  • 05000445/FIN-2015008-01  + (Failure to Evaluate the Lack of Missile Protection on the Turbine Driven Auxiliary Feedwater Pumps Steam Exhaust Piping)
  • 05000298/FIN-2015007-04  + (Failure to Evaluate the Lack of Missile Protection on the Emergency Diesel Generator 1 and 2 Fuel Oil Storage Tank Vents)
  • 05000461/FIN-2015002-05  + (Failure to Evaluate the Operational Impact of the TDRFP Lockout Switch Position)
  • 05000280/FIN-2014007-02  + (Failure to Evaluate the Range of Conditions that Effect Canal Level Probes)
  • 05000416/FIN-2012005-06  + (Failure to Evaluate the Risk Significances and Develop Action Plans to Address Equipment Identified During Extent of Condition Review for a Post Scram Root Cause Analysis)
  • 05000254/FIN-2016008-02  + (Failure to Evaluate the Target Rock Relief Valve Accumulator per ASME Code)
  • 05000269/FIN-2014007-01  + (Failure to Evaluate the Under Voltage Relays at the Worst Case Minimum Drop Out Bus Voltage)
  • 05000275/FIN-2016007-05  + (Failure to Evaluate the Voltage Effects of Limiting Design Basis Events on the 230 kV Offsite Power Circuit)
  • 05000456/FIN-2014005-03  + (Failure to Evaluation Impact of PMP Event On Turbine Building Flooding and Associated Safety-Related SSCs)
  • 05000315/FIN-2011003-01  + (Failure to Examine Reactor Coolant System Piping Following Application of Mechanical Stress Improvement)
  • 05000445/FIN-2008003-02  + (Failure to Expeditiously Restore Fire Hose Stations in Containment to Service)
  • 05000400/FIN-2011008-06  + (Failure to Extend the Design Life for Molded-Case Circuit Breakers)
  • 05000261/FIN-2016008-01  + (Failure to Failure to Keep EOP FRP-H.1 in Conformance with Plant Specific Guidelines)
  • 05000263/FIN-2015002-04  + (Failure to Fill the Reactor Cavity in Accordance with Refueling Preparation Procedure)
  • 05000369/FIN-2010002-03  + (Failure to Flow Test Nuclear Service Water A Train Standby Nuclear Service Water Pond (SNSWP) Supply Header at Maximum Design Flow)
  • 05000445/FIN-2014003-01  + (Failure to Follow 10 CFR 50.59 for a Change to the Spent Fuel Pool Configuration)
  • 05000482/FIN-2011002-04  + (Failure to Follow 10 CFR 50.65 a(2) for Main Control Board Annunciator Power Supply Failures)
  • 05000482/FIN-2012004-05  + (Failure to Follow ALARA Planning Procedures)
  • 05000482/FIN-2011004-03  + (Failure to Follow ASME Code Case OMN-1 for Butterfly Valves)
  • 05000498/FIN-2012003-01  + (Failure to Follow ASME Code Requirements)
  • 05000298/FIN-2016001-01  + (Failure to Follow ASME Code Requirements when taking Corrective Actions for a Pump in the Required Action Range)
  • 05000285/FIN-2013008-34  + (Failure to Follow ASME Code Requirements When Establishing New Pump Reference Values as Corrective Actions)
  • 05000416/FIN-2018002-02  + (Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle)
  • 05000413/FIN-2017004-03  + (Failure to Follow Administrative Procedures)
  • 05000416/FIN-2013004-07  + (Failure to Follow Alarm Response Steps to Restore the TSE Following Maintenance)