Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000445/FIN-2015008-01 + (Failure to Evaluate the Lack of Missile Protection on the Turbine Driven Auxiliary Feedwater Pumps Steam Exhaust Piping)
- 05000298/FIN-2015007-04 + (Failure to Evaluate the Lack of Missile Protection on the Emergency Diesel Generator 1 and 2 Fuel Oil Storage Tank Vents)
- 05000461/FIN-2015002-05 + (Failure to Evaluate the Operational Impact of the TDRFP Lockout Switch Position)
- 05000280/FIN-2014007-02 + (Failure to Evaluate the Range of Conditions that Effect Canal Level Probes)
- 05000416/FIN-2012005-06 + (Failure to Evaluate the Risk Significances and Develop Action Plans to Address Equipment Identified During Extent of Condition Review for a Post Scram Root Cause Analysis)
- 05000254/FIN-2016008-02 + (Failure to Evaluate the Target Rock Relief Valve Accumulator per ASME Code)
- 05000269/FIN-2014007-01 + (Failure to Evaluate the Under Voltage Relays at the Worst Case Minimum Drop Out Bus Voltage)
- 05000275/FIN-2016007-05 + (Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power Circuit)
- 05000456/FIN-2014005-03 + (Failure to Evaluation Impact of PMP Event On Turbine Building Flooding and Associated Safety-Related SSCs)
- 05000315/FIN-2011003-01 + (Failure to Examine Reactor Coolant System Piping Following Application of Mechanical Stress Improvement)
- 05000445/FIN-2008003-02 + (Failure to Expeditiously Restore Fire Hose Stations in Containment to Service)
- 05000400/FIN-2011008-06 + (Failure to Extend the Design Life for Molded-Case Circuit Breakers)
- 05000261/FIN-2016008-01 + (Failure to Failure to Keep EOP FRP-H.1 in Conformance with Plant Specific Guidelines)
- 05000263/FIN-2015002-04 + (Failure to Fill the Reactor Cavity in Accordance with Refueling Preparation Procedure)
- 05000369/FIN-2010002-03 + (Failure to Flow Test Nuclear Service Water A Train Standby Nuclear Service Water Pond (SNSWP) Supply Header at Maximum Design Flow)
- 05000445/FIN-2014003-01 + (Failure to Follow 10 CFR 50.59 for a Change to the Spent Fuel Pool Configuration)
- 05000482/FIN-2011002-04 + (Failure to Follow 10 CFR 50.65 a(2) for Main Control Board Annunciator Power Supply Failures)
- 05000482/FIN-2012004-05 + (Failure to Follow ALARA Planning Procedures)
- 05000482/FIN-2011004-03 + (Failure to Follow ASME Code Case OMN-1 for Butterfly Valves)
- 05000498/FIN-2012003-01 + (Failure to Follow ASME Code Requirements)
- 05000298/FIN-2016001-01 + (Failure to Follow ASME Code Requirements when taking Corrective Actions for a Pump in the Required Action Range)
- 05000285/FIN-2013008-34 + (Failure to Follow ASME Code Requirements When Establishing New Pump Reference Values as Corrective Actions)
- 05000416/FIN-2018002-02 + (Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle)
- 05000413/FIN-2017004-03 + (Failure to Follow Administrative Procedures)
- 05000416/FIN-2013004-07 + (Failure to Follow Alarm Response Steps to Restore the TSE Following Maintenance)
- 05000341/FIN-2016001-08 + (Failure to Follow Apparent Cause Evaluation Procedure)
- 05000382/FIN-2011004-07 + (Failure to Follow Apparent Cause Evaluation Process Procedure)
- 05000461/FIN-2008002-01 + (Failure to Follow Approved Fire Protection Program Procedures Concerning Control of Transient Combustible Material)
- 05000285/FIN-2009004-04 + (Failure to Follow Auxiliary Building Crane Operating Instructions)
- 05000361/FIN-2012003-05 + (Failure to Follow Battery Testing Procedure for Battery Exceeding 85% Service Life)
- 05000354/FIN-2015004-01 + (Failure to Follow CAP Procedures to Ensure Functionality of the Main Control Room during a Station Blackout)
- 05000327/FIN-2008002-02 + (Failure to Follow Calibration Procedure (Section 1R22))
- 05000247/FIN-2008003-06 + (Failure to Follow Camera Controls Procedure Resulting in RFI Induced MBFP Runback and Subsequent Manual Reactor Trip)
- 05000397/FIN-2011008-01 + (Failure to Follow Clearance Order Instructions)
- 05000254/FIN-2013002-01 + (Failure to Follow Clearance Order Instructions)
- 05000254/FIN-2012002-01 + (Failure to Follow Clearance Order Instructions)
- 05000445/FIN-2018001-01 + (Failure to Follow Commercial Grade Dedication Process)
- 05000382/FIN-2009002-01 + (Failure to Follow Commitment Tracking Procedures)
- 05000313/FIN-2011003-01 + (Failure to Follow Compliance Work Order for Corrective Maintenance on Safety Related Equipment)
- 05000387/FIN-2010006-03 + (Failure to Follow Condition Report Process for Overdue Actions)
- 05000260/FIN-2016012-01 + (Failure to Follow Conduct of Operation Procedure)
- 05000529/FIN-2017003-03 + (Failure to Follow Conduct of Operations Procedure)
- 05000220/FIN-2013003-01 + (Failure to Follow Containment Isolation System Surveillance Procedure Resulting in Isolation of the Reactor Coolant Isolation Cooling System)
- 05000293/FIN-2011008-01 + (Failure to Follow Corrective Action Process for HPCI Diaphragm Degraded Condition)
- 05000482/FIN-2009005-06 + (Failure to Follow Corrective Action Procedure)
- 05000255/FIN-2013003-02 + (Failure to Follow Corrective Action Process for Service Water Leaks)
- 05000528/FIN-2011002-02 + (Failure to Follow Corrective Action Program Procedure)
- 05000528/FIN-2012002-01 + (Failure to Follow Corrective Action Program Procedure)
- 05000456/FIN-2012007-04 + (Failure to Follow Corrective Action Program Procedure)
- 05000397/FIN-2015001-03 + (Failure to Follow Corrective Action Program Procedures)
- 05000397/FIN-2013003-02 + (Failure to Follow Corrective Action Program Procedures)