ML23251A162
| ML23251A162 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 09/29/2023 |
| From: | Joel Wiebe Plant Licensing Branch III |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| Wiebe J | |
| References | |
| EPID L-2023-LRO-0035 | |
| Download: ML23251A162 (1) | |
Text
September 29, 2023 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NOS. 1 AND 2 - STEAM GENERATOR TUBE INSPECTION REPORTS TO REFLECT TSTF-577 REPORTING REQUIREMENTS (EPID L-2023-LRO-0035)
Dear Mr. Rhoades:
By letter dated April 6,2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23096A144), Constellation Energy Generation, LLC (Constellation) provided the steam generator tube inspection report to reflect TSTF [Technical Specification Task Force]-577 Revised Frequencies for Steam Generator Tube Inspections reporting requirements as specified by Technical Specifications 5.6.9 Steam Generator (SG) Tube Inspection Report, for Byron Station, Unit Nos. 1 and 2. By letter dated June 1, 2023 (ML23152A061), Constellation provided the report with better quality, since portions of the original submitted report were not readable.
The NRC staff has reviewed the report and has concluded that the report meets the requirements of Technical Specification 5.6.9.
If you have any questions, please contact me at 301-415-6606 or via e-mail at Joel.Wiebe@nrc.gov Sincerely,
/RA/
Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455 cc: Listserv
ML23251A162 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DNRL/NCSG/BC NAME JWiebe SRohrer (SLent for)
SBloom DATE 9/8/23 9/11/23 7/11/23 OFFICE NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JWhited JWiebe DATE 9/28/23 9/29/23