Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Response to Question Regarding GDC-5 Guidance for Dual Unit Shutdown". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20301A168  + (Response to Public Comments to DG-1372 for Revision 4 of RG 1.136, Design Limits, Loading Combinations, Materials, Construction and Testing of Concrete Containments)
  • ML21244A455  + (Response to Public Comments to DG-1381 for RG 1.244 Control of Heavy Loads at Nuclear Facilities)
  • ML22172A164  + (Response to Public Follow-up Question Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 21, 2022)
  • ML20052D203  + (Response to Public Utils Board of Brownsville,Tx 820419 Answers to ASLB 820413 Questions.Certificate of Svc Encl)
  • ML19345D872  + (Response to Public Utils Board of Brownsville 801112 Comments on Proposed License Conditions & Statement Pursuant to ASLB 801024 Requests at Prehearing Conference. Certificate of Svc Encl)
  • ML19323A171  + (Response to Public Utils Board of City of Brownsville,Tx 800331 Motion to File Re Roundtree Affidavit as Amicus Curiae.Disclosure of Documents Should Not Affect Potential for Settlement.Certificate of Svc Encl)
  • ML19309E422  + (Response to Public Utils Board of City of Brownsville,Tx 800331 Motion to File Roundtree Affidavit.Requests to File counter-affidavit,re Status of Settlement,If Roundtree Affidavit Is Accepted by Aslab.Certificate of Svc Encl)
  • ML21145A102  + (Response to Quad Cities Force-On-Force Hardship Letter - 052521)
  • ML021020151  + (Response to Quality Assurance Program Description, Reduction in Commitment)
  • ML101180473  + (Response to Query on MPS3 Tube Inspection Results)
  • ML11250A172  + (Response to Question 1 of the Referenced RAI)
  • ML102100213  + (Response to Question 12)
  • ML102100215  + (Response to Question 13)
  • ML102100217  + (Response to Question 14)
  • ML19260E913  + (Response to Question 14 of Ucs Third Set of Interrogatories Re TMI-1 Restart Safety Evaluation.Nrc Will Require Licensee Commitment to Substantially Improve Operator Ability to Detect Inadequate Core Cooling)
  • ML102100219  + (Response to Question 19)
  • ML11214A091  + (Response to Question 2 of the Referenced RAI)
  • ML102100231  + (Response to Question 20c)
  • ML102100232  + (Response to Question 22)
  • ML102100235  + (Response to Question 23)
  • ML20148H085  + (Response to Question 40 Re Commission Interpretation of Ban on Importing U from South Africa to Extend Beyond U Oxide to Mfg Forms Such as UF6)
  • ML102100209  + (Response to Question 5.b)
  • ML102100210  + (Response to Question 6)
  • LR-N12-0380, Response to Question No. 4 and Follow-on Questions to NRC Request for Information Received on Security Plan Revision 15  + (Response to Question No. 4 and Follow-on Questions to NRC Request for Information Received on Security Plan Revision 15)
  • ML20069H543  + (Response to Question Posed at 830216 Special Prehearing Conference Re Health,Safety & Environ Impacts of Transshipment of Spent Fuel from Surry to North Anna.Environ Impacts Beyond ASLB Jurisdiction.Certificate of Svc Encl)
  • ML053200432  + (Response to Question Regarding the Use of Thermo-Lag Insulation at the Oyster Creek Nuclear Generating Station)
  • NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers  + (Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers)
  • ML20040D892  + (Response to Question on Effect of Spacer Grid Design on DNBR Prediction,Waterford Steam Electric Station,Unit 3)
  • ML21292A302  + (Response to Question on License Amendment Request to Revise Reactor Core Safety Limit)
  • ML25023A109  + (Response to Questions 1 and 2 from Letter Dated December 6, 2024)
  • ML110950059  + (Response to Questions 23.1, 23.2, and 23.3 of the Referenced RAI)
  • ML100640343  + (Response to Questions 28 and 30 of Request for Additional Information Regarding a Spent Fuel Pool Criticality License Amendment Request)
  • ML20245C325  + (Response to Questions 362.1,362.2 & 362.3 of NRC Ltr)
  • ML18219D889  + (Response to Questions Completing Facilitys Commitment to Stated Reg. Guides for Additional Information on Quality Assurance Program for Operations)
  • ML053070546  + (Response to Questions Dated October 26, 2005 Concerning Decommissioning Plan for the Ward Center for Nuclear Studies at Cornell University, Triga Reactor)
  • ML052770242  + (Response to Questions Dated September 21, 2005 Concerning Decommissioning Plan for the Ward Center for Nuclear Studies at Cornell University, Triga Reactor)
  • ML18207A860  + (Response to Questions Pertaining to Licensed Operator)
  • RA-18-066, Response to Questions Pertaining to Licensed Operator  + (Response to Questions Pertaining to Licensed Operator)
  • ML18192A165  + (Response to Questions Pertaining to Licensed Operator (RA-18-066))
  • ML20198L002  + (Response to Questions Posed by Aslab Re Viability of Appeal from 860429 Order Rejecting Atty General Sole Contention from Proceeding.Aslb Decision Rejecting Atty General Contention Warranted.Certificate of Svc Encl)
  • ML20138M634  + (Response to Questions Posed by Commission 851205 Order Re Qa/Qc Contention & Deposition of Keppler)
  • ML20138M641  + (Response to Questions Posed by Commission 851205 Order Re Qa/Qc Contention & Deposition of Keppler)
  • ML20039E606  + (Response to Questions Posed in .Commission Intends to Support Federal & State Initiatives to Expedite TMI-2 Cleanup.Discusses NRC Positions on Technical & Procedural Questions Re TMI-1 Restart)
  • ML16131A653  + (Response to Questions Raised During NRC Audit of the Response to Request for Additional Information Regarding Post Extended Power Uprate Steam Dryer Inspection Results)
  • NL-15-071, Response to Questions Raised at April 30, 2015 Government to Government Meeting Regarding Natural Gas Pipelines Near Indian Point Entergy Center  + (Response to Questions Raised at April 30, 2015 Government to Government Meeting Regarding Natural Gas Pipelines Near Indian Point Entergy Center)
  • ML19289C062  + (Response to Questions Raised by from B Scholl Re the Proliferation of Nuc Pwr,The Increase in Radioactive Waste & the Necessity of Pwr as a Source of Electricity for Il)
  • ML061870169  + (Response to Questions Raised in a D. Lochbaum Letter of May 15, 2006)
  • ML20079N093  + (Response to Questions Re Beaver Valley Unit 1 Impingement, Entrainment Monitoring rept,890131 Observation of Gizzard Shad Discharge of BVPS,1983 Annual Environment Rept Nonradiological)
  • ML20085A474  + (Response to Questions Re Effect of double-ended Rupture of Up to Three Tubes During LOCA on Capability to Reflood & Cool Core Per 10CFR50,App K Requirements)
  • ULNRC-05482, Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water  + (Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water)