept for Aug 1978.Activity Included Production of Chemically Defected Tubes for stress-corrosion Cracking,Burst & Collapse Tests, Fatigue & Nondestructive Tests & Surry Steam Generator Bids)
- ML20079Q821 + (Steam Generator Tube Integrity Program Leak Rate TESTS- Progress Report)
- ML19242D177 + (Steam Generator Tube Integrity Program, Monthly Progress Rept June-Jul 1979)
- ML19225C612 + (Steam Generator Tube Integrity Program, Interim Rept,May 1979)
- ML19289E224 + (Steam Generator Tube Integrity Program, Jan-Feb 1979)
- ML19281B715 + (Steam Generator Tube Integrity Program, Progress Rept for Mar 1979)
- ML20148D069 + (Steam Generator Tube Integrity Program, Monthly Progress Rept for Sept 1978.Physical Testing on Standby Awaiting Phase 2 Specimens)
- ML19276F881 + (Steam Generator Tube Integrity Program,Annual Progress Rept,1977)
- ML19209D249 + (Steam Generator Tube Integrity Program,Phase 1 Rept)
- ML20049J031 + (Steam Generator Tube Integrity Program. Quarterly Rept, Jan-Mar 1977)
- ML20203C844 + (Steam Generator Tube Integrity Program.Annual Report,October 1996 -September 1997)
- ML20216E360 + (Steam Generator Tube Integrity Program.Annual Report,August 1995 - September 1996)
- ML20151W246 + (Steam Generator Tube Integrity Program.Phase II Final Report)
- ML20138K256 + (Steam Generator Tube Integrity Program.Semiannual Report, August 1995 - March 1996)
- ML20206A222 + (Steam Generator Tube Integrity Program.Semiannual Report, October 1997 - March 1998)
- ML20237E268 + (Steam Generator Tube Integrity Program.Semiannual Report, October 1996 - March 1997)
- ML20056A450 + (Steam Generator Tube Integrity Program/Steam Generator Group Project.Final Project Summary Report)
- ML052840138 + (Steam Generator Tube Kinetic Expansion Inspection and Repair Criteria)
- ML041350318 + (Steam Generator Tube Leak)
- 05000261/FIN-2014002-02 + (Steam Generator Tube Leak Resulting from Foreign Material)
- ML19316A129 + (Steam Generator Tube Leak Status Rept)
- ML15119A103 + (Steam Generator Tube Metallurgical Examination Results)